r TEXAS HIGH PLAINS II r FOREWORD The enterprise budgets for Texas High Plains 11 Region are based on estimates of yields, produc tion input quantities, and production practices which represent the best judgment of local produc ers, county Extension agents-agriculture, financial institution representatives, farm machinery dealers and others knowledgeable of the area. Variation in yields, production inputs and production prac tices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. The machinery inventory is applicable to both typical and high level management. In some bud gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Land charges were based on the customary land lord's crop share less his proportionate share of certain production and harvesting inputs and a percentage of fixed cost on the irrigation system when applicable. A per acre land charge was made when crop share was not used. ^ TEXAS HIGH PLAINS II REGION Assumed Prices Paid and Received by Farmers \J tern Unit Price Prices paid (1976) ^ \ ^*N Seed Cotton (delinted) Grain Sorghum Soybean Wheat (cleaned and treated) Alfalfa Corn (for grain) Corn (for si I age) Forage Sorghum Sugar Beets cwt. cwt. cwt. bu. cwt. cwt. cwt. cwt. cwt. Custom rates Cotton (harvest and haul) Combining soybeans Combining wheat (dryland) Combining wheat (Irrigated) Combining grain sorghum (dryland) Combining grain sorghum (Irrigated) Sugar beets (harvest and haul) Hay harvest. Swath, bale, haul Corn (harvest and haul) Drying corn cwt. acre acre acre acre cwt. ton bale bu. bu. 1.00 2.00 7.50 2.00 7.50 .30 3.00 .60 .50 .10 Hauling Grain sorghum Soybeans Wheat Chemical spraying (aerial) Cotton ginning cwt. bu. bu. acre cwt. .20 .20 .15 2.50 1.25 Fuel and lubricants Gasollne L.P. gas Diesel fuel Motor oil (heavy duty, detergent) gal gal gal gal .40 .35 .40 2.40 Fertilizer (bulk) Nitrogen (anhydrous) Nitrogen (granular) Phosphorous lb. lb. lb. .16 .30 .30 35.00 40.00 10.00 7.00 175.00 95.00 75.00 32.00 60.00 -2^ tem Unit Price Prices paid (1976) (cont.) Labor (except hoeing) Labor (hoeing) hour hour 2.75 2.25 Chemicals Pre-emergence herbicide Methyl parathion Ma lath ion Land Lease (cash rent) 5 gal gal. gal. acre 40.00 5.25 11.00 50.00 $100 $100 $100 $100 8.00 2.00 8.00 8.00 Hal I Insurance Wheat Cotton Corn Grain Sorghum Interest Cap i taI Operating .08 .10 Prices received (1976) Cotton Cotton seed Wheat Grain sorghum A l f a l f a h a y ( s t a n d i n g i n fi e l d ) Forage sorghum hay (baled) Ensilage (corn) standing in field Pasture grazing Corn (grain) Soybeans Sugar beets (\A% sugar) lb. Lint ton bu. cwt. ton ton ton lb. gain bu. bu. ton .40 90.00 3.75 4.50 40.00 45.00 15.00 .20 2.70 5.00 35.00 1/ These price assumptions are not to be interpreted as predictions or prospective prices. -^~^ ."--^ x - ^ TEXAS HIGH PLAINS II REGION Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size Purchase Price Tractor - 100 HP $12,350 Tractor 85 HP 9,410 Tractor 45 HP A,120 Pickup 1/2 ton 5,100 Rolling cultivator 6R - 20 feet 2,000 MB Plow 4B - 5.3 feet 1,650 Chisel 13 feet 940 Float 7 feet 1,760 Border disc - 7 feet 235 Flex planter 6R - 20 feet 680 Lister - Planter - 20 feet 2,120 Ta n d e m d i s c - 1 3 f e e t 1 , 6 5 0 Offset disc - 13 feet 2,350 Grain drill - 16 feet ls880 Shredder 4R - 13.3 feet 1,650 Rod weeder - 20 feet 380 S a n d fi g h t e r - 3 0 f e e t 3 5 0 Bed shaper - 20 feet 940 Harrow 16 feet 350 Clod buster - 6 feet 450 Beet thinner - 20 feet 2,120 Herb sprayer - 30 feet 590 To o l b a r 6 R - 2 0 f e e t 2 3 5 Lister 6R - 20 feet U000 Cultipacker - 16 feet 350 Estimated Years of Use 5 8 12 3 8 8 8 10 10 5 8 8 8 10 8 5 10 12 12 12 10 10 12 