r TEXAS DEEP EAST FOREWORD r The enterprise budgets for Texas Deep East Region are based on estimates of yields, production input quantities, and production practices which represent the best judgment of local producers, county Extension agents-agriculture, financial insti tution representatives, farm machinery dealers and others knowledgeable of the area. Variation in yields, production inputs and production practices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. The machinery inventory is applicable to both typical and high level management. In some bud gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Land charges were based on the customary land lord's crop share less his proportionate share of certain production and harvesting inputs. A per acre land charge was made when crop share was not used. DEEP EAST TEXAS REGION Assumed Prices Paid and Received by Farmers 1/ Item Unit Price Seed Peanuts Cotton Corn Grain sorghum Soybeans Crimson clover Yuchi arrowleaf clover La S-l clover Vetch Peas Gulf ryegrass Oats Wheat Rye Watermelon Coastal sprigs Bahiagrass Lovegrass lb. lb. bag cwt. cwt. cwt. cwt. cwt. cwt. cwt. cwt. cwt. cwt. cwt. lb. bu. cwt. lb. $ .45 .11 44.80 44.00 12.00 58.00 160.00 250.00 48.00 40.00 25.00 11.00 14.00 16.00 7.00 .40 58.00 1.00 Fertilizer Nitrogen Phosphorous Potash 12-12-12 16-6-12 10-20-20 6-24-24 10-20-10 Lime lb. lb. lb. ton ton ton ton ton ton .20 .18 .12 115.00 116.00 140.00 150.00 116.00 12.50 Labor Irrigation Tr a c t o r hour hour Price Paid (1977) 2.50 2.50 DEEP EAST TEXAS -2- Item Custom rates Cut, rake & bale Cut, rake & round bale Stacking (medium stack) Cotton picking Cotton stripping Round baling Hay hauling Corn harvesting Corn hauling Combining grain sorghum Hauling grain sorghum Coastal sprigging Baling twine Fuel Diesel Gasoline Herbicides T r e fl a n K annex Atrizine Miloguard Caparol Cot a ran DSMA Bal an Vernam 2,4-D-B 2,4-D Banvel D Simazine Arsenic acid Insecticides Methyl parathion Bidrin Diazanon Azrodin Sevin - 80% wettable powder Disyston Dasanit Dylox Fungicides Benlate Maneb Bravo Tercachlor Unit Price bale roll stack acre $ .50 10.00 35.00 20.00 lb. R. Bale bale bu. bu. acre cwt. acre bundle gal. gal. 5 gal. lb. 5 lb. 5 lb. gal. gal. gal. 5 gal. gal. 5 gal. gal. gal. 5 lb. (80%) gal. .05 4.50 .22 .25 .12 11.00 .20 20.00 13.50 .38 .489 136.00 3.25 15.75 17.25 2.95 4.95 7.75 40.00 19.20 80.00 8.40 33.95 16.95 4.80 gal. 10 lb. 5 gal. 7.50 11.50 3.30 24.00 19.50 22.20 gal. 18.00 gal. qt. gal lb. .62 2 lb. 16.60 3 lb. 4.25 5 gal. 125.00 lb. (10% gran.) .22 DEEP EAST TEXAS -3- ^^^N Item Unit Price ton bu. lb. ton cwt. bu. bu. bu. cwt. lb. $48.00 2.70 .60 95.00 4.50 1.55 5.50 3.00 2.50 .195 Prices received (1977) Coastal hay Corn Cotton lint Cotton seed Grain sorghum Oats Soybeans Wheat Watermelons Peanuts / ^ \ 1/ These price assumptions are not to be interpreted as predictions or prospective prices. " ^ ) ^ DEEP EAST TEXAS REGION Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size Tractor - 100 HP Tractor - 80 HP Tractor - 45 HP Tractor - 25 HP Pickup - H ton Truck - 2 ton Shredder 2R - 6.7 feet Shredder 4R - 13.3 feet Offset disc - 10 feet Tandem disc - 8 feet Tandem disc - 14 feet Row disc - 20 feet MB Plow 3B - 4 feet Planter - 13.3 feet Planter, peanut-13.3 ft. Planter watermelon-15 ft, Grain drill - 10 feet Grain drill - 12 feet Tool bar cult.-13.3 feet Rolling cult.-13.3 feet Lister bedder - 13.3 ft. Item No. Purchase Price 1 3 5 9 10 11 30 32 34 36 38 42 46 48 50 52 54 55 56 58 60 $12,750 10,200 6,200 3,460 5,100 8,480 800 2,600 3,200 860 4,750 1,800 975 1,350 1,800 175 1,150 1,450 900 1,450 1,120 Estimated Years of Use 7 7 10 15 2.5 10 8 8 8 8 8 8 8 8 6 10 10 10 8 8 8 Estimated Hours of Use 5250 4200 4500 4500 2500 2000 800 1000 1200 1200 1200 1200 1400 Fixed Costs Per Hour $2.92 2.39 2.05 1.47 1.58 6.61 1.38 3.60 3.67 .98 5.44 2.07 .96 480 480 400 3.87 4.43 1000 1000 1200 1200 1400 1.78 2.24 1.03 1.66 1.10 .68 (Continued) Variable Costs Per Hour $4.41 3.16 2.23 1.64 3.35 5.96 .49 1.26 1.16 .31 1.72 .65 1.04 1.58 2.10 .25 .50 .63 .50 .81 .45 r f ( DEEP EAST TEXAS REGION (Continued) Machinery Item and Size Sprayer, herb - 13.3 Sprayer, herb - 20 feet Sprayer, peanuts - 20 feet Dl 6 Invert, peanut - 6 ft. Combine peanut - 6.7 feet Trailers - 30 feet Middle buster - 12 feet Subsoiler - 24 feet Fert Dist-Melon Plant cult. IR - 12 feet Roll cult. IR - 12 feet Mist blow spray - 30 feet Springtooth digr - 12 feet Broadcast seeder - 20 feet Sprayer, pasture - 30 feet Round Baler Regular baler - 11.5 feet Side Mower Rake Item No. 62 63 64 66 68 76 77 78 79 80 81 82 83 85 90 94 95 96 97 Purchase Price Estimated Years of Use Estimated Hours of Use $ 400 8 8 8 10 8 10 10 10 4 8 6 5 6 8 10 10 10 10 10 800 800 800 $ .69 $ .22 1000 1200 1000 1000 2.63 5.70 11.37 2.33 800 4.45 1.16 2.32 475 560 1,700 5,000 800 400 2,300 1,200 1,350 250 2,400 795 400 620 5,100 3,950 885 1,025 1000 800 1800 1000 1800 1600 500 580 510 670 500 Fixed Costs Per Hour .82 .96 .55 .62 .16 2.59 .52 .34 1.92 13.60 11.98 2.05 3.18 Variable Costs Per Hour .26 .30 .35 .22 1.61 .22 .95 .08 1.04 .25 .14 .39 3.82 3.34 .57 .89 Ul B A H I A G R A S S PA S T U R E , D R Y L A N D , D E E P E A S T T E X A S R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT UNIT 1* GROSS TO TA L RECEIPTS 2. VARIABLE COSTS PREHARVEST FEPTI86-36-36) LI ME MACHINERY TRACTOPS LABORCTRACTOR & MACHINERY) INTEREST ON OP* CAP* PRICE OR VA L U E OR COST/UNIT QUANTITY COST FROM $ ACRE TON ACRE ACRE HOUR " DOL* PRODUCTION S 0*0 28*00 12*50 0*75 0*42 2*50 0*10 1*00 0*25 1*00 1*00 0*49 9*62 $ 28*00 3* 13 0.75 0.42 1.22 &L26 34.47 HARVEST COSTS S U B T O TA L , H A R V E S T $ $ 0.0 T O TA L VA P I A B L E C C S T s 34. 47 S U B T O TA L , P R E - H A R V E S T $ -34,47 3 * I N C O M E A B O V E VA R I A B L E C O S T S 4* FIXED COSTS MACHINERY TRACTORS LANO (NET RENT) T O TA L F I X E O C O S T S $ ACRE ACRE ACRE 0*53 0*39 7.00 1*00 1*00 1*00 0.53 0. 39 $ 24.00 7*93 5 * T O TA L C O S T S $ 42*40 6* NET RETURNS $ -42*40 P R E PA R E C B Y WAY N E D * TAY L O R , TA E X , O V E RTO N , T E X A S P R O J E C T E D 1 9 7 7 BAHIAGRASS PASTURE, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION PICKUP SHREDDER (2 R) PICKUP T O TA L S ITEM NO* 10 5,30 10 OATE APR J U LY J U LY /"^tK FUEL.OIL, FIXED TIMES LABOR MACHINE LUB*,REP* CCSTS OVER HOURS HOURS PER ACRE PER ACRE 0*10 0*125 0*100 0*50 0*238 0*158 0*33 0*50 0*16 0*61 0.10 J9xl25 -9x199 .9x22 __2_lI6 0*488 0*358 1*17 0*93 P R E PA R E D B Y W AY N E D * TAY L O R , TA E X , O V E R T O N , T E X A S PROJECTED 1977 B U D G E T I D E N T I F I C AT I O N N U M B E R 8 6 7 0 2 0 0 0 2 2 0 0 0 0 A N N U A L C A P I TA L M C N T H 9 /"5%, 8 BAHIAGRA5S PASTURE, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT PRICE OR VA L U E OP UNIT COST/UNIT QUANTITY COST GROSS TO TA L RECEIPTS FROM PRODUCTION 0*0 VARIABLE COSTS PREHARVEST FERT<100-50-50) LIME HERBICIDE MACHINERY T R A C TO R S LABORCTRACTOR £ MACHINERY) INTEREST ON OP* CAP* S U B T O TA L , P R E - H A R V E S T S * $ ACRE TON ACRE ACRE ACRE HOUR OOL* 35*00 12*50 2*10 0*76 0*51 2*50 0*10 35*00 3*75 C*63 0.7& 0. 51 1.35 1*00 0*30 0*30 1*00 1*00 0*54 13*55 $ $_ 1x25 43. 36 HARVEST COSTS S U B T O TA L , H A R V E S T S 0*(T" T O TA L VA R I A B L E C C S T s 43* 36 $ -43*36 3 * I N C O M E A B O V E VA R I A B L E C O S T S 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) T O TA L F I X E D C O S T S $ ACRE ACRE ACRE 0*60 0*48 7.00 1*00 1*00 1*00 0*60 0*48 $ 7*00 8*08 5 * T O TA L C O S T S % 6* NET RETURNS s -51*43 P R E PA R E D B Y W AY N E D * TAY L O R , TA E X , O V E RTO N , TEXAS 51* 43 FROJECTFD 1977 B A H I A G R A S S PA S T U R E , D R Y L A N D , D E E P E A S T T E X A S R E G I C N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT O P E R AT I O N S P R AY E R , PA S T U R E PICKUP SHREDDER(2R ) PICKUP T O TA L S ITEM NO* 5,90 10 5,30 10 D AT E JUNE JUNE J U LY J U LY /"3% FUEL,OIL, FIXED TIMES LABOR MACHINE LUB*,REP* CCSTS OVER HOURS HOURS PER ACRE PER ACRE 0*30 0*10 0*50 0*052 0*125 0*238 0*034 0.100 0*158 0 . 11 0*33 0*50 0*15 0*16 0*61 0.10 -2x125 _0*_10.X -0x22 _CA16 0*539 0*393 P R E PA R E D B Y W AY N E D * TAY L O R , TA E X , O V E R T O N , T E X A S B U D G E T I D E N T I F I C AT I O N N U M B E R 8 6 7 0 2 0 0 0 1 2 0 0 0 0 A N N U A L C A P I TA L M O N T H 9 1*27 1.08 PROJECTED 1977 - ^ * i % k 10 C O A S TA L B E R M U D A G R A S S E S TA B L I S H M E N T, D R Y L A N D , D E E P E A S T T E X A S R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT UNIT 1* GROSS H AY TO TA L RECEIPTS TON 4 FROM 8*00 $ 2 * VA R I A B L E C O S T S PREHARVEST FERTU10-60-60) LIME CUSTOM SPRIGGING HERBICIDE MACHINERY TRACTORS LABGP(TRACTOR & MACHINERY) INTEREST ON OP* CAP* S U B T O TA L , P R E - H A R V E S T ACRE TON ACRE ACPE ACRE ACRE HOUR DOL* PRICE OR VA L U E OP COST/UNIT QUANTITY COST PRODUCTION 2*50 40*00 12*50 20*00 2*10 2*12 2.67 2*50 0*10 1*00 1*00 1*00 1*00 1*00 1*00 1*88 32*15 $ _L£&t.00 120*00 $ $ BALE BALE 0*45 0*22 88*00 88*00 39*60 ._I9a36 $ 58*96 $ 146*27 T O TA L VA R I A B L E C O S T 58*509 3 * B R E A K E V E N P R I C E , VA R I A B L E C O S T S T O N $ RENT) ACRE ACRE ACRE BREAKEVEN 2*28 2*28 8*00 1*00 1*00 1*00 s 2*29 2*28 Bf. 00 12.56 $ 158.81 5* TOTAL COSTS 6* 2-23L 87*31 s HARVEST COSTS CUSTOM BALING CUSTOM HAULING S U B T O TA L , H A R V E S T 4* FIXED COSTS MACHINERY TRACTORS LAND (NET TOTAL FIXED COSTS 40*00 12*50 20*00 2* 10 2*12 2*67 4*71 PRICE, TO TA L COSTS TON 63*533 P R E PA R E D B Y WAY N E D * TAY L O R , TA E X , O V E RTO N , T E X A S P R O J E C T E D 1 9 7 7 COASTAL BERMUDAGRASS ESTABLISHMENT, DRYLANDr DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERAT ION OFFSET DISC TANDEM DISC TANOEM DISC PICKUP PICKUP SPRAYER, PASTURE PICKUP PICKUP PICKUP TO TA L S ITEM NO* D AT E 3,34 S,36 5,36 JAN JAN 10 10 FEB MAR MAY MAY 5,90 10 13 10 FEB JUNE J U LY FUEL,OIL, FIXED TIMES LABOR MACHINE LUB*,, REP* COSTS OVER HBURS HOURS PER ACRE PEP ACPE 1*00 1.00 1*00 OolO 0*10 1*00 0*10 0.10 0*10 0 . 3 11 0*388 0*388 0*125 0*4 25 0*172 0*125 0*125 0.-2.0T 0*259 0*259 0* 1.00 0*100 0 * 11 5 0*100 0*100 1*22 0*77 0*77 0.33 0*33 0*35 0* 33 0*33 1*48 Oo 89 0*89 0*1 6 0*16 0*50 0*16 0*16 _£__1___1 - 0 x 1 2 0 -0x22 .£jl!6 4*79 4.56 1*684 1*339 PREPARED BY WAYNE D* TAYLOR, TAEX, OVERTON, TEXAS B U D G E T I D E N T I F I C AT I O N N U M B E R 8 3 4 0 2 0 0 0 2 2 0 0 0 0 A N N U A L C A P I TA L M O N T H 8 FRCJECTEO 1977 /^*S\ 12 COASTAL BERMUDAGRASS ESTABLISHMENT, DRYLAND, OEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT JNIT GROSS RECEIPTS FROM PRODUCTION H AY T O TA L VA R I A B L E C O S T S P R E H A RV E S T FERTI250-100-100 LIME CUSTOM SPRIGGING HERBICIDE MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) INTEREST ON OP* CAP* S U B T O TA L , P R E - H A R V E S T HARVEST COSTS CUSTOM BALING CUSTOM HAULING S U B T O TA L , H A R V E S T PRICE OR VA L U E OR COST/UNIT QUANTITY COST $ TON 4 8.00 4,00 .122*00 $ 192*00 $ ACRE TON ACRE LBS* ACRE ACRE HOUR DOL* 80.00 12*50 20*00 4*07 2*95 3*90 2*50 0*10 80.00 12.50 20.00 4*07 2.95 3.90 7.06 1*00 1*00 1*00 1*00 1*00 1*00 2*82 40*26 $ s BALE BALE 0*45 0*22 62.55 139*00 139*00 —29x53 s 56*910 3. BREAKEVEN PRICE, VARIABLE COSTS TON J ACRE ACRE ACRE 2*99 3*42 8*00 1*00 1*00 1.00 2*99 3*42 8*_00 B 14*41 $ 242*05 5* TOTAL COSTS 6 * B R E A K E V E N P R I C E , T O TA L C O S T S 93.12 $ 227. 64 TOTAL VARIABLE COST 4* FIXED CCSTS MACHINEPY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS 4*02 T34.51 TON P R E PA R E C B Y W AY N E D * TAY L O R , TA E X , O V E R T O N , T E X A S 60*512 PROJECTED 1977 13 C O A S TA L B E R M U D A G R A S S E S TA B L I S H M E N T. D R Y L A N D , D E E P E A S T T E X A S R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT O P E R AT I O N OFFSET D I S C TANDEM D I S C PICKUP TANDEM D I S C PICKUP SPRAYEPU HERB* PICKUP SHREDDER(2R ) PICKUP PICKUP PICKUP PICKUP T O TA L S ITEM NO* 3,34 5,36 10 5,36 ID 5,62 10 5,30 10 IC 10 10 D AT E TIMES LABOR OVER HOURS JAN JAN JAN FEB FEB MAR MAR MAY M AY JUNE J U LY AUG 1*00 1*00 0*10 1*00 0*10 1*00 0*10 1*00 0.10 0*10 0*10 0*10 FUEL,OIL, FIXED MACHINE LUBo.REP* CCSTS HOURS PER ACRE PER ACRE 0.207 0o259 0*100 0* 259 0*100 0.258 0*100 0*317 0*100 0.100 0*100 1*22 0*77 0*33 0*77 0*33 0*75 0*33 1*00 0*33 0*33 0*33 1*48 0*39 0*16 0* 89 0*16 0*81 0*16 1*22 0*16 0*16 0*16 - 2 x 1 2 5 -0x199 -9x22 .9x13 6*85 6*41 0.311 0#386 0*125 0*388 0*125 0*388 0*125 Q*475 0*125 0*125 0*125 2*825 2*000 P R E PA R E D B Y W AY N E D * TAY L O R , TA E X . O V E R T O N , T E X A S B U D G E T I D E N T I F I C AT I O N N U M B E R 8 3 4 0 2 0 0 0 1 2 0 0 0 0 A N N U A L C A P I TA L M O N T H 8 PROJECTED 1977 14 C O A S TA L B E R M U D A G R A S S H AY, D R Y L A N D , D E E P E A S T T E X A S R E G I C N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT UNIT 1. GROSS RECEIPTS FROM PRODUCTION H AY T O TA L PRICE OR VA L U E Oi COST/UNIT QUANTITY COST $ TON 48*00 8*30 ACRE TON ACRE HOUR DOL* 11 7 * 2 0 12*50 2*01 2*50 0*10 1*00 0*30 1*00 0*75 38*23 BALE BALE 0*45 0*22 291.CO 291*00 2. VARIABLE COSTS PREHARVEST FERTI400-100-160 LIME MACHINERY LABOR<TRACTOR & MACHINERY) INTEREST GN OP* CAP* .198a_40 S 398*40 $ 11 7 . 2 0 3. 