r TEXAS NORTHEAST FOREWORD r The enterprise budgets for Texas Northeast Region are based on estimates of yields, production input quantities, and production practices which represent the best judgment of local producers, county Extension agents-agriculture, financial in stitution representatives, farm machinery dealers and others knowledgeable of the area. Variation in yields, production inputs and production prac tices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. r The machinery inventory is applicable to both typical and high level management. In some bud gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Crop share rental agreements do not exist to any substantial degree. Land charges were, there fore, calculated by using a fair market value times an interest rate or a cash lease. /^N NORTHEAST TEXAS REGION Assumed Prices Paid and Received by Farmers 1/ ITEM UNIT PRICE Price Paid (1979) Seed Corn Cotton Grain Sorghum Oats Southern Peas Soybeans Tomato Plants Watermelons Wheat Custom Rates Coastal Sprigging (including sprigs) Combining Corn Grain Sorghum Oats Southern Peas Wheat Soybeans Cotton strip and haul Cotton, gin, bag, and ties Hay baling Hauling Corn Oats Watermelons Wheat Southern Peas Grain Sorghum Soybeans /#*N lb. lb. lb. lb. lb. lb. $ .43 lb. lb. 7.00 acre 30.00 doz. bu. acre acre acre acre acre cwt. cwt. bale bu. bu. cwt. bu. cwt. cwt. bu. .35 .45 .14 .33 .20 .60 .15 .30 12.50 12.00 10.00 12.00 12.00 1.75 2.00 .40 .14 .08 .25 .14 .25 .25 .15 - 2 - ITEM Chemicals Fertilizer Nitrogen Phosphorous Potash Simazine 2-4D Milogard Treflan Methylparathion Sevin Malithion Grazing grain per acre Typical High Level UNIT lb. lb. lb. lb. gal. lb. gal. gal. lb. gal. lb. lb. Interest PRICE $ .20 .18 .08 4.50 5.50 2.50 28.50 5.25 1.52 11.00 250.00 500.00 .10 Prices Received (1979) Coastal Hay Typical Management High Level Management Corn Cotton Cottonseed Grain Sorghum Oats Southern peas Soybeans Tomatoes Watermelons Wheat /^% bale bale bu. lb. ton cwt. bu. cwt. bu. carton cwt. bu. 1.20 1.30 2.20 .53 80.00 3.55 1.15 16.00 6.00 9.00 3.15 2.85 1/ These price assumptions are not to be interpreted as predictions or prospective prices. /rfB%. ( NORTHEAST TEXAS REGION Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size Tractor-100 HP Tractor-70 HP Tractor-50 HP Pickup-1/2 Ton Truck Shredder 4R-13.3 Ft. T Offset Disc-10 Ft. T Tandem Disc-13 Ft. T MB Plow 4B-5.3 Ft. T MB Plow 3B-4.0 Ft. T Planter-13.3 Ft. T Grain Drill-10 Ft. T Tool Bar Cult.