r TEXAS TRANS PECOS FOREWORD r The enterprise budgets for Texas Trans Pecos Region are based on estimates of yields, production input quantities, and production practices which represent the best judgment of local producers, county Extension agents-agriculture, financial in stitution representatives, farm marchinery dealers and others knowledgeable of the area. Variation in yields, production inputs and production prac tices should be expected for particular farms. Budgets for all major crops produced in the area arc included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. The machinery inventory is applicable to both r typical and high level management. In some bud gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Land charges were based on the customary land lord's crop share less his proportionate share of certain production and harvesting inputs. A per acre land charge was made using a fair market value times an interest rate when crop share was not used. TRANS-PECOS REGION f^ Projected Input and Crop Item Prices Unit 1/ Price Projected Input Prices (1979) Seed Alfalfa Barley Pima Cotton Upland Cotton Forage Sorghum Grain Sorghum Wheat cwt. cwt. cwt. cwt. cwt. cwt. cwt. $ 175.00 12.00 25.00 40.00 45,00 50.00 15.00 Fertilizer and Chemicals Nitrogen Phosphate Herbicide Insecticide appl. appl. Fuel and Lubricants Gasoline Diesel gal. gpi. kwh ,60 ,50 .04 hr. hr. 5.00 2.75 ton 27.00 Electricity Labor Machinery and Irrigation Other Custom Rates Harvest and Haul Alfalfa Hay Pick and Haul Cotton Strip and Haul Cotton Gin, Bag and Ties - Cotton Harvest Grain Haul Grain Hail Insurance Cotton (El Paso) Cotton (Pecos Valley) Wheat (El Paso) Wheat (Pecos Valley) lb. lb. lb. lint lb. lint lb. lint acre cwt. $100 $100 $100 $100 .15 .18 10.00 7.50 .12 .06 .10 18.00 .18 6.50 14.00 4.00 12.00 TRANS-PECOS - 2 - Item Unit Price ton bu. lb. lint lb. lint ton AUM $ 70.00 1.85 .95 .55 80.00 15.00 Projected Crop Prices (1979) Alfalfa Hay Barley 2/ Pima Cotton 2/ Upland Cotton 2/ Cottonseed Grazing (Small Grains) Forage Sorghum (Sold in Field for Ensilage0 Grain Sorghum 2/ Wheat 2/ top cwt. bu. 8.00 3.55 2.8p ''^X y These projected prices should not be interpreted as predictions or prospective prices. ^ 2 / P r i c e s d o n o t i n c l u d e a n y g o v e r n m e n t p r o g r a m b e n e fi t s . / TEXAS TRANS-PECOS REGION Estimated Machinery and Equipment Cost Per Hour of Use Item No. Purchase Price Estimated Years of Use Estimated Hours of Use Fixed Costs Per Hour Tractor - 45 HP 4 P i c k u p - 1 / 2 To n 1 0 Mldboard Plow - 5.3 Ft. 30 Chisel - 13 Ft. 32 Offset Disc - 13 Ft. 34 Tandem Disc - 12 Ft. 36 Float - 12 Ft. 38 Land Plane - 12 Ft. 39 Lister - 13.3 Ft. 40 Lister - 20 Ft. 41 Bed Shaper - 13.3 Ft. 43 Bed Shaper - 20 Ft. 44 Mulcher - 13.3 Ft. 46 Mulcher - 20 Ft. 47 Roll. Cultivator-13.3 Ft. 51 Roll. Cultivator - 20 Ft. 52 Cultivator - 13.3 Ft. 54 Cultivator - 20 Ft. 55 Planter - 13.3 Ft. 57 Planter - 20 Ft. 58 Grain Drill - 14 Ft. 60 Fert. Injector 62 Fert Side Dress-13.3 Ft. 65 Fert Side Dress - 20 Ft. 66 Herb. Sprayer - 20 Ft. 72 Shredder - 13.3 Ft. 74 Border Disc - 50 Ft. 76 $20,000 5,000 3,200 2,200 4,400 2,200 2,000 3,600 1,700 2,000 2,000 2,600 2,500 3,500 1,700 2,400 1,800 2,300 1,700 2,400 2,400 2,500 2,100 2,900 1,700 2,300 800 10 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8500 4000 2000 2000 2000 2000 2000 2000 1000 1000 2000 2000 2000 2000 2000 2000 2000 2000 1000 1000 1000 1000 1000 1000 1000 1000 2000 $ 1.78 1.03 1.24 .86 1.71 .86 .79 1.40 1.32 1.55 .76 1.10 .98 1.37 .66 .93 .71 .88 1.06 1.70 1.70 2.00 1.67 2.30 1.34 1.85 .32 Machinery Item and Size CO ) ) Variable Costs Per Hour $ 4.56 2.55 1.72 .94 1.92 .94 .78 2.40 