r TEXAS HIGH PLAINS III r FOREWORD The enterprise budgets for Texas High Plains III Region are based on estimates of yields, pro duction input quantities, and production practices which represent the best judgment of local produc ers, county Extension agents-agriculture, financial institution representatives, farm marchincry dealers and others knowledgeable of the area. Variation in yields, production inputs and production prac tices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. The machinery inventory is applicable to both typical and high level management. In some bud r gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture glasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Land charges were based on the customary land lord's crop share less his proportionate share of certain production and harvesting inputs and a percentage of fixed cost on the irrigation system when applicable. A per acre land charge was made when crop share was not used. f ^ TEXAS HIGH PLAINS III REGION Assumed Prices Paid and Received by Farmers 1/ Item , Unit Price cwt. • cwt. • bu. bu. cwt. . cwt. cwt. $35.00 40.00 8.50 5.00 80.00 90.00 40.00 Custom Rates Cotton (Harvest and Haul) Combining Soybeans Combining Wheat Combining Grain Sorghum (Dryland) Combining Grain Sorghum (irrigated) Combining Southern Peas Corn, Harvest, Including Haul Drying Corn cwt. acre acre acre cwt. acre bu. bu. 1.25 12.00 8.00 8.00 .35 8.00 .40 .12 Hauling Grain Sorghum Soybeans Wheat Southern Peas cwt. bu. bu. cwt. .25 .25 .15 .25 Chemical Spraying (Aerial) acre 2.50 Cotton Ginning cwt. 2.00 Fuel and Lubricants Gasoline Diesel Fuel Natural Gas gal. gal. mcf. .60 .50 1.90 Prices Paid (1979) Seed Cotton (Delinted) Grain Sorghum Soybean Wheat (Cleaned and Treated) Alfalfa Corn Southern Peas Texas High Plains III Region -2- Item ^ % ■ Unit Price Fertilizer (Bulk) Nitrogen Phosphate lb. lb. Labor (Except Hoeing & Irrigation) Labor (Irrigation) Labor (Hoeing) hour hour hour Chemicals Pre-emergence Herbicide Treflan 5 gal. Land Lease (Cash Rent) General acre 60.00 Hail Insurance Wheat Cotton $100 $100 10.00 12.00 Interest Capital Operating $ $ $ .16 .20 5.00 5.00 2.50 130.00 .08 .10 Prices Received (1979) Cotton Cottonseed Wheat Grain Sorghum Alfalfa Hay (Standing in Field) Com (Grain) Soybeans Southern Peas lb. lint ton bu. cwt. ton bu. bu. cwt. .50 90.00 2.95 3.50 50.00 2.20 5.35 20.00 1/ These price assumptions are hot to be interpreted as predictions or prospective prices. ^s% TEXAS HIGH PLAINS III REGION Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size <. Tractor . WH DR Tractor 2 Tractor 3 Tractor 4 Tractor 5 Pickup - 1/2 Ton Rolling Cult. Rolling Cult. Cultivator 8R Lister Planter Lister Planter 8R Bed Planter Bed Planter 8R Tandem Disc Tandem Disc Offset Disc Chisel Mldb. Rollover Moldboard 6B Sandfighter Packer Lister 6R Lister 8R Shredder 2R Shredder 4R