r TEXAS ROLLING PLAINS II r FOREWORD The enterprise budgets for Texas Rolling Plains II Region are based on estimates of yields, pro duction input quantities, and production practices which represent the best judgment of local produc ers, county Extension agents-agriculture, financial institution representatives, farm machinery dealers and others knowledgeable of the area. Variation in yields, production inputs and production prac tices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. The machinery inventory is applicable to both r typical and high level management. In some bud gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Land charges were based on the customary land lord's crop share less his proportionate share of certain production and harvesting inputs. A per acre land charge was made when crop share was not used. *, ' TEXAS ROLLING PLAINS II REGION #"PN Assumed Prices Paid and Received by Farmers 1/ Item Unit Price cwt. cwt. cwt. cwt. $37.00 33.00 45.00 24.00 5.50 80.00 28.00 10.00 Prices Paid (1977) Seed Cotton (di-system) Cotton (delinted) Grain Sorghum Guar Wheat (clean and treated) Alfalfa Hybrid Forage Hay Irish Potatoes jfP^v ^#SSS\ bu. cwt. cwt. cwt. Fertilizer Nitrogen (Anhy.) Nitrogen (dry) Phosphorous lb. lb. lb. Chemicals Pre-emerge Herbicide Methyl-Parathion Malathion 5 gal. gal. gal. Custom Rates Combining wheat Combining Grain Sorghum Combining Guar Hay Harvest (mow, rake, bale, haul) acre acre acre bale .18 .25 .25 135.00 8.50 12.75 7.00 2/ 7.50 8.00 .65 Hauling Grain Sorghum Guar Wheat bu. Hoeing Labor Tr a c t o r, I r r i g a t i o n L a b o r hour hour 2.25 3.25 Cotton Ginning bale 31.00 cwt. cwt. .20 .20 .15 3/ -2Rolling Plains II Item Fuel and Lubricants Gasoline L. P. Gas Diesel Motor Oil Lubricant Capital Hail Insurance (wheat) /^*\ Unit gal. gal. gal. gal. lb. $ acre Prices RA^-ived (1977) Cotton Guar Cottonseed Wheat Grain Sorghum Alfalfa Hay Forage Sorghum Hay Coastal Hay Pasture Grazing Potatoes lb. cwt. ton bu. cwt. ton ton ton AUM cwt. Price $ .45 .32 .39 2.50 .32 .09 3.00 .55 10.00 95.00 3.05 4.30 55.00 45.00 40.00 10.00 6.00 1/ These price assumptions are not to be interpreted as predictions or prospective prices. 2/ Plus 5$/bu. over 20 bu. 3/ Plus l/2c/bu. over 5 miles. ■>^% 1 Machinery Item and Size Tractor 4 wh dr Tractor 2 Tractor 3 Tractor 4 Tractor 5 Pickup 1/2 ton Rolling Cultivator TM Cultivator 6R TM Lister-Plntr. 