CTC Role in Bachelor Degree Attainment State Board for Community and Technical Colleges Michelle Andreas and Kathy Goebel May 9, 2012 Title Here Transfer targets and degrees awarded 2015 Target 19,000 16,183 13,529 13,973 Title Here Transfer students enrolled in Washington State bachelor programs Transfers to Public Institutions Transfers to Independent Institutions Transfers to University of Phoenix Transfers to Western Governors University Transfers to CTC Applied Bachelors Total Transfers/Transitions 2008-09 2009-10 10,319 10,563 3,223 2,885 1,983 2,990 512 565 103 100 16,140 17,615 2010-11 10,600* 2,323 2,154 1,646 204 17,492 *Estimate adding TESC/CWU/EWU winter and spring transfers Sources: SBCTC AYR 2007-08, 2008-09, 2009-10, 2010-11 (excludes Running Start), WGU Self Report, and college institutional research data sites Does not include students who transfer out-of-state Title Here Ways we are increasing transfer Revision of MRPs (Business, Nursing, Biology) due to curriculum changes at universities. Revision of Direct Transfer Agreement (DTA) – math and communication. Washington 45 which is a list of courses offered at CTCs and accepted as general education at all universities. Increased transparency and publication of courses needed at universities for majors. Title Here Bachelor degrees awarded 2018 Target 42,400 Community and technical colleges = 51 Private baccalaureate institutions = 7,700 Public baccalaureate institutions = 22, 278 Title Here High demand occupation areas in Washington State through 2018* Sales and Office Support (185,000 available jobs) STEM with the majority in computer and mathematical sciences and engineering (130,000 available jobs) Management (128,000 available jobs) Education (69,000 available jobs) Health (58,000 available jobs) *Identified in Georgetown University study Title Here Applied bachelor degrees RCW 28B.50.030 Focus on individuals who hold an associate of applied science degree (professional and technical degree). Maximize application of technical course credits toward the baccalaureate degree. Serve place-bound working adults and fill skill gap needs in high-demand occupations. Title Here Applied bachelor degree approval In 2010 SBCTC authority to approve community and technical college applied baccalaureate degree programs. In November 2010, the SBCTC and the HECB approved a process, selection criteria, and application materials. Beginning July 1, 2012, SBCTC will retain sole authority for bachelor degree approval. Title Here Current budget proviso - Bellevue Bellevue College is authorized to offer applied baccalaureate degrees in: • • • • Information technology Health care services and management Biotechnology Pre-professional preparation for medical fields. Title Here Current budget proviso - Seattle The Seattle community college district is authorized to offer applied baccalaureate degree programs in: • Business/ international business and technology management, • Interactive and artistic digital media, • Sustainability, • Building science technology • Allied and global health. Current budget proviso – both colleges Title Here Directed at high school graduates, transferoriented degree holders and professional and technical degree holders. Develop a two-year plan for offering these new degrees delivered to the legislature by June 30, 2012. Funding for these new degrees shall come through redistribution of its current per fulltime enrollment funding. Title Here Policy questions considered by WACTC What should be the specific expectation for the number of bachelor degree graduates produced by the CTC system? Should every college offer a bachelor degree? What should be the specific types of bachelor degree graduates produced by the CTC system? Applied or general? Should the system focus on specific program areas in demand or regions in need of bachelor graduates or both as a priority for CTCs offering bachelor degrees? TAB 3 Building a 21st Century Learning Infrastructure for the Community and Technical Colleges Presented to the State Board for Community and Technical Colleges May 9, 2012 Wayne Doty Capital Budget Director State Board for Community and Technical Colleges 360-704-4382 Outline Background SBCTC Direction, Mission & Strategic Plan The Last Ten Years An Uncertain Future Outcomes Timeline Building Condition Fund Sources and Uses 2011-13 Summary General Obligation Bonds Building Fee Local Funds Project Selection and Prioritization Identification of Need On-line Learning Scoring Prioritization Wireless Access Major Projects Completed 2013-15 Request Pipeline 2013-15 Request Future Budget Development Update Scoring System Competition for 2015-17 2 Background 3 Prior Planning Use technology, collaboration and innovation Build a 21st Century Learning Infrastructure Mobilize technology to increase student success http://www.sbctc.ctc.edu/docs/sbctc_system_direction_final.pdf http://www.sbctc.edu/docs/strategicplan/strategic_technology_plan.pdf http://www.sbctc.ctc.edu/docs/sbctc_mission_study-interactive-web.pdf 4 Infrastructure Changes in the Last 10 Years • Wired Communications Wireless • In Person Instruction On-line • Energy Use Less • Planned Obsolescence Recycle and Reuse • Unsustainable Practices LEED Standards • ADA Standards Universal Design • Inadequately Maintained Buildings Better 5 20th Century Classroom 6 21st Century Classroom 7 An Uncertain Future • Power Outlets Wireless Power • Rigid Materials Shape and Color Changing • Discrete Pipes Vascular Walls and Ceilings • LEED Standards Net Zero Buildings • 12% Online Instruction More We can not design for unknown programs to be taught in future learning environments constructed from products that are not in the market – but we do design flexible buildings that can be renovated to accommodate new learning environments and program needs. 