10 12 Estimated Hours of Use 5000 6400 7200 2100 1600 1600 1600 1000 1600 1000 1000 1600 1600 1200 1000 1200 1000 1596 1596 2004 1000 2000 2004 2000 1596 Fixed Costs Per Hour $2.43 1.91 .95 2.02 1.72 1.42 .81 2.73 .23 .74 2.91 1.42 2.02 2.42 2.28 .35 .55 1.00 .38 .38 3.28 .45 .20 .77 .37 Variable Costs Per Hour $4.28 3.11 1.93 3.37 .94 .77 .26 .71 .06 .38 1.19 .45 .67 .68 .80 .14 .15 .26 .10 .10 .92 .13 .05 .22 .10 i i _4- ALFALFA ESTABLISHMENT, IRRIGATED, TEXAS HIGH PLAINS ESTIMATED COSIS ANO RETURNS PER ACRE TYPICAL MANAGEMENT UNIT II REGION PRICE CR C O S T / U N I T QUANTITY 1. GROSS RECEIPTS FROM PRODUCTION VALUE OR COST $ $ TOTAL 0.0 2 . VARIABLE COSTS PREHARVEST SEED FERTC2C-80-OI MACHINERY TRACTORS I R R I G AT I O N M A C H I N E RY LABORITRACTOR L MACHINERYI L A B O R U R R I G AT I C N ) I N T E R E S T O N O P. C A P. SUBTOTALt PRE-HARVEST ^ • N $ LBS. ACRE ACRE ACRE ACRE HOUR HOUR DOL. 1.75 30.00 3.10 11 . 2 1 12.32 2.75 2.75 0.10 15.00 1.00 1.00 1.00 1.00 4.90 1.72 26.55 HARVEST COSTS SUBTOTAL, HARVEST $ $ TO TA L VA R I A B L E C O S T % 103.74 3 . INCCME ABOVE VARIABLE COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT! TO TA L F I X E D C O S T S $ ACRE ACRE ACRE ACRE 5.67 6.77 16.94 16.54 1.00 1.00 1.00 1.00 . 5.67 6.77 16.94 ______ $" 4 5 . 9 2 5. TOTAL COSTS i 149.66 6. NET RETURNS $-149.66 LAND CHARGE USES $25/A. IRRIGATION FIXED COSTS. \ 0.0 $ -- 1 0 3 . 7 4 4 . FIXED COSTS ^ 26.25 30.00 3.10 11 . 2 1 12.32 13.47 4.74 _*__ $" 1 0 3 . 7 4 (1/2 ANNUAL RENTAL) LESS 50 PERCENT OF PROJECTED, 1976 -5ALFALFA ESTABLISHMENT, IRRIGATED, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION M_PLOW 4B CLOD BUSTER PICKUP BORDER DISC FLOAT BORDER DISC F E R T. A P P L I , R F N T D GRAIN DRILL PICKUP PICKUP PICKUP PICKUP TOTALS ITEM NO. 1,35 63 10 3,41 3,39 3,41 5,86 3,51 10 10 10 10 OATE FIXED FUEL,OIL, COSTS TIMES LABOR MACHINE LUB. , REP. OVER HOURS HOURS PER ACRE PER ACRE J U LY J U LY J U LY AUG AUG AUG AUG AUG AUG SEPT OCT NOV 0.475 1.00 0.712 0.0 0.371 1.00 0.100 0.10 0.125 0.639 2.00 0.958 2.00 1.759 1.173 0.479 0.319 1.00 0.064 1.00 0.097 1.00 0.179 0.269 0.10 0.125 0*100 0.100 0.10 0.125 0.10 0.125 0.100 0 . 1 0 ______ ______ 2.80 0.04 0.34 2.43 5.21 1.21 0.15 0.79 0.34 0.34 0.34 _____ 2.06 0.14 0.20 1.61 5.89 0.81 0.07 0.85 0.20 0.20 0.20 -0*20 4.898 3.720 14.31 12.44 LAND CHARGE LSES S25/A. (1/2 ANNUAL RENTAL) LESS 50 PERCENT OF I R R I G AT I O N FIXED COSTS. PROJECTED, 1976 RUDGET IDENTIFICATION NUMBER 811002402 220 0 ANNUAL CAPITAL MCNTH 12 -b- f^ ALFALFA, IRRIGATEC, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS ANU RETURNS PER ACRE TYPICAL MANAGEMENT UNIT GROSS RECEIPTS FRCM PRODUCTICN HAY TOTAL 2. VARIABLE CCSTS PREHARVEST FERT(0-8C^O) MACHINERY TRACTORS IRRIGATICN MACHINERY LABORITRACTOR _ MACHINERY) LABORMRRIGATIQN) INTEREST CN OP. CAP. SUBTOTAL, PRE-HARVEST / ^ PRICE CR C O S T / U N I T Q U A N T i r/ VALUE OR COST $ TON 40.00 .2k2*22 6.00 240.00 $ ACRE ACRE ACRE ACRE HOUR HOUR DOL. 24.00 2.69 0.15 21.12 2.75 2.75 0.10 1.00 1.00 1.00 1.00 1.10 2.95 19.13 24.00 2.69 0.15 21.12 3.02 8.12 1x21 $" 61.01 HARVEST COSTS SUBTOTAL, HARVEST $. $ 0.0 TOTAL VARIABLE CCST $ 61.01 3. INCCMjE ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS IRR IGATION MACHINERY PRORATED ESTAB. COST LAND INET RENT) TOTAL FIXED COSTS $ 178.99 $ ACRE ACRE ACRE ACRE ACRE 1.61 0.07 29.0 4 149.66 35.48 1.00 1.00 1.00 0.20 1.00 1.61 0.07 29.04 29.93 -__*__ $" 9 6 . 