6R TM Tandem Disc TM Tandem Disc TM Chisel TM Moldboard 6B TM Sand Fighter TM Lister 6R TM Shredder 2R TM Grain Drill TM Herb Spr/Disc TM Cotton Tr 3 BL TM Cotton Str/Bsk TM Rolling Cultivator HLM Cultivator 8R HLM Lister-Plntr 8R HLM Tandem Disc HLM Offset Disc HLM Chisel HLM Chisel HLM Moldboard 6B HLM Sand Fighter HLM Lister 8R HLM Shredder 2R HLM Shredder 4R HLM Grain Drill HLM Gr Drill/Fert HLM Box Float HLM Herb Spr/Disc HLM Cotton Tr 5B HLM Cotton St/Bsk HLM TEXAS ROLLINr"~^INS II REGION Estimated Machinery and i_ _ Jpment Cost Per Hour of Use Item No. 1 2 3 4 5 10 30 33 36 40 41 44 47 51 54 56 58 61 62 64 66 69 72 76 77 79 80 82 86 90 91 92 93 94 95 96 98 99 Purchase Price $50,400 22,500 17,000 14,000 6,700 5,500 1,700 1,400 1,500 1,400 2,250 4,000 2,450 450 850 475 1,750 550 750 6,000 2,400 1,900 1,900 2,250 2,250 4,000 8,500 2,450 450 1,200 475 2,100 1,750 2,250 500 550 1,100 6,000 Estimated Years of Use Estimated Hours of Use 5 5 5 5 12 3 8 8 8 8 8 8 8 8 8 8 8 8 8 5 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 2500 5000 3750 3000 3600 2100 1600 1600 1200 1600 1600 1600 1600 $19.51 4.22 4.22 3.22 2.71 1.87 1.44 1.18 1.70 1.18 1.91 3.39 2.08 800 .76 .96 .64 1600 1000 960 800 1200 1500 1600 1600 1200 1600 1600 1600 1600 1600 Fixed Costs Per Hour 2.47 .93 .85 4.26 2.03 1.61 2.15 1.91 1.91 3.39 6.74 2.08 800 .76 1200 1000 1000 1.35 960 960 800 800 1200 1200 .64 2.85 2.47 3.17 .85 .93 1.24 6.78 Variable Costs Per Hour $ 7.48 5.01 3.82 2.75 2.02 3.95 .05 .04 .06 .04 .07 .11 .07 .03 .03 .02 .08 .03 .03 .18 .07 .05 .07 .06 .06 .11 .24 .07 .03 .05 .02 .09 .08 .11 .03 .03 .04 .22 ALFALFA ESTABLISHMENT, IRRIGATEO. TEXAS ROLLING PLAINS II REGION ESTIMATED COSTS ANO RETURNS PER ACRE TYPICAL MANAGEMENT ^ ^ N UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTIGN TOTAL 2 * VA R I A B L E C O S T S PREHARVEST SEED FERT(16-20-0) MACHINERY TRACTORS I R R I G AT I O N M A C H I N E RY LAB0R(TRACTOR £ MACHINERY) L A B O R ( I R R I G AT I O N ) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST 0*0 LBS* ACRE ACRE ACRE ACRE HOUR HOUR DOL* 0*80 9*00 2*40 2*0 3 3*88 3*25 3*25 0*09 25*00 1*00 1*00 1*00 1*00 1*48 0*60 9*79 S 20*00 9*00 2*40 2*03 3*88 4*81 1*95 Qt93 45*00 HARVEST COSTS SUBTOTAL, HARVEST $_ $ "olo TOTAL VARIABLE COST $ 45*00 $ -45*00 3* INCOME ABOVE VARIABLE COSTS 4* FIXEC COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS $ ACRE ACRE ACRE ACRE 2*22 2*27 1*76 300*00 1*00 1*00 1*00 0*06 2*22 2*27 1*76 $ .-1&L22 24*25 5* TOTAL COSTS s 6* NET RETURNS $ -69* 26 PREPAREO BY NORMAN W* BRINTS, TAEX, VERNON, TEXAS 69*26 PROJECTED 1977 £ A L FA L FA E S TA B L I S H M E N T, I R R I G AT E D , T E X A S R O L L I N G P L A I N S I I R E G I O N ESTIMATED COSTS ANO RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION CHISEL TM P I C K U P 1 / 2 TO N TA N D E M D I S C T M PICKUP 1/2 TON GRAIN ORILL TM P I C K U P 1 / 2 TO N PICKUP 1/2 TON PICKUP 1/2 TON P I C K U P 1 / 2 TO N TO TA L S ITEM NO* 3 ,44 10 4 .40 10 3 • 58 10 10 10 10 DATE J U LY J U LY AUG AUG SEPT SEPT OCT NOV OEC FUEL,OIL, FIXEO TIMES LABOR MACHINE LUB..REP* CCSTS OVER HOURS HOURS PER ACRE PER ACRE 1*00 0*10 1*00 0*10 1*00 0*10 0*10 0*10 0*10 0*167 0*125 0*236 0*125 0*327 0*125 0*125 0*125 0*125 0 * 111 0*100 0*157 0*100 0*218 0*100 0*100 0*100 0*52 0*39 0*53 0*39 1*02 0*39 0*3?