The enterprise budgets for Texas El Paso Re
gion are based on estimates of yields, production
input quantities, and production practices which
represent the best judgment of local producers,
county Extension agents-agriculture, financial in
stitution representatives, farm machinery dealers
and others knowledgeable of the area. Variation
in yields, production inputs and production prac
tices should be expected for particular farms.
Budgets for all major crops produced in the
area are included for two levels of management,
when applicable. Crop yields are directly related
to levels of management. These differences are
due largely to timing of operational practices which
may not be evident in the budgets.
The machinery inventory is applicable to both
typical and high level management. In some bud
gets custom rates, primarily harvesting, were used
in lieu of the assumption that harvesting equip
ment was owned.
Budgets for establishing permanent type pasture
grasses were prepared and used for prorating estab
lishment costs in the respective pasture and hay
budgets. Forage crops include expenses only be
cause it is expected that the income will be derived
from livestock enterprises.
Land charges were based on customary land
lord's crop share less his proportionate share of
certain production and harvesting inputs. A per
acre land charge was made using a fair market
value times an interest rate when crop share was
not used.
TEXAS HIGH PLAINS V REGION
Assumed Prices Paid and Received by Farmers 1/
Item
Unit
Price
Prices Paid (1979)
Seed
Cotton
Alfalfa
lbs.
Custom Rates
Alfalfa
Cotton
Hay
(Gin,
$
lbs.
(Harvesting)
Bag,
Tie)
.40
1.75
ton
27.00
bale
35.00
Fuel Lubricants
Gasoline
Diesel Fuel
gal.
gal.
.55
.42
Fertilizer
Nitrogen
Phosphorous
lb.
lb.
.11
.18
Labor
Tractor
Irrigation
Other
hour
hour
hour
5.00
5.00
2.50
Chemicals
Herbicide
appl.
7.00
Land Lease
acre
Interest
Operating
$
.10
Prices Received (1979)
Cotton
Cottonseed
Alfalfa Hay (Standing in Field)
r
lb. lint
ton
ton
.52
80.00
70.00
1/ These price assumptions are not to be interpreted as predictions or
prospective prices.
TEXAS HIGH PLAINS V REGION
Estimated Machinery and Equipment Cost Per Hour of Use
Machinery
Item and Size
Tractor 3 - 125 HP
Pickup - 1/2 Ton
Roll. Cultivator - 20 Ft
Chisel - 13 Ft.
Lister-Plntr 6R - 20 Ft.
Bed Planter 6R - 20 Ft.
Tandem Disc - 20 Ft.
Knife Beds - 40 Ft.
Knife Rows - 40 Ft.
Sand Fight - 40 Ft.
Packer - 8.3 Ft.
Shredder - 6.6 Ft.
Herb Spr/Disc - 14 Ft.
Plant - 40 Ft.
Replant - 40 Ft.
Broadcast Herb - 13.3 Ft.
Band Herb - 20 Ft.
Shred Stalks - 6.6 Ft.
Strip - 6.6 Ft.
Module - 13.2 Ft.
Haul w/Trailer - 13.2 Ft.
Item
No.
3
10
30
32
36
38
41
45
48
49
53
56
61
67
70
71
72
73
81
82
84
Purchase
Price
$16,500
5,000
2,150
2,200
2,700
2,350
3,950
2,450
2,000
2,000
350
650
450
4,800
4,800
1,100
1,700
1,200
10,500
18,000
2,700
Estimated
Years of Use
5
3
7
15
7
7
7
15
15
15
7
7
7
15
15
8
10
9
8
8
8
Estimated
Hours of Use
2500
2100
1400
1725
1050
1400
1400
2250
2250
1050
1400
975
700
975
975
1000
350
1980
960
960
1800
Fixed Costs
Per Hour
$ 1.69
1.12
1.91
1.38
Variable Costs
Per Hour
$ 8.72
4.18
2.03
.84
.64
.83
.96
1.21
1.18
.62
1.18
1.68
2.12
2.48
1.44
1.81
5.19
5.19
-1.95
4.47
1.76
3.00
5.91
5.91
.55
9.55
16.75
1.19
.78
.96
.39
.62
.97
.62
1.20
2.22
4.33
2.86
ro
ALFALFA F.T ARL ISHMENT, SPRINKLER ! .PIRATED. HIGH PLAINS V REGION
ESTIMATED COSTS AND RETURNS PEP ACRE
PRICE
OR
VA L U E
OR
UNIT CGST/UNIT QUANTITY COST
GROSS RECEIPTS FROM PRODUCTION
TOTAL
2. VARIABLE COSTS
PREHARVEST
SEED
NITROGEN
PHOSPHATE
INSECT CONTROL
MACHINERY
TRACTORS
IRRIGATION MACHINERY
LABOR<TRACTOR . MACHINERY)
LABOR.IRRIGATION)
INTEREST ON OP. CAP.