-13.3 Ft. Tool Bar Cult.-20 Ft. T Lister/Bedder-13.3 Ft. T Sprayer Herb.-13.3 Ft. T Fert. Dist, Melon T Plant-Cult. 1-R T Rolling Cult. 1-R T Mist Blow Soray-30 Ft. Item Purchase Price 1 2 3 10 11 31 32 34 37 38 39 42 43 44 47 49 57 58 59 60 $16,800 11,500 8,200 5,100 7,665 2,600 1,700 2,520 1,350 1,080 1,350 1,150 No. 900 1,350 1,120 525 1,200 1,350 250 2,400 Estimated Years of Use 8 8 10 4 10 8 8 8 8 8 8 10 8 8 8 8 4 8 6 5 Estimated Hours of Use 4800 4800 5000 2800 3000 1000 1200 1200 1400 1400 480 1000 1200 1400 1400 800 1000 800 1800 1000 Fixed Costs Per Hour $ 2.37 1.63 1.27 .82 1.97 2.19 1.19 1.83 .81 .67 2.37 1.06 .63 .81 .67 .55 .73 1.42 .10 1.62 Variable Costs Per Hour $ 6.21 4.29 2.99 6.02 8.87 1.46 .79 1.05 .54 .38 1.57 .65 .42 .55 .45 .38 .67 .95 .08 1.35 Cjj ^m>K C O A S TA L B E R M U D A G R A S S E S TA B L I S H M E N T, N O R T H E A S T T f X A S R E G I O N L S T 1 M AT L O C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT UNIT PRICE CR V .LUL Oh COST/UMT QUANTITY COST * _ ._.__.__ ._. o.o J 1 . G . O S S h E C L I P Ti i l - K O M P R O D U C T I O N T O TA L 2 . VA W I A O L E C C S T S HKcfcHARVEST f-LRT (60-40-40) CUSTOM SPPIGGING HbRrtlCiUE MACHINERY TRACTORS LAtJOF.(T_.:ALT_)R & MACHINERY) INTCREST ON OP* CAP. SUMTiiTAL. PRE-HARVEST 9 ACRE ACRE ACRE ACRE ACRE HOUR OOL. 22*40 30*00 2.25 7.04 3.62 4.00 0.10 ! u T / > L VA R l A f c H - E C J S T O * N t T R LT U R N S S 0.0 $ 7<_.23 9 -76.23 J . I N C O M E A t J U V E VA R i A H L E C O S T S b * Ti . TA L C U S T S —*\**J> 78.23 HARVtST CUSTS ;_UHTGTAL. HARVEST 'i • FIXEO CUSTS MACHINERY TkACTORS L A N D ( N E T W E N T. T L FA L f - I X L D C O S T S 22.AO 30.00 2.?5 7.04 :.*62 lO.bC 1 .00 1.00 1 .00 1 .00 I .00 2.62 24.20 9 ACRE ACRE ACRE 2.88 2.70 10.00 __,«8 2.7C 1.00 1 .00 1 .00 .-12x22 % 15.58 9 .3.* I 9 -^3.dl P M PA M i U U Y O f , . J A M E S T. L O N G . TA E X . O V E R T O N . T F X A S P R O J E C T E D 1 9 7 . C G A S TA L B E R M U D A G R A S S E S TA B L I S H M E N T, N O R T H E A S T T E X A S H t G l O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT OPERA!ILN PICKUP PICKUP K E N T D . F E R T. A P P L l JICKU. 