TEXAS HIGH PLAINS III r FOREWORD The enterprise budgets for Texas High Plains III Region are based on estimates of yields, pro duction input quantities, and production practices which represent the best judgment of local produc ers, county Extension agents-agriculture, financial institution representatives, farm marchinery dealers and others knowledgeable of the area. Variation in yields, production inputs and production prac tices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. The machinery inventory is applicable to both typical and high level management. In some bud r gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Land charges were based on the customary land lord's crop share less his proportionate share of certain production and harvesting inputs and a percentage of fixed cost on the irrigation system when applicable. A per acre land charge was made when crop share was not used. PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/15/80. r ALFALFA ESTAB.. IRRIGATED. TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE FURROK. IRRIGATION SYSTEM CATEGORY PROJECTED YIELD UNIT 1• G R O S S R E C E I P T S BSJ3_^__;i£D___ YOUR S / U N I T VA L U E E S T I M AT E T O TA L P R O J E C T E O R E T U R N S 2 . VA R I A B L E C O S T S PREHARVEST COSTS ALFALFA SEED NITROGEN P H O S P H AT E FERTILIZER APPLI I R R I G AT I O N WAT E R FUEL & LUBE TRACTOR EQUIPMENT I R R I G AT I O N R E PA I R S TRACTOR r B-124HC 3) S 0.0 S INPUT USE EQUIPMENT I R R I G AT I O N LABOR MACHINERY I R R I G AT I O N O P E R AT I N G C A P I TA L S U B T O TA L . P R E H A R V E S T HARVEST COSTS S U B T O TA L . H A R V E S T 22.00 20.00 100.00 1.00 17.00 1 1.56 .70 34.82 LB. LB. LB. ACRE ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE 1.70 0.24 0.23 2.00 37.40 4.80 23.00 2.00 5.00 5.00 0.14 6.09 1.21 22.95 1.19 2.46 I 1.90 7.80 8.50 4t87 $ 134.17 $. ACRE S ACRE $ 134.17 $. 3 . I N C O M E A B O V E VA R I A B L E C O S T S ACRE S -134.17 $ 4. FIXED COSTS DEPREC. . INTEREST.TAXES £ INSUR. TRACTOR EQUIPMENT IRRIGATION LAND (NET SHARE-RENT) TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE S 94.96 $ ... TOTAL PROJECTED COSTS ACRE $ 229.13 $ 6. NET PROJECTED RETURNS ACRE S -229.13 $ T O TA L VA R I A B L E C O S T S 0.0 $. 12.16 5.81 34.00 ±2x22 L A N D C H A R G E B A S E D O N S 6 0 / A C R E L E S S 5 0 P C T. O F I R R I G . F I X E D C O S T S . r INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDELINE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND/OR DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. Texas Agricultural Extension Service . The Texas A&M University System . Daniel C. Pfannstiel, Director . College Station, Texas ALFALFA ESTAB., IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE FURROW IRRIGATION SYSTEM ITEM O P E R AT I O N NO. D AT E MLBD ROLLOVER PA C K E R TA N D E M D I S C GRAIN DRILL PICKUP 1/2 TON PICKUP 1/2 TON PICKUP 1/2 TON PICKUP 1/2 TON 3,46 JUNE JUNE T O TA L S 53 3,40 3,58 AUG AUG 10 10 10 AUG OCT NOV 10 DEC TIMES OVER 1.00 1.00 1.00 1 .00 0. 