r TEXAS ROLLING PLAINS I

advertisement
r
TEXAS ROLLING PLAINS I
FOREWORD
The enterprise budgets for Texas Rolling Plains
I Region are based on estimates of yields, pro
duction input quantities, and production practices
which represent the best judgment of local produc
ers, county Extension agents-agriculture, financial
institution representatives, farm machinery dealers
and others knowledgeable of the area. Variation
in yields, production inputs and production prac
tices should be expected for particular farms.
r
Budgets for all major crops produced in the
area are included for two levels of management,
when applicable. Crop yields are directly related
to levels of management. These differences are
due largely to timing of operational practices which
may not be evident in the budgets.
.
The machinery inventory is applicable to both
typical and high level management. In some bud
gets custom rates, primarily harvesting, were used
in lieu of the assumption that harvesting equip
ment was owned.
Budgets for establishing permanent type pasture
grasses were prepared and used for prorating estab
lishment costs in the respective pasture and hay
budgets. Forage crops include expenses only be
cause it is expected that the income will be derived
from livestock enterprises.
Land charges were based on the customary land
lord's crop share less his proportionate share of
certain production and harvesting inputs. A per
acre land charge was made when crop share was
not used.
TEXAS ROLLING PLAINS I REGION
f^'
Assumed Prices Paid and Received by Farmers 1/
Unit
Price
Seed
Cotton (di-syston)
Cotton (delinted)
Guar
.
Wheat (clean and treated)
Alfalfa
cwt.
cwt.
cwt.
bu.
cwt.
$39.00
34.00
22.00
4.50
Ferti1i zer
Nitrogen (Anhy.)
Nitrogen (Dry)
Phosphorous
lb.
lb.
lb.
Item
Prices Paid (1979)
j
^
Chemicals
125.00
Custom Rates
Combining Wheat
Combining Guar .
Hay Harvest (mow. rake, bale, haul)
acre
acre
bale
7.00
10.00
.65
Hauling
Guar
Wheat
cwt.
bu.
Hoeing Labor
Tractor, Irrigation Labor
Cotton Ginning
Fuel and Lubricants
Gasoline
L. P. Gas
Diesel
Capital
^
.18
.25
.25
5 gal
gal.
gal.
Pre-emerge Herbicide
Methyl-Parathion
Malathion
#
125.00
Hail Insurance (Wheat)
8.50
14.00
.25
.10 2/
hour
hour
2.75
4.50
bale
35.00
gal.
gal.
gal.
.55
.37
.42
$
acre
.095
3.00
- 2 Rolling Plains I
Item
Unit
Price
Prices Received (1979)
Cotton
Cottonseed
Guar
Wheat
Alfalfa Hay
Coastal Hay
Pasture Grazing
lb.
ton
cwt.
bu.
ton
ton
aum.
$ .50
80.00
10.00
2.95
60.00
40.00
10.00
s**\
y These price assumptions are not to be interpreted as predictions or ^^
prospective
prices.
1
2/
Plus
10«t/bu.
over
20
bu.
•-__-
■^ ^ ^
TEXAS ROLLING PLAINS I REGION
Estimated Machinery and Equipment Cost Per Hour of Use
Machinery
Item and Size
Item
No.
Purchase
Price
Tractor - 4 Wh. Dr.
Tractor 3
Tractor 4
Tractor 5
Pickup 1/2 Ton
Rolling Cultivator
Cultivator 6R
Lister-Planter 6R
Tanden Disc
Chisel
Moldboard 6B
Sand Fighter
Shredder 2R
Grain Drill
Herb. Spr/Disc
Cotton Tr 3 BL
Cotton Str/Bsk
Chisel
Grain Drill
1
3
4
5
10
30
33
36
40
44
47
51
56
58
61
62
64
79
93
$50,400
16,500
11,000
6,000
5,000
2,150
2,650
2,700
2,000
4,150
2,200
535
650
2,300
450
1,600
7,700
4,150
2,300
Estimated
Years of Use
5
5
5
10
3
7
7
7
7
7
7
7
7
7
7
7
5
7
7
Estimated
Hours of Use
2500
2500
2500
3000
2100
1400
1400
1050
1400
1400
1400
700
875
840
700
1050
1500
1400
840
Fixed Costs
Per Hour
$11.76
2.09
.71
1.49
1.37
1.13
1.38
1.89
1.04
2.17
1.15
.56
.54
2.02
.49
1.11
3.08
2.17
2.00
Variable Costs
Per Hour
$ 8.09
4.56
3.26
2.19
2.68
.86
1.08
1.44
.81
1.67
.82
.43
co
.42
1.53
.35
.86
3.44
1.67
1.55
,
7?
