J r r TEXAS EDWARDS PLATEAU EASTERN FOREWORD The enterprise budgets for Texas Edwards Plateau-Eastern Region are based on estimates of yields, production input quantities, and production practices which represent the best judgment of local producers, county Extension agents-agriculture, fi nancial institution representatives, farm machinery dealers and others knowledgeable of the area. Vari ation in yields, production inputs and production practices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. r The machinery inventory is applicable to both typical and high level management. In some bud gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Crop share rental agreements do not exist to any substantial degree. Land charges were, therefore, calculated by using a fair market value times an interest rate or a cash lease. TEXAS EDWARDS PLATEAU EASTERN REGION Assumed Prices Paid and Received by Fanners 1/ Item Unit Price Prices paid (1977) J^N Seed Cotton-typical management Cotton-high level management Grain Sorghum Kleingrass Small grain Peanuts Wheat Hybrid-Sorghum lb. lb. lb. lb. lb. lb. bu. lb. Fertilizer Ammonium nitrate 16-20-0 cwt. cwt. 8.00 8.00 cwt. cwt. bale acre 1.25 1.50 cwt. .20 .12 Custom work Cotton strip and haul Cotton ginning Hay baling and haul Combining Hauling Grain sorghum Wheat Drying-peanuts Chemicals T r e fl a n Sevin Malithion Benlate Fuels Gasoline Propane Diesel bu. ton gal. lb. gal. lb. $ .26 .31 .35 .075 .10 .44 9.00 .36 .65 8.00 12.00 28.50 1.52 7.00 8.30 gal. gal. gal. .45 .32 .42 Prices received (1977) Cotton Grain sorghum Peanuts /f^ lb. cwt. lb. 1/ These price assumptions are not to be interpreted as predictions or prospective prices. .45 4.00 .20 TEXAS EDWARDS PLATEAU EASTERN REGION Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size Item No. Tractor - 100 HP 1 Tractor 75 HP 2 Tractor 50 HP 3 Pickup - 1/2 ton 10 Truck 2 ton 11 Combine Peanut - 6.3 feet 13 D i s c - Ta n d e m - 1 3 f e e t 3 0 Disc Plow 3 Disc - 3.4 ft.36 Planter Peanut 4R-12.7 ft.40 Planter 4R - 12.7 feet 42 Chisel - 12.7 feet 44 Lister/Bedder - 12.7 feet 49 Drill Grain - 8.0 feet 52 Harrow Spike - 15 feet 54 Shredder - 6.3 feet 61 Cultivator - 12.7 feet 64 Digger Peanut - 6.3 feet 68 Sprayer Herbicide-13 feet 73 Purchase Price Estimated Years of Use $13,480 10,900 6,350 5,100 9,895 6,785 1,480 875 2,015 1,615 1,280 1,210 1,345 520 675 1,885 2,150 375 8 8 12 4 4 6 10 10 10 10 10 8 10 10 8 10 10 10 .J Estimated Hours of Use 6400 4800 3000 2000 2000 600 1000 1000 1000 500 1000 960 1000 500 600 800 750 750 Fixed Costs Per Hour $ 2.63 2.83 3.37 2.39 4.63 12.62 2.64 1.30 3.00 4.81 1.91 1.67 2.00 1.55 1.50 3.51 4.27 .75 Variable Costs Per Hour $ 5.79 3.65 3.54 5.49 11.35 4.92 .64 .65 1.13 1.81 .56 .71 .59 .45 .55 1.76 2.14 .22 N C O A S TA L 6 F R M U 0 A G R A S S E S TA H . . D R Y L A N D , T E X A S E O w A R O S P L AT E A U F A S T E R N E S T I M AT E D C O S T S A N D R E T U R N S " E R A C ^ E TYPICAL MANAGEMENT /ilP^N pp UNIT ice: COST/UMT or QUANTITY 1. GROSS RECEIPTS FHQH PRODUCTION T O TA L $ ? . VA R I A B L F C O S T S P R E H A RV E S T CUSTOM SPRIGGING ACRF FERT( lb-ZO-O) ACRE MACHINERY ACRE TRACTORS ACRE LABOR(TRACTOR & MACHINERY) HOUR INTEREST ON C P. C A P. DOL. S U B T O TA L , P R E - H A R V E S T 4 , COST 0 . 