8 Capital Budget Timeline 2010 July Aug 2011 Sep SBCTC request Oct Nov Dec OFM develops Governor’s budget Develop Criteria for 2013-15 Feb March April May June Develop Changes to Scoring System 2011 July Jan Legislature develops final 2011-13 budget 2012 Aug Sep Oct Nov Dec Jan Feb March April May June Implementation of 2011-13 budget SBCTC instructions Facility Condition Survey Colleges develop requests 2012 July SBCTC prep 2013 Aug Sep Oct Nov Dec Jan Feb March April May June Implementation of 2011-13 budget SBCTC request OFM develops Governor’s budget Legislature develops final 2013-15 budget 9 Fund Sources 10 SBCTC Capital Budget – Fund Summary New 2011‐13 Capital Funding including 2012 Supplemental $227.1 M 56% $69.5 M 17% $69.2 M 17% $25.5 M 6% $16.3 M 4% $407.7 M 100% General Obligation Bonds Building Fee (cash) Value of COPs backed with Building Fee Local Funds (through January 2012) Value of COPs backed with Local Funds Total New Capital New Debt Service (approximate) $16.7 M 73% $5.1 M 22% $1.2 M 5% $23.0 M 100% General Fund Building Fee Local Funds Total New Debt Service 11 General Obligation Bond Funds – Dollars 2,500 M 2,000 M 1,500 M State 1,000 M 500 M Higher Ed SBCTC 1975 1980 1985 1990 1995 2000 2005 2010 2015 12 General Obligation Bond Funds – Percentages 100% 90% 80% 70% 60% SBCTC / Higher Ed 50% 40% 30% Higher Ed / State 20% SBCTC / State 10% 0% 1975 1980 1985 1990 1995 2000 2005 2010 2015 13 Revenue Forecast for Estimating State Bond Capacity 14 Building Fee About 10% of the total tuition is placed in an account for construction, remodeling, and improvement community and technical college facilities. There was a beginning fund balance of $28 million. Colleges are expected to deposit another $79 million in 2011-13. The legislature has authorized about $106 million to be spent from the account. About $18 million is committed long term for debt service on COPs at four colleges. Another $22 million is used to fund maintenance and operation costs shifted from the Operating Budget. The balance was distributed for minor projects statewide based on student FTEs, facility square footage, age and condition. 15 Projected New State Capital Funding Use to determine capacity for selection of new projects in 2013-15 for 2015-17. 500 Total New Million $ 400 300 057 200 2013-15 new bond capacity based on Feb-12 Revenue Forecast, +3%/YR after that CTC portion of state capacity equal to last 3 biennial average 100 Net 060 Tuition Increase = AY12-13 +12%, +3%/YR after that 2007-09 2009-11 2011-13 2013-15 2015-17 2017-19 2019-21 2021-23 16 Local Funds Non-appropriated funds do not need legislative approval. They can be approved by the State Board for expenditure on a Capital purpose based on a “recommendation to approve” from the local board of trustees. Such a "recommendation to approve" should be explicit in the deliberations of the local board of trustees or may be made by college staff under an authority delegated by the local board for that project or category of capital expenditure. The Board has delegated certain authorities to our Executive Director, including the expenditure of local capital funds, up to $400,000 if it is not for the purpose of acquiring land. 17 Local Expenditure Authorities by Biennium Sum Authorized in Biennium $120 M Grand Total $100 M $80 M >$400,000 $60 M $40 M $20 M <=$400,000 Number Authorized in Biennium 2001-03 2003-05 2005-07 2007-09 2009-11 2011-13* 120 100 Grand Total 80 60 <=$400,000 40 >$400,000 20 0 2001-03 2003-05 Charts do not include debt service or pass through amounts. * 2011-13 is a projection based on authorities through January 2012. 2005-07 2007-09 Biennium 2009-11 2011-13* 18 Project Selection and Prioritization 19 Identification of Need Programmatic Need Minor Repairs by Severity Candidate for Renovation Space Deficit Yes No Candidate for Replacement Worse Condition Facility Condition Candidate for Additional Area 20 Online Learning Fall On-line FTEs 14% 12% 10% 8% 6% 4% 2% 0% 2000 2002 2004 2006 2008 2010 2012 21 Scoring Scoring criteria is tailored for each type of project and generally addresses: • • • • • • • • • • Focus on High Demand Programs Vocational spaces similar to workplace Address Campus Safety Increase Sustainability Age and condition of Existing Facilities Strategic and Master Plan Statewide Goals Health, safety, and code issues College Priority Reasonableness of cost 22 Guiding Principles Developed in 2010 WACTC Academy 1. Stay true to the project priorities already scored within categories. 2. Reprioritize the list selecting from each category of project in some proportional measure giving priority to categories e.g. Replacement, Renovation, Growth. 