r TEXAS ROLLING PLAINS I FOREWORD The enterprise budgets for Texas Rolling Plains I Region are based on estimates of yields, pro duction input quantities, and production practices which represent the best judgment of local produc ers, county Extension agents-agriculture, financial institution representatives, farm machinery dealers and others knowledgeable of the area. Variation in yields, production inputs and production prac tices should be expected for particular farms. r Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. . The machinery inventory is applicable to both typical and high level management. In some bud gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Land charges were based on the customary land lord's crop share less his proportionate share of certain production and harvesting inputs. A per acre land charge was made when crop share was not used. TEXAS ROLLING PLAINS I REGION f^' Assumed Prices Paid and Received by Farmers 1/ Unit Price Seed Cotton (di-syston) Cotton (delinted) Guar . Wheat (clean and treated) Alfalfa cwt. cwt. cwt. bu. cwt. $39.00 34.00 22.00 4.50 Ferti1i zer Nitrogen (Anhy.) Nitrogen (Dry) Phosphorous lb. lb. lb. Item Prices Paid (1979) j ^ Chemicals 125.00 Custom Rates Combining Wheat Combining Guar . Hay Harvest (mow. rake, bale, haul) acre acre bale 7.00 10.00 .65 Hauling Guar Wheat cwt. bu. Hoeing Labor Tractor, Irrigation Labor Cotton Ginning Fuel and Lubricants Gasoline L. P. Gas Diesel Capital ^ .18 .25 .25 5 gal gal. gal. Pre-emerge Herbicide Methyl-Parathion Malathion # 125.00 Hail Insurance (Wheat) 8.50 14.00 .25 .10 2/ hour hour 2.75 4.50 bale 35.00 gal. gal. gal. .55 .37 .42 $ acre .095 3.00 - 2 Rolling Plains I Item Unit Price Prices Received (1979) Cotton Cottonseed Guar Wheat Alfalfa Hay Coastal Hay Pasture Grazing lb. ton cwt. bu. ton ton aum. $ .50 80.00 10.00 2.95 60.00 40.00 10.00 s**\ y These price assumptions are not to be interpreted as predictions or ^^ prospective prices. 1 2/ Plus 10«t/bu. over 20 bu. •-__- ■^ ^ ^ TEXAS ROLLING PLAINS I REGION Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size Item No. Purchase Price Tractor - 4 Wh. Dr. Tractor 3 Tractor 4 Tractor 5 Pickup 1/2 Ton Rolling Cultivator Cultivator 6R Lister-Planter 6R Tanden Disc Chisel Moldboard 6B Sand Fighter Shredder 2R Grain Drill Herb. Spr/Disc Cotton Tr 3 BL Cotton Str/Bsk Chisel Grain Drill 1 3 4 5 10 30 33 36 40 44 47 51 56 58 61 62 64 79 93 $50,400 16,500 11,000 6,000 5,000 2,150 2,650 2,700 2,000 4,150 2,200 535 650 2,300 450 1,600 7,700 4,150 2,300 Estimated Years of Use 5 5 5 10 3 7 7 7 7 7 7 7 7 7 7 7 5 7 7 Estimated Hours of Use 2500 2500 2500 3000 2100 1400 1400 1050 1400 1400 1400 700 875 840 700 1050 1500 1400 840 Fixed Costs Per Hour $11.76 2.09 .71 1.49 1.37 1.13 1.38 1.89 1.04 2.17 1.15 .56 .54 2.02 .49 1.11 3.08 2.17 2.00 Variable Costs Per Hour $ 8.09 4.56 3.26 2.19 2.68 .86 1.08 1.44 .81 1.67 .82 .43 co .42 1.53 .35 .86 3.44 1.67 1.55 , 7? 