r TEXAS EDWARDS PLATEAU EASTERN r FOREWORD The enterprise budgets for Texas Edwards Plateau-Eastern Region are based on estimates of yields, production input quantities, and production practices which represent the best judgment of local producers, county Extension agents-agriculture, fi nancial institution representatives, farm machinery dealers and others knowledgeable of the area. Vari ation in yields, production inputs and production practices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. r The machinery inventory is applicable to both typical and high level management, in some bud gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Crop share rental agreements do not exist to any substantial degree. Land charges were, therefore, calculated by using a fair market value times an interest rate or a cash lease. SHEEP PRODUCTION TEXAS EDWARDS PLATEAU EASTERN REGION PROJECTED COSTS AND RETURNS PER ANIMAL UNIT* r ITEM WEIGHT EACH UNIT PRICE OR COST/UNIT QUANTITY VALUE OR COST 48.87 196.00 29.75 11 . 1 2 285.74 GROSS RECEIPTS WOOL LAMBS CULL EWES DEER LEASE TO TA L 1 .00 70.00 100.00 1 .00 LB. LB. LB. ACRE 1 .15 0.70 0.35 0.80 42.50 4.00 0.85 13.90 LB. LB. DOL. HEAD DOL. DOL. DOL. DOL. HRS. HRS. HRS. DOL. 0.07 0.06 3.75 1.00 3.00 10.00 270.00 60.00 1 .00 5.00 1 .00 1 .00 3.00 3.00 3.00 0.10 1. 66 0 . 11 9.32 36.86 VARIABLE COSTS RANGE CUBES PROT. SUPPLEMENT VET MEDICINE SHEARING MARKETING MISC EXPENSE MACHINERY(FUEL.LUBE.REP) EQUIPMENT(FUEL.LUBE.REP) LABOR. TRACTOR 6 MACHINERY LABOR. EQUIPMENT LABOR, LIVESTOCK INTEREST ON OPER.CAP., TOTAL VARIABLE COSTS r INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS LAND RENT INT. ON LIVESTOCK CAPITAL INT. ON OTHER EQUIPMENT DEPR. ON RAM PURCHASED DEPR. ON HORSE DEPR. ON OTHER EQUIP. OTHER FC, MACH & EQUIP. TOTAL FIXED COSTS 18.90 3.60 3.75 5.00 3.00 1 0.00 10.54 0. 13 4.99 0.34 27.96 3__69_ 91.88 193.86 ACRE DOL. DOL. DOL. DOL. DOL. DOL. 3.50 0.10 0.10 13.90 381.80 30.15 48.65 38. 18 3.01 1 .40 0.24 2.46 9.60 103.55 TOTAL COSTS 195.44 6. NET RETURNS 90.31 100% LAMB CROP, 1 RAM TO 33 EWES, 3% DEATH LOSS, 20% REPLACEMENT RATE. r Estimated for 1979-80, Texas Agricultural Extension Service Budget information presented is prepared solely as a general guideline and is not intended to recognize or to predict the costs and returns from any one particular farm or ranch operation. H O U R LY C O S T S U M M A RY F O R I M P L E M E N T S A N O P O W E R U N I T S B U D G E T I D E N T I F I C AT I O N N U M B E R 3 0 9 1 0 4 0 11 0 0 11 0 MACHINE PICKUP PURCHASE PRICE 5355. SIZE 0 . 5 0 S A LVA G E VA L U E 1971 . YEARS OWNED 4 . ANNUAL HOURS USED 5 0 0 . DEPR./ HOUR 1.692 INTEREST/ HOUR 0.733 INS./ HOUR 0.044 TA X E S / HOUR 0.107 T O TA L PERFORM OWNER R AT E SHIP/ HOUR/ HOUR ACRE 1 .843 1 .000 OPi COST PER HOUR 7.925 A N N U A L C O S T S U M M A R Y F O R E Q U I P M E N T A N D L I V E S T O C K B U D G E T N U M B E R 3 0 9 1 0 4 0 11 0 0 11 0 .INE _. 1 2 3 4 5 6 7 81 84 85 95 ITEM FENCE.13) W AT E R S Y S T E M C 3 ) BARN SHED WORKING PENS STOCK TRAILER S T O C K S P R AY E R EWE RAISED RAM PURCHASED YEARLING EWE HORSE SIZE 1 . 0 0 1 .00 1200.00 1000.00 1 . 0 0 18.00 5 0 . 0 0 1 .00 1 .00 1 . 0 0 1 .00 L I S T DEPREC 3 .ICE I AT I O N UNIT MILE DOL. SOFT SOFT DOL. FEET GAL. HEAD HEAD HEAD HEAD 2 4 5 3 3 3 500.00 000.00 000.00 000.00 000.00 000.00 600.00 60.00 200.00 75.00 300.00 100. 00 144.00 166.67 100.00 150.00 250.00 6 0 . 0 0 0 . 0 4 6 . 6 7 0 . 0 18.75 INTEREST INSUR ANCE TA X E S 125.00 220.00 250.00 150.00 150.00 150.00 3 0 . 0 0 6 . 0 0 13.00 7 . 5 0 2 2 . 5 0 6 . 2 5 1 1.00 12.50 7.50 7 . 5 0 7 . 5 0 1 . 5 0 0 . 3 0 0 . 6 5 0 . 3 7 1 . 1 2 12.50 2 2 . 0 0 2 5 . 0 0 15.00 15.00 15.00 3 . 0 0 0 . 6 0 1.30 0 . 7 5 2 . 2 5 FUEL R E PA I R S AND LUBE 5 . 0 0 4. 80 1 . 6 7 I .00 3.00 37.50 3 . 0 0 0 . 0 0 . 0 0 . 0 0 . 0 0 0 0 0 0 0 0 0 0 0 0 . 0 . 0 . 0 . 0 . 0 . 0 . 0 .0 .0 . 0 . 0 HOURS TOT OWN- TOT OPERLABOR ERSHP/YR AT I N G / Y R 8 . 0 0 0.0 0 . 0 0 . 0 8 . 0 0 0.0 0 . 0 0 . 0 0 . 0 0.0 0.0 118.75 177.00 204.17 122.50 172.50 272.50 64.50 0 . 9 0 48.62 1 .12 22.12 5 . 0 0 4 . 8 0 1 . 6 7 1.00 3 . 0 0 37.50 3 . 0 0 0 . 0 0 . 0 0 . 0 0 . 0 ANNUAL CHARGES MADE IN THIS BUDGET FOR EQUIPMENT AND LIVESTOCK INE 0. ITEM 1 FENCE.13) 2 WAT E R S Y S T E M . 3 ) 3 BARN 4 SHED 5 WORKING PENS 6 STOCK TRAILER 7 S T O C K S P R AY E R 81 EWE RAISED 84 RAM PURCHASED 35 YEARLING EWE 95 HORSE J SIZE 1 .00 1 .00 1200 .00 1000.00 1 .00 18 .00 50. 00 1 .00 1 .00 1 .00 1 .00 UNIT MILE DOL. SOFT SOFT DOL. FEET GAL. HEAD HEAD HEAD HEAD NUM3ER ITEMS 13.000 3.000 1.000 1 .000 1.000 1 .000 1 . 000 5 . 0 0 0 1 .000 5.000 3 . 0 0 0 P R O P O R . OWNERSHP CHARGED CHARGES 0.001 1.54 0.001 0 . 5 3 0.001 0 . 2 0 0.001 0. 12 0.001 0 . 1 7 0.001 0 . 2 7 0.001 0 . 0 6 1 .000 4 . 5 0 0.030 1 .46 0.200 1 . 1 2 6.004 0 . 2 9 O P E R AT N G CHARGES 0 . 0 6 0.01 0 . 0 0 0 . 0 0 0 . 0 0 0 . 0 4 0 . 0 0 0 . 0 0 . 0 0 . 0 0 . 0 INTEREST CHAPGES 1 .62 0 . 6 6 0 . 2 5 0 . 1 5 0 . 1 5 0 . 1 5 0 . 0 3 30.00 0. 39 7 . 5 0 0 . 2 9 ) LABOR HOURS CHARGED 0. 10 0 . 0 0 . 0 0. 0 0 . 0 1 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0. 0 1 r G O AT P R O D U C T I O N T E X A S E D W A R D S P L AT E A U E A S T E R N R E G I O N PROJECTED COSTS AND RETURNS PER ANIMAL UNIT (6 DOES) ITEM WEIGHT EACH UNIT 1 .00 1 .00 1.00 85.00 1 .00 LB. LB. HEAD LB. ACRE PRICE OR COST/UNIT QUANTITY VA L U E O R COST 7.20 48.00 1 .20 0. 13 13.90 43.20 216.00 60.00 3.31 1. GROSS RECEIPTS KID MOHAIR A D U LT M O H A I R K I D G O AT S DOES HUNTING LEASE T O TA L 6 4 50 0 0 .00 .50 .00 .30 .80 11x12. 333.63 2 . VA R I A B L E C O S T S RANGE CUBES S A LT & M I N . VET MEDICINE SHEARING MISC EXPENSE r MACHINERY(FUEL,LUBE,REP) EQUIPMENT(FUEL,LUBE,REP) LABOR, TRACTOR & MACHINERY LABOR, EQUIPMENT LABOR, LIVESTOCK I N T E R E S T O N O P E R . C A P. , T O TA L VA R I A B L E C O S T S LB. LB. DOL. HEAD DOL. DOL. OOL. HRS. HRS. HRS. DOL. 0.07 0.06 2.40 1 .50 10.00 300.00 60.00 1 .00 6.00 1.00 3.00 3.00 3.00 0.10 1 .66 0 . 11 8.00 33.91 21 .00 3.60 2.40 9.00 10.00 10.54 0. 13 4.99 0.34 24.00 -2x29 89. 38 I N C O M E A B O V E VA R I A B L E C O S T S 244.25 FIXED COSTS LAND RENT I N T. O N L I V E S T O C K C A P I TA L I N T. O N O T H E R E Q U I P M E N T DEPR. ON BUCK PURCHASED DEPR. ON HORSE D E P R . O N O T H E R E Q U I P. O T H E R F C , M A C H & E Q U I P. . T O TA L F I X E D C O S T S ACRE DOL. DOL. DOL. DOL. DOL. DOL. 3.50 0.10 0.10 13.90 582.50 30.15 48.65 58. 25 3.01 1. 20 0.24 2.46 12x62. 126.43 5 . TO TA L C O S T S 215.81 6. NET RETURNS 11 7 . 8 2 4 0 % K I D C R O P, l B U C K T O 2 3 0 A N I M A L U N I T T O TA L . r 3S3&s_Sa= 5 0 D O E S , 7 % O E AT H L O S S , 2 0 % R E P L A C E M E N T SSff - »■. - particular farm or ranch operation C°StS 3nd retUrns from an* °"e R AT E , * 5% H O U R LY C O S T S U M M A R Y F D * I M P L E M E N T S A N D P O W E R U N I T S B U D G E T I D E N T I F I C AT I O N N U M B E R — 5 3 O 1 O O O 0 1 O O O 1 O MACHINE PICKUP PURCHASE PRICE 5355. SIZE 0 . 5 0 S A LVA G E VA L U E 1971 . YEARS OWNED 4 . ANNUAL HOURS USED 5 0 0 . DEPR./ HOUR 1.692 INTEREST/ HOUR 0.733 INS./ TA X E S / HOUR HOUR' 0 .044 0.107 T O TA L P E R F O R M O P. OWNER R AT E COST SHIP/ HOUR/ PER HOUR ACRE HOUR 1 .843 1.000 7.925 ANNUAL COST SUMMARY FOR EQUIPMENT AND LIVESTOCK —BUDGET NUMBER. 5 3 010000100010 LINE NO. I TEM 1 FENCEU3) 2 3 4 5 6 7 87 90 91 95 WAT E R S Y S T E M ! 3 ) BARN SHED WORKING PENS STOCK TRAILER S T O C K S P R AY E R DOE RAISED BUCK PUPCHASED YEARLING DOE HORSE SIZE 1 .00 1.00 1200.00 1000.00 1 .00 18.00 50.0 0 1 .00 1 .00 1 .00 1 .00 UNI T MILE DOL. SOFT SQFT DOL. FEET GAL. HEAD HEAD HEAD HEAD L I S T PRICE 2500.00 4000.00 5000.00 3000.00 3000.00 3000.00 600.00 8 0 . 0 0 300.00 8 0 . 0 0 300.00 DEPREC I AT I O N INTEREST INSUR ANCE 100.00 144.00 166.67 100.00 150.00 250.00 6 0 . 0 0 0 . 0 6 0 . 0 0 0 . 0 18.75 125.00 220.00 250.00 150.00 150.00 150.00 30.00 8 . 0 0 18.00 8 . 0 0 2 2 . 5 0 6 . 2 5 1 1 .00 12.SO 7 . 5 0 7 . 5 0 7 . 5 0 1 .50 0 . 4 0 0 . 9 0 0 . 4 0 1. 12 TA X E S 1 2 2 1 1 1 2.50 2.00 5.00 5.00 5.00 5.00 3 . 0 0 0 . 8 0 1 .80 0 . 8 0 2 . 2 5 FUEL R E PA I R S AND LUB 5 . 0 0 4 . 8 0 1 . 6 7 1 .00 3. 00 3 7 . 5 0 3 .00 0. 0 0 . 0 0 . 0 0 . 0 0.0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 .0 0 . 0 0 . 0 HOURS TOT OWN- TOT OPERL A B O R E R S H 3 / Y R AT I N G / Y R 8.00 0.0 0.0 0. 0 8.00 0.0 0.0 0.0 0.0 0.0 0.0 I 18.75 177.00 204 .17 122.50 172.50 272.50 64.50 1 .20 62.70 1 .20 22.12 5.00 4.80 1 .67 1.00 3.00 37.50 3.00 0 0 0 0 . . . . 0 0 0 0 ANNUAL CHARGES MADE IN THIS BUDGET FOR EQUIPMENT AND LIVESTOCK LINE 1 _U • 1 2 3 4 5 6 7 87 90 91 95 1 1 _w FENCE{13) WAT E R S Y S T E M C 3 ) BARN SHED WORKING PENS STOCK TRAILER S T O C K S P R AY E R DOE RAISED BUCK PURCHASED YEARLING DOE HORSE J SIZE 1 .00 1 .00 1200.00 1000.00 1 .00 18.00 50 .00 1 .00 1 .00 1 .00 1 .00 UNIT MILE DOL. SQFT SQFT DOL. FEET GAL. HEAD HEAD HEAD HEAD NUMBER ITEMS 13.000 3 . 0 0 0 1 .000 1.000 1 .000 1 .000 1 .000 6. 000 1 .000 6 . 0 0 0 3. 000 P R O P O R . O W N E R S H P O P E R AT N G CHARGED CHARGES CHARGES 0.001 1 .54 0 . 0 6 0.001 0.53 0.01 0.001 0 . 2 0 0 . 0 0 0.001 0 . 1 2 0 . 0 0 0.001 0 . 1 7 0 . 0 0 0. 001 0 . 2 7 0 . 0 4 0.001 0 . 0 6 0 . 0 0 1 . 000 7 . 2 0 0 . 0 0.02 0 1 . 2 5 0 . 0 0.200 1 .44 0.0 0. 004 0.2P 0.0 INTEREST LABOR HOURS CHARGES CHARGED I .62 0 . 1 0 0 . 6 6 0 . 0 0 . 2 5 0 . 0 0 . 1 5 0 . 0 0. 15 0 . 0 1 0.15 0 . 0 0 . 0 3 0. 0 4 8 . 0 0 0 . 0 0 • 36 0 . 0 9 . 6 0 0. 0 0 . 2 9 0 .0 ) ) r RANCH BUDGET TEXAS EDWARDS PLATEAU REGION EASTERN PROJECTED COSTS AND RETURNS PER ANIMAL UNIT ITEM WEIGHT EACH UNIT PRICE OR COST/UNIT QUANTITY VALUE OR COST 0.20 0.14 0.04 1 7.00 1.60 0.34 0.27 0.02 1.08 7.20 13.90 9 1.12 51 .84 24.75 19.55 78.40 11 . 