SUBTOTAL. PRE-HARVEST
0*0
LBS.
LBS.
LBS.
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
1.75
0.11
0. 18
6.50
4.03
11.37
28.50
5.00
5.00
0. 10
Z*6*
t
123.55
HARVEST COSTS
SUBTOTAL. HARVEST
s
s
0.0
TOTAL VARIABLF CCST
*
3. INCOME ABOV_ VARIABLE COSTS
4. FIXED COSTS
MACHINERY
TRACTORS
IRRIGATION MACHINERY
LANO (NET RENT)
TOTAL FIXED COSTS
123.55
S-123.55
$
ACRE
ACRE
ACRE
ACRF
3.
3.
26.
40.
4
9
5
0
5
3
0
0
1.00
1.00
1.00
1.00
3.45
3.93
26.50
$
..±2x22
73.88
5. TOTAL COSTS
197.4?
6. NFT RETURNS
•197.43
R E N T F Q U A L S _ 5 0 0 / A £ P _ AT _ % .
P R E PA R E D B Y G A R Y ^ C C N D PA . TA E X .
JFN
43.75
2.20
10.80
6.50
4.03
1 1.37
28.50
11 . 2 7
2.50
25.00
20.00
60.00
1.00
1 .00
1.00
1.00
2.25
0.50
26.35
FORT STOCKTON, TEXAS
PROJECTED 1979
A L F A L F A E S T A B L I S H M E N T. S P R I N K L E R I R R I G A T E D . H I G H P L A I N S
E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E
O P E R AT I O N
ITEM
NG.
BREAK(MB
PLOW)
3,30
DISK
3.36
FERTILIZE(GRAN)
64
F L O AT
3.38
PICKUP
10
GRAIN
ORILL
3.61
PtCKUP
10
PICKUP
10
PICKUP
10
PICKUP
10
TOTALS
O AT E
AUG
AUG
AUG
AUG
AUG
SEPT
SEPT
OCT
NOV
DEC
V REGION
FUEL . O I L .
FIXED
T I M E S L A B O R M A C H I N E L U B . • REP.
COSTS
OVER
HOURS
HOURS
PER ACRE P E R A C R E
1 .00
1.00
LOO
LOO
0*10
LOO
0*10
0*10
0.10
0*10
0.649
0.237
0 . 0
0.414
0.125
0.330
0.125
0*125
0.125
0.432
0.158
0.184
0.276
0.100
0*220
0.100
0.100
0.100
-2x125 -2x122
2.254 1.770
.S.t EQUALS SSOO/ACR- AT 8X.
RR_M»4RE0 BY GARY CONDRA. TAEX. FORT STOCKTON. TEXAS
5.40
1.84
0.0
3.10
0.42
2.96
0.42
0.42
0.42
3*03
0*74
0*0
1.37
0. 15
1.48
0. IS
0. IS
0.15
-2*±2
.2*12
15.40
7.38
/ " ^
PROJECTED 1979
BUDGET IDENTIFICATION NUMBER-— 811007 3022470 0
ANNUAL CAPITAL MONTH 12
^*%
ALFALFA PRODUCTION. SPRINKLER IRRIGATED. HIGH PLAINS V
ESTIMATED COSTS AND RETURNS PER ACRF
PRICE
OR
VA L U E
OR
UNIT COST/UNIT QUANTITY COST
GROSS RECEIPTS FROV PRODUCTION
HAY
TOTAL
2. VARIABLE COSTS
PREHARVEST
PHOSPHATE
INSECT CONTpQL
MACHINERY
TRACTORS
IRRIGATION MACHINERY
LABORITRACTOR f, MACHINERY)
LABOR(IRRIGATION)
INTEREST ON OP. CAP.
SUBTOTAL. PRE-HARVEST
HARVEST COSTS
CUSTOM HARVEST
SUBTOTAL. HARVEST
TON
LBS.
