PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 823 •JALAPENO PEPPERS, IRRIGATED, RIO GRANDE VALLEY 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS JALAPENOS TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 160.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS 3.00 ♦SEED-JALAPENO ♦NITROGEN (DRY) 100.00 ♦PHOSPHATE 60.00 ♦HERBICIDE 2.00 ♦INSECTICIDE 15.00 PESTICIDE APPL. 15.00 ♦IRRIGATION WATER 10.00 IRRIGATION WATER 60.00 FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 6.11 IRRIGATION 60.00 EOUIPMENT 0.63 OPERATING CAPITAL 25.99 SUBTOTAL, PREHARVEST HARVEST COSTS HARVEST 160.00 PACK & COUNT 160.00 MARKETING 160.00 SUBTOTAL. HARVEST TOTAL VARIABLE COSTS PROJECTED YOUR VALUE ESTIMATE $/UNIT CWT. 20.00 3200.00 $ 3200.00 $ LB. LB. LB. ACRE APPL ACRE APPL ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 25.00 0.25 0.25 35.75 5.15 3.50 8.00 75.00 25.00 15.00 71.50 77.25 52.50 80.00 4.50 4.50 4.50 0. 150 $ 26.84 1.45 10.81 9. 16 27.51 270.00 2.83 3.90 748.75 $ CWT. CWT. CRTN ACRE ACRE BREAK-EVEN PRICE, VARIABLE COSTS #^s B-124KC19) 7 . 0 0 1120.00 1.35 216.00 0.40 64.00 $ 1400.00 $ $ 2148.75 $. $ 13.43/CWT. JALAPENOS INCOME ABOVE VARIABLE COSTS ACRE FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EOUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE 35.24 ACRE 22.29 ACRE 90.00 90.00 ACRE $ 147.53 $^ TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS $ $ 1051.25 2296.28 $_ $. $ 14.35/CWT. JALAPENOS ACRE $ 903.72 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C19.43 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 823 B-124KC19) JALAPENO PEPPERS, IRRIGATED, RIO GRANDE VALLEY 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R MOLDBOARD PLOW CHISEL PLOW OFFSET DISC FLOAT PLANE BEDDER 6R FERT.APPL,RNTD ROTOVATOR 4R HERB SPRAYR 6R STANHAY PLANTR DITCHER BLADE FERT.APPL,RNTD HERB SPRAYR 6R RLNG CULT 6R DITCHER BLADE FERT.APPL,RNTD RLNG CULT 6R DITCHER BLADE DITCHER BLADE DITCHER BLADE MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 5 1 4 1 4 1 2 1 4 1 5 2 4 2 5 2 2 5 5 5 0.0 0.0 0.0 0.0 0.0 0.0 17.50 0.0 35.75 75.00 0.0 10.00 35.75 0.0 0.0 12.50 0.0 0.0 0.0 0.0 4.62 13.75 3.39 6.44 4.42 8.35 21.73 7.08 39.59 85.97 8. 15 14.23 39.59 4.69 a. 15 16.73 4.69 8. 15 8.15 8.15 46 31 33 38 45 35 59 42 47 58 48 59 47 34 48 59 34 48 48 48 DEC DEC DEC DEC DEC JAN JAN JAN JAN JAN JAN FEB FEB FEB FEB MAR MAR MAR APR MAY 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.283 0.451 0.168 0.210 0.216 0.302 0.203 0.233 0.209 0.310 0.504 0.203 0.209 0. 194 0.504 0.203 0. 194 0.504 0.504 0.504 0.214 0.342 0. 127 0. 159 0.164 0.229 0. 154 0.176 0. 159 0.235 0.382 0. 154 0. 159 0. 147 0.382 0.154 0. 147 0.382 0.382 0.382 6. 112 4.631 TOTALS 1.27 2.03 0.76 0.95 0.97 1.36 0.91 1.05 0.94 1.40 2.27 0.91 0.94 0.88 2.27 0.91 0.88 2.27 2.27 2.27 2. 11 5.49 1.50 2.72 2. 15 3. 19 1.37 2.83 1.63 3.71 4.27 1.37 1.63 1.53 4.27 1.37 1 .53 4.27 4.27 4.27 46.58 27.51 186.50 5 5 . 4 6 3 1 6 . 0 5 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. I R R I G INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 12.000 12.000 12.000 12.000 12.000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 54.00 54.00 54.00 54.00 54.00 16.00 16.00 16.00 16.00 16.00 0.0 0.0 0.0 0.0 0.0 70.00 70.00 70.00 70.00 70.00 60.00 60.000 0.0 0.0 270.00 80.00 0.0 350.00 APPL. ACRE LABOR MONTH INCHES HOURS JAN FEB MAR APR MAY 1.24 6.22 1. 13 2.78 1.30 3.80 1.95 3.21 1.27 5.86 1.62 1.95 1.27 2.28 1.62 1.95 2.28 1.62 1.62 1.62 12.00 12.00 12.00 12.00 12.00 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF JALAPENOS (DOLLARS) 16 00 18.00 20.00 22 00 128.00 179 25 435.25 691.25 947 25 1203 25 j 144.00 295 25 583.25 871.25 11 5 9 25 1447 25 | 160.00 411 25 731.25 1051.25 1371 25 1691 25 | 176.00 527 25 879.25 1231.25 1583 25 1935 25 | 192.00 643 25 1027.25 1 4 11 . 2 5 1795 25 2179 . 2 5 j CWT. QUANTITY OF JALAPENOS 24 0 0 i i C19.44 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 824 B-124KC19) CHILI PEPPERS, IRRIGATED, RIO GRANDE VALLEY 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS CHILI PEPPERS TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 140.00 VARIABLE COSTS INPUT USE PREHARVEST COSTS 3.00 ♦SD-CHILI PEPPERS ♦NITROGEN (DRY) 100.00 60.00 ♦PHOSPHATE ♦HERBICIDE 2.00 15.00 ♦INSECTICIDE 15.00 PESTICIDE APPL. ♦IRRIGATION WATER 10.00 IRRIGATION WATER 60.00 FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT 5.91 LABOR MACHINERY IRRIGATION 60.00 EQUIPMENT 0.63 OPERATING CAPITAL -50.73 SUBTOTAL, PREHARVEST HARVEST COSTS HARVEST 140.00 PACK & COUNT 140.00 MARKETING 140.00 SUBTOTAL. HARVEST TOTAL VARIABLE COSTS CWT. 28.00 LB. LB. LB. ACRE APPL ACRE APPL ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 25.00 0.25 0.25 35.75 5. 