r TEXAS EDWARDS PLATEAU WESTERN

advertisement
r
TEXAS EDWARDS PLATEAU
WESTERN
r
FOREWORD
The enterprise budgets for Texas Edwards
Plateau-Western Region are based on yields, pro
duction input quantities, and production practices
which represent the best judgment of local produc
ers, county Extension agents-agriculture, financial
institution representatives, farm machinery dealers
and others knowledgeable of the area. Variation
in yields, production inputs and production prac
tices should be expected for particular farms.
Budgets for all major crops produced in the
area are included for two levels of management,
when applicable. Crop yields are directly related
to levels of management. These differences are due
largely to timing of operational practices which
may not be evident in the budgets.
r
The machinery inventory is applicable to both
typical and high level management. In some bud
gets custom rates, primarily harvesting, were used
in lieu of the assumption that harvesting equip
ment was owned.
Budgets for establishing permanent type pasture
grasses were prepared and used for prorating estab
lishment costs in the respective pasture and hay
budgets. Forage crops include expenses only be
cause it is expected that the income will be derived
from livestock enterprises.
Crop share rental agreements do not exist to any
substantial degree. Land charges were, therefore,
calculated by using a fair market value times an
interest rate or a cash lease.
TEXAS EDWARDS PLATEAU I WESTERN
Assumed Prices Paid and Received by Farmers \J
I tern
Unit
Price
cwt.
cwt.
$ 27.00
35.00
6.50
Prices Paid (1976)
Seed:
Cotton - Upland
Grain Sorghum
Wheat - Winter
bu.
Custom Rates:
Cotton (Harvest & Haul) - Upland
Cotton (Ginning, Bags & Ti e s ) - U p l a n d
Grain (Harvest)
Grain (Haul)
lb. 1
ba le
acre
cwt.
Fuel and Lubricants:
Gasoline
Diesel
LP Gas
M o t o r ' O i l ( h e a v y d u t y, d e t e r g e n t )
gal
gal
gal
gal
Ferti1izer:
Nitrogen (granular)
Phosphorous
lb.
lb.
.21
.18
Labor:
Labor (except hoeing)
Labor (hoeing)
hr.
h r.
2.75
2.00
Chemicals:
Pre-emergence Herbicide
Ma lath ion
Methyl Parath ion
gal .
gal .
gal .
28.50
13.50
7.50
Hai1 1nsurance:
Cotton
Wheat
$100
$100
14
12
int
.07
28.50
10.00
.15
.42
.37
.26
.
.
.
.
1.75
'
Prices Received (1976)
Cotton - Upland
Cottonseed
Grain Sorghum
Wheat
Grazing
lb.
ton
Int
cwt.
bu.
.40
110.00
4.50
4.00
lb. ga i n
\J These price assumptions are not to be interpreted as predictions or
prospective prices.
.15
>
TEXAS EDWARDS PLATEAU I WESTERN
Estimated Machinery and Equipment Cost Per Hour of Use
Machinery
Item and Size
Tractor - 120 HP
Tractor - 100 HP
Tractor - 45 HP
Pickup - 1/2 ton
Rolling cult. 6R - 20 feet
MB Plow 4B - 5.3 feet
Chisel - 13 feet
Tandem disc - 13 feet
Grain drill - 16 feet
Shredder 4R - 13 feet
Herb sprayer - 24 feet
Lister 8R - 27 feet
Lister plant 8R - 27feet
Bed planter - 27 feet
Rolling cult. 8R - 27 feet
Bed knife 8R - 27 feet
Shredder 2R - 6.7 feet
Purchase
Price
$16,600
12,000
4,000
5,100
1,900
1,550
900
1,750
1,750
1,550
550
1,800
3,000
2,000
2,040
1,000
378
Estimated
Years of Use
5
5
12
3
8
8
8
8
10
8
10
8
8
8
8
8
8
Estimated
Hours of Use
5000
5000
7200
2100
1280
1600
1600
2000
1200
1000
2000
1600
2000
2000
1200
800
1000
Fixed Costs
Per Hour
$3.27
2.37
.93
2.02
2.04
1.34
.78
1.20
2.26
2.14
.42
1.54
2.07
1.37
2.33
1.72
.52
Variable Costs
Per Hour
$5.23
4.06
1.54
3.48
1.11
.72
.24
.38
.63
.75
.12
.63
.84
.56
1.27
.94
.18
hO
-3COTTON, DRYLAND, TEXAS EDWARDS PLATEAU WESTERN REGION
ESTIMATED COSTS AND RETURNS PER ACRE
TYPICAL NANAGEPENT
PRICE
OR
VA L U E
OR
UNIT COST/UNIT QUANTITY COST
GROSS RECEIPTS FRCM PRODUCTICN
COTTONSEED
COTTON LINT
TOTAL
2 . VA R I A B L E C O S T S
PREHARVEST
SEED
HAIL INSURANCE
MACHINERY
TRACTORS
LABORURACTOR e MACHINERY)
INTEREST CN OP. C A P.