3. Projects previously scheduled for construction in 2009-11 should be the first priority. 4. Projects that have been designed should have priority over those that have not to minimize the impact of delay. 5. Look for ways to create capacity for a selection process during the 2013-15 biennium with design funds for new projects being part of the 2015-17 legislative request. 23 Outcomes 24 Measured Improvement Buildings in Adequate or Superior Condition 100% 90% 80% 70% 60% 50% 40% 30% Facility Condition Survey 146-175 = Superior 176-275 = Adequate 276-350 = Needs Improvement/Additional Maintenance 351-475 = Needs Improvement/Renovation 476-730 = Replace or Renovate 20% 10% 0% 2000 2010 2020 Survey Year 2030 25 Measured Improvement Student Accessible Facilities with Wireless Coverage 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 2000 2010 2020 Survey Year 2030 26 Major Projects Completed Completed Jan‐05 Feb‐05 Feb‐05 Jun‐05 Sep‐05 Sep‐05 Oct‐05 Dec‐05 Mar‐06 Jun‐06 Jun‐06 Sep‐06 Oct‐06 Dec‐06 Jan‐07 Jan‐07 Feb‐07 Feb‐07 Mar‐07 Mar‐07 Mar‐07 Jun‐07 Jun‐07 Jun‐07 Jul‐07 Jul‐07 Jul‐07 Jul‐07 Sep‐07 Nov‐07 Nov‐07 Dec‐07 Dec‐07 Dec‐07 Dec‐07 College: Project Highline: Student Union Clark College: Penguin Student Union Tacoma: Information Technology Building Green River: Computer Technology Center Columbia Basin College: WISE & T Bldg SPSCC General Education Complex Clark College: Clark Center at WSU Edmonds Community College: Mountlake Terrace Hall Spokane Community College: Science Building Seattle Central Replace Science & Math Seattle Central Broadway Edison Renovation Columbia Basin College: Health Science Center Everett Community College: Science and Art Green River Community College: Science Bates Technical College: LRC/Vocational Building Bellevue Community College: "D" Building Peninsula College: Replacement Science & Tech Tacoma Community College: Replace Science Building Bellingham Technical College: Welding/Auto Collision Pierce College Puyallup: Phase III Childcare/Second Entry Olympic College: Science and Technology Clover Park Technical College: Student Center Walla Walla Community College: Health Sciences Wenatchee Valley College: Anderson Hall Replacement Grays Harbor College: Replacement Instruct Bldg Renton Technical College: Portable Replacement Walla Walla Community College: Basic Skills/Computer Lab Tacoma Community College: Renovation Bldg 7 Pierce College Fort Steilacoom: Health Education Renov. Yakima Valley: Glen/Anthon Hall Replacement Grays Harbor College: Vocational Education Clover Park Technical College: Renovate Building 8 Edmonds Community College: Mukilteo Hall & Black Box Theater Seattle Central Community College: Rnv Visual Communications Shoreline Community College PUB Completed Dec‐07 Mar‐08 Mar‐08 Apr‐08 May‐08 Jun‐08 Jul‐08 Aug‐08 Dec‐08 Dec‐08 Jan‐09 Feb‐09 Mar‐09 Apr‐09 Apr‐09 May‐09 Jul‐09 Aug‐09 Oct‐09 Nov‐09 Feb‐10 Mar‐10 Apr‐10 Jun‐10 Jul‐10 Nov‐10 Jan‐11 Mar‐11 Mar‐11 Mar‐11 Apr‐11 Apr‐11 Jun‐11 Aug‐11 College: Project Spokane Falls: Business and Social Science Replacement Clark College: Central Gaiser Hall Renovation Lower Columbia College: Fine Arts Center Peninsula College: Library Renovation Pierce College Puyallup: Student Fitness Center Big Bend Community College: Fine Arts Addition & GTA Bus Stop Seattle South Community College: Repl Duwamish Building Yakima Valley: Raymond Hall Renovation Everett Community College: Undergraduate Education Center Bellevue Community College: Science and Technology Edmonds Community College: Renovate Brier Hall & Bookstore SPSCC Science Complex Centralia Community College: Science Replacement Clark College: East County Satellite Campus Pierce College Fort Steilacoom: Cascade Core Renov Phase I Columbia Basin College: Rnv. Business Education "B" Building Yakima Valley Community College: Brown Dental Clinic Rnv. Skagit Valley College: Science Building Replacement Cascadia Community College: Center for the Arts Shoreline Community College: Automotive Bldg Pierce College Fort Steilacoom: Science and Technology Edmonds Community College: Renovate Meadowdale Hall Seattle Central Community College: Renovate Edison North Cascadia Community College: South Access Pierce College Puyallup: Communication & Allied Health Spokane Community College: Renovate Building 7 Spokane Falls: Renovate Music Building 15 North Seattle Community College: Employment Resource Cntr Green River Community College: Humanities & Clsrm. Bldg. Peninsula College: Business and Humanities Center (Maier Hall) Lake Washington Institute of Technology: Allied Health Building Spokane Falls: Replace Chemistry and Life Sciences Bldg. Olympic College: Replace Humanities Building / Parking Lot Spokane Community College: Replace Technical Ed. Bldg. 2013-15 Request 28 Pipeline with 2012 Supp. Costs and Projected Funding 2011‐13 Rank 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 24 27 29 31 32 33 20 21 22 23 25 26 28 30 Type Minor Works ‐ Preservation Roof Repairs "A" Matching Fund Projects Matching Fund Projects Matching Fund Projects Matching Fund Projects Matching Fund Projects Minor Works ‐ Program Equipment Major Project ‐ Construction Major Project ‐ Construction Major Project ‐ Construction Major Project ‐ Construction Major Project ‐ Construction Major Project ‐ Construction Major Project ‐ Construction Major Project ‐ Construction Major Project ‐ Construction Major Project ‐ Construction Major Project ‐ Construction Major Project ‐ Construction Major Project ‐ Construction Major Project ‐ Construction Major Project ‐ Construction Major Project ‐ Construction Major Project ‐ Design Major Project ‐ Design Major Project ‐ Design Major Project ‐ Design Major Project ‐ Design Major Project ‐ Design Major Project ‐ Design Major Project ‐ Design Major Project ‐ Design (2) Major Project ‐ Design (2) Major Project ‐ Design (2) Major Project ‐ Design (2) Major Project ‐ Design (2) Major Project ‐ Design (2) Major Project ‐ Design (2) Major Project ‐ Design (2) College Statewide Statewide Peninsula Spokane Falls Bellingham Lower Columbia Wenatchee Statewide Statewide Spokane Falls South Puget Sound Clover Park Everett Green River Skagit Valley Lower Columbia North Seattle Tacoma Bellevue Grays Harbor Seattle Central Yakima Valley Green River Bates Clark Olympic Centralia Columbia Basin Peninsula South Seattle Renton Edmonds Whatcom Spokane Falls Clover Park Bates Olympic Clark Everett Grays Harbor South Seattle Project Emergency Repairs and Improvements Minor Repairs Fort Worden Education Center Stadium and Athletic Fields Fisheries Program Myklebust Gymnasium Music and Arts Center Minor Program Improvements Equipment Campus Classrooms Learning Resource Center Allied Health Care Facility Index Hall Replacement Science Math and Technology Buildimg Academic and Student Services Building Health and Science Building Technology Building Renewal Health Careers Center Health Science Building Science and Math Building Seattle Maritime Academy Palmer Martin Building Trades and Industry Building Mohler Communications Technology Center Health and Advanced Technologies Building College Instruction Center Student Services Social Science Center Allied Health and Early Childhood Dev Center Cascade Court Automotive Complex Renovation Science Engineering Technology Bldg Learning Commons Photography and Fine Arts Hospitality Institute West Wing Renovation Shop Building Renovation North County Satellite Learning Resource Center Student Services and Instructional Building Automotive Technology Building Target: Actual: New 16,001,000 29,999,000 2,000,000 758,000 2,000,000 2,000,000 1,689,000 20,000,000 15,000,000 17,647,000 30,196,000 20,585,000 31,357,000 18,562,000 30,574,000 38,615,000 23,335,000 39,107,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,624,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 268,000,000 343,049,000 Biennium 16,001,000 46,000,000 48,000,000 48,758,000 50,758,000 52,758,000 54,447,000 74,447,000 89,447,000 107,094,000 137,290,000 157,875,000 189,232,000 207,794,000 238,368,000 276,983,000 300,318,000 339,425,000 339,425,000 339,425,000 339,425,000 339,425,000 339,425,000 339,425,000 339,425,000 343,049,000 343,049,000 343,049,000 343,049,000 343,049,000 343,049,000 343,049,000 343,049,000 343,049,000 343,049,000 343,049,000 343,049,000 343,049,000 343,049,000 343,049,000 343,049,000 2013‐15 Target: Actual: New 17,600,000 32,500,000 22,000,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 37,108,000 45,438,000 17,579,000 19,038,000 29,181,000 24,161,000 37,282,000 6,127,000 1,030,000 1,701,000 2,676,000 1,800,000 8,434,000 1,569,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 324,000,000 305,224,000 Biennium 17,600,000 50,100,000 50,100,000 50,100,000 50,100,000 50,100,000 50,100,000 72,100,000 72,100,000 72,100,000 72,100,000 72,100,000 72,100,000 72,100,000 72,100,000 72,100,000 72,100,000 72,100,000 109,208,000 154,646,000 172,225,000 191,263,000 220,444,000 244,605,000 281,887,000 281,887,000 288,014,000 289,044,000 290,745,000 293,421,000 295,221,000 303,655,000 305,224,000 305,224,000 305,224,000 305,224,000 305,224,000 305,224,000 305,224,000 305,224,000 305,224,000 2015‐17 Target: Actual: New 19,360,000 35,750,000 ‐ ‐ ‐ 24,200,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 51,079,000 33,525,000 13,397,000 24,227,000 29,527,000 16,339,000 35,241,000 30,715,000 1,993,000 2,726,000 1,464,350 1,485,097 2,442,446 6,141,329 3,587,966 1,675,000 345,000,000 334,875,187 Biennium 19,360,000 55,110,000 55,110,000 55,110,000 55,110,000 55,110,000 55,110,000 79,310,000 79,310,000 79,310,000 79,310,000 79,310,000 79,310,000 79,310,000 79,310,000 79,310,000 79,310,000 79,310,000 79,310,000 79,310,000 79,310,000 79,310,000 79,310,000 79,310,000 79,310,000 130,389,000 163,914,000 177,311,000 201,538,000 231,065,000 247,404,000 282,645,000 313,360,000 315,353,000 318,079,000 319,543,350 321,028,447 323,470,892 329,612,221 333,200,187 334,875,187 2017‐19 Target: Actual: New 21,296,000 39,325,000 ‐ ‐ ‐ 26,620,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 28,833,000 34,831,000 15,751,758 12,969,903 35,894,554 53,804,671 40,265,034 14,584,000 367,000,000 324,174,920 Biennium 21,296,000 60,621,000 60,621,000 60,621,000 60,621,000 60,621,000 60,621,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 87,241,000 116,074,000 150,905,000 166,656,758 