1.49 1.75 .88 1.14 1.65 2.30 .75 1.04 .75 1.04 2.63 3.00 3.00 3.30 2.80 3.90 1.43 1.95 .33 ) ALFALFA ESTABLISHMENT* SPRINKLER. IRRIGATED* TEXAS TMANS-PECDS REGION PROJECTED COSTS ANO RETURNS PER ACRE PECOS VALLEY UNIT PRICE OP VA L U T OP COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION TOTAL 2. VARIABLE COSTS PREHARVEST SEEO NITROGEN PHOSPHATE INSECTICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR & MACHINERYI LABOR(IRRIGATION} INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST ^ " ^ 0.0 LBS. LBS. LBS. APPL ACRE ACRE ACRE HOUR HOUR OOL. 1.75 0.15 0.18 7.50 3.02 6.00 35.00 5.00 5.00 0.10 25.00 20.00 60.00 1.00 1.00 1 .00 1.00 2.27 2.60 25.48 .3.75 3.00 10.80 7.50 3.02 6.00 35.00 J 1.35 14.00 2.§5 9 HARVEST COSTS SUBTOTAL. HARVEST 9 TOTAL VARIABLE COST S 136.97 $ 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LANO (NET RENT) TOTAL FIXED COSTS 0.0 S-lit.97 9 ACRE ACRE ACRE ACRE 2.96 4.40 19.60 200.00 1.00 1 .00 1 .00 0.08 2.96 4.40 19.60 —16x22 _ 42.96 5. TOTAL COSTS 9 W .'. 6. NET RETURNS $-17 <_.93 RENT EQUALS S200/ACRE AT tiX PREPARED BY GARY CONORA. TAEX. FORT STOCKTON. TEXAS PROJECT .0 1979 COUNTY ___Q ENTERPRISE 31X2 REGION OJJ IRIG. LFVEL 7 LAND CLASS 0 M.MT. COOf £ MACH. COMP. _fl IRIG. SYSTEM 5 PRICE VECT. 2 PQUIP. COMP. _0 ANNUAL CAPITAL MONTH 12 DATE PRINTED: 01/15/79 A L F A L F A E S T A B L I S H M E N T. S P R I N K L E R . I R R I G A T E D . T E X A S T R A N S - P E C O S R E G I O N PROJECTED COSTS AND RETURNS PER ACRF P E C O S VA L L E Y OPERATION MOLOBOARO PLOW TANDEM DISK FLOAT PICKUP FERT. SPREADER GRAIN DRILL PICKUP PICKUP PICKUP PICKUP ITEM NO. 4.30 4.36 4.38 10 64 4. 60 10 10 10 10 DATE FIXED FUEL.OIL. COSTS L U B . . R E P. T I M E S LABOR MACHINE PER ACRE PER ACRE HOURS HOURS OVER AUG AUG AUG AUG SEPT SEPT SEPT OCT NOV OEC 1.00 0.649 1.00 0.276 0.414 1.00 0.10 0.125 0.0 1.00 0.307 1.00 0.125 0.10 0.10 0.125 0.10 0.125 0 . 1 0 __________ 0.432 0.184 0.276 0. 100 0. 184 0.205 0. 100 0.100 0.100 0.100 0.26 0.26 2.63 1.00 I .47 0.1 7 0.0 1.44 0. 17 0*1 7 0. 17 -2*23 -2x12 2.271 1 .781 9.02 7. 36 3 . 11 1.18 1 .72 0.26 0.0 1.73 0 • 26 . TOTALS P E N T E . Q U A L S * 2 0 0 / A C R t £ AT 8 % P P E PA R f O B Y G A R Y C J N D R A . TA E X . F O R T S T O C K T O N . T E X A S B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 1 2 - 8 11 0 0 8 7 0 2 850 PPOJECTFD 1979 0 ' ^ ^ v ALFALFA. SPRINKLER IRRIGATED. TEXAS TRANS-PECOS REGION PROJECTED COSTS AND RETURNS PER ACRF PECOS VALLEY UNIT GROSS RECEIPTS FROM PRODUCTION HAY TOTAL 2. VARIABLE COSTS PREHARVEST PHOSPHATE INSECTICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR<TRACTOR & MACHINERY! LABOR(IRRIGATION) INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST HARVEST COSTS CUSTOM HARVEST SUBTOTAL. HARVEST TON LBS. APPL ACRE ACRE ACRE HOUR HOUR DOL. PRICE OR VA L U E OR COST/UNIT QUANTITY COST 70.00 8.50 0.18 7.50 2.30 1.01 120.00 5.00 5.00 0.10 80.00 1.00 1 .00 1.00 1 .00 1.40 9.60 60.01 14.40 7.50 2.30 1.01 120.00 7.01 48*00 _ua_> $ 206.21 s TON 27.00 8.50 .223x50 $ 229.50 s 435.71 TOTAL VARIABLE COST $ 159.29 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATED ESTAB. COST LAND INET RENT) TOTAL FIXEO COSTS -535*22 S 595.00 $ ACRE ACRE ACRE ACRE ACRE 5. TOTAL COSTS 6. NET RETURNS ESTABLISHMENT COST PRORATED OVER 5 YEARS 1.49 0.74 67.20 193.93 200.00 1.00 1 .00 I .00 0.20 0.0R 1.49 0.74 67.20 38.79 __.1___.