Table 14.A Estimated costs and returns per Acre RR Cotton _______________________________________________________________________

advertisement
B-1241 (C8)
Projections for Planning Purposes Only
Not to be Used without Updating after October 15, 2003
Table 14.A
Estimated costs and returns per Acre
RR Cotton
2004 Projected Costs & Returns per acre
_______________________________________________________________________
ITEM
UNIT
PRICE
QUANTITY
AMOUNT
YOUR FARM
_______________________________________________________________________
dollars
dollars
INCOME
cotton lint
lb.
0.52
500.0000
260.00
_________
cotton seed
ton
120.00
0.4250
51.00
_________
-------TOTAL INCOME
311.00
_________
DIRECT EXPENSES
CROP INSURANCE
Cttn Ins APH 65/100
CUSTOM
dry fert. rig
aerial appliction
custom stripping cot
ginning cotton
FERTILIZER
fert 82-0-0
fert 6-24-24
HERBICIDE
Cotton Burndown
Roundup Cotton
Cotton Defoliant
Cotton Destruction
INSECTICIDE
Orthene
Insect, Bollworm
SEED
Seed Cotton
RR Cotton Tech Fee
PROGRAMS
Boll Weevil
OPERATOR LABOR
Tractors
Self-Propelled Eq.
DIESEL FUEL
Tractors
Self-Propelled Eq.
REPAIR & MAINTENANCE
Implements
Tractors
Self-Propelled Eq.
INTEREST ON OP. CAP.
Ac.
5.69
1.0000
5.69
_________
acre
acre
lb.
Lb
3.00
3.00
0.08
0.11
1.0000
1.0000
500.0000
500.0000
3.00
3.00
40.00
55.00
_________
_________
_________
_________
lb.
lb.
0.11
0.08
80.0000
160.0000
8.80
14.24
_________
_________
Pint
Gallon
Oz
Pt
5.00
44.50
0.24
2.25
1.0000
0.4000
16.0000
2.5000
5.00
17.80
3.93
5.62
_________
_________
_________
_________
Oz
Ac.
0.56
15.14
8.0000
1.0000
4.48
15.14
_________
_________
lb.
Lb.
1.32
0.90
10.0000
10.0000
13.20
9.00
_________
_________
Acre
13.00
1.0000
13.00
_________
hour
hour
6.50
6.50
0.5615
0.2160
3.65
1.40
_________
_________
gal
gal
1.06
1.06
4.6745
1.6506
4.95
1.74
_________
_________
Acre
Acre
Acre
Acre
4.17
3.45
3.85
6.44
1.0000
1.0000
1.0000
1.0000
4.17
3.45
3.85
6.44
-------246.59
64.40
_________
_________
_________
_________
8.07
8.66
6.14
-------22.89
-------269.48
41.51
_________
_________
_________
TOTAL DIRECT EXPENSES
RETURNS ABOVE DIRECT EXPENSES
FIXED EXPENSES
Implements
Tractors
Self-Propelled Eq.
Acre
Acre
Acre
8.07
8.66
6.14
TOTAL FIXED EXPENSES
TOTAL SPECIFIED EXPENSES
RETURNS ABOVE TOTAL SPECIFIED EXPENSES
1.0000
1.0000
1.0000
_________
_________
_________
_________
_________
ALLOCATED COST ITEMS
CASH RENT CROPLAND
acre
25.00
1.0000
25.00
_________
RESIDUAL RETURNS
16.51
_________
_______________________________________________________________________
Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation.
