_ TEXAS MIDDLE GULF COAST FOREWORD _ The enterprise budgets for Texas Middle Gulf Coast Region are based on estimates of yields, production input quantities, and production prac tices which represent the best judgment of local producers, county Extension agents-agriculture, fi nancial institution representatives, farm machinery dealers and others knowledgeable of the area. Vari ation in yields, production inputs and production practices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. _ The machinery inventory is applicable to both typical and high level management. In some bud gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Land charges were based on the customary land lord's crop share less his proportionate share of certain production and harvesting inputs. A per acre land charge was made when crop share was not used. TEXAS MIDDLE GULF COAST REGION Assumed Prices Paid and Received by Farmers 1/ Item Unit Price Prices Paid (1979) Seed Cottonseed (Acid Delinted) Grain Sorghum Rice Soybeans Fertilizer Nitrogen Phosphorous Potassium Herbicides Propanll Ordram MCPA Treflan Lorox Lasso Co to ran DSMA (4 lbs., ie) AAtrex Sencor Insecticides and Fungicides Malathion (5 lbs., ie) Toxaphene (6 lbs., ie) 4-4-Tox-Methyl Furadan Methyl Parathion (4 lbs., ie) Benlate (50% W.P.) Sevimon (4 lbs., ie) lb. lb. lb. $ .45 .40 16.75 .30 lb. lb. lb. .23 .16 .16 cwt. acre gal. gal. lb. gal. lb. gal. lb. lb. gal. gal. gal. lb. gal. lb. gal. 13.42 10.00 23.00 4.30 15.75 5.75 4.68 2.75 7.98 10.90 5.63 10.85 .30 9.40 7.95 11.65 - 2 TEXAS MIDDLE GULF COAST REGION Item Custom Rates Cotton, Picking & Hauling Ginning, Bag, Etc. Combining & Hauling-Sorghum Drying-Sorghum Drying-Rice Hauling-Rice Hauling-Soybeans Drying & Storage-Soybeans Fuel Gasoline Diesel Unit Price cwt. Seed cttn. bale cwt. cwt. cwt. cwt. bu. bu. $ 3.00 32.64 .50 .22 .68 .35 .21 .25 gal. gal. .54 .45 lb. ton cwt. bu. cwt. .53 80.00 3.65 5.65 9,05 Prices Received (1979) Cotton-Lint Seed (Cotton) Grain Sorghum Soybeans Rice y These price assumptions are not to be interpreted as predictions or prospective prices. (p TEXAS MIDDLE GULF COAST REGION Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size Tractor 40 HP Tractor 65 HP Tractor 80 HP Tractor - 100 HP Tractor - 135 HP Tractor - 165 HP Tractor 70 HP P i c k u p - 1 / 2 To n Combine - 16 Ft Combine - 13 Ft. Blade (Dozer) - 8 Ft. Spring T Harrow - 16 Ft. Spike T Harrow - 16 Ft. D i s c Ta n d e m - 1 4 F t . D i s c Ta n d e m - 1 8 F t . Bed Planter - 14 Ft. Spray Rig - 16.7 Ft. Item No. Purchase Price 1 2 3 4 5 6 7 11 17 19 30 31 33 34 35 43 45 $ 5,500 6,666 12,111 14,444 20,000 27,390 9.808 5,100 34,008 34,008 924 944 500 1,888 2,444 3,240 1,728 Estimated Years of Use 15 10 6 6 6 6 10 4 6 5 10 10 10 8 8 5 10 Estimated Hours of Use 7500 6000 3600 4200 4200 6000 6000 3600 1350 1125 2000 1250 1400 1280 1280 1500 1200 Fixed Costs Per Hour Variable Cost Per Hour ; .74 $ 1.85 2.50 3.11 3.98 5.43 7.42 3.04 1.80 8.64 7.52 .94 2.26 2.32 3.21 3.07 1.38 .96 19.08 21.34 .44 .72 .34 1.30 1.69 1.65 1.38 (Continued) .69 .33 .16 .64 .83 1.37 .63 CO Texas Middle Gulf Coast Region (Continued) Machinery Item and Size Offset Disc 14 Ft. Planter - 18 Ft. Planter - 24 Ft. Land Plane 6 - 12 Ft. Cultivator - 18 Ft. Rolling Cult. -- 20 Ft. Bedder - 10 Ft. Cultivator - 24 Ft. Sprayer (Herb) - 24 Ft Levee Plow • ■ 10 Ft. Field Cult. - 18 Ft. Field Cult. - 36 Ft. Cultipacker - 14 Ft. Cultipacker - 18 Ft. Stalk Shredder - 18 Ft Grain Cart - 16 Ft. Shop Equipment Levee Box T-A - 5 Ft. o Item No. Purchase Price 50 52 55 56 57 58 59 60 64 66 67 70 76 87 91 92 98 99 $ 1,300 2,880 3,777 3,777 1,666 1,875 850 2,333 500 1,210 1,416 3,564 611 888 2,175 1,320 5,250 19 Estimated Years of Use 8 10 10 16 10 10 10 10 10 8 10 6 12 12 6 10 8 6 Estimated Hours of Use 1280 800 800 3200 2000 2000 2000 2000 1000 2160 2000 Fixed Costs Per Hour $ .90 3.45 4.53 1.33 $ .44 2.02 2.64 .51 .56 .63 .06 .78 .22 .80 .90 .41 1.12 .48 .50 .68 600 4.72 1680 1680 1200 3250 4000 1.44 6 Variable Costs Per Hour •24 .31 2.55 .37 .54 .39 .16 .23 .79 .18 1.16 2.52 1.96 2.06 ( _ . -_ It) RICL. IRRIGATED. TEXAS MIDDLE GULF COAST REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT 0!