r TEXAS UPPER GULF COAST r FOREWORD The enterprise budgets for Texas Upper Gulf Coast Region are based on estimates of yields, pro duction input quantities, and production practices which represent the best judgment of local produc ers, county Extension agents-agriculture, financial institution representatives, farm machinery dealers and others knowledgeable of the area. Variation in yields, production inputs and production prac tices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. r The machinery inventory is applicable to both typical and high level management. In some bud gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Land charges were based on the customary land lord's crop share less his proportionate share of certain production and harvesting inputs. A per acre land charge was made when crop share was not used. TEXAS UPPER COAST REGION Assumed Prices Paid and Received by Farmers \J Item Unit Price Prices Paid (1976) Seed: Cottonseed (acid delinted) Grain Sorghum Soybeans Rice lb. lb. lb. lb. .35 .42 .20 .235 FertiIizer: Nitrogen Phosphorous Potassium 6-24-24 lb. lb. lb. lb. .21 .16 .07 .08 Herbicides: PropaniI (3 lbs., ie) Ordram (Gran) Chiptox MCPA TrefIan Lor ox Lasso Paraquat Cobex DSMA AItrazine gal lb. gal gal gal lb. gal gal gal gal lb. 10.50 .35 7.70 13.00 27.00 3.25 15.50 43.00 21 .00 4.37 2.88 Insecticides: Ma lath ion (5 lbs., ie) Toxaphene (6 lbs., i e ) 6-3-Tox-MethyI Furadan Methyl Parathion (4 l b s . , i e ) Benlate (50$ W.P.) Sevi n gal gal gal lb. gal lb. lb. 9.50 5.60 9.75 .32 9.75 8.00 1.30 Custom Rates: Cotton Picking & HuaIing Gi nni ng Baggi ng & Ties Combi ning & Hauli ng Drying - Sorghum Drying - Rice Hauling - Rice Hauling - Soybeans Drying & Storage - Soybeans cwt. cwt. bale cwt. cwt. cwt. cwt. bu. bu. 9.00 I .50 9.50 .50 .20 .50 .16 .10 .20 -2- I tern Unit Price ^ Prices Received (1976) Cotton-Ii nt Seed (cotton) Grain Sorghum Soybeans Rice lb. lb. cwt. bu. cwt. $ .46 .05 4.25 5.00 9.75 " / These price assumptions are not to be interpreted as predictions or prospective prices. a ^ " > TEXAS UPPER COAST REGION Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size Tractor - 65 HP Tractor - 100 HP Tractor - 135 HP Pickup - 1/2 ton Truck - 4 ton Combine - 16 feet Blade (dozer) - 8 feet Spring T harrow - 16 feet Disc tandem - 18 feet Roll cult. - 13.3 feet Bed planter - 14 feet Offset disc - 14 feet Land plane 6 - 12 feet Bedder - 10 feet Levee plow - 10 feet Field cultivator - 22 feet