r TEXAS NORTHEAST

advertisement
r
TEXAS NORTHEAST
r
FOREWORD
The enterprise budgets for Texas Northeast
Region are based on estimates of yields, production
input quantities, and production practices which
represent the best judgment of local producers,
county Extension agents-agriculture, financial in
stitution representatives, farm machinery dealers
and others knowledgeable of the area. Variation
in yields, production inputs and production prac
tices should be expected for particular farms.
Budgets for all major crops produced in the
area are included for two levels of management,
when applicable. Crop yields are directly related
to levels of management. These differences are due
largely to timing of operational practices which
may not be evident in the budgets.
r
The machinery inventory is applicable to both
typical and high level management. In some bud
gets custom rates, primarily harvesting, were used
in lieu of the assumption that harvesting equip
ment was owned.
Budgets for establishing permanent type pasture
grasses were prepared and used for prorating estab
lishment costs in the respective pasture and hay
budgets. Forage crops include expenses only be
cause it is expected that the income will be derived
from livestock enterprises.
Crop share rental agreements do not exist to
any substantial degree. Land charges were, there
fore, calculated by using a fair market value times
an interest rate or a cash lease.
r
NORTHEAST TEXAS REGION
Assumed Prices Paid and Received by Farmers 1/
ITEM
UNIT
PRICE
Price Paid (1978)
r
Seed
Corn
Cotton
Grain Sorghum
Oats
Southern Peas
Soybeans
Tomato Plants
Watermelons
Wheat
Custom Rates
Coastal Sprigging (including springs)
Combining
Corn
Grain Sorghum
Oats
Southern Peas
Wheat
Cotton strip and haul
Cotton, gin, bag, and ties
Hay baling
Soybeans
Hauling
Corn
Oats
Peas
Watermelons
Wheat
Southern Peas
r
lb.
lb.
lb.
lb.
lb.
lb.
doz.
lb.
lb.
acre
bu.
cwt.
acre
acre
acre
cwt.
cwt.
bale
bu.
bu.
bu.
cwt.
cwt.
bu.
cwt.
$ .43
.35
.45
.14
.30
.20
.60
7.00
.15
30.00
.30
.70
12.00
10.00
12.00
1.75
1.90
.40
.70
.10
.08
.20
.25
.12
.20
-2-
ITEM
Chemicals
Fertilizer
Nitrogen
Phosphorous
Potash
Simazine
2-4D
Milogard
T r e fl a n
Methylparathion
Sevin
Malithion
Grazing grain per acre
Ty p i c a l
High Level
Interest
UNIT
lb.
lb.
lb.
lb.
gal.
lb.
gal.
gal.
lb.
gal.
lb.
lb.
percent
PRICE
$ .20
.18
.08
4.50
5.50
2.50
28.50
5.25
1.52
11.00
250
500
.10
Prices Received (1978)
Coastal Hay
Typical Management
High Level Management
Corn
Cotton
Cottonseed
Grain Sorghum
Oats
Southern peas
Soybeans
Tomatoes
Watermelons
Wheat
bale
bale
bu.
lb. •
ton
cwt.
bu.
cwt.
bu.
carton
cwt.
bu.
1.20
1.30
1.95
.45
60.00
3.35
1.00
12.00
5.60
9.00
3.00
2.25
1/ These price assumptions are not to be interpreted as predictions or
prospective prices.
" * )
NORTHEAST TEXAS REGION
Estimated Machinery and Equipment Cost Per Hour of Use
Machinery
Item and Size
Item
No.