1ANDE* DISC T .AND... CISC T S P f t A Y t fi . H E K O . T .'ICKUP PICKUP PICKUP K , e r N T O * F E F. T. A P P L I PICKUP TOTALS ITEM NU. 10 10 3,86 10 2,34 2,34 3,49 10 10 10 3,86 10 D AT E FUEL.OIL. FIXED T I M E S L A B O R M A C H I N E L U B . . R E P. C U S T S OVER HOURS HOURS PER ACRE PER ACHE SEPT OCT FL8 FEB MAR APR APR APR M AY JUNE AUG AUG 0.1b 0.15 1.00 0.1b 1.00 1*00 1.00 0.15 0.15 0.15 1.00 0.15 0.104 0*194 0 . 11 8 0. 194 0.283 0.283 0.465 0.194 0.194 0.194 0 . 11 8 0. 155 0. 155 0.079 0. 155 0. 189 0.189 0.310 0.155 0.155 0. 155 0.079 0* _ . 0.93 0.28 0.93 1 .17 I .17 1 .23 0.93 0.93 0.93 0.28 2x12* -2x133 -2x23 2.624 I 0 • 66 1.930 0.22 Q.S.2 0.2 3 0.22 1.22 1.22 1.16 0.22 0.22 0.?2 0.23 _________ /^% P R E PA R E D O Y O R . J A M E S T. L O N G , TA E X , O V E R T O N , T E X A S P R O J E C T E D 1 9 7 9 d U O G E T I D E N T I F I C AT I O N N U M B E R 8 3 4 0 11 0 0 2 11 0 0 0 A N N U A L C A P I TA L M U N T H 8 s*% Ji^N COASTAL BERMUDAGRASS ESTABLISHMENT, NORTHEAST TEXAS REGION ESTIMATED COSTS ANO RETURNS PER ACPE HIGH LEVEL MANAGEMENT PRICE CR VA L U E OR UNIT COST/UNIT QUANTITY COST 1* GRCSS RECEIPTS FROM PRODUCTION HAY TOTAL 2. VARIABLE COSTS PREHARVZST FERT (180-80-80) CUSTOM SPRIGGING HERB* PREMERGE MACHINERY TRACTORS LABOR!TRACTOR & MACHINERY) INTEREST ON UP* CAP* SUBTOTAL, PRE-HARVEST HARVEST COSTS CLSTOM BALING SUBTOTAL, HARVEST $ BALE 1.20 $ ACRE ACRE ACRE ACRE ACRE HOUR DOL* 6. NET RETURNS 56.80 30.00 2.25 4.26 4.42 8. J.. 1*00 1*00 1*00 1.00 1.00 2.08 38.97 2x32 9 109.94 9 BALE 0.40 70.00 _-__&__ _Q 28.00 £ I 37.94 $ -53.94 3. INCOME ABOVE VARIABLE COSTS >. TCTAL COSTS 84.00 9 56.8 0 30*00 2.25 4.26 4.42 4.00 0.10 TOTAL VARIABLE COST 4. FIXEO COSTS MACHINERY TRACTORS LAND (NET RENT! TOTAL FIXEO CUSTS -2±x22 70.00 S ACRE ACRE ACRE 2.12 1.29 15.00 2. 12 3.29 1.00 1 .00 1.00 .-15x33 9 20.41 9 158.3b 9 - 74.35 M AY S f . L L > I N F l c L O . . * F P A f . t _ i _ n v D R . J A M E S T, L U N G , T A E X . O V E R T O N , T E X A S P R l _ J = C T _ 0 1 9 7 9 COASTAL BERMUDAGRASS ESTABLISHMENT* NORTHEAST TEXAS REGION ESTIMATED COSTS AND RETURNS PEP ACRE HIGH LEVEL MANAGEMENT Q P E PAT I L N PICKUP PICKUP PICKUP PICKUP s E N T D . F E R T. A P P L I H S P R AY E R . H E R B . PICKUP H TA N D E * D I S C PICKUP H TA N D E M D I S C RENTI..FEPT .APPLI PI C K UP * _ _ N T D . F _ _ RT . A P P L I T C TA L S ITEM NO* 10 10 10 10 3.86 3,83 10 1,68 10 1 ,68 3,86 10 3,86 D AT E FIXED FUEL,OIL, COSTS M A C H I N E L U B . . R E P . T I M E S LABOR P E R ACRE HOURS P E R A C R