Grain cart - 16 feet Shop equipniBnt Purchase Price $ 6,666 14,444 20,000 5,100 6,666 26,164 924 944 2,444 1,512 3,240 1,300 3,777 850 1,210 2,444 1,320 5,250 Estimated Years of Use 10 6 6 4 12 6 10 10 8 8 5 8 16 10 8 10 10 8 Estimated Hours of Use 5000 3600 3600 3600 2400 1050 2000 1250 1280 1000 1500 1280 3200 2000 2160 2000 3250 4000 Fixed Costs Per Hour $ 1.91 4.23 5.86 1.33 4.58 27.80 .69 1.12 2.53 2.01 2.28 1.35 2.25 .64 .75 1.82 .61 1.74 Variable Costs Per Hour $ 2.48 5.47 7.50 2.68 3.83 9.04 .69 .33 .83 .74 1.37 .44 .51 .06 .24 .53 .18 1.96 y 9Z6L 6a3133n0dd ^NlViaO 39W3A03 133133d 01 aBlSQCjaV 3U3M S3IlIlNVnt) SMD30 39Vd3A03 IVIlMVd 3a3HM '39V3a3V 30 lN33rJ3d 9Z NO dOHO 0N033S •OMAHCj du ilvJ33ti3d +? T SS31 NO I iOfjCilttld -JU lh3Jddd *?\ SI 1SOO CiN V 1 /T 8Z-e6 $ £6'8££ * 61 'Z6 $ SNfilUd« 13N '9 SiSUJ "1V1U1 *S r ^ Ti 9 ~ " COM 00°T 00' I I ■* • 21 tc-zz SISuj UaXH IVIlJI (lN3d ldh) Cifjvl 3fcOV 3b3V 3d3V L *y * L S 1^'ZT t e*zz sacujvyi a H '3 N I H J V W SISuj UdXld % 16*b£T % ♦;i"9<7Z $ ZZ'1*7 * S i S u 3 r l l V i V I ' d VA d A U 9 V 3 W O 0 N 1 * £ 1 S U 0 3 ' l t i V T d VA 1 V l U l 5Z'S evi T<,'£ 19** IT *£ L\'ZZ £0'k OCT COM 8£"V/ LZ'bV LZ'b* 1S3A dVH (Ad3Nilh3VK 'J ynuh 00*^7 1b*£ 3dOV 3d3V * 1M0 19*-b 1o•0 '±M3 °1K3 S *7 • 0 9T # J 5IT""" 1 — ^° IT 9T M? ZZ* £Z 8^'ZT Zl*8 8S*Z eT'v JT BZ vl -01 +/^'9 ib-/. CS'OT C+/M CT "Z 0^7 *0T *?b**/L Tf *7 oO-O 6z•s OC'^7 COM OOM UOM CZM ^ ' 1 OCM 2.0'S OO'JLl Z1'£Z 3^'ZT Zl'S Sl'Z 98*Z £<7*U US'ZT O^'OT O V I i J ' O 9T* C TZ" C OS*£Z 0Z*8Z (A«3NlhOVW 3 dlUJVdl ) dOUV 1 Ad jU ihjvvm nii ii vji ddl sauiovdi A^dNlHJVW U d d S a l V i S P. 3 bdHH d I V I S M J AJ3SNI div isnj l a3d d i v i s n o NVGVdOd 3d3V 3>J3V °1M3 "S8 1 3d3V 3d 3 V 'S91 'S«1 •S61 iOdSv) WVttGdO UNVdOdd 133SM (3dUb) HSVKld JlVHdSOHd N3i)t1dll N (JdSOl) 03dS iS3AdVH3dd S i S U J J I H V l d VA •se'i • 1M 3 IV101 iU*z£<7 $ To T T 5 T ~ bL'£\*> lbf:3 (Nuuvoi ddi) duyv") 3d3V 3d3V ddOV * 1M3 ze-o 00*^9 OO'AT T OZM L$mY£ iSdAnVH-ddd •iViUi^HS •dVj 'du !\J lS3d3iNl •"IDG 07 M 00•Z uO*G£ dUiJVdl ) ddV-v 1 SaUlJVdl AdSNlHOVvJ KrtUO S3TVS AdO 1S03 iiivh isno «noH «noH OO'-b CO"T COM 4 "lviuiyns SiSUJ AbdAaVH $ IS'661 **/ * 6 M <?vz^ £i'6 NO IIJOUUdd All iK'VliU dG ~jrnvA llNli/lSL'J dU 331^d du.i3 UNZ 331 d dddJ 1ST 33Id WOdd Sid 13 3d d SSDd'J U N fi ih JWd'JVNVl-. "IVJIdM Niil Jdjv d 3d SNdfUdd liNV S1S03 CJdlVWUSJ l SVli') J If!*. <•! 1. 