__0 124._ I $ 559.92 S 35.08 RENT EQUALS 200/ACRE AT 8% PROJECTED 1979 PPFPARED BY GARY CONORA. TAEX. FORT STOCKTON. TEXAS COUNTY _J2 ENTERPRISE 6j 0 REGION Q£ IRIG. LEVEL 2 LAND CLASS 0 MGMT. CODii 2 MACH. COMP. -Q IRIG. SYSTEM g PRICE VECT. 2 EQUIP. COMP. _0 ANNUAL CAPITAL MONTH 12 DATE PRINTED: 01/15/79 ALFALFA. SPRINKLER IRRIGATED. TEXAS TRANS-PECOS REGION PROJECTED COSTS ANO RETURNS PER ACRE PECOS VALLEY OPERATION FERT. SPREADER PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP TOTALS ITEM NO. 4.64 10 10 10 10 10 10 10 10 10 DATE FUEL.OIL. FIX_D T I M E S L A B O R M A C H I N E L U B . . R E P. C O S T S OVER HOURS HOURS PEP ACRF PEP ACRF MAR MAR APR MAY JUNE J U LY AUG SEPT OCT NOV 1 .00 0.10 0*10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.276 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.184 0. 100 0.100 0. 100 0. 100 0.100 0. 100 0.100 0.100 1 .01 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.74 0. 17 0.17 0.1 7 0.17 0.17 0.17 0.17 0. 17 -2*122 -2*26 - 2 * 11 1 .401 1.084 3.30 2.23 ^ ^ ESTABLISHMENT COST PRORATEO OVER 5 YEARS. RENT EQUALS 200/ACRE AT 8% PREPARED BY GARY CONDRA. TAEX. FORT STOCKTON. TEXAS PROJECTED 1979 B U D G E T I D E N T I F I C AT I O N N U M B E R 8 1 0 0 8 9 0 2 8 5 0 0 ANNUAL CAPITAL MONTH 12 /-^^V 8 A L FA L FA E S TA B L I S H M E N T. F L O O D I R R I G AT E D . T E X A S T R A N S - P E C O S R E G I O N PROJECTEO COSTS AND RETURNS PER ACRE EL PASO VALLEY UNIT VALUE OR COST PRICE OR COST/UNIT QUANTITY GROSS RECEIPTS FROM PRODUCTION TOTAL 2. VARIABLE COSTS PREHARVEST SEEO PHOSPHATE INSECTICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR 6 MACHINERY) LABOR(IRRIGATION) INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST 0.0 LBS. LBS. APPL ACRE ACRE ACRE HOUR HOUR DOL. 1.75 0.18 7.50 3.03 6.24 15.00 5 . 0 0 5 . 0 0 0.10 25.00 80.00 1.00 1.00 1.00 1.00 2.34 3.00 23.05 43.75 14.40 7.50 3.03 6.24 15.00 11 . 6 8 15.00 2*31 s 11 8 . 9 1 HARVEST COSTS SUBTOTAL. HARVEST s TOTAL VARIABLE COST 9 11 8 . 9 1 S -- 1 1 8 . 9 1 3. INCOME ABOVE VARIABLE COSTS 4. FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LANO (NET RENT) TOTAL FIXEO COSTS 0.0 $ ACRE ACRE ACRE ACRE 2.98 4 . 5 8 7.50 2000.00 1.00 1.00 1 .00 0.08 2.98 4.58 7.50 160.00 9 175.05 5. TOTAL COSTS 9 293.96 6. NET RETURNS 9 -- 2 9 3 . 9 6 WATER CHARGE INCLUDED IN VARIABLE IRRIGATION MACH. COSTS. RENT EQUALS S2000/ACRE AT 8%. PREPAREO BY GARY CONDRAt TAEX. FORT STOCKTON. TEXAS PROJECTED 1979 f ^ A L F A L F A E S T A B L I S H M E N T. F L O O D I R R I G A T E D . T E X A S T R A N S - P E C O S R I - G I O N P R O J E C T E D C O S T S A N O R E T U R N S P E R A C R F. E L PA S O VA L L E Y O P E R AT I O N MOLOBOARD PLOW TA N O E M D I S K F E R T. S P R E A D E R F L O AT BORDER DISK PICKUP GRAIN DRILL PICKUP PICKUP PICKUP PICKUP T O TA L S ITEM NO. 4.30 4.36 64 4.38 4.76 10 4 . 6 0 10 10 10 10 " ^ v FIXED FUEL.OIL. COSTS MACHINE L U B . . R E P. HOURS PER ACRE PER ACRE D AT E T I M E S LABOR OVER HOURS AUG AUG AUG AUG AUG AUG SEPT SEPT OCT NOV OEC 1.00 0.649 1.00 0.276 1 .00 0 . 0 1.00 0.414 1.00 0.065 0.10 0.125 1.00 0.307 0.10 0.125 0.10 0.125 0.125 0.10 0 . 1 0 .-2*123. 0.432 0. 184 0. 184 0.276 0.043 0.100 0.205 0.100 0.100 0. 100 3.11 1 .18 0 . 0 1 .72 0.25 0.26 1 .73 0.26 0.26 0.26 2.63 1 .00 0.0 1.47 0.20 0.17 1 .44 0.17 0.17 0.17 -2*192 __________ - 2 x 11 2.336 1.825 9.27 . 7.55 WATER CHARGE INCLUDED IN VARIABLE IRRIGATION MACH. COSTS. RENT EQUALS S2000/ACRE AT 8%. PREPARED BY GARY CONDRA. TAEX. FORT STOCKTON. TEXAS PROJ_CT.D 1979 B U D G E T I D E N T I F I C AT I O N N U M B E R 8 11 0 0 8 6 0 1 8 4 0 0 ANNUAL CAPITAL MONTH 12 ^~Ik 10 ALFALFA. FLOOD IRRIGATED. TEXAS TPANS-PFCOS REGION PROJECTED COSTS AND RETURNS PER ACRE EL PASO VALLEY UNIT GROSS RECEIPTS FROM PRODUCTION HAY TOTAL #"^ 70.00 8.50 -533*22 9 595.00 0.18 7.50 2.30 1.0 1 80.00 5.00 5.00 0.10 80.00 1.00 1.00 1.00 1 .00 1.40 16.00 50.01 14.40 7.50 2.30 1.01 80.00 7.01 80.00 5.00 S 197.21 9 TON 27.00 8.50 TOTAL VARIABLE COST 3. INCOME ABOVE VARIABLE COSTS 4. FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATEO ESTAB. COST LAND (NET RENT) TOTAL FIXEO COSTS VALUE OF COST S TON 2. VARIABLE COSTS PREHARVEST P H O S P H AT E LBS. INSECTICIDE APPL MACHINERY ACRE TRACTORS ACRE I R R I G AT I O N M A C H I N E RY A C R E LABOR(TRACTOR fc MACHINERY) HOUR L A B O R C I R R I G AT I O N ) HOUR I N T E R E S T O N O P. C A P. D O L . SUBTOTAL. PRE-HARVEST HARVEST COSTS CUSTOM HARV&HAUL SUBTOTAL. HARVEST PRICE OR COST/UNIT QUANTITY -223x59. 