179,626,661 215,521,215 269,325,886 309,590,920 324,174,920 DRAFT Request for New 2013-15 Appropriations SBCTC Capital Requests for New Appropriated Funds in 2013‐15 Based on May 28, 2010, June 30, 2010 and January 7, 2011 WACTC Recommendations and SBCTC Resolutions 10‐06‐29, 10‐08‐33 and 11‐1‐8. SBCTC Request Priority Type College Number Project New Approp. Cummulative 1 Minor Preservation Statewide Emergency Repairs and Improvements 16,000,000 16,000,000 2 Minor Repairs Statewide Repairs 32,500,000 48,500,000 3 Minor Program Statewide Minor Program Improvements 22,000,000 70,500,000 4 Minor Preservation Statewide Preventive Facility Maintenance and Building System Repairs 22,800,000 93,300,000 5 Construction Bellevue 20082702 Health Science Building 37,108,000 130,408,000 6 Construction Grays Harbor 20081226 Science and Math Building 45,438,000 175,846,000 7 Construction Seattle Central 30000120 Seattle Maritime Academy 17,579,000 193,425,000 8 Construction Yakima Valley 30000121 Palmer Martin Building 19,038,000 212,463,000 9 Construction Green River 20081222 Trades and Industry Building 29,181,000 241,644,000 10 Design Centralia 30000123 Student Services 6,127,000 247,771,000 Estimates from 2012 11 Construction Bates 20082703 Mohler Communications Technology Center 24,161,000 271,932,000 Supplemental Request. 12 Design Columbia Basin 20082704 Social Science Center Need to be updated with 1,030,000 272,962,000 13 Design Peninsula 30000126 Allied Health and Early Childhood Dev Center 1,701,000 274,663,000 2013‐15 estimates. 14 Design South Seattle 30000128 Cascade Court 2,676,000 277,339,000 15 Construction Clark 20082705 Health and Advanced Technologies Building 38,828,000 316,167,000 16 Design Renton 30000134 Automotive Complex Renovation 1,800,000 317,967,000 17 Design Edmonds 30000137 Science Engineering Technology Bldg 8,434,000 326,401,000 18 Design Whatcom 30000138 Learning Commons 1,569,000 327,970,000 19 Construction Olympic 30000122 College Instruction Center 48,885,000 376,855,000 Notes: A B Construction occurs in order of system priority. Predesigns and designs needed for 2015‐17 construction are added to the list assuming 2015‐17 funding is 6% higher than 2013‐15 funding. 30 DRAFT Requests for Alternative Financing in 2013-15 Projects to be paid for from non-appropriated funds: y , Request Change Description Authorize Authorize Authorize Authorize , , College Number Peninsula 30000501 South Puget SouTBD Green River TBD Whatcom TBD Whatcom TBD y , , Reference Project Forks Satellite Site Replacement of the Hawks Prairie Cent Student Life Replacement Project Health Professions Building Student Recreation Center State ‐ ‐ ‐ ‐ ‐ Local ‐ 5,000,000 13,362,449 871,000 1,006,000 SBCTC Request COP Total 2,000,000 2,000,000 5,000,000 10,000,000 15,000,000 28,362,449 6,451,000 7,322,000 10,969,708 11,975,708 Notes: Centralia Community College will need a $5M COP for construction of the Student Services Building project 30000123 in 2015‐17. 31 Future Budget Development 32 Update Scoring System The SBCTC Scoring process was developed in the last century and has benefited from regular improvements. The legislature directed the HECB and later OFM to use this process as a model for scoring requests from the rest of higher education. Since the last competition in 2008 and reprioritization in 2010, WACTC, BAC, and IC have continued to work on improving the capital scoring system to reflect new learning environments, sustainability, market conditions, and applicable legislation. Their objective has been to have criteria that is objective, transparent, and effectively differentiate proposed projects so that we can develop a single prioritized list for future requests. 33 Competition for 2015-17 Based on our projections, it looks like there will be capacity for either the 2nd designs or other new projects to be designed in 2015-17. WACTC recommended there be a limited competition for this new capacity. The existing 2nd designs would compete against new proposals from the eleven colleges that were not on the list as of March 2010. The Board will have the opportunity to adopt WACTC’s recommendations in the Fall. 34 Wrap Up Buildings are important to meeting the educational goals of the system. They are being designed to be adaptable to future needs. We have made steady progress toward the Board’s goals. We are almost through the difficult period of resizing the list to reflect the new economy. The Board will finalize the 2013-15 request in June. There will be an opportunity to adopt new rules for 2015-17 this fall. 35 TAB 4 Discussion Group Breakouts Attached is a list of potential budget request items identified through small group discussions at the March Board meeting. The items are organized around themes and investments identified at the April WACTC meeting. The task for each group is to prioritize the items into four buckets and to provide the reasoning behind their decisions. The buckets: 1 = High priority. Definitely include in the system budget request. 2 = Middle priority. Probably should be included in the request. 3 = Low priority. Maybe should be included in the request. 