SUBTCTAL, PRE-HARVEST
HARVEST COSTS
GIN, BAG, TIES
CUST COTTON PICK
SUBTOTAL, HARVEST
LBS.
iiO.OO
0.40
0.20
250.00
CWT.
DOL.
ACRE
ACRE
HCUR
DOL.
27.00
8.94
4.67
9.38
2.75
0.09
0.15
1.00
1.00
L.00
3.58
15.81
28.50
0.07
0.50
250.00
TON
22.00
$ 122.00
4.05
8.94
4.67
9.38
9.84
—l.*5fl
$
38.38
$
BALE
LBS.
14.25
.11*5(1
$~ 31.75
70.13
$
TOTAL VARIABLE COST
0.281
3. BREAKEVEN PRICE, VARIABLE COSTS LBS.
4. FIXED COSTS
MACHINERY
TRACTORS
LAND (NET RENT)
TOTAL FIXED COSTS
$
ACRE
ACRE
ACRE
1.00
1.00
1.00
4.47
5.70
..26*24
$"
37.11
$ 107.24
5 . TO TA L C C S T S
6. BREAKEVEN PRICE, TOTAL COSTS
4.47
5.70
26.94
LBS
0.429
* LAND (NET RENT) BASED ON LANDLORD'S SHARE OF 1/4 OF GROSS INCOME
LESS 1/4 OF GINNING, BAGGING AND TIES.
PLANTEO
2X1
SKIPROW.
PROJECTED,
1976
COTTCN, DRYLAND, TEXAS ECWARDS PLATEAU WESTERN REGION
ESTIMATED COSTS AND RETURNS PER ACRE
TYPICAL MANAGEMENT
OPERATION
SHREDDER 2R
TANDEM DISC
PICKUP
PICKUP
MBPLOW 43
PICKUP
L I S T E R - P L A N T 8R
PICKUP
ROLLING CULT
8R
PICKUP
L I S T E R - P L A N T 8R
HERB SPRAYER
PICKUP
BED KN IFE 8R
PICKUP
PICKUP
PICKUP
PICKUP
TOTALS
ITEM
NO.
1,69
43
10
10
1,33
10
1,61
10
3,65
10
1,61
53
10
3,67
10
10
10
10
DATE
FUFL,0IL, FIXED
T I M E S L A B O R M A C H I N E L U B . , R E P. C O S T S
CVER HCURS HOURS PER ACRE PER ACRE
DEC
DEC
DEC
JAN
FEB
FEB
MAR
MAR
APR
APR
MAY
MAY
MAY
JUNE
JUNE
J U LY
SEPT
NOV
1.00
1.50
0.10
0.10
1.50
0.10
1.00
0.10
1.00
0.10
1.25
1.25
0.10
2.00
0-10
O.iO
0.10
0.10
0.317
0.239
0.100
O.iOO
0.712
0.100
0 . 11 4
0.100
0.089
0.100
0.143
0.188
0.100
0.179
0.100
0.100
0.100
-Q*125 _£U1£0.