9 229.50 s 426.71 s 168.29 s ACRE ACRE ACRE ACRE ACRE 1.49 0.74 40.00 293.96 2000.00 1.00 1 .00 1.00 0.20 0.08 1.49 0.74 40.00 58.79 .152x22 $ 261 .0? 5. TOTAL COSTS 687.73 6. NET PETURNS 9 -92.73 ESTABLISHMENT COST PRORATEO OVER 5 YEARS. WATER CHARGE INCLUDED IN VAR IRRIG. MACH. COST. RENT EQUALS S2000/ACRE AT 8%. PREPARED BY GARY CONDRA. TAEX. FORT STOCKTON. TEXAS PROJECTED 1979 / ■ ^ 11 A L FA L FA . F L O O D I R R I G AT E O . T E X A S T R A N S - P E C O S R E G I O N PROJECTED COSTS AND RETURNS PER ACRF E L PA S O VA L L E Y O P E R AT I O N F E R T. . S P R E A D E R PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP ITEM NO. 4.64 10 10 10 10 10 10 10 10 10 D AT E MAR MAR APR M AY JUNE J U LY AUG SEPT OCT NOV T I M E S LABOR HOURS OVER 1 .00 0.10 0.10 0.10 0.10 0.10 0.27 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 6 5 5 5 5 5 5 5 5 0.10 O.^O 0.10 0 . 1 0 .. 2 x 1 2 5 1.401 T O TA L S FIXED FUEL.CIL. COSTS MACHINE L U B . . R E P. PER ACRE PER ACRE HOURS 0. 184 0.100 0. 100 0. 100 0.100 0.100 0.100 0.100 0.100 1 .01 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.74 0.1 7 Oo 17 0. 17 Oo 17 0. 17 0.17 0. 1 7 0.1 7 0t_oo -2x23 - 2 x 11 1.084 3.30 2.23 E S TA B L I S H M E N T C O S T P R O R AT E O O V E R 5 Y E A R S . W AT E R C H A R G E I N C L U D E D I N VA P 0 I R R I G . M A C H . C O S T. R E N T E Q U A L S S 2 0 0 0 / A C R E AT 8 % . P R E PA R E D B Y G A R Y C O N O R A . TA E X . F O R T S T O C K T O N . T E X A S P R O J E C T F D 1 9 7 9 B U O G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 1 2 81 008901 840 0 z * * ^ . 14 S P R I N G B A R L E Y. F L O O D I R R I G AT E D . T R A N S - P E C O S R E G I O N PROJECTED COSTS AND RETURNS PER ACRE EL PASO VALLEY ^ UNIT GROSS RECEIPTS FROM PRODUCTION BARLEY TOTAL 2. VARIABLE COSTS PREHARVEST SEEO NITROGEN INSECTICIDE MACHINERY TRACTORS IRRIGATION MACHINERY .LABOR(TRACTOR & MACHINERY) LABOR(IRRIGATION) INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL. HARVEST BU LBS. LBS. APPL ACRE ACRE ACRE HOUR HOUR OOL. PRICE OR COST/UNIT QUANTITY 1.85 0.12 0.15 7.50 4.24 6.27 35.00 5.00 5 . 0 0 0.10 85.00 3*22 148.61 $ ACRE BU. 18.00 0.09 9 18.00 . 7^6,5 25.65 9 174.26 1.00 85.00 9 -17.01 9 ACRE ACRE ACRE ACRE 4.0 4.6 17.5 2000.0 0 0 0 0 s 4.00 4.60 17.50 160.00 186.10 5. TOTAL COSTS 9 360.37 6. NET RETURNS * -• 2 0 3 . 1 2 WATER CHARGE INCL. IN VAR• IRRIG. MACH. COST. RENT EQUALS S2000/ACRE AT 8%. PREPARED BY GARY CONDRA. TAEX. FQRT STOCKTON. TEXAS ^ 14.40 30.00 7.50 4.24 6.271 35.00 12.97 35.00 $ 3. INCOME ABOVE VARIABLE COSTS / -152x25 9 157.25 120.00 200.00 1 .00 1.00 1.00 1.00 2 . 5 9 7.00 32.33 TOTAL VARIABLE COST 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS VALUE OR COST 1.00 1 .00 1.00 0.08 PROJECTED 1979 15 SPRING BARLEY. FLOOD IRRIGATED. TRANS-PECOS REGION PROJECTED COSTS AND RETURNS PER ACRE EL PASO VALLEY O P E R AT I O N MOLDBOARD PLOW CHISEL OFFSET DISC TA N O E M D I S K F E R T. I N J E C T O R F L O AT LAND PLANE 60ROER DISK PICKUP GRAIN DRILL PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP T O TA L S ITEM NO. 4 4 4 4 . . , . 4 . 4 . 4. 4. 