17
COTTON, DRYLAND, TEXAS ROLLING PLAINS I REGION
ESTIMATED COSTS AND RETURNS PER ACRE
OPERATION
ITEM
NO*
DATE
SHREDDER 2R TM
5 , 5 6 DEC
TANDEM DISC TM
4 , 4 0 DEC
MOLDBOARD 6B TM
3 , 4 7 DEC
PICKUP 1/2 TON
10
DEC
CHISEL
TM
3,44
JAN
PICKUP 1/2 TON
10
JAN
PICKUP 1/2 TON
10
FEB
TANDEM DISC TM
4 , 4 0 MAR
HERB SPR/DISC TM
61
MAR
PICKUP 1/2 TON
10
MAR
LISTER-PLNT6R TM
4 , 3 6 APR
PICKUP 1/2 TON
10
APR
PICKUP 1/2 TON
10
MAY
LISTER-PLNT6R TM
4,36
JUNE
SAND F IGHTER TM
4,51
JUNE
CULTIVATOR 6R TM
4 , 3 3 JUNE
CULTIVATOR 6R TM
3 , 3 3 JUNE
PICKUP 1/2 TON
10
JUNE
PICKUP 1/2 TON
10
JULY
PICKUP 1/2 TCN
10
SEPT
COTTON STR/BSKTM
1 , 6 4 NOV
PICKUP 1/2 TON
10
NOV
COTTON TR 3BL TM 1 0 , 6 2 NOV
TCTALS
FUEL.OIL, FIXED
T I M E S L A B O R M A C H I N E L U B . . R E P. C O S T S
OVER HOURS HOURS PER ACRE PER ACRE
1,00 0.595
0.397
1 , 0 0 0 , 2 5 3 0, 168
0,30 0.154 0 . 1 0 3
0.10
0 , 1 2 5 0. 100
0.70 0,125 0 . 0 8 3
0*10 0,125
0,100
O.iO 0,125 0 . 1 0 0
2,00
0,505 0 . 3 3 7
1,00 0 , 0
0.196
0,10 0,125
0.100
1,00 0,309 0 . 2 0 6
0*10 0 . 1 2 5 0 . 1 0 0
0 . 1 0 0,125 0 . 1 0 0
1,00 0,309 0 . 2 0 6
1.00 0,125 0 . 0 8 3
1,00 0,190 0 . 1 2 7
1 , 0 0 0,190
0.127
0.10 0.125
0, 100
0 . 1 0 0 , 1 2 5 0. 100
0.10 0,125 0 . 1 0 0
0 , 5 0 0,425
0.283
0*10 0,125
0.100
0 , 5 0 °**ZS -2*232
4.857
3.601
1.21
0.80
0.63
0.27
0.58
0.27
0.27
1 .59
0.07
0.27
1.10
0.27
0.27
1.10
0.36
0.63
0.80
0.27
0.27
0.27
2.08
0.27
1,69
0.83
0.79
0.19
0.78
0.19
0.19
1.6 7
0. 15
0. 19
1.30
0. 19
0.19
1.30
0.35
0.70
1.02
0.19
0.19
0. 19
2.30
0.19
-1*16
-1*13
14.79
15,90
LANO (NET RENT) BASED ON 1/4 OF GROSS INCOME LESS I/. UP
1 / 4 O F I N S E C T, G I N - 8 A G - T I I
YIELO BASED ON 2X2 PLANTING PATTERN. GOVT PAYMT NOT INCL.