Grain Drill Box Float Herb Spr/Disc 1 Item No. 1 2 3 4 5 10 30 31 34 36 37 38 39 40 41 43 44 46 47 51 53 54 55 56 57 58 60 61 Purchase Price $50,400 22,000 16,500 11,000 6,000 5,000 2,150 2,800 3,450 2,700 3,200 2,350 3,000 2,000 3,950 9,000 4,150 3,000 2,200 535 350 1,050 1,650 650 2,999 2,300 400 450 Estimated Years of Use 5 5 5 5 10 3 Estimated Hours of Use Fixed Costs Per Hour 2500 2500 2500 2500 3000 2100 1400 1400 1400 1050 1050 1400 1400 1400 1400 1400 1400 1400 1400 $11.76 3.55 2.09 700 .56 .18 .73 1400 1050 1050 875 875 840 700 700 .71 1.49 1.37 1.23 1.46 1.80 1.89 2.24 1.22 1.57 1.04 2.07 4.92 2.17 1.57 1.15 1.14 .54 1.67 2.02 .43 .49 Variable Costs Per Hour $ 9.08 5.86 4.91 3.66 2.35 2.83 .86 1.13 1.40 1.44 1.71 .95 1.21 .81 1.59 3.29 1.67 1.21 .88 .43 .15 .57 .90 .42 1.29 1.53 .31 .35 ) 4 M.FALFA FSTAB.* IRRIGATED. TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE EUR ROW IRRIGATION SYSTEM UNIT PRICE OR COST/UNIT QUANTITY 1* GROSS RECEIPTS FROM PRODUCTION TOTAL ?• VARIABLE COSTS PREHARVEST SEED F_RT<20-100-0) MACHINERY TRACTORS IRRIGATION MACHINERY LABORfTRACTOR C MACHINERY) LABORCIRRIGATION) INTEREST ON OP* CAP* SUBTOTAL. PRE-HARVEST VALUE OR COST i s s LBS* ACRE ACRE ACRE ACRE HOUR HOUR DOL* 22*00 1*00 1*00 1*00 1*00 1*85 4.25 23*02 0*80 23*20 2*27 5.29 27*71 5*00 5*00 0*10 17.60 23*20 2.27 5*29 27.71 9.23 21.25 2*22 s 106.86 HARVEST COSTS SUBTOTAL. HARVEST f^ o*o" o7o~ i TOTAL VARIABLE COST * 108.86 3. INCOME ABOVE VARIABLE COSTS s«- 1 0 8 * 8 6 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND .NET RENT) TOTAL FIXEO COSTS % ACRE ACRE ACRE ACRE 3*21 5*37 26*35 46*82 1*00 1.00 1*00 1*00 3*21 5.37 26*35 s .-±6*22 81*TS 5. TOTAL COSTS s 190*61 6* NET RETURNS $<- 1 9 0 . 6 1 LAND CHARGE BASED ON S60/ACRE LESS 50 PCT* OF IRRIG* FIXED COSTS* PREPARED BY MARVIN O* SARTIN. TAEX. LUBBOCK. TEXAS PROJECTED 1979 ALFALFA ESTAB*• IRRIGATED. TEXAS HI6H PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE FURROW IRRIGATION SYSTEM OPERATION TEM NO* __■___>__i_ MLBO ROLLOVER TM PA C K E R TM TANDEM DISC TM GRAIN DRILL TM PICKUP 1/2 TON PICKUP 1/2 TON PICKUP 1/2 TON PICKUP 1/2 TON 3.46 53 3.40 3.58 10 10 10 to /^^_\ DATE TIMES LABOR MACHINE L U B * . R E P. COST OVER HOURS HOURS PER ACRE PER AC JUNE JUNE AUG AUG AUG OCT NOV OEC 1 * 0 0 0*741 0*494 1*00 0 * 0 0*329 If 00 0 * 2 5 3 0 * 1 6 8 1*00 0*353 0*235 0*10 0*125 0*100 0*10 0*125 0*100 0*10 0*125 0.100 0*10 ,_____!_.& - 3 x 1 2 2 3.51 0*05 1*13 1.74 0.28 0*28 0.28 4.24 0*10 1*30 2. 19 0*19 0. 19 0. 