_|i^ UNIT 1. GROSS RLCEIPTS FRUM PRODUCTION RICC 1ST CROP RICE 2ND CROP CWT. CWT. PRICE OR VA L U E OR COST/UNIT QUANTITY COST 9.05 9.05 4 7.00 9.70 CUST AIR OTHER CUST AIR HERB CUST AIR SEfcD CUST AIR FEKT MACHINERY T R A C TO R S I R R I G AT I O N M A C H I N E R Y LABORCTRACTOR & MACHINERY) L A B O R C I R R I G AT I O N ) I N T E R E S T O N O P. C A P. C W T. LBS. LBS. LBS. ACRE ACPE ACRE ACRE ACRE ACRE C W T. C W T. ACRE ACRE ACRE HOUR HOUR DOL. 16.75 0.20 0.15 0.15 4.36 13.42 11.17 5.10 2.24 3.00 2.00 2.25 6.39 11.77 29.3 2 5.06 5.06 0.10 1 • 14 163.00 52.0 0 28.00 0.33 2.00 1 .00 0.40 3.33 2.00 I .20 5.80 1 .00 l .oo 1.00 4.35 4.31 86.34 SUBTOTAL. PRE-HARVEST HARVEST COSTS CUST HAUL CUST DRY CGR.WT) SALES COMM MACHINERY TRACTORS LABORCTRACTOR <- MACHINERY) SUBTOTAL. HARVEST C W T. C W T. C W T. ACRE ACRE HOUR ?.ao - 11 x 2 5 s 91 .06 9 3 25.12 9 188.02 T. ACRE ACRE ACRE 34.67 12.97 49.10 .4.67 Id.97 1 .00 1 .00 I .00 $ ..±3x12 96.7-» _ 4 2 1 '.6 5. TOTAL COSTS _ 6. NET RETURNS LAND RENT IS 10 PERCENT OF GROSS 22.10 42.94 3.97 / .99 63. 15 63.15 56.70 1.00 1 .00 2.24 3. INCOME ABOVE VARIABLE COSTS Hii!^ 19.09 32.60 7.80 4.20 1.44 26.84 1 1.17 2.04 7.46 6.00 2.40 I 3.05 6.39 1 I .77 29.32 22.03 21.82 8.63 S 2 34.06 $ 0.35 0.68 0.07 7.89 2.80 5.06 TC.AL VARIABLE COST 4. FIXED COSTS MACHINERY TRACTORS LAND CNET RENT) TOTAL FIXEC COSTS —22x12 9 i I 3 • I 3 TOTAL . VARIABLE COSTS PREHARVEST SEED (105PC) NITROGEN PHOSPHATE POTASH C60PC) INSECT PROPANIL-ORDRAM PROPANIL-ORDRAM FURAOAN 4 2 5.3. 4rntA~ L =_ S S 1 0 P E RC E N T O F 9 1.27 DRY IN'. ♦ SECOND CROP RICE 75 PERCENT OF ACREAGE. ALLOTMENT CHARGE NOT SPECIFIED. PREPARED BY DR. ARTHUR GERLOW. TAEX. BRYAN, TX PROJECTED 1970 16 RICE. I R R I G AT E D . T E X A S M I D D L E G U L P C H A S T R F G I - . ' N E S T 1 M AT E D C O S T S A N O R E T U R N S P E ° A C ? _ . HIGH LEVEL MANA;',E WENT >__-gf O P E R AT I O N ITEM NU. D AT E FUEL.OIL. FlX'.O T I M = S L A B O R M . C H I N 1 L U B . . P. P. f f T j T S O V E R H O U R S H O U R S P F. R A C H E ^ C " . ' A C R h SHOP OFF C 98 6.50 NOV NUV 0.10 1.00 0.0 0.222 PICKUP 11 NOV 0.10 SHOP EQUIPMENT C 90 DEC 0.10 DISK TA N D E M 5,35 DEC 1.00 FIELD C U LT I VATO R 6.70 OEC 1.00 LAND PLANE 6 o.__ DEC 1.0 0 J. 0.125 0.0 0.171 0.087 2 7_ PICKUP I I SHOP EQUIPMENT SHOP EQUIPMENT PICKUP 11 SHOP EQUIPMENT 0,1?5 0.0 0.0 0.125 0.0 EQUIPMENT SET DISK DISK SPRNG FIELD DEC C 98 C 98 f-EB C 98 0.10 JAN 0.10 FEO 0.10 0.10 MAR 0.10 TA N D E M 5.35 MAR T HARROW 5.31 MAR C U LT I VATO R 6.70 MAR LANO LEVEE OLADE PICKUP LEVEE PLANE6 6.56 MAR PLOW b.66 MAR CDOZER) 3.30 MAR I I MAR BOX T-A 99 MAR 0.50 0.50 1.00 0.75 2.00 1.00 0.20 0.33 0.187 2*152 0 .20 1 .44 0.18 0 .20 0 „ 83 0 .69 I .60 0 . 18 0.20 0 .20 0. IH 0.20 0 .42 0.43 0.69 I .35 3.02 1 . 11 0.36 0.68 0.10 0.18 0.10 0.18 0. 10 0.16 0 • 10 0.40 0 .20 0.28 4.43 1 .67 0.40 0.20 0.18 0.20 0.72 3.32 I .25 0.27 6.598 135 28.85 0.085 0.104 0.087 0.206 0.671 0.377 0.250 0.0 SHOP EQUIPMENT PICKUP 11 SHOP EQUIPMENT C 98 APR C 98 APR 0.05 0.10 M AY 0.05 0.0 0.125 0.0 PICKUP 11 SHOP EQUIPMENT PICKUP ll SHOP EQUIPMENT PICKUP 11 SHOP EQUIPMENT M AY C 98 JUNE C 98 J U LY C 98 0.10 JUNE 0.05 0.10 J U LY 0.05 0.22 AUG 0.10 0.125 0.0 0.125 0.0 0.275 0.0 RLADE COMBINE GRAIN CDOZER) 17 CART 3.30 AUG 3.92 AUG 1.00 AUG 0.25 0.094 0.64 1 1.00 0.641 PICKUP 11 AUG 0.22 0.275 SHOP EQUIPMENT C 9b SEPT 0.10 0.0 PICKUP 11 SEPT 0.10 0.125 SHOP EQUIPMENT C 98 UCT 0.10 0.0 OFF SET OISK 6.5 0 OCT 0.50 0 . 11 I COMBINE 17 OCT 0.75 0.481 GRAIN CART 3,92 UCT 0.75 0.481 PICKUP 11 T O TA L S UCT 0.15 0. 1 01 0. I 4.3 0. 100 0. 101 0. I 14 0»05l< o. i«;. 0. 1 00 0 .101 0•10I 0. 1 00 0.101 0. 0 . 7 0.069 0.0 58 0.137 0.447 0...S2 0.200 0.312 0.050 0.100 0.050 0. 100 0.05 0 0. 100 0.050 0.220 0.101 0. 063 0.513 0.428 0.220 0.101 0. 100 0.101 0.074 0.385 0.321 0 . 1 . 1.10 0.14 0 . 1 . 1.01 0. 7 6 l.'_3 0.14 0 . 1 -\ 0•1M 0.14 0. IH 0.. 1 0.>2 0. 7fy i. ir> 3. 1 s 1. .> ) 0._7 I • "♦ 0.0^) 0.14 0.09 0. 1 4 0.0 9 0. 14 0.09 0. 10 0. t . 0•3? 14.93 2.16 0.30 0.18 0. 14 0•1>1 0.S5 11.20 1 .>>2 -2x23 47.64 BUDGET IDENTIFICATION NUMBER-— 99 0229012290 0 ANNUAL CAPITAL MONTH 10 LAND RENT IS 10 PERCENT OF GROSS INCOME LESS 10 PERCENT IF DRYING. SECOND CROP RICE 75 PERCENT OF ACREAGE. ALLOTMENT CHARGE NOT SPECIFIED. PREPARED BY DR. ARTHUR GERLOW, TAEX, BRYAN, TX PROJECTED 1979 ^ / COTTON. DRYLAND. TEXAS MIDDLE GULF COAST REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT \___^-> VALUE OR COST PRICE OR UNIT COST/UNIT QUANTITY 1. GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTON SEED TOTAL 2. VARIABLE COSTS PREHARVEST COTTON SEED NITROGEN PHOSPHATE POTASH MALATHION TOX-METHYL INSECT. - LATE HERB. PREMERGE HERB, POSTEMERGE CUST AIR INSECT MACHINERY TRACTORS LABORCTRACTOR fc MACHINERY) INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST HARVEST COSTS CUSTOM HARV&HAUL GIN. BAG. ETC. SUBTOTAL. HARVEST LBS. TON 0.53 80.00 300.00 0.24 9 178.20 CWT. LBS. LBS. ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE HOUR DOL. 45.00 0.23 0.16 0.16 1.36 2.71 3.82 5.75 1.46 2.00 4.45 12.76 5.06 0.10 2x3± $ 1 15.02 s CWT. BALE 11 . 2 0 32.64 3.00 0.60 33.60 .__i____8 $ 53.18 9 168.20 9 3. INCOME ABOVE VARIABLE COSTS C 15.75 11 . 5 0 10.88 0.80 2.72 5.42 7.64 5.75 1.46 6.00 4.45 12.76 25.95 0.35 50.00 68.00 5.00 2.00 2.00 2.00 1.00 1.00 3.00 1.00 1.00 5.13 39.38 TOTAL VARIABLE COST 4. FIXED COSTS MACHINERY TRACTORS LAND CNET RENT) TOTAL FIXED COSTS 159.00 —13*22 10.00 9 ACRE ACRE ACRE 6.32 12.26 29.91 1.00 1 .00 1.00 6.32 12.28 .-23x31 9 48.52 5. TOTAL COSTS 9 216.72 NET RETURNS $ -38.52 LANO RENT BASED ON LANDLORDS SHARE OF 1/4 GROSS INCOME LESS 1/4 OF FERTILIZER. INSECTICIDE. AND GINNING. GOV'T PYMNT NOT INCLUDED. P R E PA R E O B Y D R . A R T H U R G E R L O W. TA E X . B R YA N . T E X A S P R O J E C T E D 1 9 7 9 COTTON. DRYLAND. TEXAS MIDDLE GULF COAST REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION ROLLING CULT PICKUP BEDDER SPRAY RIG SPRAYER CHERB) PICKUP PICKUP ROLLING CULT PLANTER PICKUP CULTIVATOR SPRAYER (HERB) PICKUP C U LT I VAT O R SPRAYER CHERB) PICKUP C U LT I VAT O R S P R AY E R C H E R B ) PICKUP PICKUP S TA L K S H R E D D E R D I S K TA N D E M BEDDER PICKUP R O L L I N G C U LT PICKUP BEDOER PICKUP T O TA L S ITEM NO. 5.58 I1 5.59 5.45 64 11 11 5, 58 5.55 1I 5.60 64 11 5.60 64 11 5.60 64 11 1I 5.91 34 5.59 11 5.58 11 5.59 11 DATE FUEL.OIL. FIXED TIMES LABOR MACHINE LUB..REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE NOV NOV DEC DEC DEC DEC FEB MAR MAR MAR APR APR APR MAY MAY MAY JUNE JUNE JUNE J U LY AUG AUG AUG AUG SEPT SEPT OCT OCT 1 .00 0.217 0. 145 0.10 0.125 0.100 1.00 0.387 0.258 1 .00 0.257 0. 172 1.00 0.0 0. 143 0.30 0.375 0.300 0.10 0.125 0. 100 1.00 0.217 0.145 1 .00 0.161 0.107 0.20 0.250 0.200 1.00 0.179 0 . 11 9 0.0 1.00 0.143 0.10 0.125 0.100 1.00 0.179 0. 1 19 1 .00 0.0 0. 143 0.10 0. 125 0.100 1 .00 0.179 0. 1 19 1.00 0.0 0. 143 0.10 0. 125 0. 100 0.20 0.250 0.200 1 .00 0.175 0. 1 16 1 .00 0.0 0. 146 1.00 0.387 0.258 0.30 0.375 0.300 1 .00 0.217 0. 145 0.10 0.125 0. 100 1.00 0.387 0.258 0 . 1 5 - 2 x 1 2 1 _J____1__0 5.128 4.429 1«▶ 03 O i. 18 1 .▶ 70 1 .. 2 2 ^J 1.12 0.14 1.79 1 .46 0 ., 0 3 0 ,, 5 4 0 ,» 16 1 ,, 0 3 0 ,. 9 8 0 ., 3 6 0 ., 8 7 0 • 03 0 ,. 1 8 0 ▶ 87 0 ,. 0 3 0.. 1 8 0 ,. 8 7 0 .. 0 3 0 .18 0 ,36 0 .85 0 ■ 09 1 .70 0 .54 1 .03 0 .18 1 .70 0.41 0.14 1.12 1 .46 0.27 0.96 0.1 1 0. 14 0.96 0. 1 1 0. 14 0.96 0.1 1 0.14 0.27 0.98 0.30 1.79 0.41 1.12 0.14 1. 79 -2x21 -2x22 17.21 16.61 0. 1 I LAND RENT BASED ON LANDLORDS SHARE OF 1/4 GROSS INCOME LESS 1/4 OF FERTILIZER. INSECTICIDE. AND GINNING. GOV'T PYMNT NOT INCLUDEO. P R E PA R E D B Y D R . A RT H U R G E R L O W. TA E X . B RYA N . T E X A S P R O J E C T E D 1 9 7 9 B U O G E T I D E N T I F I C AT I O N N U M 8 F. R 9 3 1 0 2 2 0 0 2 2 2 0 0 0 A N N U A L C A P I TA L M O N T H 1 0 \urnW COTTON. DRYLAND. TEXAS MIDDLE GULF COAST REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION COTTON LINT PRICE OR VA L U E OR COST/UNIT QUANTITY COST LBS, TON 0.53 80.0 2. VARIABLE COSTS PREHARVEST COTTON SEED NITROGEN PHOSPHATE POTASH MALATHION TOX-METHYL INSECT. - LATE HERB9 PREMERGE HERB. POSTEMERGE CUST AIR INSECT MACHINERY TRACTORS LABORCTRACTOR & MACHINERY) INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST CWT. LBS. LBS. ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE HOUR OOL. 45.00 0.23 0.16 0.16 1.36 2.71 3.82 5.75 1 .46 2.00 4.45 12.76 5.06 0.10 HARVEST COSTS CUSTOM HARV&HAUL GIN. BAG. ETC. SUBTOTAL. HARVEST CWT. BALE COTTON SEED TOTAL 400.00 0 0.32 2x3± 9 11 5 . 0 2 9 11 . 2 0 36.25 ACRE ACRE ACRE 6.32 12.28 42.41 33.60 3.00 0.80 3. INCOME ABOVE VARIABLE COSTS L 15.75 11 . 5 0 10.88 0.80 2.72 5.42 7.64 5.75 1.46 6.00 4.45 12.76 25.95 0.35 50.00 68.00 5.00 2.00 2.00 2.00 1.00 1 .00 3.00 1.00 1 .00 5.13 39.38 TOTAL VARIABLE COST 4. FIXED COSTS MACHINERY TRACTORS LAND CNET RENT) TOTAL FIXED COSTS 212.00 25.60 S 237.60 .-23x22 9 62.60 9 177.62 9 5<»o98 UOO 1.00 6.32 12.28 1.00 —±2x±i 9 6 1.02 5. TOTAL COSTS _ 238.64 6. NET RETURNS $ -1.04 LAND PENT BASED ON LANDLORDS SHARE OF 1/4 GROSS INCOME LESS 1/4 OF FERTILIZER. INSECTICIDE. AND GINNING. GOV'T PYMNT NOT INCLUDED. PREPARED BY DR. ARTHUR GERLOW. TAEX. BRYAN. TEXAS PROJECTED 1979 COTTON. DRYLAND. TEXAS MIDDLE GULF COAST RFGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION ROLLING CULT PICKUP BEDDER SPRAY RIG SPRAYER CHERB. PICKUP PICKUP ROLLING CULT PLANTER PICKUP CULTIVATOR SPRAYER CHERB) PICKUP CULTIVATOR SPRAYER CHERB) PICKUP C U LT I VAT O R S P R AY E R C H E R B ) PICKUP PICKUP S TA L K S H R E D D E R D I S K TA N O E M BEDDER PICKUP R O L L I N G C U LT PICKUP BEDDER PICKUP T O TA L S ITEM NO. 5.58 11 5.59 5.45 64 11 11 5.58 5.55 11 5.60 64 11 5.60 64 11 5,60 64 11 11 5.91 34 5.59 11 5,58 11 5.59 11 DATE FUEL.OIL. FIXED TIMES LABOR MACHINE LUB..REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE NOV NUV DEC DEC DEC DEC FEB MAR MAR MAR APR APR APR MAY MAY MAY JUNE JUNE JUNE J U LY AUG AUG AUG AUG SEPT SEPT OCT OCT 1 .00 0.217 0. 