E OVER HOURS SEPT OCT NOV JAN FEB FEB FEB MAR MAR APR APR MAY AUG 0*09 0*09 0*09 0.09 1*00 1*00 0*09 1*00 0*09 1*00 1.00 0.09 1.00 0 * 11 2 0*112 0.112 0.112 0 * 11 8 0*423 0 * 11 2 0*258 0 * 11 2 0*258 0*118 0 * 11 2 0 * 11 8 0*090 0*090 0.090 0*090 0.079 0*282 0*090 0*172 0*090 0*172 0*079 0*090 0*64 0.54 0*54 0*54 0*28 1*12 0*54 1 .46 0.54 1 .46 0*28 0*54 0*13 0. 13 0.13 0.13 0*23 1*06 0,13 1*40 0* 13 1 .40 0.23 0.13 -2*223 -2*23 -2*23 2*079 1*491 8*68 5.41 HAY SOLD IN FIELD. PREPARED BY OR* JAMES T. LONG, TAEX, OVERTON, TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER— - 8 3 4 0 11 0 0 111 0 0 0 ANNUAL CAPITAL MONTH 8 /^v>. 8 COASTAL BERMUDAGRASS HAY* NORTHEAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT 1* GROSS H AY TO TA L RECEIPTS BALE 2* VARIABLE COSTS PREHARVEST F E RT 2 4 0 - 1 0 0 - 1 3 0 HERBICIDE MACHINERY TRACTORS LABCR(TRACTOR t MACHINERY) INTEREST CN OP* CAP* SUBTOTAL* PRE-HARVEST HARVEST COSTS CUSTOM BALING SUBTOTAL* HARVEST FROM 1.20 S PRICE OR VA L U E OR COST/UNIT QUANTITY COST PRODUCTION 210*00 S 252*00 252.00 9 ACRE ACRE ACRE ACRE HOUR DOL* 76*40 2*25 3*01 0*56 4*00 0.10 76.40 1.13 3.01 ?.56 3*44 1.00 0*50 1*00 1*00 0*86 23.93 $ 9 BALE 0.40 210.00 9 9 TOTAL VARIABLE COST 3* BREAKEVEN PRICE* VARIABLE COSTS BALE BALE 4* FIXED COSTS MACHINERY TRACTORS PRORATEO ESTAB* COST LANO (NET RENT I TCTAL FIXEO COSTS ..BUM 84.00 170.93 0.814 9 ACRE ACRE ACRE ACRE 0*70 0.45 93.61 10.00 1 .00 1 .00 0.07 1.00 0.70 0*45 6.57 9 5* TOTAL COSTS 6. BREAKEVEN PRICE, TOTAL COSTS 2*23 86.93 .-12x22 I 7.7? 9 188.66 BALE 0.8«_. » ESTABLISHMENT COST PRORATED OVER 15 YEARS* HERBICIDE AT $2.25/ACHE HAY SULD IN FIELD* PPEPAhEO BY OR* JAMES T. LONG* TAEX, OVERTON, TEXAS PROJECTED 197W COASTAL BERMUDAGRASS HAY, NORTHEAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION PICKUP RENTD.FERT.APPL 1 .ICKUP PICKUP RENTO.FERT.APPLI PICKUP PICKUP TOTALS ITEM NO. 10 3,86 10 10 3*86 10 10 DATE AUG FEB FEB APR M AY M AY JUNE FUEL,OIL. FIXEO TIMES LABOR MACHINE LUB.,REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE 0.10 1.00 0.10 0*10 1.00 0.10 0.10 0.125 0 . 11 8 0*125 0*125 0 . 11 8 0*125 0*100 0.079 0*100 0*100 0*079 0*100 0*60 0.26 0.60 0.60 0.26 0*60 QtHftft Q»69 0.14 0.2J 0.14 0*14 0.23 0*14 0. 14 0*861 0*657 3.57 1. 