1
Tractor - 100 HP
Tractor - 70 HP
2
Tractor - 50 HP
3
10
Pickup - 1/2 Ton
Shredder 4R - 13.3 Ft. T 31
Offset Disc - 10 Ft. T
32
Tandem Disc - 13 Ft. T
34
MB Plow 4B - 5.3 Ft. T 37
MB Plow 3B - 4.0 Ft. T 38
Planter - 13.3 Ft. T
39
Grain Drill - 10 Ft. T
42
Tool Bar Cult. - 13.3 Ft .43
Tool Bar Cult. - 20 Ft. T44
Lister/Bedder - 13.3 Ft. T47
Sprayer Herb. - 13.3 Ft. T49
Fert. Dist, Melon T
57
Plant-Cult 1-R T
58
59
Rolling Cult. 1-R T
Mist Blow Spray - 30 Ft. 60
V
Purchase
Price
Estimated
Years of Use
Estimated
Hours of Use
$16,800
11,500
8,200
5,100
2,600
1,700
2,520
1,350
1,080
1,350
1,150
8
8
10
4
8
8
8
8
8
8
10
8
8
8
8
4
8
6
5
4800
4800
5000
2800
1000
1200
1200
1400
1400
900
1,350
1,120
525
1,200
1,350
250
2,400
480
$ 3.22
3.00
2.39
1.41
3.51
1.92
2.87
1.30
1.05
3.80
1.76
1.01
1.31
1.08
Variable Costs
Per Hour
$ 4.39
4.14
2.88
5.28
1.46
.80
1.05
.54
.38
1.57
800
.89
1000
800
1.08
2.28
1800
1000
.16
.65
.42
.55
.45
.38
.68
.95
.08
2.46
1.35
1000
1200
1400
1400
_
Fixed Costs
Per Hour
c
r
COASTAL BERMUDAGRASS ESTABLISHMENT, NORTHEAST TEXAS REGION
ESTIMATED COSTS ANO RETURNS PER ACRE
TYPICAL MANAGEMENT
PRICE
OR
VA L U E
OR
UNIT COST/UNIT QUANTITY COST
GROSS
TO TA L
RECEIPTS
FROM
2 . VA R I A B L E C O S T S
PREHARVEST
FERT(6 0-40-40)
CUSTOM SPRIGGING
HERBICIDE
MACHINERY
T R A C TO R S
LABOR(TRACTOR & MACHINERY)
I N T E R E S T O N O P. C A P.
S U B T O TA L . P R E - H A R V E S T
r
PRODUCTION
$.
$
0.0
$
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
DOL.
22.40
30.00
2.25
6.25
3.49
3.00
0.10
1 .00
1 .00
1.00
1.00
1.00
2.62
23.81
$
22.40
30.00
2.25
6.25
3.49
7.87
2.33
74.64
HARVEST COSTS
S U B T O TA L . H A R V E S T
$
$
0.0
T O TA L VA R I A B L E C O S T
$
74.64
$ -74.64
3 . I N C O M E A B O V E VA R I A B L E C O S T S
4. FIXED COSTS
MACHINERY
TRACTORS
LAND (NET RENT)
T O TA L F I X E D C O S T S
s
ACRE
ACRE
ACRE
2.88
2.70
10.00
1.00
1.00
1.00
2.38
2.70
$
-12*22
15.58
5 . T O TA L C O S T S
$
6. NET RETURNS
$ -90.22
90.22
PREPARED BY DR. JAMES T. LONG. TAEX. OVERTON. TEXAS PROJECTED 1978
r
C O A S TA L B E R M U D A G R A S S E S TA B L I S H M E N T, N O R T H E A S T T E X A S R E G I O N
E S T I M AT E D C O S T S A N O R E T U R N S P E R A C R E
TYPICAL MANAGEMENT
O P E R AT I O N
PICKUP
PICKUP
R E N T D . F E R T. A P P L I
PICKUP
TA N D E M
DISC
T
TA N D E M
DISC
T
S P R AY E R . H E R B . T
PICKUP
PICKUP
PICKUP
R E N T D . F E R T. A P P L I
PICKUP
T O TA L S
ITEM
NO.
10
10
3.86
10
2,34
2,34
3.49
10
10
10
3,86
10
LABOR MACHINE
HOURS
HOURS
_
COST
LUE.,REP
PER ACRE PER AC!