145 Oc 10 0.125 Oc 100 1 -00 0.387 0.258 1 .00 0.257 0. 172 1 .00 0*0 0. 143 0.30 0.375 0.300 O.kO 0 .125 0. 100 1.00 0.217 0. 145 1.00 0. 161 0. 107 0o20 0.250 0.200 1.00 0.179 0 . 11 9 1 cOO 0.0 0. 143 0.1 0 0.125 0_ 100 1.00 0.179 0. 1 19 1 .00 0 . 0 0. 143 0.10 0.125 Oo 100 1«00 0.179 0 . 11 9 1 .00 0,0 0. 143 0.10 0.125 Oo 100 0.20 0.250 0-200 1 .00 0.175 Oo 1 16 1 .00 0.0 0.146 1 .00 0.387 0.258 0.30 0.375 0.300 1 .00 0.217 0. 145 0*10 0. 125 0. 100 1 -00 0.387 0.258 0«15 - 2 x 1 2 1 - 2 x 1 5 2 5.126 4.429 - 1 .03 0.18 1 .70 1 .22 0.03 0.54 0.18 1 .03 0.96 0.36 0.87 0.03 0 .18 0.87 0.03 0.18 0.87 0 .03 0. 18 0 .36 0.85 0.09 1 .70 0.54 1 .03 0.18 I .70 0.41 0. 14 1.12 1 .46 0.27 0.96 0. 1 1 0. 14 0.96 0. 1 1 0.14 0.96 0.1 I 0. 14 0.27 0.98 0.30 1 .79 0.41 1.12 0. 14 1.79 -2x22 -2x22 1 7.21 1 8.61 1.12 0. 14 1. 79 I .46 0. 1 I LANO RENT BASED UN LANDLORDS SHARE OF 1/4 GROSS INCOME LESS 1/4 OF FERTILIZER. INSECTICIDE. ANO GINNING. GOV'T PYMNT NOT INCLUDED. P R E PA R E D B Y D R . A RT H U R G E R L O W. TA E X . B RYA N , T E X A S P R O J E C T E D 1 9 7 9 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 1 0 2 2 0 0 1 2 2 0 0 0 A N N U A L C A P I TA L M O N T H 1 0 GRAIN SORGHUM. DRYLAND. TEXAS MIDDLE GULF COAST REGION ESTIMATED COSTS ANO RETURNS PER ACRE TYPICAL MANAGEMENT . Ha^ UNIT 1 • GROSS RECEIPTS FROM PRODUCTION SORGHUM T O TA L VARIABLE COSTS PREHARVEST SORGHUM SEED NITROGEN PHOSPHATE INSECTICIDE HERBICIDE CUST AIR INSECT MACHINERY TRACTORS LABORCTRACTOR & MACHINERY) INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST ^H^X' HARVEST COSTS COMBINE £ HAUL DRYING PRICE OR C O S T / U N I T QUANTITY VA L U E O R COST _ C W T. LBS. LBS. LBS. ACRE ACRE ACRE ACRE ACRE HOUR DOL. 3.65 0.40 0.23 0.16 6.02 4.65 2.00 4.27 8.88 5.06 0.10 30.00 __1Q__5<_ 9 109.50 9.00 85.00 25.00 1.00 1.00 1.00 1.00 1.00 5.90 27.41 s 9 CWT. CWT. 0.50 0.22 30.00 30.00 S U B T O TA L . H A R V E S T TUTAL VARIABLE COST 15.00 6x62 9 21.60 9 107.13 3. BREAKEVEN PRICE. VARIABLE COSTS CWT. 4. FIXED COSTS MACHINERY TRACTORS LANO CNET RENT) TOTAL FIXED COSTS 3.571 9 ACRE ACRE ACRE 5.37 9.80 !3.54 1.00 1.00 1.00 5.37 9.80 .-23j.5± 9 5. TOTAL COSTS 6. BREAKEVEN PRICE. TOTAL COSTS 3.60 19.55 4.00 6.02 4.65 2.00 4.27 8.88 29.83 2*74 85.53 38.70 9 145.84 CWT, 4.861 LAND RENT BASED ON LANDLORDS SHARE OF 33 PERCENT OF GROSS INCOME LESS 33 PERCENT OF FERT. INSECT AND DRYING. GOV'T PYMNT NOT INCLUOEO. PREPARED BY OF. ARTHUR GERLOW. TAEX* BRYAN. TEXAS PROJECTED 1979 10 GRAIN SORGHUM. DRYLAND. TEXAS MIDDLE GULF COAST REGION E S T I M AT E D C O S T S A N O R E T U R N S P E R A C R E TYPICAL MANAGEMENT OPERATION DISK TANDEM BEDDER PICKUP F I E L D C U LT I VAT O R PICKUP BEODER PICKUP BEODER PICKUP SPIKE T HARROW BED PLANTER CULTIPACKER C U LT I VATO R PICKUP BED PLANTER C U LT I PA C K E R C U LT I VATO R PICKUP C U LT I VAT O R PICKUP PICKUP PICKUP PICKUP STALK SHREDDER DISK TANOEM BEDDER PICKUP TOTALS ITEM NO. 4,35 3.59 11 4.67 11 3,59 11 3.59 11 1.33 3.43 1.87 3.57 11 3.43 1.87 3.57 11 3.57 11 11 11 11 2.91 4*35 3.59 11 DATE FIXED FUEL.OIL. MACHINE COSTS TIMES LABOR L U B . . R E P. PER ACRE PER ACRE OVER HOURS HOURS NOV NOV NOV DEC . DEC JAN JAN FEB FEB MAR MAR MAR MAR MAR APR APR APR APR MAY MAY JUNE J U LY AUG SEPT SEPT SEPT SEPT 0.25 1.00 0.15 1.00 0.10 1 .00 0.15 1.00 0.15 1 .00 0.75 0.75 1.00 0.30 0.25 0.25 1.00 0.20 1.00 0.15 0.10 0.10 0.20 1.00 1.00 1 .00 0.20 0.16 0.98 0.27 0.59 0.18 0.98 0.27 0.98 0.27 0.33 1 .12 0.21 0.68 0.54 0.37 0.07 0.68 0.36 0.68 0.27 0.18 0. 18 0.36 0.44 0.64 0*98 0.20 1.31 0.20 0.65 0. 14 1.31 0.20 1.31 0.20 0.31 1 .49 0.23 0.91 0.41 0.50 0.08 0.91 0.27 0.91 0.20 0.14 0. 14 0.27 0.48 0.81 1.31 Q.f. _0 0-028 0.258 0. 150 0. 116 0. 100 0.258 0. 150 0.258 0.150 0. 139 0.220 0.087 0. 159 0.300 0.073 0.029 0.159 0.200 0.159 0.150 0. 100 0.100 0.200 0. 1 16 0 . 11 4 0.258 0.200 -2x36 -2x21 5.895 4.230 13.14 15. 17 0.043 0.387 0.187 0.174 0.125 0.387 0.187 0.387 0.187 0*208 0.330 0.131 0.238 0.375 0 . 