The enterprise budgets for Texas El Paso Re
gion are based on estimates of yields, production
input quantities, and production practices which
represent the best judgment of local producers,
county Extension agents-agriculture, financial in
stitution representatives, farm machinery dealers
and others knowledgeable of the area. Variation
in yields, production inputs and production prac
tices should be expected for particular farms.
Budgets for all major crops produced in the
area are included for two levels of management,
when applicable. Crop yields are directly related
to levels of management. These differences are
due largely to timing of operational practices which
may not be evident in the budgets.
The machinery inventory is applicable to both
r
typical and high level management. In some bud
gets custom rates, primarily harvesting, were used
in lieu of the assumption that harvesting equip
ment was owned.
Budgets for establishing permanent type pasture
grasses were prepared and used for prorating estab
lishment costs in the respective pasture and hay
budgets. Forage crops include expenses only be
cause it is expected that the income will be derived
from livestock enterprises.
Land charges were based on customary land
lord's crop share less his proportionate share of
certain production and harvesting inputs. A per
acre land charge was made using a fair market
value times an interest rate when crop share was
not used.
TEXAS EL PASO REGION
Assumed Prices Paid and Received by Farmers ]_/
I tern
Unit
Price
cwt.
cwt.
cwt.
cwt.
cwt.
cwt.
cwt.
$1 10.00
12.00
70.00
28.00
28.00
43.00
15.00
Prices paid (1976)
Seed
Alfalfa
Barley
Corn
Cotton-Pima
Cotton-Up land
Grain Sorghum
Wheat
Custom rates
Cotton (harvest and haul)-Pima
Cotton (harvest and haul)-Upland
Cotton (ginning, bags & ties)-Pima
Cotton (ginning, bags & ties)-Upland
Grain (harvest and haul)
Hay (hau1 Ing)
Fertilizer application
lb. lint
lb. lint
bale
bale
cwt.
.09
.07
34.50
28.50
.57
ton
acre
7.00
1.30
Fuel and lubricants
Gasoline
Diesel
gal .
gal .
.40
.36
Ferti Iizer (buIk)
Nitrogen (granular)
Phosphorus
lb.
lb.
.21
Labor
Labor
hour
2.50
ton
bu.
ton
lb.
lb.
ton
cwt,
lb.
bu.
55.00
2.00
12.00
.80
.40
10.00
4.50
.15
4.00
. 18
Prices received (1976)
J
Alfalfa
Barley
C o r n S i l a g e ( s t a n d i n g i n t h e fi e l d )
Cotton-Pima
Cotton-Upland
Cottonseed
Grain Sorghum
Grazing (gain)
Wheat *
_/ These price assumptions are not to be interpreted as predictions or
prospective prices.
TEXAS EL PASO REGION
Estimated Machinery and Equipment Cost Per Hour of
Machinery
Item and Size
Tractor - 115 HP
Tractor - 100 HP
Tractor - 50 HP
Tractor - 45 HP
Pickup - 1/2 ton
Swather S.P. - 14 feet
Shredder - 13 feet
Shredder - 6 feet
Offset disc - 12 feet
Offset disc - 9 feet
Plow 4B - 5.3 feet
Plow 3B - 4 feet
Float - 12 feet
Lister 4R - 12 feet
Roller cultivator - 20 feet
Roller cultivator - 12 feet
Bed planter - 12 feet
Spray rig - 12 feet
Border disc - 50 feet
Cultivator - 12 feet
Rotovator - 12 feet
Grain drill - 14 feet
Baler - 14 feet
Baler - 10 feet
Swather - 10 feet
Purchase
Price
$13,500
10,500
4,000
3,600
5,100
11,000
1,300
400
2,200
1,350
1,500
1,000
1,320
550
1,900
1,350
1,450
400
275
950
2,750
1,450
6,000
4,400
6,600
Estimated
Years of Use
6
8
15
15
4
6
8
8
8
10
8
10
10
8
8
8
10
10
10
10
10
10
5
6
5
Estimated
Hours of Use
5400
9600
10500
7500
2800
900
1000
1000
1600
2000
2000
2000
1200
1200
1680
1200
1800
760
800
1200
2000
500
1500
1200
1000
Fixed Costs
Per Hour
$ 2.69
1.40
.70
.89
2.15
14.05
1.77
.54
1.86
1.03
1.01
.76
.73
.25
1.53
1.51
.53
.79
.22
1.20
2.09
1.91
4.30
4.31
6.32
Variable Costs
Per Hour
$ 4.72
3.05
1.99
1.88
3.23
12.97
.74
.23
.70
.34
•65
.43
.51
.30
1.01
.98
.52
.27
.18
.52
1.19
1.47
2.96
2.71
5.72
i
?