3 d S V X d l M ' U V ' j l d d i * ] J l d -*7- -5- RICE, IRRIGATED, TEXAS UPPER GULF COAST REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT O P F R AT ION FIXED F U F L ,»OUTI LL » L U B . , * E P. C OSTS HEM TIMES LABOR MACHINE PFR ACRE PER ACRE N O o D AT E O V E R H O U R S H O U R S TRUCK PICKUP SHOP EQUIPMFNT C L E V F E B O X T- A TRUCK P I CK UP SPRNG T HARROW TRUCK SPRNG T HARROW F I E L D C U LT I VAT O R PICKUP TRUCK F I E L D C U LT I VAT O R LEVEE PLOW BLADE (DOZER) PICKUP PTCKUP PICKUP PICKUP TRUCK OFF SET DISK RLADF (DOZER* COMBINE GRAIN CART PICKUP TRUCK OFF SET DISK 8LADE (DOZER) COMBINE GRAIN CART PICKUP OFF SET DISK BLADF (DOZERS PICKUP TRUCK COMBINE GRAIN CART PICKUP TOTALS 9 11 98 99 9 LI 9 4,31 5,68 i l 9 5,68 5,66 4,30 IL i l 11 9 <t,50 4,30 17 4,92 11 9 4,50 4,30 IT 4,92 11 4,50 4,30 11 9 1? 4,92 i l NOV NOV DEC DEC DEC DEC JAN FEB FEB FEB FEB MAR MAR MAR MAR MAR APR MAY JUNE JULY J U LY J U LY J U LY J U LY J U LY AUG AUG AUG AUG AUG AUG SEPT SEPT SEPT OCT OCT OCT OCT 0.04 OolO 1.00 0.33 OolO OolO 1,00 0.05 1,00 0o50 Q.1J OolO 0«50 2.00 loOO Oo20 Oo 10 0.10 OolO 0.15 2o00 0 oil 0.50 0*50 0o22 0.13 loOO 0 oOl 0.50 0.50 0o22 1.00 0o03 0 ,10 0.13 0.25 0.25 0.15 0.050 0.125 0.0 0.0 0.125 0.125 0.208 0.062 0 203 0 071 0 . 125 Oo 125 Oo 071 Oo 671 Oc.377 0«.250 o. 125 0< 125 0, 125 0. 187 0 444 0 042 0 253 0 321 0 275 0 162 0 222 0 ,004 0 ,253 0 ,321 0 = 275 0.222 O.OLl 0.125 Oo 162 0,127 0.160 0■ 040 0< 100 I . 006 0. 332 0, 100 0 100 0 139 0 050 0 139 0 048 0.100 0»100 0.048 0.447 0.252 0-200 0.100 0.100 0.100 0.150 0.296 0.028 0.203 Oc 214 0*220 0.130 0.148 0.003 0, 2 0 3 0. 2 1 4 0 220 0 148 0 003 Oo 100 Oc 130 0.10 1 0.107 0.08 0.27 1.97 0.63 0.19 0.27 0o96 0. 10 0.96 0.45 3.27 0. 19 0.45 4.13 1.82 0. 54 0.27 0.27 0.27 0.29 2.07 0.20 1.83 1.44 0.59 0.25 1.04 0o02 1. 83 1.44 0.59 1.04 0.05 Oc 2 7 0.25 0.92 0.72 0.07 0.13 1.75 1.20 0.17 0.13 0.86 0.08 0.86 0.42 0.13 0.17 0.42 3.48 1.45 0.26 0.13 0.13 0.13 0.25 1.90 0.16 5.63 1.21 0.29 0.22 0.95 0.01 5.63 1.21 0.29 0.95 0.04 0.13 0.22 2.81 0.61 _cu.iai -2*.L22 24 6.27 0 29o38 34.72 1/ LAND COST IS 14 PERCENT OF PRODUCTION LESS 14 PERCENT OF DRYING. SECOND CROP ON 25 PFRCENT OF ACREAGE. WHERE PARTIAL COVERAGE OCCURS OUANTmES WERE ADJUSTED TO REFLECT COVERAGE OBTAINED. PROJECTED, 1976 ^ -6R I C F, I R R I G AT E D , T E X A S U P P F R G U L F C O A S T P F G I O N ESTIMATED COSTS AMD RETURNS PER ACRF HIGH LEVEL MANAGEMENT UNI T $ 1. GROSS RECEIPTS FROM PRODUCTION RICF 1ST CROP RICE 2ND CROP TOTAL 9.75 9.75 47.00 3.20 1.20 11 7 . 