9 0 13.50 0.50 6.48 32.40 1. GROSS RECEIPTS STEER CALVES HEIFER CALVES CULL COWS WOOL LAMBS CULL EWES KID GOATS DOES KID MOHAIR ADULT MOHAIR HUNTING LEASE TOTAL 5.00 4.50 10.00 1 .00 70.00 100.00 1.00 85.00 1.00 1.00 1.00 CWT. CWT. CWT. LB. LB. LB. HEAD LB. LB. LBo ACRE 90.00 80.00 55.00 1*15 0.70 0.35 50*00 0.30 6.00 4.50 0.30 11•\2 34 1.56 2= VARIABLE COSTS CONCENTRATES SALT & MIN. VET MEDICINE SHEARING MARKETING MISC EXPENSE MACHINERY(FUEL,LUBE,REP) EQUIPMENT(FUEL,LUBE,REP) LABOR, TRACTOR & MACHINERY LABOR, EQUIPMENT LABOR, LIVESTOCK INTEREST ON OPER.CAP., TOTAL VARIABLE COSTS r LB. LB. DOL. DOL. DOLo DOL. DOLo DOL. HRS. HRS* HRS. DOL. 0.07 0.06 5.45 3.37 3.50 10.00 302.00 47.76 1.00 1 .00 1.00 1 .00 3.00 3.00 3.00 0.10 1.66 0 . 11 7.20 38.79 3_ INCOME ABOVE VARIABLE COSTS 4. r FIXEO COSTS LAND RENT INT. ON LIVESTOCK CAPITAL INT. ON OTHER EQUIPMENT DEPR. ON RAM PURCHASED DEPR. ON BUCK PURCHASED DEPR. ON HORSE DEPR. ON OTHER EQUIP. OTHER FC, MACH & EQUIP. TOTAL FIXED COSTS 21.14 2.87 5.45 3.37 3.50 10.00 10.54 0. 13 4.99 0.34 21 .60 v. 8 8 87.79 253.77 ACRE DOL. DOLo DOL. DOL* DOL. DOL. DOL. 3.50 0.10 OolO 13.90 507.35 30. 15 48.65 50.74 3.01 0.56 0. 18 0.24 2.46 \lx*9. 11 7 . 3 3 TOTAL COSTS 205.12 NET RETURNS 136.44 103 COWS _** _Q7_ _>_fP_- 210 GOATS. 90% CALF CROP, 100% LAMB CROP, 50% KID CRO^ . l8SWSfJ?fiai?S8ifesS__§ Extension Service. Adeline and is not intended to recognize or to pridict _W_a_t_H»1 the c§st_a£nS r2i^_aLLgfSeral operation. ^.4.* .**« _ne .costs and returns from any one particular farm or ranch H O U R LY C O S T S U M M A R Y F O R I M P L E M E N T S A N D P O W E R U N I T S B U D G E T I D E N T I F I C AT I O N N U M B E R ANNUAL YEARS HOURS DEPR./ INTEREST/ INS./ TA X E S / SI ZE OWNED USED HOUR HOUR HOUR HOUR 0 . 5 0 1971. 4 . 5 0 0 . 1.692 0.733 0.044 0.107 A N N U A L C O S T S U M M A R Y F O R E Q U I P M E N T A N D L I V E S T O C K — B U D G E T N U M B E R 11 9 1 0 4 0 11 0 0 11 0 PURCHASE PRICE 5355. MACHINE PICKUP LINE NO. ITEM SIZE 1 FENCE I 13) 2 WATER SYSTEM.3) 3 BARN 4 SHEO 5 WORKING PENS 6 STOCK TRAILER 7 STOCK SPRAYER 51 COW RAISED 54 BULL PURCHASED 55 HEIFER RAISED 81 EWE RAISED 84 RAM PURCHASED 85 YEARLING EWE 87 DOE RAISED 90 BUCK PURCHASED 91 YEARLING DOE 95 HORSE 1 .00 1.00 1200 .00 1000.00 1 .00 18.00 50.00 1 .00 1 .00 1 .00 1 .00 1 .00 1.00 1 . 0 0 1 .00 1.00 1 .00 UNIT MILE DOL. SQFT SQFT DOL. FEET GAL. HEAD HEAD HEAD HEAD HEAD HEAD HEAD HEAD HEAD HEAD S A LVA G E VA L U E LIST PRICE 2500.00 4000.00 5000.00 3000.00 3000.00 3000.00 600.00 500 .00 1300.00 400.00 6 0 . 0 0 200.00 75.00 8 0 . 0 0 300 .00 8 0 . 0 0 300.00 DEPRECI AT I O N INTEREST 100.00 144.00 166.67 100.00 150.00 250.00 60.00 0 . 0 0 . 0 0 . 0 0 . 0 46.67 0 . 0 0 . 0 6 0 . 0 0 0 . 0 18.75 125.00 220.00 250.00 150.00 150.00 150.00 30.00 50.00 130.00 40.00 6 . 0 0 13.00 7.50 8 . 0 0 18.00 8 . 0 0 22.50 ANNUAL CHARGES MADE IN THIS BUDGET LINE NO. ITEM 1 FENCE!13) 2 WATER SYSTEM(3) 3 BARN 4 SHED 5 WORKING PENS 6 STOCK TRAILER 7 STOCK SPRAYER 51 COW RAISED 54 BULL PURCHASED 55 HEIFER RAISED 81 EWE RAISED 84 RAM PURCHASED 85 YEARLING EWE 87 90 91 95 DOE RAISED BUCK PURCHASED YEARLING DOE HOPSE SIZE 1 .00 1 .00 1200.00 1000.00 1 . 0 0 18.00 50.00 1 .00 1 .00 1 .00 1 .00 1 .00 1 .00 1.00 1 .00 1 .00 1 .00 UNIT MILE DOL. SQFT SQFT DOL. FEET GAL. HEAD HEAD HEAD HEAD HEAD HEAD NUMBER ITEMS 13.000 3.000 1.000 1 .000 1. 000 1.000 1. 000 0 . 4 5 0 0 . 4 5 0 0.450 2 . 0 0 0 0 . 4 0 0 2 . 0 0 0 HEAD HEAD HEAD HEAD 0. 900 0. 150 0.900 3.000 P R O P O R . OWNERSHP CHARGED CHARGES 0.001 1.54 0.001 0 .53 0.001 0 . 2 0 0.001 0 . 1 2 0.001 0 . 1 7 0.001 0 . 2 7 0.001 0 . 0 6 1.000 3 . 3 7 0.030 0 . 2 6 0. 130 0.35 1 .000 1 .80 0.030 0 . 5 8 0.200 0.4S 1 .000 0 .020 0.200 0.004 INSURANCE TA X E S 6 . 2 5 1 1.00 12.50 7 . 5 0 7.50 7 . 5 0 1 .50 2 . 5 0 6 . 5 0 2 . 0 0 0 . 3 0 0 . 6 5 0 . 3 7 0 . 4 0 0 . 9 0 0.40 1. 12 12.50 22.00 25.00 15.00 15.00 15.00 3 . 0 0 5 . 0 0 13.00 4 . 0 0 0 . 6 0 1.30 0 . 7 5 0 . 8 0 1.80 0 . 8 0 2 . 2 5 FOR EQUIPMENT AND O P E R AT N G CHARGES 0 . 0 6 0.01 0.00 0 . 0 0 0 . 0 0 0 . 0 4 0 . 0 0 0 . 0 0.0 0.0 0 . 0 0 . 0 0 . 0 1 .08 0. 19 0.22 0.29 .Educational programs conducted by the Texas Agricultural Extension Service serve people of all FUEL R E PA I R S A N D L U B E 5 . 0 0 4. 80 1 .67 1 .00 3 . 0 0 3 7 . 5 0 3 . 0 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0. 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0.0 0.0 0 . 0 0 . 0 T 3 TA L PERFORM OWNER R AT E SHIP/ HOUR/ HOUR ACRE 1 .843 1 .000 O P. COST PER HOUR 7 . 9 2 5 HOURS TOT OWN- TOT OPERL A B O R E R S H = / Y R AT I N G / Y R 8 . 0 0 0 . 0 0 . 0 0.0, 8 . 0 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 11 8 . 7 5 177.00 204.17 122.50 172 .50 272.50 64.50 7.50 19.50 6.00 0.90 48.62 1.12 1 .20 62.70 1 .20 22.12 5.00 4.80 1.67 1.00 3.00 37.50 3.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LIVESTOCK INTEREST LABOR HOURS CHARGES CHARGED 1 . 6 2 0. 10 0.66 0 . 0 0 . 2 5 0 . 0 0. 15 0. 0 0 . 1 5 0 .01 0 . 1 5 0. 0 0 . 0 3 0 . 0 2 2 . 5 0 0 . 0 1 .75 0. 0 2 . 3 4 0 . 0 12.00 0. 0 0 . 1 6 0 . 0 3 . 0 0 0 . 0 7.20 0.05 1 .44 0.29 y 0. 0. 0. 0. 0 0 0 0 l/ess of socio-economic level, race, color, sex, religion or national origin.' Cooperative Extension Work in Agriculture and Home Economics. The Texas A&M University Sys :un and the United States Department of Agriculture cooperating Distributed in furtherance of the Acts of Congress of Mas 8 IS14 as amended, and June 30 1914 J B-3_2.10.10) COW-CALF PRODUCTION --TlXAS EDWARDS PLATEAU EASTERN REGION PROJECTED COSTS AND RETURNS PER COW r ITEM WEIGHT EACH UNIT 5.00 4.50 10.00 1.00 C W T. C W T. C W T. ACRE PRICE OR COST/UNIT QUANTITY VALUE OR COST GROSS RECEIPTS S T E E R C A LV E S H E I F E R C A LV E S CULL COWS DEER LEASE T O TA L 90.00 80.00 55.00 0.80 0.4 0.3 0.1 13.9 5 2 0 0 202.50 11 5 . 2 0 55.00 11x12. 383.82 VARIABLE COSTS RANGE CUBES SALT S MIN. VET MEDICINE SALES COMM. r MISC EXPENSE MACHINERY(FUEL.LJBE.REP) EQUIPMENT(FUEL.LUBE.REP) LABOR, TRACTOR g. MACHINERY LABOR, EQUIPMENT LABOR, LIVESTOCK INTEREST ON OPER.CAP., TOTAL VARIABLE COSTS LB. LB. DOL. DOL. DOL. DOLo DOL. HRS. HRS. HRS. DOL _ 0.07 0.06 8.00 5.00 10.00 330.00 30.00 1 .00 1 .00 1 .00 3.00 3.00 3.00 0.10 1.66 0 . 11 7.00 36.49 2x65. 88.54 INCOME ABOVE VARIABLE COSTS FIXED COSTS LAND RENT INT. ON LIVESTOCK CAPITAL INT. ON OTHER EQUIPMENT DEPR. ON HORSE DEPR. ON OTHER EQUIP. OTHER FC, MACH & EQUIP. TOTAL FIXED COSTS 23. 10 1.80 8.00 5.00 10.00 10.54 0.13 4.99 0.34 21 .00 295.28 ACRE DOL. DOL. DOL. DOL. DOL. 3.50 0.10 0.10 13.90 599.49 30. 15 TOTAL COSTS NET RETURNS 48.65 59.95 3,01 0.24 2.46 12x21. 127.18 215 7? 168.10 90X CALF CROP, 1 BULL TO 30 COWS, 3% COW DEATH LOSS, 1355 REPLACEMENT 230 ANIMAL UNITS TO TA L . * R E P L A C E M E N T. Estimated for 1979-80, Texas Agricultural Extension Service Budget information presented is prepared solely as a general guideline and _<_ BMSffttl ... _r.r_. K?d1ct the cits AWSi'SS'S; S1S r Tout* A©ficiHtural Ext emion Service . The Teaew MM Untumitv «^,t___„ r_ •_„_.«_ • exw mmm untamity System . Den.el C. P fannttlel, Director . College Station, Texas H O U R LY C O S T S U M M A RY F O R I M P L E M E N T S A N D P O W E R U N I T S B U D G E T I D E N T I F I C AT I O N N U M B E R 11 11 0 4 0 9 1 0 0 11 0 MACHINE PICKUP PURCHASE PRICE 5355. SIZE 0 . 5 0 S A LVA G E VA L U E 1971 . YEARS OWNED 4 . ANNUAL HOURS USED 500. DEPR./ HOUR 1.692 INTEREST/ HOUR 0.733 JNS./ HOUR 0.044 TA X E S / HOUR 0.107 T O TA L OWNER SHIP/ HOUR 1.843 P E R F O R M O P. R AT E COST HOUR/ PER ACRE HOUR 1.000 7.925 A N N U A L C O S T S U M M A R Y F O R E Q U I P M E N T A N D L I V E S T O C K — B U D G E T N U M B E R 11 11 0 4 0 9 1 0 0 11 0 LINE NO. 1 2 3 4 5 6 7 51 54 55 95 ITEM SIZE FENCE!13) WAT E R S Y S T E M ! 3 ) BARN SHED WORKING PENS STOCK TRAILER S T O C K S P R AY E R COW RAISED BULL PURCHASED HEIFER RAISED HORSE 1 .00 1 .00 1200.00 1000.00 1 .00 18.00 5 0 . 0 0 1 .00 1 . 0 0 1 .00 1 . 0 0 LIST PRICE UNIT MILE DOL. SOFT SQFT DOL. FEET GAL. HEAD HEAD HEAD HEAD 2 4 5 3 3 3 500.00 000.00 000.00 000.00 000.00 000.00 600.00 500.00 1300.00 400.00 300.00 DEPREC I AT I O N 100.00 144.00 166.67 100.00 150.00 250.00 6 0 . 0 0 0 . 0 0 . 0 0 . 0 1 8 . 7 5 INTEPEST 1 2 2 1 1 1 25.00 20.00 50.00 50.00 50.00 50.00 3 0 . 0 0 5 0 . 0 0 130.00 40. 00 22.50 FUEL INSUR ANCE TA X E S R E PA I R S 6 . 2 5 1 1.00 12.50 7 . 5 0 7 . 5 0 7 . 5 0 1 . 5 0 2 . 5 0 6 . 5 0 2 . 0 0 1 .12 12.50 22.00 25.00 15.00 15.00 15.00 3 . 0 0 5 . 0 0 13.00 4 . 0 0 2 . 2 5 5 . 0 0 4 . 8 0 1 .67 1 .00 3 . 0 0 37.50 3 . 0 0 0 . 0 0 . 0 0 . 0 0 . 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 HOURS TOT OWN- TOT OPERLABOR ERSHP/YR ATING/YR 8.00 0.0 0*0 0.0 8.00 0 0 0 0 0 0 . . . . . . 0 0 0 0 0 0 11 8 . 7 5 177.00 204.17 122.50 172.50 272.50 64.50 7.50 19.50 6 .00 22.12 5.00 4.80 I .67 1.00 3.00 37.50 3.00 0 0 0 0 .0 .0 .0 .0 ANNUAL CHARGES MADE IN THIS BUDGET FOR EQUIPMENT AND LIVESTOCK LINE NO. ITEM 1 FENCEtl3) 2 WAT E R S Y S T E M ! 3 ) 3 BARN 4 SHED 5 WORKING PENS 6 STOCK TRAILER 7 S T O C K S P R AY E P 5 1 COW RAISED 54 BULL PURCHASED 5 5 HEIFER RAISED 9 5 HORSE ' SIZE 1 .00 1 .00 1200.00 1000.00 1 .00 18.00 50.00 1 .00 1 .00 1 .00 1 .00 UNIT MILE DOL. SQFT SQFT DOL. FEET GAL. HEAD HEAD HEAD HEAD NUMBER I TEMS 13.000 3 . 0 0 0 1.000 1 .000 1 .000 1 .000 I . 000 1.000 1 .000 1 .000 3 . 0 0 0 P R O P O R . O W N E R S H P O P E R AT N G CHARGED CHARGES CHARGES 0.001 1 . 5 4 0 . 0 6 0.001 0 . 5 3 0.01 0.001 0 . 2 0 0 . 0 0 0.001 0 . 1 2 0 . 0 0 0.001 0 . 1 7 0 . 0 0 0.001 0 . 2 7 0 . 0 4 0.001 0 . 0 6 0 . 0 0 1 .000 7 . 5 0 0 . 0 0. 034 0 .67 0 . 0 0. 130 0 . 7 8 0 . 0 0.004 0 . 2 9 0 . 0 INTEREST LABOR HOURS CHARGES CHARGED 1 . 6 2 0. 10 0 .66 0 . 0 0 . 2 5 0 . 0 0 . 1 5 0. 0 0 . 1 5 0 .01 0 . 1 5 0 . 0 0 . 0 3 0 . 0 5 0 . 0 0 0 . 0 4 . 4 6 0 . 0 5 . 2 0 0 . 0 0 . 2 9 0 . 