Projections for Planning Purposes Only B-1241 (C10)

advertisement
Projections for Planning Purposes Only
Not to be Used without Updating after January 1, 2008
Table 14.A
Estimated costs and returns per acre
Peanut, Runner, Dryland
2008 Projected Costs and Returns per Acre
_______________________________________________________________________
ITEM
UNIT
PRICE
QUANTITY
AMOUNT
YOUR FARM
_______________________________________________________________________
dollars
dollars
INCOME
peanuts f. runner
cwt
19.00
15.0000
285.00
_________
-------TOTAL INCOME
285.00
_________
DIRECT EXPENSES
SEED
seed peanut
seed treat. peanuts
CROP INSURANCE
crop ins. s peanut
FUNGICIDE
fung. spanish pean
fungicide peanut d
MISC ADMIN O/H
mis admin o/h pean d
HERBICIDES
herb pre emerg peanu
CUSTOM
pesticide appl pea 3
pest. appl pean 4
cstm haul peanut i
peanut drying si
OPERATOR LABOR
Tractors
Self-Propelled Eq.
DIESEL FUEL
Tractors
Self-Propelled Eq.
GASOLINE
Pick-up, 3/4 ton
REPAIR & MAINTENANCE
Implements
Tractors
Self-Propelled Eq.
Pick-up, 3/4 ton
INTEREST ON OP. CAP.
lb
acre
0.65
5.91
65.0000
1.0000
42.25
5.91
_________
_________
acre
12.00
1.0000
12.00
_________
acre
acre
4.60
8.63
1.0000
1.0000
4.60
8.63
_________
_________
acre
4.00
1.0000
4.00
_________
acre
16.74
1.0000
16.74
_________
acre
acre
ton
ton
5.00
50.00
10.50
16.80
1.0000
1.0000
1.1500
1.2500
5.00
50.00
12.07
21.00
_________
_________
_________
_________
hour
hour
10.00
10.00
1.2317
0.4250
12.31
4.25
_________
_________
gal
gal
2.80
2.80
8.0236
4.2500
22.46
11.90
_________
_________
gal
3.00
0.9100
2.73
_________
4.74
15.18
3.14
1.00
3.39
1.0000
1.0000
1.0000
1.0000
1.0000
4.74
15.18
3.14
1.00
3.39
-------263.34
21.65
_________
_________
_________
_________
_________
8.48
22.52
4.05
3.00
-------38.07
-------301.41
-16.41
_________
_________
_________
_________
acre
acre
acre
acre
acre
TOTAL DIRECT EXPENSES
RETURNS ABOVE DIRECT EXPENSES
FIXED EXPENSES
Implements
Tractors
Self-Propelled Eq.
Pick-up, 3/4 ton
acre
acre
acre
acre
8.48
22.52
4.05
3.00
TOTAL FIXED EXPENSES
TOTAL SPECIFIED EXPENSES
RETURNS ABOVE TOTAL SPECIFIED EXPENSES
1.0000
1.0000
1.0000
1.0000
_________
_________
_________
_________
_________
ALLOCATED COST ITEMS
cash rent s peanut d
acre
30.00
1.0000
30.00
_________
RESIDUAL RETURNS
-46.41
_________
_______________________________________________________________________
Information presented is prepared solely as a general guide & not intended to recognize or predict the costs & returns from any one operation.
These projections were collected & developed by TCE staff & approved for publication.
B-1241 (C10)
Projections for Planning Purposes Only
Not to be Used without Updating after January 1, 2008
B-1241 (C10)
Table 14.B
Estimated resource use and costs for field operations, per acre
Peanut, Runner, Dryland
2008 Projected Costs and Returns per Acre
_____________________________________________________________________________________________________________________________________________
TRACTOR COST
EQUIP COST
ALLOC LABOR
OPERATING INPUT
OPERATION/
SIZE/
TRACTOR
PERF TIMES
-------------- -------------- ---------------------------------TOTAL
OPERATING INPUT
UNIT
SIZE
RATE OVER MTH DIRECT
FIXED DIRECT
FIXED HOURS
COST
AMOUNT
PRICE
COST
COST
_____________________________________________________________________________________________________________________________________________
------------dollars----------dollars
-------dollars-------shredder
chisel
Pick-up, 3/4 ton
acre
tandem disc - 20 ft 20 feet
bedder
6-row
planter-peanut
seed peanut
lb
seed treat. peanuts acre
cultivator 8 row
8 row
fung. spanish pean
acre
pesticide appl pea 3 acre
sprayer
18 row
herb pre emerg peanu acre
mis admin o/h pean d acre
fungicide peanut d
acre
pest. appl pean 4
acre
crop ins. s peanut
acre
peanut digger
combine peanut
cstm haul peanut i
ton
peanut drying si
ton
100
225
0.130
0.110
1.00
1.00
1.00
1.00
1.00
1.00
Mar
Mar
Mar
May
May
May
3.45
5.47
2.20
2.64
0.40
0.22
3.73
0.76
0.40
1.60
0.57
0.35
3.00
1.40
0.73
2.95
0.130
0.110
1.30
1.10
7.94
9.79
1.0000
6.73
200
0.103
3.93
1.98
0.103
1.03
9.13
100
0.114
3.02
1.93
0.114
1.14
7.23
100
0.240
6.38
4.08
0.240
2.40
17.43
65.0000
0.65
42.25
42.25
1.0000
5.91
5.91
5.91
125
0.103 1.00 May
3.31
2.04
0.57
1.05 0.103
1.03
8.02
1.00 Jun
1.0000
4.60
4.60
4.60
1.0000
5.00
5.00
5.00
125
0.110 1.00 Jun
3.53
2.18
0.32
0.69 0.110
1.10
7.83
1.0000 16.74
16.74
16.74
1.00 Jun
1.0000
4.00
4.00
4.00
1.00 Jul
1.0000
8.63
8.63
8.63
1.0000 50.00
50.00
50.00
1.00 Sep
1.0000 12.00
12.00
12.00
100
0.320 1.00 Sep
8.52
5.44
0.44
0.70 0.320
3.20
18.32
0.425
15.04
4.05 0.425
4.25
23.34
1.1500 10.50
12.07
12.07
1.2500 16.80
21.00
21.00
------- ------- ------- ------- ------ ------------- ------TOTALS
37.65
22.52
23.52
15.54 1.656
16.56
182.20 298.02
INTEREST ON OPERATING CAPITAL
3.39
UNALLOCATED LABOR
0.00
TOTAL SPECIFIED COST
301.41
_____________________________________________________________________________________________________________________________________________
Information presented is prepared solely as a general guide & not intended to recognize or predict the costs & returns from any one operation.
These projections were collected & developed by TCE staff & approved for publication.
Download