0.475
0.0
0.125
0.125
1.068
0.125
0.171
0.125
0.134
0.125
0.214
0.0
0.125
0.268
0.125
0.125
0.125
3.580
2.981
2.05
0.09
0.35
0.35
4.99
0.35
0.81
0.35
0.55
0.35
i.Oi
0.02
0.35
1.04
0.35
0.35
0.35
1.33
0.28
0.20
0.20
3.67
0.20
0.67
0.20
0.45
0.20
0.84
0.08
0.20
0.80
0.20
0.20
0.20
-0x25
-U*2ii
14.04
10.17
* LAND (NET RENT) BASED ON LANDLORD'S SHARE OF 1/4 CF GROSS INCOME
LESS 1/4 OF GINNING, BAGGING AND TIES.
PLANTED
2
X
1
SKIPROW.
PROJECTED,
1976
B U D G E T I D E N T I F I C AT I C N N U M B E R 9 3 0 0 9 0 0 2 9 0 0 0
A N N U A L C A P I TA L M O N T H i l
-5COTTON, DRYLAND, TEXAS EDWARDS PLATEAU WESTERN REGION
ESTIMATED COSTS AND RETURNS PER ACRE
HIGH LEVEL MANAGEMENT
PRICE
OR
VA L U E
OR
UNIT COST/UNIT QUANTITY COST
1. GROSS RECEIPTS
COTTONSEED
COTTON LINT
TOTAL
FRCM PRODUCTION
VARIABLE COSTS
PREHARVEST
SEED
FERT(20-20-0)
HAIL INSURANCE
MACHINERY
TRACTORS
LABCR(TRACTOR & MACHINERY)
INTEREST CN OP. C A P.
SUBTCTAL, PRE-HARVEST
HARVEST COSTS
GIN, BAG, TIES
CUST COTTCN PICK
SUBTCTAL, HARVEST
TON
LBS.
11 0 . 0 0
0.21
23.10
0.40 300.00 _12£LlPJ}
$ 143.10
CWT.
ACRE
DOL.
ACRE
ACRE
HCUR
DOL.
27.00
7.80
11 . 5 6
4.66
9.32
2.75
0.09
0.15
1.00
1.00
1.00
1.00
3.60
21.47
BALE
28.50
0.07
0.60
300.00
"*f
4.05
7.80
11 . 5 6
4.66
9.32
9.90
2*124.
49.33
$
TOTAL VARIABLE CCST
17.10
_21*QQ
$"
38.10
$
87.43
3. BREAKEVEN PRICE, VARIABLE CCSTS LBS.
4. FIXED COSTS
MACHINERY
TRACTORS
LAND (NET RENT)
TOTAL FIXED COSTS
$
ACRE
ACRE
ACRE
4.48
5.65
29.55
1.00
1.00
1.00
4.48
5.65
.-22*55
$"
5. TOTAL COSTS
6. BREAKEVEN PRICE, TOTAL COSTS
0.291
39.68
$ 1 2 7 . 11
LBS.
0.424
* LAND CHARGE BASED CN LANDLORDS SHARE CF GROSS (1/4) LESS 1/4 OF
FERTILIZER
AND
GINNING.
PROJECTED,
1976
P L A N T E D 2 X 1 S K I P R O W.
-6-
COTTON, DRYLAND, TEXAS EDWARDS PLATEAU WESTERN REGION
ESTIMATED COSTS AND RETURNS PER ACRE
HIGH LEVEL MANAGEMENT
OPERATION
SFREDDER 2R
TANDEM DISC
PICKUP
PICKUP
MBPLOW 49
PICKUP
LISTER-PLANT 8R
PICKUP
R O L L I N G C U LT. 8 R
PICKUP
LISTER-PLANT 8R
HERB SPRAYER
PICKUP
PICKUP
BED KN IFE 8R
PICKUP
PICKUP
PICKUP
TOTALS
ITEM
NO.
