Projections for Planning Purposes Only Not to be Used without Updating after December 15, 2002 Table 1.A Estimated costs and returns per Acre Cotton, Dryland, (2X2 Planting Pattern) 2002 Projected Costs and Returns per Acre _______________________________________________________________________ ITEM UNIT PRICE QUANTITY AMOUNT YOUR FARM _______________________________________________________________________ dollars dollars INCOME cotton lint lb. 0.55 250.0000 137.50 _________ cottonseed ton 115.00 0.2100 24.15 _________ -------TOTAL INCOME 161.65 _________ DIRECT EXPENSES seed seed - cotton herbicide herbicide - cotton custom insect appl. gin, bags, ties stripping crop insurance dry cotton insurance insecticide insecticide - cotton OPERATOR LABOR Implements Tractors DIESEL FUEL Tractors Self-Propelled Eq. REPAIR & MAINTENANCE Implements Tractors Self-Propelled Eq. INTEREST ON OP. CAP. lb. 0.60 8.0000 4.80 _________ pint 2.40 1.5000 3.60 _________ acre lb. lb. 3.50 0.12 0.07 1.0000 250.0000 250.0000 3.50 30.00 17.50 _________ _________ _________ acre 12.00 1.0000 12.00 _________ lb. 6.25 1.0000 6.25 _________ hour hour 6.00 6.00 0.8766 1.4547 5.25 8.72 _________ _________ gal gal 1.28 1.28 6.6380 1.1718 8.49 1.49 _________ _________ 4.56 16.02 0.09 4.17 1.0000 1.0000 1.0000 1.0000 4.56 16.02 0.09 4.17 -------126.50 35.14 _________ _________ _________ _________ 8.65 26.03 0.17 -------34.86 -------161.36 0.28 _________ _________ _________ Acre Acre Acre Acre TOTAL DIRECT EXPENSES RETURNS ABOVE DIRECT EXPENSES FIXED EXPENSES Implements Tractors Self-Propelled Eq. Acre Acre Acre 8.65 26.03 0.17 TOTAL FIXED EXPENSES TOTAL SPECIFIED EXPENSES RETURNS ABOVE TOTAL SPECIFIED EXPENSES 1.0000 1.0000 1.0000 _________ _________ _________ _________ _________ ALLOCATED COST ITEMS dry land cotton acre 32.00 1.0000 32.00 _________ RESIDUAL RETURNS -31.71 _________ _______________________________________________________________________ Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of Texas Cooperative Extension and approved for publication. B-1241 (C7) Projections for Planning Purposes Only Not to be Used without Updating after December 15, 2002 B-1241 (C7) Table 1.B Estimated resource use and costs for field operations, per Acre Cotton, Dryland, (2X2 Planting Pattern) 2002 Projected Costs and Returns per Acre ____________________________________________________________________________________________________________________________________________ _ TRACTOR COST EQUIP COST ALLOC LABOR OPERATING INPUT OPERATION/ SIZE/ TRACTOR PERF TIMES -------------- -------------- ---------------------------------TOTAL OPERATING INPUT UNIT SIZE RATE OVER MTH DIRECT FIXED DIRECT FIXED HOURS COST AMOUNT PRICE COST COST ____________________________________________________________________________________________________________________________________________ _ ------------dollars----------dollars -------dollars-------shredder 4 row 13 ft disc-tandem 21 feet 21 ft moldboard plow 4 bottom chisel 23 ft 23 ft herbicide - cotton pint disc - tandem 13 ft lister 20 ft planter 6 row 18 ft seed - cotton lb. pickup truck 3/4 ton insect appl. acre insecticide - cotton lb. cultivator 6 row disc - tandem 13 ft cultivator 6 row cultivator 6 row disc - tandem 13 ft disc - tandem 13 ft dry cotton insurance acre gin, bags, ties lb. stripping lb. 75 100 125 125 0.209 0.105 0.474 0.099 1.00 1.00 0.30 1.00 Dec Dec Jan Mar 2.98 2.12 3.48 2.43 2.86 2.57 4.15 2.90 0.67 0.75 0.27 0.19 1.25 1.41 0.51 0.36 0.209 0.105 0.142 0.219 1.25 0.63 0.85 1.31 9.02 7.50 9.28 7.22 1.5000 2.40 3.60 3.60 75 0.159 1.00 Mar 2.26 2.17 0.57 1.06 0.350 2.10 8.18 100 0.114 1.00 Apr 2.32 2.80 0.00 0.13 0.114 0.68 5.95 75 0.152 1.00 May 2.17 2.08 0.57 1.06 0.152 0.91 6.81 8.0000 0.60 4.80 4.80 0.006 11.66 May 1.59 0.17 1.77 1.00 Jun 1.0000 3.50 3.50 3.50 1.0000 6.25 6.25 6.25 75 0.147 1.00 Jun 2.09 2.01 0.47 0.87 0.324 1.94 7.40 75 0.159 0.06 Jun 0.14 0.13 0.03 0.06 0.021 0.13 0.51 75 0.147 1.00 Jun 2.09 2.01 0.47 0.87 0.324 1.94 7.40 75 0.147 1.00 Jul 2.09 2.01 0.47 0.87 0.324 1.94 7.40 75 0.159 0.06 Aug 0.14 0.13 0.03 0.06 0.021 0.13 0.51 75 0.159 0.06 Oct 0.14 0.13 0.03 0.06 0.021 0.13 0.51 1.00 Nov 1.0000 12.00 12.00 12.00 1.00 Nov 250.0000 0.12 30.00 30.00 250.0000 0.07 17.50 17.50 ------- ------- ------- ------- ------ ------------- ------TOTALS 24.52 26.03 6.16 8.83 2.331 13.98 77.65 157.18 INTEREST ON OPERATING CAPITAL 4.17 UNALLOCATED LABOR 0.00 TOTAL SPECIFIED COST 161.36 ____________________________________________________________________________________________________________________________________________ _ Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of Texas Cooperative Extension and approved for publication.