1 4 5. TOTAL COSTS $ 157.15 6. NET RETURNS 82.85 LANO CHARGE USES $50/A. LESS 50 PERCENT OF IRRIGATION FIXED COSTS. ESTABLISHMENT COSTS PRORATED OVER 5 YEARS. PROJECTED, 1976 -7ALFALFA, IRRIGATED, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION PICKUP F E R T. A P P L I , R E N T D PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP TOTALS ITEM NO. 10 5,86 10 10 10 10 10 10 10 DATE TIMES LABOR MACHINE OVER HCURS HOURS OCT MAR MAR APR MAY JUNE J U LY AUG SEPT 0.10 1.00 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.125 0.097 0.125 0.125 0.125 0.125 0.125 0.125 ^ ^ FIXED FUEL,OIL, LUB., REP. COSTS PER ACRE PER ACRE 0.34 0.15 0.34 0.34 0.34 0.34 0.34 0.34 _____ 0.20 0.07 0.20 0.20 0.20 . 0.20 0.20 0.20 -0*L22 0.100 0.064 0.100 0.100 0.100 0.100 0.100 0.100 _______ 1.097 0.864 2.84 1.69 -0*20 LAND CHARGE USES $50/A. LESS 50 PERCENT OF IRRIGATION FIXED COSTS. E S TA B L I S H M E N T C O S T S P R O R AT E D O V E R 5 Y E A R S . P R O J E C T E D , 1 9 7 6 , ^ \ B U D G E T I D E N T I F I C AT I O N N U M B E R 8 1 0 0 2 6 0 2 2 2 0 0 ANNUAL CAPITAL MONTH 9 -^^\. - 0 - # ^ ALFALFA ESTABLISHMENT, IRRIGATED, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER/ACRE HIGH LEVEL MANAGEMENT UNIT $ $ GRCSS RECEIPTS FROM PRODUCTION TOTAL 2. VARIABLE COSTS PREHARVEST SEED FERTI2C-80-0) MACHINERY TRACTORS IRRIGATION MACHINERY LABORITRACTOR _ MACHINERY) LABOR!IRRIGATION) INTEREST CN OP. CAP. SUBTOTAL, PRE-HARVEST #PN, VA L U E 0 COST PRICE OR C O S T / U N I T QUANTITY 0.0 $ LBS. ACRE ACRE ACRE ACRE HOUR HOUR DOL. 1.75 30.00 3.24 10.98 12.32 2.75 2.75 0.10 15.00 1.00 1.00 1.00 1.00 5.04 1.72 26.52 26.25 30.00 3.24 10.98 12.32 13.87 4.74 _*__ $ 104.05 HARVEST COSTS SUBTOTAL, HARVEST $ $ TOTAL VARIABLE COST $ 104.05 $-104.05 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 0.0 $ ACRE ACRE ACRE ACRE 6.13 6.51 16.94 16.54 1.00 1.00 1.00 1.00 6.13 6.51 16.94 _______ $ 46.12 5. TOTAL COSTS $ 150.17 6. NET RETURNS $-150.17 LAND CHARGE USES $25/A. (1/2 ANNUAL RENTAL) LESS 50 PERCENT OF IRRIGATION FIXED COSTS. PROJECTED, 1976 -9A L FA L FA E S TA B L I S H M E N T, I R R I G AT E D , T E X A S H I G H P L A I N S ESTIMATED COSTS ANO RETURNS PER/ACRE HIGH LEVEL MANAGEMENT OPERATION MBPLOW 4B CLOD BUSTER PICKUP TANOEM DISC FLOAT HARROW BORDER DISC F E R T. A P P L I , R E N T D CULTIPACKER GRAIN DRILL C U LT I PA C K E R PICKUP PICKUP PICKUP PICKUP ITEM NO. 1,35 63 10 3,47 3,39 5,61 3,41 5,86 5,73 3,51 5,73 10 10 10 10 DATE J U LY J U LY J U LY AUG AUG AUG AUG AUG AUG AUG AUG AUG SEPT OCT NOV TOTALS LAND CHARGE USES $25/A. FIXED COSTS. II RFGION FUEL,OIL, FIXED T I M E S L A B O R M A C H I N E L U B . , R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE L.OO 1.00 0.10 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 o.io 0.712 0.0 0.125 0.478 1.759 0.208 0.479 0.097 0.208 0.269 J.208 0.125 0.125 0.125 0.475 0.371 0.100 0.319 1.173 0.139 0.319 0.064 0.139 0.179 0.139 0. 100 0*100 0.100 .___.__ 2.80 0.04 0.34 1.33 5.21 0.33 1.21 0.15 0.3 3 0.79 0.33 0.34 0.34 0.34 -CL___ -2:22 5.044 3.816 14.22 12.64 0.10 0.10 0 . 1 0 .__L__. 2.06 0.14 0.20 1.18 5.89 0.21 0.81 0.07 0.21 0.85 0.21 0.20 0.20 0.20 ■/ ^ \ ( 1 / 2 A N N U A L R E N TA L ) L E S S 5 0 PERCENT OF I R R I G AT I O N PROJECTED, 1 9 7 6 B U D G E T I D E N T I F I C AT I O N N U M B E R 8 11 0 0 2 4 0 1 2 2 0 0 A N N U A L C A P I TA L M O N T H 1 2 ALFALFA, IRRIGATED, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT PRICE OR UNIT COST/UNIT QUANTITY 1. GRCSS RECEIPTS F^CM W*0DUCT1ON HAY TOTAL TON 40.00 8.00 .120*00 $~ 3 2 0 . 0 0 2. VARIABLE COSTS PREHARVEST FERTI C-12C-0) VALUE OR COST $ $" 36.00 2.69 0.15 29.92 3.02 11 . 