0 I .00 e.co I .oc 1 .oc 6.29 5.89 2.25 0.09 21 .00 B .00 6.29 5.89 7.36 1 .00 3.27 31.93 g+31 $ 51 .41 HARVEST COSTS S U R T O TA L , H A R V E S T '£$ 0.0 TO T AL VARIABLE COST $ 51 .41 FIXED COSTS MACHINERY T PA C TO R S LAND (NET T O TA L F I X t D C O S T S or s 21 .00 3 . I N C O M E A B O V E . VA R I A B L E C O S T S \ value: $ -51.41 $ ACr>E ACRE ACRE 4.37 4.5 5 8.00 1.00 1 .00 1.00 $ 4. 37 4.55 B t fi O 16.92 5 . T O TA L C C S T S $ 68. 33 6. NET RETURNS $ •68.33 RFNT) L A N D C H A R G E E A S E D O N P R E VA I L I N G R AT E S I N R E G I O N . P R E PA R E D B Y P O B t t R T K E N S I N G . TA E X . S A N A N G E L O , T E X A S P R O J E C T E D 1 9 7 7 '-/ C C A S T A L B E R M U D A G R A S S E S T A B . , D R Y L A N D , T F X A S F D W A P D S P L AT E A U ^ A S T E R N E S T I M AT E D C O S T S A N D R E T U R N S P F R ACRE TYPICAL MANAGEMENT O P E R AT I O N DISK PLOW 3 DISK D I S K - TA N D E M PICKUP F F R T. A P F L I , R E N T D O I S K - TA N O E M PICKUP PICKUP PICKUP PICKUP F E R T. A P P L I . R E N T D PICKUP PICKUP PICKUP PICKUP PICKUP IT^w NO. 2 ,, 36 2 , 30 10 2 ,, 8 6 2 , 30 10 10 10 10 ? i, 86 10 10 10 10 10 D AT E JAN JAN JAN FEB FEB FFB MAR APR MAY JUNF JUNF J U LY AUG SEPT OCT T IMES LABOR M A C H I N E OVER HOURS HOURS 1 .00 1 .00 0 .10 1 • 00 2.00 0.10 0. 10 0 .10 0.10 1 .00 0.10 0. 1 0 T O TA L S o.io 0.10 0. 10 FUEL,OIL, FIXED LUB.,RF». COSTS PER ACRE PER ACRF C.740 0. 1 59 0.100 0.064 0.319 0.100 0. 1 00 0. 100 0. 100 3.064 0.100 0. 1 00 0.100 0.100 3.72 0. 80 C.55 C.28 I. 60 0 .55 0.55 0. 55 0.55 C. 28 0.55 0.55 0. 55 0.55 3.45 0. 89 0.24 0.22 1.77 0.24 0.24 C. 24 0.24 0.22 0.24 0.24 0.24 0.24 - 0 * 1 2 5 -_l_xi____ -0*55 .<L_-2.1 12.18 8.92 1 . 1 10 0.239 0 . 125 0. 097 0 .478 0.125 0. 125 0 .125 0 .125 0.097 0 .125 0. 125 0. 125 0.125 3.27Q 2.347 LAND CHARGE EASED CN PREVAILING RATES IN WEGION. PREPARED BY ROBERT KFNSING. TAEX, SAN ANGFLO, TEXAS BUDGET IDENTIF IC.ATI CN NUMBER—ANNUAL CAPITAL MONTH 12 '^N z^5^ PRQJECTE'D 1977 8340100C21000 0 /■^a"\ C O A S TA L H F R M U D A G PA S S PA S T U R E , D R Y L A N D , T r ' X A S t D W A R D S P L AT E A U E S T I M AT E D C O S T S A N D R E T U R N S P E P A C R F TYPICAL MANAGEMENT UNI T 1. GROSS RECEIPTS FROM PRODUCTION FERT(32-40-0) T O TA L ACRF EASTERN PPICF OR VA L U E OR COST/UNIT QUANTITY COST 1 .00 16.CO $ 16.00 s 5.49 0.56 3.25 0A20 9.51 HARVEST COSTS S U B T O TA L , H A R V E S T $ $ 0 . 0 T O TA L VA R I A B L E C O S T $ 9. 51 s 6.49 2. VARIAELE COSTS PREHARVEST MACHINERY TRACTORS LABOR (TRACTOR F, MACHINERY) INTEREST ON OP. CAP. ACRE ACRF HOUR OOL. 5. 0. 2. 0. 4 5 2 0 9 6 5 9 S U B T O TA L , P R E - H A R V E S T i 1 .OC 1.00 1 .44 \2 .25 ' j' 3 . I N C O M E A B O V E VA R I A B L E C O S T S 4. Fl XED COST? MACHINFRY T R A C TO R S P R O R AT E D E S TA B . C O S T LANO (NET RENT) TOTAL F IXC D COSTS $ ACRF ACRE ACRF ACRE 2.3 7 0.44 68.39 8.CO 1 1 0. 