17 COTTON, DRYLAND, TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER ACRE OPERATION ITEM NO* DATE SHREDDER 2R TM 5 , 5 6 DEC TANDEM DISC TM 4 , 4 0 DEC MOLDBOARD 6B TM 3 , 4 7 DEC PICKUP 1/2 TON 10 DEC CHISEL TM 3,44 JAN PICKUP 1/2 TON 10 JAN PICKUP 1/2 TON 10 FEB TANDEM DISC TM 4 , 4 0 MAR HERB SPR/DISC TM 61 MAR PICKUP 1/2 TON 10 MAR LISTER-PLNT6R TM 4 , 3 6 APR PICKUP 1/2 TON 10 APR PICKUP 1/2 TON 10 MAY LISTER-PLNT6R TM 4,36 JUNE SAND F IGHTER TM 4,51 JUNE CULTIVATOR 6R TM 4 , 3 3 JUNE CULTIVATOR 6R TM 3 , 3 3 JUNE PICKUP 1/2 TON 10 JUNE PICKUP 1/2 TON 10 JULY PICKUP 1/2 TCN 10 SEPT COTTON STR/BSKTM 1 , 6 4 NOV PICKUP 1/2 TON 10 NOV COTTON TR 3BL TM 1 0 , 6 2 NOV TCTALS FUEL.OIL, FIXED T I M E S L A B O R M A C H I N E L U B . . R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE 1,00 0.595 0.397 1 , 0 0 0 , 2 5 3 0, 168 0,30 0.154 0 . 1 0 3 0.10 0 , 1 2 5 0. 100 0.70 0,125 0 . 0 8 3 0*10 0,125 0,100 O.iO 0,125 0 . 1 0 0 2,00 0,505 0 . 3 3 7 1,00 0 , 0 0.196 0,10 0,125 0.100 1,00 0,309 0 . 2 0 6 0*10 0 . 1 2 5 0 . 1 0 0 0 . 1 0 0,125 0 . 1 0 0 1,00 0,309 0 . 2 0 6 1.00 0,125 0 . 0 8 3 1,00 0,190 0 . 1 2 7 1 , 0 0 0,190 0.127 0.10 0.125 0, 100 0 . 1 0 0 , 1 2 5 0. 100 0.10 0,125 0 . 1 0 0 0 , 5 0 0,425 0.283 0*10 0,125 0.100 0 , 5 0 °**ZS -2*232 4.857 3.601 1.21 0.80 0.63 0.27 0.58 0.27 0.27 1 .59 0.07 0.27 1.10 0.27 0.27 1.10 0.36 0.63 0.80 0.27 0.27 0.27 2.08 0.27 1,69 0.83 0.79 0.19 0.78 0.19 0.19 1.6 7 0. 15 0. 19 1.30 0. 19 0.19 1.30 0.35 0.70 1.02 0.19 0.19 0. 19 2.30 0.19 -1*16 -1*13 14.79 15,90 LANO (NET RENT) BASED ON 1/4 OF GROSS INCOME LESS I/. UP 1 / 4 O F I N S E C T, G I N - 8 A G - T I I YIELO BASED ON 2X2 PLANTING PATTERN. GOVT PAYMT NOT INCL. PREPARED BY NORMAN W. BRINTS. TAEX, VERNON. TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER— - 9 3 0 0 5 0 0 2 5 0 0 0 A N N U A L C A P I TA L M O N T H 11 16 COTTON, DRYLAND, TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER ACRE UNIT 1, GROSS RECEIPTS F R O M P R O D U C T I O N COTTON LINT COTTONSEED TOTAL VA R I A B L E C O S T S PREHARVEST SEED INSECTICIDE MISC EXPENSE HERBICIDE MACHINERY TRACTORS LABQRCTRACTOR & MACHINERY) INTEREST ON OP, CAP, LBS. TON 0 5 0 80 00 175,00 0*14 LBS, APPL ACRE ACRE ACRE ACRE HOUR DOL. 0.39 4.50 5.00 5.06 5.61 7.10 4,50 0.09 H._Q 8.00 1.00 1.00 1 .00 1.00 1.00 4 . 