D AT E
TIMES
OVER
SEPT
OCT
FEB
FEB
MAR
APR
APR
APR
M AY
JUNE
AUG
AUG
0.15
0.194
0.15
0.194
1.00
0.118
0.15
0.194
1.00
0.283
1 .00
0.283
0.465
1.00
0.15
0.194
0.15
0.194
0.15
0.194
1 .00
0.118
0 . 1 5 __L_.__94
155
155
079
155
189
189
310
155
155
155
079
0. 82
0.82
0.27
0. 82
1.14
1.14
1.19
0.82
0. 82
0.82
0.27
0.22
0.22
0.23
0.22
1.22
1.22
1. 16
0.22
0.22
0.22
0.23
-2x155
-2x22
-2x22
2.624
1 .93 0
9.74
5.58
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
"
P R E PA R E D B Y D R . J A M E S T. L O N G , TA E X , O V E R T O N , T E X A S P R O J E C T E D 1 9 7 8
B U D G E T I D E N T I F I C AT I O N N U M B E R — 8 3 4 0 11 0 0 2 11 0 0 0
A N N U A L C A P I TA L M O N T H 8
_
r
COASTAL BERMUDAGRASS ESTABLISHMENT, NORTHEAST TEXAS REGION
ESTIMATED COSTS AND RETURNS PER ACRE
HIGH LEVEL MANAGEMENT
UNIT
GROSS RECEIPTS FROM PRODUCTION
HAY
TOTAL
VARIABLE COSTS
PREHARVEST
FERT (180-80-80)
CUSTOM SPRIGGING
HERB, PREMERGE
MACHINERY
TRACTORS
LABOR(TRACTOR & MACHINERY)
C A P.
INTEREST ON OP
SUBTOTAL, PRE-HARVEST
r
HARVEST COSTS
CUSTOM BALING
SUBTOTAL,
BALE
PRICE
OR
VA L U E
OR
COST/UNIT QUANTITY COST
1 .30
70.00
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
DOL.
56.80
30.00
2.25
3.80
4.26
3.00
0.10
1.00
1 .00
1.00
1.00
1 .00
2.08
38.62
BALE
0.40
70.00
HARVEST
-22x22
$
28.00
$
135.20
$ -44.20
3. INCOME ABOVE VARIABLE COSTS
$
4. FIXED COSTS
ACRE
ACRE
ACRE
2.12
3.29
10.00
1.00
1.00
1.00
2.12
3.29
s
—12x22
15.41
150.61
5. TOTAL COSTS
$
6. NET RETURNS
$ -59.61
HAY SOLD IN FIELD.
PREPARED BY DR. JAMES T. LONG, TAEX. OVERTON, TEXAS
r
56.80
30.00
2.25
7.80
4.26
6.24
. 3.8$
$ 107.20
$
TOTAL VARIABLE COST
MACHINERY
TRACTORS
LAND (NET RENT)
TOTAL FIXED COSTS
—21x22
S 91.00
PROJECTED 1978
C O A S TA L B E R M U O A G R A S S E S TA B L I S H M E N T, N O R T H E A S T T E X A S R E G I O N
E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E
HIGH LEVEL MANAGEMENT
O P E R AT I O N
PICKUP
NO.
10
ITEM
D AT E
RENTD.
F E R T. A P P L I
TO TA L S
FUEL,OIL,
FIXED
TIMES
LABOR
MACHINE
L U B . . R E P.
COSTS
OVER
HOURS
HOURS
PER
ACRE
PER
ACRE
SEPT
PICKUP
PICKUP
PICKUP
RENTD.FERT.Ao PL1
SPRAYER,HERB.
H
PICKUP
TANDEM DISC
H
PICKUP
H
TANDEM DISC
RENTQ.FERT.APPLI
PICKUP
.
10
10
10
3,86
3,83
10
1 ,68
10
1 ,68
3.86
10
3.86
0.09
OCT
NOV
JAN
FEB
FEB
FEB
MAR
MAR
APR
APR
MAY
AUG
2.079
0 . 11 2
0.09
0.09
0.09
1 .00
1.00
0.09
1.00
0.09
1.00
1 .00
0.09
1.00
0. 112
0 . 11 2
0 . 11 2
0. 118
0.423
0 . 11 2
0.258
0 . 11 2
0.258
0 . 11 8
0 . 11 2
0 . 11 8
0.090
0.48
0.48
0.48
0.48
0.27
1.08
0.48
1.41
0.48
1.41
0.27
0.48
0.090
0.050
0.050
0.079
0.282
0.090
0.172
0.090
0.172
0.079
0.050
_0...Q79
1.491
0.27
8.05
0.13
0. 13
0.13
0.13
0.23
1.06
0.13
1.40
0.13
1.40
0.23
0.13
___Qi_jg3
5.41
_
H AY S O L D I N F I E L D .