0 J J TEXAS EDWARDS PLATEAU EASTERN REGION r Assumed Prices Paid and Received by Farmers 1/ Item Unit Prices Paid (1979) Seed Cotton-Typical Management Cotton-High Level Management Grain Sorghum Kleingrass Small Grain Peanuts Wheat Hybrid-Sorghum r Fertilizer Ammonium Nitrate 16-20-0 lb. lb. lb. lb. bu. lb. bu. lb. Price I $ .30 .35 .40 6.00 4.00 .44 6.00 .36 cwt. cwt. 8.00 8.00 Custom Work Cotton Strip and Haul Cotton Ginning Hay Baling and Haul Combining Hauling Grain Sorghum Wheat Drying-Peanuts cwt. cwt. bale acre 1.25 1.50 .75 8.00 cwt. bu. ton .20 .15 20.00 Chemicals Pre-emerge herbicides Sevin Malathion Benlate gal. lb. gal. lb. 28.50 1.52 15.00 8.30 gal. gal. .55 .50 lb. cwt. lb. bu. .51 3.45 .20 2.85 Fuels Gasoline Diesel Prices Received (1979) Cotton r Grain Sorghum Peanuts Wheat 1/ These price assumptions are not to be interpreted as predictions or prospective prices. TEXAS EDWARDS PLATEAU EASTERN REGION Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item Item and Size No. Tractor - 100 HP 1 Tractor - 75 HP 2 Tractor - 50 HP 3 P i c k u p - 1 / 2 To n 1 0 T r u c k - 2 To n 1 r Combine Peanut - 6.3 Ft. 13 Disc-Tandem - 13 Ft. 30 Disc Plow 3 Disc - 3.4Ft 36 Planter Peanut 4R-12.7Ft 40 Planter 4R - 12.7 Ft. 42 Chisel - 12.7 Ft. 44 Lister/Bedder - 12.7 Ft. 49 Drill Grain - 8.0 Ft. 52 Harrow Spike - 15 Ft. 54 Shredder - 6.3 Ft. 61 Cultivator - 12.7 Ft. 64 Digger Peanut - 6.3 Ft. 68 Sprayer Herbicide-13Ft. 73 V __/ Purchase Price $14,155 11,445 6,670 5,355 10,390 7,125 1,555 920 2,115 1,695 1,345 1,270 1,410 545 710 1,980 2,255 395 Estimated Years of Use 8 8 12 4 4 6 10 10 10 10 10 8 10 10 8 10 10 10 ( _J Estimated Hours of Use 6400 4800 3000 2000 2000 600 1000 1000 1000 500 1000 960 1000 500 600 800 750 750 Fixed Costs Per Hour $ 1.69 1.82 2.03 1.84 3.58 9.00 1.49 .88 2.03 3.25 1.29 1.17 1.35 1.05 1.06 2.37 2.88 .51 Variable Costs Per Hour $ 6.40 4.07 4.02 6.39 13.12 5.73 .68 .69 1.18 1.90 .59 .74 •61 .47 .58 1.85 2.24 .23 • ~ • COASTAL BERMUDAGRASS ESTAB•• DRYLAND* TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST 1* GROSS RECEIPTS FROM PRODUCTION TOTAL 2* VARIABLE COSTS PREHARVEST CUSTOM SPRIGGING FERT(16-20-0) MACHINERY TRACTORS LABORCTRACTOR & MACHINERY) INTEREST ON OP. CAP* SUBTOTALe PRE-HARVEST 0.0 ACRE ACRE ACRE ACRE HOUR OOL. 21.00 8.00 7.22 6.58 3.00 0.09 i.oo 21*00 8.00 7.22 6*58 10*20 1.00 1.00 1.00 3.40 33*05 $ ._,?t97 55.97 HARVEST COSTS SUBTOTALt HARVEST $ 9 0*0 TOTAL VARIABLE COST 9 55*97 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS LAND CNET RENT) TOTAL FIXED COSTS 9 -55*97 9 ACRE ACRE ACRE 4.62 4.61 8.00 1*00 1*00 1.00 9 4*62 4*81 8*00 17.43 5 . T O TA L C O S T S 9 73*40 6. NET RETURNS 9 -73.40 LAND CHARGE BASED ON PREVAILING RATES IN REGION* PREPARED BY ROBERT KENSING* TAEX* SAN ANGELO, TEXAS PROJECTED 1979 COASTAL BERMUDAGRASS ESTAB., DRYLAND. TEXAS EOWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION ITEM NO* DATE FUEL.OIL. FIXED LA80R MACHINE LUB.,REP. COSTS TIMES HOURS HOURS PER ACRE PER ACRE OVER DISK PLOW 3 DISK 2*36 JAN 1.00 1.181 D I S K - TA N D E M 2 . 3 0 J A N 1 . 0 0 0 . 2 5 4 PICKUP 10 JAN 0.10 0*125 F E R T. A P P L I e R E N T D 2 . 8 6 F E B 1 . 0 0 0 . 1 0 3 D I S K - TA N D E M 2 . 3 0 F E B 2 . 0 0 0 . 5 0 8 PICKUP 10 FEB °»10 0.125 PICKUP 10 MAR 0*10 0.125 PICKUP 10 APR 0*10 0*125 piCKUp 10 M AY 0*10 0.125 F E R T. A P P L I . R E N T D 2 . 8 6 J U N E 1 . 0 0 0 . 1 0 3 PICKUP 10 JUNE 0*10 0*125 PICKUP 10 J U LY 0*10 0*125 PICKUP 10 AUG 0*10 0*125 PICKUP 10 SEPT 0*10 0.125 3*66 0*94 0*25 0.23 1*88 0*25 0*25 0*25 0*25 0.23 0.25 0*25 0*25 0*25 0.740 0.159 0*100 0.064 0.319 0.100 0*100 0*100 0.100 0*064 0*100 0*100 0*100 0*100 -2*25 pxckup 10 OCT o.io -2*123. -2*122 TOTALS 3*399 2*347 LAND CHARGE BASED ON PREVAILING RATES IN REGION* PREPARED BY ROBERT KENSING. TAEX. SAN ANGELO. TEXAS 13*80 9.43 PROJECTED 1979 B U D G E T I D E N T I F I C AT I O N N U M B E R 8 3 4 0 1 0 0 0 2 1 0 0 0 0 ANNUAL CAPITAL MONTH 12 /"a% v' COASTAL BERMUDAGRASS PASTURE. DRYLAND* TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION TOTAL S 2* VARIABLE COSTS PREHARVEST FERT(32-40-0) ACRE MACHINERY ACRE TRACTORS ACRE LABOR(TRACTOR & MACHINERY) HOUR I N T E R E S T O N O P. C A P * D O L * SUBTOTAL. PRE-HARVEST 0.0 $ 16*00 6*38 0*63 3*00 0*09 1.00 1*00 1*00 1*46 8*60 16.00 6*38 0*63 4.37 0*77 __, $ 28*16 HARVEST COSTS SUBTOTAL. HARVEST $ $ 0.0 TOTAL VARIABLE COST $ 28*16 3* INCOME ABOVE VARIABLE COSTS 4* FIXEO COSTS MACHINERY TRACTORS P R O R AT E D E S TA B . C O S T LAND (NET RENT) TOTAL FIXED COSTS 9 -28*16 9 ACRE ACRE ACRE ACRE 2*50 0*46 72*06 8*00 1*00 1.00 0.10 1.00 2*50 0.46 7.21 2*22 9 18*17 5* TOTAL COSTS 9 46.33 6* NET RETURNS 9 -46.33 ESTABLISHMENT COST PRORATED OVER 10 YEARS* LAND CHARGE BASED ON PREVAILING P. IN REGION* INCOME FROM CROP REFLECTED IN THE LIVESTOCK BUDGETS* PREPARED BY ROBERT KENSING. TAEX. SAN ANGELO* TEXAS PROJECTED 1979 ^^% COASTAL BERMUDAGRASS PASTURE. ORYLAND. TEXAS EDWARDS PLATEAU EASTER ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION PICKUP PICKUP PICKUP FERT .APPLI*RENTD PICKUP PICKUP PICKUP PICKUP FERT•APPLI * RENTD PICKUP PICKUP PICKUP ITEM NO* 10 10 10 2*86 10 10 10 10 2.86 10 10 10 DATE FUEL.OIL, FIXED TIMES LABOR MACHINE L U B . . R E P * COSTS OVER HOURS HOURS PER ACRE PER ACRE JAN FEB MAR APR APR MAY JUNE JULY AUG AUG SEPT OCT 0*10 0*10 0*10 1.00 0*10 0*10 0*10 0*10 1 .00 0*10 0*10 0*10 0*125 0*125 0*125 0*103 0*125 0*125 0*125 0*125 0*103 0*125 0*125 0*100 0*100 0*100 0*064 0.100 0*100 0.100 0*100 0*064 0*100 0*100 Qti&a -2x122 0*64 0*64 0*64 0*31 0.64 0.64 0*64 0*64 0*31 0*64 0*64 .ftj $* 0.25 0.25 ; 0.25 0.23 0.25 0.25 0*25 0*25 0.23 0.25 0*25 , 0,25 <**%. TOTALS 1*456 1*129 7*01 2*96 ESTABLISHMENT COST PRORATED OVER 10 YEARS* LAND CHARGE BASED ON PREVAILING R< IN REGION* INCOME FROM CROP REFLECTED IN THE LIVESTOCK BUDGETS* PREPARED BY ROBERT KENSING* TAEX* SAN ANGELO, TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER 8350100021000 0 ANNUAL CAPITAL MONTH 10 COASTAL BERMUDAGRASS ESTAB., DRYLAND. TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION TOTAL S 0.0 VARIABLE COSTS PREHARVEST ._S?_.5__'_r"'° SS, ___•-•' ACRe :_.. "■" ■• • • ts *>•»« ■; - ;:s MACHINERY ACRE T ,~ Z'ZZ i < >O a _R S _ _ _ _A_ C» R _ .E A _ K6t . 5 8 7.22 1#0Q 1.00 T ■R»A_ C_ T LABOR(TRACTOR & MACHINERY) HOUR 3.00 3.40 INTEREST ON O P. C A P. D0L. 0.09 39.72 S U B TO TA L * PRE-HARVEST . __ 28 2 67#. 5 10.20 3.57 *Z^Z HARVEST COSTS SUBTOTAL. HARVEST TOTAL VARIABLE COST 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS LAND (NET TOTAL FIXEO COSTS 5. TOTAL COSTS 6. NET RETURNS ACRE ACRE RENT) 4.62 4.81 ACRE 8.00 1.00 1.00 1.00 83.20 $ -83.20 LAND CHARGE BASED ON PREVAILING RATES IN REGION. PREPARED BY ROBERT KENSING. TAEX. SAN ANGELO, TEXAS PROJECTED 1979 / ^ 8 COASTAL BERMUDAGRASS ESTAB., DRYLAND. TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION DISK PLOW 3 DISK DISK-TANDEM PICkUP FERT.APPLI.RENTD DISK-TANDEM PICKUP PICKUP PICKUP PICKUP FERT.APPLI.RENTD PICKUP PICKUP PICKUP PICKUP PICKUP TOTALS ITEM NO. 2.36 2.30 10 2.86 2.30 10 10 10 10 2.86 10 10 10 10 10 DATE FUEL.OIL, FIXED TIMES LABOR MACHINE L U B . . R E P. COSTS OVER HOURS HOURS PER ACRE PER ACRE JAN JAN JAN FEB FEB FEB MAR APR MAY JUNE JUNE JULY AUG SEPT OCT 0*740 1 . 0 0 1 .181 2*00 0*508 0*319 0 * 1 0 0*125 0*100 1*00 0*103 0*064 1*00 0*254 0 * 1 5 9 0*10 0*125 0 * 1 0 0 0*10 0*125 0.100 0.100 0*10 0*125 0*10 0*125 0*100 1*00 0 * 1 0 3 0*064 0*10 0*125 0*100 0*10 0*125 0*100 0*10 0 * 1 2 5 0 * 1 0 0 0*10 0*125 0*100 0 * 1 0 -__!___ ■-■<__. 100 4*12 1*77 0*64 0*31 0*89 0*64 0*64 0*64 0*64 0*31 0.64 0*64 0*64 0*64 0*64 -3x25 3.399 13*80 9.43 2*347 LAND CHARGE BASED ON PREVAILING RATES IN REGION* PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO, TEXAS 3.66 1*88 0*25 0* 23 0.94 0*25 0*25 0*25 0*25 0*23 0*25 0*25 0*25 0*25 PROJECTED 1979 BUDGET IDENTIFICATION NUMBER 8340100011000 0 ANNUAL CAPITAL MONTH 12 /"s^t\ / ^ COASTAL BERMUDAGRASS PASTURE. DRYLAND* TEXAS EDWARDS PLATEAU EASTERN ESTIMATEO COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST GRCSS RECEIPTS FROM PRODUCTION TOTAL 2 * VARIABLE COSTS PREHARVEST FERT(120-40-0) MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) INTEREST ON OP* CAP* SUBTOTAL. PRE-HARVEST / ^ ' 3* 0*0 ACRE ACRE ACRE HOUR DDL* s 38*00 6*69 3*58 3.00 0*09 1*00 1*00 1*00 2*42 18*96 9 38*00 6*69 3*58 7*26 1.71 57*24 HARVEST COSTS SUBTOTAL. HARVEST $__ $ 0*0 TOTAL VARIABLE COST $ 57.24 INCOME ABOVE VARIABLE COSTS $ -57.24 4 * FIXED COSTS MACHINERY TRACTORS PRORATED ESTAB* COST LANO (NET RENT) TOTAL FIXED COSTS 9 ACRE ACRE ACRE ACRE 3*35 2*62 81*86 8*00 1*00 1.00 0*10 1*00 9 3.35 2.62 8.19 8.00 22. 16 5 * TOTAL COSTS 9 79.39 6 * NET RETURNS 9 -79.39 ESTABLISHMENT COST PRORATED OVER 15 YEARS. LAND CHARGE BASED ON PREVAILING RATE IN REGION. INCOME FROM CROP REFLECTED IN THE LIVESTOCK BUDGETS. PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO. TEXAS PROJECTED 1979 10 COASTAL BERMUDAGRASS PASTURE. DRYLAND. TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION ITEM NO. DATE FUEL,OIL. FIXED TIMES LABOR MACHINE LUB..REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE PICKUP 10 JAN 0*10 0*125 0*100 0*64 PICKUP 10 FEB 0*10 0*125 0*100 0.64 PICKUP 10 MAR 0*10 0*125 0*100 0*64 F E R T. A P P L I . R E N T D 2 . 8 6 A P R 1 * 0 0 0 . 1 0 3 0 * 0 6 4 0 * 3 1 PICKUP 10 APR 0*10 0*125 0*100 0*64 PICKUP 10 M AY 0*10 0*125 0*100 0*64 SHREDDER 2.61 JUNE 1.00 0*430 0*269 1.47 F E R T. A P P L I . R E N T D 2 . 8 6 J U N E 1 * 0 0 0 * 1 0 3 0 * 0 6 4 0 . 3 1 PICKUP 10 JUNE 0*10 0*125 0*100 0*64 PICKUP 10 J U LY 0*10 0*125 0.100 0*64 SHREDDER 2.61 AUG 1*00 0*430 0*269 1.47 F E R T. A P P L I . R E N T D 2 , 8 6 A U G 1 . 0 0 0 . 1 0 3 0 . 0 6 4 0 . 3 1 PICKUP 10 AUG 0.10 0.125 0.100 0.64 PICKUP 10 SEPT 0.10 0*125 O.iOO 0*64 PICKUP 10 OCT 0*10 0*125 _.0_jl1Q& -2*6± 0*25 0.25 0*25 0*23 0*25 0*25 1*39 0.23 0*25 0*25 1*39 0*23 0*25 0*25 Qt25 10*27 5.97 TOTALS 2*419 1*732 ESTABLISHMENT COST PRORATED OVER 15 YEARS. LAND CHARGE BASED ON PREVAILING RATE IN REGION* INCOME FROM CROP REFLECTED IN THE LIVESTOCK BUDGETS. PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO, TEXAS PROJECTEO 1979 B U D G E T I D E N T I F I C AT I O N N U M B E R 8 3 5 0 1 0 0 0 11 0 0 0 0 ANNUAL CAPITAL MONTH 10 1 ^ COASTAL BERMUDAGRASS ESTAB •• IRRIGATED, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION TOTAL 2* VARIABLE COSTS PREHARVEST CUSTOM SPRIGGING FERT (16-20-0) HERBICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR & MACHINERY) LABORCIRRIGATION) INTEREST ON OP* CAP* SUBTOTAL, PRE-HARVEST 0*0 ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL* 22*50 8*00 2*75 5.09 4*70 19*38 3*00 3.00 0.09 1.00 1*00 1.00 1*00 1*00 1.00 2*41 0*60 38*72 22*50 8*00 2*75 5*09 . 