5 0 ____ 85.88 HARVEST COSTS SUBTOTAL., HARVEST $ $ 0.0 TOTAL VARIABLE CCST $ 85.88 MACHINERY TRACTORS IRRIGATION HACHMERY LABORITRACTOR £ MACHINERY) LABOR! IRR IGATION) INTEREST CN CfV CAP. SUBTOTAL, Wl€-HARV_ST AC#E ACRE ACRE ACRE HOUR HOUR DOL* 36.00 2.69 0.15 29.92 2.75 2.75 0.10 1.00 1.00 1.00 1.00 1.10 4.18 26.01 3. INCCME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATED ESTAB. COST LAND (NET RENT) TOTAL FIXED COSTS $ 234.12 $ ACRE ACRE ACRE ACRE ACRE 1.61 0.07 41.14 150.17 29.43 1.61 0.07 41.14 21.47 1.00 1.00 1.00 0.14 1.00 ._-2___ $" 93.73 5. TOTAL COSTS $ 179.61 6. NET RETURNS $ 140.39 LAND CHARGE USES $50/A. LESS 50 PERCENT OF IRRIGATION FIXED COSTS. ESTABLISHMENT COSTS PRORATED OVER 7 YEARS. PROJECTED, 1976 ^~*\ -IIALFAIFA, IRRIGATED, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION PICKUP F E R T. A P P L I , R E N T D PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP TOTALS ITEM NO. 10 5,86 10 10 10 10 10 10 10 ^ DATE FIXED FUEL,OIL, TIMES LABOR MACHINE LUB. , REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE OCT MAR MAR. APR MAY JUNE J U LY AUG SEPT 0. 100 0.10 0.125 1.00 0.097 0.064 0.10 0.125 0.100 0.10 0.125 0.100 0.10 0.125 0.100 0.10 0.125 0.100 O.IO 0.125 0.100 0.10 0.125 0.100 O.LO _ _ _ _ _ _ _ _ _ _ _ _ 1.097 0.864 0.34 0.15 0.34 0.34 0.34 0.34 0.34 0.34 _____ -2:22 2.84 1.69 \ 0.20 0.07 0.20 0.20 0.20 0.20 0.20 0.20 LAND CHARGE LSES $50/A. LESS 50 PERCENT OF IRRIGATION FIXED COSTS. E S TA B L I S H M E N T C O S T S P R O R AT E D O V E R 7 Y E A R S . P R O J E C T E D , 1 9 7 6 /**% B U D G E T I D E N T I F I C AT I O N N U M B E R 8 1 0 0 2 9 0 1 2 2 0 0 ANNUAL CAPITAL MONTH 9 ^^S -12CORN FOR GRAIN, IRRIGATED, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PEP ACRE TYPICAL MANAGEMENT UNIT 1. GROSS RECEIPTS FROM PRtJDUCTICN CORN TOTAL 2. VARIABLE COSTS PREHARVEST SEED FERTI 150-60-0) HERB, POSTEMERGE INSECTICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOU _ MACHINERY) LABOR! IRRIGATION) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL CUSTOH DRYING SUBTOTAL, HARVEST $ BU. 2.70 130.00 LBS. ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL* 0.95 46.20 6.75 10.00 5.63 10.90 19.36 2.75 2.75 0.10 0.17 0 . 11 0.10 130.00 130.00 130.00 23.75 46.20 6.75 10.00 5.63 10.90 19.36 15.07 12.10 6x_2 $ 156.18 $ BU. BU. BU. 22.10 14.30 -_l_x__ $ 205.58 $ 145.41 3. INCOME ABOVE VARIABLE COSTS MACHINERY TRACTORS IRRIGATION IACH INERT LAND tNET Rl (NT* TOTAL FIXED C ISTS .__lxQ_ $" 3 5 1 . 0 0 $ 25.00 1.00 1.00 1.00 1.00 1.00 1.00 5.48 4*40 64.24 TOTAL VARIABLE COST 4. FIXEO COSTS VALUE OR COST PRICE OR COST /UN IT QUANTITY ACRE ACRE ACRE ACRE 7.76 6.54 Z6.62 78.26 1.00 1.00 1.00 1.00 7.76 6.54 26.62 __iax2_ $ 119.19 5. TOTAL COSTS $ 324.77 6. NET RETURNS $ 26.23 LAND (NET RENT) BAS60 ON LANDLORDS SHARE OF 1/3 OF GROSS INCOME LESS 1/3 OF FERTILIZER, HftUUNG* DRYING, PROJECTED, 1976 AND 50* OF FIXEO IRRIGATION COSTS. / ^ -13- CORN FOR GRAIN, IRRIGATFO, TFXAS HIGH PLAINS I! REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION SHREDDER 4P TANDEM OISC TANDEM DISC PICKUP CHISEL PICKUP PICKUP OFFSET DISC TANDEM DISC PICKUP FLOAT HARROW LISTER, 6-R PICKUP LISTER, 6-R FLEX PLANTER 6R HERB SPRAYER ROD WEEDER PICKUP R O L L I G C U LT I 6 R ) TOOL BAR, 6--ROW PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP TOTALS ITEM NO. 1,53 47 3,47 10 1,37 10 10 1,49 3,47 10 3,39 3,61 lt71 10 lt71 43 67 3,55 10 3,31 3 ,69 10 10 10 10 10 10 DATE FIXED FUFL,OIL, COSTS TIMES LABOR 1MACHINE L U B . , R E P. PER ACRE PER ACRE OVER HCURS HOURS NOV NOV NOV NOV DEC DEC JAN FEB FEB FEB MAR MAR MAR MAR APR APR APR APR APR MAY MAY MAY JUNE J U LY AUG SEPT OCT 1.00 1.00 1.00 0.10 1.00 0.10 0.10 1.00 1.00 0.10 2.00 1.00 1.00 0.10 1.00 1.00 1.00 1.00 0.10 1.00 1.00 0.10 0.10 O.LO 0.10 O.LO O.LO ___12_ 0.160 0.159 0.159 0.100 0.193 0.100 0.100 0.159 0.L59 0.100 1.173 0.139 0."098 0.100 0.098 0.154 0.121 0.098 0.100 0*121 0.098 0.100 0. ICO 0.100 0.100 0.100 ______ 0.95 0.07 0.67 0.34 1.04 0.34 0.34 0.92 0.67 0.34 5.21 0.53 0.52 0.34 0.52 0.06 0.02 0.38 0.34 0.56 0.37 0.34 0.34 0.34 0.34 0.34 _____ -0*22 5.481 4.288 16.53 14.30 0.239 0.0 0.239 0.125 0.290 0.125 0.125 0.239 0.239 0.125 1.759 0.208 0.146 0.125 0.146 0.0 0.0 0.146 0.L25 0.181 0.146 0.125 0.125 0.125 0.125 0.125 0.83 0.23 0.59 0.20 0.72 0.20 0.20 0.79 0.59 0.20 5.89 0.37 0.36 0.20 0.36 0 . 