P R E PA R E D B Y D R . J A M E S T. L O N G , TA E X , O V E R T O N , T E X A S P R O J E C T E D 1 9 7 8
3 U D G E T I D E N T I F I C AT I O N N U M B E R — 8 3 4 0 11 0 0 111 0 0 0
A N N U A L C A P I TA L M O N T H 8
.
COASTAL BERMUDAGRASS HAY. NORTHEAST TEXAS REGION
ESTIMATED COSTS AND RETURNS PER ACRE
TYPICAL MANAGEMENT
r
UNIT
1.
GROSS
H AY
TO TA L
RECEIPTS
BALE
FROM
1.20
$
2 . VA R I A B L E C O S T S
PREHARVEST
FERT 240-100-130
HERBICIDE
MACHINERY
T R A C TO R S
LABOR(TRACTOR & MACHINERY)
I N T E R E S T O N O P. C A P.
S U B T O TA L , P R E - H A R V E S T
HARVEST COSTS
CUSTOM BALING
S U B T O TA L , H A R V E S T
r
PRICE
OR
VA L U E
OR
COST/UNIT QUANTITY COST
PRODUCTION
210.00
,232*22
252.00
$
ACRE
ACRE
ACRE
ACRE
HOUR
DOL.
76.
2.
2.
0*
3.
0.
4
2
6
5
0
1
0
5
4
4
0
0
1.00
0.50
1.00
1 .00
0.86
23.79
76.40
1 .13
2.64
0.54
2.58
2x22
$
85.67
$
BALE
0.40
210.00
_&_U_2!_.
$
84.00
s 169.67
T O TA L VA R I A B L E C O S T
3 . B R E A K E V E N P R I C E , VA R I A B L E C O S T S
BALE
4. FIXED COSTS
MACHINERY
T R A C TO R S
P R O R AT E D E S TA B . C O S T
LAND (NET RENT)
T O TA L F I X E D C O S T S
ACRE
ACRE
ACRE
ACRE
0.808
$
0.
0.
90.
10.
7
4
2
0
0
5
2
0
1 .00
1.00
0.07
1 .00
0.70
0.45
6.32
—12x22
17.47
s 187.14
5 . T O TA L C O S T S
6 . B R E A K E V E N P R I C E . T O TA L C O S T S
$
BALE
0.891
* E S TA B L I S H M E N T C O S T P R O R AT E D O V E R 1 5 Y E A R S . H E R B I C I O E AT S 2 . 2 5 / A C R E
HAY SOLD IN FIELO.
PREPARED BY DR. JAMES T. LONG. TAEX, OVERTON, TEXAS PROJECTED 1978
r
COASTAL BERMUDAGRASS HAY, NORTHEAST TEXAS REGION
ESTIMATED COSTS AND RETURNS PER ACRE
TYPICAL MANAGEMENT
O P E R AT I O N
PICKUP
R E N T D . F E R T. A P P L I
PICKUP
PICKUP
R E N T D . F E R T. A P P L I
PICKUP
OICKUP
T O TA L S
ITEM
NO.
10
3.86
10
10
3,86
10
10
D AT E
TIMES LABOR MACHINE
OVER
HOURS
HOURS
AUG
FEB
FEB
APR
MAY
MAY
JUNE
0.10
1 .00
0.10
0.10
1.00
0.10
0.10
FUEL,OIL,
FIXED
L U B . . R E P. C O S T S
PER ACRE PER ACRE
0. 100
0.079
0. 100
0.100
0.079
0. 100
0. 53
0.27
0.53
0.53
0.27
0. 53
0. 14
0*23
0. 14
0. 14
0. _3
0. 14
.2x125 -2x122
2x52
-2x1*
3. 19
1. 15
0.125
0.118
0.125
0.125
0 . 11 8
0.125
0.861
0.657
_
* E S TA B L I S H M E N T C O S T P R O R AT E D O V E R 1 5 Y E A R S . H E R B I C I D E AT S 2 . 2 5 / A C R E
H AY S O L D I N F I E L D .
P R E PA R E D B Y D R . J A M E S T. L O N G , TA E X , O V E R T O N , T E X A S P R O J E C T E D 1 9 7 8
.