30 32 34 36 6 2 3 6 3 9 76 10 60 10 10 10 10 10 10 D AT E FUEL.OIL. FIXEO T I M E S LABOR MACHINE L U B . . R E P . COSTS OVER HOURS HOURS PER ACRE PER ACRE DEC OEC OEC DEC DEC DEC DEC DEC DEC JAN JAN FEB MAR APR M AY JUNE 0.33 0.67 0.67 1.00 1.00 0.67 0.33 1.00 0.10 1.00 0.10 0.10 0.10 0.10 0.10 0.10 . 0.214 0.177 0.171 0.276 0 . 0 0.277 0.232 0.065 0.125 0.307 0.125 0.125 0.125 0.125 0.125 0-125 0.143 0.118 0.1 14 0.184 0.172 0.185 0.154 0.043 0.100 0.205 0.100 0. 100 0.100 0. 100 0.100 1.03 0.76 0.84 1.18 0.57 1 .16 1.21 0.25 0.26 1.73 0.26 0.26 0.26 0.26 0.26 0.87 0.64 0.78 1.00 0.56 0.98 0.98 0.20 0.17 1.44 0.17 0.17 0.17 0.17 0.17 ___oo -2x25 -2x12 2.594 2.018 10.51 8.60 HATER CHARGE INCL. IN VAR. IRRIG. MACH. COST. RENT EQUALS S2000/ACRE AT 8 .. PREPARED BY GARY CONDRA. TAEX. FORT STOCKTON. TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER 889008902 840 0 ANNUAL CAPITAL MONTH 6 /^-^K 12 WINTER BARLEY. FURROW IRRIGATED. TRANS-PECOS REGION PPOJECTEO COSTS AND RETURNS PER ACRE PECOS VALLEY UNIT GROSS RECEIPTS FROM PRODUCTION BARLEY GRAZING TOTAL VALUE OP COST PRICE OR C O S T / U N I T QUANTITY $ BU. AUMS 1.85 15.00 65.00 2.50 120.25 —32x52 9 157.75 2 . VA R I A B L E C O S T S PREHARVEST SEED NITROGEN INSECTICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR!TRACTOR & MACHINERY) LABOR(IRRIGATION) INTEREST ON OP. CAP. LBS. LBS. APPL ACRE ACRE ACRE HOUR HOUR OOL. 0.12 0.15 7.50 5.27 7.24 96.00 5.00 5.00 0.10 60.00 100.00 1.00 1.00 1 .00 1.00 3.24 19.20 60.95 * S U B TO TA L . P R E - H A RV E S T HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL. HARVEST 7.20 15.00 7.50 5.27 7.24 96.00 16.18 96.00 ACRE BU. 18.00 0.09 1.00 65.00 122.58 4. FIXED COSTS 9 ACRE ACRE ACRE ACRE 4.93 5.31 38.40 200.00 1.00 1.00 1 .00 0.08 4.93 5.31 38.40 _ 16.00 9 64.64 5. TOTAL COSTS 9 144.98 6. NET RETURNS S-- 1 8 7 . 2 3 1 9 7 8 - 1 9 7 9 C R O P R E N T E Q U A L S S 2 0 0 / A C R E AT 8 % . PREPARED Bv GARY CONORA. TAEX. FORT STOCKTON. TEXAS ^ 5x25 23.85 $ 280.33 3. INCOME ABOVE VARIABLE COSTS / 256.48 18.00 S TOTAL VARIABLE COST MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS __-._ft._» 2 PROJECTED 1979 13 W I N T E R B A R L E Y. F U R R O W I R R I G A T E D . T R A N S - P E C O S R E G I O N PROJECTED COSTS AND RETURNS PER ACRE P E C O S VA L L E Y ITEM O P E R AT I O N MOLDBOARO PLOW CHISEL OFFSET DISC TA N D E M O I S K F E R T. I N J E C T O R F L O AT LISTER MULCHER PICKUP GRAIN DRILL PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP NO. O AT E 4.30 4.32 4.34 4.36 6 2 4 . 3 8 4.41 4 . 4 7 10 4.60 10 10 10 10 10 10 10 10 10 AUG AUG AUG AUG AUG AUG AUG AUG AUG SEPT SEPT OCT NOV DEC JAN FEB MAR APR MAY FUEL.OIL. FIXEO M A C H I N E L U B . . R E P . C OSTS T I M E S LABOR HOURS HOURS PER ACRE PER ACRE OVER 1.03 0.76 0.84 1 .18 0.57 1.72 1 .11 1.02 0.26 1.73 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 -2*26 - 2 * 11 3.236 12.51 10.24 T O TA L S 2.497 1 9 7 8 - 1 9 7 9 C R O P R E N T E Q U A L S S 2 0 0 / A C R E AT 8 % . P R E PA R E D B Y G A R Y C O N O R A . TA E X . F O R T S T O C K T O N . T E X A S B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 5 0.87 0.64 0.78 1.00 0.56 1.47 1 .01 0.82 0.17 1.44 0.17 0. 17 0.17 0.17 0. 17 0.17 0.17 0. 17 0.214 0.143 0.177 0 . 11 8 0 . 11 4 0.171 0.184 1.00 0.276 0.172 0.0 1.00 0.276 1.00 0*414 0.154 1 . 0 0 p. 231 0 . 1 9 6 0. 131 1.00 0.125 0.100 0.10 0.307 0.205 1.00 0.125 0.100 0.10 0.125 0.100 0.10 0 .125 0.100 0.10 0 .125 0.100 0.10 0 . 125 0.100 0.10 0 . 125 0.100 0.10 0.100 0.125 0.10 0.10 0.125 0.100 0 . 