11 0.06 0.26 0.20 0.48 0.24 0.20 0.20 0.20 0.20 0.20 /**% ^**% LAND (NET RENT) BASED ON LANDLORD'S SHARE OF L/3 OF GROSS INCOME LESS 1/3 OF FERTILIZER, HAULING, DRYING, A N D 5 0 * O F F I X E O I R R I G AT I O N C O S T S . P R O J E C T E D * 1 9 7 6 B U D G E T I D E N T I F I C AT I O N N U M B E R 7 2 0 0 2 6 0 2 2 2 0 0 ANNUAL CAPITAL MONTH 10 >=~^ -14C C R N F O R G R A I N , I R R I G AT E D , T E X A S H I G H P L A I N S I I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT 1. GROSS RECEIPTS FRCM PRODUCTION CORN TOTAL 2. VARIABLE COSTS PREHARVEST SEED FERT! 180-60-0) INSECTICIDE HERBICIDE MACHINERY TRACTORS IRRIGATICN MACHINERY LABORITRACTOR € MACHINERY) LABOR!IRRIGATION) INTEREST CN OP. CAP. $ BU. LBS. ACRE ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. 2.70 0.95 51.00 10.00 6.75 5.63 10.71 21.12 2.75 2.75 0.10 150.00 25.00 1.00 1.00 1.00 1.00 1.00 1.00 5.48 2.95 67.37 S U B TO TA L , P R E - H A RV E S T HARVEST COSTS CUSTCM COMBINE CUSTOM HAUL CLSTOM DRYING SUBTOTAL, HARVEST ____x_Q $ 405.00 23.75 51.00 10.00 6.75 5.63 10.71 21.12 15.07 8.12 .___xl_. $ " 158.88 $ BU. BU. BU. 0.17 0 . 11 0.10 150.00 150.00 150.00 25.50 16.50 ._l_x__ $ 57.00 $ 215.88 TOTAL VARIABLE COST $ 189.12 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS I R R I G AT I O N M A C H I N E RY LAND (NET RENT) TOTAL FIXED COSTS VALUE OR COST PRICE OR C O S T / U N I T QUANTITY $ ACRE ACRE ACRE ACRE 7.76 6.38 29.04 91.90 1.00 1.00 1.00 1.00 7.76 6.38 29.04 -_-_X__ $' 135.09 5 . TO TA L C O S T S $ 350.97 NET RETURNS 54.03 LAND (NET RENT) BASED ON LANDLORD'S SHARE LESS 1/3 OF FERTILIZER, HAULING, DRYING, A N D 5 0 * O F F I X E D I R R I G AT I C N C C S T S . OF 1/3 OF GROSS INCOME PROJECTED, 1976 -15C C R N F O R G R A I N , I R R I G AT E D , T E X A S H I G H P L A I N S ESTIMATED CCSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION SHREDDER 4R TANDEM DISC TANDEM DISC PICKUP CHISFL PICKUP PICKUP OFFSET DISC TANDEM OISC PICKUP FLOAT HARROW LISTER, 6-R PICKUP ROD WEEDER LISTER, 6-R HERB SPRAYER FLEX PLANTER 6R PICKUP R O L L I G C U LT I 6 R ) TOOL BAR, 6-.R0W PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP TOTALS ITEM NO. It 53 47 3,47 10 1*37 10 10 1,49 3,47 10 3,39 5,61 1» 71 10 3,55 1,71 67 43 10 3t31 3,69 10 10 10 10 10 10 II REGION ^ D AT E FIXED FUEL,OIL, COSTS TIMES LABOR MACHINE LUB. t REP. OVER HOURS HCURS PER ACRE PER ACRE NOV NOV NOV NOV DEC DEC JAN FEB FEB FEB MAR MAR MAR MAR APR APR APR APR APR MAY MAY MAY JUNE J U LY AUG SEPT OCT 1.00 0.239 0.160 0 . 0 0.159 1.00 1.00 0.239 0.159 0.100 0.10 0.125 1.00 0.290 0.193 0.10 0.125 0.100 0.10 0.125 0.100 1.00 0.239 0.159 1.00 0.239 0.159 0.100 0.10 0.125 1.759 I.173 2.00 1.00 0.208 0.139 0.-98 L.OO 0.146 0.10 0.125 0.100 0.098 L.OO 0 . 1 4 6 1.00 0.146 0.098 0.0 0.121 1.00 L.OO 0.0 0.154 O.LO 0.125 0.100 0 . 1 8 1 0 .L21 1.00 0 .098 1.00 0.L46 0.10 0.125 0.100 0. 