4.70 19.38 7.24 1.80 3t _? 9 74.94 HARVEST COSTS SUBTOTAL, HARVEST $ o7o~ TOTAL VARIABLE COST 9 74.94 3* INCOME ABOVE VARIABLE COSTS 9 -74.94 4* FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 9 ACRE ACRE ACRE ACRE 3.13 3*49 11 * 9 4 12.00 3.13 3.49 11 . 9 4 1*00 1 .00 1.00 1*00 9 ...l__»go 30.56 5* TOTAL COSTS 9 105.50 6. NET RETURNS 9 -- 1 0 5 . 5 0 PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO, TEXAS PROJECTED 1979 12 COASTAL BERMUDAGRASS ESTAB*. IRRIGATED* TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION ITEM NO* DATE DISK PLOW 3 DISK 2,36 JAN PICKUP 10 JAN D I S K - TA N D E M 2.30 FEB PICKUP 10 FEB PICKUP 10 MAR F E R T. A P P L I . R E N T D 3 . 8 6 A P R PICKUP 10 APR PICKUP 10 M AY PICKUP 10 JUNE PICKUP 10 J U LY FUEL.OIL, FIXED TIMES LABOR MACHINE LUB*,REP* COSTS OVER HOURS HOURS PER ACRE PER ACRE 1*00 1*181 0 * 1 0 0*125 1 . 0 0 0*254 0 * 1 0 0*125 0 * 1 0 0*125 1 * 0 0 0*103 0*10 0*125 0 * 1 0 0*125 0 * 1 0 0*125 0 * 1 0 -9*123 0*740 0*100 0*159 0*100 0*100 0*064 0*100 0*100 0*100 2x192 4*12 0*64 0*89 0*64 0*64 0*31 0.64 0*64 0*64 .0_64 3.66 0.25 0.94 0.25 0.25 0.27 0.25 0.25 0*25 -2x25 ^ % TOTALS 2*413 1*664 PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO, TEXAS 9.79 6*62 PROJECTED 1979 B U D G E T I D E N T I F I C AT I O N N U M B E R 8 3 4 0 1 0 2 0 2 1 0 2 0 0 ANNUAL CAPITAL MONTH 12 /^_k 13 COASTAL BERMUDAGRASS, HAY £ GRAZING IRRIGATED, TEXAS EDWARDS PLATEAU EASTE ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT GROSS R E C E I P T S F R O M P R O D U C T I O N H AY T O TA L VARIABLE COSTS PREHARVEST FERT (150-50-0) MACHINERY TRACTORS IRRIGATION MACHINERY LABORITRACTOR & MACHINERY) LABOR(IRRIGATION) INTEREST ON OP* CAP* SUBTOTAL, PRE-HARVEST / ^ HARVEST COSTS CUSTOM HARV&HAUL SUBTOTAL, HARVEST TON ACRE ACRE ACRE ACRE HOUR HOUR DOL. 50.00 5.00 47.50 3.19 0.31 29*07 3.00 3.00 0*09 1*00 1.00 1.00 1*00 0.73 0*90 21*31 BALE 9 210.63 42.125 ACRE ACRE ACRE ACRE ACRE 1*25 0*27 17.91 104.57 12.00 1 .00 1.00 1 .00 0*10 1*00 $ 252*52 5* TOTAL COSTS TON ESTABLISHMENT COSTS PRORATED OVER 10 YEARS* PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO, TEXAS f ^ 47.50 3. 19 0.31 29.07 2*18 2.70 1*92 86.88 0.75 165.00 __.12_LsZ§ S 123.75 3* BREAKEVEN PRICE* VARIABLE COSTS TON 6* BREAKEVEN PRICE, TOTAL COSTS -232x22 9 250*00 & TOTAL VARIABLE COST 4* FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATED ESTAB* COST LAND (NET RENT) TOTAL FIXED COSTS VA L U E O R COST PRICE OR C O S T / U N I T QUANTITY 50.503 PROJECTED 1979 14 COASTAL BERMUDAGRASS, HAY €> GRAZING IRRIGATED* TEXAS EDWARDS PLATEAU /'^\_ ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION FERT.APPLI.RENTO PICKUP PICKUP PICKUP PICKUP PICKUP TOTALS ITEM NO* DATE FUEL,OIL, FIXED TIMES LABOR MACHINE LUB..REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE 3 . 8 6 APR 1.00 0.103 0*064 10 APR 0.10 0.125 0.100 0.125 0*100 10 MAY 0*10 0*10 0.125 0*100 10 JUNE 10 JULY 0 * 1 0 0 * 1 2 5 0 . 1 0 0 10 AUG 0.10 0*125 0.100 0*31 0.64 0*64 0*64 0*64 .2*6SL -2*23 0*728 0*564 3*50 1*52 ESTABLISHMENT COSTS PRORATED OVER 10 YEARS. PREPAREO BY ROBERT KENSING. TAEX. SAN ANGELO* TEXAS 0*27 0*25 0*25 0*25 0*25 PROJECTED 1979 y ^ K BUOGET IDENTIFICATION NUMBER—- 8360103021020 0 ANNUAL CAPITAL MONTH 8 ^ ^ \ 15 f^ COASTAL BERMUDAGRASS ESTAB.* IRRIGATED* TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST 1* GROSS RECEIPTS FROM PRODUCTION TOTAL 2* VARIABLE COSTS PREHARVEST CUSTOM SPRIGGING FERT(32-40-0) HERBICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR & MACHINERY) LABOR(IRRIGATION) INTEREST ON OP* CAP* SUBTOTAL* PRE-HARVEST 0*0 ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL* 22*50 16*00 2*75 5*09 7*22 38*76 3*00 3*00 0*09 1*00 1.00 1.00 1*00 1.00 1*00 2*41 1 .20 54*75 K 9 TOTAL VARIABLE COST $ -- 1 0 8 . 0 8 9. ACRE ACRE ACRE ACRE 3*13 3*25 23*88 12*00 5. TOTAL COSTS 6* NET RETURNS PREPARED BY ROBERT KENSING. TAEX. SAN ANGELO. TEXAS ^ 0.0 9 108.08 3* INCOME ABOVE VARIABLE COSTS / ±*22 9 108*08 HARVEST COSTS SUBTOTAL. HARVEST 4* FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 22*50 16.00 2.75 5.09 7.22 38.76 7.24 3*60 1*00 1.00 1*00 1*00 3.13 3.25 23*88 9 .-12*22 42.27 9 150.35 $ - 150.35 PROJECTED 1979 16 COASTAL BERMUDAGRASS ESTAB., IRRIGATED, TEXAS EDWARDS PLATEAU EASTER^^) E S T f M AT E D C O S T S A N D R E T U R N S P E R A C R E _ HIGH LEVEL MANAGEMENT OPERATION DISK PLOW 3 DISK PICKUP DISK-TANDEM PICKUP PICKUP FERT.APPLI,RENTD PICKUP PICKUP PICKUP PICKUP TOTALS ITEM NO* 1.36 10 1,30 10 10 3,86 10 10 10 10 DATE FUEL,OIL, FIXED TIMES LABOR MACHINE LUB*,REP* COSTS OVER HOURS HOURS PER ACRE PER ACRE JAN JAN FEB FEB MAR APR APR MAY JUNE JULY 1*00 1*181 0*10 0*125 1*00 0*254 0*10 0.125 0*10 0*125 1*00 0 * 1 0 3 0.10 0.125 0.10 0*125 0*10 0*125 0*10 .-Of125 0*740 0*100 0*159 0*100 0*100 0*064 0.100 0*100 0*100 2*413 0,100 6*19 0.64 1.33 0.64 0*64 0*31 0*64 0*64 0*64 OffC.* 3*47 0*25 0.90 0.25 0.25 0.27 0*25 0*25 0*25 0t2_ 1*664 12*31 6.39 ^s. PREPARED BY ROBERT KENSING* TAEX, SAN ANGELO, TEXAS PROJECTED 1979 BUOGET IDENTIFICATION NUMBER—- 8340103011020 0 ANNUAL CAPITAL MONTH 12 z^-^!)* 17 COASTAL BERMUDAGRASS, HAY & GRAZING IRRIGATED. TEXAS EDWARDS PLATEAU EASTE. ESTIMATED COSTS ANO RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION HAY TOTAL 2* VARIABLE COSTS PREHARVEST FERT (270-70-0) MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTOR & MACHINERY) LABOR(IRRIGATION) INTEREST ON OP* CAP* SUBTOTAL. PRE-HARVEST HARVEST COSTS CUSTOM HARVeHAUL SUBTOTAL. HARVEST PRICE OR VA L U E OR COST/UNIT QUANTITY COST 9 TON 50*00 9*00 A5Q.00 $ 450.00 ACRE ACRE ACRE ACRE HOUR HOUR DOL* 81.50 3*19 1*55 48.45 3*00 3*00 0.09 1*00 1*00 1.00 1.00 1.14 1*50 36.03 81.50 3.19 1.55 48*45 3.42 4.50 -3.24 $ 145.86 BALE 0*75 297*00 9 TOTAL VARIABLE COST .222*25 9 222.75 9 368.61 1 3* BREAKEVEN PRICE. VARIABLE COSTS TON 4* FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATEO ESTAB* COST LAND (NET RENT) TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE 40.956 9 1*25 1*37 29*85 149*25 12*00 9 5* TOTAL COSTS 6* BREAKEVEN PRICE. TOTAL COSTS 1.00 1.00 1.00 0.10 1.00 1.25 1*37 29*85 14*92 lf_Q_ 59*39 9 428*00 TON ESTABLISHMENT COSTS PRORATEO OVER 10 YEARS* PREPARED BY ROBERT KENSING* TAEX. SAN ANGELO. TEXAS 47.556 PROJECTED 1979 18 COASTAL BERMUDAGRASS* HAY & GRAZING IRRIGATED. TEXAS EDWARDS PLATEAU ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION FERT.APPLI*RENTD PICKUP FERT.APPLI•RENTD PICKUP FERT.APPLI.RENTD PICKUP FERT.APPLI*RENTD PICKUP FERT.APPLI.RENTD PICKUP TOTALS ITEM NO. 3*66 10 3.86 10 3*86 10 3*86 10 3*66 10 DATE FUEL.OIL. FIXED TIMES LABOR MACHINE LUB..REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE APR APR MAY MAY JUNE JUNE JULY JULY AUG AUG 1*00 0.10 1.00 0.10 1.00 0.10 1.00 0*10 1*00 0.10 0*103 6*125 0*103 0.125 0*103 0*125 0*103 0*125 0*103 0.125 0.064 0.100 0.064 0*100 0.064 0.100 0.064 0.100 0.064 fti 100 0.31 0.64 0.31 0.64 0.31 0 .64 0.31 0.64 0.31 ._-_._-. -3x25 1.139 0.822 4.75 2*62 ESTABLISHMENT COSTS PRORATED OVER 10 YEARS* PREPARED BY ROBERT KENSING. TAEX. SAN ANGELO. TEXAS 0.27 0.25 0.27 0.25 0*27 0*25 0*27 0*25 0*27 s ^ \ PROJECTED 1979 BUDGET IDENTIFICATION NUMBER 6360104011020 0 ANNUAL CAPITAL MONTH 8 '"*% 19 COTTON. DRYLAND. TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEED TOTAL VARIABLE COSTS PREHARVEST SEED HERBICIDE MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) OTHER LABOR INTEREST ON OP* CAP* SUBTOTAL* PRE-HARVEST HARVEST COSTS STRIP & HAUL GIN. BAG. TIES HAUL. COMP &EDUC SUBTOTAL. HARVEST PRICE OR VA L U E OR COST/UNIT QUANTITY COST $ LBS* TON 0.5 1 80.00 170 • 0 0 0. 14 S - 11 * 2 9 97.90 9 LBS. ACRE ACRE ACRE HOUR HOUR DOL* 0.30 5.06 8.91 11 . 3 2 3.00 3.00 0.09 10.00 1*00 1 .00 1.00 4.82 2.00 15.74 9 3.00 5.06 8.91 1 1.32 14.47 6.00 1.42 SO. 18 9 CWT. CWT. BALE 1.25 1 .50 3.00 7 . 80 7.BO 0.35 TOTAL VARIABLE COST 3. INCOME ABOVE VARIABLE COSTS 4. FIXEO COSTS MACHINERY TRACTORS LANO (NET RENT) TOTAL FIXED COSTS 86.70 9.75 1 1 . 70 1.0 . $ 2 2.j0 I 72.68 S 25.22 s ACRE ACRE ACRE 9*68 8.28 24.47 1 .00 1 .00 1 .00 9.68 8.23 s _____ ±1 42.43 5. TOTAL COSTS $ 11 5 . 11 6. NET RETURNS $ -17.21 LAND CHARGE BASED ON LANOLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTILIZER. INSECTICIDE* AND GINNING. GOVERNMENT PYMNT NOT INCLUDED. PREPARED BY ROBERT KENSING. TAEX, SAN ANGELO. TEXAS PROJECTED 19 79 f^ 20 /^^\ COTTON. DRYLAND, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION SHREDDER DISK-TANDEM DISK PLOW 3 DISK CHISEL PICKUP PICKUP DISK-TANOEM PICKUP PICKUP PLANTER 4-R PICKUP CULTIVATOR CULTIVATOR PICKUP CULTIVATOR PICKUP CULTIVATOR PICKUP PICKUP TOTALS ITEM NO* 2.61 2.30 2,36 2.44 10 10 2.30 10 10 2*42 10 2.64 2.64 10 2.64 10 2,64 10 10 OATE FUEL.OIL, FIXED LABOR COSTS TIMES MACHINE L U B . , R E P. PER ACRE OVER HOURS HOURS PER ACRE DEC DEC JAN JAN JAN FEB MAR MAR APR MAY MAY JUNE JUNE JUNE JULY JULY AUG SEPT NOV 1*00 1.00 0.30 0*70 0.10 0*10 1.00 0*10 0*10 1*20 0*10 1.00 1*00 0*10 1.00 0.10 1.00 0.10 0.10 0.430 0*254 0*354 0*221 0.125 0*125 0*254 0*125 0*125 0*749 0*125 0*359 0*359 0*125 0*359 0*125 0*359 0*125 0.64 1*52 0*64 1 .39 0.94 1.10 0.77 0.25 , 0.25 0.94 0.25 0.25 4.04 0*25 1.63 1.63 0.25 1.63 0.25 1 .63 0.25 0»IS5 0.269 0*159 0*222 0*139 0.100 0.100 0*159 0.100 0.100 0.469 0.100 0.225 0.225 0.100 0.225 0.100 0.225 0.100 0.