0 0 65.00 30.00 1.00 1.00 0.45 1 7.00 5.07 1.50 1.45 1.20 1.00 1.00 1.00 5.29 4.31 74.94 VARIABLE COSTS PREHARVEST SEED (105PC) NITROGEN PHOSPHATE POTASH (8CPC) INSECT PROPANIL ORDRAM (45PC) FURADAN CUST AIR FEPT CUST AIP INSECT CUST AIR HERB CUST AIR SFFD MACHINERY TRACTORS I R R I G AT I O N M A C H I N E RY LABOR(TRACTOR & MACHINERY) LABOR( IRR IGATION) I N T E R E S T C N O P. C A P. SUBTOTAL, PRE-HARVEST CWTo LBSo LBS. LBS. LBS. ACRE ACRE LBS. CWT. ACRE ACRE CWTo ACRE ACRE ACRE HOUR HOUR DOL. 23.50 0.21 0.16 0.07 1.40 10.50 17.50 0.32 2.00 1.40 2.85 2.15 8.72 12.48 23.72 4.00 4.00 0.09 HARVEST COSTS CUST HAUL CUST DRY SALES COMM MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) SUBTCTAL* HARVEST CWT. CWT. CWT, ACRE ACRE HOUR 0.16 0.45 0.07 4.67 3.51 4.0 0 2 8.20 24.57 10.40 2.10 1.40 10.50 7.87 5.44 10.14 2.10 4.13 2.58 8.72 12.48 23.72 21.16 17.25 __fc_X_ $ 55.91 55.91 50.20 1.00 1.00 1.43 $ 9 . 11 25.16 3.51 4.67 3.51 __!_ 51.70 $ 251.21 $ 238.24 3. INCOME ABOVE VARIABLE COSTS TRACTORS LAND (NET RENT) TOTAL FIXED COSTS 458.25 __3.1-.2Q $ 489.45 $ 199.51 TOTAL VARIABLE COST 4. FIXED COSTS MACHINERY VALUE OP COST PRICE OR C O S T / U N I T QUANT ITY $ ACRE ACRE ACRE 22.31 12.41 65.00 1.00 1.00 1.00 22.31 12.41 _____Q0 $ 99.72 5. TOTAL COSTS 6. NET RETURNS $ 350.93 $ 138.52 1/ 'AND COST IS 14 PERCENT OF PRODUCTION LESS 14 PERCENT OF DRYING. SECOND CROP ON 25 PERCENT OF ACREAGE. WHERE PARTIAL COVERAGE OCCURS QUANTITIES WERE ADJUSTED TO REFLECT COVERAGE OBTAINED. PROJECTED, 1976 -7- RICE, IRRIGATED, TEXAS UPPER GULF COAST REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION TR UC K PICKUP SHOP EQUIPMENT C LEVEE BOX T-A TRUCK PICKUP SPRNG T HARROW TRUCK SPRNG T HARROW F I E L D C U LT I VAT O R PICKUP TRUCK F I E L D C U LT I VAT O R LEVEE PLOW BLADE (DOZER) PI CK UP PICKUP PICKUP PICKUP TRUCK OFF SET DISK BLADE (DOZFR) COMBINE GRAIN CART PICKUP TRUCK OFF SET DISK BLADE (DOZER) COM3INF GRAIN CART PICKUP OFF SET DISK BLADE (DOZFR) P I CK UP TRUCK COMBINE GRAIN CART PICKUP TOTALS ITEM NO. 9 11 98 99 9 11 4,31 9 4,31 5,63 11 9 5,68 5,66 4,30 11 11 11 11 9 4,50 4,30 17 4,92 11 9 4,50 4,30 17 4,92 11 4,50 4,30 11 9 17 4,92 11 DATE FJEL,OIL, FIXED COSTS LUB. , REPo TIMES LABOR MACHINE PFR ACRE PER ACRF OVER H OU RS HOURS NOV NOV DEC DEC DEC DEC JAN FEB FEB FEB FFB MAR MAR MAR MAR MAR APR MAY JUNE J U LY J UL Y JULY J U LY J U LY J U LY AUG AUG AUG AUG AUG AUG SEPT SEPT SEPT OCT OCT OCT OCT 0.050 0.04 0.10 0.125 1.00 OoO 0.0 0.33 0.10 0.125 0.125 0.10 1.00 0*208 0„05 0.062 0.208 1.00 0.50 Oo071 0.10 0.125 0.10 0.125 0.50 0.071 2.00 0.671 1.00 0.377 0.250 0.20 O.IO 0.125 0.10 0.125 0.10 0.125 0.L5 0„187 0.444 2.00 0 . 