15 3.50 8.00 CWT. CWT. CWT. ACRE ACRE BREAK-EVEN PRICE, VARIABLE COSTS PROJECTED YOUR VALUE ESTIMATE $/UNIT 3920.00 $ 3920.00 $ 4.50 4.50 4.50 0. 150 $ 75.00 25.00 15.00 71.50 77.25 52.50 80.00 25.54 1.45 10. 16 9. 16 26.59 270.00 2.83 -7.61 734.37 $ 7.00 980.00 1 .35 189.00 0.30 42.00 $ 1211.00 $ $ 1945.37 $ $ 13.90/CWT. CHILI PEPPERS 3. INCOME ABOVE VARIABLE COSTS ACRE 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE 33.97 ACRE 22.20 ACRE 90.00 90.00 ACRE $ 146.16 $ 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS $ $ 1974.63 2091.53 $ $ $ 14.94/CWT. CHILI PEPPERS ACRE $ 1828.47 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C19.45 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 824 B-1241(C19) CHILI PEPPERS, IRRIGATED, RIO GRANDE VALLEY 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R MOLDBOARD PLOW CHISEL PLOW OFFSET DISC FLOAT PLANE BEDDER 6R ROTOVATOR 4R HERB SPRAYR 6R STANHAY PLANTR DITCHER BLADE FERT.APPL,RNTD HERB SPRAYR 6R RLNG CULT 6R DITCHER BLADE FERT.APPL,RNTD RLNG CULT 6R DITCHER BLADE DITCHER BLADE DITCHER BLADE MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 5 46 1 31 4 33 1 38 4 ,45 1 35 1 42 4 .47 1 ,58 5 .48 2 59 4 47 2 34 5 48 2 59 2 34 5 48 5 48 5 48 DEC DEC DEC DEC DEC JAN JAN JAN JAN JAN FEB FEB FEB FEB MAR MAR MAR APR MAY 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.283 0.451 0.168 0.210 0.216 0.302 0.233 0.209 0.310 0.504 0.203 0.209 0. 194 0.504 0.203 0. 194 0.504 0.504 0.504 0.214 0.342 0.127 0.159 0.164 0.229 0.176 0.159 0.235 0.382 0.154 0. 159 0.147 0.382 0. 154 0. 147 0.382 0.382 0.382 5.909 4.477 TOTALS 1.27 2.03 0.76 0.95 0.97 1.36 1.05 0.94 1.40 2.27 0.91 0.94 0.88 2.27 0.91 0.88 2.27 2.27 2.27 1 .27 2.28 1.62 1.95 2.28 1.62 1.62 1.62 0.0 0.0 0.0 0.0 0.0 0.0 0.0 35.75 75.00 0.0 10.00 35.75 0.0 0.0 12.50 0.0 0.0 0.0 0.0 2 . 11 5.49 1.50 2.72 2. 15 3. 19 2.83 1.63 3.71 4.27 1.37 1.63 1.53 4.27 1.37 1.53 4.27 4.27 4.27 TOTAL OPER. COST 4.62 13.75 3.39 6.44 4.42 8.35 7.08 39.59 85.97 8. 15 14.23 39.59 4.69 8. 15 16.73 4.69 8. 15 8. 15 8. 15 4 4 . 6 3 2 6 . 5 9 1 6 9 . 0 0 54.09 294.32 SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS 12.000 12.000 12.000 12.000 12.000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 54.00 54.00 54.00 54.00 54.00 16.00 16.00 16.00 16.00 16.00 0.0 0.0 0.0 0.0 0.0 70.00 70.00 70.00 70.00 70.00 60.00 60.000 0.0 0.0 270.00 80.00 0.0 350.00 IRRIG APPL. ACRE LABOR MONTH INCHES HOURS JAN FEB MAR APR MAY 1.24 6.22 1. 13 2.78 1.30 3.80 3.21 1.27 5.86 1.62 1.95 APPL. MACH INPUT FIXED COSTS COSTS 12.00 12.00 12.00 12.00 12.00 TOTAL IRRIG COSTS RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF CHILI PEPPERS (DOLLARS) QUANTITY OF CHILI PEPPERS 33 60 22 4 0 25.20 28.00 30.80 11 2 . 0 0 805 63 1119.23 1432.83 1746.43 2060 0 3 j 126.00 998 13 1350.93 1703.73 2056.53 2409 3 3 | 140.00 1190 63 1582.63 1974.63 2366.63 2758 6 3 | 154.00 1383 13 1814.33 2245.53 2676.73 3107 9 3 | 1575 63 2046.03 2516.43 2986.83 3457 2 2 ! CWT. i 168.00 j C19.46 • /•^l PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 926 B-124KC19) BUFFLE GRASS ESTABLISHMENT, DRYLAND, TEXAS RIO GRANDE VALLEY REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS PASTURE TOTAL PROJECTED RETURNS VARIABLE COSTS PREHARVEST COSTS ♦BUFFEL GRASS BRUSH CLEARING CUSTOM PLANT FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OPERATING CAPITAL SUBTOTAL. PREHARVEST HARVEST COSTS SUBTOTAL, HARVEST PROJECTED YIELD UNIT 1.00 PROJECTED VALUE $/UNIT ACRE 0.0 LB. ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 7.00 130.00 5.00 $ 0.0 0.0 YOUR ESTIMATE $ INPUT USE 4.00 1.00 1.00 0.39 0.42 14.32 TOTAL VARIABLE COSTS BREAK-EVEN PRICE, VARIABLE COSTS 4.50 4.50 0. 150 $ ACRE $ ACRE $ 28.00 130.00 5.00 1 .35 0.97 0.44 0.98 1.75 1.89 2. 15 172.52 $ 0.0 $ 172.52 $ $172. 52/ACRE PASTURE INCOME ABOVE VARIABLE COSTS ACRE $ -172.52 $ FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 5.00 $ 2.60 2.01 5.00 9.61 $ TOTAL PROJECTED COSTS ACRE $ 182.13 $ BREAK-EVEN PRICE. TOTAL COSTS NET PROJECTED RETURNS $182. 13/ACRE PASTURE ACRE $ -182.13 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. Jf|B!\ C19.47 PROJECTIONS FOR PLANNING PURPOSES ONLY B-124.1 (C19) NOT TO BE USED WITHOUT UPDATING AFTE4? 11-17-84. 926 BUFFLE GRASS ESTABLISHMENT, DRYLAND. TEXAS RIO GRANDE VALLEY REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION RLNG CULT 6R TOTALS MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 4,34 S E P T 2 . 0 0 0 . 3 8 9 0.295 2.61 1.75 0.0 3.23 7.59 0.389 0.295 2.61 1.75 0.0 3.23 7.59 C19..48 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 927 B-124KC19) BUFFEL GRASS, DRYLAND, TEXAS RIO GRANDE VALLEY REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT GROSS RECEIPTS PASTURE TOTAL PROJECTED RETURNS 2.50 VARIABLE COSTS PREHARVEST COSTS FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY EQUIPMENT OTHER OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL, HARVEST AUM IPROJECTED VALUE $/UNIT 0.0 YOUR ESTIMATE $ 0.0 0.0 $ 0.0 0.81 0.0 0. 