*Q0 1.47 0*89 1 .24 0*76 0.64 0.64 0.89 0.64 0.64 3.18 0*64 1*52 1 .52 0*64 -3x6± _ftj_2S 4*824 3.217 20*23 17.96 1 • 52 /*^^ LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTILIZER. INSECTICIDE. AND GINNING. GOVERNMENT PYMNT NOT INCLUDED. PREPARED BY ROBERT KENSING. TAEX* SAN ANGELO, TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER 93 0100021000 0 ANNUAL CAPITAL MONTH 11 21 COTTON. DRYLAND. TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT 1. GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEEO TOTAL PRICE OR VA L U E OR COST/UNIT QUANTITY COST LBS. TON 0.51 80.00 220.00 0.18 11 2 . 2 0 14.40 S 126.60 2. VARIABLE COSTS PREHARVEST SEED FERT (16-20-0) HERBICIDE INSECTICIDE I N S E C T. A P P L I . MACHINERY TRACTORS LABORITRACTOR & MACHINERY) OTHER LABOR INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST LBS. ACRE ACRE APPL APPL ACRE ACRE HOUR HOUR DOL. 0.35 8.00 5*06 1.25 1.75 8.49 14.36 3.00 3.00 0.09 10.00 1 .00 1.00 2.00 2.00 1.00 1 • 00 4.57 1 .00 25.63 3 .50 8 • 00 5 • 06 2 .50 3. 5 0 8. 4 9 14 • 36 13 . 7 0 3 • 00 HARVEST COSTS STRIP £ HAUL GIN. BAG. TIES HAUL. COMP &EDUC SUBTOTAL* HARVEST CWT. CWT. BALE 1.25 1.50 3.00 . - 2x21 64 • 42 10.08 10.08 0.46 12.60 15.12 A-.38 $ 29.10 S TOTAL VARIABLE COST 33.08 INCOME ABOVE VARIABLE COSTS 4. FIXEO COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS 93.52 ACRE ACRE ACRE 8.85 7.58 29.65 1.00 1 .00 1.00 8.85 7.58 9 23x65 46.07 5. TOTAL COSTS $ 139.59 6. NET RETURNS $ -12.99 LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTILIZER. INSECTICIDE. AND GINNING. GOVERNMENT PYMNT NOT INCLUOED. PREPARED BY ROBERT KENSING. TAEX. SAN ANGELO, TEXAS PROJECTED 1979 22 /"^&k COTTON* DRYLAND, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION SHREDDER DISK-TANOEM DISK PLOW 3 DISK CHISEL PICKUP PICKUP FERT .APPLI•RENTD DISK-TANDEM PICKUP PICKUP PLANTER 4-R PICKUP CULTIVATOR CULTIVATOR PICKUP PICKUP CULTIVATOR PICKUP PICKUP TOTALS ITEM NO* 3*61 1.30 1,36 1.44 10 10 3.86 1,30 10 10 1.42 10 1*64 2.64 10 10 2.64 10 10 DATE DEC DEC DEC JAN JAN FEB MAR MAR MAR APR MAY MAY JUNE JUNE JUNE JULY AUG SEPT NOV FUEL,OIL, FIXED TIMES LABOR MACHINE LUB..REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE 1 i.00 0*430 0*254 0*354 0*221 0*125 0*125 0*103 0*254 0*125 0*125 0.749 0.125 0*359 0*359 0*125 0.125 0*359 0.125 0*269 0*159 0*222 0*139 0*100 0*100 0*064 0.159 0.100 0.100 0.469 0. 100 0.225 0.225 0.100 0.100 0.225 0.100 1..00 0 ..30 O i▶70 0..10 0_.10 l i▶00 1..00 0.▶10 0.,10 1.▶20 0 .10 1 .00 1., 0 0 0 .10 0 .10 1 .00 0 • 10 0 • 10 - 2 x 1 2 5 - 3 x 1 3 3 4*567 3.057 -2*6± 1.57 0.90 1.04 0.74 0.25 0.25 0.27 0.90 0.25 0.25 3.92 0.25 1.57 1 .63 0*25 0*25 1.63 0.25 _0_l2__ 22.85 16.42 1.45 1.33 1.86 1.15 0.64 0.64 il' 0.31 1.33 0.64 0.64 4.50 0.64 2*14 1 .52 0*64 0*64 1*52 0*64 /^V LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTILIZER* INSECTICIDE. AND GINNING* GOVERNMENT PYMNT NOT INCLUDED. PREPARED BY ROBERT KENSING. TAEX. SAN ANGELO. TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER— - 93 0100011000 0 ANNUAL CAPITAL MONTH 11 /^^v 23 (f^ GRAIN SORGHUM. DRYLAND, TEXAS EDWARDS PLATEAU EASTERN ESTIMATEO COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST 1. GROSS RECEIPTS FROM PRODUCTION GRAIN SORGHUM TOTAL 2. VARIABLE COSTS PREHARVEST SEED MACHINERY TRACTORS LABOR(TRACTOR fc MACHINERY) INTEREST ON OP* CAP* SUBTOTAL, PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAULING SUBTOTAL, HARVEST s CWT* 3*45 15*00 LBS* ACRE ACRE HOUR DOL* 0*40 7*89 14*55 3.00 0*09 7*20 1*00 1*00 5*08 9*64 s s 9 8*00 0*20 1*00 15*00 8*00 9 9 3. BREAKEVEN PRICE, VARIABLE COSTS CWT* CWT* —2x32 11 * 0 0 52.41 3.494 9 ACRE ACRE ACRE 5 . TO TA L C O S T S 6 . B R E A K E V E N P R I C E , TO TA L C O S T S 2.88 7.89 14.55 15.23 0*87 41*41 9 ACRE CWT* TOTAL VARIABLE COST 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS 51.75 51.75 CWT* 8*63 8*93 8*00 1.00 1.00 1.00 8.63 8.93 3*22 $ 25*56 $ 77.97 5*198 LAND CHARGE BASED ON CASH RENT* GOVERNMENT PYMNT NOT INCLUDED* P R E PA R E D B Y R O B E R T K E N S I N G , TA E X , S A N A N G E L O , T E X A S P R O J E C T E D 1 9 7 9 24 /<<sa%k GRAIN SORGHUM, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION ITEM NO. PICKUP 10 PICKUP 10 DISK PLOW 3 DISK 1*36 D I S K - TA N O E M 2,30 PICKUP 10 F E R T. A P P L I , R E N T D 2 , 8 6 D I S K - TA N D E M 2,30 LISTER/BEDDER 2*49 PICKUP 10 PICKUP 10 PLANTER 4-R 2.42 C U LT I VATO R 2,64 PICKUP 10 PICKUP 10 SHREDDER 2.61 PICKUP 10 TOTALS DATE JAN FEB MAR MAR MAR APR APR APR APR M AY JUNE JUNE JUNE J U LY AUG AUG FUEL.OIL, FIXED TIMES LABOR MACHINE LUB..REP. COSTS OVER HOURS HOURS PER ACRE PER ACPE 0*10 • 125 0 * 1 0 0 0.10 • 125 0*100 1.00 • 181 0*740 1*00 • 254 0 * 1 5 9 0.10 • 125 0 . 1 0 0 1.00 • 103 0 . 0 6 4 1.00 • 254 0 . 1 5 9 1*00 • 387 0 . 2 4 2 0*10 • 125 0 * 1 0 0 0.10 • 125 0 * 1 0 0 1.20 • 749 0 * 4 6 9 2*00 • 718 0 . 4 5 0 0*10 • 125 0.100 0*10 • 125 0 . 1 0 0 1,00 • 430 0 . 2 6 9 0 * 1 0 -2x125 - 2x102 0*64 0*64 6*19 0*89 0*64 0*31 0*89 1 .36 0*64 0*64 3*18 3*03 0.64 0*64 1.47 0.25 0.25 3.47 0.94 0.25 0.23 0.94 1*29 0.25 0.25 4*04 3.26 0*25 0.25 1*39 -2*3* -3x25 5*076 3.354 22.44 17*56 LAND CHARGE BASED ON CASH RENT. GOVERNMENT PYMNT NOT INCLUDED. PREPARED BY ROBERT KENSING* TAEX. SAN ANGELO. TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER—- 73 0100021000 0 ANNUAL CAPITAL MONTH 9 /**%. 25 GRAIN SORGHUM, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST 1* GROSS RECEIPTS FROM PRODUCTION GRAIN SORGHUM CWT* TOTAL 2. VARIABLE COSTS PREHARVEST SEED FERT (32-40-0) MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST /#*. HARVEST COSTS CUSTOM COMBINE CUSTOM HAULING SUBTOTAL, HARVEST LBS. ACRE ACRE ACRE HOUR DOL. 3*45 20.00 69T QQ 9 69.00 0.4 0 16.00 7.71 13*35 3.00 0.09 7.20 1.00 1.00 1.00 4.69 16.97 2.88 16.00 7.71 13.35 14.07 9, j 9 ACRE CWT. 8.00 0.20 1.00 20.00 TOTAL VARIABLE COST 8.00 .._4.Qp 9 12.00 9 3* BREAKEVEN PRICE, VARIABLE COSTS CWT 4. FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS 1*33 55,53 ACRE ACRE ACRE 67.53 3.376 8.20 8.25 8.00 1 .00 1.00 1 .00 8.20 8.25 _U00_ $ 24.45 5. TOTAL COSTS 91.98 6 . B R E A K E V E N P R I C E , T O T A L C O S T S C W T. 4.599 LAND CHARGE BASED ON CASH RENT. GOVERNMENT PYMNT NOT PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO, TEXAS INCLUDED. PROJECTEO 1979 26 GRAIN SORGHUM, DRYLAND, TEXAS EOWAROS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION PICKUP PICKUP DISK PLOW 3 DISK DISK-TANDEM PICKUP PICKUP FERT.APPLI,RENTD DISK-TANDEM PICKUP PLANTER 4-R CULTIVATOR PICKUP PICKUP SHREDDER PICKUP TOTALS ITEM NO. 10 10 1*36 2,30 10 10 2.86 2*30 10 2.42 2.64 10 10 3.61 10 DATE FIXED FUEL.OIL. COSTS TIMES LABOR MACHINE L U B . . R E P. OVER HOURS HOURS ..PER ACRE PER ACRE JAN FEB MAR MAR MAR APR MAY MAY MAY JUNE JUNE JUNE JULY AUG AUG 0 * 1 0 0*125 0*100 0*10 0*125 0*100 0*740 1 * 0 0 1*181 1*00 0*254 0 . 1 5 9 0 * 1 0 0*125 0 . 1 0 0 0*10 0.125 0 . 1 0 0 1*00 0.103 0 . 0 6 4 1*00 0*254 0.159 0*10 0*125 0.100 1*20 0*749 0*469 2*00 0*718 0*450 0*100 0*10 0*125 0*10 0*125 0*100 1*00 0 * 4 3 0 0 * 2 6 9 0 * 1 0 -2x125 - 2 x 1 2 2 0*64 0*64 6.19 0*89 0*64 0.64 0.31 0*89 0*64 3.18 3.03 0.64 0*64 1*45 9,6*. -3x25 3 * 111 21*06 16.45 4*689 0*25 0*25 3.47 0.94 0.25 0.25 0.23 0.94 0.25 4.04 3.26 0.25 0*25 1.57 ^ ^ ^ LAND CHARGE BASED ON CASH RENT. GOVERNMENT PYMNT NOT INCLUDED. PREPARED BY ROBERT KENSING* TAEX, SAN ANGELO* TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER 73 0100011000 0 ANNUAL CAPITAL MONTH 9 /^V 27 KLEINGRASS ESTABLISHMENT, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT PRICE OR COST/UNIT QUANTITY 1. GROSS RECEIPTS FROM PRODUCTION TOTAL VALUE OR COST s_ $ 2* VARIABLE COSTS PREHARVEST SEED LBS. MACHINERY ACRE TRACTORS ACRE LABOR(TRACTOR £> MACHINERY) HOUR I N T E R E S T O N O P. C A P. D O L . SUBTOTAL, PRE-HARVEST 0*0 9 6.00 4.84 10.31 3.00 0.09 2*00 1*00 1.00 3*45 19*55 9 12*00 4.84 10*31 10.36 1.76 39.28 HARVEST COSTS SUBTOTAL, HARVEST __ $ 0*0 TOTAL VARIABLE COST $ 39*28 9 -39*28 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS LAND (NET TOTAL FIXED COSTS ACRE ACRE ACRE 9 4.24 6*20 8*00 9 4.24 6*20 8.00 18.44 5* TOTAL COSTS 9 57.72 6. NET RETURNS 9 -57.72 RENT) 1.00 1*00 1*00 LAND CHARGE BASED ON PREVAILING RATES IN REGION. PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO, TEXAS PROJECTED 1979 28 KLEINGRASS ESTABLISHMENT* DRYLAND, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION ITEM NO* DATE FUEL,OIL, FIXED T I M E S L A B O R M A C H I N E L U B . . R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE PICKUP 10 JAN 0*05 0*062 0*050 0*32 DISK PLOW 3 DISK 1.36 FEB 1.00 1*181 0*740 6*19 D I S K - TA N D E M 2,30 FEB 1.00 0*254 0*159 0*89 PICKUP 10 FEB 0*05 0*062 0*050 0*32 F E R T. A P P L I * R E N T D 2.86 MAR 1.00 0*103 0*064 0.31 D I S K - TA N D E M 2,30 MAR 1*00 0*254 0.159 0.89 HARROW SPIKE 3.54 MAR 1*00 0*237 0*148 0*78 PICKUP 10 MAR 0.05 0*062 0*050 0*32 DRILL GRAIN 3.52 APR 1*00 0*571 0*358 1.95 PICKUP 10 APR 0*05 0*062 0*050 0.32 PICKUP 10 M AY 0*05 0*062 0.050 0*32 PICKUP 10 JUNE 0*05 0*062 0*050 0*32 PICKUP 10 J U LY 0*05 0*062 0*050 0*32 F E R T. A P P L I * R E N T D 2*86 AUG 1*00 0*103 0*064 0*31 PICKUP 10 AUG 0*05 0*062 0*050 0*32 PICKUP 10 SEPT 0*05 0*062 0*050 0*32 PICKUP 10 OCT 0*05 0*062 0.050 0.32. PICKUP 10 NOV 0*05 0*062 0*050 0.32 PICKUP 10 DEC 0.05 0.062 0.050 0.32 TO TA L S 3.453 2.294 LAND CHARGE BASED ON PREVAILING RATES IN REGION. PREPARED BY ROBERT KENSING. TAEX. SAN ANGELO, TEXAS B U D G E T I D E N T I F I C AT I O N N U M B E R 8 2 8 0 1 0 0 0 2 1 0 0 0 0 A N N U A L C A P I TA L M O N T H 1 2 15.16 0*13 3*47 0*94 0*13 0*23 0*94 0*87 0*13 2*27 0*13 0.13 0*13 0*13 0*23 0*13 0*13 0*13 0*13 0.13 10.44 PROJECTED 1979 ^ % 29 KLEINGRASS PASTURE, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION TOTAL VARIABLE COSTS PREHARVEST MACHINERY LABORCTRACTOR & MACHINERY) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST 0.0 ACRE HOUR DOL. 7.66 3.00 0.09 1.00 1.50 3.51 7*66 4.50 Qf32 $ 12.48 HARVEST COSTS SUBTOTAL, HARVEST $ S TOTAL VARIABLE COST $ 12.48 INCOME ABOVE VARIABLE COSTS $ -12.48 4. FIXED COSTS MACHINERY TRACTORS PRORATED ESTAB. COST LAND (NET RENT) TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 3.00 0.0 59.52 8.00 0.0 3.00 0.0 5.95 1.00 1.00 0.10 1.00 9 —3*92 16.95 5. TOTAL COSTS 9 29.43 6. NET RETURNS $ -29.43 ESTABLISHMENT COST PRORATEO OVER 10 YEARS* LAND CHARGE BASED ON PREVAILING RATES IN REGION. INCOME FROM CROP REFLECTED IN THE LIVESTOCK BUDGETS. PREPARED BY ROBERT KENSING. TAEX. SAN ANGELO. TEXAS PROJECTED 1979 f^ 30 /■^ k KLEINGRASS PASTURE. DRYLAND. TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT FUEL.OIL, FIXED COSTS I T E M T I M E S L A B O R MACHINE LUB..REP. PER ACRE PER ACRE HOURS O P E R AT I O N N O . D AT E O V E R H O U R S 10 10 10 10 10 10 10 10 10 10 10 10 PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP TOTALS OCT NOV DEC JAN FEB MAR APR MAY JUNE JULY AUG SEPT 0 . 