Projections for Planning Purposes Only B-1241 (C7)

advertisement
Projections for Planning Purposes Only
Not to be Used without Updating after January 1, 2008
Table 3.D
Estimated costs and returns per AC
Grain Sorghum
Dryland, Follow Cotton, West Central Texas D-7, 2008
_______________________________________________________________________
ITEM
UNIT
PRICE
QUANTITY
AMOUNT YOUR FARM
_______________________________________________________________________
dollars
dollars
INCOME
Grain Sorghum
cwt
5.84
22.0000
128.48 _________
--------TOTAL INCOME
128.48 _________
DIRECT EXPENSES
FERTILIZERS
17-17-0-5
HERBICIDES
2,4-D Amine
Glyphosate
Atrazine
SEED/PLANTS
Grain Sorghum
HAULING
Haul Sorghum
CROP INSURANCE
Dry Grain Sorghum
CUSTOM HARVEST
Sorghum Combining
OPERATOR LABOR
Tractors
Self-Propelled
HAND LABOR
Implements
Self-Propelled
DIESEL FUEL
Tractors
Self-Propelled
GASOLINE
Pickup
Pickup-Hand
REPAIR & MAINTENANCE
Implements
Tractors
Self-Propelled
Pickup
lb
0.17
110.0000
18.97
_________
pt
pt
qt
1.65
2.37
2.75
1.5000
2.0000
1.0000
2.47
4.74
2.75
_________
_________
_________
lb
1.50
8.0000
12.00
_________
cwt
0.33
22.0000
7.33
_________
ac
8.00
1.0000
8.00
_________
AC
15.00
1.0000
15.00
_________
hour
hour
10.21
10.21
0.1570
0.0117
1.60
0.12
_________
_________
hour
hour
10.00
10.00
0.0745
0.0058
0.75
0.06
_________
_________
gal
gal
3.00
3.00
1.0213
0.1209
3.07
0.36
_________
_________
gal
gal
2.90
2.90
0.0781
0.0961
0.22
0.28
_________
_________
AC
AC
AC
miles
2.71
0.34
0.11
0.03
1.0000
1.0000
1.0000
1.0000
2.71
0.34
0.11
0.04
--------80.92
47.56
_________
_________
_________
_________
TOTAL DIRECT EXPENSES
RETURNS ABOVE DIRECT EXPENSES
FIXED EXPENSES
Implements
Tractors
Self-Propelled
Pickup
Pickup-Hand
AC
AC
AC
each
each
3.96
2.76
0.96
5897.97
842.56
_________
_________
1.0000
1.0000
1.0000
0.0000
0.0000
3.96 _________
2.76 _________
0.96 _________
0.39 _________
0.06 _________
--------TOTAL FIXED EXPENSES
8.13 _________
--------TOTAL SPECIFIED EXPENSES
89.05 _________
RETURNS ABOVE TOTAL SPECIFIED EXPENSES
39.43 _________
_______________________________________________________________________
Note: Cost of production estimates are based on 2007 input prices.
Information presented is prepared solely as a general guide & not intended to recognize or predict the costs & returns from any one operation.
These projections were collected & developed by TCE staff & approved for publication.
B-1241 (C7)
Projections for Planning Purposes Only
Not to be Used without Updating after January 1, 2008
B-1241 (C7)
Table 3.A
Estimated resource use and costs for field operations, per AC
Grain Sorghum
Dryland, Follow Cotton, West Central Texas D-7, 2008
_______________________________________________________________________________________________________________________________________________
POWER UNIT COST EQUIPMENT COST
ALLOC LABOR
OPERATING/DURABLE INPUT
OPERATION/
SIZE/
POWER UNIT
PERF TIMES
-------------- -------------- ----------------------------------TOTAL
OPERATING INPUT
UNIT
SIZE
RATE OVER MTH DIRECT
FIXED DIRECT
FIXED HOURS
COST
AMOUNT PRICE
COST
COST
_______________________________________________________________________________________________________________________________________________
------------dollars----------dollars
---------dollars--------Stalk Shredder
Sprayer( 600-825Gal)
2,4-D Amine
Glyphosate
Plant - Folding
Grain Sorghum
Dry Grain Sorghum
17-17-0-5
Atrazine
Sorghum Combining
Haul Sorghum
Pickup
Application 1
Application 2
Pickup-Hand
Application 1
Application 2
20'
90'
pt
pt
8R-38
lb
ac
lb
qt
AC
cwt
each
miles
miles
each
Miles
Miles
2WD 105
0.082
0.011
1.00
1.00
Dec
Feb
1.44
0.47
0.84
0.96
1.76
1.45
0.08
0.01
0.84
0.18
6.33
1.61
1.5000
1.65
2.47
2.47
2.0000
2.37
4.74
4.74
MFWD 150
0.074 1.00 May
1.97
1.92
0.95
2.51
0.14
1.51
8.86
8.0000
1.50
12.00
12.00
1.0000
8.00
8.00
8.00
110.0000
0.17
18.97
18.97
1.0000
2.75
2.75
2.75
1.00 Oct
1.0000 15.00
15.00
15.00
22.0000
0.33
7.33
7.33
1.00 Jan
0.39
0.0000
0.39
0.13
0.5000
0.13
0.13
0.5000
0.13
1.00 Jan
0.06
0.0000
0.06
0.14
0.5000
0.14
0.14
0.5000
0.14
------- ------- ------- ------- ------ ------------- -------TOTALS
3.88
3.72
3.25
4.41
0.24
2.53
71.26
89.05
INTEREST ON OPERATING CAPITAL
0.00
UNALLOCATED LABOR
0.00
TOTAL SPECIFIED COST
89.05
_______________________________________________________________________________________________________________________________________________
Note: Cost of production estimates are based on 2007 input prices.
Information presented is prepared solely as a general guide & not intended to recognize or predict the costs & returns from any one operation.
These projections were collected & developed by TCE staff & approved for publication.
Download