11 0 0.044 0.238 0.250 0.238 0.187 0.125 0.125 0.250 0.175 0.171 0.387 ^ / _^# LAND RENT BASED ON LANDLORDS SHARE OF 33 PERCENT OF GROSS INCOME LESS 33 PERCENT OF FERT. INSECT AND DRYING. GOV'T PYMNT NOT INCLUDED. PROJECTED 1979 PREPAREO BY DR. ARTHUR GERLOW. TAEX. BRYAN. TEXAS B U D G E T I D E N T I F I C AT I O N N U M B E R 7 3 0 2 2 0 0 2 2 2 0 0 0 ANNUAL CAPITAL MONTH 10 ^ ^ n GRAIN SORGHUM. DRYLAND. TEXAS MIDDLE GULF COAST REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT \ ^ / UNIT PR ICE OR VA L U E OR COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION SORGHUM TOTAL CWT, 3.50 VARIABLE COSTS PREHARVEST SORGHUM SEED NITROGEN PHOSPHATE INSECTICIDE HERBICIDE CUST AIR INSECT MACHINERY TRACTORS LABORCTRACTOR & MACHINERY) INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST LBS. LBS. LBS. ACRE ACRE ACRE ACRE ACRE HOUR DOL. 0.40 0.23 0.16 6.02 4.65 2.00 4.27 8.88 5.06 0.10 9.00 35.00 25.00 1.00 1 .00 1.00 1.00 1 .00 5.90 27.41 HARVEST COSTS COMBINE & HAUL ORYING SUBTOTAL. HARVEST CWT. CWT. 0.50 0.22 35.00 35.00 35.00 -122x32 9 122.50 9 17.50 7.70 $ ~25.20 $ 11 0 . 7 3 TOTAL VARIABLE COST 3.164 3. BREAKEVEN PRICE. VARIABLE COSTS CWT. 4 FIXED COSTS MACHINERY TRACTORS LAND CNET RENT) TOTAL FIXED COSTS 9 ACRE ACRE ACRE 1.00 1 .00 1.00 5.37 9.80 —21x±l $ 4_.63 9 153.37 5. TOTAL COSTS 6. BREAKEVEN PRICE. TOTAL COSTS 5.37 9.80 27.47 CWT 4.382 LAND RENT BASED ON LANDLORDS SHARE OF 33 PERCENT OF GROSS INCOME LESS 33 PERCENT OF FERTo INSECT AND DRYING. GOV'T PYMNT NOT INCLUDED. PREPARED BY DR. ARTHUR GERLOW. TAEX. BRYAN. TEXAS PROJECTEO 1979 _ ■ 12 GRAIN SORGHUM, ORYLANO, TEXAS MIOOLE GULF COAST REGION ESTIMATEO COSTS AND RETURNS P_R ACRE HIGH LEVEL MANAGEMENT OPERATION DISK TANDEM BEDDER PICKUP F I E L D C U LT I VAT O R PICKUP BEODER PICKUP BEDDER PICKUP SPIKE T HARROW BED PLANTER CULTIPACKER C U LT I VATO R PICKUP BED PLANTER C U LT I PA C K E R C U LT I VATO R PICKUP C U LT I VATO R PICKUP PICKUP PICKUP PICKUP STALK SHREDDER DISK TANDEM BEDDER PICKUP TO TA L S ITEM NO. 4,35 3.59 11 4.67 11 3.59 11 3,59 11 1.33 3.43 1 .87 3,57 11 3,43 1 ,87 3,57 11 3.57 11 11 11 11 2.91 4.35 3.59 11 DATE FUEL,OIL. FIXED TIMES LABOR M A C H I N E L U B . . R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE NOV NOV NOV DEC DEC JAN JAN FEB FEB MAR MAR MAR MAR MAR APR APR APR APR MAY MAY JUNE J U LY AUG SEPT SEPT SEPT SEPT 0«. 2 5 l l. 0 0 O i, 1 5 11. 0 0 0 .. 1 0 1 .. 0 0 0 ., 1 5 l l, 0 0 0 ., 1 5 1 .. 0 0 O i. 7 5 0 .. 7 5 l l. 0 0 0 ., 3 0 0 .. 2 5 O i. 2 5 l l, 0 0 0 ,. 2 0 11, 0 0 O i. 1 5 O i, 1 0 0 ., 1 0 O i, 2 0 l l. 0 0 l l. 0 0 1 .. 0 0 0 ., 2 0 o. £___ 0«, 0 2 8 O i. 2 5 8 O i. 150 O i, 116 0 ,, 100 0 ,, 2 5 8 Oi, 1 5 0 0<, 2 5 8 0 ., 150 0 ,. 139 0 .. 2 2 0 O i. 0 8 7 O i. 1 5 9 0 ,. 3 0 0 O i, 0 7 3 0 .. 0 2 9 O i, 159 O i, 2 0 0 O i, 1 5 9 0 ., 1 5 0 0 ., 1 0 0 O i» 100 O i, 2 0 0 O i. 1 1 6 0 ., 1 1 4 0«. 2 5 8 0.16 0.98 0.27 0.59 0. 18 0.98 0.27 0.98 0.27 0.33 1 .12 0.21 0.68 0.54 0.37 0.07 0.68 0.36 0.68 0.27 0.18 0.18 0.36 0.44 0.64 0.98 _Q_i209 9i36 0.20 1 .11 0.20 0.65 0. 14 1.31 0.20 1.31 0.20 0.31 1.49 0.23 0.91 0.41 0.50 0.06 0.91 0.27 0.9 1 0.20 0.14 0.14 0.27 0.48 0.81 1 .31 Of 21 5.895 4.230 13.14 15. 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .043 .387 . 187 . 174 . 125 .387 , 187 . 387 . 187 .208 .330 . 131 .238 .375 .U O .044 .236 .250 .238 . 187 . 125 . 125 .250 . 175 . 171 .387 LAND RENT BASEO ON LANDLORDS SHARE OF 33 PERCENT OF GROSS INCOME LESS 3 3 P E R C E N T O F F E RT, I N S E C T A N D D RY I N G . G O V ' T P Y M N T N O T I N C L U D E D . P R E PA R E D B Y D R . A R T H U R G E R L O W. TA E X . B R YA N . T E X A S P R O J E C T E D 1 9 7 9 B U D G E T I D E N T I F I C AT I O N N U M B E R 7 3 0 2 2 0 0 1 2 2 0 0 0 A N N U A L C A P I TA L M O N T H 1 0 ^J s^# 13 RICE8 IRRIGATED. TEXAS MIDDLE GULF COAST REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT GRCSS RECEIPTS FROM PRODUCTION RICE 1ST CROP RICE 2NO CRUP TOTAL 2 . VA R I A B L E C O S T S P .EHARVEST SEED ( 105PC > NITROGEN PHOSPHATE POTASH C80PC) INSECT PROPANIL-ORDRAM FURADAN FUNGICIDE CUST AIR OTHER CUST AIR HERB CUST AIR SEEO CUST AIR FERT MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTOR & MACHINERY) L A B O R C I R R I G AT I O N ) INTEREST ON OP. CAPo SUBTOTAL, PRE-HARVEST HARVEST COSTS CUST HAUL CUST DRY CGR.WT) SALES COMM MACHINERY TRACTORS LABORCTRACTOR & MACHINERY) SUBTOTAL. HARVEST PRICE OR C O S T / U N I T QUANTITY CWT. CWT. 9.05 42.57 385.26 9.05 4.67 ±2x26 CWT. LBS. LBS. LBS. ACRE ACRE ACRE ACRE ACRE ACRE 16.75 0.20 0*15 0.15 4.36 13.42 5.10 8.16 2.24 3.00 2.25 2.25 6.39 11 .77 29.32 5.06 5.06 0. 10 1. 