11 0.042 0.253 0.50 0.50 0.321 0.22 0.275 0.162 0.13 0.222 1.00 0.01 0o004 0.253 0.50 0.5 3 0.321 0-22 0.275 1 .00 0.222 0.03 0 . 0 11 0.10 0.125 0ol3 0. 162 0.127 0.25 0.25 0.160 0 . 1 5 _Q_iai 0.0 40 0.100 1.006 0.332 0.100 0.100 0.139 0.050 0.139 0.048 0.100 0.100 0.048 0.447 0.252 0.200 0.100 0.100 OolOO 0.150 0.296 0.028 0o203 0.214 0o220 0.130 Oo 148 0.003 0.203 0.214 0.220 0.148 0.008 0.100 0.130 0 . 10 1 0.107 ___.!__ 0. 08 0.27 1.97 0.68 0. 19 3.27 0.96 0.10 0.96 0.45 0.27 0. 19 0.45 4. 13 1.82 0.54 0.27 0.2 7 0.27 0.29 2.07 0.20 1.83 1.44 Oo 59 0o25 1.04 0.02 1.83 1.44 0.59 1.04 0.05 0.27 0o25 3.92 0.72 _____ 0.07 0.13 1.75 1.20 0.17 0.13 0. 86 0.08 0.86 0.42 0.13 0.17 0.42 3.48 1.45 0.26 0.13 0.13 0.13 0.25 1.90 0.16 5.63 1.21 0.29 0.22 0.95 0.01 5.63 1.21 0.29 0.95 0.04 0.13 0.22 2.81 0. 61 _____ 6.7 24 6.270 29.38 34.72 1/ LAND COST IS 14 PERCENT OF PRODUCTION LESS 14 PERCENT OF DRYING. SECOND CROP CN 25 PERCENT OF ACREAGE. WHERE PARTIAL COVERAGE OCCURS QUANTITIES WERE ADJUSTED TO REFLECT COVERAGF OBTAINED. PROJECTED, □ -oS0Y8EANS, DRYLAND, TEXAS UPPER GULF COAST REGION ESTIMATED COSTS AND RETURNS PFR ACRE TYPICAL MANAGEMENT PRICE CR VA L U E OR UNIT COST/UNIT QUANTITY COST 1. GROSS RECEIPTS FROM PROOUCTtCN SOYBEANS TOTAL BU. 5.00 VARIABLE COSTS PREHARVEST CLOVER SEED FERTILIZER INSECT BROADCAST HERB CUST AIR INSECT MACHINERY TRACTORS LABCRC TRACTOR & MACHINERY) INTEREST CN OP. C A P. S U B TO TA L , PRE-HARVEST LBS. CWT. ACRE ACRE ACRE ACRE ACRE HOUR DCL. 0.20 8.30 0.90 10.00 1.60 7.69 20.26 4.00 0.09 HARVEST COSTS DRYING STORAGE MACHINERY TRACTORS LABOR(TRACTOR 6 MACHINERY) SUBTCTAL, HARVEST BU. BU. ACRE ACRE HOUR 0.10 0.15 4.66 3.85 4.00 50.00 2.00 2.00 0.10 3.00 1.00 1.00 5.74 10.00 26.43 .-Z*12 16.60 1.80 1.00 4.80 7.69 20.26 22.98 87.51 22.00 22.00 1.00 1.00 1.45 2.20 3.30 4.66 3.85 __X2 $ 19.79 $ 107.30 TOTAL VARIABLE COST 4.877 3. BREAKEVEN PRICE* VARIABLE COSTS BU. 4. FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TO TA L F I X E D COSTS 22.00 _______ $ 110.00 ACRE ACRE ACRE 20*52 18.81 15.40 5 . TO TA L C O S T S 6 . B R E A K E V E N P R I C E , T O TA L C O S T S B U . 