1 0 0.1 0 0.10 0.1 0 FIXED FUEL,OIL, COSTS L U B . , R E P . LABOR MACHINE P E R ACRE P E R A C R E HOURS HOURS .-———•—»- — 0.571 0 . 0 0.208 0.280 0.125 0. 125 0. 125 0.432 0.206 0.158 0.212 0.100 0.100 0.100 -3x125 -2x122 1.559 1.409 8 3 0 3 0 0 0 9. 15 0. 09 3 . 0 8 4.66 0. 25 0.25 0.25 -2x±2 2x25 10.95 17.96 5. 0. 1. 2. 0. 0. 0. 1 0 6 5 4 4 4 "1 " > - PROJECTIONS FOR PLANNING PURPOSES ONLY N O T TO B E U S E D W I T H O U T U P D AT I N G A F T E R 1 0 / 1 4 / 8 0 . r A L FA L FA , I R R I G AT E D , T E X A S H I G H P L A I N S I I I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE FURROW IRRIGATION SYSTEM CATEGORY PROJECTED YIELD UNIT 1. GROSS RECEIPTS A L FA L FA H AY TOTAL PROJECTED RETURNS r B-124KC 3) 2 . VA R I A B L E C O S T S PREHARVEST COSTS PHOSPHATE FERTILIZER APPLI IRRIGATION WATER F U E L & L U B E T R A C TO R EQUIPMENT I R R I G AT I O N R E PA I R S TRACTOR EQUIPMENT I R R I G AT I O N LABOR MACHINERY I R R I G AT I O N O P E R AT I N G C A P I TA L SUBTOTAL, PREHARVEST HARVEST COSTS SUBTOTAL, HARVEST 5.10 TON EB____I__{3 S / U N I T VA L U E 50.00 YOUR E S T I M AT E _25.2_t.i_0 S 255.00 $ INPUT USE 80 .00 1 .00 40.00 0.87 4.00 37 .91 LB. ACRE ACIN ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR OOL. ACRE 0.23 2.00 18.40 2.00 0.0 2.1 1 54.00 0.0 0.67 28.00 4.37 20.00 5.00 5.00 0.14 _ 2x21 $ l34.86 S ACRE $ 0.0 $. TOTAL VARIABLE COSTS ACRE $ 134.86 $ INCOME ABOVE VARIABLE COSTS ACRE 120.14 $ 4. FIXED COSTS D E P R E C . . I N T E R E S T. TA X E S & INSUR TRACTOR EQUIPMENT I R R I G AT I O N PRORATED ESTABLISHMENT 229.13 LAND (NET SHARE-RENT) TOTAL FIXED COSTS ACRE ACRE ACRE DOL. ACRE ACRE 5. TOTAL PROJECTED COSTS ACRE $ 269.35 $ 6. NET PROJECTEO RETURNS ACRE $ - 14.35 $ 0.0 1.73 80.00 32.77 0 . 14 $ —22x22 i , t L _,. ,. 134.49 $ LAND CHARGE BASED ON S60/ACRE LESS 50 PCT. OF IRRIG. FIXED COSTSESTABLISHMENT COST PRORATED OVER 7 YEARS. CROP SOLD STANDING IN FIELD r I N F O R M A T I O N P R E S E N T E D I S P R E PA R E D S O L E L Y A S A G E N E R A L G U I D E L I N E A N D I S N O T INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PA R T I C U L A R F A R M O R R A N C H O P E R AT I O N . T H E S E P R O J E C T I O N S W E R E C O L L E C T E D A N D / O R D E V E L O P E D B Y S TA F F M E M B E R S O F T H E T E X A S A G R I C U LT U R A L E X T E N S I O N S E R V I C E A N D A P P R O V E D F O R P U B L I C AT I O N . A L FA L FA , I R R I G AT E D . T E X A S H I G H P L A I N S I I I R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E F U R R O W I R R I