19 -2x22 -2*13 1*846 1.627 7,56 8.58 TOTALS LAND CHARGE BASEO ON *60/ACRE LESS 50 PCT* OF IRRIG* FIXED COSTS. PREPARED BY MARVIN 0* SARTIN. TAEX. LUBBOCK. TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER' ANNUAL CAPITAL MONTH 12 > 811003402 320 0 /am\ ALFALFA. IRRIGATED. TEXAS HIGH PLAINS III REGION FSTIMATED COSTS AND RETURNS PER ACRE FURROW IRRIGATION SYSTEM / ^ PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION HAY TOTAL TON 2* VARIABLE COSTS PREHARVEST FERT<0-80-0) ACRE MACHINERY ACRE I R R I G AT I O N M A C H I N E RY A C R E LABORCTRACTOR & MACHINERY) HOUR L A B O R C I R R I G AT I O N ) HOUR INTEREST ON OP* CAP* DOL* SUBTOTAL. PRE-HARVEST 50*00 20*00 1*98 81*50 5*00 5*00 0*10 6.50 1.00 1*00 1*00 0*87 12.50 3^.31 HARVEST COSTS SUBTOTAL. HARVEST S 174.08 3* INCOME ABOVE VARIABLE COSTS ^ 4. FIXED COSTS MACHINERY TPACTORS IRRIGATION MACHINERY PRORATED ESTAB* COST LANO CNET RENT) TOTAL FIXED COSTS 20.00 1*98 81.50 4.37 62.50 „ .3*73 $ 174.08 0*0 TOTAL VARIABLE COST ■ _32pf00 $~325*00 $ 150*92 ACRE ACRE ACRE ACRE ACRE 1*32 0*0 77.50 190*61 21*25 1.00 1.00 1.00 0.14 1*00 1.32 0.0 77.50 27.26 21*25 $ 127.33 5. TOTAL COSTS $ 301.42 6* NET RETURNS $ 23.58 LAND CHARGE BASED ON S60/ACRE LESS 50 PCT. OF IRRIG* FIXEO COSTS* ESTABLISHMENT COST PRORATED OVER 7 YEARS* CROP SOLD STANDING IN FIELD, PREPARED BY MARVIN 0* SARTIN. TAEX. LUBBOCK. TEXAS PROJECTED 1979 ALFALFA. IRRIGATED. TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE FURROW IRRIGATION SYSTEM ITEM NO* OPERATION PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP 1/2 1/2 1/2 1/2 1/2 1/2 1/2 TON TON TON TON TON TON TON TOTALS 10 10 10 10 10 10 10 DATE FUEL.OIL. FIXED TIMES LABOR MACHINE L U B . . R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE MAR MAY JUNE JULY AUG SEPT OCT 0*10 0*125 0*100 0*10 0.125 0*100 0*10 0 * 1 2 5 0 * 1 0 0 0 * 1 0 0*125 0*100 0*10 0*125 0*100 0 . 1 0 0*125 0*100 0*10 ,_._U125 - 2 x 1 2 2 0*875 0*700 0*28 0*28 0*28 0.28 0*28 0*28 0.19 0.19 0*19 0.19 0*19 0.19 -2*22 -2*13 1*98 1-32 LAND CHARGE BASEO ON S60/ACRE LESS 50 PCT* OF IRRIG* FIXED COSTS. ESTABLISHMENT COST PRORATED OVER 7 YEARS* CROP SOLD STANDING IN FIELD, PREPARED BY MARVIN 0. SARTIN. TAEX. LUBBOCK. TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER- '— 81 003602 320 0 ANNUAL CAPITAL MONTH 10 8 CORN. IRRIGATED. TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE FURROW IRRIGATION SYSTEM UNIT GROSS RECEIPTS FROM PRODUCTION CO»N TOTAL VARIABLE COSTS PRFHARVEST SEED INSECTICIDE FERTC160-40-0) HERBICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTOR C MACHINERY) LABO .(IRRIGATION) INTEREST ON CP* CAP. SUBTOTAL. PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL CUSTOM DRYING SUBTOTAL. HARVEST PRICE OR COST/UNIT QUANTITY s BU* 2*20 140.00 -223*22 % 308*00 % LBS* ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL* 0.90 7.50 29.20 5*50 5*06 13*35 44*01 5*00 5*00 0*10 18.00 1*00 1*00 1*00 1.00 1.00 1*00 4*85 6*75 58*76 16.20 7.50 29.20 5.50 5.06 13*35 44.61 24.25 3 3.75 5*33 % 184.70 % BU* BU. BU* 0*25 0*15 0*12 140*00 140*00 140*00 TOTAL VARIABLE CCST 35.00 21*00 —Iftt _fl $" 72*80 $ 257.50 3* INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND CNET RENT) TOTAL FIXED COSTS VALUE OR COST 50*50 ACRE ACRE ACRE ACRE 6*29 13*77 41.85 51.87 1.00 1.00 1.00 1.00 6.29 13.7T 41o85 —51*21 % 11 3 . 