3,69
43
10
10
1,33
10
1,61
10
3,65
10
1,61
53
10
10
1,67
10
10
10
DATE
DEC
DEC
DEC
JAN
FEB
FEB
MAR
MAR
APR
APR
MAY
MAY
MAY
JUNE
JUNE
J U LY
SEPT
NOV
FUEL,OIL, FIXED
T I M E S L A B C R M A C H I N E L U B . , R E P. C O S T S
OVER HOURS HOURS PER ACRE PER ACRE
1.00 0 . 4 7 5 0 . 3 1 7
1.50 0.0
0.239
0.10 0 . 1 2 5 0 . 1 0 0
0.10 0 . 1 2 5 0. 100
1.50 1.068 0 . 7 1 2
O.iO 0 . 1 2 5 0 . 1 0 0
1.50 0.257 0. 171
0.10 0.125 0.100
0.50 0.067 0.045
0.10 0.125 0 . 1 0 0
1.25 0.214 0 . 1 4 3
1.25 0 . 0
0.188
0.10 0 . 1 2 5 0 . 1 0 0
0.10 0.125 0.100
2.00 0.268 0.179
O.iO 0 . 1 2 5 0.100
0.10 0.125 0.100
0 . 1 0 -Q*125 -Q*1Q0.
1.60
0.09
0.35
0.35
4.99
0.35
i.22
0.35
0.27
0.35
1.01
0.02
0.35
0.35
1.29
0.35
0.35
0.28
0.20
0.20
3.67
0.20
1.01
0.20
0.23
0.20
0.84
0.08
0.20
0.20
0.99
0.20
0.20
-Q*25
-G*20_
3.598 2.993
13.98
10.13
* LAND CHARGE BASED CN LANDLORDS SHARE OF GROSS
FERTILIZER AND GINNING.
PLANTED 2 X 1 SKIPROW.
B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 0 0 9 0 0 1 9 0 0 0
A N N U A L C A P I TA L M O N T H 11
1.04
( 1/4) LESS 1/4 OF
PROJECTED, 1 9 7 6
-7COTTGN, IRRIGATED, TEXAS EDWARDS PLATEAU WESTERN REGION
ESTIMATED COSTS ANO RETURNS PER ACRE (FURRCW)
TYPICAL MANAGEMENT (PREPLANT PLUS 1 PCSTPLANT)
PRICE
CR
VA L U E
OR
UNIT COST/UNIT QUANTITY COST
1. GROSS RECEIPTS FRCM PRODUCTION
COTTONSEED
COTTCN LINT
TOTAL
2. VARIABLE COSTS
PREHARVEST
SEED
FERT( 40-20-0)
INSECTICIDE
HERBICIDE
HAIL INSURANCE
MACHINERY
TRACTORS
IRRIGATION MACHINERY
LABOR(TRACTOR £ MACHINERY)
LABOR( IRR IGATION)
I N T E R E S T C N O P. C A P.
SUBTOTAL, PRE-HARVEST
HARVEST COSTS
GIN, BAG, TIES
CUST COTTCN PICK
SUBTOTAL, HARVEST
TON
LBS
110.00
0.40
0.33
475.00
36.30
-12Q_*Q0.
% 226.30
CWT.
ACRE
ACRE
ACRE
DOL.
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
27.00
12.00
6.00
5.20
16.57
4.63
8 . 11
9.30
2.75
2.75
0.09
0.20
1.00
i.00
1.00
1.00
1.00
1.00
1.00
3.47
2.00
38.13
5.40
12.00
6.00
5.20
16.57
4.63
8 . 11
9.30
9.54
5.50
2*62
85.86
BALE
LBS.
28.50
0.0 7
0.95
475.00
$
27.07
-22*25
$"
TOTAL VARIABLE CCST
$
3 . B R E A K E V E N P R I C E , VA R I A B L E C O S T S L 3B3S .
4. FIXED COSTS
MACHINERY
TRACTORS
IRRIGATION MACHINERY
LANC (NET RENT)
TOTAL FIXED COSTS
60.32
146.19
0.308
$
ACRE
ACRE
ACRE
ACRE
4.51
4.84
8.00
42.8 1
1.00
1.00
1.00
1.00
4.51
4.84
8.00
.-42*21
60.16
5. TOTAL COSTS
$ 206.35
1
6. BREAKEVEN PRICE, TOTAL COSTS
LBS.
0.434
* LAND CHARGE BASED CN LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF
F E R T I L I Z E R , G I N N I N G A N D 5 0 P C T. O F I R R I . F I X E D C O S T S .
PROJECTED, 1976
Download