G AT I O N S Y S T E M O P E R AT I O N PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP 1 / 2 TON 1 / 2 TON i / 2 TON 1 / 2 TON 1 / 2 TON 1 / 2 TON 1 / 2 TON T O TA L S I TEM NO. 10 10 10 10 10 10 10 D AT E FUEL.OIL, FIXED COSTS T I M E S LABOR M A C H I N E L U B . , R E P . OVER HOURS HOURS P E R A C R E PER ACRE MAR MAY JUNE J U LY AUG SEPT OCT 0.10 0.125 0.1 0 0.125 0.10 0.125 0.1 0 0.125 0.1 0 0.125 0.10 0.125 0 . 1 0 .. 2 x 1 2 2 -2x122 _<_*__ <2 _a_.2_> 0.8 75 0.700 2.78 1.73 0 0 0 0 0 0 . . . . . . 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . . . . . . 4 4 4 4 4 4 0 0 0 0 0 0 0 0 0 0 0 0 . . . . . . 1 25 25 25 25 25 25 _ - PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/14/80. B-124KC 3) CORN. IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE FURROW IRRIGATION SYSTEM r PROJECTED __*Q__E________— YIELD UNIT S/UNIT VA L U E CATEGORY 1. GROSS RECEIPTS CORN TOTAL PROJECTED RETURNS 2. r 3.0 0 22_>JL____ . $ 390.00 $. BU. VA R I A B L E C O S T S I N P U T U S E PREHARVEST COSTS SEED CORN/GRAIN LOO ACRE 12.00 12.00 I N S E C T. CORN 1.00 ACRE 15.00 15.00 NITROGEN t60.00 LB. 0.24 38.40 P H O S P H AT E 40.00 LB. 0.2 3 9.2 0 FERTILIZER APPLI LOO ACRE 2.00 2.00 HERB. CORN l.OO ACRE 5.50 5.50 I R R I G AT I O N WAT E R 27.00 ACIN FUEL & LUBE TRACTOR ACRE 16.0 2 EQUIPMENT ACRE 3.32 I R R I G AT I O N ACRE 36.45 R E PA I R S TRACTOR ACRE 3.02 EQUIPMENT ACRE 3.53 I R R I G AT I O N ACRE 18.90 LABOR MACHINERY 4.26 HOUR 5.00 21.29 I R R I G AT I O N 2.70 HOUR 5.00 13.50 O P E R AT I N G C A P I TA L 81.82 DOL. 0.14 Hx±2 S U B TO TA L . PREHARVEST ACRE * 209.59 $ HARVEST COSTS CUST HARV CORN 130.00 BU. 0.25 32.50 HAUL CORN 130.00 BU. 0.15 19.50 CUSTOM DRYING 130.00 BU. 0.12 12x&2 S U B TO TA L . HARVEST ACRE $ 67.60 S TO TA L 3. 130.00 YOUR E S T I M AT E INCOME VA R I A B L E ABOVE COSTS ACRE VA R I A B L E COSTS $ 2 ACRE * 77.19 $ 11 2 . 8 1 S 4. FIXED COSTS D E P R E C . I N T E R E S T. T A X E S & I N S U R . TRACTOR ACRE EQUIPMENT ACRE I R R I G AT I O N ACRE LAND (NET SHARE-RENT) TO TA L FIXED COSTS ACRE r 5. TO TA L 6. NET PROJECTED PROJECTED 30.68 11 . 11 54.00 _t_»___»0 162.39 ACRE * $ COSTS ACRE $ 439.58 $ RETURNS ACRE $ -49.58 $ LAND CHARGE 8ASED ON LANDLORD'S SHARE OF GROSS 2 5% LESS 25% OF D R Y I N G A N D 5 0 % O F I R R I G A T I O N F I X E D C O S T S . G O V T P Y M N T. N O T I N C L U D E D . I N F O R M A T I O N P R E S E N T E D I S P R E PA R E D S O L E L Y A S A G E N E R A L G U I D E L I N E A N D I S N O T INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PA R T I C U L A R F A R M O R R A N C H O P E R AT I O N . T H E S E P R O J E C T I O N S W E R E C O L L E C T E D A N D / O R D E V E L O P E D B Y S TA F F M E M B E R S O F T H E T E X A S A G R I C U LT U R A L E X T E N S I O N S E R V I C E