7 * ) 5* TOTAL COSTS « 371.27 6. NET RETURNS t -63.2^ LAND CHARGE BASFO ON LANDLORD'S SHARE OF GROSS 25X LESS 25% OF DRYING AND 50% OF IRRIGATION FIXED COSTS. GOV»T PYMNT. NOT INCLUDEp. PREPARED BY MARVIN 0. SARTIN. TAEX. LUBBOCK* TEXAS PPOJECTEO 1979 CORN, IRRIGATED. TEXAS HIGH PLAINS III REGION EST IMATEO COSTS AND RETURNS PER ACRE FURROW IRRIGATION SYSTEM OPERATION ITEM NO. DATE SHREDDER 4Q TM 3,57 DEC TA N D E M D I S C T M 3 . 4 0 D E C PICKUP 1/2 TON 10 OEC MLBD ROLLOVER TM 2.46 JAN PA C K E R TM 53 JAN P I C K U P 1 / 2 T O N ■, 1 0 J A N TA N D E M D I S C T M 3 . 4 0 F E B PICKUP 1/2 TON 10 FEB B O X F L O AT T M 4 . 6 0 M A R PICKUP 1/2 TON 10 MAR LISTER 6R TM 2.54 APR BED PLANTER6R TM 3.38 APR HERB SPR/DISC TM 61 APR PICKUP 1/2 TON 10 APR R O L L I N G C U LT T M 3 . 3 0 M AY P I C K U P 1 / 2 TO N 1 0 M AY PICKUP 1/2 TON 10 JUNE P I C K U P 1 / 2 TO N 1 0 J U LY PICKUP 1/2 TON 10 AUG PICKUP 1/2 ton 10 SEPT PICKUP 1/2 TON 10 OCT TOTALS FUEL.OIL. FIXFD TIMES LABOR MACHINE LUB..REP. COSTS OVER HOURS HOURS PER ACRE PER ACRF 1.00 2.00 0.10 1.00 1.00 0.10 1.00 0.10 2.00 0.10 1.00 1.00 1*00 0*10 1*00 0*10 0*10 0*10 0*10 0*10 0*10 0*295 0*505 0.125 0*741 0.0 0.125 0.253 0*125 1*010 0.125 0*184 0*309 0*0 0*125 0*177 0*125 0*125 0*125 0*125 0.125 0.197 0*337 0.100 0*494 0.329 0*100 0*166 0. 100 0.673 0. 100 0*123 0*206 0*196 0*100 0 * 11 8 0.100 0*10 0 0*100 0*100 0.100 1.42 2.26 0.28 4*08 0.05 0.28 1*13 0.28 3.17 , 0.28 0*93 1.41 0*07 0.28 0.80 0.28 0*28 0*28 0*28 0*28 1. 7 2 2 .▶ 60 0 , 19 5 ,. 5 6 0 , 10 o. 19 1. 3 0 0 ,» 19 2. 75 0< 1 9 1«. 2 1 I . 65 0 . 15 O i▶ 19 0«▶ 92 0«» 19 0,. 19 0.> 19 0,▶ 19 0., 1 9 .2*123 .£_._.____ -2*23 -2x12 4.850 3*942 18.41 20.06 LAND CHARGE BASED ON LANDLORD'S SHARE OF GROSS 25% LESS 25% OF DRYING AND 50% OF IRRIGATION FIXED COSTS. GOV'T PYMNT. NOT INCLUDED. PREPARED BY MARVIN O. SARTIN. TAEX, LUBBOCK. TFXAS PROJECTED 1979 BUOGET IDENTIFICATION NUMBERANNUAL CAPITAL MONTH 10 72 003602 320 0 10 ' COTTON. DRYLAND. TEXAS HIGH PLAINS III ESTIMATED COSTS ANO RETURNS PER ACRE REGION PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST f^ GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEED TOTAL LBS. TON VARIABLE COSTS PREHARVEST SEEO HERBICIDE HAIL INSURANCE MACHINERY TRACTORS LABORCTRACTOR e MACHINERY) OTHER LABOR INTEREST ON CP. CAP. SUBTOTAL. PRE-HARVEST LBS. ACRE DOL* ACRE ACRE HOUR HOUR DOL* HARVEST COSTS GIN. BAG. TIES CUSTOM HARVGHAUL SUBTOTAL. HARVEST CWT. CWT. 0.50 90.00 300.00 0.23 0.35 7.00 0.12 4.65 10.70 5.00 2*50 0*10 15*00 1*00 60*00 1.00 1*00 4.18 2.00 20.04 2*00 1*25 13.20 13.20 150.00 —22x12 S 170.TQ 5.25 7.00 7.20 4.65 10.70 20.91 5.00 2*22 S 62.72 S 26.40 ___.l__i._i_l $ 42.90 S 105.62 TOTAL VARIABLE COST 3 . INCOME ABOVE VARIABLE COSTS 4 . FIXFD COSTS MACHINERY TRACTORS LAND CNET RENT) TOTAL FIXEO CCSTS 65.08 ACRE ACRE ACRE 5.81 11 . 