Projections for Planning Purposes Only B-1241 (C10)

advertisement
Projections for Planning Purposes Only
Not to be Used without Updating after November 1, 2005
Table 9.A
Estimated costs and returns per acre
Corn, Dryland
2006 Projected Costs and Returns per Acre
_______________________________________________________________________
ITEM
UNIT
PRICE
QUANTITY
AMOUNT
YOUR FARM
_______________________________________________________________________
dollars
dollars
INCOME
corn
bu
2.60
55.0000
143.00
_________
-------TOTAL INCOME
143.00
_________
DIRECT EXPENSES
SEED
seed corn-grain
CROP INSURANCE
crop ins. corn
FERTILIZER
nitrogen n32
phospate
MISC ADMIN O/H
mis admin o/h corn
HERBICIDES
herbicide corn
CUSTOM
cstm haul corn
cstm hvst corn dry
custom harvst/bu
OPERATOR LABOR
Tractors
DIESEL FUEL
Tractors
GASOLINE
Pick-up, 3/4 ton
REPAIR & MAINTENANCE
Implements
Tractors
Pick-up, 3/4 ton
INTEREST ON OP. CAP.
thou
1.90
15.2600
28.99
_________
acre
10.14
1.0000
10.14
_________
0.37
0.42
60.0000
40.0000
22.20
16.80
_________
_________
acre
16.00
0.5000
8.00
_________
acre
7.00
1.0000
7.00
_________
bu
acre
bu
0.15
14.00
0.14
55.0000
1.0000
55.0000
8.25
14.00
7.70
_________
_________
_________
hour
8.40
0.8170
6.86
_________
gal
2.00
6.2365
12.47
_________
gal
2.20
0.9100
2.00
_________
acre
acre
acre
acre
3.37
9.22
1.00
5.39
1.0000
1.0000
1.0000
1.0000
3.37
9.22
1.00
5.39
-------163.41
-20.41
_________
_________
_________
_________
6.75
15.77
3.00
-------25.52
-------188.94
-45.94
_________
_________
_________
lb
lb
TOTAL DIRECT EXPENSES
RETURNS ABOVE DIRECT EXPENSES
FIXED EXPENSES
Implements
Tractors
Pick-up, 3/4 ton
acre
acre
acre
6.75
15.77
3.00
TOTAL FIXED EXPENSES
TOTAL SPECIFIED EXPENSES
RETURNS ABOVE TOTAL SPECIFIED EXPENSES
1.0000
1.0000
1.0000
_________
_________
_________
_________
_________
ALLOCATED COST ITEMS
cash rent corn dry
acre
20.00
1.0000
20.00
_________
RESIDUAL RETURNS
-65.94
_________
_______________________________________________________________________
Information presented is prepared solely as a general guide & not intended to recognize or predict the costs & returns from any one operation.
These projections were collected & developed by TCE staff & approved for publication.
B-1241 (C10)
Projections for Planning Purposes Only
Not to be Used without Updating after November 1, 2005
B-1241 (C10)
Table 9.B
Estimated resource use and costs for field operations, per acre
Corn, Dryland
2006 Projected Costs and Returns per Acre
_____________________________________________________________________________________________________________________________________________
TRACTOR COST
EQUIP COST
ALLOC LABOR
OPERATING INPUT
OPERATION/
SIZE/
TRACTOR
PERF TIMES
-------------- -------------- ---------------------------------TOTAL
OPERATING INPUT
UNIT
SIZE
RATE OVER MTH DIRECT
FIXED DIRECT
FIXED HOURS
COST
AMOUNT
PRICE
COST
COST
_____________________________________________________________________________________________________________________________________________
------------dollars----------dollars
-------dollars-------shredder
Pick-up, 3/4 ton
crop ins. corn
chisel
offset disc
mis admin o/h corn
planter-max emerge m
seed corn-grain
sprayer-hi speed
herbicide corn
fert. - side dress
nitrogen n32
phospate
cultivator 8 row
cstm haul corn
cstm hvst corn dry
custom harvst/bu
100
7.19
6.00
10.14
10.14
10.14
225
0.110 1.00 Aug
4.28
2.81
0.20
0.37 0.110
0.92
8.59
12-foot
125
0.130 1.00 Sep
3.34
2.74
0.73
1.52 0.130
1.09
9.44
acre
1.00 Feb
0.5000 16.00
8.00
8.00
150
0.100 1.00 Feb
2.51
1.65
0.59
1.23 0.100
0.84
6.83
thou
15.2600
1.90
28.99
28.99
150
0.090 1.00 Mar
2.26
1.48
0.21
0.44 0.090
0.75
5.16
acre
1.0000
7.00
7.00
7.00
150
0.153 1.00 Apr
3.86
2.54
0.71
1.48 0.153
1.29
9.90
lb
60.0000
0.37
22.20
22.20
lb
40.0000
0.42
16.80
16.80
8 row
125
0.103 1.00 May
2.65
2.17
0.53
1.10 0.103
0.86
7.33
bu
1.00 Jul
55.0000
0.15
8.25
8.25
acre
1.0000 14.00
14.00
14.00
bu
55.0000
0.14
7.70
7.70
------- ------- ------- ------- ------ ------------- ------TOTALS
21.70
15.77
6.37
9.75 0.817
6.86
123.08 183.55
INTEREST ON OPERATING CAPITAL
5.39
UNALLOCATED LABOR
0.00
TOTAL SPECIFIED COST
188.94
_____________________________________________________________________________________________________________________________________________
acre
acre
0.130
1.00
1.00
Aug
Aug
2.77
2.34
0.38
3.00
0.60
3.00
0.130
1.09
Information presented is prepared solely as a general guide & not intended to recognize or predict the costs & returns from any one operation.
These projections were collected & developed by TCE staff & approved for publication.
1.0000
1.0000
Download