> 0*39 0*94 0*19 0*79 0*19 1*64 0*19 0*19 0*19 -2*122 -0*22 -0*12 1*480 1*087 4*43 4*49 PREPAREO BY NORMAN W* BRINTS. TAEX. VERNON, TEXAS PROJECTEO 1977 '^S B U D G E T I D E N T I F I C AT I C N N U M B E R 8 11 0 0 6 1 0 2 6 5 0 0 A N N U A L C A P I TA L M O N T H 1 2 ^^N A L FA L FA . I R R I G AT E D , T E X A S R O L L I N G P L A I N S I I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION HAY TOTAL VAPIABLE COSTS PREHARVEST FERT(0-46-0) INSECTICIDE MACHINERY I R R I G AT I O N M A C H I N E RY LABCR(TRACTOR & MACHINERY) L A B O R U R R I G AT I O N ) INTEREST ON OP* CAP* SUBTOTAL, PRE-HARVEST HARVEST COSTS CUSTOM HARVEST SUBTOTAL, HARVEST TON PRICE OR VA L U E OR COST/UNIT QUANTITY COST 65*00 6*00 -122*22 $ 390*00 $ ACRE APPL ACRE ACRE HOUR HOUR DOL* 11 * 5 0 3*00 2*76 15*52 3*25 3*25 0*09 1*00 3*00 1*00 1*00 0*87 2*40 12*67 BALE 0*65 200*00 11*50 9*00 2*76 15*52 2* 84 7*80 If 20 50*63 $ _l__2_t22 $ 130*00 $ 180*63 TOTAL VARIABLE COST /^N 30*105 3* BREAKEVEN PRICE, VARIABLE COSTS TON 4* FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATEO ESTAB* COST LAND (NET RENT) TOTAL FIXED CCSTS $ ACRE ACRE ACRE ACRE ACRE 1*00 1*00 1*00 0.17 1*00 1*31 0*0 7*04 11 * 5 7 —22*00 $ 101*92 $ 282*55 5* TOTAL COSTS 6* BREAKEVEN PRICE, TOTAL COSTS 1*31 0*0 7*04 69*26 82*00 TON 47*091 LAND CHARGE IS 33% OF GROSS LESS 33% OF FERTILIZER AND HARVEST* ESTABLISHMENT COSTS PRORATED OVER SIX YEARS* P R E PA R E D B Y N O R M A N W * B R I N T S , TA E X , V E R N O N , T E X A S P R O J E C T E D 1 9 7 7 ALFALFA.IRRIGATED. TEXAS ROLLING PLMMS I I REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT ITEM NO* OPERATION PICKUP P ICKUP PICKUP PICKUP PICKUP PICKUP PICKUP 1 / 2 1 / 2 1 / 2 1 / 2 1 / 2 1 / 2 1 / 2 TON TON TON TON TON TON TON 10 10 10 19 10 10 10 /*!*% FUEL.OIL. FIXED COSTS TIMES LABOR MACHINE LUB*«REP* PER ACRE DATE OVER HOURS HOURS PER ACRE 0*10 0*125 0*100 OCT 0*10 0*125 0*100 APR 0*10 0*125 0*100 MAY JUNE 0*10 0*125 0*100 JULY 0*10 0*125 0*100 0 * 1 0 0*125 0*100 AUG SEPT 0.10 -0*125 -2_ul22 0*39 0*39 0*39 0*39 0*39 0*39 JLM.29. 0*19 0*19 0*19 0*19 0*19 0*19 __2_Li2 0*875 0*700 J>*76 1*31 TO TA L S L A N 0 C H A * - - I S 3 3 * O , - O S S - B S S 3 3 « O , P E « T I L I Z _ * I N . H A R V E S T. ^r^^rsr^rN%ro-THT-.T._x.,vErNrN?*TEx,s pRo_ec-_o _,-, B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 9 - 81 00 6402 650 0 8 ALFALFA ESTABLISHMENT, IRRIGATED, TEXAS ROLLING PLAINS II REGION ESTIMATED COSTS ANO RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT PRICE OR COST/UNIT QUANTITY VALUE OR COST 1* GROSS RECEIPTS FROM PRODUCTION TOTAL 2* VARIABLE COSTS PREHARVEST SEED FERT(16-20-0) HERBICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABQR(TRACTOR & MACHINERY) L A B O R ( I R R I G AT I O N ) INTEREST ON OP* CAP* SUBTOTAL, PRE-HARVEST 0*0 $ LBS* ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL* 0*80 9*00 6*00 2*41 3*97 3*88 3*25 3*25 0*09 25*00 1*00 1*00 1*00 1*00 1*00 1*91 0.60 11 . 