1 .00 .00 10 .00 2 .37 0.44 6.84 s SUOQ. 17.65 5. TOTAL COSTS 27.15 6. NET RFTURNS $ -11.15 E S TA B L I S H M E N T C O S T P R O R AT E D O V E R 1 0 Y E A R S . L A N D C H A R G E B A S E D O N P R E VA I L I N G R AT E IN REGION. INCO^F FRCM CROP REFLECTED IN THE LIVESTOCK BUDGETS. P R E PA R E D B Y R O B E R T K E N S I N G . TA E X , S A N A N G E L O . T E X A S P R O J E C T E D 1 9 7 7 C O A S TA L B E P M U D A G R A S S PA S T U R E , D R Y L A N D , T E X A S E O W A K D S P L AT E A U F A S T E R N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT O P E R AT I O N PICKUP PICKUP PICKUP F E R T. A P P L I . R E N T D PICKUP PICKUP PICKUP PICKUP F E R T. A P P L I . R E N T D PICKUP PICKUP PICKUP T O TA L S TTFM NO. 10 10 10 2 ,86 10 10 10 10 2,86 10 10 10 PAT E T IMES L A B O R M A C H I N E OVER HOURS HOURS JAN FEB MAR APR APR MAY JUNF J U LY AUG AUG SEPT OCT 0.10 0.10 0 .10 1 .00 0.10 0 .10 0.10 0.10 1 .00 C. IC 0 .10 0.10 0 .125 0. 125 0 .125 0.097 0. 125 0 .125 0. 125 0. 125 0.097 0. 125 0 . 125 FIXFD FUEL.OIL, L U B . , R E P. COSTS PFR ACRF PER ACRE 0. 100 0. 100 0.100 C .064 0. 100 0.100 0.1 00 O.IOO 0.064 0.1 00 0.100 0.55 0. 55 0. 55 0.28 0. 55 0.55 0.55 0.55 C.28 0.55 C. 55 C.24 0.24 0.24 0.22 0.24 0.24 0.24 C. 24 0.22 C.24 0. 24 - 0 * 1 2 5 -fi-uiaa _fc.__t.55 -0*2± 6.06 2.81 1 .443 1.129 <-*%. E S TA B L I S H M E N T C O S T P R O R AT E D O V E R 1 0 Y E A R S . L A N D C H A R G E B A S F D O N P R E VA I L I N G R AT E IN REGION* INCOME FROM CROP RFFLFCTFD IN THF LIVESTOCK BUDGETS. P R E PA R E D B Y R O B F R T K F N S I N G , TA E X , S A N A N G F L O , T E X A S P R O J E C T E D 1 9 7 7 BUDGET IDENT IFICAT I CN NUMBER—- 83«_0 1 0 002 1 OOO 0 A N N U A L C A P I TA L M O N T H 1 0 C O A S TA L B E R M U r A G R A S S E S TA B . , D R Y L A N D , T E X A S E D W A R D S P L AT E A U E A S T E R N E S T I M AT E D COSTS AND RETURNS PER ACRE = > ' *■- * " >■ HIGH LFVEL MANAGEMENT UNIT PRIC* V* VA L U F OR COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION T O TA L VA R I A B L E C O S T S P R E H A RV E S T CUSTOM SPRIGGING FERT( 32-40-0) HERBICIDE MACHINERY TRACTORS L A B C R C T R A C T O R F, M A C H I N F R Y ) INTEREST ON O P. C A P. S U B T O TA L , P R E - H A R V E S T S s ACRF ACRE ACRE ACRF ACf?E HOUR DOL. 2 1.00 16.OC 1.20 6.29 5*89 2*25 0.09 1 .0 0 1 .00 1 .00 I .0 0 1 .0 0 3.27 38.59 0.0 21 .00 16.00 1 .20 6.29 5.89 7. 36 ._ 3.47 $ 61.21 HARVEST COSTS S U B T O TA L , H A R V E S T S $ 0.0 T O TA L VA R I A B L F C O S T s 61 .21 J ^ N I N C O M E A B O V E VA R I A B L E C O S T S FIXED CCSTS MACHINERY TRACTORS LAND (NET T O TA L F I X E D C O S T S RENT) $ -61.21 ACRF ACRF ACRF 4 .37 4.55 8.00 s 1 .00 1 .00 I.00 4. 37 4.55 2*00 $ 16.9? 5 . T O TA L C O S T S s 78. 