13 0.0 1.57 2.25 0.05 4.81 $ $ 0.0 $ 4.81 $ $ INPUT USE 0.0 0.35 0.50 0.37 TOTAL VARIABLE COSTS ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 4.50 4.50 4.50 0. 150 ACRE ACRE BREAK-EVEN PRICE. VARIABLE COSTS $ 1.93/AUM PASTURE 3. INCOME ABOVE VARIABLE COSTS ACRE 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 P R O R AT E D E S TA B L 1 8 2 . 1 3 TOTAL FIXED COSTS ACRE ACRE ACRE DOL. ACRE 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS $ $ 10.00 0.10 -4.81 $ $ 0.0 1. 15 10.00 18.21 29.37 $ $ 34.18 $ $ 13.67/AUM PASTURE ACRE $ -34.18 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C19.49 i T J O > C t Z o o 3 m tn j> H Z C H TJ HH m H OJ o -n o < m < > TJ > rno i z o H m CO to ro ro ro > O O •o. Ol o i ro O 3 O i n o c O O i n H H H H m T J > 0 cn > n m H O H m tj hh o o< hh tj m o H-J VO • OT O m to J»TJ ■ rom i 1 i i —t 1 —k -^ tn tn CO Ol -J to Ol J> to X o o o to 01 00 to Ol ^ > H Z C O T J O Z i o Z < H m - TJ CO 10 1 1 O O Ol 1 o o Xk 00 10 —L ■ TJ —L .jk. 03 OI ~J CO H i ro o n c m H - O o O 10 Xk 00 m o o 1 o o - Xk 00 to 0) to CO k 01 Xk i _ i o o Xk 00 1 o o Ol l o ro cn • A 00 ro 3 m tn > T J T J > tntn — ' H c zoo to -* —4. 01 Xk i o o o ro to 01 CO to • A CO to _* -«i ro c -n -n m n to H T J mm O t n i t 1 It i ZH i o m i • 3 •no O C T J > n -c HH TJ mm n H O C 1 TJ T J 2 men n > > H H m o > n O H o m COTJ H 2 tn > H > Z O i t < m o-c I H H O ti ro i z-c c c > m 2 n O O m t n tn H Z >Z O cnTJ I T J • > i t T J O mm i tn TJ m Z O i i i i i i 30 OTJ zm HTJ X i i i i i OH <y> m3 TJm tn i Xn i o > b ! ■■Tcro JO ■CO TJ • |i o• O i 3 i x> i oo i CI 1 TJHH i tnz i m ■ 003 o ! 1i Ot nTmJ >o b i l■ tnH T J X O i b i i on i o> i tnro i HO • to TJ Gi -k TJ t o > oo tn cntn - TJ T J O O T J C - C m n o > H o ! • 1 O i i 6 i o! b i 1 OHH> i OZTJ i in tjtj i Hen • tnn« i i i i i 0-T13 Ohh> I fl X O Hmi tno i 1 i l i OH OTJO omH tOTJ> -in z O H 33 S2 mm Ch" Z m o o - € t n O H O m t O X H > tntn 5? > T J <=z" Z H O O T J O m T j H > c z T J O Z m tn Si §5 < T J > m n T J n m >-c o TJTJ mm Cl HH O O ro H n m 2 H > n > O H O n 0 m > O m m TJ O m 3 i t TJ _ ro > Z J> >< TJ TJ n 1 o O t n T J H to O H 3 I > m-c m ^ O O n C l < T J > > TJ m > > TJ m ztn 3 m o N t m t n < z > H O H > -c to • OS i TJ> i mo I TJX I 3>it i HZ i it m i OTJ z M m "to -'? zn ^oo Xk roi —L ro Xk ^ ^—s o .^ m < w PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 929 B-124KC19) BERMUDA TYPE GRASSES, ESTAB., IRRIGATED, TEXAS RIO GRANDE VALLEY REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS HAY TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 3.00 VARIABLE COSTS INPUT USE PREHARVEST COSTS CUSTOM SPRIGGING 1.00 ♦NITROGEN (DRY) 150.00 ♦HERBICIDES 2.00 ♦IRRIG. WATER 3.00 IRRIGATION WATER 18.00 FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 2. 15 IRRIGATION 4.50 EQUIPMENT 0.98 OPERATING CAPITAL 112.00 SUBTOTAL, PREHARVEST HARVEST COSTS 100.00 MOW.RAKE,BALE CUSTOM BALE HAUL 100.00 SUBTOTAL, HARVEST TO TA L VA R I A B L E COSTS PROJECTED YOUR $/UNIT VALUE ESTIMATE TON 150.00 ACRE LB. ACRE APPL ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 125.00 0.25 2.50 8.00 BALE BALE ACRE 0.65 0.40 ACRE 4.50 4.50 4.50 0.150 $ $ 450.00 450.00 $ 125.00 37.50 5.00 24.00 $ 10.91 2.26 5.56 4.27 9.66 20.25 4.41 16.80 265.62 $ $ 65.00 40.00 105.00 $ 370.62 $. BREAK-EVEN PRICE, VARIABLE COSTS $123.54/TON HAY 3. INCOME ABOVE VARIABLE COSTS ACRE 4. FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EOUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE. TOTAL COSTS 6. NET PROJECTED RETURNS 40..00 $ $ 79.38 $ 13.68 10.09 40.00 63.77 434.39 $. $144.80/T0N HAY ACRE $ 15.61 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C19.51 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, B-124KC19) 929 BERMUDA TYPE GRASSES. ESTAB.. IRRIGATED, TEXAS RIO GRANDE VALLEY REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION OFFSET DISC FLOAT PLANE DITCHER BLADE HERB SPRAYR 6R DITCHER BLADE FERT.APPL,RNTD MOLDBOARD PLOW OFFSET DISC OFFSET DISC DITCHER BLADE HERB SPRAYR 6R MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTI- OVER HOURS HOURS COSTS COSTS 2.38 2.45 4,48 4,47 4.48 4,59 2,31 2,38 2,38 4,48 4,47 JAN JAN MAR MAR MAY MAY AUG AUG OCT OCT OCT 1.00 1.00 0.01 1.00 0.01 1.00 1.00 2.00 1.00 0.01 1.00 TOTALS IRRIGATION APPLICATION MAR MAY OCT TOTALS TOTAL OPER. COST 5.59 5. 19 0.210 0.216 0.005 0.209 0.005 0.203 0.451 0.421 0.210 0.005 0.209 0. 159 0. 164 0.004 0.159 0.004 0.154 0.342 0.319 0.159 0.004 0.159 2.37 2. 