7 7 $ 20.00 9.00 6.00 2*41 3.97 3.88 6.19 1.95 l_L__2 54.52 HARVEST COSTS SUBTOTAL, HARVEST K $ ~o7o~ TOTAL VARIABLE COST $ 54.52 3* INCOME ABOVE VARIABLE COSTS 4* FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LANO (NET RENT) TOTAL FIXED COSTS $ -54.52 ACRE ACRE ACRE ACRE 2*38 3*90 1*76 300*00 5* TOTAL COSTS 6* NET RETURNS PREPAREO BY NORMAN W. BRINTS. TAEX. VERNON. TEXAS 1.00 1.00 1.00 0.06 2.38 3.90 1.76 ..I9it22 26.03 s 80.55 -80.55 PROJECTED 1977 A L FA L FA O P E R AT I O N E S T A B L I S H M E N T. I R R I G A T E O , T E X A S R O L L I N G P L A I N S E S T I M AT E D C O S T S A N O R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT ITEM NO. MOLOBOARO 6B HLM 2.82 PICKUP 1/2 TON 10 TA N O E M D I S C H L M 2 , 7 6 BOX F L O AT HLM 3,95 PICKUP 1/2 TON 10 GRAIN DRILL HLM 3,93 PICKUP 1/2 TON 10 PICKUP 1/2 TON 10 PICKUP 1/2 TON 10 PICKUP 1/2 TON 10 II REGION s*K FUEL.OIL. FIXED T I M E S LABOR MACHINE L U B * , R E P. C O S T S PER ACRE PER ACRE HOURS HOURS OVER D AT E 0*75 0*10 1*00 1*00 0*10 1*00 0*10 0*10 0*10 J U LY J U LY AUG AUG AUG SEPT SEPT OCT NOV DEC 0*317 0*125 0*137 0*471 0*125 0*229 0*125 0*125 0*125 0*212 0*100 0*092 0*314 0*100 0*153 0*100 0*100 0*100 1*29 0*39 0*56 1*45 0*39 0*71 0*39 0*39 0*39 1*51 0*19 0*64 1*65 0*19 1*15 0*19 0*19 0*19 0*10 .JUIML _2*.122 -*U32 -0*12 1*905 1*370 T O TA L S 6*38 6*27 ^^X P R E PA R E O B Y N O R M A N W. B R I N T S . TA E X . V E R N O N . T E X A S B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 1 2 - 8 11 0 0 6 1 0 1 650 PROJECTED 1977 0 /-^k 0 A L FA L FA , I R R I G AT E D , T E X A S R O L L I N G P L A I N S I I R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION HAY TOTAL 2* VARIABLE COSTS PREHARVEST FERT<0-92-0) INSECTICIDE MACHINERY I R R I G AT I O N M A C H I N E R Y LABORCTRACTOR & MACHINERY) L A B O R ( I R R I G AT I O N ) INTEREST ON OP* CAP* S U B T O TA L , P R E - H A R V E S T HARVEST COSTS CUSTOM HARVEST SUBTOTAL, HARVEST PRICE OR COST/UNIT QUANTITY VALUE OR COST $ TON 65*00 7*50 ACRE APPL ACRE ACRE HOUR HOUR DOL* 23*00 3*00 2*76 19*40 3*25 3*25 0*09 1*00 3*00 1*00 1*00 0*87 3*00 17*79 487f.59 S 487*50 23*00 9*00 2*76 19*40 2*84 9.75 1-52 $ BALE 0.65 250.00 TOTAL VARIABLE COST -1.3+-J50. $ 162*50 $ 3* BREAKEVEN PRICE. VARIABLE COSTS TON 4* FIXED COSTS MACHINERY TRACTORS I R R I G AT I O N M A C H I N E R Y P R O R AT E D E S TA B * C O S T LAND (NET RENT) T O TA L F I X E D C O S T S 230*95 30*793 $ ACRE ACRE ACRE ACRE ACRE 5 * T O TA L C O S T S 6* BREAKEVEN PRICE, TOTAL