-3ALFALFA ESTABLISHMENT, IRRIGATEC, TEXAS EL PASO REGION
ESTIMATED COSTS AND RETURNS PER ACRE
TYPICAL MANAGEMENT
UNIT
VALUE OR
COST
PRICE PR
COST/UNIT QUANTITY
1. GROSS RECEIPTS FROM PRODUCTION
TOTAL
, VARIABLE COSTS
PREHARVEST
SFED
FERTC0-80-0)
FERTILIZER APPLI
OTHER IRIG LABOR
MATER CHARGE
DISTRI SYSTM COS
MACHINERY
TRACTORS
IRRIGATION MACHINERY
LABCRITRACTOR £ MACHINERY)
L A B O R ( I R R I G AT I O N )
I N T E R E S T C N O P. C A P.
SUBTOTAL, PRE-HARVEST
0.0
CWT,
ACRE
ACRE
HOUR
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
11 0 . 0 0
14.40
1.30
2.50
28.00
10.00
3.10
8.40
7.85
2.50
2.50
0.09
0.40
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.95
1.00
46.42
$
44.00
14.40
1.30
2.50
28.00
10.00
3.10
8.40
7.85
9.88
2.50
4.*4.1
136.35
HARVEST COSTS
SUBTOTAL, HARVEST
$
TOTAL VARIABLE COST
$ 136.35
0.0
$ -• 1 3 6 . 3 5
3. INCOME ABOVE VARIABLE COSTS
$
4. FIXED COSTS
MACHINERY
TRACTORS
IRRIGATION MACHINERY
LAND (NET RENT)
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
4.49
3.85
6.20
800.00
1.00
1.00
I.00
0.08
4.49
3.85
6.20
$"
78.55
5. TOTAL COSTS
$ 214.89
6. NET RETURNS
* -- 2 1 4 . 8 9
LAND AND WATER CHARGE BASED ON SINGLE CROPPING.
IRRIGATION FROM BOTH WELL AND FROM WATER DISTRICT
PLANTED FALL.
PROJECTED, 1976
-4-
A L FA L FA E S TA B L I S H M E N T, I R R I G AT E D , T E X A S E L PA S O R E G I O N
ESTIMATED COSTS AND RETURNS PER ACRE
TYPICAL MANAGEMENT
OPERATION
PICKUP
PICKUP
SHREDER OFFSET DISC
PLOW 3B
OFFSET DISC
FLOAT
BORDER DISC
GRAIN DRILL
PICKUP
PICKUP
P I CK UP
PICKUP
ITEM
NO.
10
10
2,32
2,34
2,36
2,34
2,37
2,47
4,53
10
10
10
10
DATE
FUEL,OIL,
FIXED
TIMES LABOR MACHINE L U B . , R E P.
COSTS
OVER
HOURS
HOURS
PER ACRE PER ACRE
JAN
AUG
SEPT
SEPT
SEPT
SEPT
SEPT
SEPT
SEPT
SEPT
OCT
NOV
DEC
0.10
0.10
1.00
1.00
1.00
1.00
2.00
1.00
1.00
0.10
0.10
0.10
0.10
TOTALS
0.125
0.125
0.477
0 . 3 11
0.849
0 . 3 11
0.924
0.0 57
0.276
0.125
0.125
0.125
0.100
0. 100
0.354
0.230
0.629
0.230
0.684
0.042
0.205
0.100
0.100
0.100
0.21
0.21
0.78
0.62
1.53
0.62
2.29
0.09
1.12
0.21
0.21
0.21
-SUI25
_fl*iaa
-a«.22
-Q-.21
3.954
2.973
11 . 5 0
8.35
LAND AND WATER CHARGE BASED ON SINGLE CROPPING.
IRRIGATION FROM BOTH WELL AND FROM WATER DISTRICT,
P L A N T E D FA L L .