14 163.00 52*00 28.00 0.33 2.00 0.40 1.00 2.00 2.00 1.20 5.80 1.00 1 .00 1 .00 4.35 4.31 84.02 0.35 0.68 0.07 7.89 2.80 5.06 52.43 52.43 47.24 1 .00 1 .00 2.24 CWT. ACRE ACRE ACRE HOUR HOUR DOL. 9 427.52 6. NET RETURNS 2x±3 9 CWT. CWT. ACRE ACRE HOUR 18.35 35.65 3.31 7.89 2.80 $ __1J____._» 79.35 S 307.49 $ 120.03 3. INCOME ABOVE VARIABLE COSTS 5 . T O TA L C O S T S 19.09 32.60 7.80 4.20 1.44 26.84 2.04 8.16 4.48 6.00 2.70 13.05 6.39 1 1.77 29.32 22.03 21.82 228.14 TOTAL VARIABLE COST ., FIXED COSTS MACHINERY TRACTORS LAND CNET RENT) TOTAL FIXED COSTS VALUE OR COST ACRE ACRE ACRE 34.67 12.97 40.92 34.67 12.97 1.00 1 .00 1.00 —±2x32 9 88.56 $ 39'>.05 S 31.47 LAND RENT IS 10 percent of gross income less io percent of drying. SECOND CROP RICE 75PERCENT OF ACREAGE. ALLOTMENT CHARGE NOT SPECIFIED. PREPARED BY D R . A R T H U R G E R L O W, TA E X , B R YA N , T X P R O J E C T E D 1 9 7 9 I. R I C E . I R R I G AT E D . T E X A S M I D D L E G U L F C O A S T R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT \^~0r' OPERAT1CN SHOP EQUIPMENT C OFF SET DISK PICKUP SHOP EQUIPMENT C DISK TANDEM F I E L D C U LT I VATO R LAND PLANE6 PICKUP SHOP EQUIPMENT C SHOP EQUIPMENT C PICKUP SHOP EQUIPMENT C DISK TANDEM SPRNG T HARROW F I E L D C U LT I VAT O R LAND PLANE6 LEVEE PLOW BLAOE CDOZER) PICKUP LEVEE BOX T-A SHOP EQUIPMENT C PICKUP SHOP EQUIPMENT C PICKUP SHOP EQUIPMENT C PICKUP SHOP EQUIPMENT C PICKUP SHOP EQUIPMENT C BLADE CDOZER) COMBINE GRAIN CART PICKUP SHOP EQUIPMENT C PICKUP SHOP EQUIPMENT C OFF SET DISK COMBINE GRAIN CART PICKUP TOTALS ITEM NO. 98 6.50 I1 98 5.35 6.70 6.56 11 98 98 11 98 5,35 5*31 6,70 6.56 5.66 3.30 11 99 98 11 98 11 98 11 98 11 98 3.30 17 3.92 11 98 11 98 6*50 17 3.92 11 DATE NOV NOV NOV DEC DEC DEC DEC DEC JAN FEB FEB MAR MAR MAR MAR MAR MAR MAR MAR MAR APR APR MAY MAY JUNE JUNE J U LY J U LY AUG AUG AUG AUG AUG SEPT SEPT OCT OCT OCT OCT OCT BUDGET IDENTIFICATION NUMBERANNUAL CAPITAL MONTH 10 FUEL.OIL. FIXED TIMES LABOR M A C H I N E L U B . . R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE • 10 • 00 • 10 • 10 • 00 • 00 • 00 • 10 •10 • 10 • 10 • 10 • 50 • 50 • 00 .75 .00 .00 .20 .33 • 05 .10 • 05 • 10 • 05 •10 .05 • 22 • 10 .25 • 00 .00 • 22 • 10 •10 • 10 .50 .75 .75 .15 0« 0 0 . 222 0 . 125 0.0 0 . 171 0 .087 0 . 2 75 0 . 125 Oo 0 0 .0 0 . 125 0.0 0 .085 0 . 104 0 . 087 0 .206 0 . 671 0 .377 0 .250 0 .0 0 .0 0 . 125 Oo 0 0 . 125 0 .0 0 . 125 0 .0 0 .275 0.0 0 .094 0- 641 0 * 641 0 . 275 0.0 0 . 125 0 .0 0 . tl 1 0 . 481 0 . 481 0* 121 0«. 101 0«» 148 Oi. 100 0 .. 1 0 1 0«, 1 14 Oi. 0 5 8 0 .. 183 Oi, 100 Oi, 1 0 1 0 ., 101 Oi, 100 0 .. 101 0 ., 0 5 7 Oi, 0 6 9 0 ,, 0 5 8 Oi. 1 3 7 0<, 4 4 7 Oi▶ 252 0 .▶ 200 0 .. 3 3 2 Oi. 0 5 0 Oi. 100 Oi, 0 5 0 0,. 100 0<,0 50 Oi, 1 0 0 Oi, 0 5 0 0,, 2 2 0 0 ,, 101 Oi, 0 6 3 Oi, 5 1 3 0 .. 4 2 8 0.. 2 2 0 Oi. 101 0.. 1 0 0 0 ,> 101 Oi, 0 7 4 0,. 3 8 5 0 .321 -J_J-!__<_ 6.598 6. 135 99 0229022290 0 Oi, 2 0 1 1. 4 4 0 - 18 0<, 2 0 Oi. 8 3 0 ., 6 9 11, 8 0 0 .. 1 8 0 ,, 2 0 0 .. 2 0 0 .. 1 8 Oi, 2 0 Oi. 4 2 Oi. 4 8 Oi▶69 11▶35 3,, 0 2 1 ., 11 Oi. 3 6 0 ,, 6 8 Oi, 1 0 0 ., 1 8 0 .. 1 0 Oi, 18 0 ., 1 0 Oi. 1 8 0 ., 1 0 0 ,▶40 0 ,, 2 0 Oi. 2 8 4 ,. 4 3 1 i, 6 7 0 ., 4 0 Oi, 2 0 Oi. 1 8 Oi, 2 0 0<. 7 2 3 i, 3 2 1 .. 2 5 0.09 0. 14 0.09 0. 14 0.09 0.14 0.09 0.3 0 0.16 0.32 14.93 2.16 0.3 0 0.18 0.14 0. 18 0.55 1 1.20 1 .62 i21 -2x22 28.85 47.64 - fl j 0.18 I .1 0 0.14 0.1 8 1.01 0. 76 I .53 0*14 0*1 3 0. 18 0* 14 0.18 0.51 0.52 0.76 1 .15 3.15 1.29 0.27 I•24 __£____-*___ IS 10 P^RCENT OF GROSS INCOME LESS 10 PERCENT OF DRYING. DR ARTHlTr?pPL75_*cvENL2„ DR. ARTHUR GERLOW, TAEX, ACREAGE' BRYAN, ALl<>™ENT TX PROJECTED CHARGE NOT 1Q7Q SPECIFIED. PREPARED BY ^y /**\ 6_6I ___D_,rObc. svx_i ' N VA a e 'xhivi *M0id39 ynHidv *aa aq 03_vd3dd *39Vd0lS ONV 9NIA80 30 lN3D>_3d .1 SS31 3WODNI SS0d9 30 lN3DH_d *I SI 1N38 CNV1 •ne _6 . *Z SlSOD 1V1H1 •IDldd N3A3-.V3.fi *9 9. __I S Zf *0 . SlSOD 1V101 *9 $ rrT9T" OO- I 00*1 oo-1 Z.'6 ;._•' I 12*91 Z8*6 62'Sl SlSOD 03X13 1V1D1 (IN . . 13N) ONV1 SdOlDVdl Ad3NTHDVW SlSOD OBXIJ *. 3dDV 3BDV 3dDV $ -Z9*9 t>0*Zl t • 0 9 S l S O D 3 1 - l V i a VA * 3 D l _ d N _ I A H > 1 V 3 _ R • * _ __*81 _ 9TT9~~ .0*2 9_ •_ I V* V Oc'' . isod 20*1 CO* I 00* I 00* I? 00* 12 90*9 .0*2 9C*2 12*0 02*0 anoH 3dDV 3dDV 9Z*2_ 86** 00* I 00* I 00 • _■ C9*0 09*0 OOM 00* I 00*09 01*0 90*9 68*8 96*£ 09*2 S6*Z *8*8l 9Z*9 6 1 * 11 0£*0 •100 anoH 3tiDV 3dDV 3dDV 3dDV 3dDV 38D V 3dDV •sai 00* \z 99*9 •no •no $ T6*86 faZ^ Zl *92 68«e 96*e 00*01 ZZ*t> Z . "6 92*9 6,1 • I I 00*81 S -.9*01 I _9T9TT iSOD tfO 30 IVA A1I1NVO0 JLlNO/lSOD 80 3DI«d OO 3iaviavA ivkji 1S3A8VH *1V10100S (Ad3NIMDVW _ aniDVdl)80HV~l SdOlDVdl Ad3NIHDVW invH l.VdOlS 3 AdO SlSOD l$_.AdVH lS3AdVH-3dd * 1V101B. S mdVO *dO NO !S3d31Nl CAd3NIHDVW "3 dOlDVdl ) B0PV1 SdOlDVdl AdSNIHDVW 1 D 3 S N I t fl V I S O D 30ID19NOJ 30IDIGH3H 30IDI1D3SNI >« _ d _ N G33S NV3PA0S lS3AdVH3dd S l S O D 3 1 8 V I M VA * 2 1V101 SNV39AOS NOIlDOOOdd H0H4 Sldl3D-lH -.SUMO "1 UNO 1N3W39VNVW " I V D I d A l 3 d D V d 3 d SNdf.l3d ONV SlSOD 0-.lV.vl 1S3 NO!9_.b 1SVOD 3109 3100 IW S V X 3 1 ' O N V l A d O * S N V 3 8 A 0 S a "^% 0 1 H1NOW IVlIdVD 1V0NNV 0 0 0 2 2 1 0 0 2 2 0 6 6 d 3 0 W n N N O l 1 V D I _ . 