16 0.03 1. 19 0.03 0.93 5.35 4.74 2.37 0.03 1. 19 0.95 0.97 0.02 0.94 0.02 0.91 2.03 1.89 0.95 0.02 0.94 37.50 2.27 2.06 0.06 1.63 0.06 1.45 4.53 4.54 2.27 0.06 1.63 0. 10 6.26 0. 10 40.80 11.91 11. 17 5.59 0. 10 6.26 2.146 1.626 20.38 9.66 42.50 20.55 93.09 SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. I R R I G INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS IRRIG APPL. ACRE LABOR MONTH INCHES HOURS WATER APPLICATION WATER APPLICATION WATER APPLICATION APPL. MACH INPUT FIXED COSTS COSTS 0.0 0.0 0.0 2.50 0.0 0.0 0.0 0.0 0.0 2.50 6.00 6.00 6.00 1.500 1.500 1.500 0.0 0.0 0.0 0.0 0.0 0.0 6.75 6.75 6.75 8.00 8.00 8.00 0.0 0.0 0.0 14.75 14.75 14.75 18.00 4.500 0.0 0.0 20.25 24.00 0.0 44.25 ^ RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF HAY (DOLLARS) QUANTITY OF HAY '"^Sb 120.00 135.00 150.00 165.00 2.40 -61.62 -25.62 10.38 46.38 82.38 ! 2.70 -36.12 4.38 44.88 85.38 125.88 | 3.00 -10.62 34.38 79.38 124.38 169.38 | 3.30 14.88 64.38 11 3 . 8 8 163.38 212.88 | 40.38 94.38 148.38 202.38 256.38 | TON 1 3.60 180.00 I j NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. C19.52 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 928 B-124KC19) BERMUDA GRASS HAY, IRRIGATED, TEXAS RIO GRANDE VALLEY REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS HAY TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 12.00 VARIABLE COSTS INPUT USE PREHARVEST COSTS NITROGEN (DRY) 200.00 ♦IRRIG. WATER 4.00 IRRIGATION WATER 24.00 FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 0.0 IRRIGATION 6.00 EQUIPMENT 0.98 OPERATING CAPITAL -69.08 SUBTOTAL, PREHARVEST HARVEST COSTS 400.00 MOW,RAKE.BALE CUSTOM BALE HAUL 400.00 SUBTOTAL, HARVEST TO TA L VA R I A B L E COSTS TON PROJECTED YOUR VALUE ESTIMATE $/UNIT 150.00 1800.00 $ 1800.00 $ LB. APPL ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 0.25 8.00 50.00 32.00 4.50 4.50 4.50 0. 150 $ 0.0 2.26 0.0 0.35 0.0 27.00 4.41 -10.36 105.66 $ BALE BALE ACRE 0.65 0.40 $ 260.00 160.00 420.00 $ ACRE $ 525.66 $. BREAK-EVEN PRICE. VARIABLE COSTS $ 43.81/TON HAY INCOME ABOVE VARIABLE COSTS FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 P R O R AT E D E S TA B L 1 5 . 6 1 TO TA L FIXED COSTS TOTAL PROJECTED COSTS ACRE ACRE ACRE ACRE DOL. ACRE ACRE BREAK-EVEN PRICE. TOTAL COSTS NET PROJECTED RETURNS $ 1274.34 $ 0.0 3.23 40.00 40!00 O. 10 1.56 $ 44.79 $. $ 570.45 $. $ 47.54/TON HAY ACRE $ 1229.55 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C19.53 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 928 B-1241(C19) BERMUDA GRASS HAY. IRRIGATED, TEXAS RIO GRANDE VALLEY REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS TOTALS IRRIGATION APPLICATION 0.0 0.0 APR JUNE JULY AUG TOTALS 6.00 6.00 6.00 6.00 0.0 0.0 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. ACRE LABOR MONTH INCHES HOURS WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.0 1.500 1.500 1.500 1.500 0.0 0.0 0.0 0.0 24.00 6.000 0.0 0.0 0.0 0.0 0.0 APPL. MACH INPUT FIXED COSTS COSTS 6.75 6.75 6.75 6.75 0.0 APPL. IRRIG INPUT FIXED COSTS COSTS 8.00 8.00 8.00 8.00 TOTAL OPER. COST 0.0 0.0 0.0 0.0 0.0 27.00 32.00 0.0 0.0 TOTAL IRRIG COSTS 14 14 14 14 75 75 75 75 59.00 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF HAY (DOLLARS) 120.00 135.00 150.00 165.00 9.60 | 10.80 | 7 1 0 34 8 1 2 34 854 34 998 34 1142 34 r 1286 34 ! 974 34 1136 34 1298 34 1460 34 | 12.00 j 13.20 | 9 1 4 34 1 0 1 6 34 1094 34 1274 34 1454 34 1634 34 | 1214 34 1412 34 1610 34 1808 34 | 14.40 j 1 1 1 8 34 1334 34 1550 34 1766 34 1982 34 | TON QUANTITY OF HAY T 180.00 "*% C19.54 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 931 B-1241(C19) BERMUDA PASTURE, IRRIGATED, TEXAS RIO GRANDE VALLEY REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS PASTURE TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 2.50 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS NITROGEN (DRY) 150.00 ♦IRRIG. WATER 4.00 IRRIGATION WATER 24.00 FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 1.07 IRRIGATION 6.00 EQUIPMENT 0.98 OPERATING CAPITAL 48. 19 SUBTOTAL. PREHARVEST HARVEST COSTS SUBTOTAL. HARVEST TOTAL VARIABLE COSTS BREAK-EVEN PRICE. VARIABLE COSTS YOUR ESTIMATE PROJECTED VALUE $/UNIT AUM 0.0 LB. APPL ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 0.25 8.00 4.50 4.50 4.50 0. 150 $ ACRE $ ACRE $ $ 0.0 0.0 $ 37.50 32.00 3.70 2.26 1 .21 1.41 4.82 27.00 4.41 7.23 121.54 $ 0.0 $ 121.54 $ $ 48.62/AUM PASTURE INCOME ABOVE VARIABLE COSTS ACRE FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 P R O R AT E D E S TA B L 1 5 . 