1 0 0*125 0*100 0 . 1 0 0*125 0*100 0 . 1 0 0*125 0 . 1 0 0 0.10 0*125 0.100 0 . 1 0 0*125 0 . 1 0 0 0 . 1 0 0*125 0*100 0.10 0*125 0.100 0*10 0*125 0.100 0*10 0*125 0*100 0*10 0*125 0*100 0*10 0*125 0*100 0 * 1 0 - 2 * 1 2 3 . 0,100 -9x5± 0.25 0.25 0*25 0.25 0*25 0*25 0*25 0*25 0.25 0.25 0*25 __t25 1*500 1*200 7*66 3.00 0*64 0*64 0*64 0.64 0.64 0*64 0.64 0*64 0*64 0*64 0*64 p _TA__L ISHMENT COST PRORATEO OVER 10 YEARS. LAND CHARGE BASED ON PREVAILING RATE_ N r1£on_ INCOME FROM CROP REFLECTED IN THE LIVESTOCK BUDGETS. PREPARE^ BY ROBERT KENSING* TAEX. SAN ANGELO* TEXAS PROJECTED 1979 BUDGET IDENTIFICATION N U M B E R 8 3 0 1 0 0 0 2 1 0 0 0 0 9 ANNUAL CAPITAL MONTH _____ 31 KLEINGRASS ESTABLISHMENT, DRYLAND, TEXAS EOWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION TOTAL 0.0 2* VARIABLE COSTS PREHARVEST SEED LBS* FERT(32-40-0) ACRE MACHINERY ACRE TRACTORS ACRE LABORITRACTOR & MACHINERY) HOUR INTEREST ON OP* CAP* DOL* SUBTOTAL* PRE-HARVEST S 6*00 16.00 8*68 11 * 2 0 3.00 0*09 2*00 1*00 1*00 1*00 4*20 32*14 $ 12.00 16.00 8.68 11 . 2 0 12.61 2.89 63.37 HARVEST COSTS SUBTOTAL* HARVEST $ -" " " 0 . 0 9 TOTAL VARIABLE COST 9 63.37 3* INCOME ABOVE VARIABLE COSTS 9 -63.37 4. FIXED COSTS MACHINERY TRACTORS LAND (NET TOTAL FIXED COSTS 9 9 5.74 6.20 8.00 19.95 5. TOTAL COSTS 9 83.32 6* NET RETURNS 9 -83.32 RENT) ACRE ACRE ACRE 5*74 6*20 8*00 LAND CHARGE BASED ON PREVAILING RATES IN REGION* PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO, TEXAS 1*00 1*00 1*00 PROJECTED 1979 32 /^^k KLEINGRASS ESTABLISHMENT, D R Y L A N D , T E X A S E D W A R D S P L AT E A U E A S T E R N ESTIMATED COSTS A N O R E T U R N S P E R A C R E H I G H L E V E L MANAGEMENT OPERATION PICKUP DISK PLOW 3 OISK DISK-TANDEM PICKUP FERT.APPLI,RENTD DISK-TANDEM HARROW SPIKE PICKUP DRILL GRAIN PICKUP PICKUP PICKUP PICKUP FERT.APPLI,RENTD PICKUP PICKUP PICKUP PICKUP PICKUP TOTALS ITEM NO* 10 1.36 1,30 10 3,86 1,30 3,54 10 3,52 10 io 10 io 3,86 10 10 10 10 10 DATE FIXED FUEL,OIL, COSTS TIMES LABOR MACHINE L U B . . R E P. PER ACRE PER ACRE HOURS HOURS OVER JAN FEB FEB FEB MAR MAR MAR MAR APR APR MAY JUNE JULY AUG AUG SEPT OCT NOV DEC 0*10 1*00 1 .00 0*10 1*00 1 .00 1*00 0*10 1.00 0*10 0*10 0*10 0*10 1*00 0*10 0*10 0*10 0*10 0*10 0*125 1*181 0*254 0*125 0 • 103 0*254 0*237 0*125 0*571 0*125 0*125 0*125 0*125 0*103 0*125 0*125 0*125 0*125 0*125 4*203 0*100 0*64 6*19 1 .33 0*64 0.31 1*33 0.78 0*64 1.95 0*64 0*64 0*64 0*64 0.31 0*64 0*64 0*64 0*64 0*64 -2*25 2*894 19*87 11 * 9 5 0*100 0*740 0*159 0*100 0.064 0.159 0.148 0.100 0.358 0.100 0*100 0*100 0.100 0*064 0*100 0.100 0.100 0.100 LAND CHARGE BASED ON PREVAILING RATES IN REGION* PREPARED BY ROBERT KENSING* TAEX, SAN ANGELO* TEXAS BUDGET IDENTIFICATION N U M B E R 8 2 8 0 1 0 0 0 11 0 0 0 0 ANNUAL CAPITAL MONTH 12 0*25 3.47 0.90 0.25 0.27 0.90 0.87 0.25 2.27 0.25 0.25 0.25 0*25 0*27 0*25 0*25 0*25 0*25 PROJECTED 1979 33 KLEINGRASS PASTURE, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT . PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST 1. GROSS TO TA L RECEIPTS FROM $ PRODUCTION 2* VARIABLE COSTS PREHARVEST FERT (150-40-0) ACRE MACHINERY ACRE TRACTORS ACRE LABOR(TRACTOR & MACHINERY) HOUR I N T E R E S T O N O P. C A P. D O L . SUBTOTAL* PRE-HARVEST 45*50 7*66 0*62 3*00 0*09 $. 1.00 1 .00 1.00 1.71 20*76 HARVEST COSTS SUBTOTAL, HARVEST TO TA L /#*N 3* 4* INCOME VA R I A B L E ABOVE FIXEO MACHINERY TRACTORS PRORATED ESTAB* COST LANO (NET RENT) TOTAL FIXED COSTS COST VA R I A B L E COSTS 3.00 0*55 88*04 8*00 45*50 7*66 0*62 5*12 1*32 $ 60.77 $ S 0.0 S 60*77 $ COSTS ACRE ACRE ACRE ACRE $ 0.0 -60*77 9 1*00 1*00 0*10 1.00 3.00 0.55 8.80 8.00 S 20*35 5* TOTAL COSTS S 81*12 6* NET RETURNS 9 -81*12 ESTABLISHMENT COST PRORATED OVER 10 YEARS* LAND CHARGE BASED ON PREVAILING P IN REGION* INCOME FROM CROP REFLECTED IN THE LIVESTOCK BUDGETS. PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO* TEXAS PROJECTED 1979 34 KLEINGRASS PASTURE. OPYLAND. TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION PICKUP PICKUP PICKUP PICKUP PICKUP FERT.APPLI ,RENTD PICKUP PICKUP PICKUP PICKUP PICKUP FERT.APPLI •RENTD PICKUP PICKUP TOTALS ITEM NO* 10 10 10 10 10 3,86 10 10 10 10 10 3.86 10 10 DATE FUEL,OIL, FIXED TIMES LABOR MACHINE LUB..REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE OCT NOV DEC JAN FEB MAR MAR APR MAY JUNE JULY AUG AUG SEPT 0.10 0*10 0*10 0*10 0.10 1.00 0*10 0*10 0*10 0*10 0*10 1*00 0*1 0 0*10 0*125 0 . 1 0 0 0 * 1 2 5 0. 100 0*125 0.100 0*125 0 . 1 0 0 0*125 0 . 1 0 0 0*103 0 . 0 6 4 0*125 0.100 0*125 0.100 0*125 0.100 0*125 0.100 0*125 0.100 0*103 0*064 0*125 0*100 0 * 1 2 5 -2*122 1.706 1*329 0.64 0.64 0*64 0.64 0.64 0*31 0*64 0*64 0.64 0*64 0*64 0.31 0*64 0.25 0*25 0.25 0*25 0*25 0*27 0*25 0*25 0*25 0*25 0*25 0*27 ♦ 0*25 -2*3* -2*23 8*28 3*55 /*^l\ ESTABLISHMENT COST PRORATED OVER 10 YEARS. LAND CHARGE BASED ON PREVAILING R IN REGION* INCOME FROM CROP REFLECTED IN THE LIVESTOCK BUDGETS* PREPAREO BY ROBERT KENSING. TAEX. SAN ANGELO. TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER 83 0100011000 0 ANNUAL CAPITAL MONTH 9 ■/df^%. 35 PEANUTS* DRYLAND, TEXAS EDWARDS PLATEAU EASTERN ESTIMATEO COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT 1* GROSS RECEIPTS FROM PRODUCTION PEANUTS TOTAL LBS. PRICE OR COST/UNIT QUANTITY 0*20 900*00 ,180.00 $ 180.00 19*80 8*00 11 * 1 0 16.00 8.00 18.00 8.55 12.85 14.32 3.00 2* VARIABLE COSTS PREHARVEST SEED FERT (0-40-0) HERBICIDE FOLIAR FUNGICIDE INSECTICIDE ALLOTMENT LEASE MACHINERY TRACTORS LABOR(TRACTOR 6 MACHINERY) OTHER LABOR INTEREST ON OP* CAP* SUBTOTAL* PRE-HARVEST LBS* ACRE ACRE APPL APPL CWT* ACRE ACRE HOUR HOUR DOL* 0*44 8*00 11 * 1 0 8.00 4*00 2*00 8*55 12*85 3.00 3.00 0.09 45.00 1.00 1.00 2.00 2.00 9.00 1.00 1.00 4.77 1.00 41*72 HARVEST COSTS CUSTOM DRYING MACHINERY TRACTORS LABORITRACTOR & MACHINERY) SUBTOTAL, HARVEST TON ACRE ACRE HOUR 20*00 6.99 2*81 3*00 0*45 1*00 1.00 1.92 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS .— 2*25 9 123.38 9 9 9.00 6.99 2.81 5*76 24.55 9 147.93 TOTAL VARIABLE COST 3* BREAKEVEN PRICE* VARIABLE COSTS VALUE OR COST 0.164 LBS. 9 ACRE ACRE ACRE 19.54 9.79 15.00 5. TOTAL COSTS 6 . B R E A K E V E N P R I C E , TO TA L C O S T S L B S . ALLOTMENT LEASE = »2 PER CWT OF PRODUCTION. PREPARED BY ROBERT KENSING. TAEX. SAN ANGELO. TEXAS 1.00 1.00 1.00 19.54 9.79 15x23 9 44.33 $ 192.26 0.214, PROJECTED 1979 36 PEANUTS. DRYLAND. TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION ITEM NO* DATE FUEL.OIL, FIXED TIMES LABOR MACHINE LUB..REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE PICKUP 10 MAR 0*13 0*156 0*125 0.80 DISK PLOW 3 DISK 1*36 MAR 1.00 1*181 0.740 6*19 PICKUP 10 APR 0*13 0*156 0*125 0.80 D I S K - TA N D E M 2 . 3 0 A P R 2 . 0 0 0 * 5 0 8 0 * 3 1 9 1 . 7 7 F E R T. A P P L I . R E N T D 3 * 8 6 M AY 1 * 0 0 0 * 1 0 3 0 * 0 6 4 0 . 3 1 PICKUP 10 M AY 0*13 0*156 0*125 0.80 D I S K - TA N D E M 2 * 3 0 M AY 1 . 0 0 0 * 2 5 4 0 * 1 5 9 0 . 8 9 S P R AY E R H E R B I C I D 7 3 M AY 1 . 0 0 0 * 0 0 . 2 2 0 0 . 0 5 L I S T E R / B E D D E R 2 * 4 9 M AY 1 * 0 0 0 * 3 8 7 0 * 2 4 2 1 * 3 6 PICKUP 10 JUNE 0*13 0*156 0.125 0.80 PLANTER PEANUT4R 2*40 JUNE 1*20 0*371 0.233 1.41 PICKUP 10 J U LY 0.13 0.156 0.125 0.80 C U LT I VATO R 2 * 6 4 J U LY 2 * 0 0 0 * 7 1 8 0 * 4 5 0 3 . 0 3 PICKUP 10 AUG 0*13 0*156 0*125 0*80 PICKUP 10 SEPT 0*13 0*156 0.125 0.80 PICKUP 10 OCT 0.13 0*156 0*125 0*80 DIGGER PEANUT 2,68 OCT 1*00 0*917 0*574 4.09 COMBINE PEANUT 13 OCT 1*00 0*814 0.652 3.73 T R U C K 1 1 O C T 0 . 1 5 0 . 1 8 7 _ _ . Q _ * J _ 5 fl 1 .97 TOTALS 6*691 4*803 31*20 ALLOTMENT LEASE = $2 PER CWT OF PRODUCTION* PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO, TEXAS 0.31 3*47 0*31 1*88 0*27 0*31 0*94 0.17 1*29 0*31 1.56 0.31 3*26 0*31 0.31 0*31 4.62 8.63 0*73 > ^ k 29*33 PROJECTED 1979 BUOGET IDENTIFICATION NUMBER 95 0100021000 0 ANNUAL CAPITAL MONTH 10 /^^^ 37 PEANUTS* DRYLAND, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION PEANUTS TOTAL r^ VARIABLE COSTS PREHARVEST SEED FERT (0-40-0) HERBICIDE FOLIAR FUNGICIDE ALLOTMENT LEASE MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) OTHER LABOR INTEREST ON OP* CAP* SUBTOTAL, PRE-HARVEST HARVEST COSTS CUSTOM DRYING MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) SUBTOTAL, HARVEST LBS. PRICE OR COST/UNIT VALUE OR COST QUANTITY 0.20 i2oo.oo _24Q_tO_g 9 240.00 LBS. ACRE ACRE APPL CWT. ACRE ACRE HOUR HOUR DOL. 0.44 8.00 11 . 1 0 8.00 2.00 8.44 12.04 3.00 3.00 0.09 50.00 1.00 1.00 3.00 12.00 1*00 1*00 4*52 1*50 44.99 TON ACRE ACRE HOUR 20.00 11 . 5 8 2.81 3.00 0*60 1.00 1*00 2*36 22*00 8*00 11 * 1 0 24.00 24.00, 8.44 12.04 13.55 4.50 !_*<_5 s 131.69 9 9 9 165.14 TOTAL VARIABLE COST 0.138 LBS. 3* BREAKEVEN PRICE, VARIABLE COSTS LBS* 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS 9 ACRE ACRE ACRE 20.87 9.52 15.00 LBS. ALLOTMENT LEASE = 92 PER CWT OF PRODUCTION. PREPARED BY ROBERT KENSING* TAEX* SAN ANGELO. TEXAS /#pfcV 1*00 1*00 1*00 20.87 9.52 —lSfQQ. 9 45*39 9 210*53 5* TOTAL COSTS 6* BREAKEVEN PRICE. TOTAL COSTS 12.00 11 . 