PREPARED BY NORMAN W. BRINTS. TAEX, VERNON. TEXAS
PROJECTED 1979
BUDGET IDENTIFICATION NUMBER— - 9 3 0 0 5 0 0 2 5 0 0 0
A N N U A L C A P I TA L M O N T H 11
16
COTTON, DRYLAND, TEXAS ROLLING PLAINS I REGION
ESTIMATED COSTS AND RETURNS PER ACRE
UNIT
1, GROSS RECEIPTS F R O M P R O D U C T I O N
COTTON LINT
COTTONSEED
TOTAL
VA R I A B L E C O S T S
PREHARVEST
SEED
INSECTICIDE
MISC EXPENSE
HERBICIDE
MACHINERY
TRACTORS
LABQRCTRACTOR & MACHINERY)
INTEREST ON OP, CAP,
LBS.
TON
0 5 0
80 00
175,00
0*14
LBS,
APPL
ACRE
ACRE
ACRE
ACRE
HOUR
DOL.
0.39
4.50
5.00
5.06
5.61
7.10
4,50
0.09
H._Q
8.00
1.00
1.00
1 .00
1.00
1.00
4 . 4 3
15.45
3.12
4.50
5.00
5.06
5.61
7.10
19,94
..47
$ 51.80
BALE
ACRE
ACRE
HOUR
35,00
0.97
1 . 11
4.50
0,
1,
1.
0.
3
0
0
4
5
0
0
3
TOTAL VARIABLE COST
3, INCOME ABOVE VARIABLE COSTS
4. FIXED COSTS
MACHINERY
TRACTORS
LAND
(NET
TOTAL FIXED COSTS
87,50
98,70
S U B T O TA L , P R E - H A R V E S T
HARVEST COSTS
GIN,
BAG,
TIES
MACHINERY
TRACTORS
LABOR(TRACTOR & MACHINERY)
SUBTOTAL, HARVEST
VALUE OR
COST
PRICE OR
COST/UNIT QUANTITY
12.
0._K~
1 , 11
]
_•?_
$
16,25
S
68,05
s
30.65
$
RENT)
ACRE
ACRE
ACRE
8.14
7.76
20.49
8.14
7,76
1.00
1.00
1.00
-22**2
$
36,39
5. TOTAL COSTS
9 104.44
6. NET RETURNS
9
-5.74
LAND (NET RENT) BASED ON 1/4 OF GROSS INCOME LESS 1/4 F I N S E C T • G I N - B A G
YIELD BASED ON 2X2 PLANTING PATTERN. GOVT PAYMT NOT INCL.
PREPARED BY NORMAN _" • BRINTS, TAEX, VERNON, TEXAS PROJECTED 1979
>=sIk
19
GUAR, DRYLAND. TEXAS ROLLING PLAINS I REGION
ESTIMATED COSTS AND RETURNS PER ACRE
OPERATION
6B TM
MCLDBOARD
P I C K U P 1 / 2 TON
TM
CHISEL
P I C K U P 1 / 2 TON
P I C K U P 1 / 2 TON
TA N D E M D I S C T M
LISTER-PLNT6R TM
P I C K U P 1 / 2 TON
P I C K U P 1 / 2 TON
SAND FIGHTER TM
R O L L I N G C U LT T M
P I C K U P 1 / 2 TON
LISTER-PLNT6R TM
R O L L I N G C U LT T M
P I C K U P 1 / 2 TON
C U LT I VATO R 6R TM
P I C K U P 1 / 2 TON
P I C K U P 1 / 2 TON
P I C K U P 1 / 2 TON
P I C K U P 1 / 2 TON
TOTALS
ITEM
NO,
3,47
10
3,44
10
10
3,40
4,36
10
10
4,51
4,30
10
4,36
4,30
10
3,33
10
10
10
10
DATE
DEC
DEC
JAN
JAN
FEB
MAR
MAR
MAR
APR
MAY
MAY
MAY
JUNE
JUNE
JUNE
J U LY
J U LY
AUG
SEPT
OCT
FIXED
FUEL,OIL,
COSTS
L
U
B
.
,
R
E
P.