6 1 TOTAL FIXED COSTS ACRE 7.14 ACRE 5.45 ACRE 40.00 40.00 DOL. 0.10 1.56 ACRE $ 54.15 $[ TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE, TOTAL COSTS NET PROJECTED RETURNS $ $ -121.54 175.69 $_ $_ $ 70.28/AUM PASTURE ACRE $ -175.69 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C19.55 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 931 B-124KC19) BERMUDA PASTURE. IRRIGATED, TEXAS RIO GRANDE VALLEY REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE M A C H A P P L . M A C H TO TA L MACHINERY ITEM OPER TIMES LABOR MACHINE OPER LABOR INPUT FIXED OPER. OPERATION NO. MONTH OVER HOURS HOURS COSTS COSTS COSTS COSTS COST FLEX HARROW FLEX HARROW SHREDDER 4R SHREDDER 4R 4,57 4.57 4,46 4,46 MAY JULY JULY SEPT 1.00 1.00 1.00 1.00 TOTALS IRRIGATION APPLICATION 0.252 0.252 0.283 0.283 0.191 0.191 0.214 0.214 1.070 0 . 8 11 5 . 9 7 APPL. ACRE LABOR MONTH INCHES HOURS WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION MAR MAY JULY SEPT TOTALS 6.00 6.00 6.00 6.00 1.500 1.500 1.500 1.500 1 .22 1 .22 1 .77 1 .77 1 1 1 1 13 13 27 27 0.0 0.0 0.0 0.0 4.82 0.0 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS 0.0 0.0 0.0 0.0 24.00 6.000 0.0 0.0 0.0 0.0 0.0 6.75 6.75 6.75 6.75 1 1 2 2 4 4 5 5 80 80 89 89 15 15 93 93 9.37 20.15 APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 8.00 8.00 8.00 8.00 0.0 0.0 0.0 0.0 14 14 14 14 75 75 75 75 0.0 27.00 32.00 0.0 59.00 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF PASTURE (DOLLARS) 38.89 43.75 48.62 53.48 -43.75 -34.03 -24.31 -14.58 r -4.86 j -34.03 -23.09 -12.15 -1.22 9.72 ! 2.50 j 2.75 j -24.31 -12.15 0.0 12.15 24.31 j -14.58 -1.22 12.15 25.52 38.89 | 3.00 | -4.86 9.72 24.31 38.89 53.48 | AUM QUANTITY OF PASTURE 1 2.00 ] 2.25 j 58.34 NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. C19.56 /**% PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 932 B-124KC19) SOYBEANS, IRRIGATED, TEXAS RIO GRANDE VALLEY 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS SOYBEANS TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 30.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS 60.00 ♦SOYBEAN SEED ♦INNOC. 1.00 30.00 PHOSPHATE 3.00 ♦IRRIG. WATER 3.00 ♦INSECTICIDE PESTICIDE APPL. 3.00 1.00 HERB, PREMERGE ♦FUNGICIDE 1.00 IRRIGATION WATER 18.00 FUEL & LUBE--TRACTOR R E PA I R S T R A C T O R EQUIPMENT LABOR-- MACHINERY 1.07 IRRIGATION 4.50 OPERATING CAPITAL 21.27 SUBTOTAL. PREHARVEST HARVEST COSTS CUST HARV & HAUL 30.00 FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 0.33 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS PROJECTED YOUR $/UNIT VA L U E E S T I M AT E BU. 5.00 LB. APPL LB. APPL APPL APPL APPL APPL ACIN ACRE ACRE ACRE HOUR HOUR DOL. ACRE 0.28 1.10 0.25 8.00 2.60 3.50 9.00 9.80 BU. ACRE ACRE ACRE ACRE HOUR ACRE $ 16.80 1. 10 7.50 24.00 7.80 10.50 9.00 9.80 4.50 4.50 0.150 $ 0.70 4.50 ACRE 150.00 150.00 $ 3.74 1.38 2.32 4.81 20.25 3. 19 122.20 $ $ 21.00 0.29 2.77 0.09 8.98 1 .48 34.61 $ $ 156.80 $ BREAK-EVEN PRICE, VARIABLE COSTS $ 5.23/BU. SOYBEANS 3 . I N C O M E A B O V E VA R I A B L E C O S T S A C R E $ - 6 . 8 0 $ . 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE. TOTAL COSTS $ $ $ 222.42 $ 7 . 41/BU. SOYBEANS ACRE 6. NET PROJECTED RETURNS 50.00 7. 12 8.50 50.00 65.62 $ $ -72.42 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C19.57 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 932 B-1241(C19) SOYBEANS, IRRIGATED, TEXAS RIO GRANDE VALLEY 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R OFFSET DISC BEDDER 6R PLANTER 6R DITCHER BLADE CULTIVATOR 6R DITCHER BLADE DITCHER BLADE COMBINE GRAIN CART MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTh OVER HOURS HOURS COSTS COSTS APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 5,46 4,38 1,35 4,36 5,48 4,44 5,48 5,48 14 4,61 AUG AUG AUG AUG AUG SEPT OCT NOV DEC DEC 1.00 1.00 1.00 1.00 0.01 1.00 0.01 0.01 1.00 1.00 TOTALS IRRIGATION APPLICATION 0.283 0.210 0.151 0.202 0.005 0.207 0.005 0.005 0.246 0.082 0.214 0. 159 0 . 11 5 0.153 0.004 0.157 0.004 0.004 0. 196 0.063 1. 18 1.45 1.78 1.71 0.02 1.28 0.02 0.02 11.92 1.15 1.27 0.95 0.68 0.91 0.02 0.93 0.02 0.02 1. 10 0.37 0.0 0.0 0.0 17.90 0.0 0.0 0.0 0.0 0.0 0.0 2. 11 2.36 1.60 2.41 0.04 1.80 0.04 0.04 4.53 0.69 4.56 4.75 4.06 22.93 0.08 4.01 0.08 0.08 17.56 2.20 1.397 1.069 20.51 6.29 17.90 15.62 60.32 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS APPL. ACRE LABOR MONTH INCHES HOURS WATER APPLICATION WATER APPLICATION WATER APPLICATION AUG OCT NOV TOTALS 6.00 6.00 6.00 1.500 1.500 1.500 0.0 0.0 0.0 0.0 0.0 0.0 6.75 6.75 6.75 8.00 8.00 8.00 0.0 0.0 0.0 14.75 14.75 14.75 18.00 4.500 0.0 0.0 20.25 24.00 0.0 44.25 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF SOYBEANS (DOLLARS) 4.00 4.50 5.00 5.50 24.00 -56.60 -44.60 -32.60 -20.60 -8.60 j 27.00 -46.70 -33.20 -19.70 -6.20 7.30 | 30.00 -36.80 -21.80 -6.80 8.20 23.20 | 33.00 -26.90 -10.40 6. 