13 6. NET RETURNS s -78.13 L A N D C H A R G E b A S E D O N P R E VA I L I N G R AT E S I N R E G I O N . P R E PA R E D B Y R O B E R T K E N S I N G . TA F X . S A N A N G E L O , T E X A S P R O J E C T E D 1 9 7 7 A^\ C O A S TA L B E R V u r - A G PA S S F S TA B . , D R Y L A N D , T E X A S E D W A R D S P L AT E A U E A S T E R N F S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT ITEM OPERAT ION Nil • D AT E DISK PLOW 3 DISK D I S K - TA N D E M PICKUP F E R T. A P P L I , R E N T D D I S K - TA N D E M PICKUP PICKUP PICKUP PICKUP F E R T. A P P L I . R F N T D PICKUP PICKUP PI C K UP PICKUP PICKUP 2, 36 2,30 10 2, 86 2 ,30 JAN JAN JAN FEB 10 10 FEB FEB MAR 10 10 APR M AY 10 JUNE JUNE J U LY 10 AUG 10 10 OCT 2,86 10 SFPT TOTAL S FUEL,OIL, FIXFD TIMES LABOR M AC H I NE LU t?. , REP . COSTS OVER HOURS HOURS PER ACRE PER ACRE 1 .00 2.00 0.1 0 1 .00 1 .00 0. 10 0 .10 0.10 0. 10 I .00 0.1 0 0.10 0 .10 0. 10 0 .10 I . 1 10 0 .478 0. 125 0.097 0. 2 39 0. 125 0. 125 0.125 C. 125 0 .007 C 740 0.319 0. 100 0. 064 0. 1 59 0.1 00 0. 100 0.100 0. 1 CO 0.064 0.100 0. 100 0. 1 00 C. 1 CO 3.7 2 1. 60 0.55 0. 28 0.80 0.55 0. 55 0.55 C.55 0.28 0.55 0. 55 C.55 C.55 -0*125 -0*100 -_-_--.__ 3.45 1. 77 0.24 0.22 0.89 0 .24 0.24 0.24 0*24 0. 22 0.24 0.24 0.24 0.24 ._-__-___ 12. 1 8 8.92 C. 0. C 0. 125 125 .125 125 3.270 2. 34 7 LANO CHARGE BASLD ON PREVAILING RATES IN REGION. PREPARED BY ROBERT KENSING. TAEX. SAN ANGFLO. TEXAS BUDGET IDENTIF IC4TI CN NUMBERANNUAL CAPITAL MONTH 12 / * ^ V PROJECTED 1977 8340100011000 0 ^—^%. C O A S TA L H E R M L D A G R A S S PA S T U R E . D R Y L A N D . T E X A S E D W A R D S P L AT E A U f a « _ t p o n . F S T I M AT F D COSTS AND RETURNS PEP ACRF EASTERN HIGH LEVEL MANAGEMENT UNIT PRICE OR COST/UNIT QUANTITY VALUE OR COST 1, GROSS RFCEIPTS FROM PRODUCTION TOTAL VARIABLE COSTS PREHARVEST FERT( 12C-4C-0) MACHINERY TRACTOPS LABOR(TPACTOR t M A C H I N E R Y ) INTEREST ON OP. C A P . SUBTOTAL, P R E - H A R V E S T 0 . 0 ACRE. ACRE ACRF HOUR DOL . 38.OC 5. 79 3.2 0 2.25 0.C9 1 .00 1.00 l.OC 2.35 18.52 JL..67 $ 53.94 HARVEST CCSTS S U B T O TA L , H A R V E S T $ $ 0 .0 TO TA L VA R I A H I . t £ C O S T s 53.94 $ -53.94 3 . I N C O M E A B O V E VA R I A B L F C O S T S 4 . 38.00 5.79 3.20 5.28 Fl Xf D COSTS MACHINERY TRACTORS P R O R AT E D F S TA H . C O S T LANC (NET »'ENT) T O TA L F I X E D C O S T S $ ACRF ACRE ACRE ACRE 3. 17 2.47 78.1 9 8.CC 1 .00 1.00 0.10 l.OC $ 3.17 2.47 7.82 JjUOO 21 .47 5 . T O TA L C C S T S 75.41 6. NFT RETURNS * -75.41 F S TA B L I S H M E M C O S T P R O R AT E C O V E R 1 5 Y FA R S . L A N D C H A R G F B A S F D O N P R E VA I L I N G R AT E I N R E G I O N . I N C O M E F R O M C R O P R F F L F C T E C I N T H E L I V E S T O C K B U D G E T S . P R F PA R E D B Y R 0 8 P R T K E N S I N G o TA E X , S A N A N G E L O , T E X A S P R O J E C T E D 1 9 7 7 C O A S TA L B F f c M U D A C W A S S PA S T U R E , D R Y L A N D , T F X A S E D W A R D S P. AT P * . , « r E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E P L AT t A U E A S T E R N HIGH LFVFL MANAGEMENT OPFRAT ION PICKUP PICKUP PICKUP F E R T. A P P L I , R E N T D PICKUP P I C K UP SHRFDDER F E R T. A P P L I , R E N T D P I CK UP PICKUP SHREDDER F E R T. A P P L I . R E N T D PICKUP PICKUP PICKUP I TE M NO. 10 10 10 2. 