4 = Do not include in the request. Before beginning the discussion, each group should identify the person who will report out to the larger group. Identified below are facilitators to help keep the discussion moving and note takers to write down the buckets each item is placed in and to take notes on the discussion. Group 1 Group 2 Group 3 Sharon Fairchild Jim Bricker Larry Brown Wayne Martin Erin Mundinger Shaunta Hyde Elizabeth Chen Scott Morgan Bill Bonaudi David Beyer Rich Cummins Gerald Pumphrey Linda Kaminski Trustees Carol Lander-McVicker Tim Douglas Tom Malone Students Thuy Nguyen Matthew Schrader Jonathan Russell Board Members Presidents Labor Carla Naccarato-Sinclair Facilitators Note Takers Location John Boesenberg Michelle Andreas Hardin Community Rm. Bernal Baca Mike Scroggins Wayne Doty Executive Dining Rm. Schedule: 3:50 – 4:00 Introduction and Framework for Discussion 4:00 – 4:45 Break into Small Groups 4:45 – 4:50 Reconvene 4:50 – 5:15 Report Outs Deb Merle Nick Lutes Simplot A&B TAB 4 2013-15 Budget Development Work Group Students Jonathan Russell Clover Park Technical College My name is Jonathan Russell and I am enrolled in the computer network security program at Clover Park Technical College. I am currently in my fourth quarter of six and plan to graduate this summer. This past year I enrolled in college and it has transformed my life. I have made an effort to be more involved at every opportunity at my college. I have served as the President of the Computer Networking Information Systems Security extracurricular club, Club Shield. I am the Student Body President at Clover Park Technical College and was recently voted into the Presidency of The Washington State Community and Technical College Student Association. I have grown to love these jobs but have found true passion for helping others and standing up for those without a voice. I have worked for system wide LGBTQ demographics at the CTC level. My hopes and dreams are to finish my college education and be a valuable team member as an IT Network Administrator where I can work hard and flourish while starting my own family. Matthew Schrader South Puget Sound Community College Matthew Aaron Shrader is currently serving his second year on South Puget Sound Community College’s Student Senate, serving as Senator for Legislative Affairs for the 2011-2012 school year. Shrader uses his administrative skills and his ability to motivate, encourage, and engage others as well as his innovation to see projects accomplished both at SPSCC and state-wide. Shrader was chosen to lead the Washington State CTC Student Coalition for LGBTQ Demographics, a state-wide coalition of students who sought to have Lesbian, Gay, Bisexual, Transgender, & Queer (LGBTQ) demographics added to the CTC uniform application. Currently WSSSC has formed a task force to answer technical questions on implementing these demographics, and asked Shrader to serve on this task force. Academically Shrader dropped out of high school, earned a GED, and had the motivation to start taking college classes to make something of himself. Shrader has flourished at SPSCC both academically and personally. He will graduate in June. Currently Shrader serves as the Secretary on the Mpowerment Advisory Committee, a local non-profit that does HIV/AIDS prevention work and encourages young gay men to have healthy relationships. Most of Shrader’s free time is spent with Capital City Pride, in which he serves as the youngest CoChair in the organizations 22 year history. 2013-15 Budget Development Work Group Students Thuy Nguyen Highline Community College My name is Thuy Nguyen. I am currently a student at Highline Community College. I’m in the process of getting my AA with emphasis of Business. I would like to transfer to either UW Tacoma or CWU. My goal is to go into Business Administration and own my own marketing business. The favorite part of my position is the connections I am making with the students, faculty and instructors on campus. Every day in the Center for Leadership and Service is a new and unique experience. I believe that everyone should have the opportunity to have open access education. 2013‐15 Operating Budget Development Small Group Discussions 1 = High priority. Definitely should be included in the system budget request. 2 = Middle priority. Probably should be included in the system budget request. 3 = Low priority. Maybe should be in the system budget request. 4 = Do not include in the request. WACTC Themes WACTC Investments Invest in Faculty and Staff Meet 21st Century Challenges Address Access and Affordability Invest in Infrastructure/ Instructional Technology Promote and Energize Workforce and Economic Development Scale up Innovative Programs Expand STEM Capacity Foster Industry Cluster Development Items from March Board Meeting 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Faculty and Staff Salary Increases Professional Development Faculty Increment Funding Close Part‐Time Faculty Salary Gap Full‐Time/Part‐Time Faculty Mix General Enrollments ABE/ESL Enrollments I‐BEST ‐ Enrollments or Curriculum Development Professional/Technical Enrollments Tuition: No Tuition Increase Financial Aid: Increase Financial Aid Financial Aid: Scholarships for Undocumented Students Professional