15 0,125 * f.STABLlSHMENT COST PRORATED OVER 15 YEARS* HERBICIDE AT S2. .5/ACRE H AY S O L O I N F I E L D . P F E PA R f c O B Y O R . J A M E S T. L O N G , TA E X , O V E R T O N , T E X A S P R C J E C T E D 1 9 7 9 ^ ^ \ P U D G E T I D E N T I F I C AT I O N N U M B E R 8 3 6 0 11 0 0 2 111 0 0 A N N U A L C A P I TA L M O N T H 7 ^ % * v 10 CUASTAL BERMUDAGRASS HAY* NORTHEAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT PRICE OR VA L U E CP UNIT COST/UNIT QUANTITY COST 1, GROSS H AY TO TA L RECEIPTS FROM PRODUCTION * BALE 1.30 300.00 _3___2_t___2 * J90.00 2* VARIABLE COSTS PREHARVEST FERT 300-100-200 ACRE HERBICIOE ACRE MACHINERY ACRE TRACTORS ACRE LABORCTRACTOR & MACHINERY) HOUR INTEREST ON OP* CAP* DOL* SUBTOTAL* PRE-HARVEST HARVEST COSTS CUSTOM BALING SUBTOTAL, HARVEST 9 94.00 2.25 4.32 1*86 4.00 0.10 1 .00 1.00 1 .00 1.00 1.65 36.06 0.40 300.00 94.00 2.2b 4.32 '•86 6.t 1 _U_3l $ 11 2 . 6 4 $ BALE TOTAL VARIABLE COST .122xOA s 120.00 $ 2 3 2.fi4 3. BREAKEVEN PRICE* VARIABLE COSTS BALE 4* FIXEO COSTS MACHINERY 1RACT0RS P R O R AT E D E S TA B * C O S T LAND (NET RENT) TOTAL FIXED COSTS 0.775 9 ACRE ACRE ACRE ACRE 5. TOTAL COSTS 6* BREAKEVEN PRICE, TOTAL COSTS BALE 1.23 1 .48 74.35 15*00 1.00 1.00 0.07 1.00 1.23 1.43 5.20 . 15.&o 9 22.92 9 255.56 0.852 HAY SOLD IN FIELD* PREPARED BY DR. JAMES T. LONG. TAEX, OVERTON, TEXAS PROJECTED 1979 11 C O A S TA L B E R M U D A G R A S S H AY * N O R T H E A S T T E X A S R E G I O N E S T I M AT E D COSTS ANO RETURNS PER ACRE HIGH LEVEL MANAGEMENT FUEL,OIL* 1TEM O P E R AT I O N NO. D AT E TIMES OVER LABOR HOURS MACHINE HOURS ACRE PICKUP 10 FEB 0*10 0.125 0.100 R E N T D . P E R T. A P P L I 3.86 MAR \.00 0 * 11 8 0.079 S P R AY E R , H E R B * H 3,83 APR 1.00 0*423 0.282 PICKUP 10 APR 0.10 0.125 0.100 R E N T. . F E R T. A P P L I 3,86 M AY 1.00 0 . 11 8 0.079 PICKUf 10 M AY O.lp 0.125 0.100 PICKUP IO JUNE 0*10 0.125 0*100 PICKUP 10 J U LY 0.10 0.12S 0.100 AUG 1.00 0 . 11 8 0*079 RENTD.f-EKT .APPLI 3.86 AUG 0.10 0.125 0.100 PICKUP 10 pickup 10 TOTALS sept o.RO -2lx1Z3 -2x122 1.651 FIXEO L U B * * R E P. PER 1.218 COSTS PER 0-60 0.28 1.12 0.60 0.28 0.60 0*60 0.60 0.28 0.60 -2*02 6.18 ^^ / ACRE 0.14 0*23 U06 0.14 0.23 0*14 0.14 0.14 0.23 0.14 -2*1± 2.72 H AY SOLO IN FIELD* __«.