86 10 10 2, 61 2 ,86 10 10 2 .«. I 2, 86 10 10 10 O AT E JAN FEB MAR APR APR M AY JUNE JUNE JUNE JUL Y AUG AUG AUG SEPT OCT T O TA L S ^ FUEL,OIL, FIXED T I M F S L A B O R M A C H I N F L U P. , R F a . C O S T S OVER HOURS HOURS PER ACRE PER ACRF 0. 1 0 0 .10 0.10 1.00 0 .10 0.10 1.00 1 .00 0. 10 C.IO 1 .00 1 .00 0 .10 0.10 0. 125 0. 125 C .125 0. 097 0 .125 0. 125 0. 404 0 .097 0. 125 C. 125 0 .404 0. 0 97 0.125 0. 125 0. 1 00 0. 100 0 .100 0.064 0. 100 0.100 0. 269 0.064 0.1 00 0. 1 00 0.269 0. 064 0.100 0. 100 v*-0 -2*125 -0*100 2.348 1.732 0.55 0. 55 0.55 0. 28 0.24 0. 24 0.24 0.22 0.24 0 .24 1 .31 0.22 0.24 0.24 1.31 0.22 0. 24 0.24 0. 55 0.55 1. 33 0.28 0.55 C. 55 1 .33 C.28 0. 55 0.55 -5x55 -Q*2* 8.99 5.65 >*lk E S TA B L I S H M E N T C O S T P P O R AT E D O V E R 1 5 Y E A R S . LANO R AT E I N R E G I O N . I N C O M E F R O M C R O P R E F L E C T E D 7 n " t H p " — G ? - B A S E ° ° N P R E VA I l - l N G LIVESTOCK BUDGETS. P R E PA R E D B Y R O B E R T K E N S I N G , TA E X , S A N A N G E L O , TEXAS PROJECTFD 1977 B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 1 0 \ 8350i000l100C 0 ^ 5 ^ . 11 C O A S TA L B E R M U D A G R A S S F. S TA P. , I R R I G AT E D , T E X A S E D W A R D S P L AT E A U F A S T F R N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT UNI T PPICF OR VA L U E OR COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION T O TA L 2 . VA R I A B L . E C O S T S PREHARVFST CUSTOM SPRIGGING FERT (16-20-C) HERBICIDE. MACHINEPY TRACTORS I R R I G AT I O N M A C H I N E P Y L A B O R ( T R A C T O P F, M A C H I N E R Y ) L A B C R ( 1 R R I G AT I O N ) I N T E R E S T O N O P. C A P. S U B T O TA L , P R f c - H A P V E S T J ^ 0 . 0 ACRE ACRE ACRE ACRE ACRF ACRE HOUR HOUR DOL. 22.50 6.CO 2 .75 4 .43 4.2 1 1 7.64 2. 25 2.2 5 0.0 9 1 .00 1 .00 1 .00 I .00 1.00 1 .00 2. 32 0.6C 36.90 22 .50 8.00 2.75 4 .43 4.21 17.64 5.22 1 .35 1*22 69.42 HARVEST COSTS S U B T O TA L , H A R V E S T $ 0.0 T O TA L VA R I A B L E C O S T $ 69. 42 $ -69.42 3 . I N C O M E A B O V E VA R I A B L E C O S T S 4. FlXED COSTS MACHINERY TRACTOPS I R R I G AT I O N M A C H I N E P Y LAND (NET PFNT) T O TA L F I X E D C O S T S $ ACPE ACRE ACRF ACRE 2 .96 3. ?C 10.8C 12.00 5. TOTAL COSTS 6. NET RETURNS PREPARED BY FCBERT KENSING, TAEX, SAN ANGFLO, TEXAS 1 1 1 1 .00 .00 .00 .OC $ 2 .96 3.30 10.80 12.00 29.06 $ 98.48 -98.48 PROJECTED 1977 12 C O A S TA L B E R M U D A G R A S S F S TA B . . I R R I G AT E D , T E X A S F D WA R D S P L AT E A U E A S T E R N ^ E S T I M AT E D COSTS AND RETURNS PFR ACRE bRRN ^^ TYPICAL MANAGEMENT O P E R AT I O N NO. ITHM TIMES LABOR D AT E OVER HOURS FUEL,OIL, FIXFD MACHINE LUB. , R E P. COST<; HOURS PFR ACRE PER ACRE DISK PLOW 3 DISK 2,36 JAN 1.00 I . 11 0 C.740 3.72 ^ 4, PICKUP 10 ^N 0.1C 0.125 C.100 C.55 o 24 D I S K - TA N D E M 2.30 FEB 1.00 0.239 0.159 C.8C o RO PICKUP »0 FEB 0.10 0.125 C.100 C.55 n ?! PICKUP 10 M*« 0.10 0.125 C.100 0.55 o'o! F E R T. A P P L I . R F N T D 3.86 APR 1.00 0.097 0.064 0.27 no* PICKUP l0 AP* 0.10 0.125 0.100 0.55 o.ll PICKUP 10 M AY 0.10 0.125 0.100 C.55 L PICKUP 10 JUNE 0.10 0.125 0.100 0.55 tV VPICKUP 10 J U LY -----*fcD °«24 o.io __ui2s _aAiaa -0*35 -o*g* ™ TA L S 2.320 1.664 &•*>* 6.26 /!