Development in Use of Technology Open Course Library eLearning and Online Services Statewide Library Resources New Teaching and Learning Technology Funding for Building Repair and Maintenance E.g., Hybrid Degree Programs** 20 STEM Enrollments 21 E.g., Disseminate Aerospace Training Innovations** 22 23 24 Wrap Around Services 25 26 27 Increase Student 28 Achievement 29 Accelerate Math Progression 30 Invest in Student Achievement Initiative to Increase Completions *From WACTC April meeting **From State Board staff Priority Single Point of Contact Book Loan Program Opportunity Grants Counseling/Advising Academic Planning Increase Number of Faculty and Staff Developmental Education ‐ Invest in Promising Practices Programs that Accelerate Math Progression* Student Achievement Initiative Funding* May 9, 2012 SBCTC Meeting TAB 4 WACTC Academy Synthesis from General Business Meeting April 27, 2012 2013-15 Budget Building Exercise Developing Themes and Investment Priorities Meet 21st Century Challenges Invest in Faculty and Staff Address Access and Affordability Invest in Infrastructure/Instructional Technology 1. Promote and Energize Workforce Development AND Economic Development Scale Up Innovative Programs Expand STEM capacity Foster Industry Cluster Development 2. Increase Student Achievement Wrap Around Services Accelerate Math Progression Invest in Student Achievement Initiative to increase completion TAB 7 W ASHINGTON A SSOCIATION OF C OMMUNITY AND T ECHNICAL C OLLEGES BOARD OF PRESIDENTS Date: April 4, 1012 To: State Board for Community and Technical Colleges From: Gerald Pumphrey, President, WACTC Subject: The Transformation Fund The 2011/13 biennial budget for community and technical colleges was developed and passed by the legislature containing what was understood by the presidents as one year set aside of $2 million for initial development of the ERP or what is now known as ctcLink. There was support of this set aside from the presidents with the understanding that it was a one year commitment only. During the November WACTC meeting the presidents discussed this one time set aside and voted in favor of having those funds restored to their operating budgets in the 2012/13 fiscal year, due to the large reductions that have occurred over the past three years. At the WACTC meeting in March, the topic of this set aside was discussed again with a proposal to continue to set aside the $2 million for a system Transformation Fund. While the Transformation Fund was an idea that some presidents thought would be useful to the system, it was not viewed to currently be as high a priority as restoration of the dramatically reduced operating budgets. During the April WACTC meeting, the presidents voted unanimously to have the one time, $2 million set aside returned to their operating budgets, rather than being used for a Transformation Fund. Business Affairs Commission Human Resources Management Commission Information Technology Commission Instruction Commission Public Information Commission Research and Planning Commission Student Services Commission TAB 7 W ASHINGTON A SSOCIATION OF C OMMUNITY AND T ECHNICAL C OLLEGES BOARD OF PRESIDENTS Date: April 4, 2012 To: State Board for Community and Technical Colleges From: Gerald Pumphrey, President, WACTC Subject: Tuition Increase for 2012/13 The 12% tuition increase for 2012/13 is an action item for the May State Board meeting, and is a difficult issue. None of the presidents want to continue to shift the cost of education from the State to our students, when we know that it is difficult for many of them to pay already. Conversely, the legislature has made the decision to significantly reduce our budgets over the past three years, and has proposed tuition increases as a partial offset to those reductions. It is important to understand that the 12% proposed tuition increase for the coming year was approved by the legislature as a partial offset to budget reductions that were made in the 2011 legislative session for the entire biennium. That tuition increase was already incorporated into 2012/13 fiscal year planning before the 2012 legislative session. The discussion and decision during the 2012 legislative session was whether or not to make additional cuts to the higher education operating budgets beyond those approved in 2011. The fortunate final decision was to avoid additional general operating budget reductions to higher education. However, the system is required to fund STEM increases and the Customized Training account without additional funding, resulting in net reductions to college operating budgets for the coming year. The issue of the 12% tuition increase was discussed at the April WACTC meeting. While people are very concerned about the impact of tuition increases on students, the 12% increase is needed to offset biennial cuts made in the 2011 legislative session. Failure to approve the 12% tuition increase for the 2012/13 year will result in further budget cuts which will reduce access and services to students. WACTC voted unanimously to recommend approval of the 12% tuition increase, and voiced a commitment to advocate against further tuition increases as a means of shifting costs of our system from the