11 36.07 1.00 1.00 1.00 5.81 11 . 11 —26*21 S 52.99 5 . TOTAL COSTS S 158.61 6 . NET RETURNS 9 12.09 LAND CNET RENT! BASEO ON 1/4 OF GROSS INCOME LESS 1/4 OF GINNING, BAGGING AND TIES. PLANTED 2X1 SKIPRO.. £OV»T PYMNT. NOT INCLUDED. PREPARED BY MARVIN 0. SARTIN. TAEX. LU8B0CK, TEXAS PROJECTED 1979 11 COTTON. DRYLAND. TEXAS HIGH PLAINS III REGION FSTIMATEO COSTS AND RETURNS PEP ACRE w w i i — i OPERATION ITEM NO. FUEL.OIL. FIXED DATE SHREODER 2R TM 4.56 DEC TA N D E M D I S C T M 3 . 4 0 O E C PICKUP 1/2 TON 10 OEC PICKUP 1/2 TON 10 JAN MOLDBOARD 6B TM 2.47 FEB PA C K E R TM 53 FEB PICKUP 1/2 TON 10 FEB TA N D E M D I S C T M 3 . 4 0 M A R HERB SPR/DISC TM 61 MAR PICKUP 1/2 TON 10 MAR PICKUP 1/2 TON 10 APR L I S T E R - P L N T 6 R t M 3 , 3 6 M AY P I C K U P 1 / 2 TO N 1 0 M AY SAND FIGHTER TM 5.51 JUNE C U LT I VAT O R 8 R T M 4 . 3 4 J U N E PICKUP 1/2 TON 10 JUNE P I C K U P 1 / 2 TO N 1 0 J U LY PICKUP 1/2 TON 10 SEPT PICKUP 1/2 TON 10 NOV TOTALS T I M E S LABOR MACHINE L U B * . R E P * C O S T S OVER HOURS HOURS PER ACRE PER ACRE 1*00 1*50 0.10 0*10 1*50 1*50 0*10 1*00 1*00 0.10 0*10 1*25 0*10 2.00 2*00 0.10 0*10 0*10 0*10 0.595 0*379 0.125 0.125 0*771 0*0 0*125 0*253 0*0 0.125 0.125 0.387 0.125 0.250 0.298 0.125 0.125 0.125 0.397 0.253 0.100 0.100 0.514 0.494 0.100 0.168 0.196 0.100 0.100 0.256 0.100 0.167 0.199 0.100 0*100 0*100 1*91 1*69 0.28 0.26 4.07 0.07 0.28 1.13 0.07 0.28 0.28 1.69 0.28 0.54 1.15 0.28 0.28 0.28 1*70 1*95 0. 19 0. 19 5.43 0*15 0.19 1*30 0*15 0.19 0* 19 2.35 0* 19 0.73 1.27 0. 19 0. 19 0. 19 .2x125 .____!&& -2x22 -2*13 4*182 3*645 15*35 16.92 LAND CNET RENT) BASEO ON 1/4 OF GROSS INCOME LESS 1/4 OF GINNING. BAGGING AND TIES. PLANTED 2 X 1 SKIPROW* GOV'T PYMNT* NOT INCLUDED* PREPARED BY MARVIN O. SARTIN. TAEX. LUBBOCK. TEXAS PROJECTED 1979 BUDGET IDENTIFICATION NUMBER* ANNUAL CAPITAL MONTH 11 93 003002 300 0 12 COTTON, IRRIGATED. TEXAS HIGH PLAINS III REGION ESTIMATED COSTS ANO RETURNS PER ACRE <SPRINKLERS) PREPLANT PLUS ONE POSTPLANT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST 1. GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEED TOTAL ?• VARIABLE COSTS PREHARVEST SEED F E RT C 4 0 - 2 0 - 0 ) HERBICIDE HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTOR & MACHINERY) LABORCIRRTGATION) OTHER LABOR INTEREST ON OP* CAP* SUBTOTAL. PRE-HARVEST HARVEST COSTS GIN. BAG. TIES CUSTOM HARV&HAUL SUBTOTAL. HARVEST LBS. TON 0.50 90.00 450.00 0.33 —22*22 S 254.70 LBS. ACRE ACRE DOL. ACRE ACRE ACRE HOUR HOUR HOUR DOL. 0.35 9.80 7.00 0.12 4.74 9.02 17.15 5.00 5.00 2.50 0*10 20*00 1*00 1.00 100*00 1*00 1*00 1*00 3.58 0*70 3*00 37.81 7.00 9.80 7.00 12.00 4.74 9.02 17.15 17.92 3.50 7.50 2*23 99.42 CWT. CWT. 2*00 1*25 19*80 19*80 39.60 S 64.35 TOTAL VARIABLE COST S 163.77 3. INCOME ABOVE VARIABLE COSTS 4. FIXFD COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND CNET PENT) TOTAL FIXED COSTS 225.00 90.93 ACRE ACRE ACRE ACRE 6.00 10*01 14*63 4 4 . 