1.00 20.52 1.00 18.81 1*00 _______ $ 54.73 $ 162.03 7.365 1/ LAND COST COMPUTED ON BASIS OF 1/7 OF PRODUCTION PROJECTED, 1976 SOYBEANS, DRYLAND, TEXAS UPPER GULF COAST REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION DISK TANDEM COMBINE GRAIN CART TRUCK PICKUP PICKUP SHOP EQUIPMENT C DISK TANDEM PICKUP DISK TANDEM LAND PLANE6 PICKUP DISK TANDEM BEDDER PICKUP BEODER BED PLANTER BLADE (DOZER) R O L L C U LT I VATO R PICKUP R O L L C U LT I VATO R PICKUP R O L L C U LT I VATO R PICKUP BLADE (DOZER) PICKUP PICKUP COMBINE GRAIN CART TRUCK PICKUP TOTALS ITEM NO. 5,35 17 5,92 10 11 11 98 5,35 i l 5,35 5,56 11 5,35 5,59 11 5,59 5,43 2,30 5,41 11 5,41 11 5,41 11 2,30 11 11 17 5,92 10 11 D AT E TIMES LABOR MACHINE HOURS OVER HCURS NOV NOV NOV NOV NOV DEC DEC JAN JAN FEB FEB FEB APR APR APR MAY MAY MAY MAY MAY JUNE JUNE J U LY J U LY AUG AUG SEPT OCT OCT OCT OCT l.QO Go 50 0«*5G 0.12 OolO 0.10 1.00 loOO 0.10 1.00 1.00 0.20 1,00 1.00 0.10 1.00 1*00 1*00 1.00 0.10 2.00 0.10 1.00 0.22 1.00 0.22 0.10 0.50 0.50 0.12 0.15 0.171 0.252 0.321 0.150 0.125 0.125 0.0 0.171 0.125 0.171 0.275 0.250 0.171 0.387 0.125 0.387 0.440 0.377 0o239 0.125 0.479 0.125 0.239 0.275 0.377 0.275 0.125 0.253 0.321 0.150 FUEL,OIL, FIXED COSTS L U B . , R E P. PER ACRE PER ACRE 0 . 11 4 0*203 0.214 0*120 0.100 0.100 1.006 0 . 11 4 0.100 0 . 11 4 0.183 0.200 0 . 11 4 0.258 0. 100 0.258 0.293 0.252 0.160 0.100 0.319 0.100 0.160 0.220 0.252 0.220 0.100 0.203 0.214 0.120 _a,_ai .0*120 7.192 6.157 1.12 1.83 1.96 0.46 0.27 0.27 1.97 1.12 0.27 1.12 1.74 0.54 1.12 2.34 0.27 2.34 3.04 0.92 1.55 0.27 3 . 11 0.27 1.55 0.59 0.92 0.59 0.27 1.83 1.96 0.46 _____ -0*20 36.45 39.33 1.09 5.63 1.63 0.55 0.13 0.13 1.75 1.09 0.13 1.09 1.70 0.26 1.09 1.98 0.13 1.98 2.73 0.75 1.44 0.13 2.88 0.13 1.44 0.29 0.75 0.29 0.13 5.63 1.63 0.55 ~ 1/ LAND COST CCMPUTED ON BASIS OF 1/7 OF PRODUCTICN PROJECTED, 1976 BUDGET I0ENTIFICAT2CN NUMBER 99 0210012100 0 ANNUAL CAPITAL MONTH 10 > -iu- SOYBEANS, DRYLAND, TEXAS UPPER GULF COAST REGION ESTIMATED COSTS AND RETURNS PER ACRF HIGH LEVEL MANAGEMENT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST 1. GROSS RECEIPTS FROM PRODUCTICN SOYBEANS TOTAL 2 . VA R I A B L E C O S T S PREHARVEST SEED FERTILIZER INSECT BROADCAST HFRB. FOLIAR FUNGICIDE CUST AIR INSECT MACHINERY TRACTORS LABORITRACTOR & MACHINERY) INTEREST ON OP. C A P. SUBTOTAL, J 'RE-HARVEST HARVEST COSTS DRYING STORAGE MACHINERY TRACTORS LABORITRACTOR & MACHINERY) SUBTOTAL, HARVEST BU LBS. CWT. ACRE ACRE ACRE ACRE ACRE ACRE HOUR DOL. 5.00 30.00 _1_Q_Q_ 150.00 0.20 8.30 0.90 14.00 7.00 1.60 7.69 20.26 4.00 0.09 50.00 2.00 2.00 0.25 2.00 3.00 1.00 1.00 5.74 30.51 10.00 16.60 1.80 3.50 14.00 4.80 7.69 20.26 22.98 Z*12 $ 104.37 $ BU. BU. ACRE ACRE HOUR 0.10 0.15 4.66 3.85 4.00 30.00 30.00 1.00 1.00 1.45 3.00 4.50 4.66 3.85 2:12 $ $ 126.17 TOTAL VARIABLE CO ST 4.206 3 . B R E A K E V E N P R I C E , VA R I A B L E C O S T S B U . 4. FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TO TA L F I X F D C O S T S ACRE ACRE ACRE 20.52 18.81 21.00 1.00 1.00 1.00 20.52 18.81 __21__Q $ 60.33 $ 186.50 5. TOTAL COSTS 6. BREAKEVEN PRICE, TOTAL COSTS 21.79 BU. 6.217 1/ LAND COST COMPUTED GN BASIS OF 1/7 OF PRODUCTION PROJECTED, 1976 - 11 - SOYBEANS, DRYLAND, TEXAS UPPER GULF CCAST REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION DISK TANDEM COMBINE GRAIN CART TRUCK PICKUP PICKUP SHOP EQUIPMFNT C DISK TANDEM PICKUP DISK TANDEM LAND PLANE6 PICKUP DISK TANDEM BEDDER PICKUP BEDDER BED PLANTER BLADE (OG7ER) R O L L C U LT I VATO R PICKUP ROLL CULTIVATOR PICKUP ROLL CULTIVATOR PICKUP BLADE (DOZER) PICKUP PTCKUP COMBIME GRAIN CART TRUCK PICKUP TOTALS ITEM NO. 5,35 17 5,92 10 11 11 98 5,35 11 5,35 5,56 11 5,35 5,59 11 5,59 5,43 2,30 5,41 11 5,41 11 5,41 11 2,30 11 11 17 5,92 10 11 DATE TIMES LABOR HOURS OVER NOV NOV NOV NOV NOV DEC DEC JAN JAN FEB FEB FEB APR APR APR MAY MAY MAY MAY MAY JUNE JUNE J U LY JULY AUG AUG SEPT OCT OCT OCT OCT 1.00 0.50 0.50 0.12 0.10 0.10 1.00 1.00 0.10 1.00 1.00 0.20 1.00 1.00 0.10 1.00 1.00 1.00 1.00 0.10 2.00 0.10 1.00 0.22 1.00 0.22 0.10 0.50 0.50 0.12 0.15 MACHINE HOURS 0.171 0.253 0.321 0.150 0.125 0.125 0.0 0.171 0.125 0.171 0.275 0.250 0.171 0.387 0.125 0.387 0.440 0.377 0.239 0.125 0.479 0.125 0.239 0.275 0.377 0 .275 0.125 0.253 0.321 0.150 0 . 11 4 0.203 0.214 0.120 0.100 0.100 1.006 0 . 11 4 0.100 0 . 11 4 0.183 0.200 0 . 11 4 0.258 0. 100 0.258 0.293 0.252 0.160 0.100 0.319 0.100 0.160 0.220 0.252 0.220 0.100 0.203 0.214 0.120 7.192 6.157 FIXED FUEL,OIL, COSTS LUB. , REP. PER ACRE PER ACRF ___iaz ___i__ 1.12 1. 83 1.96 0.46 0.27 0.27 1.97 1. 12 0.27 1.12 1.74 0.54 1.12 2.34 0.27 2.34 3.04 0.92 1.55 0.27 3 . 11 0.27 1.55 0.59 0.92 0. 59 0.27 1.83 1.96 0.46 _____ 1.09 5.63 1.63 0.55 0. 13 0.13 1.75 1.09 0.13 1.09 1.70 0.26 1.09 1.98 0.13 1.98 2.73 0.75 1.44 0.13 2.88 0. 13 1.44 0.29 0.75 0.29 0.13 5.63 1.63 0.55 -0:22 36.45 39.33 1/ LAND COST COMPUTED ON BASIS OF 1/7 OF PRODUCTION PROJECTED, 19 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 9 0 2 1 0 0 1 2 1 0 0 0 A N N U A L C A P I TA L M O N T H 1 0