FOREWORD
The enterprise budgets for Texas Edwards
Plateau-Western Region arc based on yields, pro
duction input quantities, and production practices
which represent the best judgment of local produc
ers, county Extension agents-agriculture, financial
institution representatives, farm machinery dealers
and others knowledgeable of the area. Variation
in yields, production inputs and production prac
tices should be expected for particular farms.
Budgets for all major crops produced in the
area are included for two levels of management,
when applicable. Crop yields are directly related
to levels of management. These differences are due
largely to timing of operational practices which
may not be evident in the budgets.
r
The machinery inventory is applicable to both
typical and high level management. In some bud
gets custom rates, primarily harvesting, were used
in lieu of the assumption that harvesting equip
ment was owned.
Budgets for establishing permanent type pasture
grasses were prepared and used for prorating estab
lishment costs in the respective pasture and hay
budgets. Forage crops include expenses only be
cause it is expected that the income will be derived
from livestock enterprises.
Crop share rental agreements do not exist to any
substantial degree. Land charges were, therefore,
calculated by using a fair market value times an
interest rate or a cash lease.
TEXAS EDWARDS PLATEAU II REGION
r
Assumed Prices Paid and Received by Farmers 1/
Item
Unit
Price
Prices Paid (1978)
Seed
Cotton
Grain Sorghum
Wheat
Alfalfa
Custom Rates
Cotton (Harvest & Haul)
Cotton (Ginning, Bags & Ties)
Grain (Harvest)
Grain (Haul)
Wheat (Combine)
Wheat (Haul)
c
bu.
lbs.
cwt.
cwt.
cwt.
.33
.40
7.50
.70
bu.
1.00
1.75
.30
.25
7.00
.15
Fuel and Lubricants
Gasoline
Diesel
L.P. Gas
Motor Oil (Heavy Duty, Detergent)
gal.
gal.
gal.
gal.
.55
.42
.40
1.75
Fertilizer
Nitrogen
Phosphorous
lb.
lb.
.16
.20
Labor
hour
5.00
Chemicals
Pre-emergence Herbicide
Methyl Parathion
gal.
gal.
28.50
8.50
Hail Insurance
Cotton
Wheat
$100
$100
12.00
10.00
Interest
r
lbs.
lbs.
bu.
acre
.10
Texas Edwards Plateau II Region
Item
tt
__.
Unit
Price
Prices Received (1978^
Cotton
Cottonseed
Grain Sorghum
Wheat
Grazing
Hay
lb.
ton
cwt.
bu.
lbs.
ton
$ .44
60.00
3.30
2.20
.30
45.00
^
U __-*___£_ PS.10"8 are n0t " ^ lnterP"ted as P-ciictions or
" _
TEXAS EDWARDS PLATEAU II REGION
Estimated Machinery and Equipment Cost Per Hour of Use
Machinery
Item and Size
Item
No.
Tractor - 2 Wh. Dr.
1
Tractor - 150 HP
2
Tractor - 125 HP
3
Tractor - 90 HP
4
Tractor - 40 HP
5
10
Pickup - 1/2 Ton
Roll. Cultivator - 20 Ft. 30
Roll. Cultivator - 26 Ft. 31
Cult. 8R - 26.6 Ft.
34
Lister Planter 6R - 20 Ft .36
Bed Planter 6R - 20 Ft.
38 Bed Planter 8R - 26.6 Ft. 39
Tandem Disc - 14 Ft.
40
Tandem Disc - 20 Ft.
41
Offset Disc - 28 Ft.
43
Chisel - 23 Ft.
44
Mldb. Rollover - 5.3 Ft. 46
Moldboard - 8 Ft.
47
51
Sandfighter - 22.5 Ft.
Packer
53
Lister 8R - 26.6 Ft.
55
Shredder 2R - 6.6 Ft.
56
Shredder 4R - 13.3 Ft.
57
Grain Drill - 13.5 Ft.
58
Herb Spr/Disc - 14 Ft.