T I M E S LABOR MACHINE
PER
ACRE
PER
ACRE
HOURS
OVER
HOURS
0,30
0*10
1,40
0,10
0,10
0,30
1,00
0,10
0*10
2.00
1.00
0.10
1.10
1 .00
0*10
1,00
0,10
0.10
o.io
0.10
0.154
0.125
0.250
0.125
0.125
0.076
0.309
0.125
0.125
0.250
0.177
0.125
0.340
0.177
0.125
0.190
0.125
0.125
0.125
0.**5
0.103
0.100
0.167
0.100
0.100
0.051
0.206
0.100
0.100
0.167
0. 118
0.100
0.227
0. 1 18
0.100
0.127
0.100
0.100
0.100
Qt_Q0
0.63
0.27
1 .15
0.27
0.27
0.31
1.10
0.27
0.27
0.72
0.56
0.27
1.21
0.56
0.27
0.80
0.27
0.27
0.27
0.79
0. 19
1.56
0. 19
0.19
0.38
1.30
0.19
0.19
0.69
0.60
0.19
1.43
0.60
0. 19
1.02
0.19
0. 19
0.19
-2x22
2x12
3.299
2.383
10.00
10.43
LAND CHARGE USES LANDLORD'S SHARE OF GROSS 33% LESS 33X OF HAUL
ANC HARVEST.
PREPARED EY NORMAN W. BRINTS, TAEX, VERNON, TEXAS PROJECTED 1979
B U D G E T I D E N T I F I C AT I O N N U M B E R 9 0 3 0 0 5 0 0 2 5 0 0 0
ANNUAL CAPITAL MONTH 10
18
GUAR, DRYLAND, TEXAS ROLLING PLAINS I REGION
ESTIMATED COSTS AND RETURNS PER ACRE
UNIT
1, GROSS RECEIPTS FROM PRODUCTION
GUAR
TOTAL
PRICE
OR
VA L U E
OR
COST/UNIT QUANTITY COST
*
CWT
10,00
6.00
i
60,00
?
$ 60.00-
2 , VA R I A B L E C O S T S
PREHARVEST
SEED
MISC EXPENSE
MACHINERY
TRACTORS
LABOR(TRACTOR & MACHINERY)
INTEREST ON OP. CAP.
SUBTOTAL, PRE-HARVEST
HARVEST COSTS
CUSTOM COMBINE
CUSTOM HAUL
SUBTOTAL, HARVEST
LBS,
ACRE
ACRE
ACRE
HOUR
DOL,
0.22
3.00
4.39
5.61
4.50
0.09
8.00
1.00
1.00
1.00
3.30
6.10
$
9
ACRE
CWT.
10.00
0.25
1.00
6.00
10,00
1,50
9
T O TA L VA R I A B L E C O S T
ACRE
ACRE
ACRE
6.948
5.1 1
5,32
16.00
5. TOTAL COSTS
6. BREAKEVEN PRICE, TOTAL COSTS
11, SOL
4 1 .6 . '
3 . B R E A K E V E N P R I C E , V A R I A B L E C O S T S C W T.
4. FIXED COSTS
MACHINERY
TRACTORS
LAND (NET RENT)
TOTAL FIXED COSTS
1.76
3.00
4.39
5,61
14,84
ftf58
30,19
1,00
1.00
1.00
$
5 . 11
5.32
16.00
26.43
9
68. 12
11 . 3 5 3
CWT,
L A N O C H A R G E U S E S L A N D L O R D ' S S H A R E O F G R O S S 3 3X
X LESS
LESS
A N D H A R V E S T.
PPEPAREO BY NORMAN W. BRINTS, TAEX, VERNON, TEXAS
EXAS
33X OF HAUL
PROJECTED 1979
"S5^k
__!
WHEAT, DRYLAND, TEXAS ROLLING PLAINS I REGION
ESTIMATED COSTS AND RETURNS PER ACRE
OPERATION
CHISEL
PICKUP
CHISEL
PICKUP
CHISEL
PICKUP
GRAIN
PICKUP
PICKUP
PICKUP
PICKUP
PICKUP
PICKUP
PICKUP
PICKUP
PICKUP
HLM
1 / 2 TON
HLM
1 / 2 TON
HLM
1 / 2 TON
DRILL HLM
1 / 2 TON
1 / 2 TON
1 / 2 TON
1 / 2 TON
1 / 2 TON
1 / 2 TON
1 / 2 TON
1 / 2 TON
1 / 2 TON
TOTALS
ITEM
NO,
1 • 79
10
1•79
10
1 • 79
10
1 • 93
10
10
10
10
10
10
10
10
10
D AT E
FUEL,OIL,
FIXED
COSTS
TIMES LABOR MACHINE L U B . . R E P.