11 1.00 1.00 1.00 1.00 6.00 10.01 14.63 ___._-_.__I $~ 7 4 . 7 5 5. TOTAL COSTS $ 238.52 6. N.T RETURNS 16.18 LAND CHARGE BASED ON 1/4 OF GROSS INCOME LESS 1/4 OF FERTILIZER. GINNING AND 50 PCT. OF IRRIG. FIXED COSTS* GOV'T PVMNT. NOT INCLUDED. PREPARED BY MARVIN 0. SARTIN. TAEX. LUBBOCK. TEXAS PROJECTED 1979 ^ ^ 13 C O T T O N . I R R I G AT E D , T E X A S H I G H P L A I N S I I I R E G I O N ESTlMATEO COSTS ANO RETURNS PER ACRE CSPRINKLERS> PREPLANT PLUS ONE POSTPLANT OPERATION SHREDDER 4R TM TANDEM DISC TM PICKUP 1/2 TON MOLDBOARD 6B TM PA C K E R TM CHISEL TM PICKUP 1/2 TON TANDEM DISC TM PICKUP 1/2 TON TA N D E M D I S C T M HERB SPR/DISC TM PICKUP 1/2 TON LISTER 8R TM PICKUP 1/2 TON ROLLING CULT TM BED PLANTER8R TM PICKUP 1/2 TON SAND FIGHTER TM ROLLING CULT TM PICKUP 1/2 TON PICKUO 1/2 TON PICKUP 1/2 TON PICKUP 1/2 TON TOTALS ITEM TIMES LABOR MACHINE LUB*»REP* COSTS NO. DATE, OVER HOURS HOURS PEP ACRE PFR ACRE *__•—_■._._ 3.57 2.41 10 2.47 S3 2.44 10 2.41 10 2.41 61 10 2.55 10 4.31 3.39 10 5.51 4,31 10 10 10 10 DEC 1 . 0 0 0*295 0*197 OEC 1 * 0 0 0 * 1 7 7 0 * 11 8 DEC 0*10 0*125 0*100 JAN 0*50 0*257 0*171 JAN 0*50 0 . 0 0.165 JAN 0*50 0 . 0 8 9 0*060 JAN 0*10 0.125 0*100 FEB 1 * 0 0 0 . 1 7 7 0 * 11 8 FEB 0*10 0.125 0*100 MAR In 00 0 * 1 7 7 0 * 11 8 MAR 1*00 0 * 0 0*196 MAR 0*10 0*125 0*100 APR . 1*00 0 * 1 4 8 0 * 0 9 8 APR 0*10 0*125 0*100 MAY 1 * 0 0 0*138. 0 * 0 9 2 MAY 1*50 0*349 0*233 MAY 0*10 0*125 0*100 JUNE 2*00 0*250 0*167 JUNE 2 * 0 0 0 * 2 7 7 0 * 1 8 5 JUNE 0 * 1 0 0 * 1 2 5 0 * 1 0 0 JULY 0 * 1 0 0 * 1 2 5 0 * 1 0 0 SEPT 0 * 1 0 0 * 1 2 5 0*100 NOV 0*10 ._ 01.125 __>1_1Q2 1*42 1.02 0.26 1*36 0. 02 0*52 0.28 1*02 0*28 1*02 0*07 0*28 0*78 0*28 0*51 1*65 0*28 0.54 1.02 0.28 0*28 0*28 1*72 1.42 0* 19 1*81 0.05 0*73 0. 19 1*42 0. 19 1.42 0.15 0.19 1.04 0. 1Q 0.54 2.00 0. 19 0.73 1.07 0. 19 0.19 0.19 -2*22 -2*12 3.584 2.917 13.76 16.01 LANO CHARGE BASED ON 1/4 OF GROSS INCOME LESS 1/4 OF FERTILIZER. GINNING ANO 50 PCT. OF IRRIG. FIXED COSTS. GOV'T PYMNT. NOT INCLUDED PREPARED BY M A RV I N 0 . S A RT I N . TA E X , L U B B O C K , T E X A S P R O J E C T E D 1 9 7 9 BUDGET IDENTIFICATION NUMBER-*— 93 00 3202 340 0 ANNUAL CAPITAL MONTH 11 14 COTTON, IRRIGATED, TEXAS HIGH PLAINS III REGION c-STIMATFD COSTS AND RETURNS PER ACRE CFURROW) PREPLANT PLUS ONE POSTPLANT UNIT 1. GROSS REC^IOTS FROM PRODUCTION COTTON LINT COTTON«5frfrD TOTAL J ^ 2. VAPIABLE COSTS PREHARVEST SEEO FFRTC40-20-0) HERBICIDE HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTOO & MACHINERY) LABORCIRRIGATION) OTHER LABOR INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST HARVEST COSTS GIN, BAG, MES CUSTOM HARV&HAUL SUBTOTAL, HARVEST PRICE OR VA L U E OP COST/UNIT QUANTITY COST LBS. TON 0.50 90.00 500.00 0.35 250.00 ______________ S 281.50 LBS. ACRE ACRE DOL. ACRE ACRE ACRE HOUR HOUR HOUR DOL. 0.35 9.80 7.00 0.12 4.74 9.02 19.80 5.00 5.00 2.50 0.10 20.00 1.00 1.00 11 5 . 