B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 1 2
0.32
0.32
1.38
0.92
2.57
0.92
2.85
0.16
0.76
0.32
0.32
0.32
- 811007202 750 0
PROJECTED, 1976
A L FA L FA , I R R I G AT E D , T E X A S E L PA S O R E G I O N
ESTIMATED COST S AND RETURNS PER ACRE
T Y P I C A L MANAGEMENT
PRICE
OR
VA L U E
OR
UNIT COST/UNIT QUANTITY COST
GRCSS RECEIPTS FROM PRODUCTION
HAY
TOTAL
TON
VARIABLE COSTS
PREHARVEST
FERT(0-100-0)
FERTILIZER APPLI
OTHER IRIG LABOR
WATER CHARGE
DISTRI SYSTM COS
MACHINERY
IRRIGATION MACHINERY
LABOR!TRACTOR & MACHINERY)
L A B O R C I R R I G AT I O N )
INTEREST CN OP. CAP.
SUBTOTAL, PRE-HARVEST
ACRE
ACRE
HOUR
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
HARVEST COSTS
BALER WIRE
CUSTOM HAULING
MACHINERY
TRACTORS
LABOR(TRACTOR & MACHINERY)
SUBTOTAL, HARVEST
TON
TON
ACRE
ACRE
HOUR
55.00
6.00
18.00
1.30
2.50
28.00
10.00
2.90
9.42
2.50
2.50
0.09
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.12
1.20
41.23
18.00
1.30
7.50
28.00
10.00
2.90
9.42
2.81
3.00
2*22
$ 86.85
$
4.50
7.00
13.50
13.38
2.50
6.00
6.00
1.00
1.00
4.93
27.00
42.00
13.50
13.38
_..12*22
$ 108.20
$ 195.05
TOTAL VARIABLE COST
32.509
3 . B R E A K E V E N P R I C E , VA R I A B L E C O S T S TO N
4. FIXED COSTS
MACHINERY
TRACTORS
IRRIGATION MACHINERY
PRORATED ESTAB. COST
LAND (NET RENT)
TOTAL FIXED COSTS
_22Q*CQ
$ 330.00
ACRE
ACRE
ACRE
ACRE
ACRE
20.08
6.12
7.44
208.98
800.00
5. TOTAL COSTS
6 . B R E A K E V E N P R I C E , T O TA L C O S T S T O N
ESTABLISHMENT COST PRORATED OVER FOUR YEARS.
THE SAME AS BALING COSTS PER TON.
1.00
1.00
1.00
0.25
0.08
20.08
6.12
7.44
52.24
$ 149.88
$ 344.93
57.489
CUBING CCSTS APPROX.
PROJECTED, 1976
-6-
A L FA L FA , I R R I G AT E D , T E X A S E L PA S O R F G I O N
ESTIMATED COSTS AND RETURNS PER ACRE
TYPICAL MANAGEMENT
OPERATION
PICKUP
PICKUP
PICKUP
SWATHER
BALER
PICKUP
SWATHER
BALER
PICKUP
SWATHER
BALER
PICKUP
SWATHER
BALER
PICKUP
SWATHER
BALER
PICKUP
PICKUP
SWATHER
BALER
TOTALS
ITEM
NO.
10
10
10
2,66
2,64
10
2,66
2,64
10
2,66
2,64
10
2,66
2,64
10
2,66
2,64
10
10
2,66
2,64
DATE
TIMES LABOR MACHINE
OVER
HOURS
HOURS
NOV
MAR
APR
APR
APR
MAY
MAY
MAY
JUNE
JUNE
JUNE
J U LY
J U LY
J U LY
AUG
AUG
AUG
SEPT
OCT
OCT
OCT
0.10
0.10
0.10
I. 00
1.00
0.10
1.00
1.00
0.10
I.00
1.00
0.10
1.00
1.00
0.10
1.00
1.00
0.10
0.10
1.00
1.00
0.125
0.125
0.125
0.268
0.554
0.125
0.268
0.554
0.125
0.268
0.554
0.125
0.268
0.554
0.125
0.268
0.554
0.125
0.125
0.268
FIXEO
FUEL, OIL,
COSTS
L U B . , R E P.
PER ACRE PER ACRE
0.100
0.100
0.100
0.198
0.410
O.iOO
0.198
0.410
0.100
0.198
0.410
0.100
0.198
0.410
0.100
0.198
0.410
0.100
0.100
0.198
0.32
0.32
0.32
1.86
2.62
0.32
1.86
2.62
0.32
1.86
2.62
0.32
1.86
2.62
0.32
1.86
2.62
0.32
0.32
1.86
0.21
0.21
0.21
1.59
2.46
0.21
1.59
2.46
0.21
1.59
2.46
0.21
1.59
2.46
0.21
1.59
2.46
0.21
0.21
1.59
-Q_*5i4. -0*4.10.
-2*62
-2*46
29.78
26.19
6.057
4.553
ESTABLISHMENT COST PRORATED OVER FOUR YEARS
THE SAME AS BALING COSTS PER TON.