____._«____ . __•»__ PREPARED BY DR* JAMES T. LONG. TAEX. OVERTON. TEXAS PROJECTED 1979 J 3 U 0 G E T I D E N T I F I C AT I O N N U M B E R 8 3 6 0 11 0 0 111 0 0 0 ANNUAL CAPITAL MONTH 9 ^ % ^ 12 CORN. NORTHEAST TEXAS REGION E S T I M AT E O C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION CORN T O TA L VARIABLE COSTS PREHARVEST FERT (100-60-60) SEED HERBICIDE MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) INTEREST ON OP. CAP. BU. PRICE OR COST/UNIT 2.20 65.00 ACRE LBS* ACRE ACRE ACRE HOUR OOL* 35*60 0.43 6*25 5.26 13.98 4.00 0*10 1.00 10.00 0*60 1*00 1 .00 3.88 35.75 35.60 4.30 3.75 •3.26 13.98 15.5j 2x52 9 82.00 $ BU* BU* 0.30 0.14 O5.00 65.00 19.50 3x12 9 26.60 S 11 0 . 6 0 3. INCOME ABOVE VARIABLE COSTS 9 32.4_t 4. FIXED CUSTS S TOTAL VARIABLE COST MACHINERY T R A C TO R S LAND (NET RENT) T O TA L V I X E D C J S T S ACRE ACRE ACRE 4*94 9.87 20.00 1.00 1 .00 1 .00 4.94 9.H7 —22x23 9 34.81 b . T O TA L C O S T S $ 145.40 li* NET RETURNS * -2.40 G O V E R N M E N T PAY M E N T N O T I N C L U D E D . P R L ' P A H C O H Y O H * J A M E S T. L O N G , T A E X , O V E R T O N , T E X A S f^ _J.£_2-_o_> 9 143.00 S U B T O TA L * P R E - H A R V E S T HA. VEST COSTS CUSTOM PICKING CUSTLM HAUL S U B T O TA L , H A R V E S T VALUE OF. COST QUANTITY PRCJECT£0 19 79 13 CORN* NORTHEAST TEXAS REGION ESTIMATED COSTS ANO RETURNS PER ACRE TYPICAL MANAGEMENT — O P E R AT I O N PICKUP T SHREDDER<4R) PICKUP T M;J PLC*(4c_ TA N O E M D I S C T R E N T D . F E R T. A P P L I PICKUP LISTER-BEDDER T T S P R AY E R . H E R B * TA N D E M D I S C T PICKUP T PLANTER T O O L B A R C U LT * T PICKUP PICKUP T O TA L S /SS%v —> ITEM NO* 10 1,31 10 1*37 2,34 3,86 10 1.47 2 , 4 9 34 10 1,39 1,43 10 10 D AT E FIXED FUEL,OIL. COSTS L U B . . R E P , T I M E S LABOR MACHINE P E R A C R E P E R ACRE HOURS OVER HOURS SEPT OCT DEC FEB FEB FEB MAR MAR MAR MAR APR APR MAY J U LY AUG 0*10 1.00 0*10 1.00 1.00 1*00 0.10 1*00 1.20 1.00 0*10 1.00 1*00 0*10 0.10 0* 100 0*185 0*100 0*556 0*189 0.079 0.100 0*258 0.372 0*189 0*100 0*207 0*244 0* 100 0*60 1 .65 0*60 4*44 1.17 0.28 0.60 2*04 2*06 0.20 0*60 1 .87 1*92 0.60 0*14 1*62 0*14 3*65 1.22 0*23 0*14 1*64 1*67 0*54 0*14 1.87 1.53 0.14 __fl*_U& _ _ * . _ £ .2x63 -2*1± 19*24 14.81 0.125 0.277 0.125 0*834 0*283 0.118 0.125 0*388 0*558 0*0 0*125 0*310 0*365 0.125 3*884 2*878 GOVERNMENT PAYMENT NOT INCLUDED. PREPARED BY DR. JAMES T. LONG. TAEX, OVERTON, TEXAS B U D G E T I D E N T I F I C AT I O N N U M B E R - - 7 2 0 1 1 0 0 2 1 1 0 0 0 A N N U A L C A P I TA L M O N T H 8 PROJECTED 1979 >"^_\ 14 CORN, NORTHEAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT 1* GROSS RECEIPTS FROM