^8K PREPARED BY ROBERT KENSING, TAEX. SAN ANGELO, TEXAS PROJECTED 1977 PUDGET IDENTIFICATION NUMBER— 834O10202102C 0 ANNUAL CAPITAL MONTH 12 ^ ^ \ / C O A S TA L H E R V U r - A G R A S S , H AY t G R A Z I N G I R R I G AT E D , T E X A S E D W A R D S P L AT E A U E A S T ^ E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R F TYPICAL MANAGEMFNT UNIT GROSS H AY T O TA L PRICE OR COST/UNIT QUANTITY VA L U E O R COST RECEIPTS FROM PRODUCTION TON 50. OC 5.0C S -250*00 250.00 VA R I A b L E C C S T S P R E H A RV E S T FERT (150-50-0) MACHINFRY T R A C TO R S I R R I G AT I O N M A C H I N E R Y LABOR(TRACTOR & MACHINERY) LABCR( IRR I GAT ION) I N T E R E S T O N Q P, C A P. S U O T O TA L , P R E - H A R V E S T HARVEST COSTS C U S TO M H A RV & H A U L S U B T O TA L , H A R V E S T f ^ ACRE ACRF ACRE ACRE HOUR HOUR DOL. 47.50 2.75 0.27 °6.46 2.25 2 „P 5 O.CQ 1 .00 1 .oc 1 .oc 1 .oc 0.72 0.90 20 .79 $ BALE 0.65 165.00 _10.Ia.25 $ 107.25 T O TA L VA R I A B L E C C 5 T $ 3 . B R E A K E V E N P R I C E , V A R I A B L E C O S T S TTO ON 4. FlXED COSTS MACHINERY T R A C TO R S I R R I G AT I C N M A C H I N E R Y P R O R AT E D E S TA B . C O S T LANT (NET t-FNT) total r ixro COSTS * ACRF ACRE ACRE ACRE ACRF 1 .1 <> 0.26 16.20 'J8.5 2 12.0C 1 .00 1 .00 I .00 0.1C 1.00 1.19 0.26 16.20 O.S5 s .-12*00 39.50 229.25 TON E S TA B L I S H M E N T C O S T S P R O PAT E D O V E R 1 0 Y E A R S . P R E PA R E D P Y R O B E R T K E N S I N G * TA E X . S A N A N G E L O , J ^ \ 189.75 3 7.9 50 5 . T O TA L C O S T S 6 . B R E A K E V E N P R I C E , T O TA L C O S T S 47.50 2 .75 0.27 26.46 I .62 2. 02 1 .87 82.50 4 5.84 9 TEXAS PROJECTED 1977 14 C O A S TA L B E R M U D A G R A S S . H AY & G R A Z I N G I R R I G AT E D . T F X A S E D W A R D S P L AT E A U E A S T E S T I M AT E D C O S T S A N D R E T U R N S P F R A C R E TYPICAL MANAGEMENT O P E R AT I O N NO. FUFL.OIL, FIXED ITF'V TIMES LABOR MACHINE L U B . . R E P. COSTS D AT E OVER HOURS HOURS PEP ACRE PER ACRE FERT .APPL T. R E N T D 3,86 APR PICKUP 10 APR 0.10 PICKUP 10 M AY 0.10 PICKUP 10 JUNF 0.10 PICKUP 10 J U LY 0.10 PICKUP 10 AUG 0. 1 0 _Cil2 TO TA L S 0.722 1.00 C.097 0.064 C.27 0.125 0.100 0.55 0.125 0.100 0.5b 0.125 0.100 Ci55 0.125 0.100 0.55 5 _£.. 102 ___.•. 5_> 0.564 3.02 C.26 C.24 0.24 0.24 0.24 -0+g± 1.44 E S TA B L I S H M E N T C O S T S P R O R AT E C O V E R 1 0 Y E A R S . P R E PA R F D B Y R O B E R T S E N S I N G . TA E X , S A N A N G F L O , T E X A S P R O J E C T E D 1 9 7 7 B U D G E T I D F N T I F I C AT I C N N U M B E R — - 8 3 6 0 1 0 3 0 2 1 0 2 0 0 A N N U A L C A P I TA L M O N T H 8 15 COASTAL BERMUDAGRASS ESTAB., IRRIGATED, TEXAS EDWARDS PLATEAU EASTERN ESTIMATED COSTS AND RETURNS PEP ACRE HIGH LEVEL MANAGEMENT UNIT GROSS RECEIPTS FRCM T O TA L PRODUCTION 2 . VA R I A B L E C O S T S PREHARvfcST CUSTOM SPRIGGING FERT( 32-40-0) HERBICIDE MACHINERY TRACTORS I R R I G AT I O N M A C H I N E R Y L A B O R < T R A C TO R F, M A C H I N E RY ) L A B O R ( I R R I G AT I O N ) I N T E R E S T O N O P. C A P. S U B T O TA L . P R E - H A R V E S T A ^ \ PRICE OR COST/UNIT QUANTITY S ACRF ACRF ACPE ACRE ACRF ACRE HOUR HOUR DOL . 