r TEXAS HIGH PLAINS IV FOREWORD r The enterprise budgets for Texas High Plains IV Region are based on estimates of yields, pro duction input quantities, and production practices which represent the best judgment of local produc ers, county Extension agents-agriculture, financial institution representatives, farm machinery dealers and others knowledgeable of the area. Variation in yields, production inputs and production prac tices should be expected for particular farms. gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. The machinery inventory is applicable to both typical and high level management. In some bud Land charges were based on the customary land lord's crop share less his proportionate share of certain production and harvesting inputs and a percentage of fixed cost on the irrigation system when applicable. A per acre land charge was made when crop share was not used. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. TEXAS HIGH PLAINS IV REGION Assumed Prices Paid and Received by Farmers 1/ tern Unit Price Prices paid (1976) Seed Cotton (delinted) Grain Sorghum Wheat (cleaned and treated) Alfalfa Sprigs Southern peas cwt. cwt. bu. cwt. bu. cwt. 35.00 40.00 7.00 175.00 I .00 55.00 Custom rates Cotton (harvest and haul) Combining wheat (dryland) Combining wheat (irrigated) Combining grain sorghum (dryland) Combining grain sorghum (irrigated) cwt. acre acre acre cwt. 1.00 7.50 2.00 7.50 .30 HauIing Grain sorghum Wheat cwt. bu. .20 .15 Chemical spraying (aerial) Cotton ginning acre cwt. 2.50 I .25 Fuel lubricants Gasoli ne L . P. g a s Diesel fuel M o t o r o i I ( h e a v y d u t y, d e t e r g e n t ) gal . gal . gal . ga I . .40 .35 .40 2.40 FertiIizer (buIk) Nitrogen (anhydrous) Nitrogen (granular) lb. lb. Labor (except hoeing & irrigation) Labor (irrigation) Labor (hoeing) hour hour hour .16 .30 2.75 2.75 2.25 -2- tem ChemicaIs Pre-emergence herbicide Methyl parathion Ma lath ion Land Lease (cash rent) Genera I Hai I Insurance Wheat Cotton Grain Sorghum Interest Capita I Operating Unit Pri ce 5 ga gal . gal . 40.00 5.25 I I .00 acre 50.00 $100 $100 $100 8.00 12.00 8.00 .08 .10 Price received (1976) Cotton Cottonseed Wheat Grain sorghum A l f a l f a h a y ( s t a n d i n g i n fi e l d ) Pasture grazing lb. ton bu. cwt. ton lb. int .40 90.00 3.75 4.50 40.00 .20 ]_/ These price assumptions are not to be interpreted as predictions or prospective prices. " > TEXAS HIGH PLAINS IV REGION Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size Tractor - 120 HP Tractor - 100 HP Tractor - 45 HP Pickup - 1/2 ton Rolling cultivator 6R - 20 feet MB plow 4B - 5.3 feet Chisel - 13 feet Tandem disc - 13 feet Grain drill - 16 feet Shredder 4R - 13 feet Sandfighter (2) - 20 feet Clod buster - 5.5 feet Herb sprayer - 