75 2*01 1*87 21.82 128*66 S U B T O TA L , P R E - H A R V E S T HARVEST COSTS CUSTOM BALING CUSTOM HAULING S U B T O TA L , H A R V E S T 130.95 — 34x22 $ 194.97 323.63 T O TA L VA P I A B L E C O S T ON N 3 * B R E A K E V E N P R I C E , V A R I A B L E C O S T S TTO 4* FIXED COSTS MACHINERY T R A C TO R S P R O R AT E D E S TA B * C O S T LAND (NET PENT) T O TA L F I X E D C O S T S $ ACRE ACRE ACRE ACRE 0*95 0*0 38*83 10*0C 1*00 1*00 0*07 1*00 0*95 0*0 2*72 s _.-l£*.00 13*67 337* 29 5 * T O TA L C O S T S 6 * B R E A K E V E N P R I C E , T O TA L C O S T S 38*991 TON 40*638 E S TA B L I S H M E N T C O S T P R O R AT E D O V E R 1 5 Y E A R S * H E R B I C I D E AT $ 2 * 2 5 / A C R E EVERY OTHER YEAR* F R E PA R E D B Y WAY N E D * TAY L O R , TA E X , O V E RTO N , T E X A S P R C J E C T E D 1 9 7 7 15 C O A S TA L B E R M U D A G R A S S H AY, D R Y L A N D . D E E P E A S T T E X A S R E G I C N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT O P E R AT I O N PICKUP PICKUP PICKUP P ICKUP PICKUP PICKUP ITEM NO* 10 10 10 10 10 10 T O TA L S D AT E FUEL,OIL, FIXED L U B * . R E P . COSTS T I M E S LABOR MACHINE P E R ACPE P E R A C R E OVER HOURS HOURS APR MAY JUNE J U LY AUG SEPT 0*10 0*125 0*100 0*10 0*125 0*100 0*10 0*125 0*100 0*10 0*125 0*100 0*10 0*125 0*100 0 * 1 0 .-2x125 _ fl l . i fl O 0*750 0*600 0* 0* 0 . 0 . 0* 33 33 3 3 3 3 33 0* 0* 0* 0. 0* 16 16 16 16 16 -9x22 -0x15 2*01 0*95 E S TA B L I S H M E N T C O S T P R O R AT E D O V E R 1 5 Y E A R S * H E R B I C I D E AT $ 2 * 2 £ / A C R E EVERY OTHER YEAR* P R E PA R E D B Y WAY N E D * TAY L O R , TA E X , O V E RTO N , T E X A S P R O J E C T E D 1 9 7 7 B U D G E T I D E N T I F I C AT I O N N U M B E R 8 3 6 0 2 0 0 0 2 2 0 0 0 0 A N N U A L C A P I TA L M O N T H 9 COASTAL BERMUDAGRASS HAY, DRYLAND, DEEP EAST TEXAS REGICN ESTIMATED COSTS AND RETURNS PEP ACRE CONVENTIONAL 3ALEP HIGH LEVEL MANAGEMENT PRICE OR VA L U F OP UNIT COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION HAY TOTAL VA R I A B L E C O S T S P R E H A RV E S T FERT(450-100-200 LIME HERBICIDE MACHINERY TRACTORS LABORITRACTOR & MACHINERY) INTEREST ON OP* CAP* S U B T O TA L , P R E - H A R V E S T HARVEST COSTS CUSTCM HAULING BALER TWINE MACHINERY TRACTORS LABORITRACTOR & MACHINERY) S U B T O TA L , H A R V E S T TON ACRE TON LBS* ACRE ACRE HOUR DOL* 48*00 132*00 12*50 2*10 0.38 0*31 2*50 C.IO 00 -±22x00 ■B 432*00 1*00 0*50 1*00 1*00 1*00 0*30 38.44 132*C0 6*25 2*10 0*33 0. 31 0. 74 3.*. 84 $ 145.62 s BALE TON ACRE ACRE HOUR 0*22 0*99 6*67 3*99 2*50 69. 20 8.91 6, e-7. 3*99 315*00 9.00 1.00 1*00 2*87 $ $ 241*66 T O TA L VA R I A B L E C O S T TO ON N 3 * B R E A K E V E N P R I C E , VA R I A B L E C O S T S T 4* FIXED COSTS MACHINERY TRACTORS P R O R AT E D E S TA B * C C S T LAND (NET RENT) T O TA L F I X E D C O S T S 26*851 $ ACPE ACRE ACRE ACPE 19*07 3*97 50*05 } 0*00 ^ \ 19.07 3.97 3.50 ...10*00 36. 54 $ 2 78.20 3 0 . 9 11 TON E S TA B L I S H M E N T C O S T P R O R AT E D O V E R 1 5 Y E A R S . P R E PA R E D B Y W AY N E D . TAY L O R , TA E X , O V E R T O N . j 1*00 1*00 0*07 1*00 $ 5 * T O TA L C O S T S 6 * B R E A K E V E N P R I C E , T O TA L C O S T S 1 x 11 96*0^ TEXAS PROJECTED lv? 17 C O A S TA L B E R M U D A G R A S S H AY, D R Y L A N D , D E E P E A S T T E X A S R E G I C N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E C O N V E N T I O N A L HIGH LEVEL MANAGEMENT O P E PAT I O h PICKUP S P R AY E R , PA S T U R E PEGUL4P BALER PICKUP REGULAR BALER PICKUP REGULAR BALER PICKUP REGULAR BALEP PICKUP REGULAR BALER PICKUP T O TA L S ITEM NO« 10 5,90 5,95 10 5,95 \ U 5,95 io 5,95 10 5,95 10 BALER FUEL, OIL. --IX ED L UB*,REP* COSTS TIMES LABOR MACHINE P ER ACRE PER ACRE D AT E O V E R H O U R S H O U R S 0*33 0*35 1*80 0*33 1.80 0.33 1*80 0.33 1*80 0* 32 1*80 3* 16 0*50 4*32 0*16 4*32 0*16 4. 32 0*16 4*32 0*16 4*32 s e p t 0 * 1 0 - 2 x 1 2 5 _ fl * . l fi f t - 9 x 2 2 _0.fi. I£ APR MAY M AY MAY JUNE JUNE J U LY J U LY AUG AUG SEPT 0*10 1*00 1*00 0*10 1*00 OolO 1*00 0*10 1*00 0*10 1*00 0.125 0.172 0*446 0*125 0*448 0*125 0*448 0*125 0*448 0*125 0*448 0*100 0*115 0*299 0*100 0*299 0*100 0*299 0*100 0*299 0*100 0*299 3*164 2*209 E S TA B L I S H M E N T C O S T P R O R AT E D O V E R 1 5 Y E A R S * P R E PA R E D B Y W AY N E D * TAY L O R , TA E X , O V E R T O N , TEXAS 11 * 3 5 23*04 PROJECTED 1977 B U D G E T I D E N T I F I C AT I C N N U M B E R — 8 3 6 0 2 0 C 0 1 2 0 0 0 0 A N N U A L C A P I TA L M O N T H 9 >^^K C O A S TA L B E R M U D A PA S T U R E , D R Y L A N D , D E E P E A S T T E X A S R F G I O N E S T I M AT E D C 3 S T S A N D R E T U R N S P E P A C R F TYPICAL MANAGEMENT UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST 1. GROSS RECEIPTS FROM PRODUCTION T O TA L 2* VARIABLE COSTS PREHARVEST FERTO00-50-50) LIME MACHINERY TRACTORS LABORCTRACTOR & MACHINERY) INTEREST ON OP* CAP* O.C ACRE TON ACRE ACRE HOUR DOL* 35*00 12*50 1*16 0*85 2*50 0*10 1.00 0.25 1.00 l.CC 0.85 11.73 35*C0 3.13 1* 16 0*85 2.1? 1 x 11 s 43*42 HARVEST COSTS S U B T O TA L , H A R V E S T s 0*0 T O TA L VA R I A B L E C O S T $ A3.43 S U B T O TA L , P R E - H A R V E S T $ -43* A3 3 * I N C O M E A B O V E VA R I A B L E C O S T S 4* FIXED COSTS MACHINERY T R A C TO R S P R O R AT E D E S TA B * C O S T LAND (NET RENT) T O TA L F I X E D C O S T S s ACRE ACRE ACRE ACRE 0*91 0*78 38.83 8*00 0.91 0.78 2.72 1.00 1*00 C.07 1*00 2x99 $ 12.41 5 * T O TA L C O S T S $ 55. e4 6* NET RETURNS $ -55.84 P R E PA R E D B Y W AY N E D . TAY L O R , TA E X , O V E R T O N , T E X A S FROJECTED 1977 19 C O A S TA L B E R M U D A PA S T U R E , D R Y L A N D , D E E P E A S T T E X A S R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT O P E PAT I O N PICKUP SHREDDER(2R) PICKUP P ICKUP T O TA L S ITEM NO* 10 5,3C 10 10 D AT E FUEL,OIL, FIXED TIMES LABOR MACHINE LUB*,REP« CCSTS OVER HOURS HOURS PER ACRE PER ACRE APR JULY JULY AUG 0*10 0*125 0*100 1*00 0 * 4 7 5 0 * 3 1 7 0 * 1 0 C*125 0*100 0*10 -2x125 -9x199 0*33 1*00 0*33 -9x22 0*16 ___._L.L_t 0*850 0*617 2*00 1*6 9 P R E PA R E D B Y W AY N E D * TAY L O R , TA E X , O V E R T O N , T E X A S E U D G E T I D E N T I F I C AT I O N N U M B E R 8 3 5 0 2 0 0 0 2 2 0 0 0 0 A N N U A L C A P I TA L M C N T H 9 0*16 1*22 PRCJECTED 1977 S^IK 20 COASTAL BERMUDAGRASS PASTURE, DRYLAND, DEEP EAST TEXAS REGICN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST GROSS TO TA L RECEIPTS FROM PRODUCTION 2* VARIABLE COSTS PREHARVEST FERTU50-50-50) ACRE LIME TON HERBICIDE ACPE MACHINERY ACRE TRACTORS ACRE LABORITRACTOR 6- MACHINERY) INTEREST ON OP* CAP* S U B T O TA L , P R E - H A R V E S T HOUR DOL* 45*00 12*50 2*10 0*36 0*15 2* 5C 0*10 $. $ 1*00 0*30 0*50 l.OC 1*00 0*21 5*14 45.00 3.75 1.05 0. 36 0.15 0. 5 3 $ 1x51 52.35 HARVEST COSTS S U B T O TA L , H A R V E S T $_ s o7cT T O TA L VA R I A B L E C O S T $ 52. 35 i 3.o INCOME ABOVE VARIABLE COSTS 4* FIXEC COSTS MACHINERY ACRE TRACTORS ACRE P R O R AT E D E S TA B * C O S T A C R E LAND (NET RENT) ACRE TOTAL FIXED COSTS -52* 35 $ $ 0* 27 0* IA 3*50 8*00 11*91 5* TOTAL COSTS _ 64*26 6* NET RETURNS $ -64*26 0*27 0*14 50o05 8*00 1*00 1*00 0*07 1*00 PREPARED BY WAYNE D* TAYLOR, TAEX, OVERTON, TEXAS PROJECTED 1977 21 COASTAL BERMUDAGRASS PASTURE, DRYLAND, OEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT /^% FUEL,OIL, FIXED ITEM TIMES LABOR MACHINE LUB*,REP* COSTS O P E R AT I O N N O * D AT E O V E I R H O U R S H O U R S P E R A C R E P E R A C R E S P R AY E R , PA S T U R E pickup 10 JUNE TO TA L S 5,90 JUNE 0*50 0*10 -2x125 0 * 2 11 0*086 0*057 0*18 0*25 -9x199 -9x22 _-Q*16 0*157 OoSl 0*41 P R E PA R E D B Y W AY N E D * TAY L O R , TA E X , O V E R T O N , T E X A S P R O J E C T E D 1 9 7 7 B U D G E T I D E N T I F I C AT I O N N U M B E R — 8 3 5 0 2 0 0 0 1 2 0 0 0 0 A N N U A L C A P I TA L M O N T H 9 ^*^ 22 C O A S TA L B E R M U D A - C R I M S O N C L O V E R - R Y E G R A S S PA S T U R E , D R Y L A N D , D E E P E A S T T E X A S E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT UNIT 1* 2* GROSS TO TA L RECEIPTS VA R I A B L E C O S T S PREHARVEST RYEGRASS SEED FERTC80-60-60) HERBICIDE LIME MACHINERY TRACTORS LABORITRACTOR & MACHINERY) I N T E R E S T O N O P * C A P. S U B T O TA L , P R E - H A R V E S T HARVEST COSTS CUSTOM BALING CUSTCM HAULING S U B T O TA L , H A R V E S T 3* FROM $ PRICE OR VA L U E Oi COST/UNIT QUANTITY COST PRODUCTION $ 0*C $ LBS* ACRE ACRE TON ACRE ACRE HOUR DOL* 0*25 34*00 2*10 12*50 1*27 1*98 2*50 0*10 10*00 1*00 0*30 0*30 1*00 1.00 1.49 26*24 2. 50 34.00 C.63 3*75 1.27 1.9P 3.72 2x52 $ 50.47 s EALE BALE 0*45 0*22 28*00 28*00 12. 60 5x15 $ 18*76 T O TA L VA R I A B L E C O S T $ 69*2* I N C O M E A B O V E VA R I A B L E C O S T S s -69*23 FIXED COSTS MACHINERY TRACTORS P R O R AT E D E S TA B * C O S T LAND (NET RENT) T O TA L F I X E D C O S T S $ ACRE ACRE ACRE ACRE 1*28 1*83 38.83 8.00 1.00 1.00 0*07 1*00 1. 28 1.83 2.72 $ 82.00 13.82 T O TA L C O S T S $ 83. 05 NET RETURNS $ -83*05 PREPARED BY WAYNE D* TAYLOR. TAEX, OVERTON, TEXAS PROJECTED 1977 23 COASTAL BERMUDA-CRIMSON CLOVER-RYEGRASS PASTURE, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT O P E R AT I O N BROADCAST SEEDER PICKUP S P R AY E R , PA S T U R E PICKUP SHREDDER(2R ) TA N D E M D I S C PICKUP T O TA L S ITEM NO* 5,85 10 5,90 10 5,30 5,36 10 D AT E FIXED FUEL*OlL, COSTS L A B O R M A C H I N E LUBo »REP« TIMES P E R A C R E P E R ACPE OVER HOURS HOURS OCT OCT JUNE JUNE SEPT SEPT SEPT 1*00 0*10 0*30 0*10 1*00 loOO OolO 0*196 0*125 0*052 0*125 0*475 0*388 0*131 0*100 0o034 0*100 0*317 0*259 Oo 37 0*33 O o i i 0o33 1*00 0*77 _£fl.l2§ ____L__QP. -9x22 _J_.aI6 1 .486 1*041 3*25 3*10 PREPARED BY WAYNE D* TAYLOR, TAEX, OVERTON, TEXAS BUDGET IDENTIFICATION NUMBER 8140 200022000 0 ANNUAL CAPITAL MONTH 9 0*3 0*1 Ooi 0 o l 1*2 0o3 7 6 5 6 2 9 PROJECTED 1977 24 C O A S TA L B E R M U D A - C R I M S O N C L O V E R - R Y E G R A S S PA S T U R E , D R Y L A N D , D E E P E A S T T E X A S R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST 1* GROSS RECEIPTS FROM PRODUCTION T O TA L VA R I A B L E C O S T S PREHARVEST RY E G R A S S S E E D FERT(100-60-60) LIME HERBICIDE MACHINERY T R A C TO R S LABOR(TRACTOR & MACHINERY) INTEREST ON OP* CAP* S U B T O TA L , P R E - H A RV E S T HARVEST COSTS BALER MACHINERY TWINE ^p^ TRACTORS C' LABCR(TRACTOR & MACHINERY) 0*0 LBS* ACRE TON ACRE ACRE ACRE HOUR DOL* 0*25 38*00 12*50 2*10 1*61 2*04 2*50 0*10 10*00 1*00 0*30 0*50 1*00 1*00 1*65 29*08 2* 50 38.0', 3.75 1*05 1*61 2*04 4. 11 -2x21 55*98 ACRE ACRE ACRE HOUR 0*98 1*79 3*41 2*50 0*50 1*00 1*00 1*52 0* 49 1.79 3.41 .-2x20 SUBTOTAL, HARVEST 9*49 TOTAL VARIABLE COST 65* 46 3* INCOME ABOVE VARIABLE COSTS $ -65*46 4. FIXEO COSTS MACHINERY TRACTORS PRORATED ESTAB* COST LAND (NET RENT) TOTAL FIXED COSTS $ ACRE ACRE ACRE ACRE 7 4 50 8 .8 *7 *0 *0 5 4 5 0 1.00 1*00 0*07 1*00 7.65 4*74 3*50 2x02 $ 24*09 5* TOTAL COSTS $ 89*55 6* NET RETURNS $ -89*55 P R E PA R E D B Y W AY N E D * TAY L O R , TA E X , O V E R T O N , T E X A S FROJECTED 1977 25 C O A S TA L B E R M U D A - C R I M S O N C L O V E R - R Y E G R A S S PA S T U R E , D R Y L A N D , D E E P E A S T T E X A S R E G I O i E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT O P E R AT I O N BROADCAST SEEDER PICKUP PICKUP S P R AY E R , PA S T U R E SICLE MOWER RAKE ROUND BALER PICKUP SHREDDER(2R) TA N D E M D I S C PICKUP ITEM NO* 5,85 10 10 5,90 5,96 5,97 3,94 10 5,30 5,36 10 D AT E FIXED FUEL.OIL, CCSTS M A C H I N E L U B o , R E P o T I M E S LABOR P E R ACRE HOURS HOURS P E R A C R E OVER OCT OCT MAY JUNE JUNE JUNE JUNE JUNE SEPT SEPT SEPT 1*00 0*196 0*10 0*125 0*10 0*125 0*50 0*086 1*00 0*574 0*430 1*00 0*516 1*00 0*10 0*125 1*00 0*475 1*00 0*388 0 * 1 0 .-2x125 0*131 OolOO 0*100 0*057 0*383 0*286 Co344 0*100 0*317 0*259 0*37 0o33 0*33 0*18 1*24 1*02 2*94 0*33 1*00 0o77 0*37 0*16 0*16 0o25 1*73 lo61 5*88 0*16 1*22 0*89 -9x199 -9x23 -2x15 3*165 2*177 8,85 12*58 T O TA L S P R E PA R E D B Y W AY N E D * TAY L O R , TA E X , O V E R T O N , T E X A S B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 9 8140200012000 0 PROJECTED 1977 26 C G M M O N B E R M U D A G R A S S PA S T U R E , D R Y L A N D , D E E P E A S T T E X A S R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT UNIT VALUE OR COST PRICE OR COST/UNIT QUANTITY 1* GROSS RECEIPTS FROM PRODUCTION TOTAL VA R I A B L E C O S T S PREHARVEST FERT(86-36-36) LIME MACHINERY TRACTORS LABORITRACTOR £- MACHINERY) INTEREST ON OP* CAP* S U B T O TA L , P R E - H A R V E S T 0* C ACPE TON ACRE ACRE HOUR DOL* 28*00 12*50 0*75 0*42 2*50 0*10 26.0 ) 3. 1 3 0. 75 C.42 1.22 1*00 0*25 1*00 1.00 C.49 9*62 £t2£ $ 34*47 HARVEST COSTS S U B T O TA L , H A R V E S T $ $ 0.0 T O TA L VA R I A B L E C C S T $ 34.47 $ -34.47 3 . I N C O M E A B O V E VA R I A B L E C O S T S • FIXED COSTS MACHINERY T R A C TO R S LAND (NET RENT) T O TA L F I X E D C O S T S $ ACRE ACRE ACRE 0*53 0*39 7.00 0. 53 0* 39 1*00 1*00 1*00 1x02 $ 7.93 5 * T O TA L C O S T S $ 42.40 6* NET RETURNS $ -42.40 P R E PA R E O B Y W AY N E D * TAY L O R , TA E X , OVERTON, TEXAS PROJECTED 1977 27 COMMON BERMUDAGRASS PASTURE. DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT O P E R AT I O N PICKUP SHREDDER(2R) PICKUP ITEM NO* 10 5,30 10 D AT E FIXED FUEL.OIL, COSTS T I M E S LABOR M A C H I N E L U B © , R E P. PER ACRE PER ACRE OVER HOURS HOURS APR J U LY J U LY 0.125 0*10 0.50 0*238 0 * 1 0 ._Q.