10 22.60 39.10 j 36.00 -17.00 1.00 19.00 37.00 55.00 | BU. QUANTITY OF SOYBEANS 6.00 I __. i NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT. OR OTHER MANAGEMENT STRATEGIES. ^*p"»\ C19.58 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 933 Mf$k B-1241(C19) BELL PEPPERS, IRRIGATED,TEXAS RIO GRANDE VALLEY REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT GROSS RECEIPTS BELL PEPPERS TOTAL PROJECTED RETURNS 400.00 VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦BELL PEPPERS 2.50 FERTILIZER APPL 4.00 ♦HERBICIDE 1.00 ♦INSECTICIDE 16.00 ♦FUNGICIDE 12.00 PESTICIDE APPL. 16.00 ♦IRRIG. WATER 8.00 IRRIGATION WATER 48.00 FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 2.55 IRRIGATION 12.00 EQUIPMENT 0.98 OTHER 40.00 OPERATING CAPITAL 115.18 SUBTOTAL, PREHARVEST HARVEST COSTS HARVEST 400.00 PACK&CONT 400.00 MKT-VEGETABLES 400.00 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS CRTN 6 . 0 0 2400.00 $ 2400.00 $ LB. ACRE ACRE APPL APPL APPL APPL ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 25.00 3.00 43.34 5. 10 9.67 3.50 8.00 CRTN CRTN CRTN ACRE 1.25 2.70 0.40 ACRE BREAK-EVEN PRICE. VARIABLE COSTS PROJECTED YOUR VALUE ESTIMATE $/UNIT 4.50 4.50 4.50 4.50 0. 150 $ 62.50 12.00 43.34 81.60 116.04 56.00 64.00 $ 13. 13 2.26 5.89 7.01 11.46 54.00 4.41 180.00 17.28 730.92 $ 500.00 1080.00 160.00 $ 1740.00 $ 2470.92 $__ $ 6.18/CRTN BELL PEPPERS 3. INCOME ABOVE VARIABLE COSTS ACRE 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 17.91 __ 10.47 __ 90.00 90.00 _ $ 11 8 . 3 8 $ _ _ 5. TOTAL PROJECTED COSTS ACRE $ BREAK-EVEN PRICE. TOTAL COSTS 6. NET PROJECTED RETURNS $ -70.92 2589.30 $ $__ $ 6.47/CRTN BELL PEPPERS ACRE $ -189.30 $ PACKED IN 30 POUND CARTONS. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C19.59 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 933 B-124KC19) BELL PEPPERS, IRRIGATED.TEXAS RIO GRANDE VALLEY REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R MOLDBOARD PLOW CHISEL PLOW OFFSET DISC FLOAT PLANE BEDDER 6R ROTOVATOR 4R HERB SPRAYR 6R STANHAY PLANTR DITCHER BLADE HERB SPRAYR 6R DITCHER BLADE RLNG CULT 6R DITCHER BLADE RLNG CULT 6R DITCHER BLADE DITCHER BLADE MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTHI OVER HOURS HOURS COSTS COSTS APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 5 46 1 31 4 33 1 38 4 45 1 35 1 42 4 47 1 ,58 5 48 4 .47 5 48 2 34 5 48 2 ,34 5 .48 5 48 0.0 2. 11 0.0 2.74 0.0 0.75 0.0 2.72 0 . 0 . 2. 15 0.0 1.60 0.0 2.83 29.04 1.63 62.50 3.71 0.0 0.04 14.30 1.63 0.0 0.04 0.0 1.53 0.0 0.04 0.0 1.53 0.0 0.04 0.0 0.04 4.56 6.70 1.66 6.28 4.34 4.06 6.91 32.80 73.23 0.08 18.07 0.08 4.57 0.08 4.57 0.08 0.08 JUNE JUNE JUNE JUNE JUNE JULY JULY JULY JULY JULY AUG AUG AUG SEPT SEPT OCT NOV 1.00 0.50 0.50 1.00 1.00 1.00 1.00 1.00 1.00 0.01 1.00 0.01 1.00 0.01 1.00 0.01 0.01 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.283 0.226 0.084 0.210 0.216 0.151 0.233 0.209 0.310 0.005 0.209 0.005 0.194 0.005 0.194 0.005 0.005 0.214 0.171 0.064 0.159 0.164 0.115 0.176 0.159 0.235 0.004 0.159 0.004 0. 147 0.004 0. 147 0.004 0.004 2.546 1.929 1.27 1.02 0.38 0.95 0.97 0.68 1.05 0.94 1.40 0.02 0.94 0.02 0.88 0.02 0.88 0.02 0.02 25.68 11.46 105.84 25. 15 168. 13 IRRIG SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 3.000 3.000 3.000 1.500 1.500 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 13.50 13.50 13.50 6.75 6.75 16.00 16.00 16.00 8.00 8.00 0.0 0.0 0.0 0.0 0.0 29.50 29.50 29.50 14.75 14.75 48.00 12.000 0.0 0.0 54.00 64.00 0.0 118.00 APPL. ACRE LABOR MONTH INCHES HOURS JULY 12.00 AUG 12.00 SEPT 12.00 OCT 6.00 NOV 6.00 TOTALS 1.18 2.94 0.53 2.62 1.21 1.78 3.03 1.19 5.62 0.02 1.19 0.02 2.16 0.02 2.16 0.02 0.02 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF BELL PEPPERS (DOLLARS) 4.80 5.40 6.00 6.60 320.00 j - 5 8 6 . 9 2 360.00 j - 5 6 8 . 9 2 400.00 j -550.92 440.00 j -532.92 480.00 j - 5 1 4 . 9 2 -394.92 -202.92 -10.92 181 .08 | -352.92 -136.92 79.08 295.08 | -310.92 -70.92 169.08 409.08 j -268.92 -4.92 259.08 523.08 | -226.92 61.08 349.08 637.08 j CRTN QUANTITY OF BELL PEPPERS 7.20 i . i NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT. GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. C19.60 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 934 / * * B-124KC19) CABBAGE, IRRIGATED, TEXAS RIO GRANDE VALLEY REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS CABBAGE TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 600.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦CABBAGE SEED 1.00 ♦NITROGEN (DRY) 200.00 ♦PHOSPHATE 80.00 ♦HERBICIDE 1.00 ♦INSECTICIDE 23.00 PESTICIDE APPL. 23.00 ♦FUNGICIDE 12.00 ♦IRRIG. WATER 7.00 IRRIGATION WATER 42.00 FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 3.57 IRRIGATION 10.50 EQUIPMENT 1. 