24 feet Cotton trail (9) - 3 feet Lister 8R - 27 feet Lister plant 8R - 27 feet Bed planter - 27 feet Rolling cultivator 8R - 27 feet Bed knife 8R - 27 feet Shredder 2R - 6.7 feet Purchase Price $16,600 12,000 4,000 5,100 1,900 1,550 900 1,750 1,750 1,556 350 450 550 800 1,800 3,000 2,000 2,040 1,000 378 Estimated Years of Use 5 5 12 3 8 8 8 8 10 8 10 12 10 12 8 8 8 8 8 8 Estimated Hours of Use 5000 5000 7200 2100 1280 1600 1600 2000 1200 1000 2000 2004 2000 1800 1600 2000 2000 1200 800 1000 Fixed Costs Per Hour $3.27 2.37 .93 2.02 2.04 1.34 .78 1.20 2.26 2.14 .27 .38 .42 .75 1.54 2.07 1.37 2.33 1.72 .52 Variable Costs Per Hour $5.44 4.22 1.92 3.37 1.11 •72 .24 .38 .63 .75 .08 .10 .12 .28 .63 .84 .56 1.27 .94 .18 J -4A L FA L FA E S TA B . , I R R I G AT E D , T E X A S H I G H P L A I N S V ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT (CENTER PIVOT SYSTEM) UNIT PRICE OR C O S T / U N I T QUANTITY VALUF OR COST 1. GROSS RECEIPTS FROM PRODUCTION TOTAL VARIABLE COSTS PREHARVEST SEED FERT( 20-100-60) MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTOR _ MACHINERY) LABOR( IRRIGATION) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST 0.0 LBS. ACRE ACRE ACRE ACRE HOUR HOUR DOL. 1.75 54.00 2.30 6.18 17.60 2.75 2.75 0.10 22.00 1.00 1.00 1.00 1.00 2.18 1.50 34.91 s 38.50 54.00 2.30 6.18 17.60 5.Q9 4.12 _._._._ 132. 19 HARVEST COSTS SUBTOTAL, HARVEST $ TOTAL VARIABLE COST $ 132.19 INCOME ABOVE VARIABLE COSTS . -- 1 3 2 . 1 9 FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 0.0 $ ACRE ACRE ACRE ACRE 2.58 3.63 22.40 39.80 1.00 1.00 1.00 1.00 2.58 3.63 22.40 .-12:22 $" 68.41 5. TOTAL COSTS $ 6. NET RETURNS $ -- 2 0 0 . 6 0 * LAND CHARGE BASED ON RATES I N R E G I O N , $ 5 0 / A C R E , L E S S I R R I G AT I O N F I X E D C O S T S . 200.60 5 0 P C T. O F PROJECTED, 1976 A L FA L FA F S TA B . , I R R I G AT E D , T E X A S H I G H P L A I N S I V R F G I O N ESTIMATED COSTS AND RETURNS PEP ACRE TYPICAL MANAGEMENT (CENTER PIVOT SYSTEM) OPERATION ITEM NO. DATE FUFL,OIL, FIXFD T I M E S L A B O R M A C H I N E L U B . , R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE MBPLOW 4B 1,33 JUNE 1.00 0.712 0.475 CLOD BUSTER 51 JUNE 1.00 0.0 0.404 PICKUP 10 J U LY 0.10 0.125 0.100 TA N D E M DISC 3,43 AUG 1.00 0.239 0.159 F E R T. A P P L I , R E N T D 3 , 8 6 A U G 1 . 0 0 0 . 0 9 7 0 . 0 6 4 TA N D E M DISC 1,43 AUG 1.00 0.239 0.159 PICKUP 10 AUG 0.10 0.125 0.100 GRAIN DRILL 3,45 SEPT 1.00 0.269 0.179 PICKUP 10 SEPT 0.10 0.125 0.100 PICKUP 10 OCT 0.10 0.125 0.100 PICKUP 10 NOV 0.10 __xl__ ______ 3.44 0.04 0.34 0.87 0.33 1.10 0.34 1.02 0.34 0.34 _____ -2:22 2.180 1.941 8.48 6.21 TOTALS 2.50 0.15 0.20 0.64 0.18 0.82 0.20 0.91 0.20 0.20 * L A N D C H A R G E B A S E D O N R AT E S I N R E G I O N , S 5 0 / A C R E , L E S S 5 0 P C T. O F I R R I G AT I O N FIXED COSTS. PROJECTED, 1976 BUDGET IDENTIFICATION NUMBER A N N U A L C A P I TA L M O N T H 1 2 811004302 470 0 -6A L FA L FA , I R R I G AT E D , T E X A S H I G H P L A I N S I V R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT (CENTER PIVOT SYSTEM) PRICE OR VA L U F OR UNIT COST/UNIT QUANTITY COST I. GROSS RECEIPTS FROM PRODUCTION HAY TOTAL TON 40.00 -222*22 6.50 $ 260.00 2. VARIABLE COSTS PREHARVEST FERT(0-100-60) MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR _ MACHINERY) L A B O R ( I R R I G AT I O N ) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST ACRE ACRE ACRE ACRE HOUR HOUR DOL. 48.00 1.68 0.15 42.24 2.75 2.75 0.10 1.00 1.00 1.00 1.00 0.72 3.60 41.15 48.00 1.68 0. 15 42.24 1.98 9.90 __11 $" 1 0 8 . 0 7 HARVEST COSTS SUBTOTAL, HARVEST $ $ 0.0 TOTAL VARIABLE COST $ 108.07 3. INCOME ABOVE VARIABLE COSTS 4. FI XED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATED ESTAB. COST LAND (NET RENT) TOTAL FIXED COSTS $ 151.93 $ ACRE ACRE ACRE ACRE ACRE 1.01 0.07 53.76 200.61 38.12 1.00 1.00 1.00 0.14 1.00 1.01 0.07 53.76 28.69 .-22:12 $ 121.65 5. TOTAL COSTS $ 229.72 NET RETURNS $ 30.28 C R O P S O L D S TA N D I N G I N F I E L D . LAND CHARGE BASED ON LANDLORD SHARE (1/4) LESS 50 PCT. FIXED COSTS. ESTABLISHMENT COST PRORATED OVER 7 YEARS. O F I R R I G AT I O N PROJECTED, 1976 ALFALFA, IRRIGATED, TEXAS HIGH PLAINS IV REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT (CENTER PIVOT SYSTEM) OPERATION F E R T. A P P L I , R E N T D PICKUP PICKUP PICKUP PICKUP PICKUP ITEM NO. 5,86 10 10 10 10 10 DATE TIMES LABOR MACHINE OVER HOURS HOJRS MAR MAR MAY J U LY SEPT OCT 1.00 0.10 0.10 0.10 0.10 0.10 TOTALS 0.097 0.125 0.125 0.125 0.125 ^ FIXED FUEL,OIL, L U B . , R E P. COSTS PER ACRE PER ACRE -2*122 0.064 0.100 0.100 0.100 0.100 ______ 0.15 0.34 0.34 0.34 0.34 _____ 0.07 0.20 0.20 0.20 0.20 _____ 0.722 0.564 1.83 1.08 * CROP SOLD STANDING IN FIELD. * LAND CHARGE BASED ON LANDLORD SHARE (1/4) LESS 50 PCT. OF IRRIGATION FIXED COSTS. ESTABLISHMENT COST PRORATED OVER 7 YEARS. PROJECTED, 1976 BUDGET IDENTIFICATION NUMBER ANNUAL CAPITAL MONTH 10 81 004602 470 0 ALFALFA ESTAB., IRRIGATED, TEXAS HIGH PLAINS IV ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT (CENTER PIVOT SYSTEM) UNIT PRICE CR C O S T / U N I T QUANTITY 1. GROSS RECEIPTS FROM PRODUCTION TOTAL 2 . VA R I A B L E C O S T S PREHARVEST SEED FERT(20-120-100) MACHINERY TRACTORS IRRIGATION MACHINERY LABORITRACTOR _ MACHINERY) LABOR! IRRIGATION) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST VALUE OR COST $ $ 0.0 $ LBS. ACRE ACRE ACRE ACRE HOUR HOUR DOL. 1.75 72.00 2.30 5.95 17.60 2.75 2.75 0.10 22.00 1.00 1.00 l.oo 1.00 2.18 1.50 40.5 4 38.50 72.00 2.30 5.95 17.60 5.99 4.12 ____ $ 150.52 