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
70.00
0.18
6.50
3.76
1.93
128.25
5.00
5.00
0.10
8.50
, ? 3 i Q fi
S~59S_00
80.00
LOO
LOO
1.00
1.00
1.40
2.25
49.73
14.40
6.50
3.76
1.93
126.25
7.01
11 . 2 5
S
TON
27.00
a»50 -223*32
9 229.50
TOTAL VARIABLE CCST
S 407.56
3. INCOME ABOVE VARIABLE COSTS
4. FIXED COSTS
MACHINERY
TRACTORS
IRRIGATION MACHINERY
LAND (NET RENT)
T3TAL ^IXED COSTS
41,9?
178.06
* 187.44
$
ACRE
ACRE
ACRE
ACRE
1.3
0.6
119.2
40.0
8
7
5
0
LOO
1.00
LOO
1.38
0.67
11 9 . 2 5
LOO —±2*22
S 161.30
5. TOTAL COSTS
9 568.86
6. NET RETURNS
9
26.14
R E N T E Q U A L S 1 5 0 0 / A C R E AT 8 % .
P R E PA R E D B Y G A R Y C C N D R A . TA E X . F O R T S T O C K T O N . T E X A S
PROJECTED 1979
A L FA L FA P R O D U C T I O N . S P R I N K L E R I R R I G AT E D . H I G H P L A I N S V
ESTIMATED COSTS AND RETURNS PER ACRE
ITEM
NO.
OPERATION
DATE
■M - M - » W. _ - < - _ « M M . « N a . « M « . a « l « . . « l
PICKUP
10
FERTILIZE(GRAN)
PICKUP
10
PICKUP
10
PICKUP
10
PICKUP
10
PICKUP
10
PICKUP
10
PICKUP
10
°ICKUP
10
3.64
NOV
MAR
MAR
APR
M AY
JUNE
J U LY
AUG
SEPT
OCT
TO TA L S
FUEL.OIL. FIXEO
TIMES LABOR MACHINE LUB*.REP* COSTS
OVER HOURS HOURS PER ACRE PER ACRE
0«10
1*00
0.10
0.10
0*10
0.10
0.10
0*10
0*10
0*125
0.276
0*125
0.125
0*125
0*125
0.125
0*125
0.125
0.100
0.184
0.100
0*100
0*100
0*100
0.100
0*100
0.100
0.42
1.93
0.42
0.42
0*42
0.42
0.42
0*42
0.42
0*15
0*67
0*15
0.15
0*15
0.15
0.15
0*15
0.15
0*10 _.a__l_._ -2*192 -2x±2 -2*12
1*401 1.084
5.69
2.05
^ %
RENT EQUALS S500/ACRE AT 8%.
PREPARED BY GARY CONDRA. TAEX. FORT STOCKTON. TEXAS
PROJECTED 1979
B U D G E T I D E N T I F I C AT I O N N U M B E R - — 8 1 0 0 7 6 0 2 2 4 7 0 0
A N N U A L C A P I TA L M O N T H 1 0
/-^\
COTTON. SPRINKLER IRRIGATED (PP+2). HIGH PLAINS V REGION
ESTIMATED COSTS AND RETURNS PER ACRE
MARTIN CO*
PRICE OR
UNIT COST/UNIT QUANTITY
1* GROSS RECEIPTS FRCM PRODUCTION
COTTON LINT
COTTONSEED
TOTAL
2. VARIABLE COSTS
PREHARVEST
SEFD
NITROGEN
INSECT CONTROL
HERBICIDE
HOEING
MACHINERY
TRACTORS
IRRIGATION MACHINERY
LABOR(TRACTOR £ MACHINERY)
LABOR(IRRIGATION)
OTHER LABOR
INTEREST ON OP. CAP.
SUBTOTAL. PRE-HARVEST
HARVEST COSTS
OESICCANT
TRANS. MODULE
GIN. BAG. TIES
MACHINERY
TRACTORS
LABOR(TRACTOR & MACHINERY)
SUBTOTAL. HARVEST
LBS*
TON
0*52
80.00
400.00
0.32
LBS.