«.JL25 0*100 0*158 0*33 0*50 0*16 0*61 -9x199 -9x22 -9x15 0*488 0.358 1*17 0*93 T O TA L S P R E PA R E D B Y W AY N E D * TAY L O R , TA E X , O V E R T O N , T E X A S B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 9 8310200022000 0 PROJECTED 1977 28 C C M M O N B E R M U D A G R A S S PA S T U R E , D R Y L A N D , D E E P E A S T T E X A S R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT UNIT 1* GROSS TO TA L RECEIPTS FROM S PRICE OP VA L U E OR COST/UNIT QUANTITY COST PRODUCTION $ 0*0 2* VARIABLE COSTS PREHARVEST FERTO00-50-50) ACRE LIME TON HERBICIDE ACRE MACHINERY ACRE TRACTORS ACPE LABOR(TRACTOR & MACHINERY) HOUR INTEREST ON OP* CAP* DOL* S U B T O TA L , P R E - H A R V E S T 35*00 12*50 2*10 0o35 0*09 2*50 0*10 1.00 0*30 0*30 1*00 1*00 0*18 13.ai 35*00 3."5 0.63 0.35 0.09 0.44 1x24 $ 41.60 HARVEST COSTS S U B T O TA L , H A R V E S T $ $ 0*0 T O TA L VA R I A B L E C O S T s 41*60 $ -41*60 , I N C O M E A B O V E VA R I A B L E C O S T S 4* FIXED COSTS MACHINERY TRACTORS LAND (NET T O TA L F I X E D C O S T S $ RENT) ACRE ACRE ACRE 0*22 0*08 7*00 1*00 1*00 1*00 0*22 0*08 Z*_oo $ 7*31 5 * T O TA L C O S T S $ 48*91 6* NET RETURNS $ -48* 91 P R E PA R E D B Y WAY N E D * TAY L O R , TA E X , O V E RTO N , T E X A S F R O J E C T E D 1 9 7 7 y^'N 29 COMMON BERMUDAGRASS PASTURE, DRYLANC, DEEP EAST TEXAS REGI3N ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT FUEL,OIL, FIXED ITEM TIMES LABOR MACHINE LUBo,REP* CCSTS O P E R AT I O N N O * D AT E O V E R H O U R S H O U R S P E R A C R E P E R A C R E S P R AY E R , PA S T U R E 5 . 9 0 J U N E 0 * 3 0 0 o 0 5 2 0 * 0 3 4 0 * 11 0 © ! 5 PICKUP 10 TO TA L S JUNE 0*10 0*177 _Q.fi.125 _fiAlfi£ 0*134 -0x22 0*44 _fifl.l6 0*31 PREPARED BY WAYNE D* TAYLOR, TAEX, OVERTON, TEXAS PROJECTED 1977 B U D G E T I D E N T I F I C AT I O N N U M B E R 8 3 1 0 2 0 0 0 1 2 0 0 0 0 ANNUAL CAPITAL MONTH 9 30 C O M M O N E E R M U D A - C R I M S O N C L O V E R - R Y E G R A S S PA S T U R E , D R Y L A N D , D E E P E A S T T E X A S R E G I O N E S T I M AT E D C O S T S A N D P E T U R N S P E R A C R E TYPICAL MANAGEMENT UNIT 1* GROSS TO TA L RECEIPTS PRICE OR VA L U E CR COST/UNIT QUANTITY COST FROM $ PRODUCTION 0*0 2 * VA R I A B L E C O S T S PREHARVEST RYEGRASS SEED LBS* 0*25 FERT(65-60-60) ACRE 31*00 HERBICIDE ACRE 2*10 LIME TON 12*50 MACHINERY ACRE 1*27 TRACTORS ACRE 1*98 LABORITRACTOR t MACHINERY) HOUR INTEREST ON OP* CAP* DOL* S U 8 T 0 TA L , PRE-HARVEST HARVEST CUSTOM BALING CUSTOM HAULING S U B TO TA L , TO TA L 3* 4* COSTS BALE BALE HARVEST VA R I A B L E INCOME TO TA L 6* NET 0*45 0*22 COSTS 1*28 1*83 ACRE COSTS COSTS RETURNS 2*50 31.00 0*63 3.13 1*27 1*98 3.72 2x24 46*56 $ VA R I A B L E FIXED MACHINERY ACRE TRACTORS ACRE LAND (NET RENT) TO TA L FIXED 5* $ 10*00 1*00 0*30 0.25 1*00 1*00 2*50 1*49 0*10 23*44 $ 25*00 25*00 11 . 2 5 5x52 16*75 $ 63*31 $ COST ABOVE S COSTS $ -63*31 $ 1*00 1*00 1*00 $ 7*00 $ $ 1*28 1.83 1x00 10.10 73.42 -73*42 P R E PA R E D B Y WAY N E D * TAY L O R . TA E X , O V E RTO N , T E X A S P R O J E C T E D 1 9 7 7 31 COMMON BERMUDA-CRIMSON CLOVER-RYEGRASS PASTURE, DRYLANC, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT O P E R AT I O N BROADCAST SEEDER PICKUP S P R AY E R , PA S T U R E PICKUP SHREDDER(2R ) TA N D E M D I S C PICKUP T O TA L S ITEM NO* 5,85 10 5,90 10 5,30 5,36 10 D AT E FIXED FUEL,OIL, T I M E S LABOR MACHINE L U B * , R E P * CCSTS OVER HOURS HOURS PER ACRE PER ACPE OCT OCT JUNE JUNE SEPT SEPT SEPT 1*00 0*196 OolO 0*125 0o30 0*052 OolO 0*125 loOO 0*475 loOO 0*388 O o l O ..2x125 1*486 0*131 0*100 0*034 OolOO 0*317 0*259 ____-12Q Oo 37 0o33 0* 11 0o33 loOO 0o77 0*33 -2x15 1.041 3o 25 3.10 PREPARED BY WAYNE D* TAYLOR, TAEX, OVERTON, TEXAS B U D G E T I D E N T I F I C AT I O N N U M B E R 8 1 5 0 2 0 0 0 2 2 0 0 0 0 ANNUAL CAPITAL MONTH 9 0o37 0 o l 6 Oo 15 0*16 lo22 0o89 PROJECTED 1977 32 C R I M S G N C L O V E R E S T A B L I S H M E N T, D R Y L A N D , D E E P E A S T T E X A S R E G I C N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION TOTAL O.C VA R I A B L E C O S T S PREHARVEST CLOVER SEED INOCULANT RYEGRASS SEED FERT(20-40-40) LIME MACHINERY TRACTORS LABCRITRACTOR & M A C H I N E R Y ) INTEREST ON OP* C A P * SUBTOTAL, P R E - H A R V E S T LBS* ACRE LBS* ACRE TON ACRE ACRE HOUR DOL* 0*58 0*40 0*25 16*00 12*50 0*92 1*89 2*5C 0*10 N s 11 * 6 0 0* 40 2.50 16.00 5* 00 0*92 1.89 3. 27 0*22 41.80 HARVEST COSTS S U B T O TA L , H A R V E S T $_ $ O.C T O TA L VA R I A B L E C O S T s 41.80 3 * I N C O M E A B O V E VA R I A B L E C O S T S $ -41.80 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS 3 ACRE ACRE ACRE 1*05 1*74 8*00 $ 1.05 1.7A 8*00 10* 80 5* TOTAL COSTS s 52.59 6* NET RETURNS s -52. 59 PREPARED BY WAYNE D* TAYLOR, TAEX, OVERTON, TEXAS ^ 20*00 1*00 10*00 1*00 0*40 1*00 1*00 1*31 2*15 1*00 1*00 1*00 PROJECTED 1977 33 C R I M S O N C L O V E R E S T A B L I S H M E N T, D R Y L A N D , D E E P E A S T T E X A S R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT O P E R AT I O N SHREDDER(2R ) PICKUP TA N D E M D I S C BROADCAST SEEDER PICKUP T O TA L S ITEM NO* D AT E 5,30 SEPT 10 5,36 5.85 SEPT OCT OCT 10 OCT TIMES LABOR OVER HOURS FUELoOIL, FIXED MACHINE LUB*,REP© COSTS HCURS PER ACRE PER ACRE 1*00 0*475 0*10 0*125 1*00 0*388 1*00 0*196 0*10 _Q_*125 0*317 0*100 0*259 0ol31 _£*iflO loOO 0*33 0o77 0o37 lo22 0. 16 0*89 0*37 9x22 -2*15 1*310 0.907 2*81 2*80 P R E PA R E D B Y W AY N E D . TAY L O R . TA E X , O V E R T O N , T E X A S B U D G E T I D E N T I F I C AT I O N N U M B E R 8 0 7 0 2 0 0 0 2 2 0 0 0 0 A N N U A L C A P I TA L M O N T H 1 0 PROJECTED 1977 S * ^ K _>H CRIMSCN CLOVER ESTABLISHMENT, DPYLAND, DEEP EAST TEXAS REGICN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT PPICE OR COST/UNIT QUANTITY VALUE OR COST GROSS RECEIPTS FROM PRODUCTION TOTAL VARIABLE COSTS PREHARVEST CLCVEP SEED INCCULANT RYEGRASS SEED FERTI25-60-60) LIME MACHINERY TRACTORS LABORITRACTOR & M A C H I N E R Y ) INTEREST ON OP* C A P * CO LBS* ACRE LBS* ACRE TON ACRE ACRE HOUR DOL* 0*58 0*40 0*25 23*00 12.50 0*92 1*89 2.50 0*10 20.00 1.00 10*00 1*00 0.30 1*00 1*00 1*31 1*94 S U B T O TA L , P R E - H A R V E S T $ 11. 60 0. 40 2* 50 23.00 3. 75 0.92 1.89 3. 27 0*19 47. 53 HARVEST COSTS S U B T O TA L , H A R V E S T $ s O.C T O TA L VA R I A B L E C O S T $ 47* 53 3 * I N C O M E A B O V E VA R I A B L E C O S T S $ -47,53 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) T O TA L F I X E D C O S T S _ ACRE ACRE ACRE 1*05 1*74 8*00 1*00 1*00 l.CO $ 1*05 1.74 8*00 10. 80 5 * T O TA L C O S T S $ 58.32 6* NET RETURNS s -58. 32 P R E PA R E D B Y W AY N E D . TAY L O R , TA E X , O V E R T O N , T E X A S PROJECTED 1977 35 CRIMSON CLOVER ESTABLISHMENT, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION SHREDDER(2R) PICKUP TANDEMi DISC BROADCAST SEEDER PICKUP TOTALS ITEM NO* 5,30 10 5,36 5.85 10 DATE FIXED FUEL.CIL, TIMES LABOR MACHINE LUB*,REP* CCSTS OVER HOURS HOURS PER ACRE PER ACRE SEPT SEPT OCT OCT OCT 1*00 0*475 0*317 0 * 1 0 0*125 0*100 loOO 0 * 3 8 8 0 * 2 5 9 loOO 0 * 1 9 6 0 . 1 3 1 OolO .. 2 x 1 2 5 _2La1SQ 1*310 0*907 PREPARED BY WAYNE Do TAYLOR, TAEX, OVERTON, TEXAS B U D G E T I D E N T I F I C AT I O N N U M B E R 8 0 7 0 2 0 0 0 1 2 0 0 0 0 A N N U A L C A P I TA L M O N T H 1 0 1.00 Oo 32 0*77 0o37 lo 22 Oo 16 0*89 0* 37 . 0 o, 3 3 __2i_16 2o81 2*80 FROJECTED 1977 36 LA S-l CLOVER ESTABLISHMENT, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST lo GROSS TO TA L RECEIPTS FROM * 2 . VA R I A B L E C O S T S PREHARVEST CLOVER SEED LBSo INCCULANT ACRE RYEGRASS SEED LBS* FERT(50-80-80) ACRE LIME TON MACHINERY ACRE TRACTORS ACRE LABCRITRACTOR & MACHINERY) HOUR INTEREST ON OP* CAP* DOL* S U B T O TA L , P R E - H A R V E S T PRODUCTION $ 0.0 $ 2*50 0*10 0.25 34.00 12*50 0*92 1*89 2*50 0*10 3*00 1*00 10*00 1*00 0*30 1*00 1.00 1*31 6 * 11 7. 50 0.10 2*50 s 34.00 3. 75 0. 92 1*89 3. 27 &*._.! 54. 54 HARVEST COSTS S U B T O TA L , H A R V E S T $ $ 0.0 T O TA L VA R I A B L E C C S T $ 54, 54 $ -54.54 3 * I N C O M E A B O V E VA R I A B L E C O S T S 4* FIXED COSTS MACHINERY TRACTORS LAND (NET TOTAL FIXED COSTS s $ 1.05 1*74 8*CC 10*80 5* TOTAL CGSTS $ 65* 3A 6* NET RETURNS $ -65. 34 RENT) ACRE ACRE ACRE 1*05 1*74 8*00 1*00 1.00 1.00 PREPARED BY WAYNE D* TAYLOR, TAEX, OVERTON, TEXAS FROJECTED 1977 37 LA S-l CLOVER ESTABLISHMENT, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT O P E R AT I O N SHREDDER(2R ) PICKUP TA N D E M D I S C BROADCAST SEEDER PICKUP T O TA L S ITEM NO. 5,30 10 5,36 5,85 FUEL.OIL, FIXED TIMES LABOR M A C H I N E L U B * , R E P. C C S T S D AT E O V E R H O U R S H O U R S PER ACRE PER ACRE SEPT SEPT OCT OCT 10 OCT 0*475 0*317 0*10 0*125 1*00 0*388 1*00 0*196 0*10 _0_*125 0*100 0*259 0*131 . fl A l fl O -9x22 1*22 0* 16 0*89 0* 37 _0jli6 1*310 0*907 2*81 2*80 1*00 P R E PA R E D B Y W AY N E D * TAY L O R , TA E X , O V E R T O N , T E X A S B U D G E T I D E N T I F I C AT I O N N U M B E R 8 0 3 0 2 0 C 0 1 2 0 0 0 0 A N N U A L C A P I TA L M O N T H 1 0 loCC 0*32 0*77 0*27 PROJECTED 1977 /*^%. 38 /#*N L O V E G R A S S PA S T U R E , D R Y L A N D , D E E P E A S T T E X A S R E G I C N E S T I M AT E D C O S T S A . N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT UNIT PPICE OR VA L U E OR COST/UNIT QUANTITY COST 1* GROSS RECEIPTS FROM PRODUCTION TOTAL 2 * VA R I A B L E C O S T S PREHARVEST FERT(50-50-50) LIME MACHINERY LABORITRACTOR S MACHINERY) I N T E R E S T O N O P. C A P * S U B T O TA L , P R E - H A R V E S T 0.0 ACRE TON ACRE HOUR DOL* 25*00 12*50 0*33 2*50 0*10 l*0C 0*25 1*00 0*12 12*93 25.00 3. 13 0. 33 0* 31 1x22 s 30.07 HARVEST COSTS SUBTOTAL, HARVEST s $ 0 . 0 TOTAL VARIABLE COST $ 30.07 $ -30.07 3* INCOME ABOVE VARIABLE COSTS 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS s ACRE ACRE ACRE 0*16 0*0 7*00 $ 0. 16 0.0 7*0.0 7.16 5* TOTAL COSTS $ 37,22 6* NET RETURNS $ -37,22 PREPARED BY WAYNE D* TAYLOR, TAEX, OVERTON, TEXAS 1*00 1*00 1*00 FRCJECTED 1977 39 L O V E G R A S S PA S T U R E , D R Y L A N D , D E E P E A S T T E X A S R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT O P E R AT I O N NO* PICKUP 10 TO TA L S ITEM D AT E mar FUEL,OIL, FIXED TIMES LABOR MACHINE LUB*,REPo CCSTS OVEP HOURS HOURS PER ACRE PER ACRE 0*10 -0x125 0*125 -0x100 -0x22 0*100 0o33 _.Oai__ 0ol6 P R E PA R E D B Y WAY N E D * TAY L O R , TA E X , C V E RTO N , T E X A S P R O J E C T E D 1 9 7 7 e u D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 9 8645200022000 0 ^ % 40 LOVEGRASS FASTURE, DRYLAND, DEEP EAST TEXAS REGICN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT PRICE OR VA L U E _R COST/UNIT QUANTITY COST 1. GROSS RECEIPTS FROM PRODUCTION T O TA L 2* VARIABLE COSTS PREHARVEST FERTU00-50-50) LIME MACHINERY LABOR(TRACTOR & MACHINERY) INTEREST ON OP* CAP* 0.0 ACRE TON ACRE HOUR DOLo 35o00 12o50 0*67 2*50 0*10 35.0C 3.75 0.67 0.62 1*00 0*30 1*00 0*25 12*73 1x21 s 41.32 HARVEST COSTS S U B T O TA L , H A R V E S T s C O T O TA L VA R I A B L E C C S T $ 41* 32 S U B T O TA L , P R E - H A R V E S T $ -41.32 3 * I N C O M E A B O V E VA R I A B L E C O S T S 4* FIXEC COSTS MACHINERY T R A C TO R S LAND (NET RENT) T O TA L F I X E D C O S T S $ ACRE ACRE ACRE 0*32 0*0 7.00 1*00 1*00 1*00 $ 0,32 0.0 7.0 0 7. 32 5 o T O TA L C O S T S 48.63 6. NET RETURNS s -48.63 PREPARED BY WAYNE D* TAYLOR. TAEX, OVERTON, TEXAS PROJECTED 1977 41 LOVEGRASS PASTURE, DRYLAND, DEEP EAST TEXAS REGICN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT FUEL,OIL, FIXED ITEM TIMES LABOR MACHINE LUB*,REPo CCSTS O P E R AT I O N N O * D AT E O V E R H O U R S H O U R S P E R A C R E P E R A C R E PICKUP 10 MAR 0*10 0.125 0*100 0*33 0ol6 pickup 10 sept 0*10 J2xl2-\ _£*.!£& -2x22 -9x15 TO TA L S 0o250 0*200 0o67 0*32 P R E PA R E D B Y W AY N E D o TAY L O R , TA E X , O V E R T O N , T E X A S P R O J E C T E D 1 9 7 7 B U D G E T I D E N T I F I C AT I O N N U M B E R 8 6 4 5 2 0 0 0 1 2 0 0 0 0 A N N U A L C A P I TA L M O N T H 9 /"^V 42 Y U C H I C L O V E R E S T A B L I S H M E N T, D R Y L A N D , D E E P E A S T T E X A S R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT .^jff^N UNIT lo GROSS TO TA L RECEIPTS PRICE OR VA L U E CR COST/UNIT QUANTITY COST FROM S PRODUCTION $ 0*0 2* VARIABLE COSTS PREHARVEST J CLOVER SEED LBS* 1*60 INCCULANT ACRE 0*12 RYEGRASS SEED LBS* 0*25 FERTI25-60-60) ACRE 23*00 LIME TON 12*50 MACHINERY ACRE 0*92 TRACTORS ACRE 1*89 LABGRITRACTOR S MACHINERY) HOUR INTEREST ON OP* CAP* DOL* S U B TO TA L , PRE-HARVEST HARVEST S U B TO TA L , TO TA L 3* COSTS HARVEST VA R I A B L E INCOME 4* 6*00 1*00 10*0C 1*00 0*3C 1*00 1*00 2*50 1*31 0*10 1*75 $ VA R I A B L E FIXED TO TA L 6* NET 0*0 $ COSTS 45*23 $ COSTS MACHINERY ACRE TRACTORS ACRE LAND (NET RENT) TO TA L FIXEO 5* $ $ CCST ABOVE 1*05 1*74 ACRE COSTS 9*60 0.12 2*50 23*00 3*75 0*92 1.89 3.27 fi * 1 8 45*23 -45*23 $ 1*00 1.00 8.00 1*C0 $ 1.C5 1.74 8*00 IC.80 COSTS $ 56*C2 RETURNS $ -56*02 P R E PA R E D B Y WAY N E D * TAY L O R , TA E X , O V E RTO N , T E X A S F R O J E C T E D 1 9 7 7 i ^ s 43 YUCHI CLOVER ESTABLISHMENT, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT O P E R AT I O N SHREDDER(2R) PICKUP TA N D E M D I S C BROADCAST SEEDER PICKUP ! T O TA L S ITEM NO* 5,30 10 5,36 5,85 10 FIXED FUEL,OIL, CCSTS MACHINE L U B o , R E P o PER ACRE PER ACRE HOURS D AT E T I M E S LABOR OVER HOURS SEPT SEPT OCT OCT OCT 1*00 0o475 0*10 0.125 loOO 0*388 loOO 0*196 O o l O .