19 OTHER 30.00 OPERATING CAPITAL 350.98 SUBTOTAL. PREHARVEST HARVEST COSTS HARVEST 600.00 PACK & CON 600.00 MKT-VEGETABLES 600.00 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS CRTN 2.75 LB. LB. LB. ACRE APPL APPL APPL APPL ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 75.00 0.25 0.25 23.23 6.23 3.50 4.63 8.00 75.00 50.00 20.00 23.23 143.29 80.50 55.56 56.00 4.50 4.50 4.50 4.50 0. 150 $ 14.79 2.75 6.67 6.62 16.06 47.25 5.35 135.00 52.65 790.72 $ CRTN CRTN CRTN ACRE ACRE BREAK-EVEN PRICE, VARIABLE COSTS PROJECTED YOUR VALUE ESTIMATE $/UNIT 1650.00 $ 1650.00 $ 1.00 600.00 2.75 1650.00 0.40 240.00 $ 2490.00 $ $ 3280.72 $. $ 5.47/CRTN CABBAGE 3. INCOME ABOVE VARIABLE COSTS ACRE 4. FIXED COSTS DEPREC..INTEREST.TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE 21.12 ACRE 15.95 ACRE 90.00 90.00 ACRE $ 127.07 $^ 5. TOTAL PROJECTED COSTS ACRE BREAK-EVEN PRICE. TOTAL COSTS 6. NET PROJECTED RETURNS $-1630.72 $ 3407.79 $. $. $ 5.68/CRTN CABBAGE ACRE $-1757.79 $ PACKED IN 50 LBS. CARTONS INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C19.61 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 934 B-1241(C19) CABBAGE, IRRIGATED, TEXAS RIO GRANDE VALLEY REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R OFFSET DISC MOLDBOARD PLOW CHISEL PLOW HERB SPRAYR 6R FLOAT PLANE BEDDER 6R FERT.APPL,RNTD STANHAY PLANTR DITCHER BLADE CULTIVATOR 6R DITCHER BLADE CULTIVATOR 6R DITCHER BLADE DITCHER BLADE DITCHER BLADE MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTHI OVER HOURS HOURS COSTS COSTS 5 46 1 38 1 31 1 33 4 47 1 45 2 35 4 59 1 58 5 .48 2 .44 5 .48 2 .44 5 .48 5 .48 5 .48 JUNE JUNE JULY JULY JULY AUG AUG AUG AUG AUG OCT OCT NOV DEC FEB MAR 1.00 1.00 0.50 0.50 1.00 1.00 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 0.50 0.50 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.283 0.210 0.226 0.084 0.209 0.216 0.151 0.203 0.310 0.252 0.207 0.252 0.207 0.252 0.252 0.252 0.214 0.159 0.171 0.064 0.159 0. 164 0.115 0.154 0.235 0.191 0.157 0.191 0.157 0.191 0. 191 0. 191 3.568 2.703 TOTALS 1.27 0.95 1 .02 0.38 0.94 0.97 0.68 0.91 1.40 1.13 0.93 1. 13 0.93 1. 13 1.13 1. 13 2. 19 0.76 2. 19 0.76 0.76 0.76 0.0 0.0 0.0 0.0 23.23 0.0 0.0 70.00 75.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2. 11 2.72 2.74 0.89 1.63 2.52 1.27 1.45 3.71 2. 13 1.71 2. 13 1.71 2. 13 2. 13 2. 13 TOTAL OPER. COST 4.56 6.28 6.70 2.27 26.99 5.90 3.56 73.30 85.73 4.02 4.84 4.02 4.84 4.02 4.02 4.02 2 7 . 6 5 1 6 . 0 6 1 6 8 . 2 3 33. 15 2 4 5 . 0 9 SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS 3.000 3.000 1.500 1.500 1.500 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 13.50 13.50 6.75 6.75 6.75 16.00 16.00 8.00 8.00 8.00 0.0 0.0 0.0 0.0 0.0 29.50 29.50 14.75 14.75 14.75 42.00 10.500 0.0 0.0 47.25 56.00 0.0 103.25 APPL. ACRE LABOR MONTH INCHES HOURS AUG OCT DEC FEB MAR 1. 18 2.62 2.94 1.00 1. 19 2.41 1.61 0.93 5.62 0.76 APPL. MACH INPUT FIXED COSTS COSTS 12.00 12.00 6.00 6.00 6.00 IRRIG TOTAL IRRIG COSTS RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF CABBAGE (DOLLARS) 2 20 2.47 2.75 3 02 480.00 - 1 7 2 6 72 -1594.72 -1462.72 - 1 3 3 0 72 - 11 9 8 7 2 ! 540.00 - 1 8 4 3 72 -1695.22 -1546.72 - 1 3 9 8 22 -1249 72 j 600.00 - 1 9 6 0 72 -1795.72 -1630.72 - 1 4 6 5 72 - 1 3 0 0 72 j 660.00 - 2 0 7 7 72 -1896.22 -1714.72 - 1 5 3 3 22 -1351 - 2 1 9 4 72 -1996.72 -1798.72 - 1 6 0 0 72 - 1 4 0 2 72 j CRTN QUANTITY OF CABBAGE 3 30 i 720.00 72 j j NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT, OR OTHER MANAGEMENT STRATEGIES. C19.62 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 935 B-1241(C19) CANTALOUPS, IRRIGATED, TEXAS RIO GRANDE VALLEY REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY 1. GROSS RECEIPTS CANTALOUPES TOTAL PROJECTED RETURNS PROJECTED YIELD UNIT 375.00 2. VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦CANTALOUPE SEED 3.00 ♦NITROGEN (DRY) 120.00 ♦PHOSPHATE 80.00 ♦INSECTICIDE 5.00 ♦HERBICIDE 2.00 ♦FUNGICIDE 6.00 PESTICIDE APPL. 6.00 ♦IRRIG. WATER 5.00 BEE RENT 0.33 IRRIGATION WATER 30.00 FUEL & LUBE--TRACTOR EOUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 3.71 IRRIGATION 7.50 EOUIPMENT 0.98 OTHER 10.00 OPERATING CAPITAL 166.85 SUBTOTAL, PREHARVEST HARVEST COSTS HARVEST 375.00 PACK & CONT 375.00 MKT-VEGETABLES 375.00 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS CRTN 7.00 LB. LB. LB. APPL ACRE APPL APPL APPL ACRE ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR HOUR DOL. ACRE 97.00 0.25 0.25 4.08 48.03 3.99 3.50 8.00 20.00 CRTN CRTN CRTN ACRE ACRE BREAK-EVEN PRICE, VARIABLE COSTS PROJECTED YOUR VALUE ESTIMATE $/UNIT 4.50 4.50 4.50 4.50 0. 