State to our students. Business Affairs Commission Human Resources Management Commission Information Technology Commission Instruction Commission Public Information Commission Research and Planning Commission Student Services Commission Chair's Report Engagement Status Report March 21, 2012 Client: Project: Status: Upcoming Milestone(s): Washington State Board for Community and Technical Colleges (SBCTC) Phase III of Efficiency Study On-time, On-budget Friday, March 23 – Deadline for all adjusting journal entries from all 30 districts Wednesday, March 28 – Tentative review of value driver and preliminary expenditure analysis findings with SBCTC leadership Week of April 9 – On-site visits for “case study” colleges to validate findings and gain additional insight Completed: Presentation of project overview and methodology to core stakeholder groups including SBCTC leadership team, “case study” college presidents and functional leaders, and the Efficiency Committee during the week of March 5th Developed and deployed hillgroupinc.box.com site with specific folder access to: o Allow “case study” colleges the ability to upload documentation and data specific to their institution in a location where only they and The Hill Group have access, o Provide a location for Efficiency Committee members to upload and view documentation from previously discussed Efficiency Committee meetings and review interim deliverables from The Hill Group, once developed o Provide SBCTC leadership with a location to upload data and related documentation into specific folders only accessible by the SBCTC leadership team and not institution leadership o Provide easy access to all project overview and methodology documentation in a specified folder available to all stakeholders Development and distribution to each of the 30 districts a standardized definition for all program indices pertinent to the study with explanatory document for allocating administrative personnel expenditures, a pivot table of the last four years of expenditures, and a worksheet for recording adjusting journal entries Executed data sharing agreement and mailed on 3/20 so that access to the SBCTC data warehouse can be established In Progress: Refinement of value drivers (faculty/staff, student, and community value) through secondary research review Development of expenditure analysis metrics that help to describe the level of value realized from each dollar spent and the degree of dispersion among students, faculty, and community (5/30 districts have returned their expenditure adjustments) Analysis of variances in district expenditure patterns and identification of potential areas where further qualitative discussion may be helpful to explain patterns Review of Phase II of Efficiency Study reports from SBCTC and compilation of additional materials from SBCTC Next Steps (Prior to April 9th Trip): Complete value driver refinement and prepare discussion topics with each “case study” institution Complete expenditure analysis and identification of outliers/similarities between institutions Chair's Report Engagement Status Report April 23, 2012 Client: Project: Status: Upcoming Milestone(s): Washington State Board for Community and Technical Colleges (SBCTC) Phase III of Efficiency Study On-time, On-budget Friday, April 27th – Proposed deadline for receipt of supplemental information request from “case study” colleges Week of May 7th – Provide preliminary value driver relationship analysis and models to SBCTC leadership for review and comment Week of May 14th – Presentation of value driver relationships and models for consideration to “case study” colleges and other key stakeholders Recently Completed: Qualitative interviews with each of the “case study” colleges to better understand value drivers and institution uniqueness as it relates to mission and controllable and uncontrollable variables Status update presentation made to Efficiency Study Steering Committee and discussion of next steps Methodology and Overview presentation made to Business Affairs Committee (BAC) and insight gained on method and approach for the next phase Data elements from SBCTC data warehouse and national databases (e.g. IPEDS, CCSSE, etc.) have been mapped to value drivers to provide insight into the cost/benefit relationships in the areas of access, persistence, goal attainment, and volume In Progress: Analysis of value driver relationships between FY08 and FY11 for both SBCTC institutions and national cohorts Continued collection of supplemental information from “case study” institutions to inform model development Conduct additional primary and secondary research with nationally recognized experts to understand potential impact of efficiency mechanisms and challenges to implementation Development of potential efficiency mechanisms (discrete) and related variables for understanding the short and long-term cost and benefit from implementing various models Next Steps (Prior to May 13 th Trip): Understanding of “joint effects” between potential efficiency mechanisms Review of preliminary models with SBCTC leadership Development of key considerations to be posed to “case study” leadership during discussions occurring during the week of 5/13