COSTS 68.45 TON 1*31 0*0 8.80 80*55 99*66 1*00 1.00 1.00 0*13 1*00 $ 1*31 0.0 8.80 10o07 99-33 11 9 * 8 3 $ 350.78 46*771 LAND CHARGE IS 33% OF GROSS LESS 33% OF FERTILIZER AND HARVEST* E S TA B L I S H M E N T C O S T S P R O R AT E D O V E R E I G H T Y E A R S * P R E PA R E D B Y N O R M A N W * B R I N T S , TA E X , V E R N O N , T E X A S P R O J E C T E D 1 9 7 7 A L FA L FA . I R R I G AT E D , T E X A S R O L L I N G P L A I N S I I R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT ITEM NO* O P E R AT I O N PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP 1/2 1/2 1/2 1/2 1/2 1/2 1/2 TON TON TON TON TON TON TON T O TA L S 10 10 10 10 10 10 10 D AT E OCT APR M AY J UNE J U LY AUG SEPT FUEL .OIL, FIXED TI MES L ABOR MAC HI NE LU B.•REP• COSTS OVER HOURS HOURS PER ACRE PER ACRE 0*10 0.10 0.10 0.10 o.to 0.1 0 0.10 0* 125 0*125 0.125 0.125 0.XZ5 0*125 o.too 0.100 0*100 0.100 0*39 0 • 39 0.39 0.39 0. 39 0 . 3 9 .2*125 _2jl122 -0*39 -0*12 2.76 1*31 0.875: 0*100 o.too 0*700 0 . 1 0 . 1 0 . 1 0.1 0 . 1 0.1 9 9 9 9 9 9 L A N D C H A R G E I S 3 > 3 % O F G R O S S L E S S 3 3 % O F F E R T I L I Z E R A N D H A R A / € S T. E S TA B L I S H M E N T C O S T S P R O R AT E D ; O V E R E I G H T Y E A R S * P R E PA R E D B Y N O R M A N W. B R I N T S , TA E X , V. E R N O M , T E X A S P R O J E C T E D 1 9 7 7 B U D G E T I D E N T I F I C AT I O N N U M B E R — 8 1 0 0 6 5 0 $ 6 5 0 0 A N N U A L C A P I TA L M O N T H 9 /"ta,\ /^^\ 12 COASTAL BERMUDAGRASS ESTAB*. IRRIGATED, TEXAS ROLLING PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION TOTAL 2* VARIABLE COSTS PREHARVEST CUSTOM SPRIGGING FERTOO-20-0) HERBICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR & MACHINERY) LABORORR IGATION) INTEREST ON OP* CAP* 0*0 ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL* SUBTOTAL. PRE-HARVEST 22*50 12*50 2*75 2*78 0*87 7*76 3*25 3*25 0*09 1*00 1*00 1*00 1*00 1*00 1*00 1*21 1*20 31*00 2±25 $ 59*93 HARVEST COSTS SUBTOTAL, HARVEST $ o7o~ TOTAL VARIABLE COST $ 59*93 3* INCOME ABOVE VARIABLE COSTS 4* FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS $ -59*93 ACRE ACRE ACRE ACRE $ 1*89 0*99 3*52 300*00 1*00 1*00 1*00 0*06 1*89 0*99 3*52 .-IStPP 24*40 5* TOTAL COSTS 84*33 6* NET RETURNS -84* 33 PREPARED BY NORMAN W. BRINTS, TAEX. VERNON. TEXAS j0^\ 22*50 12*50 2*75 2*78 0*87 7*76 3*92 3*90 PROJECTED 1977 13 COASTAL BERMUDAGRASS ESTAB*• IRRIGATEO, TEXAS ROLLING PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION CHISEL PICKUP TANDEM PICKUP PICKUP PICKUP PICKUP PICKUP P ICKUP TM 1/2 TON DISC TM 1/2 TON 1 / 2 TON 1 / 2 TON 1 / 2 TON 1 / 2 TON 1 / 2 TON TO TA L S ITEM NO* DATE 3 . 4 4 JAN 10 JAN 4.41 FEB 10 FEB 10 MAR 10 APR 10 MAY 10 JUNE 1 0 J U LY /"^v FUEL.OIL, FIXED TIMES LABOR MACHINE LUB*.REP* COSTS OVER HOURS HOURS PER ACRE PER ACRE 0 * 111 0*100 0 * 11 0 0*100 0*100 0*100 0*100 0*100 fl t l fl fl 0.52 0*39 0*37 0*39 0*39 0*39 0*3? 