4 3 15.45 3.12 4.50 5.00 5.06 5.61 7.10 19,94 ..47 $ 51.80 BALE ACRE ACRE HOUR 35,00 0.97 1 . 11 4.50 0, 1, 1. 0. 3 0 0 4 5 0 0 3 TOTAL VARIABLE COST 3, INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS LAND (NET TOTAL FIXED COSTS 87,50 98,70 S U B T O TA L , P R E - H A R V E S T HARVEST COSTS GIN, BAG, TIES MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) SUBTOTAL, HARVEST VALUE OR COST PRICE OR COST/UNIT QUANTITY 12. 0._K~ 1 , 11 ] _•?_ $ 16,25 S 68,05 s 30.65 $ RENT) ACRE ACRE ACRE 8.14 7.76 20.49 8.14 7,76 1.00 1.00 1.00 -22**2 $ 36,39 5. TOTAL COSTS 9 104.44 6. NET RETURNS 9 -5.74 LAND (NET RENT) BASED ON 1/4 OF GROSS INCOME LESS 1/4 F I N S E C T • G I N - B A G YIELD BASED ON 2X2 PLANTING PATTERN. GOVT PAYMT NOT INCL. PREPARED BY NORMAN _" • BRINTS, TAEX, VERNON, TEXAS PROJECTED 1979 >=sIk 19 GUAR, DRYLAND. TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER ACRE OPERATION 6B TM MCLDBOARD P I C K U P 1 / 2 TON TM CHISEL P I C K U P 1 / 2 TON P I C K U P 1 / 2 TON TA N D E M D I S C T M LISTER-PLNT6R TM P I C K U P 1 / 2 TON P I C K U P 1 / 2 TON SAND FIGHTER TM R O L L I N G C U LT T M P I C K U P 1 / 2 TON LISTER-PLNT6R TM R O L L I N G C U LT T M P I C K U P 1 / 2 TON C U LT I VATO R 6R TM P I C K U P 1 / 2 TON P I C K U P 1 / 2 TON P I C K U P 1 / 2 TON P I C K U P 1 / 2 TON TOTALS ITEM NO, 3,47 10 3,44 10 10 3,40 4,36 10 10 4,51 4,30 10 4,36 4,30 10 3,33 10 10 10 10 DATE DEC DEC JAN JAN FEB MAR MAR MAR APR MAY MAY MAY JUNE JUNE JUNE J U LY J U LY AUG SEPT OCT FIXED FUEL,OIL, COSTS L U B . , R E P. T I M E S LABOR MACHINE PER ACRE PER ACRE HOURS OVER HOURS 0,30 0*10 1,40 0,10 0,10 0,30 1,00 0,10 0*10 2.00 1.00 0.10 1.10 1 .00 0*10 1,00 0,10 0.10 o.io 0.10 0.154 0.125 0.250 0.125 0.125 0.076 0.309 0.125 0.125 0.250 0.177 0.125 0.340 0.177 0.125 0.190 0.125 0.125 0.125 0.**5 0.103 0.100 0.167 0.100 0.100 0.051 0.206 0.100 0.100 0.167 0. 118 0.100 0.227 0. 1 18 0.100 0.127 0.100 0.100 0.100 Qt_Q0 0.63 0.27 1 .15 0.27 0.27 0.31 1.10 0.27 0.27 0.72 0.56 0.27 1.21 0.56 0.27 0.80 0.27 0.27 0.27 0.79 0. 19 1.56 0. 19 0.19 0.38 1.30 0.19 0.19 0.69 0.60 0.19 1.43 0.60 0. 19 1.02 0.19 0. 19 0.19 -2x22 2x12 3.299 2.383 10.00 10.43 LAND CHARGE USES LANDLORD'S SHARE OF GROSS 33% LESS 33X OF HAUL ANC HARVEST. PREPARED EY NORMAN W. BRINTS, TAEX, VERNON, TEXAS PROJECTED 1979 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 0 3 0 0 5 0 0 2 5 0 0 0 ANNUAL CAPITAL MONTH 10 18 GUAR, DRYLAND, TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER ACRE UNIT 1, GROSS RECEIPTS FROM PRODUCTION GUAR TOTAL PRICE OR VA L U E OR COST/UNIT