61
Purchase
Price
Estimated
Years of Use
5
5
5
5
10
3
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
$50,400
22,000
16,500
11,000
6,000
5,000
2,150
2,800
3,450
2,700
2,350
3,000
2,000
3,950
9,000
4,150
3,000
2,200
535
350
1,650
650
2,000
2,300
450
c
Estimated
Hours of Use
Fixed Costs
Per Hour
2500
2500
2500
2500
3000
2100
1400
1400
1400
1050
1400
1400
1400
1400
1400
1400
1400
1400
$19.27
7.23
5.00
2.82
2.89
1.90
1.86
2.42
2.98
3.12
2.03
2.60
1.72
3.42
7.92
3.59
2.60
1.90
700
1400
1050
875
875
840
700
Variable Costs
Per Hour
$ 8.09
5.20
4.36
3.26
2.19
2.68
.86
1.13
1.40
1.44
.95
1.21
.81
1.59
3.29
1.67
1.21
.90
.88
.43
.15
.90
.42
2.76
3.38
1.29
1.53
.93
.30
1.89
.79
.35
c
1
*
_
^N
r
ALFALFA ESTABLISHMENT, FURROW IRRIGATED, EDWARDS PLATEAU II REGION
ESTIMATED COSTS AND RETURNS PER ACRE
UNIT
PRICE
OR
VA L U E
OR
COST/UNIT QUANTITY COST
1 . G R O S S R E C E I P T S FROM PRODUCTION
T O TA L
2. VARIABLE COSTS
PREHARVEST
SEED
F E RT C 2 0 - 1 0 0 - 0 )
MACHINERY
TRACTORS
IRRIGATION MACHINERY
LABOR(TRACTOR & MACHINERY)
LABOR(IRRIGATION)
INTEREST ON OP. CAP,
SUBTOTAL, PRE-HARVEST
r
0.0
LBS,
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
0.70
23.20
2.21
4.70
27.71
5.00
5,00
0.10
22.00
1.00
1 .00
1.00
1.00
1.85
4.25
22.03
15.40
23.20
2.21
4.70
27.71
9.23
21.25
2x22
s 105.91
HARVEST COSTS
SUBTOTAL. HARVEST
$_
s
TOTAL VARIABLE COST
s 105.91
0 . 0
3. INCOME ABOVE VARIABLE COSTS
s -• 1 0 5 . 9 1
4. FIXED COSTS
s
MACHINERY
TRACTORS
I R R I G AT I O N M A C H I N E R Y
LAND CNET RENT)
T O TA L F I X E D C O S T S
ACRE
ACRE
ACRE
ACRE
3.21
5.37
26.35
46.82
1
1
1
1
.00
,00
.00
.00
3.21
S.3-r
26.35
s
-*6x22
81 .75
5. TOTAL COSTS
s 187.66
6. NET RETURNS
$ -■ 1 8 7 , 6 6
LAND CHARGE BASED ON S60/ACRE LESS 50 PCT. OF IRRIG. FIXED COSTS.
PREPARED BY GARY CONDRA, TAEX, FORT STOCKTON, TEXAS PROJECTED 1978
r
A L F A L F A E S T A B L I S H M E N T. F U R R O W I R R I G A T E D , E D W A R D S P L A T E A U I I R E G I O N
E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E
O P E R AT I O N
MLBO ROLLOVER TM
PA C K E R
TM
TA N D E M D I S C T M
GRAIN DRILL TM
PICKUP 1/2 TON
PICKUP 1/2 TON
PICKUP 1/2 TON
PICKUP 1/2 TON
ITEM
NO.
3,46
53
3,40
3,58
10
10
10
10
D AT E
FUEL,OIL,
FIXED
T I M E S L A B O R M A C H I N E L U B . . R E P, C O S T S
OVER HOURS HOURS PER ACRE PER ACRE
JUNE
JUNE
AUG
AUG
AUG
OCT
NOV
DEC
1.00 0.741
0.494
1.00 0 , 0
0.329
1 .00 0 . 2 5 3
0.168
1 .00 0 . 3 5 3
0.235
0,10 0.125 0.100
0.10 0.125 0.100
0.10 0.125 0.100
0 . 1 0 -2x122 - 2 x 1 2 2
3. 18
0. 05
1.02
1.59
0.27
0.27
0.27
4.24
0. 10
1.30
2.19
0.19
0.19
0.19
-2x21
.2x12
1.846 1.627
6.91
8.58
T O TA L S
L A N D C H A R G E B A S E D O N * 6 0 / A C R E L E S S 5 0 P C T. O F I R R I G . F I X E D C O S T S .
P R E PA R E D B Y G A R Y C O N O R A , TA E X , F O R T S T O C K T O N , T E X A S P R O J E C T E D 1 9 7 8
B U D G E T I D E N T I F I C AT I O N N U M B E R '
A N N U A L C A P I TA L M O N T H 1 2
— 8 11 0 0 9 4 0 2 9 2 0 0
.
.
ALFALFA. FURROW IRRIGATED, EDWARDS PLATEAU II REGION
ESTIMATEO COSTS AND RETURNS PER ACRE
r
UNIT
GROSS RECEIPTS FROM PRODUCTION
HAY
TOTAL
TON
PRICE
OR
VA L U E
OR
COST/UNIT QUANTITY COST
45.00
6.50
*
,292.50
292.50
2. VARIABLE COSTS
PREHARVEST
FERT(0-80-4 0)
MACHINERY
I R R I G AT I O N M A C H I N E R Y
L A B O R ( T R A C TO R S - M A C H I N E RY )
L A B O R C I R R I G AT I O N )
I N T E R E S T O N O P. C A P.