A N D A P P R O V E D F O R P U B L I C AT I O N . C O R N , I R R I G AT E D . T E X A S H I G H P L A I N S I I I R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E F U R R O W I R R I G AT I O N S Y S T E M ITEM O P E R AT I O N NO. D AT E SHREDDER 4R TA N D E M D I S C PICKUP 1/2 TON MLBD ROLLOVER PACKER PICKUP 1/2 TON TA N D E M D I S C PICKUP 1/2 TON B O X F L O AT PICKUP 1/2 TON LISTER 6R BED PLANTER6R HERB SPR/DISC PICKUP 1/2 TON R O L L I N G C U LT PICKUP 1/2 TON PICKUP 1/2 TON PICKUP 1/2 TON PICKUP 1/2 TON PICKUP 1/2 TON PICKUP 1/2 TON 3,57 3,40 DEC DEC 10 DEC JAN T O TA L S 2,46 5 3 10 3,30 JAN JAN FEB FEB MAR MAR APR APR APR APR M AY 10 M AY 10 10 10 10 1 0 JUNE J U LY 3,40 10 4,60 10 2,54 3.38 6 1 10 AUG SEPT OCT FIXED FUEL,OIL, COSTS M A C H I N E L U B . , R E P . T I M E S LABOR P E R ACRE HOURS P E R A C R E OVER HOURS 1.00 2.00 0. 1 0 1.00 1.00 0.1 0 1.00 0.10 2.00 0.10 1 .00 1.00 1.00 0.10 1.00 0.10 0. 10 0.1 0 0.1 0 0.10 0.1 0 0.21 0 0.316 0.100 0.432 0.206 0.100 0.158 0.100 0.655 0.100 0.1 15 0.153 0.158 0.100 0.147 0.100 0.100 0.100 0.100 0.100 2.01 3.21 0.40 5.91 0.03 0.40 1.60 0.40 4.27 0.40 I .29 1.65 0.01 0.40 1 .53 0.40 0.40 0.40 0.40 0.40 4.31 6. 15 0.25 9.88 0.09 0.25 3.08 0.25 7.24 0.25 2. 15 3.31 0. 16 0 . 2 5 2.71 0. 25 0. 25 0. 25 0* 25 0.25 -2x122 -2x122 -2**2 -_£______ 3.649 25.89 41.79 0.277 0.417 0.125 0.571 0 . 0 0.125 0.208 0.125 0.864 0.125 0.151 0.202 0 . 0 0 0 0 0 0 0 0 . . . . . . . 1 1 1 1 1 1 1 2 9 2 2 2 2 2 5 4 5 5 5 5 5 4.259 1 - _ . PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/14/80. C 8-124UC 3) COTTON. DRYLAND, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE I ACRE COTTON ON 1.5 ACRES LAND CATEGORY PROJECTEO YIELD UNIT PRQ_!EC.I££> YOUR S/UNIT VA L U E E S T I M AT E 1. GROSS RECEIPTS COTTON LINT C O T TO N S E E D T O TA L P R O J E C T E D R E T U R N S r 2 . VA R I A B L E C O S T S PREHARVEST COSTS SD COTTON-UPLAND HER8I. COTTON HAIL INSURANCE NITROGEN P H O S P H AT E FERTILIZER APPLI FUEL & LUBE TRACTOR EQUIPMENT R E PA I R S TRACTOR EQUIPMENT LABOR MACHI NERY OTHER O P E R AT I N G C A P I TA L S U B T O TA L . P R E H A R V E S T HARVEST COSTS GIN.BAG. TIES C U S TO M H A RV & H A U L S U B T O TA L . H A R V E S T 350.00 0.27 LB. TON 10 0.70 0.00 245.00 27.00 272.00 $ INPUT USE 15.00 I .00 35.00 20.00 20 .00 1 .00 3.55 2.00 34.10 13.20 13.20 T O TA L VA R I A B L E C O S T S LB. ACRE DOL. LB. LB. ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. ACRE C W T. C W T. ACRE 0.45 6.00 0.15 0.24 0.23 2.00 5.00 3.50 0.14 6.75 6.00 12.75 4.80 4.60 2.00 12.01 3.02 2.22 2.92 17.74 7.00 s 2.00 1.50 ±xlZ 86.57 $ 26.40 . 19.80 46.20 $. ACRE 132.77 $. ACRE 139.23 ACRE ACRE ACRE ACRE 22.49 12.47 S 5. TOTAL PROJECTED COSTS ACRE $ 6. NET PROJECTED RETURNS ACRE $ 3 . I N C O M E A B O V E VA R I A B L E C O S T S $ 4. FIXED COSTS DEPREC.,INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND (NET SHARE-RENT) TOTAL FIXED COSTS .