QUANTITY COST * CWT 10,00 6.00 i 60,00 ? $ 60.00- 2 , VA R I A B L E C O S T S PREHARVEST SEED MISC EXPENSE MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL, HARVEST LBS, ACRE ACRE ACRE HOUR DOL, 0.22 3.00 4.39 5.61 4.50 0.09 8.00 1.00 1.00 1.00 3.30 6.10 $ 9 ACRE CWT. 10.00 0.25 1.00 6.00 10,00 1,50 9 T O TA L VA R I A B L E C O S T ACRE ACRE ACRE 6.948 5.1 1 5,32 16.00 5. TOTAL COSTS 6. BREAKEVEN PRICE, TOTAL COSTS 11, SOL 4 1 .6 . ' 3 . B R E A K E V E N P R I C E , V A R I A B L E C O S T S C W T. 4. FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS 1.76 3.00 4.39 5,61 14,84 ftf58 30,19 1,00 1.00 1.00 $ 5 . 11 5.32 16.00 26.43 9 68. 12 11 . 3 5 3 CWT, L A N O C H A R G E U S E S L A N D L O R D ' S S H A R E O F G R O S S 3 3X X LESS LESS A N D H A R V E S T. PPEPAREO BY NORMAN W. BRINTS, TAEX, VERNON, TEXAS EXAS 33X OF HAUL PROJECTED 1979 "S5^k __! WHEAT, DRYLAND, TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER ACRE OPERATION CHISEL PICKUP CHISEL PICKUP CHISEL PICKUP GRAIN PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP HLM 1 / 2 TON HLM 1 / 2 TON HLM 1 / 2 TON DRILL HLM 1 / 2 TON 1 / 2 TON 1 / 2 TON 1 / 2 TON 1 / 2 TON 1 / 2 TON 1 / 2 TON 1 / 2 TON 1 / 2 TON TOTALS ITEM NO, 1 • 79 10 1•79 10 1 • 79 10 1 • 93 10 10 10 10 10 10 10 10 10 D AT E FUEL,OIL, FIXED COSTS TIMES LABOR MACHINE L U B . . R E P. OV _R HOURS HOURS PER ACRE PER ACRE JUNE JUNE J U LY J U LY AUG AUG SEPT SEPT OCT NOV DEC JAN FEB MAR APR MAY 1,00 0.10 1,00 0.10 1.00 0.10 1.00 0.10 0.10 0.10 0.10 0.10 0.1 0 0.10 0.10 0.10 0.156 0.125 0.156 0.125 0.156 0.125 0.262 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0ti<_5 0.104 0. 100 0.104 0.100 0. 104 0.100 0. 175 0.100 0.100 0. 100 0.100 0.100 0.100 0.100 0.100 0. 100 1 ,19 0,27 1,19 0.27 1.19 0.27 1*97 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 2.73 0.19 2.73 0.19 2.73 0.19 4.52 0.19 0. 19 0.19 0.19 0,19 0,19 0, 19 0, 19 2x21 -9*13 2.231 1.687 8.74 14,95 LANO (NET RENT) BASED ON 33X OF GROSS INCOME LESS 33X OF FERT, INSECT, HARVt AND HAUL, GOVT PAYMENT NOT INCLUDED. PREPARED BY NORMAN W. BRINTS, TAEX, VERNON, TEXAS PROJECTED 1979 BUDGET IOENTIFICA..UN NUMBER 76 005002 500 0 ANNUAL CAPITAL MONTH 5 #*=. 20 WHEAT, DRYLAND, TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER ACRE UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST 1, GROSS RECEIPTS FROM PRODUCTION WHEAT GRAZING TOTAL BU. AUMS 2, VARIABLE COSTS PREHARVEST SEED FERT(16-20-0) INSECTICIDE CROP INSURANCE MISC EXPENSE MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) INTEREST ON OP. CAP, SUBTOTAL, PRE-HARVEST BU. ACRE APPL ACRE ACRE ACRE ACRE HOUR DOL* 4.50 9.00 3.50 3.00 3.00 4.01 4.73 4.50 0.09 1.00 1.00 1.00 1.00 1.00 1 .00 1.00 2.23 20.88 HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL, HARVEST ACRE BU. 7.00 0.10 1.00 20.00 2.95 10.00 59.00 -20.»