OV _R
HOURS
HOURS PER ACRE PER ACRE
JUNE
JUNE
J U LY
J U LY
AUG
AUG
SEPT
SEPT
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
1,00
0.10
1,00
0.10
1.00
0.10
1.00
0.10
0.10
0.10
0.10
0.10
0.1 0
0.10
0.10
0.10
0.156
0.125
0.156
0.125
0.156
0.125
0.262
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0ti<_5
0.104
0. 100
0.104
0.100
0. 104
0.100
0. 175
0.100
0.100
0. 100
0.100
0.100
0.100
0.100
0.100
0. 100
1 ,19
0,27
1,19
0.27
1.19
0.27
1*97
0.27
0.27
0.27
0.27
0.27
0.27
0.27
0.27
2.73
0.19
2.73
0.19
2.73
0.19
4.52
0.19
0. 19
0.19
0.19
0,19
0,19
0, 19
0, 19
2x21
-9*13
2.231
1.687
8.74
14,95
LANO (NET RENT) BASED ON 33X OF GROSS INCOME LESS 33X OF FERT, INSECT, HARVt
AND HAUL, GOVT PAYMENT NOT INCLUDED.
PREPARED BY NORMAN W. BRINTS, TAEX, VERNON, TEXAS PROJECTED 1979
BUDGET IOENTIFICA..UN NUMBER 76 005002 500 0
ANNUAL CAPITAL MONTH 5
#*=.
20
WHEAT, DRYLAND, TEXAS ROLLING PLAINS I REGION
ESTIMATED COSTS AND RETURNS PER ACRE
UNIT
PRICE
OR
VA L U E
OR
COST/UNIT QUANTITY COST
1, GROSS RECEIPTS FROM PRODUCTION
WHEAT
GRAZING
TOTAL
BU.
AUMS
2, VARIABLE COSTS
PREHARVEST
SEED
FERT(16-20-0)
INSECTICIDE
CROP INSURANCE
MISC EXPENSE
MACHINERY
TRACTORS
LABOR(TRACTOR & MACHINERY)
INTEREST ON OP. CAP,
SUBTOTAL, PRE-HARVEST
BU.
ACRE
APPL
ACRE
ACRE
ACRE
ACRE
HOUR
DOL*
4.50
9.00
3.50
3.00
3.00
4.01
4.73
4.50
0.09
1.00
1.00
1.00
1.00
1.00
1 .00
1.00
2.23
20.88
HARVEST COSTS
CUSTOM COMBINE
CUSTOM HAUL
SUBTOTAL, HARVEST
ACRE
BU.
7.00
0.10
1.00
20.00
2.95
10.00
59.00
-20.»_ .
20.00
2.00
9
79.00
4.50
9.00
3.50
3.00
3.00
4.01
4.73
10,04
It ?e
43.76
TOTAL VARIABLE COST
3, INCOME ABOVE VARIABLE COSTS
4, FIXEO COSTS
MACHINERY
TRACTORS
LAND (NET RENT)
TOTAL FIXED COSTS
^ %
$
7.0__
_tQ.o
9.00
$
52.76
S
26.24
$
ACRE
ACRE
ACRE
3.91
11 . 0 5
18.97
1 .00
1.00
1.00
3.91
11 . 0 5
9
—13*32
33.93
5, TOTAL COSTS
86,69
6, NET RETURNS
-7.69
LAND (NET RENT) BASED ON 33X OF GROSS INCOME LESS 33X OF FERT, INSECT, HA.
ANO HAUL, GOVT PAYMENT NOT INCLUOED.
PREPARED BY NORMAN W. BRINTS, TAEX, VERNON, TEXAS PROJECTED 1979
'**%,
ALFALFA ESTABLISHMENT, DRYLAND, TEXAS ROLLING PLAINS I REGION
ESTIMATED COSTS AND RETURNS PER ACRE
ITEM
NO.