22 .5C 16.00 2.75 4 .4 3 6.52 35.28 2.25 2.25 0 . 0 ° $ 0 . 0 $ 22.50 16.00 2.75 4.43 6.52 35.28 5.22 2.70 4.67 100.08 1 .00 1 .00 1.00 1 .00 1 .00 1.00 2.32 1.20 51 .94 HARVEST COSTS S U L ^ T C TA L , H A R V E S T % $ T O TA L VA R I A B L F C O S T $ 100.08 4. FIXED CCSTS MACHINERY TRACTORS I R R I G AT I O N M A C H I N E R Y LAND (NFT RENT) T O TA L F I X E O C O S T S 0 . 0 $ -• 1 0 0 . 0 8 3 * I N C O M E A B O V E VA R I A B L E C O S T S S ACRE ACRF ACRE ACRE 2.96 3.C8 2 1 .6C 12 .00 1 .00 1 .00 1.00 1 .00 $ 2.96 3.08 21.60 12.00 39.64 5 . T O TA L C O S T S % 139.71 6. NET RFTURNS •139.71 P R E PA R E D P Y R O B E R T K E N S I N G . TA F X , ■^P*v VA L U E O R COST *N ANGELO • T E X A S PROJECTED 1977 16 C O A S TA L B L R M U D A U R A S S E S TA B . , I R R I G AT E D , T E X A S E D W A R D S P L AT FA U E A S T E R N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C P E HIGH LEVEL MANAGEMFNT I T F. O P E R AT I O N NO. DISK PLOW 3 DISK PICKUP DISK-TANDEM PICKUP PICKUP FERT .APPLI.RFNTD PICKUP PICKUP PICKUP PICKUP D AT E 1 , 36 10 1 ,30 10 10 J, 86 10 10 10 10 M TIMES OVER JAN JAN FEB FEB MAR APR APR MAY JUNE- JULY TOTALS LABOR HOURS MACHINE HOURS PER 1 .00 1 . 11 0 0. 740 0 .10 0 .1 25 0.100 1 .00 0.239 0. 159 C .125 0. 100 P .10 0.10 0 .125 0.100 1 .00 0.097 0.064 0 .10 0 .125 0. 100 0 . 1 0 0. 1 25 0. 100 0.1C 0. 125 0. ICO 0 .10 -0.^.125 -_.£jl!£_2 2.320 FUCL,OIL, L U B . , R E P. 1 .664 ACRE J"s*\ FIXED COSTS PER ACRE 5. 62 0.55 1.21 0. 55 C .55 C. 27 0. 55 0.55 0. 55 3.27 0.24 0.85 0.24 0.24 0.26 0.24 0.24 0.24 -0*55 .0*24 10. 95 6.04 P R E PA R E D B Y R O B E R T K F N S I N G * TA E X , S A N A N G E L O , T E X A S P R O J E C T E D 1 9 7 7 hudgft identification number— A N N U A L C A P I TA L M O N T H 1 2 8 3 4 0 1 C 3 C 11 0 2 0 0 s—*\^ 17 C O A S TA L B E P M U L A G R A S S . H AY & G R A Z I N G I R R I G AT F D , T E X A S E D W A R D S P L AT E A U F A S T F P. E S T I M AT E D C O S T S A N D R E T U R N S ° E R A C R E HIGH LEVEL MANAGEMENT UNI T GROSS HAY T O TA L PRICF CR COST/UNIT QUANTITY RECEIPTS FROM PRODUCTION VA R I A B L E C O S T S PREHARVEST FERT (27C-70-0) MACHINFRY T R A C TO R S I R R I G AT I C N M A C H I N E R Y LABOR(TRACTOR & MACHINERY) L A B O R ( I P R I G AT I O N ) I N T E R E S T O N O P. C A P. S U B T O TA L , P R F - H A R V E S T $ TON 50.0 0 9.0 0 _*50..00 % 450.00 ACRE ACRE ACRE ACRF HOUR HOUR DOL. 81 .5C 2 .75 1 .37 44. 10 2 .25 2.25 0.09 1 .00 1 .00 1 .00 1 .00 1.1 1 1 .50 35.20 81 .50 2.75 I .37 44. 10 2.49 3.37 3.17 138.75 $ HARVEST COSTS CUSTOM HARV&HAUL SUBTOTAL, HARVEST VA L U E O P COST $ BALF 0.65 297.00 TOTAL VARIABLF COST 193.05 $ 193.05 S 3. BREAKEVEN PRICF, VARIABLE CCSTS TON 4. FIXED CCSTS MACHINERY TPACTORS I R R I G AT I O N M A C H I N E R Y P R O R AT E D E S TA B . C O S T LANC (NFT RENT) T O TA L F I X E D C O S T S 36.867 s ACRE ACRE ACRE ACRE ACRE 1.19 I .29 27.CC 139.76 12.00 1 .00 1 .00 I.00 0 .10 1 .00 1. 