-2x125 0*317 OolOC 0*259 Ooi 31 1*00 Oo 33 0*77 0o37 lo22 0 o l 6 0o89 Oo 37 -d-tiaa -9x22 -2*15 1*310 0*907 2o81 2o80 PREPARED BY WAYNE D* TAYLOR, TAEX, OVERTON, TEXAS BUOGET IDENTIFICATION NUMBER 80 75230012000 0 ANNUAL CAPITAL MONTH 10 PROJECTED 1977 44 CORN, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT PRICE OR VA L U E OP COST/UNIT QUANTITY COST $ GROSS RECEIPTS FROM FPCDUCTION CORN TOTAL BU* VARIABLE COSTS PREHARVEST SEED FERT (120-60-60) HERBICIDE LIME MACHINERY TRACTORS LABORITRACTOR & MACHINERY) INTEREST ON OPo CAPo SUBTOTAL, PRE-HARVEST BAGS ACRE ACRE TON ACRE ACRE HOUR DOL* HARVEST COSTS CU3T0M COMBINING CUSTOM HAULING BU* BU* 2*70 70.00 _I 89*0 0 $ 189* CO 44*80 42*00 7*43 12*50 3*69 6*45 2*50 0*10 0*25 1*00 1*00 0*50 loOC 1*00 2*58 45*46 11 * 2 0 42*00 7.43 6. 25 3.69 6.45 6.44 4*5.5 88*00 $ $ 0*25 0*12 17, 50 70*00 70*00 $ SUBTOTAL, HARVEST S 11 3 . 9 0 TOTAL VARIABLE COST 1*627 3* BREAKEVEN PRICE, VARIABLE COSTS BU* 4. FIXED CCSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS $ ACRE ACRE ACRE 5*70 4*27 10*00 1*00 l.OC 1*00 5.70 4, 27 __iQi.C0 $ 19.97 $ 133.87 5* TOTAL COSTS 6* BREAKEVEN PRICE, TOTAL COSTS 8*4C 25.90 BU PREPARED BY WAYNE D* TAYLOR. TAEX, OVERTON, TEXAS 1.912 PROJECTED 1977 45 CORN, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT O P E R AT I O N OFFSET DISC TA N D E M D I S C PICKUP TA N D E M D I S C PICKUP TA N D E M D I S C PLANTER S P R AY E R , H E R B * PICKUP R C L L I N G C U LT I VAT PICKUP R O L L I N G C U LT I VAT R ENTD* FE RT * APPLI PICKUP T O TA L S ITEM NO* 1,34 1,38 10 1 ,38 10 1 ,38 1,48 62 10 1 ,58 10 1 ,58 86 10 /**% D AT E FUEL,OIL, FIXED T I M E S LABOR MACHINE L U B * , R E P o CCSTS OVER HOURS HOURS PER ACRE PER ACRE NOV NOV NOV FEB FEB MAR MAR MAR MAR APR APR MAY MAY MAY 1*00 0 * 3 11 loOO 0o222 0*125 OolO loOO 0*222 OolO 0*125 loOO 0*222 1.10 0*306 1.10 0*0 0.20 0*250 1.00 0*272 0*125 OolO loOO 0*272 loOO 0*0 O o l O .-0-+125 0*207 0*148 OolOO 0*148 0*100 0*148 0*20 4 0*284 0o200 0ol81 0*100 0*181 0*079 1*34 1*04 0.33 1*04 0* 33 l o 0 4 lo40 O0O6 0*67 l o l l Oo 33 l o l l OoO -2x199 -2x22 l o 4 8 1*32 0,16 lo32 O0I6 lo32 lo50 0o20 0o32 0o94 O0I6 0o94 OoO - Q * I 6 2*576 2ol80 10ol3 9*97 PREPARED BY WAYNE D* TAYLOR, TAEX, OVERTON, TEXAS B U D G E T I D E N T I F I C AT I O N N U M B E R 7 2 0 2 0 0 0 2 2 0 0 0 0 ANNUAL CAPITAL MONTH 10 PROJECTED 1977 <***%. 46 CORN, DRYLAND, DEEP EAST TEXAS REGION E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT UNIT 1* GROSS CORN TO TA L RECEIPTS BU* FROM 2*70 $ 2 * VA R I A B L E C O S T S PREHARVEST SEED FERT (16D-80-80) LIME HERBICIDE MACHINERY TRACTORS LABCRITRACTOR & MACHINERY) INTEREST ON OP* CAP* S U B T O TA L , P R E - H A R V E S T HARVEST COSTS CUSTOM COMBINING CUSTOM HAULING S U B T O TA L , H A R V E S T PRICE OR VA L U E OR COST/UNIT QUANTITY COST PRODUCTION 90*00 * BAGS ACRE TON ACRE ACRE ACRE HOUR DOL* 44*80 56*00 12*50 7*43 3*69 6*86 2*50 0*10 0*25 1*00 1*00 1*00 1*00 1*00 2*69 57.78 s 11 * 2 0 56*00 12*50 7*43 3*69 6*86 6*73 5*78 11 0 * 1 9 $ BU* BU* 0*25 0*12 90*00 90*00 22o 50 s TOTAL VARIABLE COST ._12_l8__ 33o 30 $ 143*49 3* BREAKEVEN PRICE, VARIABLE COSTS BU* 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS ACRE ACRE ACRE 1*594 $ 5*70 4.54 10*00 1*00 1*00 1*00 $ 5*70 4.54 -_.lftl.ft_l 20*24 s 163* 74 5* TOTAL COSTS 6 * B R E A K E V E N P R I C E , T O TA L C O S T S $ .,243*00 243o00 BU* 1*819 P R E PA R E D B Y WAY N E D * TAY L O R , TA E X , O V E RTO N , T E X A S F R C J E C T E D 1 9 7 7 47 CORN, DRYLAND. DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT O P E R AT I O N OFFSET DISC TA N D E M D I S C PICKUP TA N D E M D I S C PICKUP \ TA N D E M D I S C PLANTER I S P R AY E R . H E R B * PICKUP R O L L I N G C U LT I VAT PICKUP R O L L I N G C U LT I VAT RENTD*FERT* APPLI PICKUP T O TA L S ITEM NO* 1 .34 1,38 10 1.38 10 1 ,38 1 ,48 62 10 1*58 10 1 ,58 1,86 10 s^S. D AT E FUEL.OIL, FIXED T I M E S LABOR MACHINE L U B o , R E P o CCSTS PER ACRE PER ACRE OVER HOURS HOURS NCV NOV NOV FEB FEB MAR MAR MAR MAR APR APR MAY M AY MAY 1*00 0 . 3 11 1*00 0*222 OolO 0*125 loOO 0*222 OolO 0*125 0 *222 loOO l o l O 0*306 1*10 0*0 0*20 0*250 0*272 1*00 OolO 0*125 loOO 0*272 loOO 0*118 O o l O .- 9 x 1 2 5 0.207 Ooi 48 OolOO 0.148 OolOO Ooi 48 0.20 4 0.284 0.200 0*181 OolOO Ooi 81 0o079 l o 3 4 1.04 0o33 1*04 0*33 1*04 1*40 0*06 0*67 1*11 0*33 1*11 0*42 1*48 1*32 0*16 1*32 0*16 1*32 1*50 0*20 0*32 0o94 Oo 16 0*94 0*28 -9x199 -9x32 _.2ill6 2*694 2.180 10*55 10*24 PREPARED BY WAYNE D. TAYLOR* TAEX• OVERTON• TEXAS PROJECTED 1977 BUDGET IDENTIFICATION NUMBER— 72 0200022000 0 ANNUAL CAPITAL MONTH 10 &..V9 /"^StV 48 COTTON, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACPE TYPICAL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION COTTONSEED COTTON LINT TOTAL VARIABLE COSTS PREHARVEST SEED FER«T( 50-30-20) HERBICIDE INSECTICIDE MACHINERY TRACTORS LABOR!TRACTOR & MACHINERY) INTEREST ON OP* CAP* SUBTOTAL, PRE-HARVEST HARVEST COSTS DESICCANT GIN, BAG, TIES CUST COTTON PICK MACHINERY LABORITRACTOR £ MACHINERY) SUBTOTAL, HARVEST PRICE OR VA L U E OR COST/UNIT QUANTITY COST $ TON LBS* 100*00 0*60 0*20 250*00 20*00 _150*00 S 170*00 LBS* ACRE ACRE APPL ACRE ACRE HOUR DOL* 0*10 17*80 12*00 8*25 3*58 6*12 2*50 0*10 60*00 1*00 1*00 5*00 1*00 1.00 2.65 31.76 6*00 17.80 12.00 41.25 3,58 6. 12 6.63 3 fi . l S 96.55 $ $ ACRE BALE ACRE ACRE HOUR 4*57 30*00 20*00 0*67 2*50 1*75 0*5C 1.5C 1*00 0*25 $ TOTAL VARIABLE COST $ 150.84 3* BREAKEVEN PRICE, VARIABLE COSTS LBS* 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS 0.603 $ ACRE ACRE ACRE 4*77 4.15 20*24 1.00 1*00 1*00 4. 77 4.15 $ 5* TOTAL COSTS 6* BREAKEVEN PRICE, TOTAL COSTS 8. CO 15.00 30.00 0.67 ftfi.62 54. 29 —22x24 29.16 $ 180«00 LBS* 0.720 LAND CHARGE BASED ON LANDLORD'S SHARE OF 1/4 OF GPOSS LESS 1/A OF FERTILIZER, INSECTICIDE AND GINNING. P R E PA R E D B Y WAY N E D * TAY L O R , TA E X , O V E R " : O N , T E X A S P R O J E C T E D 1 9 7 49 COTTON, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT O P E R AT I O N SHREDDER(4R ) PICKUP OFFSET DISC LISTER-BEDDER PICKUP RENTD*FERT*APPLI PICKUP RCW DISC PICKUP PLANTER S P R AY E R , H E R B * PICKUP R O L L I N G C U LT I VAT S P R AY E R , H E R B * PICKUP PICKUP T O TA L S ITEM NO* 3,32 10 1,34 1,60 10 1,86 10 3,42 10 1*48 62 10 1.56 62 10 10 D AT E FUEL,OIL, FIXED T I M E S LABOR MACHINE L U B * , R E P. CCSTS PER ACRE PEP ACRE OVER HOURS HOURS OCT OCT NOV NOV NOV FEB FEB MAR MAR APR APR APR JUNE JUNE JUNE SEPT 0.239 1*00 OolO 0.125 loOO 0.311 loOO 0.347 0.20 0o250 loOO 0.118 OolO 0.125 loOO 0.155 0.125 OolO 0.333 1.20 0*0 1.20 OolO 0*125 loOO 0*272 loOO 0*0 OolO 0*125 0 . 2 0 .-Q_x-29 0*160 0*100 0*207 0*231 0*200 0*079 0*100 0*104 0*100 0*222 0*310 0*100 0*181 0*258 0*100 0*96 0*33 1 *34 1*33 0*67 0*42 0o33 0*56 0*33 loE3 0*07 0o33 l o l l 0*06 0*33 l o l 3 0*16 1 o48 l o 0 7 0*32 C*28 0*16 0*58 0 o l 6 1*64 0o21 0*16 0*94 0*18 0*16 -2x299 -2x51 -9x22 2*901 2*652 10o3€ Bo 92 LAND CHARGE BASED ON LANDLORD'S SHARE OF 1/4 OF GROSS LESS 1/4 OF FERTILIZER, INSECTICIDE AND GINNING* PREPARED BY WAYNE D* TAYLOR, TAEX, OVERTON, TEXAS PROJECTED 1977 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 0 2 0 0 0 2 2 0 0 0 0 ANNUAL CAPITAL MONTH 9 COTTON, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT 1* GROSS RECEIPTS FROM PRODUCTION COTTONSEED COTTON LINT TOTAL VARIABLE COSTS PREHARVEST SEED FERT (50-30-20) HERBICIDE INSECTICIDE MACHINERY TRACTORS LABOR(TRACTOR & M A C H I N E R Y ) INTEREST ON OP* C A P * SUBTOTAL, P R E - H A R V E S T HARVEST COSTS DEFOLIANT GIN, BAG. TIES CUST COTTON PICK MACHINERY LABOR(TRACTOR & MACHINERY) S U B T O TA L , H A R V E S T PRICF OR VA L U E OR COST/UNIT QUANTITY COST TON LBS* 100*00 0*60 0.30 375*00 LBS* ACRE ACRE APPL ACRE ACRE HOUR DOL* 0*10 17.80 12o00 8*25 3*95 10*52 2*50 0*10 60*00 1*00 1*0C 5*00 1*00 1*00 3*90 33*30 ACRE BALE ACRE ACRE HOUR 4*57 30*00 20*00 0*67 2*50 1.75 0.75 1*50 1*00 0*25 30.00 -225x22 $ 255.00 s $ T O TA L VA R I A B L E C C S T $ 8*00 22o50 30oCC C 67 0*62 61o79 $ 166.28 0.444 3 * B R E A K E V E N P R I C E , VA R I A B L E C O S T S L B S * FIXED COSTS MACHINERY TRACTORS L A N D ( N E T RENT) T O T A L F I X E D COSTS I ACRE ACRE ACRE 5*57 7*06 41*49 1*00 l.CC 1.00 s 5.57 7o06 __4i*49 54. 11 $ 220.A9 T O TA L C O S T S BREAKEVEN PRICE, TOTAL COSTS 6.0C 17.80 12oOC 41o25 3o95 10o 52 9Q74 . 1*33 104o59 LBS, 0.588 LAND CHARGE BASED ON LANDLORD'S SHARE OF 1/4 OF GPOSS LESS 1/4 OF FERTILIZER. INSECTICIDE AND GINNING* P R E PA R E D B Y WAY N E D * TAY L O R , TA E X , O V E R TO N , T E X A S P R O J E C T E D 1 jP^N 51 COTTON, DRYLAND, DEEP EAST TEXAS REGION E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT O P E R AT I O N ITEM NO* D AT E TIMES LA30R OVER HOURS FUEL,OIL, FIXED MACHINE LUB*,REPo CCSTS HOURS PER ACRE PEP ACRE SHREDDER(4R) 3,32 OCT 1*00 0o239 0ol€0 0.96 lo!3 PICKUP 10 OCT 0*10 0ol25 OolOO 0,33 0.16 OFFSET DISC 1,34 NOV 1*00 0 * 3 11 0o2C7 1*34 1,48 LISTER-BEDDER 1,60 NOV loOO 0*347 0o231 1*33 1*07 PICKUP 10 NOV 0*10 0ol25 OolOO 0*33 0*16 LISTER-BEDDER 1,60 FEB 1©00 0*347 0o231 1o33 lo07 RENTD*FERT*APPLI 86 FEB 1*00 0*0 0o079 OoO OoO PICKUP 10 FEB 0*10 0*125 0*100 0*33 Colo ROW DISC 3,42 MAR 1*00 0*155 0©104 0,56 0o58 PICKUP 10 MAR 0*10 0ol25 0.100 0.33 0,16 PLANTER 1,48 APR 1*20 0*333 0*222 1©53 1*64 S P R AY E R , HERB* 63 APR 1*20 0*0 0o206 0o05 C17 PICKUP 10 APR 0*10 0*125 0.100 0o33 0ol6 TOOL BAR C U LT * 1.56 M AY 2*00 0*644 0o430 2*49 1*95 S P R AY E R . h E R B * 62 M AY 1*00 0*0 0o258 0o06 0ol8 PICKUP 10 M AY 0*10 0*125 OolOO 0*33 0ol6 TCCL BAR C U LT * 1,56 JUNE 2*00 0*644 0o430 2*49 1*95 PICKUP 10 JUNE 0*10 0ol25 0*100 0o33 0ol6 PICKUP 10 SEPT 0*20 _P_*2]5ft _ft*200 _0*67 _ftA32 4*147 T O TA L S 3*458 15*14 12o62 LAND CHARGE B A S E D O N L A N D L O R D ' S S H A R E O F 1 / 4 O F G R O S S L E S S 1 / 4 O F FERTILIZER, INSECTICIDE AND GINNING* PROJECTFD 1977 P R E PA R E D B Y W A Y N E D * T A Y L O R , T A E X , O V E R T O N , T E X A S B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M C N T H 9 93 0200012000 0 52 GRAIN SORGHUM, DRYLAND, DEEP EAST TEXAS REGICN E S T I M AT E D C O S T S A N D R E T U R N S P E R A C P E TYPICAL MANAGEMENT UNIT 1* GROSS RECEIPTS FROM PRODUCTION GRAIN TOTAL 2* VARIABLE COSTS PREHARVEST SEED FERT(80-40-40) HERBICIDE INSECTICIDE MACHINERY TRACTORS - LABCR(TRACTOR & MACHINERY) INTEREST ON OP* CAP* CWT* LBS* ACRE ACRE ACRE ACRE ACRE HOUR DOL* PRICE OR VA L U E OP COST/UNIT QUANTITY COST 4.50 0*44 28*00 4*00 3*00 3*39 7*30 2*50 0*10 26.00 8*00 1*00 1*30 0*50 1*00 1.00 2*84 17.83 3*52 28*00 5*20 1*50 3*39 7* 30 7.11 $ S U B T O TA L , P R E - H A R V E S T HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL S U B T O TA L , H A R V E S T s _ilZ*CO S 11 7 . 0 0 1x12 57. 80 $ ACRE CWT* 11 * 0 0 0*20 1*00 26*00 11 . 0 0 s $ T O TA L VA R I A B L E C O S T 3 * B R E A K E V E N P R I C E , VA R I A B L E C O S T S C W T * —5x22 16*20 74.00 2*846 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED CCSTS ACRE ACPE ACRE 5* TOTAL COSTS 6 * B R E A K E V E N P R I C E , T O TA L C O S T S CWT* 4.55 4.89 2 5.14 1*00 1*00 1*00 4, 55 4.89 —25x14 $ 34.58 $ 108.58 4.176 LAND CHARGE BASED ON LANDLORD'S SHARE OF 30% OF GROSS LESS 3CX OF FERTILIZER AND HAULING* P R E PA R E D B Y WAY N E D * TAY L O R , TA E X , O V E RTO N , T E X A S F F O J E C T E D 1 9 7 7 53 GRAIN SORGHUM, DRYLAND, DEEP EAST TEXAS REGICN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION SHREDDER ( 4R ) PICKUP OFFSET DISC LISTER-BEDDER PICKUP R E N T D * F E RT * A P P L I LISTER-BEDDER PICKUP PLANTER RENTD* FERT* APPLI SPRAYER,HERB* PICKUP R C L L I N G C U LT I VAT PICKUP R O L L I N G C U LT I VAT SPRAYER, HERB* PICKUP TOTALS ITEM NO* 3 ,32 10 1,34 1,60 10 86 1 • 60 10 1,48 86 62 10 1 • 58 10 1,58 62 10 DATE AUG AUG NOV NOV NOV FEB FEB FEB MAR MAR MAR MAR APR APR M AY MAY MAY s*%. FUEL.OIL, FIXED TIMES LABOR MACHINE LUB*,REP* CGSTS OVER HOURS HOURS PER ACRE PER ACRE loOO OolO loOO loOO OolO loOO 1*00 OolO 1*10 1*10 1*10 0*10 loOO OolO loOO loOO OolO Ooi 60 OolOO 0.207 0.231 OolOO OoO 79 0.231 0.100 0.204 0.0 86 0.284 OolOO 0.181 0.100 0.181 0.258 -.QLAiftft -9x22 1.13 0*16 1.48 1.07 0*16 0*0 1*07 0*16 1*50 0*0 C*20 0.16 0*94 0*16 0*94 0*18 .0*16 2*844 2*704 10*69 9*44 0o239 0*125 0 * 3 11 0*347 0*125 0*0 0*347 0*125 0*306 0*0 0*0 0*125 0o272 0ol25 0o272 OoO J2xl25 0.96 0o33 1.34 1*33 0.33 OoO 1.33 0.22 1.40 OoO 0.06 0.33 1 . 11 0.33 1 . 