S U B T O TA L . P R E - H A R V E S T
r
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
16.00
1.68
81.50
5.00
5.00
0.10
1.00
1.00
1.00
0.87
12.50
34.95
16.00
1.88
81.50
4.37
62.50
3x32
$
169.75
HARVEST COSTS
S U B T O TA L . H A R V E S T
*
T O TA L VA R I A B L E C O S T
$
169.75
$
122.75
s
3 . I N C O M E A B O V E VA R I A B L E C O S T S
s
4. FIXED COSTS
MACHINERY
TRACTORS
I R R I G AT I O N M A C H I N E R Y
P R O R AT E O E S TA B . C O S T
LANO (NET RENT)
T O TA L F I X E D C O S T S
0 . 0
ACRE
ACRE
ACRE
ACRE
ACRE
1.32
0 . 0
77.50
187.66
21 .25
1
1
1
0
1
.00
.00
.00
.14
.00
1
0
77
26
s
.32
.0
.50
.84
-21x23
126.91
5 . T O TA L C O S T S
s
296.66
6. NET RETURNS
*
-4.16
L A N O C H A R G E B A S E O O N S 6 0 / A C R E L E S S 5 0 P C T. O F I R R I G . F I X E D C O S T S .
E S TA B L I S H M E N T C O S T P R O R AT E D O V E R 7 Y E A R S . C R O P S O L D S TA N D I N G I N F I E L D .
P R E PA R E D B Y G A R Y C O N O R A , TA E X , F O R T S T O C K T O N , T E X A S P R O J E C T E D 1 9 7 8
r
ALFALFA, FURROW IRRIGATED, EDWARDS PLATEAU II REGION
ESTIMATED COSTS AND RETURNS PER ACRE
.
ITEM
NO.
OPERATION
PICKUP
PICKUP
PICKUP
PICKUP
PICKUP
PICKUP
PICKUP
1/2
1/2
1/2
1/2
1/2
1/2
1/2
TON
TON
TON
TON
TON
TON
TON
TOTALS
10
10
10
10
10
10
10
DATE
FUEL.OIL, FIXED
TIMES LABOR MACHINE LUB..REP. COSTS
OVER HOURS HOURS PER ACRE PER ACRE
MAR
MAY
JUNE
JULY
AUG
SEPT
OCT
0 . 1 0 0.125 0.100
0.10 0.125 0.100
0.10 0.125 0.100
0.10 0.125 0.100
0 . 1 0 0 . 1 2 5 0. 100
0.10 0.125 0.100
0 . 1 0 -2x125 - 2 x 1 2 2
0.27
0.27
0.27
0.27
0.27
0.27
0.19
0.19
0.19
0.19
0.19
0.19
-2x21
-2*13
0.875 0.700
1.88
1.32
LANO CHARGE BASED ON «60/ACRE LESS 50 PCT, OF IRRIG. FIXED COSTS.
ESTABLISHMENT COST PRORATED OVER 7 YEARS. CROP SOLD STANDING IN FIELD.
PREPARED BY GARY CONORA. TAEX. FORT STOCKTON. TEXAS PROJECTED 1978
BUDGET IDENTIFICATION NUMBER- ■- 8 1 0 0 9 6 0 2 9 2 0 0
ANNUAL CAPITAL MONTH 10
"1
• " .
COTTON, DRYLAND, EDWARDS PLATEAU II REGION
ESTIMATED COSTS AND RETURNS PER ACRE
r
UNIT
GROSS RECEIPTS FROM PRODUCTION
COTTON LINT
C O T TO N S E E D
T O TA L
VA R I A B L E C O S T S
P R E H A RV E S T
SEED
HERBICIDE
HAIL INSURANCE
MACHINERY
T R A C TO R S
LABORCTRACTOR & MACHINERY)
OTHER LABOR
I N T E R E S T O N O P. C A P.
S U B T O TA L . P R E - H A R V E S T
r
HARVEST COSTS
GIN. BAG. TIES
CUSTOM HARV&HAUL
PRICE
OR
VA L U E
OR
COST/UNIT QUANTITY COST
$
LBS.
TON
0.44
60.00
300.00
0.23
132.00
.-12x22
S
145.80
$
LBS.
ACRE
DOL.
ACRE
ACRE
HOUR
HOUR
DOL.
0.33
7.00
0.12
4.50
9.53
5.00
2.50
0.10
15.00
1.00
60.00
1 .00
1.00
4.18
2.00
18.97
4.95
7.00
7.20
4.50
9.53
20.91
5.00
$
1x32
60.99
$
C W T.
C W T.
1.75
1 .00
13.20
13.20
SUBTOTAL. HARVEST
T O TA L VA R I A B L E C O S T
23.10
1. t?0
36.30
97.29
3 . I N C O M E A B O V E VA R I A B L E C O S T S
48.51
4. FIXED COSTS
MACHINERY
TRACTORS
LANO CNET RENT)
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
5.81
11 . 11
30.67
1.00
1 .00
1.00
5.81
11 . 11
—32x62
S 47.59
5. TOTAL COSTS
S 144.89
6. NET RETURNS
0.91
LAND CNET RENT) BASED ON 1/4 OF GROSS INCOME LESS 1/4 OF GINNING, 8AGGING
ANO TIES. PLANTED 2X1 SKIPROW. GOV«T PYMNT. NOT INCLUDED.
PREPARED BY GARY CONDRA• TAEX, FORT STOCKTON, TEXAS PROJECTED 1978
r
Download