1 0 -2x125 -2x122 0.33 0.67 0.67 • 71 008902 860 0 PROJECTED 1979 . ^ k 16 S P R I N G B A R L E Y * F U R R O W I R R I G AT E D . T R A N S - P E C O S R E G I O N PROJECTED COSTS AND RETURNS PER ACRE P E C O S VA L L E Y UNIT GROSS RECEIPTS FROM PRODUCTION BARLEY T O TA L BU. PRICE OR VA L U E OP COST/UNIT QUANTITY COST 1.85 85.00 S _57fgS 157.25 2 . VA R I A B L E C O S T S PREHARVEST SEED NITROGEN INSECTICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR & MACHINERY) LABOR(IRRIGAT ION) INTEREST ON OP. CAP. LBS. LBS. APPL ACRE ACRE ACRE HOUR HOUR DOL. 0. 0. 7. 4. 7. 84. 5. 5. 0. 1 1 5 5 2 0 0 0 1 2 5 0 0 4 0 0 0 0 120.00 200.00 1.00 1.00 1.00 1.00 2.86 16.80 44.03 s S U B T O TA L . P R E - H A R V E S T f^ HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL. HARVEST 18.00 0.09 1.00 85.00 18.00 2*65 $ 25.65 9 276.00 3. INCOME ABOVE VARIABLE COSTS $ -• I 1 8 . 7 5 9 ACRE ACRE ACRE ACRE 4.44 5.31 33.60 200.00 1.00 1 .00 1.00 0.08 4*44 5.31 33.60 .-jLiuoa 9 59.35 5. TOTAL COSTS 9 335.35 6. NET RETURNS $ -- 1 7 8 . 1 0 RENT EQUALS S200/ACRE AT 8%. PREPARED BY GARY CONORA. TAEX. FORT STOCKTON. TEXAS r> U±2 25Q.35 s ACRE BU. TOTAL VARIABLE COST 4. FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 14.40 30.00 7.50 4.50 7.24 84.0QI 14.31 8 4,. 00 PROJECTED 1979 17 S P R I N G B A R L E Y. F U R R O W I R R I G A T E D * T R A N S - P E C O S R F G I O N PROJECTED COSTS ANO RETURNS PER ACRE P E C O S VA L L E Y ITEM NO. O P E R AT I O N D AT E FUEL.OIL. FIXEO T I M E S L A B O R M A C H I N E L U B . . R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE MOLOBOARD PLOW 4.30 DEC 0.33 0.214 0.143 CHISEL 4.32 DEC 0.67 0.177 0 . 11 8 OFFSET DISC 4.34 DEC 0.67 0.171 0 . 11 4 TA N D E M DISK 4.36 DEC 1.00 0.276 0.184 F E R T. INJECTOR 62 OEC 1.00 0.0 0.172 F L O AT 4.38 DEC 1.00 0.414 0.276 LI8T5R 4.41 DEC 1.00 0.231 0.154 MULCHER 4.47 OEC UOO 0.196 0.131 PICKUP 10 DEC 0.10 0.125 0.100 GRAIN DRILL 4.60 JAN 1.00 0.307 0.205 PICKUP 10 JAN 0.10 0.125 0.100 PICKUP 10 FEB 0.10 0.125 0.100 PICKUP 10 MAR 0.10 0.125 0.100 PICKUP 10 APR 0*10 0.125 0.100 PICKUP 10 M AY 0.10 0.125 0.100 PICKUP 10 T O TA L S JUNE 0.10 /^^^. _2*125 2.861 1.03 0.76 0.84 1.18 0.57 1.72 I . 11 1.02 0.26 1.73 0.26 0.26 0.26 0.26 0.26 0.87 0.64 0.78 1 .00 0.56 1.4 7 1.01 0.82 0,17 1.44 0.17 .9*129 -2*26 .2*12 2.197 11 .74 9.75 RENT EQUALS S200/ACRE AT 8%. PREPARED BY GARY CONORA* TAEX. PORT STOCKTON* TEXAS 0, 0, 0, 0, 17 17 17 17 PROJECTED 1979 0UDG6T IDENTIFICATION NUMBER—- 889008901 860 0 ANNUAL CAPITAL MONTH 6 .*1K 18 PIMA COTTON* FLOOD IRRIGATED IPP «• 1 ) . TEXAS TRANS-PECOS REGION PROJECTEO COSTS AND RETURNS PER ACRE EL PASO VALLEY 1. GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEED TOTAL 2. VARIABLE COSTS PREHARVEST SEEO NITROGEN PHOSPHATE HERBICIDE SCOUTING HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR V MACHINERY) LABOR(IRRIGATION) INTEREST ON OP. CAP. SUBTOTAL* PRE-HARVEST HARVEST COSTS CUSTOM HARV&HAUL GIN. BAG. TIES SUBTOTAL. HARVEST UNIT PRICE OR COST/UNIT LBS. TON 0.95 60.00 225.00 0. 18 LBS. LBS. LBS. APPL ACRE $10 ACRE ACRE ACRE HOUR HOUR DOL. 0.25 0.15 0.18 10.00 4.50 6.50 7.66 14.68 15.00 5.00 5.00 0.10 25.00 100.00 50.00 2 . 0 0 1.00 1.50 1.00 1.00 1.00 5.28 3.00 63.18 LBS. LBS. 0.12 0.10 230.00 230.00 6. NET RETURNS f^ —1±**2 228.15 6.25 15.00 9.00 20.00 4.50 9.75 7.66 14.68 15.00 26*38 15.00 6.32 $ 149.54 $ 27.60 —23*22 $ 50.60 9 200.14 3. INCOME ABOVE VARIABLE COSTS 5. TOTAL COSTS 213.75 9 TOTAL VARIABLE COST 4. FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LANO (NET RENT) TOTAL FIXED COSTS VALUE OR COST QUANTITY 9 ACRE ACRE ACRE ACRE 28.01 9 7.9 10.7 7.5 00.0 6 7 0 0 1 .00 1.00 1 .00 0.08 7.96 10.77 7.50 9 .162*22 186.23 9 386.36 9 -- 1 5 8 . 