-21x*2 96.36 S 229.13 s 42.87 $ LANO (NET RENT) BASED ON 1/4 OF GROSS INCOME LESS 1/4 OF GINNING, BAGGING AND TIES. PLANTED 2 X I SKI PROW. GOV'T PYMNT. NOT INCLUDED. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDELINE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND/OR DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. COTTON, DRYLAND, TEXAS HIGH PLAINS III REGION E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E 1 ACRE COTTON ON 1.5 ACRES LAND O P E R AT I O N SHREDDER 2R TA N D E M D I S C PICKUP 1/2 TON PICKUP 1/2 TON MOLDBOARD 6B PA C K E R PICKUP 1/2 TON TA N D E M D I S C HERB SPR/DISC PICKUP 1/2 TON PICKUP 1/2 TON LISTER-PLNT6R PICKUP 1/2 TON SAND FIGHTER C U LT I VAT O R 8 R PICKUP 1/2 TON PICKUP 1/2 TON PICKUP 1/2 TON PICKUP 1/2 TON T O TA L S ITEM NO. 4,56 3,40 10 10 2,47 53 10 3,40 61 10 10 3*36 10 5,51 4.34 10 10 10 10 D AT E DEC DEC DEC JAN FEB FEB FEB MAR MAR MAR APR MAY MAY JUNE JUNE JUNE J U LY SEPT NOV n FUEL.OIL, FIXED T I M E S L A B O R M A C H I N E L U B . , R E P. COSTS OVER HOURS HOURS P E R A C R E PER ACR 1.00 1.50 0.10 0.1 0 I .50 1.50 0.10 1 .00 1 .00 0.10 0.10 1.25 0.10 2.00 2.00 0.10 0.1 0 0.1 0 0.557 0.312 0.125 0.125 0.567 0.0 0.125 0.208 0 . 0 0.125 0.125 0.189 0. 125 0.151 0.312 0.125 0.125 0.125 0.422 0.237 0.100 0.100 0.430 0.309 0.100 0.158 0.158 0.100 0.100 0.143 0.100 0.115 0.236 0.100 0.100 0.100 2.81 2.41 0.40 0.40 5.40 0.05 0.40 1 .60 0.01 0.40 0.40 1 .49 0.40 0.61 1.79 0.40 0.40 0.40 5.00 4.61 0.25 0.25 11.17 0. 14 0.25 3. 08 0. 16 0.25 0.25 2.99 0.25 0.71 4.63 0.25 0.25 0.25 0 . 1 0 . _J____12__ -2x122 _____ -2x22 3.547 3.208 20.16 34.96 1 ~i PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 10/14/80. r COTTON. IRRIGATED. TEXAS HIGH PLAINS III REGION ESTIMATEO COSTS AND RETURNS PER ACRE .FURROW* PREPLANT PLUS ONE POSTPLANT CATEGORY PROJECTED YIELD UNIT 1. GROSS RECEIPTS COTTON LINT COTTONSEED T O TA L P R O J E C T E D R E T U R N S ■100 .00 0.28 LB. TON YOUR E S T I M AT E EB__E_I__ S/UNIT VA L U E 0.70 280.00 10 0.00 2_____L£L S 3 08.00 • INPUT USE 2 . VA R I A B L E C O S T S P R E H A RV E S T C O S T S LB. 20.00 S O C O T TO N - U P L A N D 40.00 LB. NITROGEN LB. 20.00 P H O S P H AT E ACRE 1.00 HERBI. COTTON ACRE 1.00 FERTILIZER APPLI DOL. 125.00 HAIL INSURANCE ACIN 12.00 I R R I G AT I O N W AT E R ACRE FUEL t LUBE—TRACTOR ACRE EQUIPMENT ACRE I R R I G AT I O N ACRE R E PA I R S TRACTOR ACRE EQUIPMENT ACRE I R R I G AT I O N 3.15 HOUR LABOR MACHINERY HOUR 1.20 I R R I G AT I O N 3.00 HOUR OTHER 52.68 OOL. O P E R AT I N G C A P I TA L ACRE S U B T O TA L . P R E H A R V E S T HARVEST COSTS 22.00 C W T. GIN.BAG. TIES 22.00 CWT. CUSTOM HARVCHAUL ACRE SUBTOTAL. HARVEST 9.00 9.60 4.60 6.00 2.00 18.75 0.45 0.24 0.23 6.00 2.00 0.15 5.00 5.00 3.50 0 14 S 2.00 1.50 10.69 3.02 16.20 1.95 3.23 8.40 15.75 6.00 10.50 7.38 133.06 . $. 