CUBING COSTS APPROX.
PROJECTED, 1976
B U D G E T I D E N T I F I C AT I O N N U M B E R 8 1 0 0 7 2 0 2 7 5 0 0
A N N U A L C A P I TA L M O N T H 1 0
^
-7ALFALFA ESTABLISHMENT, IRRIGATFD, TEXAS EL PASO REGION
ESTIMATED COSTS AND RETURNS PFR ACRE
HIGH LEVEL MANAGEMENT
UNIT
VALUE OR
COST
PRICE OR
COST/UNIT QUANTITY
1. GRCSS RECEIPTS FROM PRODUCTICN
TOTAL
2. VARIABLE COSTS
PREHARVEST
SEED
FERT(0-80-0)
FERTILIZER APPLI
OTHER TRIG LABOR
WATER CHARGE
DISTRI SYSTM COS
MACHINERY
TRACTORS
IRRIGATION MACHINERY
LABCR(TRACTOR £ MACHINERY)
LABCR(IRRIGATION)
INTEREST CN OP. CAP.
0.0
CWT.
ACRE
ACRE
HOUR
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
11 0 . 0 0
14.40
1.30
2.50
28.00
10.00
3.26
10.16
9.42
2.50
2.50
0.09
0.40
I.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.33
1.20
46.50
44.00
14.40
1.30
2.50
28.00
10.00
3.26
10.16
9.42
8.33
3.00
4*42
$ 138.80
SUBTOTAL, PRE-HARVEST
HARVEST COSTS
SUBTOTAL, HARVEST
$
$
TOTAL VARIABLE COST
$ 138.80
$ - 138.80
3. INCOME ABOVE VARIABLE COSTS
4. FIXED COSTS
MACHINERY
TRACTORS
IRRIGATION MACHINERY
LAND (NET RENT)
TOTAL FIXED COSTS
0.0
$
ACRE
ACRE
ACRE
ACRE
4.76
5.69
7.44
800.00
1.00
1.00
I.00
0.08
4.76
5.69
7.44
-64*00
81.89
5. TOTAL COSTS
220.69
6. NET RETURNS
$-• 2 2 0 . 6 9
LAND AND WATER CHARGE BASED ON SINGLE CROPPING.
IRRIGATION FROM BCTH WELL AND FROM WATER DISTRICT
PLANTED FALL.
PROJECTED, 1976
-8-
A L FA L FA E S TA B L I S H M E N T, I R R I G AT E O , T E X A S E L PA S O R E G I O N
ESTIMATED COSTS AND RETURNS PER ACRE
HIGH LEVEL MANAGEMENT
OPERATION
PICKUP
PICKUP
SHREDER OFFSET DISC
PLOW 4B
OFFSET DISC
FLOAT
BORDER DISC
GRAIN DRILL
PICKUP
PICKUP
PICKUP
PICKUP
TOTALS
ITEM
NO.
10
10
1*31
i»33
1,35
lf33
1,37
1,47
3,53
10
10
10
10
DATE
TIMES LABOR MACHINE
OVER
HOURS
HOURS
JAN
AUG
SEPT
SEPT
SEPT
SEPT
SEPT
SEPT
SEPT
SEPT
OCT
NOV
DEC
0.10
0.10
1.00
1.00
I.00
1.00
2.00
1.00
1.00
0.10
O.iO
0.10
0.10
0.125
0.125
0.220
0.233
0.641
0.233
0.924
0.057
0.276
0.125
0.125
0.125
FIXED
FUEL,OIL,
LUB. ,REP.
COSTS
PER ACRE PER ACRE
0.100
0.100
0.163
0.173
0.475
0. 173
0.684
0.042
0.205
0.100
0.100
0.100
0.32
0.32
1.04
1.10
3.00
I.10
4.22
0.24
0.79
0.32
0.32
0.32
0.21
0.21
0.81
0.88
2.01
0.88
3.35
0.16
1.07
0.21
0.21
0.21
-0*125 -0*100
-0*22
-0*21
3.333 2.514
13.42
10.45
LAND AND WATER CHARGE BASED ON SINGLE CROPPING.
IRRIGATION FROM BOTH WELL AND FROM WATER DISTRICT
P L A N T E D FA L L .
B U D G E T I D E N T I F I C AT I O N N U M B E R 8 11 0 0 7 2 0 1 7 5 0 0
A N N U A L C A P I TA L M O N T H 1 2
PROJECTED, 1976
~ >
Download