11 N 3 0 I 1 3 9 0 0 b 6Z6I C _1 : _f()Hd S V X T j I * N VA d 9 • X i s V l • « 0 1 d _ 9 H O H 1 H V • d O A G 0 3 d V d 3 d d *39Vd01S ONV 9N1A8Q 30 l N 3 D d 3 d . 1 S S 3 1 3W0DNI SS0d9 30 !N3Dd3d t.1 Sl lN3d 0NV1 9 1*9? *2*Z I 962* . 0_T0~ Z2*"0~ 81 *0 0 - * 0 0 - *0 0 9 T T & " ~ ZSITO™ 001 *0 9 2 1 * 0 0 2 2 * 0 9Z2*0 0 2 2 * 0 9Z2*0 691 *0 8£2*0 001 *0 9 2 1 * 0 Z1C*0 9 L V 0 001 *0 921 *0 091 *0 9 2 2 * 0 t:. i *o 912*0 b fl ' O 8 0 2 * 0 . 6 6 * 9 S1V101 9 1 * 0 0T*0 22*0 1DO i d 3 S 90 V I I I I I 1 22* 00* 01* 00* 01* 0 I 0 2 0 a inr a inr 3Nnr TT Z 9 ' Z I I 3NOP AV W Z 9 ' Z I I 00*1 00*1 00* 1 00*2 AV W AV W AV W AV W 9 Z * Z 2 9 ' Z ££»Z 69 ». 01*0 0 2 * 0 00* 1 01*0 WdV 9 3 3 11 I I 93 3 NVT *7£'P I I OC* 1 00* I NVT •/(_•*/ nvt 894tr 01* 00* 00* 01* 0 I 2 0 D30 D30 D30 AON 1 I 9S» . 09' t. 1 I 00*1 00* I AON AON 26* . 61 3_DV HJd JdDV _Jd S_OUH SdOOH d3AO S l S O D • d 3 d * * t . n i 3 N 1 H D V W d 0 9 V l S 3 W 11 Q3XH *1IO*13nd 31V0 ♦.I *o cc*o c - *c 7 9*0 . 1 *c .r•I t/I*0 c.. *o ^<.• \ P t » 0 U M . 1 * 0 _ i *0 9< *0 Z 9 * 0 8 1 * 0 .£* I 91 *0 Z 9 * 18* £ 9 * 99* 0 0 0 I HI *0 yr *o 6 8 2 * 0 001 *0 t/£ f*0 9 2 1 * 0 * 0 *0 *0 *0 0 9 2 * 0 612*0 921 *0 *0 *0 *0 * 0 *0 ♦/I *o 6/* 0 81 *0 91 *0 0 / * 0 0 0 2 o.I COI 9.1 /^ 9 Z * 8 1 * 8/ * .9* 8 1 * 9-1 001 9-1 9 6 2 00 1 . . I *0 _ . *0 t _ • I . 1 *0 Ot _ < _".• 6 0 0 0 I 0 21*2 Z_* 2 82 . *0 20. *0 6 1 2 * 0 Z I 2 * 0 9 2 1 * 0 Z 12*0 t/t/. *o 921 *0 1 . 9 * 0 8Z£*0 •ON W31I 1N3W39VNVW lVDIdAl -UOV d Jd SNd013d ONV SlSOD 031VW11S3 N(1I«'-_H lf>V3_) d l f . 9 S i a a i W S V X 3 1 ' Q N V I A H G • S N V 3 0 A O S 8L dOXDld dO*DId dOXDld d n * D l d d o i V A i n n D dn»DId d O l VA I l l O D dn»DId d3>iDVdinnD d31NVld MOddVH 1 3NldS 11 0 D 9 N I 11 0 8 dOXDld dOXDld W30NV1 >1S10 dOXDld W30NV1 aSlO linD 9 N I 11 0 d HOD dOXDld 9 N 111 0 8 *SIO 13S 330 d O . D i d 1HVD NlVdD 3NI8W0D N0I±Vd3d0 19 SOYBEANS. DRYLAND. TEXAS MIDDLE GULF COAST REGin. E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R F HIGH LEVEL MANAGEMENT UNIT 1 . G R O S S R E C E I P T. . F R O M P R O D U C T I O N SOYBEANS T O TA L VARIABLE CCSTS PREHARVEST SOYBEAN SFED N £ P & K FOLIAR FUNGICIDE HERBICIDE INSECTICIDE CUST AIR INSECT MACHINERY TRACTORS LABORCTRACTOR & MACHINERY) INTEREST ON OP. CAP* SUBTOTAL. PRE-HARVEST HARVEST CUSTS DRY £ STORAGE HAUL MACHINERY TRACTORS LABORCTRACTOR & MACHINERY) SUBTOTAL. HARVEST BU, PRICE OR VA L U t f)P COST/UNIT QUANTITY CHST 5.65 30.00 _L____Q $ 169.50 LBS. ACRE ACRE ACRE ACRE ACRE ACRE ACRE HOUR DOL. 0.30 11 . 1 9 7.95 18.84 5.25 2.50 3.96 8.89 5.06 0.10 60.00 1.00 1 .00 0.50 1 .20 4.00 1 .00 1 .00 4.98 25.47 18.00 1 1. 19 7.95 9.42 6.30 10.00 3.96 8.89 25.17 9 9 BU. BU. ACRE ACRE HOUR 0.20 0.21 2.35 2.04 5.06 30.00 30.00 I .00 1 .00 I .02 6.00 6.30 2.35 2.04 $ 3. BREAKEVEN PRICE. VARIABLE COSTS BU 4.176 S ACRE ACRE ACRE 15.29 9.87 22.89 I .00 1 .00 I .00 I $ 5. TOTAL COSTS 6. BREAKEVEN PRICE. TOTAL COSTS __aJL__ 21.85 $ 125.28 TOTAL VARIABLE COST 4. FIXED COSTS MACHINERY TRACTORS LAND (NET PfcNT) TOTAL FIXEO COSTS 2±S5 103.43 .29 '" _ 87 22.89 4 «.05 _ ! ... 3 BU. LANO PENT IS 14 PERCENT OF GROSS INCOME LESS 14 PERCENT OF DRYING AND STORAGE. PREPARED BY DR. ARTHUR GERLOW. TAEX. BRYAN. TEXAS 5.778 PROJECTED 1979 20 SOYBEANS. DRYLAND. TEXAS MIDDLE GULF COAST REGION E S T I M AT E D C O S T S A N D R . T U R N S P F R A C R F HIGH LEVEL MANAGEMENT U P E R AT I O N COMBINE GRAIN CART PICKUP OFF SET D I S K ROLLING CULT PICKUP ROLLING CULT D I S K TA N D E M PICKUP O I S K TA N D E M PICKUP PICKUP ROLLING CULT S P I K E T HARROW PLANTER CULTIPACKER PICKUP C U LT I VATO R PICKUP C U LT I VATO R PICKUP PICKUP PICKUP PICKUP TOTALS ITEM NU. 19 4, 92 11 4,50 4,58 11 4,58 4,34 11 4.34 11 11 4.58 7.33 7.52 7,76 11 7.57 11 7.57 11 11 11 11 D AT E FUEL.OIL. FIXED T I M E S L ^ B O R M A C H I N E L U B . . R E P. C O S T S OVER HOURS HOURS PFR ACRF ■ _1P ACRE NOV NOV NOV DEC DEC DEC JAN JAN JAN FEB FEB APR MAY MAY MAY MAY MAY JUNE JUNE J U LY JULY AUG SEPT OCT 1 .00 1 .00 0.1 0 2.00 1 .00 0.1 0 1.00 1 .00 0.1 0 1.00 0.20 0.10 2.00 1 .00 1.00 1 .00 0.10 2.00 0*10 1 .00 0.22 0.22 0.1 0 0.15 0.378 0.302 0.641 0.423 0.125 0 . 10 0 0.444 0.296 0.21 7 0. 145 0.125 0. 