44.00 . _i_L_J_ S 77.00 ». ACRE S 210.06 S. 3. INCOME ABOVE VARIABLE COSTS ACRE S 97.94 *. 4. FIXEO COSTS O E P R E C . I N T E R E S T. T A X E S £ I N S U R . TRACTOR EQUIPMENT I R R I G AT I O N LANO (NET SHARE-RENT) T O TA L F I X E D C O S T S ACRE ACRE ACRE ACRE ACRE S 19.90 11 . 2 7 24.00 §0.45 105.63 S. 5. TOTAL PROJECTED COSTS ACRE 6. NET PROJECTEO RETURNS ACRE TOTAL VARIABLE COSTS r B-1241.C 3) * » 315.69 *, -7.69 S LAND CHARGE BASED ON 1/4 OF GROSS INCOME LESS 1/4 OF FERTILIZER. G I N N I N G A N D 5 0 P C T. O F I R R I G . F I X E D C O S T S . G O V T P Y M N T. N O T I N C L U D E D . I N F O R M AT I O N P R E S E N T E D I S P R E PA R E D S O L E LY A S A G E N E R A L G U I D E L I N E A N D I S N O T I N T E N D E D TO R E C O G N I Z E O R P R E D I C T T H E C O S T S A N D R E T U R N S F R O M A N Y O N E PA R T I C U L A R FA R M O R R A N C H O P E R AT I O N . T H E S E P R O J E C T I O N S W E R E C O L L E C T E D A N D / O R D E V E L O P E D B Y S TA F F M E M B E R S O F T H E T E X A S A G R I C U LT U R A L E X T E N S I O N S E R V I C E A N D A P P R O V E D F O R P U B L I C AT I O N . r C O T T O N . I R R I G AT E D , T E X A S H I G H P L A I N S I I I R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E ( F U R R O W ) PREPLANT PLUS ONE POSTPLANT O P E R AT I O N SHREDDER 4R TANDEM DISC PICKUP 1/2 TON MOLDBOARD 6B PACKER CHISEL PICKUP 1/2 TON TANDEM DISC HERB SPR/DISC PICKUP 1/2 TON TANDEM DISC PICKUP 1/2 TON LISTER 8R PICKUP 1/2 TON ROLLING CULT BED PLANTER8R PICKUP 1/2 TON SAND FIGHTER ROLLING CULT PICKUP 1/2 TON PICKUP 1/2 TON PICKUP 1/2 TON PICKUP 1/2 TON T O TA L S I TEM NO. D AT E 3,57 2,41 10 2.47 53 2,44 10 2,41 61 10 2.41 10 2,55 10 4.31 3,39 10 5.51 4*31 10 10 10 10 DEC DEC DEC JAN JAN JAN JAN FEB FEB FEB MAR MAR APR APR MAY MAY MAY JUNE JUNE JUNE J U LY SEPT NOV ^ FIXED FUEL,OIL, COSTS TIMES LABOR MACHINE LUB.,REP. PER ACRE OVER HOURS HOURS PER ACRE 0.100 0.143 0.1 03 0.050 0.100 0 . 11 0 0.158 0.100 0.1 I 0 O.tOO 0.086 0.100 0.11 1 0.172 0.100 0.1 1 5 0.222 0.100 0. 1 00 0.100 2.0 1 1.39 0.40 I .80 0.02 0.65 0.40 1.39 0.01 0.40 1.39 0.40 0.99 0.40 0.90 1.94 0.40 0.61 1.8 I 0.40 0.40 0.40 4.31 2.67 0 . 2 5 3 . 7 2 0.05 1.13 0.25 2.67 0. 16 0.25 2.67 0.25 1.71 0.25 1.62 4.03 0.25 0.71 3.25 0.25 0.25 0.25 -2x122 -2x122 -2x*2 ________ 18.89 31.18 1.00 1.00 0.1 o 0.50 0.50 0.50 0.1 0 1.00 1.00 0.1 0 1.00 0.10 I .00 0.10 1.00 I .50 0.2 77 0.146 0.125 0.189 0.0 0.066 0.125 0.146 0 . 0 0.125 0.146 0.125 0.1 14 0.125 0.1 0 2.00 2.00 0.1 0 0.125 0.151 0.292 0.125 0.10 0.10 0.1 0 0.125 0.146 0.227 0.125 3.150 0.21 0 0.1 10 2.700 - _ >