11 0.06 LAND CHARGE BASED ON LANDLORD'S SHARE OF 30% OF GROSS LESS 30% OF FERTILIZER AND HAULING* PREPARED BY WAYNE Do TAYLOR. TAEX* OVERTON, TEXAS FROJECTED 1977 B U D G E T I D E N T I F I C AT I O N N U M B E R 7 3 0 2 C 0 0 2 2 0 0 0 0 ANNUAL CAPITAL MCNTH 7 54 GRAIN SORGHUM, DRYLAND, DEEP EAST TEXAS REGICN E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT UNIT lo GROSS RECEIPTS FROM PRODUCTION GRAIN T O TA L VARIABLE COSTS PREHARVEST SEED FERT(80-40-40) HERBICIDE INSECTICIDE MACHINERY TRACTORS LABORITRACTOR & MACHINERY) INTEREST ON OPo CAP© SUBTOTAL, PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL, HARVEST VALUE OR COST PRICE OR COST/UNIT QUANTITY $ CWT* 4o50 35*00 _157*52 $ 157.50 LBS* ACRE ACRE ACRE ACRE 0o44 28o00 4o00 3o00 3o31 8*00 1*00 1*30 0*50 1*00 3*52 28*00 5* 20 1*50 3*31 ACRE HOUR DOLo 7*66 2o50 OolO 1*00 7*66 7.36 2*94 17*88 $ $ ACRE CWT* lloOO 0o20 11 * 0 0 1*00 35*00 TOTAL VARIABLE COST 18*00 $ 76* 34 2*181 $ ACRE ACRE ACRE 4*39 5*13 35*55 1*00 1*00 1*00 s 4*39 5* 13 ._15*5.5 45*07 $ 121.40 5* TOTAL COSTS 6 * B R E A K E V E N P R I C E , T O TA L C O S T S 1x99 $ CWTo 3o BREAKEVEN PRICE, VARIABLE COSTS CWTo 4* FIXED CCSTS MACHINEPY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS 1x12 58*34 CWTo 3*469 LAND CHARGE BASED ON LANDLORD'S SHARE OF 30% OF GROSS LESS 30% OF FERTILIZER AND HAULING* P R E PA R E D B Y WAY N E D o TAY L O R , TA E X . O V E RTO N , T E X A S F R O J E C T E D 1 9 7 7 55 GRAIN SORGHUM, DRYLAND, DEEP EAST TEXAS REGION E S T I M AT E D C O S T S A N O R E T U R N S P E R A C P E HIGH LEVEL MANAGEMENT O P E R AT I O N SHREDDER ( 4 R ) PICKUP OFFSET D I S C L I S T E R - B EDDER PICKUP RENTD*FERT* APPLI L I S T E R - B EDDER PICKUP PLANTER RENTD*FE R T * A P P L I S P R AY E R , HERB* PICKUP TO O L B A R C U L T * P ICKUP TO O L B A R C U L T * S P R AY E R , H E R B * RENTD.FE R T * A P P L I PICKUP ITEM NO* 3,32 10 1*34 1,60 10 86 1,60 10 1,48 86 62 10 1 ,56 10 1 ,56 62 86 10 D AT E AUG AUG NOV NOV NOV FEB FEB FEB MAR MAR MAR MAR APR APR M AY M AY M AY MAY TIMES LABOR OVER HOURS 1*00 OolO loOO loOO OolO 1.10 1*10 1*10 0*10 1*00 0*10 1*00 loOO loOO OolO _&a.l23 0*160 0*100 0*207 0o231 0*100 0*079 0*2 31 0*100 0*204 0*0 86 0*284 0*100 0*215 0*100 0*215 0*258 0*079 0o96 0*33 1*34 lo33 0* 33 OoO lo 33 0*33 lo40 OoO 1*25 0*06 OoO lol3 0ol6 1 o48 1*07 0ol6 OoO 1*07 0*16 1*50 OoO 0o20 0ol6 0,97 0ol6 0o97 Ooi 8 CO .9x199 -2x22 .2x15 2*944 2*849 10*97 9o52 OolO loOO loOO T O TA L S 0.239 0.125 0 . 3 11 0.347 0*125 0*0 0*347 0*125 0*306 0*0 0*0 0*125 0*322 0*125 0*322 0*0 0*0 FUEL,OIL, FIXED MACHINE LUBo.REPo COSTS HOURS PER ACRE PER ACRE 0o06 0o33 lo25 0o33 LAND CHARGE BASED ON LANDLORD'S SHARE OF 30% OF GROSS LESS 30% OF FERTILIZER AND HAULING* P R E PA R E D B Y WAY N E D * TAY L O R , TA E X , O V E RTO N , T E X A S F R O J E C T E D 1 9 7 7 B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 7 73 0200012000 0 /t^^K 56 O AT S F O R G R A Z I N G A N D G R A I N , D R Y L A N D , D E E P E A S T T E X A S R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C P E TYPICAL MANAGEMENT UNIT 1* GROSS RECEIPTS FROM PRODUCTION GRAIN GRAZING TOTAL 2* VARIABLE COSTS PREHARVEST SEED CUSTOM PLANT FERT(160-60-60) INSECTICIDE MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) INTEREST ON OP* CAP* S U B T O TA L , P R E - H A R V E S T HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL S U B T O TA L , H A R V E S T BU* LBS* PRICE OR VA L U E O^ COST/UNIT QUANTITY COST lo55 0*30 5__02 $ 11 6 * 0 0 LBS* ACRE ACRE • ACRE ACRE ACRE HOUR DOL* 0*1 1 1.75 50*00 2.A0 1*70 1*98 2*50 0*10 100*00 1*00 1*00 1*00 1.00 1.00 1*37 0.41 11 . 0 0 1.75 50.00 2*40 1*70 1*98 3*43 0*04 72*30 ACRE BU* I 2*0 0 0*05 1.00 40*00 $ 12.00 2*00 14.00 $ 86. 30 $ 29.70 T O TA L VA R I A B L E C C S T 3 * I N C O M E A B O V E VA R I A B L E C O S T S 4* FIXED COSTS MACHINERY T R A C TO R S LAND (NET RENT) T O TA L F I X E D C O S T S 62*00 40*00 180*C0 5 ACRE ACRE ACRE 1*86 1*65 7*50 1.00 l.CO l.CO 1*86 1*65 $ 7*50 11 * 0 1 5* TOTAL COSTS $ 97.31 6* NET RETURNS $ 18.69 PREPARED BY WAYNE D* TAYLOR, TAEX, OVERTON, TEXAS FFOJECTED 1977 57 OATS FOR GRAZING AND GRAIN. DRYLAND. DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION PICKUP PICKUP OFFSET DISC PICKUP TANDEM DISC SPRAYER, PASTURE PICKUP TO TA L S ITEM NO* ' 10 10 3*34 10 5,36 5,90 10 DATE MAR M AY AUG AUG SEPT SEPT SEPT FUEL,OIL, FIXED TIMES LABOR MACHINE LUBo.REPo COSTS OVER HOURS HOURS PER ACRE PER ACRE 0*10 OolO loOO OolO loOO loOO OolO OolOO 0*100 0*207 0*100 0o259 0 * 11 5 0*33 0o33 lo22 0o33 0o77 0*35 0ol6 0ol6 1.48 0ol6 0o89 0*50 -2x125 -9x199 -9x23 .2*16 3o68 3o51 0*125 0*125 0 * 3 11 0*125 0*388 0*172 1*371 0.981 PREPARED BY WAYNE Do TAYLOR, TAEX* OVERTON, TEXAS PROJECTED 1977 BUDGET IDENTIFICATICN NUMBER-— 7410200022000 0 ANNUAL CAPITAL MONTH 9 /^^. 58 OATS FOR GRAZING AND GRAIN, DRYLAND, OEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION GRAIN GRAZING TOTAL 2. VARIABLE COSTS PREHARVEST SEED FERT (160-60-60) INSECTICIDE MACHINERY TRACTORS LABORCTRACTOR & MACHINERY) INTEREST ON OP* CAP* SUBTOTAL* PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL, HARVEST PRICE OR VA L U E OR COST/UNIT QUANTITY COST LBSo 1*55 0*30 50*00 216*00 77.50 64*85 $ 142.30 LBS* ACRE ACRE ACRE ACRE HOUR DOL* 0 * 11 50*00 2*40 2*21 2*77 2*50 0*10 100*00 l*CC 1*50 loOC 1*00 1*94 1*98 lloCO 50o00 3o6C 2* 21 2*77 4.85 ftl.Sft 74.62 ACRE BU* 12*00 0*05 1*00 50*00 BU* s s 12.00 2x52 $ 14.50 s 89. 12 3* INCOME ABOVE VARIABLE COSTS $ 53* 18 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS s TOTAL VARIABLE CCST ACRE ACRE ACRE 2*67 2*38 7. 50 1*00 1*00 1*00 2.67 2. 38 $ 1x52 12.54 5* TOTAL COSTS s 101.67 6* NET RETURNS 3 PREPARED BY WAYNE D* TAYLOR* TAEX, OVERTON, TEXAS 4C, 63 PROJECTED 1977 59 OATS FOR GRAZING AND GRAIN* DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT O P E R AT I O N S P R AY E R * PA S T U R E PICKUP PICKUP PICKUP OFFSET DISC PICKUP TA N D E M D I S C GRAIN DRILLU2F) S P R AY E R * PA S T U R E PICKUP T O TA L S ITEM NO* 5,90 10 10 10 3*34 10 5*36 5,55 5,90 10 D AT E FUEL.OIL, FIXED CCSTS T I M E S LABOR MACHINE L U B * . R E P o OVER HOURS HOURS PER ACRE PER ACPE OCT OCT MAR MAY AUG AUG SEPT SEPT SEPT SEPT 0*50 0.086 0*10 Ooi 25 0.10 0.125 0*10 0.125 loOO 0.311 OolO 0.125 loOO 0.388 loOO 0.358 loOO 0.172 O o l O .-2x125 0o057 0.100 OolOO OolOO 0*207 0*100 0*259 0*239 0*115 0*18 0 . 3 3 0o33 0e33 1*22 0* 33 0*77 0 , 7 9 0o35 0*25 0 . 1 6 0 . 1 6 0 . 1 6 1.48 0.16 0.89 1.12 0o50 _-!lfi.lft£ -9x22 -2x15 1.940 1*377 4 . 9 8 5o04 PREPARED BY WAYNE Do TAYLOR, TAEX, OVERTON* TEXAS BUOCET IDENTIFICATION NUMBER 741020001200C 0 ANNUAL CAPITAL MONTH 9 PROJECTED 1977 60 PEANUTS, DRYLAND, DEEP EAST TEXAS REGICN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION PEANUTS TOTAL VA R I A B L E C O S T S PREHARVEST PEANUT SEED FERTI20-40-40) INSECT/PLANTING HERBICIDE FUNGICIDE INSECT/PLANTING RYE SEED FERT(40-40-40) MACHINERY TRACTORS LABORITRACTOR 6- M A C H I N E R Y ) INTEREST ON OP. CAPo SUBTOTAL, P R E - H A R V E S T HARVEST COSTS CUSTOM DRYING STORAGE MKTGo• RESEARCH MACHINERY TRACTORS LABCR(TRACTOR & MACHINERY) S U B T O TA L , H A R V E S T PRICE OR VA L U E OR COST/UNIT QUANTITY COST CWT, 19o50 16.00 _31£*ft0 $ 312.00 LBS* ACRE ACRE ACRE APPL ACRE LBS* ACRE ACRE ACRE HOUR DOL* 0*45 16*00 4*50 4*50 4.25 3*00 0*16 20*00 7CoOO 1*00 1*00 1*00 4*00 0*30 50*00 1*00 1*00 1*00 4o60 54*76 31.50 16*00 4.50 4* 50 17*00 4*85 11 * 9 3 2*50 0*10 11 . 9 3 11 * 5 1 5*48 $'136*17 $ TON TON TON ACRE ACRE HOUR 11 * 0 C 20*00 1*00 2*32 3*24 2*50 0o80 0*80 0*80 1*00 loOO 1 * 11 8*80 16*00 0* 80 2*32 3*24 2*77 $ 33*93 $ 170*10 T O TA L VA R I A B L E C C S T 3 * B R E A K E V E N P R I C E , VA R I A B L E C O S T S CWT, 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) T O TA L F I X E D C O S T S ACRE ACRE ACRE 10*632 S 10*35 10*57 20*00 1*00 l.CO 1*00 10*35 10*57 _29x92 $ 40*92 $ 2 11 * 0 2 5 * T O TA L C O S T S 6* BREAKEVEN PRICE, TOTAL COSTS 0. 90 8*00 20*00 4* 85 CWT. L A N D C H A R G E B A S E D O N R E N TA L R AT E S I N R E G I O N * P R E PA R E D B Y W AY N E D o TAY L O R , TA E X , O V E R T O N , T E X A S 13*189 PROJECTED 1977 PEANUTS, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS H»EK rtCPE TYPICAL MANAGEMENT O P E R AT I O N MB PLOW(3B) PICKUP GRAIN DRILL(IOF) PICKUP S P R AY E R , H E R B * TA N D E M D I S C PICKUP PLANTER,PEANUT S P R AY E R , P E A N U T S PENTD* FERT* APPLI R O L L I N G C U LT I VAT PICKUP R O L L I N G C U LT I VAT S P R AY E R , P E A N U T S PICKUP S P R AY E R , P E A N U T S PICKUP S P R AY E R , P E A N U T S PICKUP CCMBINE,PEANUT TRUCK PICKUP T O TA L S ITEM NO* 1*46 10 3*510 62 1*38 10 1 ,50 64 66 3,58 10 3,58 3t64 to 3,64 10 3,64 10 1 ,68 11 10 D AT E OCT OCT NOV MAR APP APR APR MAY M AY MAY MA Y M AY JUNE JUNE JUNE J U LY J U LY AUG AUG SEPT SEPT SEPT FUEL.OIL, FIXED T I M E S LABOR MACHINE L U 8 . , R E P * CCSTS OVER HOURS HOUR 3 PER ACRE PER ACR loOO 0*10 1*00 0.10 loOO 1*00 0*10 1*20 1*20 1*?9 1 * \j t; 0*10 l.CO 0*10 2*30 0*10 1*00 0*10 1*00 0*15 0 * 1 0 .-2x125 0o645 0*100 0*286 0*100 0*258 0* I4d OolO J 0*222 0o206 0,094 0*1 El 3*100 0*1 81 0*172 0*100 0-395 OolOO 0*17? 0* 100 0.613 0.1 50 4*0 8 0*33 loSO 0*33 0*06 1*04 0 * 33 1*64 0*06 C O 1*00 0.33 1*00 0*86 0*33 1 .'*9 0*33 t>*86 Co 33 4%e7 D«8. 2*88 0*16 1*51 0*16 0*18 1*32 0*16 1*76 0*20 0*0 0*94 0*16 0*94 0*77 0*16 1*77 0*16 0*77 0*16 S*64 0*99 ,.9*199 -Os.22 ___*16 5 * 7 11 4*525 1:2.35 20*92 i*oc 0*967 0*125 0*430 0*125 0*0 0.222. 0 * 125 0*333 0*0 0*0 ft «-!•»•» Q.y\v> 0*27,; 0«25« 0.1'rlf 0*59? 0*125 0*?.t.6 0*1 i" 5 0 * 919 0*187 LAND CHARGE BASED ON RENTAL RATES IN REGION* PREPARED BY WAYNE D* TAYLOR, TAEX, O.^.f'Tt-N, TEXAS PROJECTED 1977 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 5 C 2 0 0 0 2 2 0 0 0 0 ANNUAL CAPITAL MONTH 9 /**%. 62 PEANUTS, IRRIGATED, DEEP EAST TEXAS REGICN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT PRICE OR VA L U E OR JNIT COST/UNIT QUANTITY COST GROSS RECEIPTS F R O M P R O D U C T I O N PE ANUTS CWTo 19o50 30*00 _585_*£0 $ 585.00 LBSo ACRE ACRE ACRE APPL ACRE LBS* ACRE ACRE ACRE ACRE HOUR HOUR DOL* 0o45 24000 4o50 4o50 4o25 3*00 0*1 6 20*00 5*79 15o03 6o0 7 2*50 2*50 0*10 75*00 1*00 1*00 1*00 5*00 0*30 50*00 1*00 1*00 1*00 1*00 5o66 loOO 59*74 33*75 24.00 40 50 4.50 21. 25 0. 90 8o00 2 C 0 0 T O TA L 2 * VA R I A B L E C O S T S P R E H A RV E S T PEANUT SEED FERT(30-60-60) INSECT/PLANTING HERBICIDE FUNGICIDE INSECT/PLANTING RYE SEED FERT(40-40-40) MACHINERY TRACTORS I R R I G AT I O N M A C H I N E R Y LABORITRACTOR 6- MACHINERY) L A B O R ! I R R I G AT I O N ) INTEREST CN OP* CAP* S U B T O TA L . P R E - H A R V E S T HARVEST COSTS CUSTOM DRYING STORAGE MKTG* .RESEARCH MACHINERY TRACTORS LABORITRACTOR & MACHINERY) SUBTOTAL, HARVEST 5.7Q 15.03 6.0 7 14.14 2o 50 5*97 $ 166.40 $ TON TON TON ACRE ACRE HOUR 11 * 0 0 20*00 loOO 10o07 6o44 2o50 1*50 1*50 1 o 50 1*00 loOC 2*20 $ $ 236*41 TOTAL VARIABLE COST 3* BREAKEVEN PRICE, VARIABLE COSTS CWT. C W T. 4* FIXEC COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 7,8 80 s ACRE ACRE ACRE ACRE 5* TOTAL COSTS 6 * B R E A K E V E N P R I C E D T O TA L C O S T S 16.50 30*00 1*50 10.07 6* 44 5*50 70.01 CWT* 15o00 14.85 4o50 20*00 1*00 1*00 1*00 1*00 15oC0 14o85 4,50 .-20«.oo $ 54, 2 5 I 2 90,75 9.692 S U P P L E M E N TA L I R R I G AT I O N O F 5 A C R E I N C H E S * L A N D C H A R G E B A S E D C N R AT E S PREVAILING IN REGIONo P R E PA R E D B Y WAY N E D * TAY L O R , TA E X , O V E RTO N , T E X A S P R O J E C T E D 1 9 7 ' 63 PEANUTS, IRRIGATED, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION GRAIN DR I L L ( 1 2 i r ) RENTDoFE RT* APPLI PICKUP PICKUP MB PLOWC 3 B ) TANDEM D I S C PICKUP TANDEM D I S C S P R AY E R , hERBo PICKUP P L A N T E R , PEANUT RENTDoFE R T * A P P L I S P R AY E R , P E A N U T S R O L L I N G C U LT I VAT PICKUP R O L L I N G C U LT I VAT S P R AY E R , P E A N U T S PICKUP S P R AY E R , P E A N U T S PICKUP S P R AY E R , P E A N U T S PICKUP TRUCK D I 6 - I N V E R T, P E A N T CCMBINE, PEANUT PICKUP T O TA L S ITEM MO* 3,55 3, 'J6 10 10 1 ,46 1 ,38 10 1 .38 62 10 1 ,50 86 64 3,58 10 3,58 3*t><* 10 3,64 10 3,64 10 11 1 ,66 1 ,68 10 DAT E OCT ncT OCT DEC MAR MAR MAR APR APP APR MAY WAV (y\tKf MAY M AY J'JNfc JUNr J U LY J U LY AUG AUG SEPT SEPT SEt->T SCPT FUEL.CIL, FIXED TIMES LABOR MACHINE LUB*,REP* COSTS OVER HOURS HOURS PER ACRE PER ACRE loOO 1*00 OolO OslO 1*00 loOO 0*10 2o00 loOO OolO \o?0 Jo?0 loi.9 S *00 OolO 1 ,0 0 1-00 0.10 3o00 Col 0 2oOO OolO 0*30 loOO 1*00 OolC 0o358 0 o l l 8 0ol25 0*125 0*967 0*;!22 0ol2£> Co444 OoO 0ul25 0*333 0*0 J*0 Oft 272 0*125 OoL.72 C o?^8 0a1 ?5 0*7t3 Oo 125 'Jo 51C 0ol25 Oo 375 0*905 0 . ? i 9 0o239 0o079 OolOO OolOO 0.645 0*148 Oo 100 0o296 0*258 OolOO C 2 2 2 0.0 94 Oo 20 6 0.181 OolOO 0*181 0*172 0* 1 00 0*516 OolOO 0*3 44 0*100 Co 3 00 0o603 0*613 1*28 0*37 0*33 0*33 4*08 l o 0 4 0*33 2*08 0*06 0*33 1*64 0*0 0*06 1*00 0 » 33 1*00 0*86 0*?3 2*59 0*33 1.73 0*33 J *79 10*05 4*65 .2*125 .&LlQg .2x2.4 1*37 Co 28 0*16 0*16 2*88 1*32 0*16 2.65 0*18 0*16 1.76 OoO 0*20 0,94 0* 16 0*94 0*77 O0I6 2.30 0*16 1 o 54 0*15 1*98 3*70 5*64 - 0 * 1 6 70856 r>*996 37© 33 29*85 S U P P L E M E N TA L I R R I G AT I O N O r 5 A C R E I N C i l E S o L A N D C H A R G t : FA S E D C N R AT E S P R E VA I L I N G I N R E G I O N * P R E PA R E D 3 Y WAY N E C o T AY L G R , TA E X , L ' V t K l u N , T E X A S P R O J E C T E D 1 9 7 7 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 5 Q ? 0 2 0 £ 2 0 2 U 0 A N N U A L C A F I TA L M O N T H 9 64 SOYBEANS, DRYLAND. DEEP EAST TEXAS REGION E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT UNIT lo GROSS SOYBEANS TO TA L RECEIPTS BUo FROM 5*00 $ 2 o VA R I A B L E C O S T S PREHARVEST SEED LBSo INCCULANT ACRE FERT (15-60-60) ACRE INSECT/PLANTING ACRE HERBICIDE ACRE MACHINERY ACRE TRACTORS ACRE LABORITRACTOR & MACHINERY) HOUR INTEREST ON OP* CAP* DOLo S U B T O TA L , P R E - H A R V E S T HARVEST COSTS CUSTOM CCMBINE CUSTOM HAUL S U B T O TA L , H A R V E S T PRICE OR VA L U E OR COST/UNIT QUANTITY COST PRODUCTION 25*00 0*12 0*50 27*00 6*00 7*00 2*99 4*95 2o50 0*10 5 _125*p_0 125*00 60*00 1*00 1*00 1*00 1*00 1*00 1*00 2*20 24*41 $ $ ACRE BUo 12*00 0*20 1*00 25*00 12.00 . 