2 1 ' G O V E R N M E N T PAY M E N T N O T I N C L U D E D . R E N T E Q U A L S S 2 0 0 0 / A C P E AT 8 % . W A T E R C H A R G E I N C L U D E D I N V A R . I R R I G . M A C H . C O S T. P R E PA R E D B Y G A R Y C O N D R A . TA E X . F O R T S T O C K T O N . T E X A S P R O J E C T E D | 9 7 9 19 /"*%\ P I M A C O T TO N . F L O O D I R R I G AT E D t P P + 1 ) . T E X A S T R A N S - P E C O . R E G I O N / PROJECTED COSTS AND RETURNS PER ACRF N--~ EL PA S O VA L L E Y — OPERATION ITEM NO. OATE SHREDDER 4.74 JAN MOLDBOARD PLOW 4.30 JAN CHISEL 4.32 JAN OFFSET DISC 4.34 JAN PICKUP 10 JAN H E R B S P R AY E R 4 * 7 2 F E B TA N D E M O I S K 4 * 3 6 F E B F E R T. I N J E C T O R 6 2 F E B F L O AT 4*38 FEB LANO PLANE 4.39 FEB LISTER 4.40 FEB BORDER DISK 4.76 FEB PICKUP 10 FEB H E R B S P R AY E R 4 . 7 2 M A R MULCHER 4*46 MAR BED SHAPER 43 MAR PICKUP 10 MAR PLANTER 4.57 APR PICKUP 10 APR R O L L . C U LT I VAT O R 4 . 5 1 M AY PICKUP 10 M AY C U LT I VATO R 4.54 JUNE FERT SIDE ORESS 65 JUNE PICKUP 10 JUNE PICKUP 10 J U LY PICKUP 10 AUG PICKUP 10 SEPT PICKUP 10 OCT TOTALS FUEL.OIL. FIXED TIMES LABOR MACHINE LUB..REP. COSTS OVER HOURS HOURS PFR ACRE PER ACRE 1.iOO 0., 3 3 0 ,• 67 0 .▶ 67 0.. 1 0 1,. 0 0 l l. 0 0 1,. 0 0 Oi▶ 67 0 .. 3 3 1,. 0 0 1.. 0 0 0 .. 1 0 l l. 0 0 l l▶ 00 l l. 0 0 0 .. 1 0 l l▶00 Oi▶ 10 l l▶00 Oi. 1 0 2 i▶ 00 l l. 0 0 Oi▶ 10 0 .. 1 0 0«. 1 0 Oi. 1 0 Oi 1 0 0 .310 0 .214 Q. 1 7 7 0 . 171 0 . 125 0 .206 o. 2 7 6 0.0 0 .277 Q- 2 3 2 0 .347 0 .065 0 . 125 0 .206 Q. 2 9 5 0 .0 0 . 125 0 .278 0 . 125 0. 2 7 2 0 .125 Q. 7 0 0 0.0 0* 1 2 5 0 . 125 Q. 1 2 5 0 . 125 l • 53 l • 03 0,• 76 0 .84 0 • 26 0,. 9 5 1 • 18 0.. 5 7 1 • 16 1.• 21 1 • 61 0 • 25 0 .. 2 6 0.• 95 1 1• 40 0 .17 0 ,. 2 6 1.. 5 0 0«. 2 6 1.. 1 3 0 ,. 2 6 2 .. 9 0 0 • 65 Oi. 2 6 0 .. 2 6 0 .26 0 .• 26 1.45 0.87 0.64 0.78 0.1 7 0.85 1 .00 0.56 0.98 0.98 1.44 0*20 0. 17 0.85 1 . 11 0.25 0. 17 1.12 0.17 0.93 0. 17 2.42 0.64 0.17 0. 17 0.17 0.17 -2*23 -2x12 Q.277 4.287 22.33 18.73 - 2 * .123 O i. 2 0 7 Oi. 143 0.• 118 0 .. 114 0.▶ 100 0 .. 1 3 7 0 .> 184 Oi▶ 172 0.. 1 8 5 0<▶ 154 0 .. 2 3 1 Oi▶ 043 Oi▶ 100 Oi▶ 137 Oi. 197 0 .. 1 9 7 0 ,. 1 0 0 Oi> 185 Oi▶ 100 Oi▶ 181 Oi. 100 Oi▶ 466 0 .. 2 3 3 Oi. 1 0 0 0*. 1 0 0 Oi▶ 100 0 ., 100 -___i l 2 2 ^%. GOVERNMENT PAYMENT NOT INCLUDED. RENT EQUALS S2000/ACRE AT «X. WATER CHARGE 1NCLU0ED IN VAR. IRRIG. MACH. COST. PRr^AREO BY GARY CONDRA. TAEX. FORT STOCKTON. TEXAS PROJECTED 1979 B U O G E T I D E N T I F I C AT I O N N U M B E R 9 3 1 0 0 8 9 0 2 8 4 0 0 ANNUAL CAPITAL MONTH 11 "^% 20 f^- PIMA COTTON. FLOOD IRRIGATED {PP _» 2). TEXAS TRANS-PECOS REGION PROJECTED COSTS ANO RETURNS PER ACRE EL PASO VALLEY UNIT 1. GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEEO TOTAL 2. VARIABLE COSTS PREHARVEST SEEO NITROGEN PHOSPHATE HERBICIDE INSECTICIDE SCOUTING HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR!TRACTOR £. MACHINERY) LABORCIRRIGATION) INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST HARVEST COSTS CUSTOM HARV&HAUL GIN. BAG. TIES SUBTOTAL. HARVEST PRICE OR COST/UNIT QUANTITY LBS. TON 0.95 80.00 325.00 0.26 308.75 2 0.80 $ 329.55 LBS. LBS. LBS. APPL APPL ACRE $10 ACRE ACRE ACRE HOUR HOUR OOL. 0.25 0.15 0.18 10.00 7.50 4.50 6.50 7.83 15.95 20.00 5.00 5.00 0.10 25.00 100.00 50.00 2.00 1.00 1.00 1 .50 1.00 1 .00 1.00 5.63 4.00 68.64 6.25 15.00 9.00 20.00 7.50 4.50 9.75 7.83 15.95 20.00 28. 13 20.00 .