100 0.10 0.125 0.100 O.LO 0.125 O.LO 0.125 0.100 O.LO 0.100 0.125 O.LO _ _ x U _ _ _ _ _ _ _ 0.95 0.07 0.67 0.34 1.04 0.34 0.34 0.92 0.67 0.34 5.21 0.33 0.52 0.34 0.38 0.52 0.02 0.06 0.34 0.56 0.37 0.34 0.34 0.34 0.34 0.34 ______ -2:22 5.481 16.33 14.L4 4.288 0.83 0.23 0.59 0.20 0.72 0.20 0.20 0.79 0.59 0.20 5.89 0.21 0.36 0.20 0.26 0.36 0.06 O.ll 0.20 0.48 0.24 0.20 0.20 0.20 0.20 0.20 ^~% LAND (NET RENT! BASED ON LANDLORD'S SHARE OF 1/3 OF GROSS INCOME LESS 1/3 OF FERTILIZER, HAULING, DRYING, PROJECTED, 1976 A N D 5 0 * O F F I X E D I R R I G AT I O N C C S T S . B U D G E T I D E N T I F I C AT I O N N U M B E R 7 2 0 0 2 6 0 1 2 2 0 0 A N N U A L C A P I TA L M O N T H 1 0 ^~ik -16- f^ CORN FOR SILAGE, IRRIGATED, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS ANO RETURNS PER ACRE TYPICAL MANAGEMENT UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST 1. GROSS RECEIPTS FROM PRODUCTION CORN SILAGE TOTAL TON 17.00 18.00 _______ $ 306.00 2. VARIABLE COSTS PREHARVEST SEED FERTI 180-60-0) HERBICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABORITRACTOR - MACHINERY) LAB OR (IRRIGATION) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST LBS. ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. 0.75 51.00 6.75 5.29 10.90 19.36 2.75 2.75 0.10 25.00 1.00 1.00 1.00 1.00 1.00 5.36 4.40 50.20 18.75 51.00 6.75 5.29 10.90 19.36 14.73 12.10 5xQ2 i 143.90 HARVEST COSTS SUBTOTAL, HARVEST $ TOTAL VARIABLE COST $ 143.90 0.0 3. INCOME ABOVE VARIABLE COSTS $ 162.10 4. FIXED COSTS $ MACHINERY TRACTORS IRRIGATION MACHINERY LANO «NET RENT) TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 7.56 6.54 26.62 70.84 1.00 1.00 1.00 1.00 7.56 6.54 26.62 __I_xfi_ $ 111.56 5. TOTAL COSTS $ 255.46 6. NET RETURNS $ 50.54 LANO INET RENT) BASED ON LANDLORD'S SHARE OF 1/3 OF GROSS INCOME LESS 1/3 OF FERTILIZER AND 50* OF FIXED IRRIGATION COSTS. CROP SOLD S TA N D I N G IN FIELD. PROJECTED, 1976 -17- C O R N F O R S I L A G E , I R R I G AT E D , T E X A S H I G H P L A I N S I I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION NO. DATE FIXED FUFL,OIL, TIMES LABOR MACHINE LUB., REP. COSTS OVER HCURS HOURS PER ACRE PER ACRE SHREDDER 4R TANDEM OISC TANOEM DISC PICKUP CHISEL PICKUP PICKUP OFFSET DISC TANDEM DISC PICKUP FLOAT HARROW LISTER, 6-R PICKUP ROD WEEDER LISTER, 6-R FLEX PLANTER 6R HERB SPRAYER PTCKUP ROLL IG CULT!6R) TOOL BAR, 6-ROW PTCKUP PICKUP PICKUP PICKUP PICKUP 1,53 NOV NOV NOV NOV DEC DEC JAN FEB FEB FEB MAR MAR MAR MAR APR APR APR APR APR MAY MAY MAY JUNE JULY AUG SEPT 1 . 0 0 0.2 39 0 . 1 6 0 1.00 0 . 0 0.159 1.00 0.239 0.159 0.10 0.125 0.100 1.00 0.290 0.193 0.10 0.125 0.100 O.LO 0 . 1 2 5 0 . 1 0 0 1.00 0.239 0.159 L.OO 0 . 2 3 9 0. 159 O.LO 0 . 1 2 5 0 . 1 0 0 2.00 1.759 I.173 1.00 0 . 2 0 8 0.139 1.00 0.146 0.098 0.10 0.125 0.100 1.00 0.146 0.098 1.00 0.146 0.098 1.00 0 . 0 0. 154 1.00 0 . 0 0.121 0.10 0.125 0.100 L.OO 0 . 1 8 1 0.121 1.00 0 . 1 4 6 0.098 0.10 0.125 0.100 0.10 0.125 0.100 0.10 0.125 0.100 O.LO 0 . 1 2 5 0 . 1 0 0 O.LO -2:1Z2 . _ _ ! _ _ -_x__ 0.83 0.23 0.59 0.20 0^72 0.20 0.20 0.79 0.59 0.20 5.89 0.37 0.36 0.20 0.26 0.36 0 . 11 0.06 0.20 0.48 0.24 0.20 0.20 0.20 0.20 _____ 5.356 16.19 14. LO ITEM TO TA L S 47 3,47 10 1*37 10 10 1,49 3,47 10 3,39 3,61 1,71 10 3,55 It 71 43 67 10 3,31 3,69 10 10 10 10 10 4.188 0.95 0.07 0.67 0.34 1.04 0.34 0.34 0.92 0.67 0.34 5.21 0.53 0.52 0.34 0.38 0.52 0. 06 0.02 0.34 0.56 0.37 0.34 0-34 0.34 0.34 /*~% /"*% LAND (NET RENT) BASED ON LANDLORD'S SHARE OF L/3 OF GROSS INCOME LESS 1/3 OF FERTILIZER AND 50* OF FIXED IRRIGATION COSTS. CROP SOLD S TA N D I N G IN FIELD. PROJECTED, 1976 B U D G E T I D E N T I F I C AT I O N N U M B E R 7 2 3 0 0 2 6 0 2 2 2 0 0 ANNUAL CAPITAL MONTH 9 ^ \ -18 CORN FOR SILAGE, IRRIGATED, TEXAS HIGH PLAINS I! REGION ESTIMATED COSTS ANO RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION CORN SILAGE TOTAL 2. VARIABLE COSTS PREHARVEST SEED FERTI 200-60-0) HERBICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABORITRACTOR £ MACHINERY) LABOR!IRRIGATION) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST VALUE OR COST PRICE OR COST/UNIT QUANTITY TON 17.00 24.00 ____*__ $ 408.00 LBS. ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. 0.75 54.20 6.75 5.29 10.90 21.12 2.75 2.75 0.10 30.00 1.00 1.00 1.00 1.00 1.00 5.36 4.80 53.66 22.50 54.20 6.75 5.29 10.90 21.12 14.73 13.20 HARVEST COSTS —2*11 154.06 $ SUBTOTAL, HARVEST 0.0 $ 154.06 TOTAL VARIABLE COST 3. INCOME ABOVE VARIABLE COSTS $ 253.94 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LANO (NET RENT) TOTAL FIXED COSTS % ACRE ACRE ACRE ACRE 7.56 6.54 29.04 102.23 1.00 1.00 1.00 1.00 7.56 6.54 29.04 __Q2x23 $ 145.38 5. TOTAL COSTS $ 299.43 6. NET RETURNS $ 108.57 LAND (NET RENT) BASED ON LANDLORD'S SHARE OF 1/3 OF GROSS INCOME LESS 1/3 OF FERTILIZER ANO 50* OF FIXED IRRIGATION COSTS. CROP SOLD S TA N O I N G IN FIELD. PROJECTED, 1976 -19CORN FOR SILAGE, IRRIGATED, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION ITEM NO. DATE FUEL,OIL, FIXED TIMES LABOR MACHINE LUB.,REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE SHREDDER 4R 1,53 NOV 1.00 0.239 TA N D E M DISC 47 NOV L.OO 0.0 TA N D E M D I S C 3 , 4 7 N O V 1 . 0 0 0 . 2 3 9 PICKUP 10 NOV 0.10 0.125 CHISEL 1,37 DEC 1.00 0.290 PICKUP 10 DEC 0.10 0.125 PICKUP 10 JAN 0.10 0.125 OFFSET DISC 1,49 FEB 1.00 0.239 TA N D E M D I S C 3 , 4 7 F E B 1 . 0 0 0 . 2 3 9 PTCKUP 10 FEB 0.10 0.125 F L O AT 3,39 MAR 2.00 1.759 HARROW 3,61 MAR 1.00 0.208 LISTER, 6-R 1,71 MAR 1.00 0.146 PICKUP 10 MAR 0.10 0.125 ROD WEEDER 3,55 APR 1.00 0.146 LISTER, 6-R 1,71 APR 1.00 0.146 FLEX PLANTER 6R 43 APR 1.00 0.0 HERB S P R AY E R 67 APR L.OO 0.0 PICKUP 10 APR 0.10 0.125 R O L L I G C U LT I 6 R ) 3 , 3 1 M AY 1 . 0 0 0 . 1 8 1 T O O L B A R , 6 - R O W 3 , 6 9 M AY 1 . 0 0 0 . 1 4 6 PICKUP 10 M AY 0.10 0.125 PICKUP 10 JUNE 0.10 0.125 PICKUP 10 J U LY 0.10 0.125 PICKUP 10 AUG 0.10 0.125 PICKUP 10 SEPT 0.10 .Q4.12S TOTAL S ^~% 0.160 0.L59 0.159 0.100 0.193 0.100 0.100 0.159 0.159 0.100 1.173 0.139 0.098 0.100 0.098 0.098 0.154 0.L21 0.100 0.121 0.098 0.100 0.100 0.100 0.100 0*L00 0.95 0.07 0.67 0.34 1.04 0.34 0.34 0.92 0.67 0.34 5.21 0.53 0.52 0.34 0.38 0.52 0.06 0.02 0.34 0.56 0.37 0.34 0.34 0.34 0.34 _____ .2:Z2 5.356 4.188 16.19 14.10 0.83 0.23 0.59 0.20 0.72 0.20 0.20 0.79 0.59 0.20 5.89 0.37 0.36 0.20 0.26 0.36 0 . 11 0.06 0.20 0.48 0.24 0.20 0.20 0.20 0.20 /"~V LAND (NET RENT) BASED ON LANDLORD'S SHARE OF 1/3 OF GROSS INCOME LFSS 1/3 OF FERTILIZER AND 50* OF FIXED IRRIGATION COSTS. CROP SOLD S TA N D I N G IN FIELD. PROJECTED, 1976 BUDGET IDENTIFICATION NUMBER- - 7 2 3 0 0 2 6 0 1 2 2 0 0 ANNUAL CAPITAL MONTH 9 ^ X -C\J- COTTCN, DRYLANO, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS ANO RETURNS PER ACRE TYPICAL MANAGEMENT UNIT I . GROSS RECEIPTS FROM PRODUCTION C O T TO N L I N T COTTCNSEFD TOTAL 2 . VARIABLE COSTS PREHARVEST SEED HERtiIC IDE HALL INSURANCE MACHINERY TRACTORS LABORITRACTOR 6 MACHINERY) OTHER LABOR I N T E R E S T O N O P. C A P. S U B TO TA L , P R E - H A RV E S T HARVEST COSTS STRIP _ HAUL GIN, BAG, TIES SUBTOTAL, HARVEST 3. VALUE COR COST PRICE OR C O S T / U N I T QUANTITY $ LBS. TCN 0.40 90.00 150.00 0.12 60.00 ._l_x__ 70.30 LBS. PINT DOL. ACRE ACRE HOUR HOUR DOL. 0.35 7.00 0.12 3.76 4.33 2.75 2.25 0.10 15.00 1.00 30.00 1.00 1.00 2.53 2.00 14.97 5.25 7.00 3.60 3.76 4.33 6.97 4.50 L:2Q 36.91 $ CWT. C W T. 1.00 1.25 7.00 7.00 7.00 2*12 $ 15.75 TO TA L VA R I A B L E C O S T % 52.66 INCOMF ABOVE VARIABLE COSTS $ 18.14 4 . FIXED COSTS MACHINERY TRACTORS LAND !NET RENT) TOTAL FIXED COSTS $ ACRE ACRE ACRE 3.64 2.50 15.51 3.64 2.50 _-l_X_i 21.65 1.00 1.00 