Document 11008618

advertisement
Projections for Planning Purposes Only
Not to be Used without Updating after December 15, 2001
Table 1.A
Estimated costs and returns per acre
Corn; Conventional Tillage, Furrow Irr.
Projected for 2002, Rio Grande Valley, For Planning Purposes
_______________________________________________________________________
ITEM
UNIT
PRICE
QUANTITY
AMOUNT
YOUR FARM
_______________________________________________________________________
dollars
dollars
INCOME
Corn
bu
2.55
100.0000
255.00
_________
-------TOTAL INCOME
255.00
_________
DIRECT EXPENSES
FERTILIZER
UAN (32% N)
HERBICIDE
AAtrex 4L
IRRIGATION SUPPLIES
Irrigation Water
SEED/PLANTS
Corn Seed
CUSTOM HARVEST/HAUL
Custom Harvest Corn
Haul Corn
INSURANCE
MPCI: Irr. Corn
OPERATOR LABOR
Tractors
HAND LABOR
Implements
IRRIGATION LABOR
Labor (Flood)
Labor (Irr. Setup)
UNALLOCATED LABOR
DIESEL FUEL
Tractors
REPAIR & MAINTENANCE
Implements
Tractors
INTEREST ON OP. CAP.
cwt
7.00
2.6000
18.20
_________
pt
1.55
2.0000
3.10
_________
ac-ft
16.23
0.8000
12.98
_________
thous
1.00
18.0000
18.00
_________
bu
bu
0.22
0.11
1.0000
100.0000
0.22
11.20
_________
_________
acre
5.00
1.0000
5.00
_________
hour
8.31
0.5920
4.91
_________
hour
6.91
0.1110
0.76
_________
hour
hour
hour
6.91
6.91
8.31
2.0000
0.2000
0.4736
13.82
1.38
3.93
_________
_________
_________
gal
0.90
4.5213
4.06
_________
acre
acre
acre
4.83
3.81
4.65
1.0000
1.0000
1.0000
4.83
3.81
4.65
-------110.90
144.09
_________
_________
_________
11.82
11.81
-------23.64
-------134.54
120.45
_________
_________
TOTAL DIRECT EXPENSES
RETURNS ABOVE DIRECT EXPENSES
FIXED EXPENSES
Implements
Tractors
acre
acre
11.82
11.81
TOTAL FIXED EXPENSES
TOTAL SPECIFIED EXPENSES
RETURNS ABOVE TOTAL SPECIFIED EXPENSES
1.0000
1.0000
_________
_________
_________
_________
_________
ALLOCATED COST ITEMS
Corn Share Rent
%
255.00
33.0000
84.15
_________
RESIDUAL RETURNS
36.30
_________
_______________________________________________________________________
Brand names are mentioned only as examples and imply no endorsement.
Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation.
These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication.
B-1241 (C12)
Projections for Planning Purposes Only
Not to be Used without Updating after December 15, 2001
B-1241 (C12)
Table 1.B
Estimated resource use and costs for field operations, per acre
Corn; Conventional Tillage, Furrow Irr.
Projected for 2002, Rio Grande Valley, For Planning Purposes Only
_____________________________________________________________________________________________________________________________________________
TRACTOR COST
EQUIP COST
ALLOC LABOR
OPERATING INPUT
OPERATION/
SIZE/
TRACTOR
PERF TIMES
-------------- -------------- ---------------------------------TOTAL
OPERATING INPUT
UNIT
SIZE
RATE OVER MTH DIRECT
FIXED DIRECT
FIXED HOURS
COST
AMOUNT
PRICE
COST
COST
_____________________________________________________________________________________________________________________________________________
------------dollars----------dollars
-------dollars-------Heavy Disk
Heavy Disk
Lister Bedder
Fert Appl (Liquid)
UAN (32% N)
Plant & Pre
Corn Seed
AAtrex 4L
Ditcher
Labor (Irr. Setup)
Labor (Flood)
Irrigation Water
Ditcher
Labor (Irr. Setup)
Labor (Flood)
Irrigation Water
Custom Harvest Corn
Haul Corn
MPCI: Irr. Corn
14'
14'
8R-40
8R-40
cwt
8R-40
thous
pt
standard
hour
hour
ac-ft
standard
hour
hour
ac-ft
bu
bu
acre
150
150
190
130
hp
hp
hp
hp
0.167
0.167
0.070
0.074
1.00
1.00
1.00
1.00
Sep
Oct
Nov
Jan
2.04
2.04
1.05
1.07
2.80
2.80
1.39
1.89
0.98
0.98
0.20
0.92
2.00
2.00
0.64
2.77
0.167
0.167
0.070
0.111
1.38
1.38
0.58
0.87
9.22
9.22
3.88
7.54
2.6000
7.00
18.20
18.20
130 hp
0.074 1.00 Feb
1.07
1.89
1.59
4.01 0.148
1.12
9.70
18.0000
1.00
18.00
18.00
2.0000
1.55
3.10
3.10
130 hp
0.020 1.00 Apr
0.29
0.51
0.06
0.18 0.020
0.16
1.22
0.100
0.69
0.1000
0.69
1.00 Apr
1.000
6.91
1.0000
6.91
0.4000 16.23
6.49
6.49
130 hp
0.020 1.00 May
0.29
0.51
0.06
0.18 0.020
0.16
1.22
0.100
0.69
0.1000
0.69
1.00 May
1.000
6.91
1.0000
6.91
0.4000 16.23
6.49
6.49
1.00 Jun
1.0000
0.22
0.22
0.22
100.0000
0.11
11.20
11.20
1.00 Jul
1.0000
5.00
5.00
5.00
------- ------- ------- ------- ------ ------------- ------TOTALS
7.88
11.81
4.83
11.82 2.903
20.88
68.70 125.95
INTEREST ON OPERATING CAPITAL
4.65
UNALLOCATED LABOR
3.93
TOTAL SPECIFIED COST
134.54
_____________________________________________________________________________________________________________________________________________
Brand names are mentioned only as examples and imply no endorsement.
Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation.
These projections were collected and developed by staff members of the Texas Agricultural Extension Service and approved for publication.
Download