LBS*
ACRE
APPL
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
HOUR
DOL*
0*40
0*11
2.50
7.00
10.00
9.06
14.26
34.20
5.00
5.00
2.50
0.10
15.00
50.00
LOO
0.20
LOO
LOO
LOO
LOO
4 . 11
0.60
2*00
40*27
$
6. NET RETURNS
6*00
5*50
2. SO
1*40
10*00
9*06
14.26
34.20
20*53
3.00
5*00
___QJ_
I 15* 47
9
APPL
BALE
BALE
ACRE
ACRE
HOUR
7.00
2.50
35.00
1.94
4 . 7 7
5.00
0.50
0*80
0.80
L O O
LOO
0.78
3*50
2*00
28.00
1.94
4.77
9
—3*22
44.12
s 159*60
3. INCOME ABOVE VARIABLE COSTS
5. TOTAL COSTS
208*00
—23*62
9 233*60
TOTAL VARIABLE CCST
4. FIXED COSTS
MACHINERY
TRACTORS
IRRIGATION MACHINERY
LAND (NET RENT)
TOTAL FIXED CCSTS
VALUE OR
COST
$
74*00
s
ACRE
ACRE
ACRE
ACRE
15.80
6.56
31.80
34.17
LOO
LOO
1*00
LOO
15*80
6.58
31.80
9
.-__.!___ 7
88*35
9 247*95
9 -14*35
0. .P^GA . !Sn . .L^0 _S ?s.0Ne-r0UHTH °F C*°P «" OH_ . OUPTH O. _._._ AKO A,.
PREPARED BY GAPy CONDRA. TAEX. FORT STOCKTON. TEXAS PROJECTED .97«.
C O T T O N . S P R I N K L E R I R R I G AT E D ( P P + 2 ) . H I G H P L A I N S V R E G I O N
ESTIMATED COSTS AND RETURNS PER ACRE
MARTIN CO*
OPERATION
SHREO STALKS
PICKUP
PICKUP
BED OR LIST
KNIFE BFDS
PICKUP
BED OR LIST
KNIFE BEDS
PICKUP
PLANT
8ANO HERB
SCRATCH
REPLANT
SAND FIGHT
PICKUP
SANO FIGHT
KNIFE ROWS
PICKUP
C U LT I VAT E
PICKUP
C U LT I VAT E
PICKUP
PICKUP
STRIP
MODULE
HAUL W/ TRAILER
PICKUP
PICKUP
TOTALS
ITEM
NO.
3.73
3. 0
10
10
3.41
3.45
10
3.41
3.45
10
3.67
72
3.53
3.70
3.49
10
3.49
3.48
10
3.56
10
3.56
10
10
3.81
3.«2
10.84
10
10
DATE
JAN
JAN
JAN
FE9
MAR
MAR
MAR
APR
APR
APR
MAY
MAY
MAY
MAY
MAY
MAY
JUNE
JUNE
JUNE
J U LY
J U LY
AUG
AUG
SEPT
OCT
OCT
OCT
OCT
NOV
/<^fck
FUEL.OIL. FIXED
TIMES LABOR M A C H I N E L U 8 . . R E P. C O S T S
OVER HOURS
HOURS PER ACRE PER ACRE
0.67
LOO
0.15
0.15
LOO
LOO
0*15
1*00
LOO
0*15
LOO
1*00
0*50
0*50
LOO
0*15
LOO
2*00
0.15
2.00
0.15
LOO
0*15
0*15
0.67
0.67
0.67
0.15
0.15
0.465
0.0
0.187
0. 187
0.231
0.092
0.1R7
0.231
0.092
0. 187
0.092
0.0
0.051
0.046
0. 081
0.187
0. 081
0.231
0.187
0.233
0. 187
0. 116
0. 187
0* 187
0*399
0.285
0.100
0.187
.2*121 ,
0.310
0.0
0.150
0.150
0.154
0.062
0.150
0. 154
0.062
0*150
0.062
0. 123
0.034
0.031
0.054
0.150
0.054
0.154
0.150
0.155
0.150
0.078
0*150
0. 150
0.266
0.190
0.066
0.150
.__ ________
-2*62
-2*23
4.890
3.658
30.02
22.36
3.62
0.0
0.63
0.63
L 7 A
0.72
0.63
1.76
0.72
0.63
1.01
0.08
0.38
0.50
0.59
0.63
0.59
1.87
0.63
1.90
0.63
0.95
0.63
0.63
3.37
2.81
0.52
0.63
O F . ^ R . G A _ _ . . . ^ " - . - . S r " " 1 " ' ™ "■ " ^ L E S S ° — F ° " " H
PREPARED BY GARY CCNDRA. TAEX. FORT STOCKTON. TEXAS
1.39
0.0
0.23
0. 2 3
0.82
0. 35
0.23
0.82
0. 35
0*23
0.80
0*91
0.27
0.40
0.40
0.23
0.4 0
0.75
0.23
0.92
0.23
0.46
0*23
0.23
4.94
5.60
0.25
0.23
OF
G.NN,NG
^^^x
AND
ACL
PROJECTED 1979
B U D G E T I D E N T I F I C AT I C N N U M B E R — 9 3 0 0 7 4 0 2 2 4 7 0 0
A N N U A L C A P I TA L M O N T H 11