0*39 0.39 -2*12 1*207 0*921 3*66 2*88 1*00 0*167 0*10 0*125 1*00 0*165 0*10 0*125 0*10 0*125 0*10 0*125 0*10 0*125 0*10 0*125 0*10 -0*125 0*94 0*19 0*63 0*19 0*19 0*19 0*19 0*19 /*^a%k PREPARED BY NORMAN W* BRINTS, TAEX. VERNON. TEXAS BUDGET IOENTIFICATICN NUMBER-— 834006202 650 0 ANNUAL CAPITAL MONTH 12 PROJECTED 1977 14 COASTAL BERMUDAGRASS, IRRIGATED, TEXAS ROLLING PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT 1* GROSS RECEIPTS FROM PRODUCTION HAY TOTAL PRICE OR VA L U E OR COST/UNIT QUANTITY COST $ TON 40.00 7.00 $ 280*00 280.00 2* VARIABLE COSTS PREHARVEST FERK21 1-46-0) MACHINERY I R R I G AT I O N M A C H I N E R Y LABOR(TRACTOR & MACHINERY) L A B O R * I R R I G AT I O N ) I N T E R E S T O N O P. C A P. S U B T O TA L , P R E - H A R V E S T HARVEST COSTS CUSTOM HARVEST SUBTOTAL, HARVEST ACRE ACRE ACRE HOUR HOUR DOL. 64.50 1.97 15*52 3*25 3*25 0*09 0*65 -152*15 231*00 $ 150*15 s 244*32 TON 34*903 $ ACRE ACRE ACRE ACRE ACRE 0*9 0*0 7*0 84*3 21*5 3 4 3 7 1*00 1*00 1*00 0*10 1*00 0*93 0*0 7*04 8*43 $ s 5 . T O TA L C O S T S 6 . B R E A K E V E N P R I C E , T O TA L C O S T S 94*17 $ BALE 4. FIXED COSTS MACHINERY TR ACTOR S I R R I G AT I O N M A C H I N E R Y P R O R AT E D E S TA B . C C S T LAND (NET RENT) T O TA L F I X E D C O S T S 2-25 $ TOTAL VARIABLE COST 3. BREAKEVEN PRICE, VARIABLE COSTS 64*50 1*97 15*52 2*03 7*80 1*00 1*00 1*00 0*62 2*40 24*74 TON —21-51 37*97 282* 30 40*328 LAND CHARGE IS 33% OF GROSS LESS 33% OF FERTILIZER AND HARVEST* E S TA B L I S H M E N T C O S T S P R O R AT E D O V E R T E N Y E A R S * P R E PA R E O B Y N O R M A N W. B R I N T S , TA E X , V E R N O N . T E X A S P R O J E C T E D 1 9 7 7 15 COASTAL BERMUDAGRASS. IRRIGATED. TEXAS ROLLING PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT ITEM NO* OPERATION PICKUP PICKUP PICKUP P ICKUP PICKUP 1 1 1 1 1 / / / / / 2 2 2 2 2 TON TON TON TON TON TO TA L S 10 10 10 10 10 DATE APR M AY JUNE J U LY AUG FUEL.OIL. FIXED TIMES LABOR MACHINE LUB.,REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE 0*10 0.125 0*100 0*10 0*125 0*100 0.10 0*125 0*100 0*10 0*125 0*100 0 * 1 0 -1*125 __J2__122 0*39 0*39 0.39 0.39 0*19 0*19 0.19 0.19 -0*22 _2i.l2 0.625 0.500 1*97 0*93 LAND CHARGE IS 33% OF GROSS LESS 33% OF FERTILIZER AND HARVEST* ESTABLISHMENT COSTS PRORATED OVER TEN YEARS* PREPARED BY NORMAN W. BRINTS. TAEX. VERNON* TEXAS PROJECTED 1977 BUDGET IDENTIFICATION NUMBER— 836006402 650 0 ANNUAL CAPITAL MONTH 6 /*^S 16 C O A S TA L B E R M U D A G R A S S E S TA B * , I R R I G AT E O , T E X A S R O L L I N G P L A I N S I I R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION TOTAL 2* VARIABLE COSTS PREHARVEST CUSTOM SPRIGGING