5 8 2.81 7.07 33.45 0.175 PROJECTED 1979 38 PEANUTS. DRYLAND. TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION PICKUP PICKUP OISK PLOW 3 DISK DISK-TANDEM FERT.APPLI.RENTD PICKUP 0ISK-TANDEM SPRAYER HERBICID LISTER/BEDDER PICKUP PLANTER PEANUT4R PICKUP CULTIVATOR PICKUP PICKUP PICKUP TRUCK DIGGER PEANUT COMBINE PEANUT PICKUP TRUCK TOTALS ITEM NO* 10 10 1*36 2*30 3.86 10 2,30 73 2*49 10 2.40 10 3*64 10 10 10 11 2.66 13 10 11 DATE FIXED FUEL.OIL, COSTS L U B . . R E P. MACHINE TIMES LABOR 1 PER ACRE PER ACRE HOURS OVER HOURS NOV MAR APR APR APR APR MAY MAY MAY MAY JUNE JUNE JULY JULY AUG SEPT SEPT OCT OCT OCT OCT 0*06 0.06 1*00 1*00 1*00 0*13 1*00 1*00 1.00 0*13 1*20 0*13 2*00 0*13 0*13 0*13 0.25 1*00 1.00 0*13 0*25 0.077 0.078 1.181 0.254 0.103 0.156 0.254 0.0 0.387 0.156 0*371 0*156 0*718 0*156 0*156 0*156 0*313 0*917 0*814 0*156 0,_13 0*062 0*063 0*740 0*159 0*064 0*125 0*159 0*220 0*242 0*125 0*233 0*125 0*450 0*125 0*125 0*125 0*250 0*574 0*652 0.125 0.25ft 6*874 4*993 ALLOTMENT LEASE = $2 PER CWT OF PRODUCTION* PREPARED BY ROBERT KENSING. TAEX, SAN ANGELO, TEXAS 0*40 0*40 6*19 0*31 0.80 0*89 0.05 1*36 0.80 1 .41 0*80 3.00 0.80 0*80 0 . 80 3*28 4*09 3.73 0.80 0.16 0.16 3.47 0.94 0.27 0.31 0*94 0.17 1.29 0*31 1*56 0*31 3*57 0*31 0*31 0*31 1*22 4.62 8*63 0*31 3x22 -1x22 34*87 30*39 6.89 ^^%, PROJECTED 1979 BUDGET IDENTIFICATION NUMBER 95 0100011000 0 ANNUAL CAPITAL MONTH 10 /^|v 39 PEANUTS, IRRIGATED, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION PEANUTS TOTAL VARIABLE COSTS PREHARVEST SEED FERT (0-50-0) FERTILIZER APPLI HERBICIDE FOLIAR FUNGICIDE INSECTICIDE ALLOTMENT LEASE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR!TRACTOR & MACHINERY) LABOR(IRRIGATION) OTHER LABOR INTEREST ON OP* CAP* SUBTOTAL* PRE-HARVEST HARVEST COSTS CUSTOM DRYING MACHINERY TRACTORS LABOR!TRACTOR & MACHINERY) SUBTOTAL* HARVEST LBS. LBS* ACRE ACRE ACRE ACRE APPL C W T. ACRE ACRE ACRE HOUR HOUR HOUR DOL* PRICE OR VA L U E OR COST/UNIT QUANTITY COST 0*20 2400*00 _4SQ_lO__1 S 480*00 0*44 10*00 1*00 3.70 8.00 4 . 0 0 2*00 13*35 10.49 25*05 3*00 3.00 3 . 0 0 0*09 80.00 1*00 1.00 1*00 5*00 2*00 24*00 1*00 1.00 1.00 5.06 1.12 2*00 85*02 35.20 10*00 1.00 3.70 40.00 8.00 48.00 13.35 10*49 , 25*05 15*19 3*37 6.00 7,65 227*02 $ 9 TON ACRE ACRE HOUR 20*0 11 * 5 2*8 3*0 0 8 1 0 24*00 1 1.58 2.81 1*20 1*00 1*00 2*36 —2x22 9 9 272.47 TOTAL VARIABLE COST 0 . 11 4 3* BREAKEVEN PRICE* VARIABLE COSTS LBS* 4. FIXED COSTS MACHINERY TRACTORS I R R I G AT I O N M A C H I N E RY LAND (NET RENT) TOTAL FIXED COSTS 45*45 ACRE ACRE ACRE ACRE 5. TOTAL COSTS 6 . B R E A K E V E N P R I C E * TO TA L C O S T S L B S * 21*80 8*07 17.77 25.00 21.80 8.07 17.77 1.00 1 .00 1.00 1.00 9 —23*22 72.64 $ 3 4 5 . 11 0.144 ALLOTMENT LEASE = S2 PER CWT OF PRODUCTION. IRRIGATION COSTS/ACRE INCH; VARIABLE £3.34. FIXED $2.43. BASED ON SIDE-ROLL SYSTEM FOR 50 ACRES. PREPARED BY ROBERT KENSING. TAEX. SAN ANGELO. TEXAS PROJECTED 1979 40 PEANUTS. IRRIGATED, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT ITEM NO. DATE OPERATION - _ — — — — — — — —_..___»_»~-»« FIXED FUEL,OIL, COSTS L U B . . R E P. MACHINE TIMES LABOR 1 PER ACRE PER ACRE HOURS OVER HOURS m ^«_» *j»^*»^- DISK PLOW 3 DISK PICKUP FERT.APPLI*RENTD PICKUP SPRAYER HERBICID DISK-TANDEM LISTER/BEDDER TRUCK PICKUP PLANTER PEANUT4R PICKUP CULTIVATOR PICKUP PICKUP PICKUP PICKUP DIGGER PEANUT COMBINE PEANUT TRUCK TOTALS 1,36 10 3,86 10 2,73 30 2.49 11 10 2*40 10 2*64 10 10 10 10 2*68 13 11 MAR MAR APR APR APR APR APR APR MAY MAY JUNE JUNE JULY AUG SEPT OCT OCT OCT OCT 1*00 0*16 1.00 0.26 1*00 1*00 1*00 0*20 0*26 1*20 0*26 1*00 0*26 0*26 0*26 0*13 1*00 1*00 0*30 1*181 0*200 0*103 0*325 0*352 0*0 0*387 0*250 0*325 0*371 0*325 0*359 0*325 0*325 0.325 0*162 0*917 0*814 Qt375 0.740 0*160 0*064 0*260 0*220 0*159 0*242 0*200 0.260 0.233 0.260 0.225 0.260 0*260 0*260 0*130 0.574 0.652 O.300 6.19 1*02 0*31 1*66 1*13 0 * 11 1*36 2.62 1*66 1*41 1.66 1.52 1 .66 1.66 1*66 0.83 4*09 3*73 _.t?3 3.47 0.40 0.27 0.65 0.96 0.37 1.29 0.97 0.65 1.56 0.65 1.63 0.65 0.65 0.65 0.33 4.62 8*63 7*421 5.460 38*23 29.87 s * \ \f*6 ALLOTMENT LEASE = S2 PER CWT OF PRODUCTION. IRRIGATION COSTS/ACRE INCH; VARIABLE S3.34; FIXED S2.43. BASED ON SIDE-ROLL SYSTEM FOR 50 ACRES. PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO, TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER 95 0102021040 O ANNUAL CAPITAL MONTH 10 41 PEANUTS, IRRIGATED, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT L* GROSS RECEIPTS FROM PRODUCTION PEANUTS TOTAL _. VARIABLE COSTS PREHARVEST SEED FERT (0-50-0) HERBICIOE INSECTICIDE FOLIAR FUNGICIDE ALLOTMENT LEASE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR & MACHINERY) LABOR(IRRIGATION) OTHER LABOR INTEREST ON OP* CAP* SUBTOTAL* PRE-HARVEST HARVEST COSTS CUSTOM DRYING MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) SUBTOTAL* HARVEST LBS. PRICE OR VA L U E OR COST/UNIT QUANTITY COST 0*20 3000*00 LBS. ACRE ACRE APPL APPL C W T. ACRE ACRE ACRE HOUR HOUR HOUR DOL. 0.44 10.00 11.10 4*00 8*00 2*00 14*42 12.33 43.42 3.00 3.00 3*00 0.09 TON ACRE ACRE HOUR 20*00 12*89 2*81 3*00 600.00 S 600.00 80.00 1*00 1.00 3 . 0 0 5*00 30.00 1.00 1.00 1.00 5.51 1.95 2.00 84.24 35.20 10.00 11 . 1 0 12.00 40.00 60.00 14.42 12.33 43.42 16.52 5.85 6.00 7t58 $ 274.42 1.50 1.00 1.00 2.48 s 9 327*56 TOTAL VARIABLE COST 0*109 BS* 3* BREAKEVEN PRICE* VARIABLE COSTS LLBS. 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 30.00 12*89 2.81 7*44 53.14 9 ACRE ACRE ACRE ACRE 5. TOTAL COSTS 6 * B R E A K E V E N P R I C E , TO TA L C O S T S L B S . 23*03 8.54 30*81 25*00 23*03 8*54 30*81 1*00 1*00 1.00 1.00 23*22 9 87*38 $ 414*94 0*138 ALLOTMENT LEASE = *2 PER CWT OF PRODUCTION. IRRIGATION COSTS/ACRE INCH; VARIABLE S3.34; FIXED S2.43* BASED ON SIDE-ROLL SYSTEM FOR 50 ACRES. PREPAREO BY ROBERT KENSING. TAEX, SAN ANGELO, TEXAS PROJECTED 1979 42 PEANUTS, IRRIGATED, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION PICKUP DISK PLOW 3 DISK PICKUP FERT.APPLI.RENTD SPRAYER HERBICID DISK-TANDEM DISK-TANOEM LISTER/BEDOER PICKUP PLANTER PEANUT4R PICKUP CULTIVATOR PICKUP PICKUP TRUCK PICKUP DIGGER PEANUT COMBINE PEANUT PICKUP TRUCK TOTALS ITEM NO* 10 1*36 10 3,86 1*73 30 1,30 2,49 10 2,40 10 2,64 10 10 11 10 2,68 13 10 11 DATE FUEL,OIL, FIXED TIMES LABOR MACHINE L U B . . R E P. COSTS OVER HOURS HOURS PER ACRE PER ACRE OCT MAR MAR APR APR APR APR APR APR MAY MAY JUNE JUNE JULY JULY AUG SEPT SEPT SEPT SEPT 0*18 1*00 0*14 1*00 1*00 1.00 1*00 1.00 0*28 1*20 0*28 1.00 0*28 0*26 0*20 0*28 1.00 1*00 0*28 0*40 0*225 0.180 1 .181 0*740 0*175 0*140 0*103 0*064 0*352 0*220 0*0 0.159 0.254 0*159 0*387 0 * 2 4 2 0*350 0*280 0.371 0*233 0.350 0.280 0.359 0*225 0.350 0*280 0.350 0*280 0.250 0*200 0.350 0.280 0.917 0.574 0.814 0 . 6 5 2 0.350 0.280 0 . 5 0 0 -2x±22 1.15 6.19 0.89 0.31 1 .74 0 . 11 1*33 1*36 1.79 1 .41 1.79 1*52 1.79 1.79 2.62 1.79 4.09 3*73 1.79 0.45 3.47 0.35 0.27 0.90 0.37 0.90 1.29 0.70 1 .56 0.70 1.63 0.70 0.70 0.97 0.70 4.62 8.63 0.70 -3*23 -1*2± 7.988 5.869 42.45 31.57 / ^ ALLOTMENT LEASE » $2 PER CWT OF PRODUCTION* IRRIGATION COSTS/ACRE INCH*, VARIABLE S3.34; FIXED $2*43* BASED ON SIDE-ROLL SYSTEM FOR 50 ACRES. PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO, TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER 95 0104011040 0 ANNUAL CAPITAL MONTH 9 / ^ 43 SMALL GRAIN FOR GRAZING, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST 1* GROSS RECEIPTS FROM PRODUCTION TOTAL 2* VARIABLE COSTS PREHARVEST SEED MACHINERY TRACTORS LABORITRACTOR C MACHINERY) INTEREST ON OP* CAP* SUBTOTAL* PRE-HARVEST 0*0 BU* ACRE ACRE HOUR DOL* 4.00 6.87 7*08 3*00 0*09 2.00 1 .00 1.00 3*15 14*44 $_ 9 TOTAL VARIABLE COST 9 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS —1*32 32.69 0.0 32*69 9 -32.69 9 9 4.92 4.26 8*00 17*19 5* TOTAL COSTS 9 49*87 6* NET RETURNS 9 -49.87 ACRE ACRE ACRE 4*92 4*26 8*00 LAND CHARGE BASED ON PREVAILING RATES IN REGION. PREPARED BY ROBERT KENSING* TAEX, SAN ANGELO, TEXAS ^ S HARVEST COSTS SUBTOTAL, HARVEST 3* INCOME ABOVE VARIABLE COSTS # 8.00 6.87 7*08 9.45 1*00 1*00 1*00 PROJECTED 1979 44 SMALL GRAIN FOR GRAZING, DRYLAND. TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION DISK-TANOEM HARROW SPIKE DRILL GRAIN PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP CHISEL PICKUP CHISEL PICKUP TOTALS ITEM NO. 2,30 2,54 2,52 10 10 10 10 10 10 10 10 10 10 1,44 10 1*44 10 DATE FUEL,OIL, FIXED COSTS TIMES LABOR MACHINE L U B . . R E P. OVER HOURS HOURS PER ACRE PER ACRE SEPT SEPT SEPT SEPT OCT NOV DEC JAN FEB MAR APR MAY JUNE JULY JULY AUG AUG 2 , 0 0 0.508 0*319 1*00 0 * 2 3 7 0 . 1 4 8 0.356 1*00 0.571 0 * 0 8 0*100 0 . 0 8 0 0*08 0*100 0.080 0 , 0 8 0*100 0 . 0 8 0 0*08 0*100 0.080 0 * 0 8 0*100 0 . 0 8 0 0.080 0 * 0 8 0*100 0*08 0*100 0.080 0 * 0 8 0*100 0 . 0 8 0 0*08 0*100 0*080 0 * 0 8 0*100 0*080 1.00 0.316 0*198 0*08 0.100 0*080 1*00 0.316 0*198 0*08 .3x132 -2*222 1 .77 0.79 1.97 O.Sl 0.51 0.51 0.51 0.51 0*51 0.51 0.51 0.51 0.51 1.64 0.51 1.64 1.88 0.77 2.03 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 1.05 0.20 1.05 -2*31 -2*22 3.149 13.94 9.19 2*181 LAND CHARGE BASED ON PREVAILING RATES IN REGION. PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO, TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER 7410100021000 0 ANNUAL CAPITAL MONTH 8 /i3S% 45 SMALL GRAIN FOR GRAZING, DRYLAND, TEXAS EDWAROS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST 1. GRCSS RECEIPTS FROM PRODUCTION TOTAL 2. VARIABLE COSTS PREHARVEST SEED FERT (50-20-0) MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST 0.0 BU. ACRE ACRE ACRE HOUR DOL. 4.00 17.00 6.87 8.55 3.00 0.09 2.50 1.00 1.00 1.00 3.35 19.01 9 10.00 17.00 6.87 8.55 10.06 lf7* 54.20 HARVEST COSTS SUBTOTAL. HARVEST 9 9 0.0 TOTAL VARIABLE COST 9 54.20 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS 9 -54.20 . 