_ . 20.00 2.00 9 79.00 4.50 9.00 3.50 3.00 3.00 4.01 4.73 10,04 It ?e 43.76 TOTAL VARIABLE COST 3, INCOME ABOVE VARIABLE COSTS 4, FIXEO COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS ^ % $ 7.0__ _tQ.o 9.00 $ 52.76 S 26.24 $ ACRE ACRE ACRE 3.91 11 . 0 5 18.97 1 .00 1.00 1.00 3.91 11 . 0 5 9 —13*32 33.93 5, TOTAL COSTS 86,69 6, NET RETURNS -7.69 LAND (NET RENT) BASED ON 33X OF GROSS INCOME LESS 33X OF FERT, INSECT, HA. ANO HAUL, GOVT PAYMENT NOT INCLUOED. PREPARED BY NORMAN W. BRINTS, TAEX, VERNON, TEXAS PROJECTED 1979 '**%, ALFALFA ESTABLISHMENT, DRYLAND, TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER ACRE ITEM NO. OPERATION CHISEL PICKUP CHtSEL PICKUP GRAIN PICKUP PICKUP TM 1/2 TON TM 1/2 TON ORILL TM 1/2 TON 1/2 TON TOTALS 3,44 10 3,44 10 3,58 10 10 DATE FIXED FUEL.OIL, COSTS MACHINE L U B . . R E P. TIMES LABOR PER ACRE PER ACRE OV _R HOURS HOURS JULY JULY AUG AUG SEPT SEPT OCT 1.00 0*10 1*00 0.10 1.00 0.10 0.10 0 * 11 9 0.100 0, 119 0,100 0.235 0. 100 0,82 0.27 0.82 0.27 1.59 0.27 1 . 11 0.19 1 , 11 0,19 2.13 0.19 9 fl 2 5 __.£__ Jioq Of 27 -2*13 1.210 0.873 4.31 5.10 0.179 0.125 0.179 0.125 0.353 0.125 PREPARED BY NORMAN W. BRINTS, TAEX, VERNON, TEXAS B U D G E T I D E N T I F I C AT I O N N U M B E R 8 11 0 0 5 0 0 2 5 0 0 0 ANNUAL CAPITAL MONTH 12 PROJECTED 1979 ALFALFA ESTABLISHMENT. DRYLAND, TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER ACRE PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST $_............. S 0.0 1. GROSS RECEIPTS FROM PRODUCTION TOTAL 2. VARIABLE COSTS PREHARVEST SEED FERT(16-20-0) MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST $ LBS, ACRE ACRE ACRE HOUR DOL. 1,25 9,00 1,83 2,48 4,50 0,09 20.00 1.00 1.00 1.00 1.21 9.83 25.00 9.00 1.83 2.48 5.45 9 —2*33 44.69 HARVEST COSTS SUBTOTAL, HARVEST $_ $ 0.0 TOTAL VARIABLE COST $ 44.69 9 -44.6 J. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS 9 ACRE ACRE ACRE 2,35 2.75 200.00 2.35 2.75 1.00 1.00 0.06 9 -1 _______ 17.10 5. TOTAL COSTS 9 6. NET RETURNS 9 -61.79 61,79 PREPARED BY NORMAN W, BRINTS, TAEX, VERNON, TEXAS PROJECTED 1979 /*=a% A L FA L FA , D RY L A N D , T E X A S R O L L I N G P L A I N S I R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E ITEM NO. O P E R AT I O N PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP 1/2 1/2 1/2 1/2 1/2 1/2 TO N TO N TON TO N TO N TON 10 10 10 10 10 10 D AT E T I M E S L A B O R M A C H I N E L U B . . R E P ,▶ C O S T S OV!rR HOURS HOURS PER ACRE PER ACRE APR MAY JUNE J U LY AUG SEPT 0.10 0.10 0.10 0.10 0.10 0.10 T O TA L S ^^*\ 0.12 0.12 0.12 0.12 0.12 0.12 5 5 5 5 5 5 0.100 0. 