FERK30-20-0) HERBICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTOR & MACHINERY) LABORURR IGATION) INTEREST ON OP. CAP. 0*0 ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL* 22*50 12*50 2*75 2*78 0*87 7.76 3.25 3.25 0*09 1*00 1*00 1*00 1*00 1*00 1*00 1*16 1*20 30*21 2-31 $ 59*70 HARVEST COSTS SUBTOTAL. HARVEST $ oTo- TOTAL VARIABLE COST $ 59*70 S U B T O TA L . P R E - H A R V E S T s -59*70 3. INCOME ABOVE VARIABLE COSTS 4. FIXEO COSTS $ 1*81 0*96 3*52 18*00 24*29 5 * T O TA L C O S T S $ 83*99 6* NET RETURNS $ -83*99 MACHINERY TRACTORS I R R I G AT I O N M A C H I N E R Y LAND (NET RENT) T O TA L F I X E D C O S T S ACRE ACRE ACRE ACRE 1*81 0*96 3*52 300*00 P R E PA R E D B Y N O R M A N W. B R I N T S , TA E X . V E R N O N , T E X A S ^*N 22*50 12*50 2*75 2*78 0*87 7*76 3*77 3*90 1*00 1*00 1*00 0*06 PROJECTED 1977 17 COASTAL BERMUDAGRASS ESTAB*• IRRIGATED. TEXAS ROLLING PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT /*=^^ '™1* O P E R AT I O N CHISEL PICKUP TA N D E M PICKUP PICKUP PICKUP PICKUP PICKUR PICKUP HLM 1/2 TON DISC HLM 1/2 TON 1/2 TON 1/2 TON 1/2 TON 1/2 TON 1/2 TON T O TA L S ITEM NO* 3.79 10 3,76 10 10 10 10 10 10 D AT E FIXED FUEL.OIL. CCSTS T I M E S LABOR MACHINE L U B * . R E P * PER ACRE PER ACRE OVER HOURS HOURS JAN JAN FEB FEB MAR APR MAY JUNE J U LY 1*00 0*147 0*10 0*125 1*00 0*137 0*10 0*125 0*125 0*10 0*10 0*125 0*10 0*125 0*10 0*125 0 * 1 0 ..2_l125 1*160 0*0 98 0*100 0*092 0*100 0*100 0*100 0*100 0*100 6 9 3 9 9 9 9 9 0*83 0*19 0*64 0*19 0*19 0*19 0*19 0*19 -&-ioa -0*29 -0-.1SL 0*890 3*65 2*77 PREPARED BY NORMAN W. BRINTS, TAEX. VERNON. TEXAS 0 * 0* 0* 0* 0* 0* 0* 0* 4 3 4 3 3 3 3 3 PROJECTED 1977 B U D G E T I D E N T I F I C AT I C N N U M B E R 8 3 4 0 0 6 2 0 1 6 5 0 0 A N N U A L C A P I TA L M O N T H 1 2 / ^ \ C O A S TA L B E R M U D A G R A S S . I R R I G AT E D . T E X A S R O L L I N G P L A I N S I I R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT UNIT GROSS R E C E I P T S F R C M F R C D U C T I O N H AY T O TA L 2* VARIABLE COSTS PREHARVEST FERT(411-46-0) MACHINERY I R R I G AT I O N M A C H I N E R Y LABCRfTRACTOR & MACHINERY) L A B Q R U R R I G AT I O N ) INTEREST ON OP* CAP* S U B T O TA L , P R E - H A R V E S T HARVEST COSTS C U S TO M H A RV E S T S U B T O TA L , H A R V E S T PRICE OR VA L U E OR COST/UNIT QUANTITY COST $ TON 40*00 -£22*22 10*00 $ 400*00 ACRE ACRE ACRE HOUR HOUR DOL* 11 2 * 0 0 1*97 23*26 3*25 3*25 0*09 1*00 1*00 1*00 0*62 3*60 42*19 BALE 0*65 334*00 s s _217t.l2 217*10 372*09 T O TA L VA R I A B L E C O S T 3 * B R E A K E V E N P R I C E , VA R I A B L E C O S T S TON 4* FIXED COSTS MACHINERY TRACTORS I R R I G AT I O N M A C H I N E R Y P R O R AT E D E S TA B * C O S T LANO (NET RENT) T O TA L F I X E D C O S T S ACRE ACRE ACRE ACRE ACRE 37*209 $ 0*93 0*0 10*56 83*99 23*40 