5*p_0 $ 17.00 s T O TA L VA R I A B L E C O S T 80*57 3*223 3 * B R E A K E V E N P R I C E , VA R I A B L E C O S T S B U * $ 4* FIXED COSTS MACHINERY TRACTORS LAND (NET TOTAL FIXED COSTS 7,20 0* 50 27,00 6o00 7o00 2*99 4.95 5.49 2*44 63* 57 RENT) ACRE ACRE ACRE 5* TOTAL COSTS 6 * B R E A K E V E N P R I C E , TO TA L C O S T S B U * 4*53 3*67 15*00 1*00 1*00 1*C0 4. 53 3o67 ._15*ftft $ 23o 19 $ 103.77 4,151 PREPAREO BY WAYNE Do TAYLOR, TAEX, OVERTON, TEXAS PROJECTED 1977 SOYBEANS, DRYLAND, DEEP EAST TEXAS REGION E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT O P E R AT I O N OFFSET D I S C PICKUP TANOEM D I S C PICKUP TANDEM D I S C S P R AY E R , H E R B * PLANTER PICKUP T O O L B A R C U LT * PICKUP PICKUP ITEM NO* 3.34 10 3*38 10 3,38 62 3,48 10 3,56 10 10 D AT E FUEL,01L, FIXED TIMES LABOR MACHINE LUB*,REP* CCSTS O V E R H O U R S J i O U R S P E R f c C R F. P E R A C R E MAR MAR APR APR MAY M AY M AY M AY JUNE JUNE OCT 1.00 0*10 1*00 OolO loOO 1*00 1»2C 0*10 1*50 0*10 *> »1 0 T O TA L S 0 o 311 0*125 0*222 0*125 0*222 ?*0 0*333 0*125 0*433 0*125 >'.i?6 C207 0* 100 0*148 0*100 0*148 Co 250 C222 0*100 0*322 0* 1 00 1.806 P R E PA R E D B Y W AY N E D . TAY L O R , TA E X , O V E F V T Q t N , T E : < A * B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 1 0 1*22 0*33 0*95 0*33 0*'a»S 0*06 1*40 0*33 1 *63 0 . 30 -X? lo48 0*16 1*32 0.16 1*32 0*18 1,64 0*16 1 .46 0*16 -9x13 94 8*19 /*^v r?1UJEC7£D 1977 9810209C220«M) 0 /^^v 66 (HEAT FOR GRAZING ANO GRAIN, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION GRAIN GRAZING TOTAL VARIABLE COSTS PREHARVEST SEED CUSTOM PLANT FERT (160-60-60) INSECT/PLANTING MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) INTEREST ON OP* CAP* S U B TO TA L , PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL. HARVEST PRICE OR VA L U E OR COST/UNIT QUANTITY COST BU* LBS* 3*00 0.30 20*00 170o00 60* OC 51*00 $ 111 * 0 0 LBS* ACRE ACRE ACRE ACRE ACRE HOUR DOL* 0*14 1*75 50*00 2*40 1*70 1*98 2*50 0*10 100*00 1*00 1*00 1*00 1*00 1*00 1*37 0*41 14.00 1* 75 50*00 2*40 1*70 1*98 3*43 ftfl.ft4 75.30 $ $ ACRE BU* 12*00 0*10 1*00 20*00 TOTAL VARIABLE COST 3* INCOME ABOVE VARIABLE COSTS 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS 12.00 2x90 $ 14,00 $ 89o3C $ 21.70 s ACRE ACRE ACRE 1*86 1*65 7.50 loOO 1*00 1*00 $ 1. 66 1*65 Z * 5 fi 11 . 0 1 5* TOTAL COSTS $ IOC 31 6* NET RETURNS s PREPARED BY WAYNE D* TAYLOR. TAEX, OVERTON, TEXAS IO. 69 FROJECTED 1977 67 WHEAT FOR GRAZING AND GRAIN* DRYLAND. DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT % O P E R AT I O N PICKUP PICKUP OFFSET DISC PICKUP TA N D E M D I S C S P R AY E R , PA S T U R E P ICKUP T O TA L S ITEM NO* 10 10 3*34 10 5*36 5*90 10 D AT E FIXED FUEL»OIL, CCSTS T I M E S LABOR MACHINE L U B * , R E P * OVER HOURS HOURS PER ACRE PER ACRE MAR MAY AUG AUG SEPT SEPT SEPT 0*10 0*125 OolO 0*125 loOO 0 * 3 11 0*10 0*125 loOO 0*388 loOO 0*172 O o l O ._._t__l__5 1*371 OolOO OolOO 0o207 OolOO 0*259 0*115 0*33 0*33 1*22 0o33 0*77 0*35 -9*199 -9*22 0*981 3*68 PREPARED BY WAYNE Do TAYLOR, TAEX* OVERTON* TEXAS 0 . 0* 1. 0* 0* 0* 1 6 16 48 16 89 50 -9x15 3*51 PROJECTED 1977 BUDGET IDENTIFICATICN NUMBER 7590200022000 0 ANNUAL CAPITAL MONTH 9 z - ^ 68 WHEAT FOR GRAZING AND GRAIN, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST 1* GPOSS RECEIPTS FROM PRODUCTION GRAIN GRAZING TOTAL VARIABLE COSTS PREHARVEST SEED FERT (160-60-60) INSECT/PLANTING MACHINERY TRACTORS LABORITRACTOR & M A C H I N E R Y ) INTEREST CN OP* C A P * SUBTOTAL, P R E - H A R V E S T HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL S U B T O TA L , H A R V E S T BU* LBS* 3*00 0*30 25*00 192*00 $ LBS* ACRE ACRE ACRE ACRE HOUR DOL* 0*14 50*00 2*40 2*2 3 2*83 2*50 0*10 ICOeOO 1*00 1*50 1*C0 1*00 1*98 lo82 ACRE BU* 12*00 0*10 1*00 25*00 3 * I N C O M E A B O V E VA R I A B L E C O S T S 2*72 2*43 7*50 ft_ti5 77,76 12*00 2x50 $ 14o50 $ 92* $ ACRE ACRE ACRE 51*60 132.60 14,00 50* CC 3. 60 2* 2 3 2. 83 4*94 ; T O TA L VA R I A B L E C C S T 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) T O TA L F I X E D C O S T S 75*00 1*00 1*00 1*00 28 40.32 2.72 2*43 7*50 $ 12*66 5 * T O TA L C O S T S $ 104,95 6* NET RETURNS $ 27,67 P R E PA R E D B Y W AY N E D * TAY L O R , TA E X , O V E R T O N , T E X A S PROJECTED 1977 of»' WHEAT FOR GRAZING AND GRAIN, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACPE HIGH LEVEL MANAGEMENT O P E R AT I O N PICKUP PICKUP PICKUP OFFSET DISC PICKUP TA N D E M D I S C S P R AY E R , PA S T U R E GRAIN DRILLI12F) PICKUP TOTALS ITEM NO* 3, 5, 5, 5, 10 10 10 34 10 36 90 55 IC D AT F OCT MA?? MAY AUG AUG SEPT SFPT SEPT SEPT FUEL,OIL, FIXED TIMES LABOR MACHINE t.UB«,REP0 CCSTS OVER HOURS HOURS PER AC»«*E PER ACRE 0.10 Oo&O OolO loOO Co*0 loOO lo50 1*10 0*10 0ol25 Ool25 0*125 0 o 3 11 Ooi 25 0 .3H6 0*258 Oo 394 o.ie 0*100 0*100 0*100 0o207 OolOO 0*^69 0* 172 0.263 0o33 0* 33 0*33 l o 2 2 0*33 0*77 0 * * 1 0*ti7 ^0-125 -0*199 -2x22 0*16 Co 8 9 0*75 1*24 .ftfi.16 t.vrr- ?.400 5* 06 5*16 PREPARED BY WAYNE Do TA\l€»U, : Af"X . OvERTON, TF.XAS B U D G E T I D E N T I F I C AT I C N N U M B E R 7 5 9 0 2 0 0 0 J 2 0 0 0 0 ANNUAL CAPITAL MONTH 9 Oo 16 0ol6 1*48 PROJECTED 1977 ,/^^_k 70 WATERMELONS, DRYLANC, DEEP EAST TEXAS REGICN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION WATERMELONS T O TA L VA R I A B L E C O S T S PREHARVEST LIME SEED FERT(74-74-74) INSECT/PLANTING G FUNGICIDE FOLIAR FEED HOEING MACHINERY TRACTORS LABOR!TRACTOR & M A C H I N E R Y ) INTEREST CN OP • C A P * SUBTOTAL, P R E - H A R V E S T HARVEST COSTS CUSTOM PULL CUSTOM STACK CUSTOM HAUL MACHINERY TRACTORS LABOR(TRACTOR & M A C H I N E R Y ) SUBTOTAL, H A R V E S T PRICE OR C O S T / U N I T QUANTITY VALUE OP COST $ CWT, 2*50 120*00 ___oc_*og S 300.CC TON LBS* ACRE APPL APPL APPL ACRE ACRE ACRE HOUR DOL* 12*50 7.00 37*00 2*40 2o07 4*86 4*00 6*91 22.76 2*50 OolO 1*00 2*CC 1*00 4.CC 4*0C 3*00 3*00 1*00 loOC 10*38 46*78 CWT* CWT* CWT* ACRE ACRE HOUR 0*10 0 * 11 0*25 4*23 0*42 2*50 120*00 120*00 120*00 1*00 1*00 1 * 11 12.5C 14.00 37. 00 9.60 &• 26 14.58 12.OC e. 9i 22.76 25.95 4*68 $ 168.25 $ 12.00 13. 20 3C.00 4o23 0*42 2x15 $ 62*62 $ 2 3C.ee TOTAL VARIABLE CCST 1.924 3* BREAKEVEN PRICE, VARIABLE COSTS CWT, 4* FIXEO COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS ACRE ACRE ACRE 1 6*6 3 17.07 10*00 5* TOTAL COSTS 6* BREAKEVEN PRICE, TOTAL COSTS CWT* LAND CHARGE BASED ON RENTAL RATES IN REGION* PREPARED BY WAYNE D* TAYLOR, TAEX, OVERTON, TEXAS 1*00 l.CO 1*C0 i e, 61 17,07 __io*co $ 43.70 % 274,53 - p ~> PROJECTED i9^7 71 WATERMELONS, DRYLAND, OEEP EAST TEXAS REGION EST I MATEO COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT O P E R AT I O N OFFSET DISC PICKUP OFFSET DISC PICKUP OFFSET DISC TA N D E M D I S C F E R T D I S T, M E L O N MIDDLE BUSTER SUBSOILER PICKUP F E R T D I S T, M E L O N P L A N T E R , WAT E R M L N P L A N T- C U LT ( l - R ) PICKUP F E R T D I S T, M E L O N R O L L o C U LT ( 1 - R ) SPRINGTOOTH DIGR M I S T B L O W S P R AY PICKUP F E R T D I S T, M E L O N SPRINGTOOTH DIGR M I S T B L O W S P R AY PICKUP TRAILERS TRUCK PICKUP TRAILERS TRUCK PICKUP T O TA L S ITEM NOo 1 ,34 10 1 ,34 10 1 ,34 5,36 1 ,79 5,77 1 ,78 10 1 ,79 9,52 9,80 10 1 ,79 9,81 1 ,83 5,82 10 1 ,79 1,83 5,82 10 5,75 11 10 5,76 11 10 D AT E FUELeOIL, FIXED CCSTS T I M E S LABOR MACHINE LUB©,REPo PER ACRE PER ACRE OVER HOURS HCURS NCV NOV OEC DEC FEB FEB FEB FEB FEB FEB MAR MAR MAR MAR APR APR APR APR APR MAY MAY MAY MAY JUNE JUNE JUNE J U LY J U LY J U LY loOO 0 * 3 11 OolO 0ol25 0 o 3 11 loOO OolO 0ol25 2*00 0o621 loOO 0o388 0o589 2e00 0o385 loOO loOO Ooi 92 0*20 0o250 2*00 0*589 0*271 lolO 1*924 6o 0 0 0o20 0o250 1*00 0o295 3o00 0o924 loOO 0*385 loOO 0*172 0*10 0ol25 loOO 0o295 2o50 0*962 3o00 0o516 OolO 0ol25 loOO Ooi 18 0o30 0o375 Ooi 0 0ol25 loOO 0*118 0o500 Oo40 O o l O J__a.i25 -9x199 -0-22 __>al__ llo489 7o943 34*32 33*70 0o207 OolOO Oo207 OolOO 0o4i4 0*259 0o393 Oo 257 0ol28 Oo 200 0*393 Ooi 81 1*283 0*200 Ooi 96 0*616 0o257 Ooi 15 OolOO Ooi 96 0o64l 0o344 0*100 0o079 0*300 OolOO 0*079 0o400 LAND CHARGE BASED ON RENTAL RATES IN REGIONo PREPARED BV WAYNE Do TAYLOR, TAEX, OVERTON, TEXAS B U O G E T I D E N T I F I C AT I O N N U M B E R 9 7 4 1 2 0 0 0 2 2 0 0 0 0 ANNUAL CAPITAL MONTH 7 1*34 0o33 lo34 0o33 2*67 0*77 2ol7 0*74 0o89 0o67 2ol7 0o40 • 3o74 0*67 l o 0 8 1*26 lo42 0o43 Oo 33 1*08 3o55 1*28 0o33 0o24 l o 7 9 0©33 0*24 2*38 l o 4 8 0 o l 6 l o 4 8 0*16 2o97 0 . 8 9 lo83 0*79 1.02 0*32 lo83 0o44 5o23 0*32 0o92 1*18 1*03 0*58 0*16 0*92 2*58 l o 7 3 0 o l 6 0*29 lo98 0*16 0o29 2*65 PROJECTED 1977 s'^%. COW-CALF PRODUCTION DEEP EAST TEXAS REGICN E S T I M AT E D C O S T S A N D R E T U R N S P E R C O W I TEM WEIGHT EACH UNIT PRICE OR COST/UNIT QUANTITY VALUE OR COST 0.43 0.32 0. 10 98.90 56.32 22+25. GROSS RECEIPTS S T E E R C A LV E S H E I F E R C A LV E S CULL COWS T O TA L 460.00 440.00 950.00 LES. LBS. LES. 0.50 0.40 0.25 178.97 2. VARIABLE COSTS C O A S TA L L E G U M E COMMON LEGUME CUSTOM BALING S A LT & M I N E R A L S VET MEDICINE MISC EXPENSE MARKETING MACHINERY(FUEL.LUBE.REP) EQUbPMENTIFUEL,LUBE.REP) LABOR, TRACTOR & MACHINERY LABCR, EQUIFMENT LABOR. LIVESTOCK I N T E R E S T O N O P E R . C A P. • T O TA L VA R I A B L E C C S T S ACRE ACRE HEAD HEAC HEAD HEAD HEAD DOL. DGL. HRS. HRS. HRS. DCL. 45.32 33.36 18.00 4.50 3.75 4.50 4.50 2.50 2.50 2.50 0.09 0.50 1.00 1.00 l.OC 1.00 1.00 1.00 3.0 0.5 3.0 £1.7 6 6 0 6 4*55 122.74 56.23 I N C O M E A B O V E VA R I A B L E C O S T S FIXED COSTS C O A S TA L L E G U M E COMMON LEGUME I N T. O N L I V E S T O C K C A P I TA L I N T. O N O T H E R E Q U I P M E N T DEPR. ON BEEF BULL PURCH. D E P R . G N O T H E R E Q U I P. O T H E R F C . M A C H C E C U I P. T C TA L F I X E D C O S T S 22.ee 33.36 18.0C 4.50 3.75 4.50 4.50 8.20 2.05 7.66 1 .40 7.50 ACRE ACRE DCL. DCL. DCL. DCL. DCL. 13 10 0 0 .82 • 10 • 09 • 09 0 ,. l i. 3 1 3 ,, 8 6 ,, 5 0 8 5 0 0 6 0 6.91 10* 10 28.25 7.76 2.97 11 . 3 5 —9+2277.13 T O TA L C C S T S 199.87 6. NET RETURNS -20.90 3 0 C O W . 1 B U L L U N I T . W I N T E R C A L V I N G . N O C R E E P F E E O . 8 6 X C A L F C R O P, 1 % C O W D 6 AT H L O S S . P R E PA R E D B Y WAY N E TAY L O R . TA E X , O V E RTO N * T E X A S F R O J E C T E D 1 9 7 7 - 7 8 STOCKER CALF PRODUCTION DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER CALF ITEM P R I C E O R Q U A N T I T Y VA L U E O R COST/UNIT COST WEIGHT UNIT EACH GRCSS RECEIPTS STOCKER STEERS TCTAL 625.00 LBS. 0.45 i -00 ...„23X*25. 28I.25 VA R I A B L E C O S T S S M A U L G R A I N PA S T * STOCKERS. 8~tQ* PRO FEEC HAjY . VET MEQfcCXNE H AULIN G&MKT G. S A LT & M I N E R A L S D E AT H L O S S MACMINERY*FUEL.LUBE.R EP) Eau IPMEN.T(iFU£t_*LUBE .REP ) LA0&R. TRACTOR- & MACHINERY LABKSR. EQUIPMENT LABjOIR, L IVE ST G£K I N T E R E S T O N O P E R . C A P. . T O TA L VA R I A B L E C C S T S ACRE C W T. C \ » T. BALE HEAD HEAO HEAD HEAD DOL. DCL. HRS. HRS. HRSo DOL. 90 .00 45 .00 6.25 1 .50 2 .25 4,80 1 .15 157,50 0.50 3.50 0.60 6.00 1 .00 1 .00 loOO 0.02 2.5 2.5 2.5 0 . 0 0.66 0 . 1 9 0 0 a 9 i *oa 45.00 157.50 3.7 5 9.0 0 2.2? 4.80 1.15 3.15 1.76 0*6 2 1 .64 0.4 7 2 .50 iie«36 __.JU5U6.S_ 244.25 3 ^ I N C O M E A B O V E VA R I A B L E C O S T S 37.00 4. FIK&tt COSTS. LAND CHARGE N AT I V E PA S T U R E I N T: . 0 : N ; O T H E R E Q U I P M E N T DEPR.. CN- OTHERV EQUIP.. OTHER FC. MACH- & ECU LP* T O TA L F I X E D C O S T S ACRE ACRE DCL. DCL. DOL. 11 . 0 1 5.00 0 .09 0.50 0.10 24.50 5.5 0.5 2.2 3.4 0 0 0 9 1+12 12*87 5 . T O T; A 4 i C O S T S 257.12 6b. NET RETURNS 24.13 5 0 S T E E R U N U T, S T O C K I N G R A T E 2 H E A D / A C R E . S M A L L G R A I N W I N T E R P A S T U R E , N e V - B M B E R ^ J U N E . 2 % D E AT H L O S S . P R E PA R E D B Y WA p Y N E TAY L O R . TA E X , OVERTON. TEXAS PROJECTED 1977-78 ^^L^ATED^nJfAS ESTIMATED COSTS °EEP AND RETURNS EAST PER T^AS COW ««CN WITHOUT SILAGE ITEM WEIGHT EACH UNIT 1.00 1.00 CWT. HEAD HEAD CWT* PRICE OR COST/UNIT QUANTITY VALUE OR COST 126.00 0.50 0.20 0.22 1331.20 1. GROSS RECEIPTS MILK STOCKERS BREEDING HEIFERS CULL COWS TGTAL 1.00 13.00 10.40 2p.00 675.00 25.00 MACHINERY!FUEL.LUBE.REP 1 EQUIPMENT!FUEL *LUBE.REP) LABOR, TRACTOR & MACHINERY LABCR, LIVESTOCK I N T E R E S T O N O P E R . C A P. . TO TA L VA R I A B L E C C S T S ~~Z1*591547,70 2 . VA R I A B L E C O S T S GRAIN MIX HAY PASTURE VET MEOICINE BREEDING SUPPLIES MGMT RECORDS UTILITIES HAULING S A LT CALF FEED MISC EXPENSE 10.00 135.00 CUT. TCN HEAD HEAD HEAD HEAD HEAD HEAD CWT. LBS. CWT. DCL. DCL. DCL. HRS. HRS. DOL. 7.10 26.00 82.50 30.00 10.00 20 .00 12.00 22.50 0 .63 0.02 9.25 10.00 55.00 3.50 1.00 1.00 1.00 l.CO 1.00 1.00 123.00 72.00 3.00 i .00 2.50 2.50 0.09 4,50 47.60 324.24 390.50 91.00 82.50 30.00 10.00 20.00 12.00 22.50 80.64 1 .44 27.75 10.00 12.05 3.48 11 . 2 5 11 9 . 0 0 -29+19. 953.29 3 . I N C O M E A B O V E VA R I A B L E C O S T S 594.41 4. FIXEC COSTS LAND CHARGE I N T. O N L I V E S T O C K C A P I TA L INT. ON OTHER EQUIPMENT DEPR. ON DAIRY COW PURCH. D E P R . C N O T H E R E Q U I P. OTHER FC, MACH & EQUIP. TOTAL FIXED COSTS ACRE DOL. DOL. DCL. DOL. DCL. 10.00 0.09 0.09 1.00 733«81 593.59 10.00 66.04 53.42 4.06 85.21 --—25+44244.18 5 . T O TA L C O S T S 11 9 7 . 