9 9 4.92 5.06 8.00 17.99 5. TOTAL COSTS 9 72.18 6. NET RETURNS 9 -72.18 ACRE ACRE ACRE 4.92 5.06 8.00 LAND CHARGE BASED ON PREVAILING RATES IN REGION. PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO, TEXAS 1.00 1.00 1.00 PROJECTED 1979 46 /^^k SMALL GRAIN FOR GRAZING, DRYLAND, TEXAS EOWAROS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION HARROW SPIKE DRILL GRAIN PICKUP PICKUP PICKUP PICKUP FERT .APPLI,RENTD PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP CHISEL DISK-TANDEM PICKUP FERT.APPLI.RENTD DISK-TANDEM PICKUP TOTALS ITEM NO. 3,54 3,52 10 10 10 10 3,86 10 10 10 10 10 10 1,44 1,30 10 3*86 1*30 10 DATE FUEL.OIL. FIXED TIMES LABOR MACHINE LUB..REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE SEPT SEPT SEPT OCT NOV DEC JAN JAN FEB MAR APR MAY JUNE JULY JULY JULY AUG AUG AUG 1.00 0.237 1*00 0.571 0.08 0.100 0*08 0.100 0*08 0.100 0*08 0.100 1*00 0.103 0*08 0.100 0*08 0.100 0*08 0.100 0*08 0.100 0*08 0.100 0*08 0.100 2 . 0 0 0.632 1.00 0.254 0 . 0 8 0.100 1.00 0.103 1.00 0.254 0.08 -fttlftft 0.148 0.358 0*080 0.080 0.080 0.080 0.064 0.080 0.080 0.080 0.080 0.080 0.080 0.396 0. 159 0.080 0.064 0.159 0.0 8Q 0.78 1 .95 0.51 0.51 0.51 0.51 0.31 0.51 0.51 0.51 0.51 0.51 0.51 3.28 1.33 0.51 0.31 1.33 0.87 2.27 0.20 0.20 0.20 0.20 0.27 0.20 0.20 0.20 0.20 0.20 0.2 0 2 . 11 0.90 0.20 0.27 0.90 -2*31 2*22 3.354 2.310 15.42 9.99 LAND CHARGE BASED ON PREVAILING RATES IN REGION. PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO, TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER-— 7410100011000 0 ANNUAL CAPITAL MONTH 8 ^%. 47 HYBRID SU°AN-SORGHUM HAY * GRAZING. DRYLAND. TEXAS EDWARDS PLATEAU EASTE E S T I M AT E D COSTS AND RETURNS PER ACRE S E TYPICAL MANAGEMENT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST 1. GROSS RECEIPTS FROM PRODUCTION HAY TO TA L 2. VARIABLE COSTS PREHARVEST SEED MACHINERY TRACTORS LABOR(TRACTOR 6 MACHINERY) INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST HARVEST COSTS CUSTOM BALING CUSTOM HAUL SUBTOTAL. HARVEST TON LBS. ACRE ACRE HOUR DOL. 57.50 2.00 11 5 . 0 0 S 115.00 0.36 5.48 9.69 3.00 0.09 35.00 1.00 1.00 3.37 9.48 12.60 5.48 9.69 10.12 Qf85 38.75 BALE BALE 0.45 0.20 60.00 60.00 TOTAL VARIABLE COST 3. BREAKEVEN PRICE. VARIABLE COSTS TON 4. FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS ACRE ACRE ACRE s 77.75 38.873 4.49 5.64 8.00 5. TOTAL COSTS 6. BREAKEVEN PRICE. TOTAL COSTS $ 27.00 12.00 39.00 TON LAND CHARGE BASED ON PREVAILING RATES IN REGION. PREPARED BY ROBERT KENSING. TAEX, SAN ANGELO, TEXAS s 1.00 1.00 1.00 s 4.49 5.64 8.00 18.13 9 95.88 47.939 PROJECTED 1979 48 HYBRID SUDAN-SORGHUM HAY & GRAZING. DRYLAND. TEXAS EDWARDS PLATEAU EA ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION PICKUP DISK PLOW 3 DISK DISK-TANDEM PICKUP DISK-TANDEM HARROW SPIKE DRILL GRAIN PICKUP PICKUP PICKUP PICKUP PICKUP TOTALS ITEM NO. 10 1.36 2.30 10 2,30 2,54 3,52 10 10 10 10 10 DATE FUEL,OIL, FIXED TIMES LABOR MACHINE LUB..REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE FEB MAR MAR MAR APR APR APR APR MAY JUNE JULY AUG 0 . 1 0 0.125 1 .00 1.181 1.00 0*254 0 . 1 0 0*125 1 .00 0 * 2 5 4 1.00 0*237 1.00 0.571 0.10 0.125 0 . 1 0 0.125 0*10 0.125 0*1 0 0 * 1 2 5 0 . 1 0 2*123 OolOO 0.740 0*159 0.100 0.159 0.148 0.358 0.100 0.100 0.100 0.100 ■0-lftQ 0.64 6.19 0.89 0.64 0 .89 0.79 1.95 0.64 0.64 0.64 0.64 0.25 Of 64, -2*25 3.372 2.265 15.16 10.13 LAND CHARGE BASED ON PREVAILING RATES IN REGION. PREPARED BY ROBERT KENSING. TAEX. SAN ANGELO* TEXAS BUDGET IDENTIFICATION NUMBER— - 8 7 8 0 1 0 0 0 2 1 0 0 0 0 ANNUAL CAPITAL MONTH 8 3.47 0.94 0.25 0.94 0.77 2.27 0.25 0.25 0.25 0.25 PROJECTED 1979 49 HYBRID SUDAN-SORGHUM HAY 6 GRAZING, DRYLAND, TEXAS EDWARDS PLATEAU EASTE1 ESTIMATED COSTS A _D RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT 1* GRCSS RECEIPTS FROM PRODUCTION HAY TOTAL 2* VARIABLE COSTS PREHARVEST SEED FERT (60-0-0) MACHINERY TRACTORS LABCR(TRACTOR 6- MACHINERY) INTEREST ON OP* CAP* SUBTOTAL, PRE-HARVEST HARVEST COSTS CUSTOM BALING CUSTOM HAUL SUBTOTAL* HARVEST PRICE OR VA L U E OR COST/UNIT QUANTITY COST TON 57.5 LBS, ACRE ACRE ACRE HOUR DOL. 0.36 15.00 5.48 10.30 3.00 0.09 0 5.00 35.00 1.00 1.00 1 .00 3.58 16.50 12.60 15.00 5.48 10.30 10.73 9 1*±3 55.61 9 BALE BALE 0.45 0.20 67.50 150.00 150.00 9 .-32*22 97.50 9 1 5 3 . 11 TOTAL VARIABLE COST 3* BREAKEVEN PRICE, VARIABLE COSTS TON 4, FIXEO COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS ACRE ACRE ACRE 30.621 9 4.49 6.29 8.00 1.00 I .00 1.00 4.49 6.29 9 3*22 18.78 9 1 71•89 5, TOTAL COSTS 6 * B R E A K E V E N P R I C E , TO TA L C O S T S 287.50 9 287.50 TON LAND CHARGE BASED ON PREVAILING PATES IN REGION. PREPARED BY ROBERT KENSING, TAEX. SAN ANGELO, TEXAS 34.377 PROJECTED 1979 50 /"^k HYBRID SUDAN-SORGHUM HAY 6- GRAZING, DRYLAND, TEXAS EDWARDS PLATEAU ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION PICKUP DISK PLOW 3 DISK DISK-TANDEM PICKUP FERT .APPLI,RENTD DISK-TANDEM HARROW SPIKE DRILL GRAIN PICKUP PICKUP FERT.APPLI,RENTD PICKUP PICKUP PICKUP TOTALS ITEM NO. 10 1,36 2,30 10 3,86 2*30 3*54 3,52 10 10 3*86 10 10 10 D*TE FUEL,OIL, FIXED TIMES LABOR MACHINE LUB..REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE FEB MAR MAR MAR APR APR APR APR APR MAY JUNE JUNE JULY AUG 0*100 0 * 1 0 0*125 0.740 1.00 1*181 1.00 0*254 0* 159 0*10 0 . 1 2 5 0*100 1*00 0*103 0*064 1 .00 0 . 2 5 4 0 * 1 5 9 1.00 0.237 0.148 1*00 0*571 0*358 0*10 0*125 0*100 0*10 0*125 0*100 1*00 0*103 0*064 0*10 0*125 0*100 0*10 0*125 0*100 0 . 1 0 __fi__125 - 2 * 1 2 2 0.64 6.19 0.89 0.64 0.31 0.78 1.95 0.64 0.64 0.31 0.64 0.64 0.64 -2*25 3*578 15.79 10.78 2.394 LAND CHARGE BASED ON PREVAILING RATES IN REGION. PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO, TEXAS 6.89 0.25 3.47 0. 94 0.25 0*27 0.94 0.87 2.27 0*25 0.25 0.27 0.25 0.25 y"^tl\ PROJECTED 1979 BUDGET IDENTIFICATION NUMBER 8780100011000 0 ANNUAL CAPITAL MONTH 8 /^3%|k 51 WHEAT, DRYLAND, TEXAS EDWAROS PLATEAU EASTERN ESTIMATED CCSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST 1. GROSS RECEIPTS FROM PRODUCTION WHEAT GRAZING TOTAL 9 BU. AUMS 2.85 5.00 18.00 3.00 BU. ACRE ACRE ACRE HOUR DOL. 6.00 3.00 8.22 4.44 3.00 0.09 1.00 1 .00 1.00 1.00 2 . 9 6 4*25 51.30 15.00 9 66.30 2 . VA R I A B L E C O S T S PREHARVEST SEED CROP INSURANCE MACHINERY TRACTORS LABOR(TRACTOR 6 MACHINERY) INTEREST ON OP. CAP. S U B TO TA L , P R E - H A RV E S T HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL. HARVEST 6. NET RETURNS 30*92 9 ACRE BU. 8.00 0.15 9 8*00 2.70 10*70 9 41.62 9 24.68 1.00 18.00 3. INCOME ABOVE VARIABLE COSTS 5. TOTAL COSTS 2x32 9 TOTAL VARIABLE COST 4. FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS 6.00 3.00 8.22 4.44 8*87 9 ACRE ACRE ACRE 4 . 9 2 3.50 8.00 1.00 1.00 1.00 4.92 3.50 3x22 9 16*42 9 58.04 9 8*26 LAND CHARGE BASEO ON CASH RENT* GOVERNMENT PYMNT NOT INCLUDED. PREPARED BY ROBERT KENSING. TAEX. SAN ANGELO. TEXAS PROJECTED 19 79 / ^ 52 WHEAT. DRYLAND. TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP DISK-TANDEM PICKUP CHISEL PICKUP CHISEL PICKUP DRILL GRAIN PICKUP ITEM NO. 10 10 10 10 10 10 10 10 2.30 10 2.44 10 2.44 10 3.52 10 TOTALS D AT E OCT NOV DEC JAN FEB MAR APR MAY JUNE JUNE J U LY J U LY AUG AUG SEPT SEPT FUEL.OIL, FIXED T I M E S L A B O R M A C H I N E L U B . . R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 1.00 0.10 1*00 0*10 1*00 0*10 1.00 0*10 0*125 • 100 0*125 • 100 0*125 • 100 0*125 • 100 0*125 • 100 0*125 • 100 0*125 • 100 0*125 • 100 0*254 • 159 0*125 • 100 0.316 • 198 0*125 • 100 0*316 • 198 0.125 • 100 0*571 • 358 0 * 1 2 5 -2x122 0.64 0.64 0.64 0.64 0.64 0.64 0*64 0*64 0.89 0.64 1.08 0.64 1 .08 0.64 1*95 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.94 0.25 1.10 0.25 1.10 0.25 2.27 -2*6*. ._U25 2 . 9 5 8 2 . 11 3 12.66 8.42 ^ ^ \ LAND CHARGE BASED ON CASH RENT. GOVERNMENT PYMNT NOT INCLUDEO. PREPARED BY ROBERT KENSING, TAEX, SAN ANGELO, TEXAS PROJECTED 1979 B U D G E T I D E N T I F I C AT I O N N U M B E R 7 6 0 1 0 0 0 2 1 0 0 0 0 A N N U A L C A P I TA L M O N T H 9 ^^%\ 53 WHEAT, DRYLAND. TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST 1* GROSS RECEIPTS FROM PRODUCTION WHEAT GRAZING TOTAL BU. AUMS 2.85 5.00 25.00 5.00 71.25 25.00 $ 96.25 2 * VA R I A B L E C O S T S PREHARVEST SEED FERT (50-20-0) CROP INSURANCE MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) I N T E R E S T O N O P * C A P. S U B TO TA L . P R E - H A RV E S T BU* ACRE ACRE ACRE ACRE HOUR DOL* 6.00 17.00 3.00 8.23 6.91 3.00 0.09 1.00 1.00 1.00 1*00 1*00 3*23 14*45 6*00 17*00 3.00 8.23 6.91 9*68 HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL. HARVEST ACRE BU* 9 9 8.00 0.15 9 8.00 3,75 11 * 7 5 9 63.87 9 32.38 1*00 25*00 TOTAL VARIABLE COST 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXEO COSTS L__2fi 52*12 9 9 4.94 4.04 8.00 16.98 5. TOTAL COSTS 9 80.85 6. NET RETURNS 9 15.40 ACRE ACRE ACRE 4.94 4*04 8.00 1*00 1.00 1 .00 LANO CHARGE BASED ON CASH RENT. GOVERNMENT PYMNT NOT INCLUDED. PREPARED BY ROBERT KENSING. TAEX. SAN ANGELO, TEXAS PROJECTED 1979 54 WHEAT, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT ITEM OPERATION NO* D AT E FUEL.OIL, FIXED T I M E S L A B O R M A C H I N E L U B . . R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE PICKUP 10 OCT 0*10 0*125 0*100 0*64 PICKUP 10 NOV 0*10 0*125 0*100 0*64 PICKUP 10 DEC 0*10 0*125 0*100 0.64 PICKUP 10 JAN 0*10 0*125 0*100 0*64 F E R T. A P P L I ,RENTD 3,86 FEB 1.00 0.103 0*064 0.31 PICKUP 10 FEB 0*10 0*125 0*100 0.64 PICKUP 10 MAR 0*10 0*125 0*100 0.64 PICKUP 10 APR 0*10 0*125 0*100 0.64 PICKUP 10 M AY 0*10 0*125 0*100 0*64 CHISEL 1,44 JUNE 1*00 0*316 0.198 1.64 PICKUP 10 JUNE 0*10 0*125 0.100 0.64 CHISEL 1*44 J U LY 1*00 0*316 0*198 1.64 PICKUP 10 J U LY 0.10 0*125 0*100 0*64 CHISEL 1.44 AUG 1*00 0*316 0*198 1.64 F E R T. A P P L I * R E N T D 3*86 AUG 1.00 0*103 0*064 0.31 PICKUP 10 AUG 0*10 0*125 0.100 0.64 DRILL GRAIN 3.52 SEPT 1*00 0*571 0*358 1.95 pickup 10 TOTALS sept o.io ,0,12? 0*25 0*25 0*25 0.25 0.27 0*25 0.25 0*25 0*25 1.05 0.25 1.05 0*25 1.05 0*27 0*25 2*27 -2*122 fti.4 -2*25 3.225 2*281 15*14 8*98 LAND CHARGE BASED ON CASH RENT* GOVERNMENT PYMNT NOT INCLUDED* PREPARED BY ROBERT KENSING. TAEX. SAN ANGELO, TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER 76 0100011000 0 ANNUAL CAPITAL MONTH 9 y ^ \