B U D G E T I D E N T I F I C AT I O N N U M B E R — 8 3 6 0 11 0 0 2 111 0 0
A N N U A L C A P I TA L M O N T H 7
10
COASTAL BERMUDAGRASS HAY, NORTHEAST TEXAS REGION
ESTIMATED COSTS AND RETURNS PER ACRE
HIGH LEVEL MANAGEMENT
r
UNIT
1. GROSS RECEIPTS FRCM PRODUCTION
H AY
T O TA L
2 . VA R I A B L E C O S T S
PREHARVEST
FERT 300-100-200
HERBICIDE
MACHINERY
T R A C TO R S
LABOR!TRACTOR & MACHINERY)
I N T E R E S T C N O P. C A P.
BALE
ACRE
ACRE
ACRE
ACRE
HOUR
DOL.
PRICE
OR
VA L U E
OR
COST/UNIT QUANTITY COST
1.30
107.60
2.25
3.81
1.79
3.00
0.10
300.00
1.00
1 .00
1.00
1 .00
1 .65
40.71
SUBTOTAL, PRE-HARVEST
HARVEST COSTS
CUSTOM BALING
SUBTOTAL, HARVEST
r
BALE
0.40
390.00
s
107.60
2.25
3.81
1.79
4.95
4.07
124.47
-122*22
$ 120.00
s 244.47
1. BREAKEVEN PRICE, VARIABLE COSTS
BALE
4. FIXED COSTS
MACHINERY
TRACTORS
PRORATED ESTAB. COST
LAND (NET RENT)
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
0.815
$
1.23
1.48
59.61
10.00
1.00
1 .00
0.07
1.00
1 .23
1.48
4. 17
$
—12x22
16.89
$ 261.36
5 . T O TA L C O S T S
BALE
HAY SOLD IN FIELD.
PREPARED BY DR. JAMES T. LONG, TAEX, OVERTON, TEXAS
r
$
300.00
TOTAL VARIABLE COST
6 . B R E A K E V E N P R I C E , T O TA L C O S T S
390.00
0.871
PROJECTED 1978
11
COASTAL BERMUDAGRASS HAY, NORTHEAST TEXAS REGION
ESTIMATED COSTS AND RETURNS PER ACRE
HIGH LEVEL MANAGEMENT
OPERATION
ITEM
NO.
DATE
.
FUEL.OIL. FIXED
TIMES LABOR MACHINE LUB..REP. COSTS
OVER HOURS HOURS PER ACRE PER ACRE
PICKUP
10
FEB
0.10
0.125
0.100
0.53
0.14
R E N T D . F E R T. A P P L I 3 , 8 6 M A R I . 0 0 0 . 11 8 0 . 0 7 9 0 . 2 7 0 . 2 3
S P R AY E R , H E R B . H 3 . 8 3 A P R 1 . 0 0 0 . 4 2 3 0 . 2 8 2 1 . 0 8 1 . 0 6
PICKUP
10
APR
0.10
0.125
0.100
0.53
0.14
R E N T O . F E R T. A P P L I 3 , 8 6 M AY 1 . 0 0 0 . 11 8 0 . 0 7 9 0 . 2 7 0 . 2 3
PTCKUP
10
M AY
0.10
0.125
0.100
0.53
0.14
PICKUP
10
JUNE
0.10
0.125
0.100
0.53
0.14
PICKUP
10
J U LY
0.10
0.125
0.100
0.53
0.14
P E N T O . F E R T. A P P L I 3 , 8 6 A U G 1 . 0 0 0 . 11 8 0 . 0 7 9 0 . 2 7 0 . 2 3
PICKUP
10
AUG
0.10
0.125
0.100
0.53
0.14
D ICKUP 10 SEPT 0.10 _Q«125 ., Qf \QQ .2x53 -2x1*
TOTALS
1.651 1.218
HAY SOLO IN FIELD.
PREPARED BY DR. JAMES T. LONG, TAEX, OVERTON, TEXAS
5.60
2.72
PROJECTED 1978
B U D G E T I D E N T I F I C AT I O N N U M B E R — 8 3 6 0 11 0 0 111 0 0 0
A N N U A L C A P I TA L M O N T H 9
.
Download