Projections for Planning Purposes Only B-1241 (C10)

advertisement
Projections for Planning Purposes Only
Not to be Used without Updating after January 1, 2008
Table 27.A
Estimated costs and returns per Acre
Processed Beets, Irrigated
2008 Projected Costs and Returns per Acre
_______________________________________________________________________
ITEM
UNIT
PRICE
QUANTITY
AMOUNT
YOUR FARM
_______________________________________________________________________
dollars
dollars
INCOME
beets
ton
40.00
15.0000
600.00
_________
-------TOTAL INCOME
600.00
_________
DIRECT EXPENSES
SEED
seed beet
CROP INSURANCE
crop insurance-NAP
FUNGICIDE
fungicide beet
FERTILIZER
nitrogen n32
phospate
MISC ADMIN O/H
mis admin o/h
SOIL ADMENDMENT
boron
HERBICIDES
herbicide beets
CUSTOM
herb appl
fungicide appl beet
IRRIGATION
irrigation costs
OPERATOR LABOR
Tractors
IRRIGATION LABOR
irr system 1
DIESEL FUEL
Tractors
GASOLINE
Pick-up, 3/4 ton
REPAIR & MAINTENANCE
Implements
Tractors
Pick-up, 3/4 ton
irr system 1
INTEREST ON OP. CAP.
lb
50.00
1.0000
50.00
_________
acre
2.00
1.0000
2.00
_________
acre
7.00
1.0000
7.00
_________
lb
lb
0.50
0.40
124.0000
80.0000
62.00
32.00
_________
_________
acre
4.00
1.0000
4.00
_________
acre
7.00
2.0000
14.00
_________
acre
25.00
1.0000
25.00
_________
acre
acre
4.00
5.00
1.0000
3.0000
4.00
15.00
_________
_________
ac/in
4.00
15.0000
60.00
_________
hour
10.00
1.8824
18.82
_________
hour
10.00
0.7500
7.50
_________
gal
2.80
9.4791
26.54
_________
gal
3.00
0.9100
2.73
_________
10.38
17.19
1.00
0.17
10.34
1.0000
1.0000
1.0000
15.0000
1.0000
10.38
17.19
1.00
2.55
10.34
-------372.07
227.92
_________
_________
_________
_________
_________
18.33
25.50
3.00
2.55
-------49.38
-------421.46
178.53
_________
_________
_________
_________
Acre
Acre
acre
ac/in
Acre
TOTAL DIRECT EXPENSES
RETURNS ABOVE DIRECT EXPENSES
FIXED EXPENSES
Implements
Tractors
Pick-up, 3/4 ton
irr system 1
Acre
Acre
acre
ac/in
18.33
25.50
3.00
0.17
TOTAL FIXED EXPENSES
TOTAL SPECIFIED EXPENSES
RETURNS ABOVE TOTAL SPECIFIED EXPENSES
1.0000
1.0000
1.0000
15.0000
_________
_________
_________
_________
_________
ALLOCATED COST ITEMS
cash rent beets
acre
40.00
1.0000
40.00
_________
RESIDUAL RETURNS
138.53
_________
_______________________________________________________________________
Information presented is prepared solely as a general guide & not intended to recognize or predict the costs & returns from any one operation.
These projections were collected & developed by TCE staff & approved for publication.
B-1241 (C10)
Projections for Planning Purposes Only
Not to be Used without Updating after January 1, 2008
B-1241 (C10)
Table 27.B
Estimated resource use and costs for field operations, per Acre
Processed Beets, Irrigated
2008 Projected Costs and Returns per Acre
_____________________________________________________________________________________________________________________________________________
TRACTOR COST
EQUIP COST
ALLOC LABOR
OPERATING INPUT
OPERATION/
SIZE/
TRACTOR
PERF TIMES
-------------- -------------- ---------------------------------TOTAL
OPERATING INPUT
UNIT
SIZE
RATE OVER MTH DIRECT
FIXED DIRECT
FIXED HOURS
COST
AMOUNT
PRICE
COST
COST
_____________________________________________________________________________________________________________________________________________
------------dollars----------dollars
-------dollars-------shredder
moleboard plow veg2
offset disc
12-foot
land plane
offset disc 20 ft
20 ft
bed shapper
nitrogen n32
lb
phospate
lb
bedder
6-row
irrigation costs
ac/in
planter
6 row
seed beet
lb
herbicide beets
acre
crop insurance-NAP
acre
herb appl
acre
cultivator 8 row
8 row
Pick-up, 3/4 ton
acre
irrigation costs
ac/in
fungicide beet
acre
fungicide appl beet acre
irrigation costs
ac/in
cultivator 8 row
8 row
irrigation costs
ac/in
nitrogen n32
lb
mis admin o/h
acre
boron
acre
fungicide appl beet acre
cultivator 8 row
8 row
irr system 1
ac/in
irrigation costs
ac/in
100
150
125
100
200
125
0.130
0.170
0.130
0.190
0.103
0.130
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Sep
Sep
Sep
Sep
Nov
Jan
Jan
3.45
5.45
4.17
5.07
3.93
4.17
2.20
2.64
2.58
3.23
1.98
2.58
0.40
1.33
0.79
1.14
3.35
0.32
0.57
1.87
1.46
2.11
6.15
0.59
0.130
0.425
0.130
0.190
0.103
0.130
1.30
4.25
1.30
1.90
1.03
1.30
7.94
15.57
10.31
13.48
16.46
8.98
64.0000
0.50
32.00
32.00
80.0000
0.40
32.00
32.00
100
0.114 1.00 Jan
3.02
1.93
0.40
0.73 0.114
1.14
7.23
3.0000
4.00
12.00
12.00
150
0.140 1.00 Jan
4.49
2.17
0.89
1.64 0.350
3.50
12.72
1.0000 50.00
50.00
50.00
1.0000 25.00
25.00
25.00
1.0000
2.00
2.00
2.00
1.0000
4.00
4.00
4.00
125
0.103 1.00 Jan
3.31
2.04
0.57
1.05 0.103
1.03
8.02
1.00 Jan
3.73
3.00
1.0000
6.73
3.0000
4.00
12.00
12.00
1.00 Feb
1.0000
7.00
7.00
7.00
1.0000
5.00
5.00
5.00
1.00 Feb
3.0000
4.00
12.00
12.00
125
0.103 1.00 Mar
3.31
2.04
0.57
1.05 0.103
1.03
8.02
1.00 Mar
3.0000
4.00
12.00
12.00
60.0000
0.50
30.00
30.00
1.00 Mar
1.0000
4.00
4.00
4.00
1.00 Apr
2.0000
7.00
14.00
14.00
2.0000
5.00
10.00
10.00
125
0.103 1.00 Apr
3.31
2.04
0.57
1.05 0.103
1.03
8.02
1.00 Apr
2.55
2.55 0.750
7.50
15.0000
12.60
3.0000
4.00
12.00
12.00
------- ------- ------- ------- ------ ------------- ------TOTALS
43.73
25.50
16.66
23.88 2.632
26.32
275.00 411.11
INTEREST ON OPERATING CAPITAL
10.34
UNALLOCATED LABOR
0.00
TOTAL SPECIFIED COST
421.46
_____________________________________________________________________________________________________________________________________________
Information presented is prepared solely as a general guide & not intended to recognize or predict the costs & returns from any one operation.
These projections were collected & developed by TCE staff & approved for publication.
Download