1.00 5 . TOTAL COSTS $ 74.31 6 . NET RETURNS $ -3.51 LAND CHARGE BASED ON LANOLORD SHARE 11/4) OF GROSS, LESS 1/4 OF GINNING. PROJECTED, 1976 -21COTTON, DRYLANO, TEXAS HIGH PLAINS II REGICN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION TANDEM DISC SHREDDER 4R PICKUP PICKUP CHISEL PICKUP 1 ISTER, 6-R PICKUP R O L L I G C U LT ( 6 R ) PICKUP LISTER-PLANTER PICKUP SANDFIGHTER R O L L I G C U LT I 6 R ) PICKUP P ICKUP PICKUP TOTALS ITEM NO. 1,47 53 10 10 lt37 10 l t 7 l 10 3,31 10 1,45 10 5,57 3,31 10 10 10 OATE TIMES LABOR MACHINE OVER HCURS HOURS DEC DEC OEC JAN FEB FEB MAR MAR APR APR MAY MAY JUNE JUNE JUNE J U LY OCT 1.00 0.159 0.239 1.00 0 . 0 0.160 0.10 0.125 0.100 0.10 0.125 0.100 1.00 0.290 0.193 0. 100 0.10 0.125 1.00 0.146 0.098 O.LOO 0.10 0.125 0.121 1.00 0.181 0.10 0.125 0.100 1.25 0.289 0.192 0.10 0.125 0.100 0.056 1.00 0.033 1.00 0.131 0.121 0.10 0.125 0.100 0.10 0.L25 0.100 0 . 1 0 _ _ _ _ _ _ ___.__._ 2.534 1.999 ^ X FIXED FUEL,OIL, LUB. , REP. COSTS PER ACRE PER ACRE 0.89 0.13 0.34 0.34 1.04 0.34 0.52 0.34 0.56 0.34 1.22 0.34 0.L4 0.56 0.34 0.34 _____ 0.69 0.36 0.20 0.20 0.72 0.20 0.36 0.20 0.48 0.20 1.12 0.20 0.09 0.48 0.20 0.20 -0*20 8.09 6.14 ^ * \ LAND CHARGE BASED ON LANDLORD SHARE (1/4) OF GROSS, LESS 1/4 OF GINNING. PROJECTED, 1976 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 0 0 2 0 0 2 2 0 0 0 ANNUAL CAPITAL MONTH 11 .>*^ -22- / ^ COTTON, DRYLAND, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT VALUE OR COST PRICE OR UNIT COST/UNIT QUANTITY GROSS RECEIPTS FROM PRODUCTICN COTTON LINT COTTONSEED TOTAL LBS. TON 0.40 90.00 200.00 0.16 2. VARIABLE COSTS PREHARVEST SEED FERT! 30-0-0) HERBICIDE HAIL INSURANCE MACHINERY TRACTORS LABORITRACTOR & MACHINERY) OTHER LABOR INTEREST CN OP. CAP. SUBTOTAL, PRE-HARVEST LBS. ACRE PINT DOL. ACRE ACRE HOUR HOUR DOL. 0.35 4.80 7.00 0.12 3.76 4.33 2.75 2.2 5 0.10 15.00 1.00 1.00 35.00 1.00 1.00 2.5 3 2.00 17.57 HARVEST COSTS STRIP £ HAUL GIN, BAG, TIES SUBTCTAL, HARVEST C W T. C W T. L.OO 1.25 9.00 9.00 30.00 -iftx__ $ 94.40 $ 5.25 4.80 7.00 4.20 3.76 4.33 6.97 4.50 __lxl_ 42.57 $ 9.00 -LL*22 20.25 % 62.82 3. INCCME ABOVE VARIABLE COSTS $ 31.58 4. FIXED COSTS MACHINERY TRACTORS LAND !NET RENT) TOTAL FIXED COSTS $ TOTAL VARIABLE COST ACRE ACRE ACRE 3.64 2.50 20.79 3.64 2.50 1.00 1.00 1.00 .-20*13. 26.93 5. TOTAL COSTS $ 89.75 6. NET RETURNS $ 4.65 LAND CHARGE BASED ON LANDLORD SHARE !l/4) CF GRCSS, LESS 1/4 OF GINNING. PROJECTED, 1976 -23COTTON, DRYLAND, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UPERAT ION SHREDDER 4R TANDEM DISC PICKUP PICKUP CHISEL PICKUP LISTER, 6-R PICKUP R O L L I G C U LT I 6 R ) PICKUP LISTER-PLANTER PICKUP SANDFIGHTER R O L L I G C U LT ( 6 R ) PICKUP PICKUP P I C K U P. TOTALS ITEM NO. 1,53 47 10 10 1,37 10 lt71 10 3,31 10 1,45 10 5,57 3,31 10 10 10 ^*% FIXEO FUEL,OIL, LUB., RE P. COSTS PER ACRE PER ACRE DATE TIMES LABOR MACHINE OVER HOURS HOURS DEC DEC DEC JAN FEB FEB MAR MAR APR APR MAY MAY JUNE JUNE JUNE AUG OCT 1.00 0.239 0.160 1.00 0 . 0 0.159 O.LO 0. 100 0.125 O.LO 0.125 0.100 1.00 0.290 0. 193 0.10 0.125 0.100 1.00 0.146 0.098 0.10 0.125 0.100 0 . 1 8 1 1.00 0.121 0.10 0.125 0.100 1.25 0.289 0.192 0.10 0.125 0.100 1.00 0.083 0.056 1.00 0.181 0.121 0.10 0.125 0.100 0.10 0. ICO 0.125 0.10 __xl__ ___!__ 0.95 0.07 0. 34 0.34 1.04 0.34 0.52 0.34 0.56 0.34 1.22 0.34 0.14 0.56 0.34 0.34 ______ ___2_ 2.535 1.999 8.10 6.14 0.83 0.23 0.20 0.20 0.72 0.20 0.36 0.20 0.48 0.20 1.12 0.20 0.09 0.48 0.20 0.20 LAND CHARGE BASED ON LANDLORD SHARE (1/4) CF GROSS, LESS 1/4 OF GINNING. PROJECTED, 1976 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 0 0 2 0 0 1 2 0 0 0 ANNUAL CAPITAL MONTH 11 _/--^