These projections were collected and developed by staff members of Texas Cooperative Extension and approved for publication
B-1241 (C8)
Projections for Planning Purposes Only
Not to be Used without Updating after October 15, 2003
Table 14.B
Estimated resource use and costs for field operations, per Acre
RR Cotton
2004 Projected Costs & Returns per acre
_____________________________________________________________________________________________________________________________________________
TRACTOR COST
EQUIP COST
ALLOC LABOR
OPERATING INPUT
OPERATION/
SIZE/
TRACTOR
PERF TIMES
-------------- -------------- ---------------------------------TOTAL
OPERATING INPUT
UNIT
SIZE
RATE OVER MTH DIRECT
FIXED DIRECT
FIXED HOURS
COST
AMOUNT
PRICE
COST
COST
_____________________________________________________________________________________________________________________________________________
------------dollars----------dollars
-------dollars-------Tandem Disk
Tandem Disk
anhydrous rig
fert 82-0-0
Field Cultivator
dry fert. rig
fert 6-24-24
High Boy Spryr
Cotton Burndown
Planter 3pt
Seed Cotton
RR Cotton Tech Fee
Temik
High Boy Spryr
Roundup Cotton
High Boy Spryr
Orthene
High Boy Spryr
Orthene
Hooded Sprayer
Roundup Cotton
High Boy Spryr
Insect, Bollworm
aerial appliction
Cotton Defoliant
custom stripping cot
ginning cotton
Boll Weevil
Cttn Ins APH 65/100
Shredder Flail
High Boy Spryr
Cotton Destruction
30 ft.
30 ft.
12R-30
lb.
32 ft.
acre
lb.
60' Boom
Pint
12 row
lb.
Lb.
3.30
60' Boom
Gallon
60' Boom
Oz
60' Boom
Oz
12R-30
Gallon
60' Boom
Ac.
acre
Oz
lb.
Lb
Acre
Ac.
6 Row
60' Boom
Pt
MFWD 200
MFWD 200
MFWD 200
0.076
0.076
0.071
1.00
1.00
1.00
Oct
Oct
Oct
1.32
1.32
1.24
1.35
1.35
1.27
1.01
1.01
0.28
1.68
1.68
0.69
0.083
0.083
0.078
0.54
0.54
0.50
MFWD 200
0.047
1.00
1.00
Nov
Apr
0.82
0.84
0.54
1.12
0.051
0.33
0.030
1.00
Apr
0.065
1.00
Apr
MFWD 200
0.030
1.00
May
1.13
1.16
0.93
1.02
0.036
0.23
0.83
1.70
0.071
0.46
0.93
1.02
0.036
80.0000
0.11
8.80
1.0000
160.0000
3.00
0.08
3.00
14.24
1.0000
5.00
5.00
10.0000
10.0000
3.5000
1.32
0.90
13.20
9.00
0.23
5.93
5.93
3.99
8.80
3.67
3.00
14.24
2.19
5.00
5.30
13.20
9.00
2.19
8.90
0.030 1.00 May
0.93
1.02 0.036
0.23
2.19
4.0000
0.56
2.24
2.24
0.030 1.00 Jun
0.93
1.02 0.036
0.23
2.19
4.0000
0.56
2.24
2.24
MFWD 150
0.055 1.00 Jul
0.91
0.92
0.24
0.38 0.066
0.43
2.89
0.2000 44.50
8.90
8.90
0.030 1.00 Jul
0.93
1.02 0.036
0.23
2.19
1.0000 15.14
15.14
15.14
1.00 Aug
1.0000
3.00
3.00
3.00
16.0000
0.24
3.93
3.93
1.00 Sep
500.0000
0.08
40.00
40.00
500.0000
0.11
55.00
55.00
1.00 Sep
1.0000 13.00
13.00
13.00
1.00 Sep
1.0000
5.69
5.69
5.69
MFWD 150
0.115 1.00 Oct
1.63
1.74
0.23
0.78 0.126
0.82
5.23
0.030 1.00 Oct
0.93
1.02 0.036
0.23
2.19
2.5000
2.25
5.62
5.62
------- ------- ------- ------- ------ ------------- ------TOTALS
8.41
8.66
9.78
14.22 0.777
5.05
216.91 263.04
INTEREST ON OPERATING CAPITAL
6.44
UNALLOCATED LABOR
0.00
TOTAL SPECIFIED COST
269.48
_____________________________________________________________________________________________________________________________________________
0.2000
44.50
Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation.
These projections were collected and developed by staff members of Texas Cooperative Extension and approved for publication
8.90
Download