4 7 6. NET RETURNS 1 0 0 C O W D A I R Y, 1 2 8 0 0 L B S . P R O D U C T I O N P E R c n u i r a c k , r e ™ « . 350.23 R NA GR O I LNK E ING P LVAECRETMOENN^Ts^ ' ' I SP. O 0W H 0E R1R9I 7 N 7G.B?O8 N E . PE RDEI P EU DT S B IYD EW M AY T A PYALROLRO.R ^T AHEI XR. E O fi G J E« C6T E FEEDER PIG PRODUCTION OEEP EAST TEXAS REGION ESTIMATED COSTS ANO RETURNS PER SOW ITEM HEIGHT UNIT EACH PRICE OR COST/UNIT QUANTITY VALUE OR CCST 18.00 .634*99. 1 . GROSS RECEIPTS P, G S TGTAL 50.00 LBS. 0.76 684.00 2 . VA R I A B L E C O S T S SOW FEEO GEST. SOW FEEO LACT. BOAR FEED P I G S TA RT E R V E T. M E D ( P I G S J HAULINGGMKTG MISC EXPENSE MACHINERY(FUEL.LUBE.REP) EQUfPMENTCFUELo4.UBE.REPI LABCR, TRACTCR £ MACHINERY LABOR. EQUIPMENT LABOR. LIVESTOCK I N T E R E S T O N O P E R . C A P. , TO TA L VA R I A B L E C C S T S C U T. C U T. CWT, C U T. HEAC HEAD HEAD OOL. DCL. HRS* HRS* HRS* DGL* 7.10 7.10 7.10 10.50 0.50 1.50 1.00 9.35 12.32 0.73 9.00 18.00 18.00 18.00 2.50 2.50 2.50 0.09 6.30 1.65 ii.ee 141.33 392.13*" 3 . I N C O M E A B O V E VA R I A B L E C O S T S 4. FIXED COSTS LAND RENT INT. ON LIVESTOCK CAPITAL INT. ON OTHER EQUIPMENT DEPR. ON SOW PURCHASED DEPR* CN BOAR PURCHASED DEPR. ON OTHER EQUIP. OTHER FC, MACH C EQUIP* TOTAL FIXEO COSTS 66.38 87.47 5.18 94.50 9.00 27.00 18.00 16.87 5.97 15.75 4.12 29.15 291.87 DOL. DCL. DOL. OCL. DOL. OOL. DCL. 0.08 0-09 0 »UV 5* TOTAL COSTS 6. NET RETURNS 20 SOW UNIT* FALL-SPRING FARROWING. 56 DAY WEANING. 18 PIGS WEANEO PER SOW PER YEAR. PREPARED BY ¥AVNE TAYLOR. TAEX. OVERTON* TEXAS 200.00 121.50 198.00 16.00 10.93 17.82 37.50 6.00 42.42 143.21*" 535.34 148.66 PROJECTED 1977-78 FINISHING HOGS DEEP EAST TEXAS REGICN ESTIMATED COSTS AND RETURNS PER NOG ITEM WEIGHT UNIT EACH PRICE OR COST/UNIT QUANTITY VA L U E O R COST 1. GROSS RECEIPTS SLAUGHTER HOGS TOTAL 235.00 LBS. 0.41 1.00 —93*3596.35 2. VARIABLE COSTS F I N I S H I N G R AT I C N FEEDER PIGS VET MEDICINE HAULING&MKTG MISC EXPENSE MACHINERYCFUEL.LUBE.REP) EQUIPMENT!FUEL,LUBE.REPI L A B O R . T R A C T O R fi - M A C H I N E R Y LABOR. EQUIPMENT LABOR. LIVE^TCCK INTEREST ON CPER.CAP*. T O TA L VA R I A B L E C C S T S C W T. HEAD HEAO HEAD 7.25 38.00 0 . 5 0 1 .50 HEAD DOL. DOL. HRS. HRS. HRS. DCL. 7.20 1.00 1.00 1.00 52.20 38.00 0.50 1 .50 0.60 1*00 0.60 1.00 0.40 0.94 0.54 1 .38 2.50 2.50 2.50 0 .09 0 . 3 0 . 2 0.5 38.6 7 2 5 2 3 . I N C O M E A B O V E VA R I A B L E C O S T S -i2+43. 100.53 - 4 . 1 8 4. FIXED COSTS LAND RENT INT* ON OTHER EQUIPMENT D E P R , O N O T H E R E Q U I P. O T H E R F C . M A C H & E C U I P. T O TA L F I X E O C O S T S DOL. OOL. DCL. DOL. 1.60 0 . 0 9 0.08 36.23 0.133.26 4.29 -.-^--1x998.69 5 . TO TA L C O S T S 109.22 6. NET RETURNS -12.87 --°o_"hP_oSs?AR' ,0° Fe° "" 8UNCH- * "«"- "«> «. PCUNO O, .„,,. p«_pa*_d ev WAyNE TAVL0R. TAEX. 0VERT0N# T£XAS PROJEOEO t977.78 CONTRACT BROILERS DEEP EAST TEXAS REGION ESTIMATEO COST ANO RETURNS PER 15000 CAPACITY BROILER HOUSE B A S E D O N A 4 H O U S E U N I T W I T H 4 - 1 / 2 B AT C H E S / Y E A R ITEM WEIGHT UNIT EACH PRICE OR COST/UNIT QUANTITY VALUE OR COST 65745.00 —3524*49. 1. GROSS RECEIPTS BROILERS TO TA L 1.00 HEAD 0.10 6574.49 2 . VA R I A E L E C O S T S ELECTRICITY LP GAS SHAVINGS CLEANING INSUR PREMIUMS SUPPLIES MACHINERYCFUEL.LUBE.REP) EOUIPMENTCFUEL.LUBE.REPl LABOR. TRACTCR t MACHINERY LABOR* EQUIPMENT L A B O R * L I V E S TO C K INTEREST CN CPER.CAP*. TO TA L VA R I A B L E C C S T S MCS. GAL. LOAD YEAR YEAR YEAR DOL. DOL* HRS* HRS. HRS. OOL. 14.00 0.38 70.00 425.00 192.00 45.00 12*00 2539*00 6.50 1.00 1.00 1*00 2.50 2.50 2.50 0.09 75.00 36*75 360*00 1053.62 —.—94*33. 3756.59 3. INCOME ABOVE VARIABLE COSTS 4. FIXEO COSTS LANO RENT INT. ON OTHER EQUIPMENT DEPR. ON OTHER EQUIP. OTHER FC, MACH £ EQUIP* TOTAL FIXEC COSTS 168.00 964.82 455.00 425.00 192.00 45.00 200.86 31.71 187,50 91.87 900.00 2817.90 DCL. OCL. DCL. OCL. 400.00 0*09 5* TOTAL COSTS 6. NET RETURNS PREPARED BY WAYNE TAYLOR. TAEX. OVERTON. TEXAS 0.08 12051.23 32.00 1084.61 1635.88 222*92. 3025.47 6782.06 -207.57 PROJECTED 1977-78 CONTRACT CAGE EGG PRODUCTION DEEP EAST TEXAS REGION ESTIMATEC COSTS ANO RETURNS PER 10000 BIRO HOLSF. BASED CN A 2 HOUSE UNIT ITEM WEIGHT UNIT EACH PRICE CR COST/UNIT QUANTITY VALUE OR COST 6339.00 .14232+15. . GROSS RECEIPTS EGGS TOTAL 1.00 CASE 2.25 14262*75 • VA R I A B L E C O S T S ELECTRICITY DIESEL CLEANING INSUR PREMIUMS SUPPLIES M A C H I N E RY ( F U E L . L U B E , R E P D EQUSPMENTCFUEL.LUBE.REPd LABOR, TRACTOR £ MACHINERY LABOR. EQUIPMENT L A B O R * L I V E S TO C K I N T E R E S T O N O P E R . C A P. , TO TA L VA R I A B L E C C S T S MCS. GAL. YEAR YE*R YEAR OOL. DGL. HRS. HRS. HRS. DCL. 65.00 0.42 310.00 201 .00 180.00 12.00 11 9 . 0 0 1.00 1.00 1.00 2.50 2.50 2.50 0.09 150.00 33.00 11 2 8 . 0 0 949.04 —--32*415313.65 • I N C O M E A B O V E VA R I A B L E C O S T S • FIXEO COSTS LANO RENT TAXES INT. ON OTHEP EQUIPMENT D E P R . O N O T H E R E Q U I P. OTHER FC* MACH £. EQUIP. T C TA L F I X E O C O S T S 780.00 49.98 310.00 201.00 180.00 401.72 28.04 375*00 82f50 2820.00 8949.10 DOL. DCL. DCL. DOL. OCL. 400.00 102.00 0.09 • . TOTAL COSTS • NET RETURNS REPARED EY WAYNE TAYLOR. TAEX. OVERTON. TEXAS 0.08 1 .00 i3343.99 32.^0 102.00 1200.96 1764.20 — .&&-.5Z3483.73 87^7.38 5465,38 PROJECTED 1977*78 COW-CALF PRODUCTION DEEP EAST TEXAS REGICN E S T I M AT E D C O S T S A N D R E T U R N S P E R C O W I TEM WE IGHT EACH UNIT PRICE OR COST/UNIT QUANTITY VA L U E O R COST 0 .43 0.32 0. 10 98.90 56.32 GROSS RECEIPTS S T E E R C A LV E S H E I F E R C A LV E S CULL COWS T O TA L 460.00 440.00 950.00 LES. LBS. LES. 0 .50 0.40 0 .25 ACRE ACRE HEAD HEAC HEAD HEAD HEAD DCL. DCL. HRS. HRS. HRS. DCL. 45.32 33.36 1 8.00 4 .50 3.75 4 .50 4.50 0.50 1 .00 1 .00 1 .OC 1 .00 1 .00 2.50 2.50 2 .50 0 .09 3.06 0 .56 3.0C 51 .76 -22*25.. 178.97 2 . VA R I A B L E C O S T S C O A S TA L L E G U M E COMMON LEGUME CUSTOM BALING S A LT F r M I N E R A L S VET MEDICINE MISC EXPENSE MARKETING MACHINERY(FUEL.LUBE .REP) EQU LPMENT<FUEL,LUBE,REP) LABOR. TRACTOR C MACHINERY LABCR, EQUIFMENT LABOR, LIVESTOCK I N T E R E S T O N O P E R . C A P. , T O TA L VA R I A E L E C C S T S i.oo 4*55. 122.74 56.23 I N C O M E A B O V E VA R I A B L E C O S T S FIXED COSTS C O A S TA L L E G U M E COMMON LEGUME I N T. O N L I V E S T O C K C A P I TA L I N T. O N O T H E R E Q U I P M E N T DEPR. ON BEEF BULL FURCH. D E P R . O N O T H E R E Q U I P. O T H E R F C , M A C H & E C U I P. T C TA L F I X E D C O S T S 22.-6 33.36 18.00 4.50 3. 75 4.50 4.50 8.20 2.05 7.66 1 .40 7.50 ACRE ACRE DCL. OCL. DCL. DCL . DCL. 13.82 10 .10 0.09 0 .09 0.50 l.CO 313.86 66.50 6.91 10. 10 28.25 7.76 2.97 11 . 3 5 „ — 2 * 1 2 77.13 T O TA L C C S T S 199.87 6. NET RETURNS -20.90 3 0 C O W , 1 B U L L U N I T . W I N T E R C A L V I N G , N O C R E E P F E E D , 8 6 % C A L F C R O P, I X C O W D E AT H L O S S . P R E PA R E D B Y WAY N E TAY L O R , TA E X . O V E RTO N , T E X A S P R O J E C T E D 1 9 7 7 - 7 8 STOCKER CALF PRODUCTION DEEP EAST TEXAS REGICN ESTIMATED COSTS AND RETURNS PER CALF I TEM WEIGHT EACH UNIT PRICE OR COST/UNIT QUANTITY VA L U E O R COST GROSS RECEIPTS STOCKER STEERS T C TA L 625.00 L B 0.45 1 .00 .231*25. 281.25 VA R I A B L E C O S T S S M A L L G R A I N P A S T. STOCKERS 8-10% PRO FEEC H AY VET MEDICINE HAULING&MKTG S A LT & M I N E R A L S D E AT H L O S S MACHINERY(FUEL.LUBE.REP ) EQUIPMENT(FUEL.LUBE.REF3 LABOR. TRACTOR & MACHINERY LAB»CR. EQUIPMENT LABiOR, LIVESTOCK I N T E R E S T O N O P E R . C A P. . T O TA L VA R I A B L E C C S T S ACRE C W T. C W T. BALE HEAD HEAD HEAD HEAC DOL. DCL. HRS. HRS. HRS. DOL. 90 .00 45 .00 6 .25 1 .50 2 .25 4.80 1 .15 157.50 0.50 3.50 0 .60 6.00 1 .00 1 .00 l.OC 0.02 2. 50 2.50 2.50 0 .09 0.66 0. 19 1.00 11 6 . 3 6 19*55 244.25 I N C O M E A B O V E VA R I A B L E C O S T S FIXEC COSTS LAND CHARGE N AT I V E PA S T U R E I N T. O N O T H E R E Q U I P M E N T D E P R . C N O T H E R E Q U I P. O T H E R F C , M A C H & E C U I P. T O TA L F I X E C C O S T S 45.00 157.50 3.75 9.00 2.25 4.80 1.15 3.15 1.76 0.62 1 .64 0.47 2.50 37.00 ACRE ACRE DCL. DCL. DOL. 1 1 .01 5.00 0 .09 0 .50 0. 10 24.5C 5. 0. 2. 3. 5 5 2 4 0 0 0 9 1*X2 12.87 T O TA L C O S T S 257.12 6. NET RETURNS 24. 13 5 0 S T E E R U N I T, S T O C K I N G R A T E 2 H E A D / A C R E , S M A L L G R A I N W I N T E R P A S T U R E . N C V E M B E R - J U N E , 2 % D E AT H L O S S . P R E PA R E D B Y WAY N E TAY L O R . TA E X , O V E RTO N . T E X A S P R O J E C T E D 1 9 7 7 - 7 8 FEEDER PIG PRODUCTION DEEP EAST TEXAS REGION E S T I M AT E D C O S T S A N D R E T U R N S P E R S O W I TEM WEIGHT EACH UNIT 50.00 LBS. PRICE OR COST/UNIT QUANTITY VALUE OR CCST 18.00 .—334+00. GROSS RECEIPTS PIGS T C TA L 0.76 684.00 VARIABLE COSTS SOW FEED GEST. SOW FEED LACT. BOAR FEED PIG STARTER V E T, M E D ( P I G S ) HAULING&MKTG MISC EXPENSE MACHINERY(FUEL.LUBE,REP) EQU IPMENTIFUEL^LUBE .REP 3 LABCR. TRACTCR & MACHINERY LABOR, EQUIPMENT L A B O R , L I V E S TO C K I N T E R E S T O N O P E R . C A P. , TO TA L VA R I A E L E C C S T S CWT. CWT. CfcT. CWT. HEAC HEAD HEAD DOL. DCL. HRS. HRS. HRS. DCL. 7.10 7.10 7 .10 10.50 1 .50 1 .00 9.35 12.32 0.73 9.00 18.00 18.00 18.00 2.50 2.50 2.50 0.09 6.30 1 .65 11 .66 141.33 0 .so X2+12. 392.13 INCOME ABOVE VARIABLE COSTS FIXEC COSTS LAND RENT I N T. O N L I V E S T O C K C A P I TA L INT. ON OTHER EQUIPMENT DEPR. ON SOW PURCHASED DEPR. CN BOAR PURCHASED DEPR. CN OTHER EQUIP. OTHER FC, MACH & EQUIP. TOTAL FIXED COSTS 66.38 87.47 5. 18 94.50 9.00 27.00 18.00 16.87 5.97 15.75 4.12 29. 1 5 291.87 DOL. DCL. DOL. DCL. DCL. DCL. DCL. 0 .08 0.09 0 .09 200.00 121.50 198.00 16.00 10.93 17.82 37.50 6.00 42.42 12+54. 143.21 TOTAL COSTS 535.34 6, NET RETURNS 148.66 2 0 S O W U N I T. FA L L - S P R I N G FA R R O W I N G . 5 6 D AY W E A N I N G , 18 PIGS WEANED PER SOW PER YEAR. PREPARED BY WAYNE TAYLOR, TAEX. OVERTON. TEXAS PROJECTED 1977-78 FINISHING HOGS DEEP EAST TEXAS REGICN ESTIMATED COSTS AND RETURNS PER HOG I TEM WEIGHT EACH UNIT 235.00 LBS. PRICE OR COST/UNIT QUANTITY VALUE OR COST L, GROSS RECEIPTS SLAUGHTER HOGS TO TA L 0.41 1 .00 7 .. 2 5 38 ,, 0 0 0 ,. 5 0 1 .50 0 .60 7 . 20 1 «, 0 0 1., 0 0 1 ., 0 0 1 i, 0 0 .95+3596.35 VARIABLE COSTS F I N I S H I N G R AT I O N FEEDER PIGS VET MEDICINE HAULING&MKTG MISG EXPENSE MACHINERY(FUEL.LUBE,REP) EQU IPMENT(FUEL,LUBE.REP I LABOR, TRACTOR & MACHINERY LABOR, EQUIPMENT LABOR, LIVESTCCK I N T E R E S T O N O P E R . C A P. , C W T. HEAD HEAD HEAD HEAD DCL. DOL. HRS. HRS. HRS. DCL. .50 .50 .50 .09 0.37 0 .22 0.55 33 . 6 2 1 .60 0.09 O.Oo 36.23 2 2 2 0 T C TA L VA R I A E L E C C S T S I N C O M E A B O V E VA R I A B L E C O S T S 4. FIXED COSTS LAND RENT INT* ON OTHER EQUIF*ENT D E P R . O N O T H E R E Q U I P. O T H E R F C . M A C H & E C U I P. T C TA L F I X E D C O S T S DOL. DOL. DCL. DOL. 109.22 T O TA L C O S T S 12.87 6. NET RETURNS 250 FED PER YEAR. 100 FED PER BUNCH. 4 POUNDS FEED PER PCUND OF GAIN. P R E PA R E D B y ' w AY N E TAY L O R , TA E X , OVERTON, TEXAS PROJECTED 1977-78 CONTRACT BROILERS DEEP EAST TEXAS REGION E S T I M AT E D C O S T A N D R E T U R N S P E R 1 5 0 0 0 C A PA C I T Y B h O I L E R H O U S E B A S E D O N A 4 H O U S E U N I T W I T H 4 - 1 / 2 B AT C H E S / Y E A R I TEM WEIGHT EACH UNIT 1 .00 HEAC PRICE OR COST/UNIT CUANTITY VA L U E O R COST GROSS RECEIPTS BROLLERS T O TA L 0 .10 65745.00 6574.49 VA R I A E L E C O S T S ELECTRICITY LP GAS S H AV I N G S CLEANING INSUR PREMIUMS SUPPLIES MACHINERY(FUEL.LUBE,REP ) EQUIPMENT(FUEL,LUBE .REP) LABOR, TRACTCR & MACHINERY LABOR. EQUIPMENT LABOR, LIVESTOCK I N T E R E S T C N C P E R . C A P. . T O TA L VA R I A B L E C C S T S MCS. GAL. LOAD YEAR YEAR YEAR DOL. DOL. HRS. HRS. HRS. DOL. 14.00 0 .38 70 .00 425 .00 192.00 45.00 12.00 2539.00 6.50 1.00 1 .00 1.00 2.50 2.50 2 .50 0 .09 75.CC 36.75 360.00 1053.62 24-33. 3756.59 I N C O M E A B O V E VA R I A B L E C O S T S FIXED COSTS LANO RENT I N T. O N O T H E R E Q U I P M E N T D E P R . O N O T H E R E Q U I P. O T H E R F C , M A C H & E Q U I P. T O TA L F I X E C C O S T S 168.00 964.82 455.00 425.00 192.00 45.00 200.86 31 .71 187.50 91.87 900.00 2817.90 DCL. DCL. DGL. DCL. 400.00 0.09 0.08 12051.23 32.00 1084.61 1635.88 222*22. 3025.47 T O TA L C O S T S 6782.06 NET RETURNS -207.57 P R E PA R E D B Y W AY N E TAY L O R . TA E X , O V E R T O N , T E X A S PROJECTED 1977-78 CONTRACT CAGE EGG PRODUCTION DEEP EAST TEXAS REGION ESTIMATEC COSTS AND RETURNS PER 10000 BIRD HOLSF BASED CN A 2 HOUSE UNIT I TEM WEIGHT UNIT EACH PRICE CR COST/UNIT QUANTITY VALUE OR COST GROSS RECEIPTS EGGS TOTAL 1 -00 CASE 2.25 6339.00 -14232+25. 14262.75 VARIABLE COSTS ELECTRIC 2.7Y DIESEL CLEANING INSUR PREMIUMS SUPPLI ES MACHINERY(FUEL.LUBE *REP) E Q U I P M E N T ( F U E L , L U B E . R E P. LABOR. TRACTOR & MACHINERY LABOR, EQUIPMENT LABOR, LIVESTOCK I N T E R E S T C N O P E R . C A P. , TO TA L VA R I A E L E C C S T S MCS. GAL., YEAR YEAR YEAR DOL. DGL. HRS. HRS. HRS. DCL. 65.00 0.42 310.00 201 .00 180 .00 2 2 2 0 .50 .50 .50 .09 12.00 11 9 . 0 0 1.00 1 .00 1 .00 150.00 33.00 1 128.OC 949.04 .IfiJEUiU 5313.65 INCOME ABOVE VARIABLE COSTS FIXED COSTS LAND RENT TAXES INT. ON OTHER EQUIPMENT DEPR. ON OTHER ECUIP. OTHER FC, MACH & EQUIP. TCTAL FIXED COSTS 780.00 49,98 310,00 201.00 180.00 401.72 28.04 375.00 82.50 2820.00 8949.10 DOL. DCL. OCL. DOL. DCL. 400.00 102.00 0.09 0.08 1 .CO 13343.99 32. 