OPERATION
CHISEL
PICKUP
CHtSEL
PICKUP
GRAIN
PICKUP
PICKUP
TM
1/2 TON
TM
1/2 TON
ORILL TM
1/2 TON
1/2 TON
TOTALS
3,44
10
3,44
10
3,58
10
10
DATE
FIXED
FUEL.OIL,
COSTS
MACHINE
L
U
B
.
.
R
E
P.
TIMES LABOR
PER
ACRE
PER
ACRE
OV _R HOURS HOURS
JULY
JULY
AUG
AUG
SEPT
SEPT
OCT
1.00
0*10
1*00
0.10
1.00
0.10
0.10
0 * 11 9
0.100
0, 119
0,100
0.235
0. 100
0,82
0.27
0.82
0.27
1.59
0.27
1 . 11
0.19
1 , 11
0,19
2.13
0.19
9 fl 2 5 __.£__ Jioq
Of 27
-2*13
1.210 0.873
4.31
5.10
0.179
0.125
0.179
0.125
0.353
0.125
PREPARED BY NORMAN W. BRINTS, TAEX, VERNON, TEXAS
B U D G E T I D E N T I F I C AT I O N N U M B E R 8 11 0 0 5 0 0 2 5 0 0 0
ANNUAL CAPITAL MONTH 12
PROJECTED 1979
ALFALFA ESTABLISHMENT. DRYLAND, TEXAS ROLLING PLAINS I REGION
ESTIMATED COSTS AND RETURNS PER ACRE
PRICE
OR
VA L U E
OR
UNIT COST/UNIT QUANTITY COST
$_.............
S
0.0
1. GROSS RECEIPTS FROM PRODUCTION
TOTAL
2. VARIABLE COSTS
PREHARVEST
SEED
FERT(16-20-0)
MACHINERY
TRACTORS
LABOR(TRACTOR & MACHINERY)
INTEREST ON OP. CAP.
SUBTOTAL. PRE-HARVEST
$
LBS,
ACRE
ACRE
ACRE
HOUR
DOL.
1,25
9,00
1,83
2,48
4,50
0,09
20.00
1.00
1.00
1.00
1.21
9.83
25.00
9.00
1.83
2.48
5.45
9
—2*33
44.69
HARVEST COSTS
SUBTOTAL, HARVEST
$_
$
0.0
TOTAL VARIABLE COST
$
44.69
9 -44.6
J. INCOME ABOVE VARIABLE COSTS
4. FIXED COSTS
MACHINERY
TRACTORS
LAND (NET RENT)
TOTAL FIXED COSTS
9
ACRE
ACRE
ACRE
2,35
2.75
200.00
2.35
2.75
1.00
1.00
0.06
9
-1 _______
17.10
5. TOTAL COSTS
9
6. NET RETURNS
9 -61.79
61,79
PREPARED BY NORMAN W, BRINTS, TAEX, VERNON, TEXAS PROJECTED 1979
/*=a%
A L FA L FA , D RY L A N D , T E X A S R O L L I N G P L A I N S I R E G I O N
E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E
ITEM
NO.
O P E R AT I O N
PICKUP
PICKUP
PICKUP
PICKUP
PICKUP
PICKUP
1/2
1/2
1/2
1/2
1/2
1/2
TO N
TO N
TON
TO N
TO N
TON
10
10
10
10
10
10
D AT E
T I M E S L A B O R M A C H I N E L U B . . R E P ,▶ C O S T S
OV!rR
HOURS
HOURS
PER ACRE PER ACRE
APR
MAY
JUNE
J U LY
AUG
SEPT
0.10
0.10
0.10
0.10
0.10
0.10
T O TA L S
^^*\
0.12
0.12
0.12
0.12
0.12
0.12
5
5
5
5
5
5
0.100
0. 100
0.100
0. 100
0.100
PfJiPP
0.750 0.600
0
0
0
0
0
0
.
.
.
.
.
*
2
2
2
2
2
2
7
7
7
7
7
7
0.
0.
0.
0.
0.