HARVEST COSTS SUBTOTAL, HARVEST $ TOTAL VARIABLE COST $ 150.52 3. INCOME ABOVE VARIABLE COSTS $-150.52 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 0.0 $ ACRE ACRE ACRE ACRE 2.58 3.46 22.40 38.80 1.00 1.00 1.00 1.00 2.58 3.46 22.40 —22:22 $ 67.24 5. TOTAL COSTS $ 217.76 6. NET RETURNS $-217.76 * LAND CHARGE BASED ON RATES IN REGICN, $50/ACRE, LESS 5 0 P C T. O F I R R I G AT I O N F I X E D C O S T S . PROJECTED, 1976 -9- A L FA L FA E S TA B . , I R R I G AT E D , T E X A S H I G H P L A I N S I V R E G I O N FSTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT (CENTER PIVOT SYSTEM) OPERATION ITEM NO. MBPLOW 4B 1,33 CLOD BUSTER 51 PICKUP 10 TA N D E M DISC 3,43 F E R T. A P P L I , R E N T D 3 , 8 6 TA N D E M DISC 3,43 PICKUP 10 GRAIN DRILL 3,45 PICKUP 10 PICKUP 10 PICKUP 10 TOTALS DATE J U LY J U LY J U LY AUG AUG AUG AUG SEPT SEPT OCT NOV FUEL,OIL, FIXED T I M E S L A B O R M A C H I N E L U B . , R E P. C O S T S OVER HCURS HOURS PER ACRE PER ACRE 1.00 0.712 0.47 5 1.00 0 .0 0.404 0.10 0.125 0 . 1 0 0 1.00 0 . 2 3 9 0.159 1.00 0 . 0 9 7 0.064 1.00 0 . 2 3 9 0.159 0.10 0.125 0.100 1.00 0 . 2 6 9 0.179 0 . 1 0 0 . 1 2 5 0. 100 0 . 1 0 0.125 0 . 1 0 0 0.10 _2*L22 _ _ _ _ _ _ 3.44 0.04 0.34 0.87 0.33 0.87 0.34 1.02 0.34 0.34 .____ 2.50 0. 15 0.20 0.64 0. 18 0.64 0.20 0.91 0.20 0.20 .2*22 2.180 1.941 8.25 6.04 * LAND CHARGE BASED ON RATES I N R E G I O N , $ 5 0 / A C R E , L E S S I R R I G AT I O N F I X E D C O S T S . B U D G E T I D E N T I F I C AT I O N N U M B E R 8 11 0 0 4 3 0 1 4 7 0 0 A N N U A L C A P I TA L M O N T H 1 2 5 0 P C T. O F PROJECTED, 1976 ALFALFA, IRRIGATED, TEXAS HIGH PLAINS IV REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MGMT., (CENTER PIVOT SYSTEM) UNIT GROSS RECEIPTS FROM PRODUCTION HAY TOTAL VARIABLE COSTS PREHARVEST FERT( 0-120-80) MACHINERY TRACTORS IRRIGATION MACHINERY LABORITRACTOR _ MACHINERY) LABOR(IRRIGATION) INTEREST ON OP. CAP. PRICE OR COST/UNIT QUANTITY TON 40.0 0 8.50 _______ $ 340.00 ACRE ACRE ACRE ACRE HOUR HOUR DOL. 60.00 1.68 0.33 58.08 2.75 2.75 0.10 1.00 1.00 1.00 1.00 0.72 4.95 52.07 60.00 1.68 0.33 58.08 1.98 13.61 SUBTOTAL, PRE-HARVEST HARVEST COSTS SUBTOTAL, 2*21 $" 140.89 $ $ HARVEST TOTAL VARIABLE COST 0.0 $ 140.89 3. INCOME ABOVE VARIABLE COSTS $ 199.11 4. FIXED COSTS MACHINERY TRACTORS IRR IGATION MACHINERY PRORATED ESTAB. COST LAND (NET RENT) TOTAL FIXED COSTS VALUE OR COST $ ACRE ACRE ACRE ACRE ACRE 1.01 0.18 73.92 217.77 48.04 1.00 1.00 1.00 0.14 1.00 1.01 0.18 73.92 31. 14 ______ $ 154.29 5. TOTAL COSTS $ 295.19 6. NET RETURNS $ 44.81 * C R O P S O L D S TA N D I N G I N F I E L D . * LAND CHARGE BASED ON LANDLORD SHARE (1/4) L E S S 5 0 P C T. O F I R R I G AT I O N FIXED COSTS. ESTABLISHMENT COST PRORATED OVER 7 YEARS. PROJECTED, 1976