0 102,00 1200.96 1764.20 324+51. 3483.73 TOTAL COSTS 8797.38 NET RETURNS 5465.38 PREPARED EY WAYNE TAYLOR, TAEX. OVERTON, TEXAS PROJECTED 1977-78 IY PRODUCTION TEXAS DEEP EAST TEXAS REGICN E S T I M AT E D C O S T S A N D R E T U R N S P E R C O W WITHOUT SILAGE ITEM WEIGHT EACH UNIT 1 1 1 13 C W T. HEAD HEAD C W T. PRICE OR COST/UNIT QUANTITY VALUE OR COST 128.00 0.50 0.20 0.22 1331.20 10.00 135.00 GROSS RECEIPTS MILK STOCKERS BREEDING HEIFERS CULL COWS T O TA L .00 .00 .00 ,00 10.40 20.00 675 .00 25.00 ——21+501547.70 2 . VA R I A B L E C O S T S GRAIN MIX H AY C W T. PASTURE VET MEDICINE BREEDING SUPPLIES MGMT RECORDS UTILITIES HAULING SALT CALF FEED MISC EXPENSE MACHINERY(FUEL.LUBE.REP) EQUIPMENT(FUEL,LUBE,REF) LABOR, TRACTOR & MACHINERY LABCR, LIVESTOCK INTEREST ON OPER.CAP.. TOTAL VARIABLE CCSTS HEAD HEAD HEAD HEAD HEAD HEAD C W T. LBS. C W T. DCL. DCL. DOL. HRS. HRS. DOL. TCN 7. 10 26.00 82 50 30.00 10.00 20 .00 12 .00 22 .50 0 .63 0.C2 9.25 10.00 55.00 3.50 1 .00 1.00 1*00 l.CO 1 .00 l.CO 123.00 72.00 3.00 1 .00 2.50 2 .50 0.09 4.50 47.60 324.24 29+12953.29 594.41 INCOME AEOVE VARIABLE COSTS FIXEC COSTS LAND CHARGE INT* ON LIVESTOCK CAPITAL INT, CN OTHER EQUIPMENT DEPR. CN DAIRY COW PURCH. DEPR. CN OTHER EQUIP. OTHER FC, MACH & EQUIP, TOTAL FIXED COSTS 390.50 91 .00 82.50 30.00 10,00 20.00 12.00 22.50 80.6 4 1.44 27.75 10.00 12.05 3.48 1 1.25 i: 9. o o ACRE DCL. DOL. DCL. DOL. DCL. 10.00 0.09 0 .09 1.00 733.81 593.59 10.00 66.04 53.42 4.06 85.21 ——25+44244. 18 TOTAL COSTS 11 9 7 . 4 7 NET RETURNS 350.23 100 COW DAIRY, 12800 LBS. PRODUCTION PER COW, EARN IS OOLBLE 6 HERRINGBONE, FEEDING OUTSIDE MILKING PARLOR, 25% REPLACEMENT. PRCJECTED 1977-78 PREPARED BY WAYNE TAYLOR. TAEX. OVERTON, TEXAS COW-CALF PRODUCTION DEEP EAST TEXAS REGICN E S T I M AT E D C O S T S A N D R E T U R N S P E R C O W I TEM WE IGHT EACH UNIT PRICE OR COST/UNIT GUANTITY VA L U E O R COST 0.43 0.32 0. 10 98.90 56. 32 GROSS RECEIPTS S T E E R C A LV E S H E I F E R C A LV E S CULL COWS T O TA L 460.00 440.00 950.00 LES L B S LES 0 .50 0.40 0 .25 22*25. 178.97 2 . VA R I A B L E C O S T S COASTAL LEGUME COMMON LEGUME CUSTOM BALING SALT & MINERALS VET MECICINE MISC EXPENSE MARKETING MACHINERY(FUEL,LUBE.REP) EQU LPMENTIFUEL,LUBE,REP) LABOR. TRACTOR £• MACHINERY — LABCR, EQUIFMENT LABOR, LIVESTOCK INTEREST CN OPER.CAP.. TOTAL VARIAELE CCSTS ACRE ACRE HEAD HEAC HEAD HEAD HEAD DOL. DCL. HRS. HRS. HRS. DCL. 4 5 .. 3 2 3 3 ,, 18 . 4 . 3 . 4 . 4 . 3 0 5 7 5 5 6 0 0 5 0 0 2 2 2 0 5 5 5 0 0 0 0 9 . . . . 0.50 1 .00 1.00 1 .oc 1 .00 1 .00 1 .00 3.06 0 .56 3.0C 51.76 4*^5. 122.74 56.23 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS C O A S TA L L E G U M E COMMON LEGUME I N T. O N L I V E S T O C K C A P I TA L I N T. O N O T H E R E Q U I P M E N T DEPR. ON BEEF BULL FURCH. D E P R . O N O T H E R E Q U I P. O T H E R F C . M A C H €■ E C U I P. T C TA L F I X E D C O S T S 22.66 33.36 18.OC 4.50 3. 75 4 .50 4.50 8.20 2.05 7.66 1 .40 7.50 ACRE ACRE DCL. DCL. DCL. DCL. DCL. 13 . 8 2 10 . 1 0 0 . 0 9 0 • 09 0 ,, 5 0 1 ., 0 0 313 , 8 6 8 6 ,, 5 0 6.91 10. 10 28.25 7.76 2.97 11 . 3 5 „—9*12. 77.13 5 . TO TA L C C S T S 199.87 . NET RETURNS -20.90 3 0 C O W . 1 B U L L U N I T, W I N T E R C A L V I N G . N O C R E E P F E E D , 8 6 % C A L F C R O P I X C O W D G AT H L O S S . PROJECTED 1977-76 P R E PA R E D B Y W AY N E TAY L O R . TA E X , O V E R T O N , T E X A S STOCKER CALF FRODUCTICN DEEP EAST TEXAS REGICN ESTIMATED COSTS AND RETURNS PER CALF I TEM WEIGHT EACH UNIT PRICE OR COST/UNIT QUANTITY VALUE OR COST GROSS RECEIPTS STOCKER STEERS TCTAL 625.00 LBS. 0.45 1 .00 .....231+.25281.25 VA R I A B L E C O S T S S M A L L G R A I N P A S T. STOCKERS 8-10% PRO FEED H AY VET MEDICINE HAULING&MKTG S A LT & M I N E R A L S D E AT H L O S S MACHINERY(FUEL.LUBE.REP ) EQUIPMENT(FUEL,LUBE .REF) LABOR, TRACTOR & MACHINERY LABJCR, EQUIPMENT LAB.OR, LIVESTOCK I N T E R E S T O N O P E R . C A P. . T O TA L VA R I A B L E C C S T S ACRE CWT. CWT. BALE HEAD HEAD HEAD HEAD DOL. DCL. HRS. HRS. HRS. DOL. 90 .00 45 .00 6 .25 1 .50 2 .25 4.80 1 . 15 157.50 0.50 3.50 0 .60 6.00 1 .00 1 .00 1.00 0.02 2.50 2.50 2.50 0 .09 0.66 0.19 1 .00 11 6 . 3 6 45.00 157.50 3.75 9.00 2.25 4.80 1.15 3.15 1. 76 0.62 1 .64 0.47 2 .50 19*q5. 244.25 3 . I N C O M E A B O V E VA R I A B L E C O S T S 4. FIXEC COSTS LAND CHARGE N AT I V E PA S T U R E I N T. O N O T H E R E Q U I P M E N T D E P R . C N O T H E R E Q U I P. O T H E R F C . M A C H & E C U I P. T O TA L F I X E C C G S T S 37.00 ACRE ACRE DCL. DCL. DOL. 11 .01 5.00 0 .09 0 .50 0. IC 24.5C 5.50 0.50 2.20 3.49 1*X1. 12.67 5 . TO TA L C O S T S 257.12 6. NET RETURNS 24. 13 5 0 S T E E R U N I T, S T O C K I N G R A T E 2 H E A D / A C R E , S M A L L G R A I N W I N T E R P A S T U R E , N C V E M B E R - J U N E , 2 % D E AT H L O S S . P R E PA R E D B Y WAY N E TAY L O R . TA E X . OVERTON. TEXAS PROJECTED 1977-78 FEEDER PIG PRODUCTION DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER SOW I TEM WEIGHT EACH UNIT 50.00 LBS. PRICE OR COST/UNIT QUANTITY VALUE OR CCST GROSS RECEIPTS PIGS TOTAL 0 .76 18.00 334+00. 684.00 2 . VA R I A B L E C O S T S S O W F E E D G E S T. S O W F E E D L A C T. BOAR FEED P I G S TA R T E R V E T. M E D ( P I G S ) HAULING&MKTG MISC EXPENSE MACHINERY(FUEL,LUBE, REP) EQUIPMENTIFUEL.LUBE.REP ) LABCR. TRACTCR & MACHINERY LABOR, EQUIPMENT LABOR, LIVESTOCK I N T E R E S T O N O P E R . C A P. , T O TA L VA R I A E L E C C S T S 3. I N C O M E A B O V E VA R I A B L E C O S T S 4 . FIXED COSTS LAND RENT I N T. O N L I V E S T O C K C A P I TA L I N T. O N O T H E R E Q U I P M E N T DEPR. ON SOW PURCHASED DEPR. CN BOAR PURCHASED D E P R . O N O T H E R E Q U I P. O T H E R F C , M A C H & E Q U I P. T O TA L F I X E D C O S T S CWT. CWT. CWT. CWT. HEAC HEAD HEAD DOL. DCL. HRS. HRS. HRS. DCL. 7. 10 7.10 7 .10 10.50 0 .50 1 .50 1 .00 9.35 12.32 0.73 9.00 18.00 18.00 18.00 2.50 2.50 2.50 0.09 6.30 1 .65 11 . 6 6 141.33 66.38 87.47 5. 18 94.50 9.00 27.00 18.00 16.87 5.97 15.75 4.12 29. 15 -12+22 392.13 291.87 DOL. DCL. DCL. DCL. DCL. DCL. DCL. 0 .08 0.09 0 .09 200.00 121 .50 198.00 16.00 1 0.93 17.82 37.50 6.00 42.42 12+54 143.21 T C TA L C O S T S 535.34 6. NET RETURNS 148.66 2 0 S O W U N I T, F A L L - S P R I N G F A R R O W I N G , 5 6 D A Y W E A N I N G , 18 PIGS WEANED PER SOW PER YEAR. P R E PA R E D B Y W AY N E TAY L O R , TA E X . O V E R T O N . T E X A S PROJECTED 1977-78 FINISHING HOGS CEEP EAST TEXAS REGICN ESTIMATED COSTS AND RETURNS PER HOG I TEM WEIGHT EACH UNIT PRICE OR COST/UNIT QUANTITY VALUE OR CGST GROSS RECEIPTS SLAUGHTER HOGS TOTAL 235.00 LBS. 0.41 1 .00 .-93*25. 96.35 VA R I A B L E C O S T S F I N I S H I N G R AT I C N FEEDER PIGS VET MECICINE HAULING&MKTG MISG EXPENSE MACHINERY(FUEL,LUBE.REP) EQU IPMENT(FUEL,LUBE,REP) L A B O R . T R A C T O R £■ M A C H I N E R Y LABOR. EQUIFMENT LABOR, LIVESTOCK I N T E R E S T O N C P E R . C A P. . T C TA L VA R I A E L E C C S T S CWT. HEAD HEAD HEAD HEAD DCL. DOL. HRS. HRS. HRS. DCL. 7.25 38.00 0 .50 I .50 0.60 7.20 1 .00 1.00 1 .00 1 .00 2.50 2 .50 2 .50 0 .09 0.37 0 .22 0.55 33.62 FIXED COSTS LAND RENT I N T. O N O T H E R E Q U I P M E N T D E P R . O N O T H E R E Q U I P. O T H E R F C . M A C H & E C U I P. T C TA L F I X E D C O S T S _ _ -3*43. 100.53 -4. 18 3 . I N C O M E A B O V E VA R I A B L E C O S T S 4. 52.20 38.00 0.50 1 .50 0.60 I.00 0.40 0.94 0.54 1.38 DOL. DOL. DCL. DOL. 1 .60 0 .09 0.08 36.23 0.13 3.26 4.29 -I 1+00. 8.69 T O TA L C O S T S 109.22 6. NET RETURNS -12.87 250 FED PER YEAR. 100 FED PER BUNCH. 4 POUNDS FEED PER PCUND OF GAIN, 2 X D E AT H L O S S . P R E PA R E D B Y WAY N E TAY L O R , TA E X , O V E RTO N , T E X A S P R O J E C T E D 1 9 7 7 - 7 8 CONTRACT BROILERS DEEP EAST TEXAS REGION E S T I M AT E D C O S T A N D R E T U R N S P E R 1 5 0 0 0 C A P A C I T Y 6 H 0 I L E R H O U S E BASED ON A 4 H O U S E U N I T W I T H 4 - 1 / 2 B A T C H E S / Y E A R I TEM WEIGHT EACH UNIT 1 .00 HEAC PRICE OR COST/UNIT QUANTITY VA L U E O R COST GROSS RECEIPTS BROILERS T O TA L 0 .10 65745.00 .65Z4j_i45. 6574.49 VA R I A E L E C O S T S ELECTRICITY LP GAS S H AV I N G S CLEANING INSUR PREMIUMS SUPPLIES MACHINERY(FUEL.LUBE,REP ) EQUIPMENT(FUEL,LUBE ,REP) LABOR, TRACTCR & MACHINERY LABOR. EQUIPMENT LABOR, LIVESTOCK I N T E R E S T C N C P E R . C A P. , T O TA L VA R I A B L E C C S T S MCS. GAL. LOAD YEAR YEAR YEAR DOL. DGL. HRS. HRS. HRS. DOL. 14.00 0 .38 70 .00 425 .00 192.00 45 .00 12.00 2539.00 6.50 1.00 1.00 I.00 2.50 2.50 2 .50 0 .09 75.00 36.75 360.00 1053.62 24*33 3756.59 I N C O M E A B O V E VA R I A B L E C O S T S FIXED COSTS LANO RENT I N T. O N O T H E R E Q U I P M E N T D E P R . O N O T H E R E Q U I P. O T H E R F C . M A C H & E Q U I P. T O TA L F I X E C C O S T S 168.00 964.82 455.00 425.00 192*00 45.00 200.86 31.71 187.50 91.87 900.00 2817.90 DCL. DCL. DCL. DCL. 400.00 0.09 0.08 12051.23 32.00 1084.61 1635.88 222*22 3025.47 T O TA L C O S T S 6782.06 NET RETURNS -207.57 P R E PA R E D B Y W AY N E TAY L O R . TA E X , O V E R T O N , T E X A S PROJECTED 1977-78 CONTRACT CAGE EGG PRODUCTION DEEP EAST TEXAS REGION ESTIMATEC COSTS AND RETURNS PER 10000 BIRD HOUSE BASED CN A 2 HOUSE UNIT I TEM WEIGHT UNIT EACH PRICE CR COST/UNIT QUANTITY VALUE OR COST 6339.00 .14232+25. GROSS RECEIPTS EGGS TOTAL 1.00 CASE 2.25 14262.75 VARIABLE COSTS ELECTRICITY DIESEL CLEANING INSUR PREMIUMS SUPPLIES MACHINERY(FUEL.LUBE *REP) EQU IPMENT (FUEL, LUBE.REP <> LABOR, TRACTOR & MACHINERY LABOR, EQUIFMENT L A B O R , L I V E S TO C K I N T E R E S T G N O P E R . C A P. , TOTAL VARIAELE CCSTS MCS. GAL* YEAR YEAR YEAR DOL. DOL. HRS. HRS. HRS. DCL. 65.00 0.42 310.00 201 .00 180 .00 12.00 11 9 . 0 0 1.00 1 .OC 1 .00 2.50 2.50 2.50 0.09 150.00 33,00 11 2 8 . 0 0 949.04 ,L£5_a41 5313.65 3 . I N C O M E A B O V E VA R I A B L E C O S T S 4. FIXED COSTS LAND RENT TAXES INT. ON OTHER EQUIPMENT DEPR. ON OTHER EQUIP, OTHER FC, MACH & EQUIP. T C TA L F I X E D C O S T S 780.00 49,98 310.00 201.00 180.00 401.72 28.04 375.00 82.50 2820.00 8949.10 DOL. DCL. DCL. DOL. DCL. 400.00 102.00 0.09 0.08 1 .00 13343.99 32..0 102.00 1200.96 1764.20 224+52. 3483.73 5 . T O TA L C O S T S 8797.38 NET RETURNS 5465.38 PREPARED EY WAYNE TAYLOR, TAEX, OVERTON, TEXAS PROJECTED 1977-78 PRODUCTION TEXAS DEEP EAST TEXAS REGICN ESTIMATED COSTS AMD RETURNS PER COW WITHOUT SILAGE ITEM WEIGHT UNIT EACH PRICE OR COST/UNIT QUANTITY VALUE OR COST 128.00 0.50 0.20 0.22 1331.20 10.00 135.00 GROSS RECEIPTS MILK STGCKER5 BREEDING HEIFERS CULL COWS T O TA L XcOO £.00 : .oc 13,00 C W T. HEAD HEAD C W T, 10.40 20.00 675 .00 25.00 C W T, 7. 10 26.00 82 ,50 30,00 10.00 20 .00 12 .00 22 .50 0 .63 0.C2 9.25 10.00 55.00 3.50 1.00 1.00 1.00 l.CO 1 .00 1.00 128.00 72.00 3.00 1 .00 2.50 2 .50 0.09 4.50 47.60 324.24 — - - 2 11 5 0 1547.70 2 . VA R I A B L E C C S T S GRAIN MIX HAY PASTURE VET MEDICINE BREEDING SUPPLIES MGMT RECORDS UTILITIES HAULING S A LT CALF FEED MISC EXPENSE MACHINERY(FUEL,LUBE.REP) EQUIPMENT(FUEL,LUBE. REP) LABOR, TRACTOR & MACHINERY L A B O R , L I V E S TO C K I N T E R E S T O N O P E R . C A P. , TOTAL VARIABLE CCSTS TCN HEAC HEAD HEAD HEAD HEAD HEAD C W T. LBS. C W T. DCL. DCL, DCL. HRS. HRS. DOL, -29*13953.29 594.41 INCOME ABOVE VARIABLE COSTS FIXEC COSTS LAND CHARGE I N T * O N L I V E S T O C K C A P I TA L INT. GN OTHER EQUIPMENT DEPR. ON DAIRY COW PURCH. DEPR, CN OTHER EQUIP, OTHER FC- MACH & EQUIP. TOTAL FIXED COSTS 390.50 91 ,00 82.50 30.00 10,00 20.00 12.00 22.50 80.6 4 1 .44 27. 75 10.00 12.05 3.48 11 , 2 5 1 19.00 ACRE DCL. DOL, DCL. DOL. DCL. 10.00 0.09 0 . 0 9 1 .00 733.81 593.59 10.00 66.04 53.42 4.06 85.21 ——25+44244. 18 TOTAL COSTS 11 9 7 . 4 7 6. NET RETURNS 350.23 100 COW DAIRY, 12800 LBS. FRODUCTICN PER COW, EARN IS OOUBLE 6 HERRINGBONE, FEEDING OUTSIDE MILKING PARLOR. 25% REPLACEMENT. P R E PA R E D B Y WAY N E TAY L O R . TA E X , O V E R T O N . T E X A S P R O J E C T E D 1 9 7 7 - 7 8 -18lOASTAL BERMUDA PASTURE, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT PRICE OR COST/UNIT QUANTITY VALUE OR COST 1. GROSS RECEIPTS FROM PRODUCTICN TOTAL 0.0 2 . VA R I A B L E C O S T S PREHARVEST FERT( 100-50-50) LIME MACHINERY TRACTORS LABOR(TRACTQR £ MACHINERY) I N T E R E S T O N O P. C A P. SUBTOTAL, PRE-HARVEST ACRE TON ACRE ACRE HOUR DCL. 35.00 12,50 1.16 0.85 2.50 0.10 I.00 0.25 1.00 1.00 0.85 11 . 7 3 35.00 3.13 1. 16 0.85 2.13 1*11 $" 43.43 HARVEST COSTS SUBTOTAL, HARVEST $ 0.0 TOTAL VARIABLE COST $ 43.43 3* INCOME ABOVE VARIABLE COSTS $ -43.43 4. FIXED COSTS MACHINERY TRACTORS PRORATED ESTAB. COST LAND (NET RENT) TOTAL FIXED COSTS $ ACRE ACRE ACRE ACRE 0.91 0.78 99.92 8.00 1.00 1.00 0.07 1.00 0.91 0.78 6.99 $" __La___l 16.69 5. TOTAL COSTS $ 6. NET RETURNS $ - 6 0 . 11 6 0 . 11 PROJECTED, 1976 -19- COASTAL BERMUDA PASTURE, DRYLAND, DEEP EAST TEXAS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION PICKUP SHREDDER(2R) PICKUP PICKUP TOTALS ITEM NO. 10 5,30 10 10 DATE FUEL,OIL, FIXED TIMES LABOR MACHINE LUB. ,REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE APR J U LY J U LY AUG 0.10 1.00 0.10 0.10 0.125 0.475 0.125 0.100 0.317 0.100 - 9 * 1 2 2 -QUAa 0.850 0.617 0.33 1,00 0.33 0.16 1.22 0.16 -9*22 -9+15 2.00 1.69 PROJECTED, 1976 BUDGET ANNUAL I D E N T I F I C AT I O N N U M B E R 8 3 5 0 2 0 0 0 2 2 0 0 0 0 C A P I TA L M O N T H 9