PRODUCTION CCRN T O TA L 2. VARIABLE COSTS PREHARVEST FERT (140-80-80) SEED HERBICIDE MACHINERY TRACTORS LABOR(TRACTOR £- MACHINERY) INTEREST ON OP* CAP* SUBTOTAL. PRE-HARVEST HARVEST COSTS CUSTOM PICKING CUSTOM HAUL SUBTOTAL, HARVEST PRICE OP COST/UNIT QUANTITY S BU< ACRE LBS* ACRE ACRE ACHE HOUR DOL* 2.20 48*80 0.43 6*25 5*1 1 12.73 4*00 0*10 90.00 -132x22 9 198.00 48.80 4.30 6.25 ? .11 12.73 14.43 1*00 10.00 1*00 1 .00 1*00 3*61 44.95 fuss $ BU* BU* 27.00 90.00 90.00 $ .-12x62 39.60 $ 135.71 s 3. INCOME ABOVE VARIABLE COSTS 62.29 $ ACRE ACRE ACRE 4.56 8.99 25.00 4.56 8.99 __tQ0 38.55 1.00 1 .00 1 .00 174.27 5 . T O TA L C O S T S 6. NFT RETURNS GOVERNMENT PAYMENT NOT INCLUDED* PREPARED BY OR* JAMES T* LONG* TAEX, OVERTON. TEXAS Jp^ 96. 11 $ 0.30 0*14 TOTAL VARIABLE COST 4. f-lXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS VA L U E O f COST % 23.73 PROJECTED 19 79 15 CORN, NORTHEAST TEXAS REGION EST I MATEO COSTS AND RETURNS PEP ACRE HIGH LEVEL MANAGEMENT OPERAT ION PICKUP H SHREDDER(4R) PICKUP H M8 PL0l.(4B) H TA N C E M D I S C R E N T D . F E R T. A P P L I PICKUP h LISTER-BEDDER H S P R AY E R . H E R B . H TA N D E M D I S C PICKUP H PLANTER T O O L B A R C U L T. H PICKUP PICKJP ITEM NO* 10 1 ,65 10 1,71 2 , 6 8 3,86 10 1,81 2*83 6 8 10 1,73 1,77 10 10 D AT E FIXED FUEL,OIL, COSTS T I M E S LABOR M A C H I N E L U B . . R E P . HOURS PER ACRE PER ACRE HOURS OVER SEPT OCT DEC FEB FEB FEB MAR MAR MAR MAR APR APR MAY J U LY AUG 0*10 1*00 OolO 1*00 1*00 1*00 0*10 1.00 1*20 1*00 0*10 1.00 1.00 0*10 0*10 T O TA L S 0*100 0*168 Oo 100 0*505 0.172 0.079 0*100 0.235 0*338 0*172 0* 100 0* 188 0*221 0. 100 0*60 1 .50 0*60 4*04 1*06 0*28 0.60 1 *86 I .87 0*18 0.60 1*70 1 .74 0*60 0*14 1*47 0* 14 3.32 1* 1 1 0.23 0*14 1.49 1 .52 0*49 0. 14 1*70 1. 38 0.14 ._-«_____. - . f t j . 1 0 0 . . 0.60 __ - a_>_j_^ 2*677 17*83 13*55 0.125 0.252 0*125 0.758 0*258 0 * 11 8 0*125 0.352 0.506 0*0 0* 125 0*282 0*331 0*125 3*608 GOVERNMENT PAYMENT NOT INCLUOED. PREPARED BY DR. JAMES T. LONG, TAEX, OVERTON, TEXAS BUDGET IDENTIFICATION NUMBER ANNUAL CAPITAL MONTH 8 /*^\ PROJECTED 1979 - 7 2 0 11 0 0 111 0 0 0 ■^^% 16 COTTON, NORTHEAST TEXAS REGION ESTIMATED COSTS ANO RETURNS PEP ACRE TYPICAL MANAGEMENT UNIT GROSS RECEIPTS COTTON LINT COTTONSEED VALUE OR COST PRICE OR COST/UNIT QUANTITY FROM PRODUCTION LBS* TON 0.53 80*00 350*00 0*28 —22*±9 9 207.90 TOTAL VARIABLE COSTS PREHARVEST F E R T. ( 5 0 - 4 0 - 4 0 ) SEED HERBICIDE INSECTICIDE MACHINERY TRACTORS LAB0R(TRACTOR & MACHINERY) INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST ACRE LBS* ACRE ACRE ACRE ACRE HOUR DOL. HARVEST COSTS DEFOLIANT STRIP I HAUL GIN, BAG. TIES HAUL, COMP &EUUC SUBTOTAL, HARVEST ACRE CWT* CWT. BALE 20*40 0.35 8*50 3*75 9 . 