19 1 .29 27.00 13.98 —12x00 $ 55.45 $ 387.25 5 . T O TA L C C S T S 6 . B R E A K E V E N P R I C E , T O TA L C O S T S 331.80 TON E S TA B L I S H M E N T C O S T S P R O R AT E D O V E R 1 0 Y E A R S . P R E PA R E D B Y R O B E R T K E N S I N G . TA E X , S A N A N G E L O , T E X A S 43.028 PROJECTED 1977 C O A S TA L B E P M U D A G R A S S , H AY t G R A Z I N G I R R I G AT E D . T E X A S E D W A R D S P L AT E A U E A S T E R N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT ITFM O P E R AT I O N NO. D AT E FERT .APPLI .RENTD PICKUP P E R T. A P P L I , P F N T D PICKUP F F P T. A P P L I , P E N T D PICKUP FERT .APPL I., R E N T D PICKUP F E R T. A P P L I ,RENTD PICKUP 3,86 3,86 APR APP M AY 10 M AY TO TA L S 10 3,86 10 3, 86 10 JUNE JUNE J U LY J U LY 3,86 AUG 10 AUG 1.108 T IMES LABOR M A C H I N E OVER HOURS HOURS 1 .00 0 .10 1 .00 0. 10 1 .00 0.10 1.00 0.10 1 .00 0.10 FUEL,OIL. FIXED L U B . . R E P. COSTS PEP ACRE PER ACRE 0.064 C. 100 0.064 0.1 00 0.064 0.100 0.064 0.100 0.064 0.27 0. 55 0.27 0.55 0. 27 0.55 C.27 0.55 0.27 0.2 6 C.24 0.26 0.24 C.26 C.24 0.26 0. 24 0.26 ,0*125 -0*100 -0+55 -0*2* 0.097 0. 125 0.097 0. 125 0.097 0. 125 0. 097 0. 125 0.097 0.822 4.12 2.48 >^tk F S TA b L I S H M E N T C O S T S P R O R AT E D O V E R 1 0 Y E A R S . P R E PA R E D B Y R O B E R T K E N S I N G , TA E X , S A N A N G E L O , T E X A S P R O J F C T E D 1 9 7 7 B U D G E T I D E N T I F I C AT I C N N U M B E R — 8 3 6 0 1 0 4 0 1 1 0 2 0 0 A N N U A L C A P I TA L M O N T H 8 19 r C O T T O N . D R Y L A N D , T E X A S E D W A R D S P L AT E A U E A S T E R N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT UNI T 1 . G R O S S R E C E I P T S FROM PRODUCTION CCTTON LINT C O T TO N S E E D T O TA L VA R I A B L E C O S T S P R E H A RV E S T SEED HERBICIDE MACHINEPY T R A C TO R S LABOR(TRACTOR & MACHINERY) OTHER LABOR I N T E R E S T O N O P. C A P. S U B T O TA L , P R E - H A RV E S T HARVEST COSTS STRIP & HAUL GIN, BAG. TIFS HAUL, CCMP &LDUC S U B T O TA L , H A R V E S T LBS. TON PRICE OR VA L U E OR COST/UNIT QUANTITY COST 0.45 100.CO 170.00 0.14 $ LBS. ACRE ACRE ACRE HOUR HOUR DOL. 0.26 5. 06 7.95 10.14 2.25 2.25 0.09 10.00 1 .00 1.00 1 .00 4.60 2.00 14 .40 C W T. C W T. BALF 1.25 I .50 3.00 7.80 7.80 0.35 T O TA L VA R I A B L E C O S T 3 . I N C O M F A B O V E VA R I A B L E C O S T S 4. FIXED CCSTS MACHINEPY TRACTORS LAND (NET RENT) T O TA L F I X E D C O S T S 76.50 14.00 90.50 2.60 5.06 7.95 10. 14 1 0.35 4.50 .-1x30 41 .90 9.75 1 1 .70 S .1 .05 2 2.50 $ 64 .40 1 26. IC s ACRE ACRE ACRE 9.14 7.83 22.62 1 .00 1 .OC 1.00 Q. 14 7.83 22. 62 5 . T O TA L C O S T S $ 103.99 6. NET RETURNS S -13.49 LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS FERTILIZFR. INSECTICIDE, AND GINNING. P R E PA R E D B Y R O B E R T K E N S I N G , T A E X , S A N A N G E L O , (1/4) LESS 1/4 OF TEXAS PROJECTED 1977