100 0.21 7 0. 145 0.219 0. 1460.125 0. 100 0.219 0. 146 0.250 0. 200 0. 125 0. 100 0.434 0. 289 0.208 0. 139 0.215 0.14* 0.225 0.150 0.125 0. 100 0.4 76 0.317 0.125 0. 100 0.238 0. 159 0.2 75 0.220 0.275 0.220 0.125 0. 100 O r . 8 7 -.0-1 .fi 2.27 2. 12 0.18 1 .54 0.78 0.16 0.78 0.79 0.16 0.79 0.36 0.18 I .56 0.5 . 0.81 0.57 0.16 1 .34 0. 18 0 .67 0.40 0.40 0.16 0.27 0. 14 0.67 0.30 0..J0 0. 14 __________ 5.994 4.2 95 17.24 25. lo LANO RENT IS 14 PERCENT OF GROSS INCOME LESS 14 PERCENT OF DRYING AND STORAGE. P R E P A R E D B Y D P. A R T H U R G E R L O W . T A E X , B R Y A N . T fl X A S v^gi/ 9.5 . 2.2 3 0. 1 4 1 .75 0.8 7 J. 14 0.87 0.96 0.14 0.96 0.2 7 0. 14 1 .7 J 0.4 >. I .2 . 0.'»3 0. 14 ^*J I . 34 PROJECTED 1979 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 9 0 2 2 0 0 1 2 2 0 0 O A N N U A L C A P I TA L M O N T H 1 0 \^$p *«_. 'uo,W «.»_5 ■ ^.q < Ws_u_i4 _ ,a,u^ • u_aMAS ^.un _ _v sexaj. aMi . a_,_as uo.suavxg |B-n„nou6v sexai 3DIA83S NOISN2UX3 IVBOiinDl d9V SVX3Z *08-6Z6l dO_ 031VWUS3 •SSOl HXV3Q XE •dO_3 _)1VD %9Z •*«* 8 A__3A3 lN3N3DVld3d Q3SIVB «S3A1VD 00O9 30VS9 •033d d33_0 ON *9NIA1VD M3801D0 'UNO line I *d3dI3H £ 'WOD 92 16*1 SNB013d 13N *9 29*962 SlSOD 1V101 88*281 96*0 1 05*01 9Z*£I 0**26 Q0*9£ ♦9*ZE1 00* .26 oo*s 01*0 01*0 Ofi* _ •TOO •TOO •TOG •TOG •100 3BDV 6z#.ei SlSOD 318V1MVA 3AOOV 3W0DNI t6*£I1 -re*. 89*S2 ♦ ♦•1 62*21 89*1 6 9 * 0 2^*9 9£*0 9©*£ 01*0 00». 00*00«V 9_.*0 00 M 00*1 21*0 S£*I oo*s t/o*8 09*£ Z£*Z1 99*£ ♦SM 9Z*C1 91*02 SlSOD 03X13 1V101 *din©3 _ HDVW »D__ B3H10 •din03 d3HZ0 NO *dd30 M O d 11 0 8 J 3 3 8 N O * d d 3 0 !N3Wdin03 d3H10 NO * IN I IVXIdVD -IDOlSSAll NC *1NI 3tfniSVd 3AI1VN SJISOD 03X13 * eo*oi ©$*♦ 99*£ 08*21 61*01 00*2 •ioa •SbH •S«H •SdH •"BO •TOO aV3H 0V3H 0V3H •1*0 MAD •1*0 S l S O D 3 1 8 V 1 B VA 1 V 1 0 1 ••dVD*d3dO NO 1S3«31NI >O01S3AIl *_t08Vl lN3WdI003 *d08Vl AB3NIHDVW _ BOlDVdl *d08V1 fd3d#38ni»13n3)lN3Wdin03 Cd3d*38n»13n3>Ad3NIHDVW 9NI13>ldVW 3SN3dX3 DSIW 3NIDI03W 13A *NIW "3 nvs !N3W31ddnS "10 Md AVH SlSOD 318VIHVA £Z*962 S9T51T 81*69 00*991 60*0 92*0 8C*0 00*9S 00*96 0 0 * 0 11 •1*0 •1*0 ml*0 00*6 0S*£ 00*t/ IVIOI SMOD HOD S3A1VD d3_I3H S3A1VD d33lS Sld!3D3d SSOHD 1SOD ao snivA A111NV00 XINH/XSOD _0 3DIdd UNO HDV3 AH913_ HOD «3d SNdOlSd ONV SXSOD 03JLD3rOMd NOID3U 1SVO0 31QQIIAI SVX31 — l_OI.10nC.OHd dlVOAAOO (2._>LVn-9 W31I * > HOURLY COST SUMMARY FOR IMPLEMENTS AND POWER UNITS BUOGET I DENT IFICATI ON NUM8ER IX 022022221022 MACHINE PICKUP SI 0.50 ZE P U R C H A S E S A LVA G E PRICE VA L U E 5100. 1677. YEARS OWNED 4. ANNUAL HOURS USED 900. DEPR./ HOUR 0.895 INTEREST/ HOUR 0.388 INS./ HOUR 0.023 TA X E S / HOUR 0.057 T O T A L P E R F O R M O P. OWNER R AT E COST SHIP/ HOUR/ PER HOUR ACRE HOUR 0.975 1.000 3.284 ANNUAL COST SUMMARY FOR EQUIPMENT AND LIVESTOCK BUOGET NUMBER 11 022022221022 . LINE NO. 1 2 11 27 51 54 55 ITEM FENCE LOT FENCE BARN POND BEEF COW RAISED BEEF BULL P U P BEEF HE IFfcR R A I SIZE 1.00 10.00 2000.00 1.00 1 .00 1.00 1 .00 UNIT MILE FEET SOFT ACRE HEAD HEAD HEAD LIST DEPREC PRICE I AT I O N INTEREST 945.00 1 1.26 4721.00 453.00 800.00 1750.00 600.00 63.00 1.13 141.63 18.12 0 . 0 262.50 0 . 0 47.25 0.56 259.65 22.65 80.00 122.50 60.00 INSUR ANCE TAXES 2.36 0.03 12.98 1.13 4.00 6. 12 3.00 4.72 0.06 25.97 2.26 8.00 12.25 6.00 FUEL R E PA I R S A N D LUBE 12.60 0. 11 15.74 5.44 0 . 0 0 . 0 0 . 0 0 0 0 0 0 0 0 . . . . . . . 0 0 0 0 0 0 0 HOURS TOT OWN- TOT OPERL A B O R E R S W P / Y R AT I N G / Y R 4.00 0.07 1.00 0 0 0 0 . . . . 0 0 0 0 70.09 1 .21 180.58 21 .52 12.00 280.87 9.00 ANNUAL CHARGES MADE IN THIS BUDGET FOR EQUIPMENT AND LIVESTOCK LINE NO. I 2 11 27 51 54 55 I TEM FENCE LOT FENCE UARN POND bEEF COW RAISED BEEF BULL PUR BEEF HEIFER RAI SIZE 1.00 10.00 2000.00 1.00 1.00 1.00 1 .00 UNIT MILE FEET SQFT ACRE HEAD HEAD HEAD NUMBER PROPOR. OWNERSHP OPERATNG INTEREST LABOR HOURS ITEMS CHARGED CHARGES 0.060 1 .000 4.21 0.76 2.83 0. 24 1.200 1.45 1 .000 0. 14 0.68 0.08 0.040 0.900 6.50 0.57 9.35 0.04 0.040 1 .000 0.86 0.22 0.91 0.0 1 .000 1.000 12.00 0 . 0 80.00 0.0 0. 04 0 1.000 1 1 .23 0 . 0 4.90 0.0 0. 125 1.000 1.12 0 . 0 7.50 0.0 Educational programs conducted by the Texas Agricultural Extension Service serve people of all ages regardless of socio-economic level, race, color, sex. religion or national origin. Cooperative Extension Work in Agriculture and Home Economics. The Texas A&M University System and the United States Department of Agriculture cooperating Distribut in turtherar.c. of the Acts of Congress of May 8. 1914. as amended, and June 30 1914 750-11-79. a. sed AEC0 6 ' I 12.60 0.1 1 15.74 5.44 0 . 0 0 . 0 0 . 0