Projections for Planning Purposes Only B-1241 (C3)

advertisement
Projections for Planning Purposes Only
Not to be Used without Updating after December 1, 2006
Table 6.A
Estimated costs and returns per Acre
Cotton, Dryland (Solid 40" Rows)
2007 Projected Costs and Returns per Acre
_______________________________________________________________________
ITEM
UNIT
PRICE
QUANTITY
AMOUNT
YOUR FARM
_______________________________________________________________________
dollars
dollars
INCOME
cotton lint
lb.
0.54
250.0000
135.00
_________
cottonseed
ton
130.00
0.2310
30.03
_________
-------TOTAL INCOME
165.03
_________
DIRECT EXPENSES
custom
fert. application
insec. appl.
stripping - custom
herbicide
herb. - cot. roundup
insecticide
insect. - cotton
Bollweevil Erad.
seed
cotton seed
fertilizer
fertilizer (N)
insurance
crop ins. - dry cott
harvest
gin, bag, ties
OPERATOR LABOR
Implements
Tractors
Self-Propelled Eq.
DIESEL FUEL
Tractors
GASOLINE
Self-Propelled Eq.
REPAIR & MAINTENANCE
Implements
Tractors
Self-Propelled Eq.
INTEREST ON OP. CAP.
acre
acre
lb.
3.50
3.50
0.09
1.0000
1.0000
250.0000
3.50
3.50
22.50
_________
_________
_________
pint
1.88
1.5000
2.82
_________
lb.
acre
5.00
10.00
1.0000
1.0000
5.00
10.00
_________
_________
lb.
2.00
7.0000
14.00
_________
lb.
0.35
57.0000
19.95
_________
12.00
1.0000
12.00
_________
lb.
0.12
250.0000
30.00
_________
hour
hour
hour
9.10
9.10
9.10
1.1978
0.9982
0.0781
10.90
9.08
0.71
_________
_________
_________
gal
2.00
6.6779
13.35
_________
gal
2.25
1.1728
2.63
_________
Acre
Acre
Acre
Acre
4.52
7.48
0.10
7.36
1.0000
1.0000
1.0000
1.0000
4.52
7.48
0.10
7.36
-------179.44
-14.41
_________
_________
_________
_________
8.24
16.60
0.27
-------25.12
-------204.57
-39.54
_________
_________
_________
acre
TOTAL DIRECT EXPENSES
RETURNS ABOVE DIRECT EXPENSES
FIXED EXPENSES
Implements
Tractors
Self-Propelled Eq.
Acre
Acre
Acre
8.24
16.60
0.27
TOTAL FIXED EXPENSES
TOTAL SPECIFIED EXPENSES
RETURNS ABOVE TOTAL SPECIFIED EXPENSES
1.0000
1.0000
1.0000
_________
_________
_________
_________
_________
ALLOCATED COST ITEMS
cotton dry
acre
32.00
1.0000
32.00
_________
RESIDUAL RETURNS
-71.54
_________
_______________________________________________________________________
Projections for Planning Purposes Only.
Information presented is prepared solely as a general guide & not intended to recognize or predict the costs & returns from any one operation.
These projections were collected & developed by TCE staff & approved for publication.
B-1241 (C3)
Projections for Planning Purposes Only
Not to be Used without Updating after December 1, 2006
B-1241 (C3)
Table 6.B
Estimated resource use and costs for field operations, per Acre
Cotton, Dryland (Solid 40" Rows)
2007 Projected Costs and Returns per Acre
_____________________________________________________________________________________________________________________________________________
TRACTOR COST
EQUIP COST
ALLOC LABOR
OPERATING INPUT
OPERATION/
SIZE/
TRACTOR
PERF TIMES
-------------- -------------- ---------------------------------TOTAL
OPERATING INPUT
UNIT
SIZE
RATE OVER MTH DIRECT
FIXED DIRECT
FIXED HOURS
COST
AMOUNT
PRICE
COST
COST
_____________________________________________________________________________________________________________________________________________
------------dollars----------dollars
-------dollars-------Shredder - 4 row
13.3 feet
Disc-Tandem (21 ft) 21 feet
fertilizer (N)
lb.
fert. application
acre
Chisel - 25 Feet
25 Feet
herb. - cot. roundup pint
Sprayer - 25 feet
25 feet
Disc-Tandem (21 ft) 21 feet
Lister
20 feet
Pick-up Truck
3/4 ton
Planter
26.6 feet
cotton seed
lb.
cultivator - 9 row
9 row
insect. - cotton
lb.
insec. appl.
acre
Sprayer - 25 feet
25 feet
herb. - cot. roundup pint
crop ins. - dry cott acre
Bollweevil Erad.
acre
gin, bag, ties
lb.
stripping - custom
lb.
125
125
0.209
0.105
1.00
1.00
1.00
Dec
Dec
Jan
4.37
2.19
3.48
1.74
0.95
1.08
1.60
1.81
0.460
0.231
4.19
2.10
14.62
8.94
57.0000
0.35
19.95
19.95
1.0000
3.50
3.50
3.50
125
0.091 1.00 Mar
1.91
1.52
0.52
1.40 0.201
1.83
7.20
1.0000
1.88
1.88
1.88
125
0.088 1.00 Mar
1.84
1.46
0.11
0.22 0.194
1.76
5.41
125
0.105 1.00 Mar
2.19
1.74
1.08
1.81 0.231
2.10
8.94
125
0.114 1.00 May
2.39
1.90
0.10
0.17 0.251
2.29
6.86
0.006 11.67 May
2.74
0.27 0.078
0.71
3.73
125
0.086 1.00 Jun
1.79
1.43
0.23
0.45 0.189
1.72
5.64
7.0000
2.00
14.00
14.00
125
0.109 1.00 Jun
2.29
1.82
0.31
0.52 0.241
2.19
7.15
1.00 Jun
1.0000
5.00
5.00
5.00
1.0000
3.50
3.50
3.50
125
0.088 1.00 Jun
1.84
1.46
0.11
0.22 0.194
1.76
5.41
0.5000
1.88
0.94
0.94
1.00 Nov
1.0000 12.00
12.00
12.00
1.0000 10.00
10.00
10.00
1.00 Nov
250.0000
0.12
30.00
30.00
250.0000
0.09
22.50
22.50
------- ------- ------- ------- ------ ------------- ------TOTALS
20.84
16.60
7.27
8.51 2.274
20.69
123.27 197.20
INTEREST ON OPERATING CAPITAL
7.36
UNALLOCATED LABOR
0.00
TOTAL SPECIFIED COST
204.57
_____________________________________________________________________________________________________________________________________________
Projections for Planning Purposes Only.
Information presented is prepared solely as a general guide & not intended to recognize or predict the costs & returns from any one operation.
These projections were collected & developed by TCE staff & approved for publication.
Download