7 3 19*96 4.00 0.1 0 1 .00 24.0 3 1 .00 6.00 1 .00 1 .00 7.84 41.73 20.40 8.40 C .50 22.o0 9.73 19.96 31.37 ±xll $ 125.03 9 5.50 1 .75 2*00 3*00 1 .00 13.30 13.30 0.73 TUTAL VARIABLE COST 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL fIXEO COSTS 185.50 5.50 23.27 26.60 2x13 9 5 7.56 9 182.59 9 25.31 9 ACRE ACRE ACRE 6*97 14.65 20.00 1.00 1*00 1 .00 6.97 14. _b .-22x22 9 * l.o2 '.. TOTAL CUSTS 9 22 4.21 0. NET RETURNS 9 -16.31 GOVERNMENT PAYMENT NUT INCLUDED. PREPARED BY OH* JAMES T* LONG. TAEX, OVERTON, TEXAS PROJECTED 1979 17 COTTON, NORTHEAST TEXAS REGION E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT /^^%- O P E R AT I O N NO* D AT E FUEL.OIL. FIXEO T I M E S L A B O R M A C H I N E L U B . . R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE PICKUP T O O L B A R C U L T. T SHREDDER(4R) T PICKUP T O C L B A R C U L T. T R E N T O . F E R T. A P P L I MB PLOtoOBI T LISTER-BEDDER T PLANTER T 10 1,44 2,31 10 1 ,44 2,86 2.38 1,47 2,39 3,49 10 2,43 3.49 10 2,43 3,49 10 3,49 10 10 OCT NOV NOV NOV FEB MAR MAR MAR APR APR APR MAY MAY MAY JUNE JUNE JUNE JULY AUG SEPT 0 * 1 8 0*225 1*00 0*243 1*00 0*277 0.18 0.225 1*00 0*243 1.00 0 . 11 8 1.00 1 .105 1*00 0*388 1 * 2 0 0o372 1.00 0*465 0*18 0*225 1*00 0*365 2.00 0*930 0*18 0.225 UOO 0 . 3 6 5 2.00 0*930 0*18 0.225 1*00 0 . 4 6 5 0*18 0*225 0 . 1 8 2*223 ITEM SPRAYER.HERB. T PICKUP T O O L B A R C U L T. S P R AY E R . H E R B . PICKUP T O O L B A R C U L T. S P R AY E R . H E R B * PICKUP T T T T SPRAYER.HERB. T PICKUP PICKUP TOTALS 0*180 0*162 0*185 Oo 180 0* 162 0*079 0.737 0*258 0*248 0*310 0.180 0*244 0.620 0.180 0*244 0.620 0*180 0.310 0*180 l .06 1*30 1*22 1*08 1*30 0*40 4*08 2*04 1 .67 1*23 1*08 1*36 2*46 1 .08 1 .36 2*46 1*08 1*23 1*08 0*25 1*06 1*31 0*25 1.06 0*28 3*43 1*64 1*84 1. 16 0.25 1* 12 2.33 0*25 1. 12 2.33 0*25 1. 16 0*25 2*122 ..1x23 -3x25 7*843 5.439 29*69 21*62 GOVERNMENT PAYMENT NOT INCLUDED* PREPARED BY DR. JAMES T. LONG, TAEX, OVERTON, TEXAS /^^\ PROJECTED 1979 BUDGET IDENTIFICATION NUMBER 9 3 0110021100 0 ANNUAL CAPITAL MONTH 9 -^^^v