Projections for Planning Purposes Only Not to be Used without Updating after February 15, 2003 Table 6.A Estimated costs and returns per Acre Cotton, Dryland (Solid 40" Rows) 2003 Projected Costs and Returns per Acre _______________________________________________________________________ ITEM UNIT PRICE QUANTITY AMOUNT YOUR FARM _______________________________________________________________________ dollars dollars INCOME cotton lint lb. 0.52 280.0000 145.60 _________ cottonseed ton 85.00 0.2310 19.63 _________ -------TOTAL INCOME 165.23 _________ DIRECT EXPENSES custom insec. appl. stripping - custom herbicide herb. - cotton insecticide insect. - cotton Bollweevil Erad. seed seed - cotton insurance crop ins. - dry cott harvest gin, bag, ties OPERATOR LABOR Implements Tractors Self-Propelled Eq. DIESEL FUEL Tractors GASOLINE Self-Propelled Eq. REPAIR & MAINTENANCE Implements Tractors Self-Propelled Eq. INTEREST ON OP. CAP. acre lb. 3.50 0.07 1.0000 280.0000 3.50 19.60 _________ _________ pint 11.90 1.0000 11.90 _________ lb. acre 6.25 10.00 1.0000 1.0000 6.25 10.00 _________ _________ 2.52 14.0000 35.28 _________ 12.00 1.0000 12.00 _________ lb. 0.12 280.0000 33.60 _________ hour hour hour 9.00 9.00 9.00 1.8880 1.5734 0.0781 16.99 14.16 0.70 _________ _________ _________ gal 1.00 8.7356 8.73 _________ gal 1.10 1.1728 1.29 _________ 8.58 10.27 0.09 8.00 1.0000 1.0000 1.0000 1.0000 8.58 10.27 0.09 8.00 -------200.98 -35.74 _________ _________ _________ _________ 15.26 19.71 0.23 -------35.21 -------236.19 -70.96 _________ _________ _________ lb. acre Acre Acre Acre Acre TOTAL DIRECT EXPENSES RETURNS ABOVE DIRECT EXPENSES FIXED EXPENSES Implements Tractors Self-Propelled Eq. Acre Acre Acre 15.26 19.71 0.23 TOTAL FIXED EXPENSES TOTAL SPECIFIED EXPENSES RETURNS ABOVE TOTAL SPECIFIED EXPENSES 1.0000 1.0000 1.0000 _________ _________ _________ _________ _________ ALLOCATED COST ITEMS cotton dry acre 32.00 1.0000 32.00 _________ RESIDUAL RETURNS -102.96 _________ _______________________________________________________________________ Projections for Planning Purposes Only. Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of Texas Cooperative Extension and approved for publication. B-1241 (3) Projections for Planning Purposes Only Not to be Used without Updating after February 15, 2003 B-1241 (C3) Table 6.B Estimated resource use and costs for field operations, per Acre Cotton, Dryland (Solid 40" Rows) 2003 Projected Costs and Returns per Acre _____________________________________________________________________________________________________________________________________________ TRACTOR COST EQUIP COST ALLOC LABOR OPERATING INPUT OPERATION/ SIZE/ TRACTOR PERF TIMES -------------- -------------- ---------------------------------TOTAL OPERATING INPUT UNIT SIZE RATE OVER MTH DIRECT FIXED DIRECT FIXED HOURS COST AMOUNT PRICE COST COST _____________________________________________________________________________________________________________________________________________ ------------dollars----------dollars -------dollars-------Shredder - 4 row Disc-Tandem (21 ft) Moldboard Plow Disc-Tandem (21 ft) Chisel - 25 Feet herb. - cotton Sprayer - 25 feet Lister Pick-up Truck Planter seed - cotton cultivator - 9 row Sand Fighter insect. - cotton insec. appl. cultivator - 9 row Disc-Tandem (21 ft) Disc-Tandem (21 ft) crop ins. - dry cott Bollweevil Erad. gin, bag, ties stripping - custom 13.3 feet 21 feet 8 feet 21 feet 25 Feet pint 25 feet 20 feet 3/4 ton 26.6 feet lb. 9 row 22.5 feet lb. acre 9 row 21 feet 21 feet acre acre lb. lb. 100 100 100 100 125 0.209 0.105 0.286 0.105 0.091 1.00 1.00 1.00 1.00 1.00 Dec Dec Dec Mar Mar 2.42 1.21 3.30 1.21 1.36 2.48 1.24 3.40 1.24 1.45 0.95 1.08 1.63 1.08 0.52 1.63 1.84 2.79 1.84 1.42 0.460 0.231 0.630 0.231 0.201 4.14 2.08 5.67 2.08 1.81 11.64 7.46 16.80 7.46 6.58 1.0000 11.90 11.90 11.90 100 0.088 1.00 Mar 1.02 1.04 0.11 0.22 0.194 1.74 4.15 100 0.114 1.00 May 1.32 1.36 0.10 0.17 0.251 2.26 5.23 0.006 11.67 May 1.38 0.23 0.078 0.70 2.32 100 0.086 1.00 Jun 0.99 1.02 0.23 0.45 0.189 1.70 4.41 14.0000 2.52 35.28 35.28 125 0.109 1.00 Jun 1.63 1.74 0.31 0.53 0.241 2.17 6.40 40 0.057 1.00 Jun 0.44 0.45 0.06 0.11 0.125 1.13 2.20 1.00 Jun 1.0000 6.25 6.25 6.25 1.0000 3.50 3.50 3.50 125 0.109 1.00 Jul 1.63 1.74 0.31 0.53 0.241 2.17 6.40 100 0.105 1.00 Aug 1.21 1.24 1.08 1.84 0.231 2.08 7.46 100 0.105 1.00 Oct 1.21 1.24 1.08 1.84 0.231 2.08 7.46 1.00 Nov 1.0000 12.00 12.00 12.00 1.0000 10.00 10.00 10.00 1.00 Nov 280.0000 0.12 33.60 33.60 280.0000 0.07 19.60 19.60 ------- ------- ------- ------- ------ ------------- ------TOTALS 19.01 19.71 9.97 15.50 3.539 31.85 132.13 228.18 INTEREST ON OPERATING CAPITAL 8.00 UNALLOCATED LABOR 0.00 TOTAL SPECIFIED COST 236.19 _____________________________________________________________________________________________________________________________________________ Projections for Planning Purposes Only.