- 6.86 S 170.78 LBS. LBS. 0.12 0.10 325.00 39.00 325.0 0 32,50 $ 71.50 TOTAL VARIABLE COST $ 242.28 3. INCOME ABOVE VARIABLE COSTS 4. FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LANO (NET RENT) TOTAL FIXEO COSTS 5. TOTAL COSTS 6. NET RETURNS f^ VALUE OR COST 9 ACRE ACRE ACRE ACRE 8.23 1 1 .70 10.00 2000.00 1.00 1 .00 1 .00 0.03 87.27 $ 8.23 I 1.70 10.00 - l fi P t O O $ 189.93 $ 432.21 $-102.66 GOVERNMENT PAYMENT NOT INCLUDED. RENT EQUALS S2000/ACRE AT 8 % . WATER CHARGE INCLUDED IN VAR. IRRIG. MACH. COST. PREPAREO BY GARY CONORA. TAEX. FORT STOCKTON. TEXAS PROJEC TED 1979 21 PIMA COTTUN. FLOOD IRRIGATED IPP ♦ 2). TEXAS TRANS-PFCOS REGION PROJECTED COSTS AND RETURNS PER ACRE EL PASO VALLEY OPERATION ITEM NO. SHREOOER 4*74 MOLDBOARD PLOW 4.30 CHISEL 4.32 OFFSET OISC 4.34 PICKUP 10 H E R B S P R AY E R 4 * 7 2 TA N O E M OISK 4*36 F E R T. I N J E C T O R 6 2 F L O AT 4.38 LANO PLANE 4.39 LISTER 4.40 BORDER DISK 4*76 PICKUP 10 H E R B S P R AY E R 4 * 7 2 MULCHER 4*46 BED SHAPER 43 PICKUP 10 PLANTER 4*57 PICKUP 10 R O L L . C U LT I VAT O R 4 . 5 1 PICKUP 10 C U LT I VATO R 4*54 FERT SIDE DRESS 65 PICKUP 10 C U LT I VATO R 4*54 PICKUP 10 PICKUP 10 PICKUP 10 PICKUP 10 TOTALS DATE JAN JAN JAN JAN JAN FEB FEB FEB FEB FEB FEB FEB FEB MAR MAR MAR MAR APR APR MAY MAY JUNE JUNE JUNE JULY JULY AUG SEPT OCT FUEL.OIL. FIXED TIMES LABOR MACHINE LUB..REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE • 00 0 . 3 1 0 • 207 • 33 0 . 2 1 4 • 143 0•67 0 . 1 7 7 • 118 0 • 67 0 . 1 7 1 • 1 14 0 • 10 0 . 1 2 5 • 100 1 • 00 0 . 2 0 6 • 137 1 • 00 0 . 2 7 6 • 184 1 • 00 0 . 0 • 172 0 • 67 0 . 2 7 7 • 185 0 • 33 0 . 2 3 2 • 154 1 • 00 0.347 • 231 I • 00 0 . 0 6 5 • 043 0 • 10 0 . 1 2 5 • 100 1 • 00 0.206 • 137 1 • 00 0.295 .197 1 • 00 0.0 • 197 0 • 10 0 . 1 2 5 • 100 1 • 00 0.278 • 185 0 • 10 0 . 1 2 5 • 100 1 • 00 • 181 0.272 0 • 10 0 . 1 2 5 • 100 2 • 00 0 . 7 0 0 • 466 1• 00 0 . 0 • 233 0 • 10 0 . 1 2 5 • 100 1 • 00 0.350 • 233 0 • 10 0 . 1 2 5 • 100 0 • 10 0 . 1 2 5 • 100 0 • 10 0 . 1 2 5 • 100 0 • 10 - 2 * 1 2 5 -2*122 5.627 4.520 1 .53 1 .03 6.76 0.84 0.26 0.95 1.18 0.57 1 .16 1.21 1.61 0.25 0.26 0.95 1.40 0.17 0.26 1 .50 0.26 1 .13 0.26 2.90 0.65 0.26 1.45 0.26 0.26 0.26 0.26 23.78 1 • 45 0,L 8 7 0.. 6 4 0.78 0,i ? 1 7 o • 85 1, 0 0 0 • 56 0,98 0,' , 9 8 1.44 0.. 2 0 0, 1 7 0, 8 5 1. 1 1 0 25 0.1 . 17 1. 1 2 O».17 i 0,' . 9 3 0, .17 2 • 42 0.64 0,» . 1 7 1 • 21 0i. 17 0.. 1 7 0,. 1 7 -JU1I 19.93 G O V E R N M E N T PAY M E N T N O T I N C L U D E D . R E N T E Q U A L S S 2 0 0 0 / A C R E AT 8 % . WA ER CHARGE INCLUDED IN VAR. IRRIG. MACH. COST* P R E PA R E D B Y G A R Y C O N D R A . TA E X . F O R T S T O C K T O N . T E X A S P R O J E C T E D 1 9 7 9 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 1 0 0 8 9 0 1 8 4 0 0 A N N U A L C A P I TA L M O N T H 11 22 f^ P I M A C O T T O N . F L O O D I R R I G AT E D t P P ♦ 3 ) . T E X A S PROJECTED COSTS AND RETURNS PER ACRE E L PA S O VA L L E Y UNIT GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEEO TOTAL TRANS-PECOS REGION LBS. TON 0.95 80.00 400.00 0.32 2. VARIABLE COSTS PREHARVEST SEED NITROGEN PHOSPHATE HERBICIDE INSECTICIDE SCOUTING HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTOR & MACHINERY) LABOR(IRRIGATION) INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST "LBS. LBS. LBS. APPL APPL ACRE $10 ACRE ACRE ACRE HOUR HOUR DOL. 0.25 0.15 0.18 10.00 7.50 4.50 6.50 8.01 17.23 25.00 5.00 5.00 0. 10 25.00 100.00 50.00 2.00 2.00 1.00 1.50 1.00 1.00 1 .00 5.98 5.00 62. 13 HARVEST COSTS GIN. BAG. TIES CUSTOM HARV&HAUL SUBTOTAL. HARVEST LBS. LBS. 0.10 0.12 ^ 6.25 15.00 9.00 20.00 15.00 4.50 9.75 a.oi 17.23 25.00 29.88 25.00 .6,21 $ 190.83 400.00 400.00 40.00 48.00 9 88.00 $ 278.83 $ 126.77 3. INCOME ABOVE VARIABLE COSTS / 330.00 —25*62 9 405.60 TOTAL VARIABLE COST 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS VALUE OR COST PRICE OR COST/UNIT QUANTITY 9 ACRE ACRE ACRE ACRF 8.50 12.64 12.50 2000.00 1 .00 1.00 1 .00 0.08 8.50 12.64 12.50 -152*22 9 193.64 5. TOTAL COSTS S 472.47 6. NET RETURNS $ -66.87 GOVERNMENT PAYMENT NOT INCLUDED. RENT EQUALS $2000/ACRE AT 8%. WATER CHARGE INCLUDED IN VAR. IRRIG. MACH. COST. PREPAREO BY GARY CONDRA. TAEX. FORT STOCKTON. TEXAS PROJECTED 1979