Projections for Planning Purposes Only B-1241 (C12)

advertisement
Projections for Planning Purposes Only
Not to be Used without Updating after October 15, 2004
Table 7.A
Estimated costs and returns per acre
Grain Sorghum; Reduced Tillage, Furrow Irr.
Projected for 2005, Rio Grande Valley, For Planning Purposes
_______________________________________________________________________
ITEM
UNIT
PRICE
QUANTITY
AMOUNT
YOUR FARM
_______________________________________________________________________
dollars
dollars
INCOME
Grain Sorghum
cwt
4.15
43.0000
178.45
_________
-------TOTAL INCOME
178.45
_________
DIRECT EXPENSES
FERTILIZER
Fert 25-10-0
HERBICIDE
Roundup Ultra 4SL
AAtrex 4L
IRRIGATION SUPPLIES
Irrigation Water
SEED/PLANTS
Grain Sorghum Seed
CUSTOM HARVEST/HAUL
Harvest/Haul Sorghum
OPERATOR LABOR
Tractors
Self-Propelled Eq.
HAND LABOR
Implements
IRRIGATION LABOR
Labor (Flood)
Labor (Irr. Setup)
UNALLOCATED LABOR
DIESEL FUEL
Tractors
Self-Propelled Eq.
REPAIR & MAINTENANCE
Implements
Tractors
Self-Propelled Eq.
INTEREST ON OP. CAP.
tons
326.22
0.2000
65.24
_________
4.56
1.55
3.2500
2.0000
14.82
3.10
_________
_________
16.23
0.4000
6.49
_________
lb
1.04
6.0000
6.24
_________
cwt
0.60
43.0000
25.80
_________
hour
hour
6.50
6.50
0.2420
0.0330
1.57
0.21
_________
_________
hour
7.50
0.1110
0.83
_________
hour
hour
hour
6.50
6.50
6.50
1.0000
0.1000
0.2200
6.50
0.65
1.43
_________
_________
_________
gal
gal
1.73
1.73
1.5754
0.0660
2.72
0.11
_________
_________
acre
acre
acre
acre
3.75
2.24
0.53
5.59
1.0000
1.0000
1.0000
1.0000
3.75
2.24
0.53
5.59
-------147.87
30.57
_________
_________
_________
_________
9.16
6.31
0.97
-------16.45
-------164.32
14.12
_________
_________
_________
pt
pt
ac-ft
TOTAL DIRECT EXPENSES
RETURNS ABOVE DIRECT EXPENSES
FIXED EXPENSES
Implements
Tractors
Self-Propelled Eq.
acre
acre
acre
9.16
6.31
0.97
TOTAL FIXED EXPENSES
TOTAL SPECIFIED EXPENSES
RETURNS ABOVE TOTAL SPECIFIED EXPENSES
1.0000
1.0000
1.0000
_________
_________
_________
_________
_________
ALLOCATED COST ITEMS
Share Rent %of Gross
%
178.45
33.0000
58.88
_________
RESIDUAL RETURNS
-44.76
_________
_______________________________________________________________________
Brand names are mentioned only as examples and imply no endorsement.
Information presented is prepared solely as a general guide & not intended to recognize or predict the costs & returns from any one operation.
These projections were collected & developed by TCE staff & approved for publication.
B-1241 (C12)
Projections for Planning Purposes Only
Not to be Used without Updating after October 15, 2004
B-1241 (C12)
Table 7.B
Estimated resource use and costs for field operations, per acre
Grain Sorghum; Reduced Tillage, Furrow Irr.
Projected for 2005, Rio Grande Valley, For Planning Purposes Only
_____________________________________________________________________________________________________________________________________________
TRACTOR COST
EQUIP COST
ALLOC LABOR
OPERATING INPUT
OPERATION/
SIZE/
TRACTOR
PERF TIMES
-------------- -------------- ---------------------------------TOTAL
OPERATING INPUT
UNIT
SIZE
RATE OVER MTH DIRECT
FIXED DIRECT
FIXED HOURS
COST
AMOUNT
PRICE
COST
COST
_____________________________________________________________________________________________________________________________________________
------------dollars----------dollars
-------dollars-------Cult middle/lift bed
Roller Stalk Chopper
Fert Appl (Liquid)
Fert 25-10-0
Roundup Ultra 4SL
Plant & Pre
Grain Sorghum Seed
AAtrex 4L
Ditcher
Labor (Irr. Setup)
Labor (Flood)
Irrigation Water
Hi-Clear Sprayer
Roundup Ultra 4SL
Harvest/Haul Sorghum
8R-40
8-row
8R-40
tons
pt
8R-40
lb
pt
standard
hour
hour
ac-ft
60'
pt
cwt
105 hp
130 hp
130 hp
0.034
0.040
0.074
1.00
1.00
1.00
Oct
Nov
Jan
0.78
0.80
1.48
1.32
0.96
1.77
0.81
0.35
0.92
1.70
0.77
2.67
0.034
0.040
0.111
0.22
0.26
0.75
4.85
3.15
7.62
0.2000 326.22
65.24
65.24
1.2500
4.56
5.70
5.70
130 hp
0.074 1.00 Jan
1.48
1.77
1.59
3.81 0.148
1.03
9.71
6.0000
1.04
6.24
6.24
2.0000
1.55
3.10
3.10
130 hp
0.020 1.00 Apr
0.40
0.48
0.06
0.18 0.020
0.13
1.26
0.100
0.65
0.1000
0.65
1.00 Apr
1.000
6.50
1.0000
6.50
0.4000 16.23
6.49
6.49
0.033 1.00 Jul
0.65
0.97 0.033
0.21
1.83
2.0000
4.56
9.12
9.12
1.00 Jul
43.0000
0.60
25.80
25.80
------- ------- ------- ------- ------ ------------- ------TOTALS
4.96
6.31
4.40
10.13 1.486
9.77
121.69 157.29
INTEREST ON OPERATING CAPITAL
5.59
UNALLOCATED LABOR
1.43
TOTAL SPECIFIED COST
164.32
_____________________________________________________________________________________________________________________________________________
Brand names are mentioned only as examples and imply no endorsement.
Information presented is prepared solely as a general guide & not intended to recognize or predict the costs & returns from any one operation.
These projections were collected & developed by TCE staff & approved for publication.
Download