0 0 1.00 1.00 1.00 3.58 3.00 3.00 40.04 7.00 9.80 7.00 13.80 4.74 9.02 19.80 17.92 15.00 7.50 s CWT. CWT. 2.00 - 1.25 22.00 22.00 T.TAL VARIABLE CCST 44.00 .-27*52 s 71.50 s 187.09 ._ 3. INCOME ABOVE VARIABLE COSTS 4. FIXEO COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENTJ TOTAL FIXED COSTS ±*22 11 5 . 5 9 ACRE ACRE ACRE ACRE $ 94.41 $ 6.00 10.01 20.40 46.90 1.00 1.00 1.00 1.00 6.00 10.01 20.40 % .-__£jl2-_ 83.31 5. TOTAL COSTS % 270.40 6. NET RETURNS s 1 I. 10 LAND CHARGE BASED CN, 1/4 OF GROSS INCOME LESS 1/4 OF FERTILIZER, GINNING AND 50 PCT. OF IRRIG. FIXED COSTS. GOV'T PYMNT. NOT INCLUDED. PREPARED BY MARVIN O. SARTIN, TAEX, LUBBOCK, TEXAS PROJECTED 19TQ / " ^ 15 COTTON. IRRIGATED, TEXAS HIGH PLAINS III REGION FSTTMATED COSTS AND RETURNS PER ACRE CFURROW) PREPLANT PLUS ONE POSTPLANT OPERATION SHREDDER 4R TM TA N D E M D I S C T M PICKUP 1/2 TON MOLDBOARD 6B TM PA C K E R TM CHISEL TM PICKUP 1/2 TON TANOEM DISC TM HERB SPR/DISC TM PICKUP 1/2 TON TA N D E M D I S C t m PICKUR 1/2 TON LISTER 89 TM PICKUP t/2 TQN ROLLING CULT TM BED PLANTER8R TM PICKUP 1/2 TON SAND FIGHTFR TM ROLLING CULT TM PICKUP 1/2 ton PICKUP 1/2 TON PICKUP 1/2 TON PICKUO 1/2 '•'ON TOTALS ITFM NO. 3,57 2,41 10 2,47 53 2,44 10 2,41 61 10 2,41 10 2,55 10 4,31 3,39 10 5,51 4,31 10 10 10 10 DATE DEC OEC OEC JAN JAN JAN JAN FEB FEB FEB MAR MAR APR APR MAY MAY MAY JUNF JUNE JUNE JULY SEPT NOV FUEL,OIL, FIXED TIMES LABOR MACHINE LUB.,RFP. COSTS OVER HOURS HOURS PER ACRF PER ACRF 1.00 0.295 0.197 1.00 0.177 0 . 11 8 0.10 0.125 0.100 0.50 0.257 0.171 0.50 0.0 0.165 0.50 0.089 0.060 0.10 0.125 0.100 1*00 0 . 1 7 7 0 . 11 8 1*00 0 . 0 0.196 0*10 0.125 0. 100 1*00 0.177 0 . 11 8 0*10 0.125 0.100 1*00 0.148 0.098 0.10 0.125 0. I 00 1.00 0.136 0.092 1.50 0.349 0.233 0.10 0.125 0.100 2.00 0.250 0.167 2 . 0 0 0.277 0.185 0.10 0.125 0.100 0. 10 0 . 1 2 5 0 . 1 0 0 0 . 1 0 0.125 0.100 0 . 1 0 .3x125 -__.!_._: 1.42 1.02 0.28 1.3 . 0.02 0.52 0.28 1.02 0.0T 0.28 1.02 0.28 0.78 0.25 0.51 1.65 0.28 0.54 1.02 0.28 0.28 0.28 15 0,1 . 1 9 1. 4 2 0«>• 19 1 • 04 0,i. 1 . 0,1 . 5 4 2,'• 00 0.I . 1 9 0.I. 71 1 • 07 0,• 1Q 0,• 19 0,• 1Q -2*22 -2*12 3.584 13.T6 16.01 2.917 I . TJ> 1 • 42 ol.. 1 . l • 81 0,• 05 0,>. 73 0,I. 19 1. 4 2 O i, r , , ? ^ B A S P D ° N l / 4 0 F G R 0 S S I N C O M E L E S S 1 / 4 OF FFRTiLI7F,,_ oI^I.G AN° BY 50 MARVIN PCT* nF PREPARED O. TqRIGSARTIN, Fi*e° TAEX, COSTS. GOV'T PYMNT. NOT INCLUOFD, LUBBOCK TEXAS PROJECTED 1979 BUDGET IOENTIFICATICN NUMBER-- 9 3 00 3302 310 0 ANNUAL CAPITAL MONTH M ^=^ 16 CO^ton, TRRIGATEO, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS ANO RETURNS PER ACRE CSPRINKLERS) PRFPLANT PLUS TWO POSTPLANT PRICE OR UNIT COST/UNIT QUANTITY GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEED TOTAL LBS. TON 0.50 - 90.00 VARIABLE COSTS PREHARVEST SEFD FERTC 30-30-0) HERBICIDE HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTOR R MACHINERY) LABQRCIRRIGATION) OTHER LABOR INTEREST ON OP. CAP* SUBTOTAL, PRE-HARVEST LBS* ACRE ACRE DOL* ACRE ACRE ACRE HOUR HOUR HOUR DOL* 0.35 13*50 7*00 0*12 4*72 8*75 23*20 5.00 5*00 2*50 0*10 25.00 1*00 1.00 120*00 1*00 1*00 1*00 3.58 I.00 3.00 44.03 Cwt. 2*00 1*25 23.10 23.10 HARVFST COSTS GIN, BAG, TfFS CUSTOM HARV&HAUL SUBTOTAL, HARVEST £WT. 525.00 0.37 262.50 —22*22 $ 295.80 8.75 13.50 7.00 14.40 4.72 8.T5 23.20 17.92 5.00 7.50 ***2 S 11 5 . 1 4 A6.20 —23*21 $ T5#0T $ 190.22 TOTAL VARIAOLF CCST $ 105.58 3. INCOME ABOVE VARIABLE COSTS $ 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND CNET RENT) TOTAL FIXFD COSTS VALUF OR COST ACRE ACRE ACRE ACRE 5.95 9.37 20.60 48.72 1.00 1.00 1.00 1.00 5.95 9 .3T 20.60 $ .-±3*22 84.65 5. TOTAL COSTS $ 274.87 NET RETURNS 20.93 LAND CHARGE BASED ON 1/4 OF GROSS INCOME LESS 1/4 OF FERTILIZER, GINNING AND 50 PCT. OF IRRIG. FIXED COSTS. GOV'T PYMNT. NOT INCLUDED. PREPARED BY MARVIN 0. SARTIN, TAEX. LUBBOCK. TEXAS PROJECTED 197Q 1/ C O T T O N . I R R I G AT E D . T E X A S H I G H P L A I N S I I I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE CSPRINKLERS) PREPLANT PLUS TWO POSTPLANT •__■•««_ . . . . p * l OPERATION FUEL.OIL. FIX^D TEM T I M E S LABOR MACHINE L U B . . R E P. COSTS NO. DATE OVER HOURS HOURS PER ACRE PER ACRE — ■ . — _.____.<*-_ SHREODER 4R TM TANDEM DISC TM PICKUP 1/2 TON MOLDBOARD 6B TM CHISEL tm PICKUP 1/2 TON TANDEM DISC TM PICKUP 1/2 TON TANDEM DISC TM HERB SPR/DISC TM PICKUP 1/2 TON LISTER 8R TM PICKUP 1/2 TON ROLLING CULT TM BED PLANTER8R TM PICKUP 1/2 TON SAND FIGHTER TM ROLLING CULT TM PICKUP 1/2 TON PICKUP 1/2 ton PICKUP 1/2 TON PICKUP 1/2 TON 3.57 2,41 10 2.47 2.44 10 3.41 10 3.41 61 10 2.55 10 4,31 3,39 10 5,51 4,31 10 10 10 10 TOTALS DEC OEC OEC JAN JAN JAN FEB FEB MAR MAR MAR APR APR MAY MAY MAY JUNE JUNE JUNE J U LY SEPT NOV 1.00 1.00 0.10 0.50 0*50 0.10 1.00 0*10 1*00 1*00 0*10 1*00 0*10 1*00 1*50 0*10 2*00 2.00 0*10 0*10 0.10 0*10 0*295 0*177 0*125 0*257 0.089 0*125 0.177 0.125 0*177 0*0 0*125 0*148 0*125 0*138 0*349 0.125 0.250 0.277 0.125 0.125 0.125 0.197 0 . 11 8 0.100 0.171 0.060 0.100 0 . 11 8 0.100 0 . 11 8 0.196 0.100 0.098 0.100 0.092 0.233 0.100 0.167 0.165 0.100 0.100 0.100 1.42 1.02 0.28 1.36 0.52 0.28 0.88 0.28 0.88 0.07 0.28 0.78 0.28 0.51 1.65 0.28 0.54 1.02 0.26 0.28 0.28 1.7? 1.42 0. 19 1.81 0. -*3 .2*125 -___.i_.__ -2x22 -2*12 3.584 2.752 13.47 15.33 0. l<* 1 . 11 0. 19 1, 11 0. 15 0.19 1.04 0. 19 0.54 2. 00 0. 19 0.73 1.07 0. 19 0. 19 0.19 LAND CHARGE BASED ON 1/4 OF GROSS INCOME LESS 1/4 OF FERTILIZER. GINNING AND 50 PCT* OF IRRIG* FtXED COSTS. GOV'T PYMNT. NOT INCLUDED. PREPARED BY MARVIN 0. SARTIN. TAEX. LUBBOCK. TEXAS PROJFCTFQ 1979 BUDGET IDENTIFICATICN NUMBER— 93 003302 340 0 ANNUAL CAPITAL MONTH 11 ^ \