1*00 1*00 1*00 0*10 1*00 0*93 0*0 10*56 8*40 $ -22*40 43*29 $ 415*38 5 * T O TA L C O S T S 6 * B R E A K E V E N P R I C E , T O TA L C O S T S 11 2 * 0 0 1*97 23*28 2*03 11 * 7 0 4*01 154* 99 TON 41*538 LANO CHARGE IS 33% OF GROSS LESS 33% OF FERTILIZER AND HARVEST* E S TA B L I S H M E N T C O S T S P R O R AT E D O V E R T E N Y E A R S * P R E PA R E D B Y N O R M A N W * B R I N T S , TA E X . V E R N O N . T E X A S P R O J E C T E D 1 9 7 7 19 C O A S TA L B E R M U D A G R A S S . I R R I G AT E D . T E X A S R O L L I N G P L A I N S I I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT ITEM NO* OPERATION PICKUP PICKUP PICKUP PICKUP PICKUP 1/2 1/2 1/2 1/2 1/2 TON TON TON TON TON T O TA L S 10 10 10 10 10 D AT E APR MAY JUNE J U LY AUG ■^^S\ FUEL.GIL. FIXED TIMES LABOR MACHINE LUB*.REP* COSTS OVER HOURS HOURS PER ACRE PER ACRE 0*10 0*10 0*10 0*10 0*10 0*125 0*125 0*125 0*125 0*100 0*100 0*100 0*100 0*39 0*39 0*39 0*39 0*19 0*19 0*19 0*19 -1*125 -2x122 .0*22 -0*12 1*97 0*93 0*625 0*500 LANO CHARGE IS 33% OF GROSS LESS 33% OF FERTILIZER ANO HARVEST* ESTABLISHMENT COSTS PRORATED OVER TEN YEARS* P R E PA R E D B Y N O R M A N W . B R I N T S . TA E X , V E R N O N , T E X A S P R O J E C T E D 1 9 7 7 B U O G E T I D E N T I F I C AT I O N N U M B E R 8 3 6 0 0 6 6 0 1 6 5 0 0 A N N U A L C A P I TA L M O N T H 8 s**$\ /,^**v 20 JSP^N COTTON. DRYLAND, TEXAS ROLLING PLAINS II REGION E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT UNIT 1. GROSS RECEIPTS FRCM COTTON LINT C O T TO N S E E D T O TA L PRICE OR VA L U E OR COST/UNIT QUANTITY COST FRODUCT ION 2 * VA R I A B L E C O S T S PREHARVEST SEED HERBICIDE MACHINERY TRACTORS LABORCTRACTOR & MACHINERY) OTHER LABOR INTEREST CN OP* CAP* S U B T O TA L , P R E - H A R V E S T HARVEST COSTS GIN, BAG, TIES MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) S U B T O TA L , H A R V E S T LBS* TON 0*55 95*00 200*00 0*26 . 11 0 * 0 0 ?ft. 70 $ 134*70 2*64 5*06 4*97 6*16 13*36 4*50 ___2jl2Z $ 37*67 LBS* ACRE ACRE ACRE HOUR HOUR DOL* 0*33 5*06 4*97 6*16 3*25 2*25 0*09 6*00 1*00 1*00 1*00 4 * 11 2*00 0*21 BALE ACRE ACRE HOUR 31*00 0*05 0*94 3*25 0*40 1*00 1*00 0*43 $ T O TA L VA R I A B L E C O S T 3 * I N C O M E A B O V E VA R I A B L E C O S T S 4* FIXEO COSTS MACHINERY T R A C TO R S LAND (NET RENT) T O TA L F I X E D C O S T S 12*40 0*05 0*94 ^m,—U23 $ 14*77 $ 52*44 $ 82*26 $ ACRE ACRE ACRE 5*90 8*24 30*57 1*00 1*00 1*00 5*90 6*24 _3fii_57 $ 44*71 5 * T O TA L C O S T S $ 97* 15 6* NET RETURNS $ 37*55 2 C O T T O N - 2 FA L L O W P L A N T I N G S Y S T E M * L A N D C H A R G E B A S E D O N L A N D L O R D ' S S H A R E O F GROSS (1/4) LESS 1/4 OF FERTILIZER, INSECTICIDE, AND GINNING* P R E PA R E D B Y N O R M A N W * B R I N T S . TA E X . V E R N O N . T E X A S P R O J E C T E D 1 9 7 7