19
19
19
19
19
-3x13
1 .61
1 .12
LAND CHARGE USES LANDLORD'S SHARE OF GROSS 33X LESS 33X OF FERTILIZER
A N D H A R V E S T. E S T A B L I S H M E N T C O S T S P R O R A T E D O V E R S I X Y E A R S .
P R E PA R E O B Y N O R M A N W . B R I N T S , TA E X , V E R N O N , T E X A S
PROJECTED 1979
B U O G E T I D E N T I F I C AT I O N N U M B E R
A N N U A L C A P I TA L M O N T H 9
8 1 005002 500 0
A L FA L FA , D RY L A N D , T E X A S R O L L I N G P L A I N S I R E G I O N
E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E
UNIT
1, GROSS RECEIPTS FROM PRODUCTION
H AY
TOTAL
2, VARIABLE COSTS
PREHARVEST
FERT(0-20-0)
MACHINERY
LABORITRACTOR & MACHINERY)
INTEREST ON OP, CAP,
SUBTOTAL, PRE-HARVEST
HARVEST COSTS
CUSTOM
HARVEST
SUBTOTAL. HARVEST
TON
ACRE
ACRE
HOUR
DOL.
s ^ k
PRICE
OR
VA L U E
OR
COST/UNIT QUANTITY COST
60,00
5.
1.
4.
0.
50
61
50
09
2,50
1.0
1.0
0.7
2.6
150,00
$ 150,00
5.50
1.61
3.37
0
0
5
3
P»25
10.73
BALE
0,65
83,00
TOTAL VARIABLE COST
___S2__2__
$
53.95
S
64.68
25.8
BREAKEVEN PRICE, VARIABLE COSTS TON
4. FIXED COSTS
MACHINERY
TRACTORS
PRORATED ESTAB. COST
LAND (NET RENT)
TOTAL FIXED COSTS
$
ACRE
ACRE
ACRE
ACRE
1.12
0.0
10.32
1,00
1 .00
0.17
1 .00
$
??,88
4 1.32
$ 106.00
5. TOTAL COSTS
6. BREAKEVEN PRICE, TOTAL COSTS
1,12
0,0
61,79
29.88
TON
42.401
LAND CHARGE USES LANDLORD'S SHARE OF GROSS 33X LESS 3 3 % O F F E R T I L I Z E R
AND HARVEST. ESTABLISHMENT COSTS PPORATEO OVER SIX Y E A R S .
PROJECTED 1979
PREPARED BY NORMAN W. BRINTS, TAEX, VERNON, TEXAS
■^%\
ALFALFA ESTABLISHMENT, IRRIGATED, TEXAS ROLLING PLAINS I REGION
ESTIMATED COSTS ANO RETURNS PER ACRE
OPERATION
CHISEL
TM
PICKUP 1/2 TON
TANDEM DISC TM
PICKUP 1/2 TON
GRAIN DRILL TM
PICKUP 1/2 TON
PICKUP 1/2 TON
PICKUP 1/2 TON
ITEM
NO.
DATE
FUEL,OIL, FIXED
TIMES LABOR MACHINE LUB,,REP. COSTS
OVER HOURS HOURS PER ACRE PER ACRE
3,44
J U LY
1.00
0.179
0 . 11 9
0.82
1 0 J U LY 0 . 1 0 0 . 1 2 5 0 . 1 0 0 0 . 2 7
3 , 4 0 AUG
1,00 0 . 2 5 3
0.168
1.02
10 AUG
0.10 0 . 1 2 5
0.100
0.27
3 , 5 8 SEPT
1.00 0 . 3 5 3
0.235
1.59
10
SEPT 0 . 1 0 0 . 1 2 5
0.100
0.27
10
OCT
0.10
0.125
0.100
0.27
io nov o.io __flL_.l__J_ o»ioo 0*27
TOTALS
1.409 1.023
PREPAREO BY NORMAN W. BR INTS, TAEX, VERNON, TEXAS
BUDGET IDENTIFICATION NUMBER
ANNUAL CAPITAL MONTH 12
- 8 11 0 0 5 1 0 2 5 2 0 0
4.77
l.ll
0.19
1.26
0.19
2.13
0.19
0.19
0.19
5.44
PROJECTED 1979
Download