150 2625.00 $ 2625.00 $ 291.00 30.00 20.00 20.40 96.06 23.94 21.00 40.00 6.60 $ 21.44 2.26 10.71 8.97 16.70 33.75 4.41 45.00 25.03 717.26 $ 1.20 450.00 3.00 1125.00 0.40 150.00 $ 1725.00 $ $ 2442.26 $_ $ 6.51/CRTN CANTALOUPES 3. INCOME ABOVE VARIABLE COSTS ACRE 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 25.69 12.84 90.00 90.00 $ 128.53 $'_ 5. TOTAL PROJECTED COSTS ACRE $ BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS $ 182.74 2570.79 $. $. $ 6.86/CRTN CANTALOUPES ACRE $ 54.21 $ CANTALOUPES SOLD IN 40 POUND CARTONS. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C19.63 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 935 B-1241(C19) CANTALOUPS, IRRIGATED, TEXAS RIO GRANDE VALLEY REGION. 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION SHREDDER 4R OFFSET DISC OFFSET DISC MOLDBOARD PLOW CHISEL PLOW RLNG CULT 6R FLOAT PLANE RLNG CULT 6R RLNG CULT 6R BEDDER 6R FERT.APPL,RNTD HERB SPRAYR 6R RLNG CULT 6R STANHAY PLANTR DITCHER BLADE HERB SPRAYR 6R RLNG CULT 6R DITCHER BLADE RLNG CULT 6R DITCHER BLADE DITCHER BLADE MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 5.46 1,38 1,38 1,31 1,33 2,34 1,45 2.34 2,34 2.35 4,59 2,47 2.34 1,58 5,48 2,47 2,34 5,48 2,34 5,48 5,48 SEPT SEPT OCT OCT OCT OCT NOV NOV DEC JAN JAN JAN FEB FEB FEB MAR MAR MAR APR APR MAY 1.00 1.00 2.00 0.50 0.50 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.01 1.00 1.00 0.01 1.00 0.01 0.01 TOTALS IRRIGATION APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION WATER APPLICATION 0.283 0.210 0.421 0.226 0.084 0. 194 0.216 0. 194 0. 194 0. 151 0.203 0.209 0. 194 0.310 0.005 0.209 0. 194 0.005 0. 194 0.005 0.005 0.214 0.159 0.319 0. 171 0.064 0. 147 0. 164 0.147 0. 147 0.115 0.154 0.159 0.147 0.235 0.004 0.159 0.147 0.004 0.147 0.004 0.004 3.710 2.811 TOTALS 1.27 0.0 0.95 0.0 1.89 0.0 1 .02 0.0 0.38 0.0 0.88 0.0 0.97 0.0 0.88 0.0 0.88 0.0 0.68 0.0 0.91 50.00 0.94 48.03 0.88 0.0 1.40 291.00 0.02 0.0 0.94 48.03 0.88 0.0 0.02 0.0 0.88 0.0 0.02 0.0 0.0 0.02 2. 16 5.62 0.02 2. 10 2. 16 0.02 2. 16 0.02 0.02 TOTAL OPER. COST 2 . 11 4.56 2.72 6.28 5.43 12.55 2.74 6.70 0.89 2.27 1.53 4.57 2.52 5.90 1.53 4.57 1.53 4.57 1.27 3.56 1.45 5 3 . 3 0 1.55 52.62 1 .53 4.57 3.71 301.73 0.04 0.08 1.55 52.62 1 .53 4.57 0.04 0.08 1.53 4.57 0.08 0.04 0.08 0.04 4 0 . 7 7 16.70 437.06 3 5 . 3 0 529.82 IRRIG APPL. ACRE LABOR MONTH INCHES HOURS FEB MAR APR MAY 1. 18 2.62 5.23 2.94 1.00 2.16 2.41 2.16 2. 16 1.61 0.93 2. 10 APPL. MACH INPUT FIXED COSTS COSTS SYSTEM OPER. LABOR HOURS COSTS COSTS APPL. IRRIG INPUT FIXED COSTS COSTS TOTAL IRRIG COSTS 12.00 6.00 6.00 6.00 3.000 1.500 1.500 1.500 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 13.50 6.75 6.75 6.75 16.00 8.00 8.00 8.00 0.0 0.0 0.0 0.0 29.50 14.75 14.75 14.75 30.00 7.500 0.0 0.0 33.75 40.00 0.0 73.75 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF CANTALOUPES (DOLLARS) 5 60 6.30 7.00 7 70 300.00 - 4 1 7 26 -207.26 2.74 212 74 422 74 | 337.50 - 3 7 9 76 -143.51 92.74 328 99 565 24 | 375.00 - 3 4 2 26 -79.76 182.74 445 24 707 74 | 412.50 - 3 0 4 76 -16.01 272.74 561 49 850 24 | - 2 6 7 26 47.74 362.74 677 74 992 74 j CRTN QUANTITY OF CANTALOUPES i 450.00 8 40 4 j NOTE: NEGATIVE RETURNS OVER VARIABLE COSTS MAY BE AVOIDABLE VIA CROP ABANDONMENT, GRAZE-OUT. OR OTHER MANAGEMENT STRATEGIES. C19.64 /=«% PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 936 B-124KC19) CARROTS, IRRIGATED, TEXAS RIO GRANDE VALLEY REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY GROSS RECEIPTS CARROTS TOTAL PROJECTED RETURNS PROJECTED UNIT YIELD 400.00 VARIABLE COSTS INPUT USE PREHARVEST COSTS ♦CARROT SEED 2.00 ♦NITROGEN (DRY) 100.00 ♦PHOSPHATE 60.00 ♦HERBICIDE 2.00 ♦INSECTICIDE 4.00 ♦FUNGICIDE 6.00 PESTICIDE APPL. 5.00 ♦IRRIG. WATER 5.00 IRRIGATION WATER 30.00 FUEL & LUBE--TRACTOR EQUIPMENT R E PA I R S T R A C T O R EQUIPMENT LABOR MACHINERY 3.19 IRRIGATION 7.50 1. 19 EQUIPMENT OPERATING CAPITAL 166.24 SUBTOTAL, PREHARVEST HARVEST COSTS HARVEST 400.00 PACK & CONT 400.00 MKT-VEGETABLES 400.00 SUBTOTAL, HARVEST TOTAL VARIABLE COSTS BAGS 4.03 LB. LB. LB. ACRE APPL APPL APPL APPL ACIN ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. ACRE 6.50 0.25 0.25 23.23 3.23 4.63 3.50 8.00 BAGS BAGS CRTN ACRE 1. 15 3.75 0.40 ACRE BREAK-EVEN PRICE, VARIABLE COSTS PROJECTED YOUR VALUE ESTIMATE $/UNIT 4.50 4.50 4.50 0. 150 $ 1612.00 $ 1612.00 $ 13.00 25.00 15.00 46.46 12.92 27.78 17.50 40.00 $ 20.42 2.75 10.02 8.09 14.38 33.75 5.35 24.94 317.36 $ 460.00 1500.00 160.00 $ 2120.00 $ 2437.36 $. $ 6.09/BAGS CARROTS 3. INCOME ABOVE VARIABLE COSTS ACRE $ 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EOUIPMENT LAND-CASH RENT 1.00 TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 25.91 15.22 90.00 90.00 $ 131.12$" 5. TOTAL PROJECTED COSTS ACRE $ BREAK-EVEN PRICE, TOTAL COSTS 6. NET PROJECTED RETURNS -825.36 2568.48 $. $. $ 6.42/BAGS CARROTS ACRE $ -956.48 $ PACKED 48 ONE LBS. CELLO BAGS PER BAG INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C19.65