100 0.100 0. 100 0.100 PfJiPP 0.750 0.600 0 0 0 0 0 0 . . . . . * 2 2 2 2 2 2 7 7 7 7 7 7 0. 0. 0. 0. 0. 19 19 19 19 19 -3x13 1 .61 1 .12 LAND CHARGE USES LANDLORD'S SHARE OF GROSS 33X LESS 33X OF FERTILIZER A N D H A R V E S T. E S T A B L I S H M E N T C O S T S P R O R A T E D O V E R S I X Y E A R S . P R E PA R E O B Y N O R M A N W . B R I N T S , TA E X , V E R N O N , T E X A S PROJECTED 1979 B U O G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 9 8 1 005002 500 0 A L FA L FA , D RY L A N D , T E X A S R O L L I N G P L A I N S I R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E UNIT 1, GROSS RECEIPTS FROM PRODUCTION H AY TOTAL 2, VARIABLE COSTS PREHARVEST FERT(0-20-0) MACHINERY LABORITRACTOR & MACHINERY) INTEREST ON OP, CAP, SUBTOTAL, PRE-HARVEST HARVEST COSTS CUSTOM HARVEST SUBTOTAL. HARVEST TON ACRE ACRE HOUR DOL. s ^ k PRICE OR VA L U E OR COST/UNIT QUANTITY COST 60,00 5. 1. 4. 0. 50 61 50 09 2,50 1.0 1.0 0.7 2.6 150,00 $ 150,00 5.50 1.61 3.37 0 0 5 3 P»25 10.73 BALE 0,65 83,00 TOTAL VARIABLE COST ___S2__2__ $ 53.95 S 64.68 25.8 BREAKEVEN PRICE, VARIABLE COSTS TON 4. FIXED COSTS MACHINERY TRACTORS PRORATED ESTAB. COST LAND (NET RENT) TOTAL FIXED COSTS $ ACRE ACRE ACRE ACRE 1.12 0.0 10.32 1,00 1 .00 0.17 1 .00 $ ??,88 4 1.32 $ 106.00 5. TOTAL COSTS 6. BREAKEVEN PRICE, TOTAL COSTS 1,12 0,0 61,79 29.88 TON 42.401 LAND CHARGE USES LANDLORD'S SHARE OF GROSS 33X LESS 3 3 % O F F E R T I L I Z E R AND HARVEST. ESTABLISHMENT COSTS PPORATEO OVER SIX Y E A R S . PROJECTED 1979 PREPARED BY NORMAN W. BRINTS, TAEX, VERNON, TEXAS ■^%\ ALFALFA ESTABLISHMENT, IRRIGATED, TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS ANO RETURNS PER ACRE OPERATION CHISEL TM PICKUP 1/2 TON TANDEM DISC TM PICKUP 1/2 TON GRAIN DRILL TM PICKUP 1/2 TON PICKUP 1/2 TON PICKUP 1/2 TON ITEM NO. DATE FUEL,OIL, FIXED TIMES LABOR MACHINE LUB,,REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE 3,44 J U LY 1.00 0.179 0 . 11 9 0.82 1 0 J U LY 0 . 1 0 0 . 1 2 5 0 . 1 0 0 0 . 2 7 3 , 4 0 AUG 1,00 0 . 2 5 3 0.168 1.02 10 AUG 0.10 0 . 1 2 5 0.100 0.27 3 , 5 8 SEPT 1.00 0 . 3 5 3 0.235 1.59 10 SEPT 0 . 1 0 0 . 1 2 5 0.100 0.27 10 OCT 0.10 0.125 0.100 0.27 io nov o.io __flL_.l__J_ o»ioo 0*27 TOTALS 1.409 1.023 PREPAREO BY NORMAN W. BR INTS, TAEX, VERNON, TEXAS BUDGET IDENTIFICATION NUMBER ANNUAL CAPITAL MONTH 12 - 8 11 0 0 5 1 0 2 5 2 0 0 4.77 l.ll 0.19 1.26 0.19 2.13 0.19 0.19 0.19 5.44 PROJECTED 1979