r TEXAS EDWARDS PLATEAU EASTERN

advertisement
r
TEXAS EDWARDS PLATEAU
EASTERN
r
FOREWORD
The enterprise budgets for Texas Edwards
Plateau-Eastern Region are based on estimates of
yields, production input quantities, and production
practices which represent the best judgment of local
producers, county Extension agents-agriculture, fi
nancial institution representatives, farm machinery
dealers and others knowledgeable of the area. Vari
ation in yields, production inputs and production
practices should be expected for particular farms.
Budgets for all major crops produced in the
area are included for two levels of management,
when applicable. Crop yields are directly related
to levels of management. These differences are due
largely to timing of operational practices which
may not be evident in the budgets.
r
The machinery inventory is applicable to both
typical and high level management. In some bud
gets custom rates, primarily harvesting, were used
in lieu of the assumption that harvesting equip
ment was owned.
Budgets for establishing permanent type pasture
grasses were prepared and used for prorating estab
lishment costs in the respective pasture and hay
budgets. Forage crops include expenses only be
cause it is expected that the income will be derived
from livestock enterprises.
Crop share rental agreements do not exist to any
substantial degree. Land charges were, therefore,
calculated by using a fair market value times an
interest rate or a cash lease.
TEXAS EDWARDS PLATEAU EASTERN REGION
Assumed Prices Paid and Received by Farmers _!_/
tern
Unit
Price
Prices paid (1976)
Seed
Cotton-typical management
Cotton-high level management
Grain Sorghum
Kleingrass
SmaII grai n
Peanuts
Wheat
Hybrid-Sorghum
lb.
lb.
lb.
lb.
lb.
lb.
bu.
lb.
.26
.31
.35
.09
. 10
.44
9.00
.36
FertiIi zer
Ammon i urn n i t r a t e
16-20-0
cwt.
cwt.
9.00
8.00
cwt.
cwt.
bale
acre
I .25
I .50
.65
8.00
cwt.
bu.
ton
.20
.12
2.00
gal .
lb.
gal .
lb.
28.50
I .52
7.00
8.30
Custom work
Cotton strip and haul
Cotton ginning
Hay baling and hauI
Comb i n i ng
Hauli ng
Grain sorghum
Wheat
Drying-peanuts
Chemicals
TrefIan
Sevin
Maiithion
Ben I ate
Fuels
Gasoli ne
Propane
Diesel
ga
ga
.45
.32
.42
Prices received (1976)
Cotton
Grain sorghum
Peanuts
lb.
cwt.
lb.
.45
4.00
.20
-2-
I tern
Unit
Price
bu.
ton
ton
ton
AMU
$ 3.50
50.00
57.50
100.00
5.00
Prices received (1976) (cont.)
Wheat
Bermudagrass Hay
Hybrid-Sorghum Hay
Cottonseed
Grazing
\J These price assumptions are not to be interpreted as predictions or prospective
prices.
'
'
TEXAS EDWARDS PLATEAU EASTERN REGION
Estimated Machinery and Equipment Cost Per Hour of Use
Machinery
Item and Size
Tractor - 100 HP
Tractor - 75 HP
Tractor - 50 HP
Pickup - 1/2 ton
Truck - 2 ton
Combine peanut - 6.3 feet
Disk-tandem - 13 feet
Disk plow 3 disk - 3.4 feet
Planter peanut 4R - 12.7 feet
Planter 4R - 6.3 feet
Chisel - 12.7 feet
Lister/bedder - 12.7 feet
Drill grain - 8.0 feet
Harrow spike - 15 feet
Shredder - 6.3 feet
Cultivator - 12.7 feet
Digger peanut - 6.3 feet
Sprayer herbicide - 13 feet
Purchase
Price
$13,480
10,900
6,350
5,100
9,895
6,785
1,480
875
2,015
1,615
1,280
1,210
1,345
520
675
1,885
2,150
375
Estimated
Years of Use
8
8
12
4
4
6
10
10
10
10
10
8
10
10
8
10
10
10
Estimated
Hours of Use
6400
4800
3000
2000
2000
600
1000
1000
1000
500
1000
960
1000
500
600
800
750
750
Fixed Costs
Per Hour
$ 2.63
2.83
3.37
2.39
4.63
12.62
2.64
1.30
3.00
4.81
1.91
1.67
2.00
1.55
1.50
3.51
4.27
.75
Variable Costs
Per Hour
$ 5.79
3.65
3.54
5.49
11.35
4.92
.64
.65
1.13
1.81
.56
.71
.59
.45
.55
1.76
2.14
.22
I
I
-4COASTAL BERMUDAGRASS ESTAB., DRYLAND, TEXAS EDWARDS PLATEAU EASTERN
ESTIMATED COSTS AND RETURNS PFR ACRE
TYPICAL MANAGEMENT
PRICE
CR
VA L U E
Oi
UNIT COST/UNIT QUANTITY COST
1. CROSS RECEIPTS FROM PRODUCTION
TOTAL
0.0
2. VARIABLE COSTS
PREHARVEST
CUSTOM SPRIGGING
FFRTt 16-20-0)
MACHINERY
TRACTORS
LABCRtTRACTOR 6 MACHINERY)
I N T E R E S T C N U P. C A P.
SUBTOTAL, PRE-HARVEST
ACRE
ACRE
ACRE
ACRE
HOUR
DOL.
21.00
8.0 0
6.29
5.89
2.25
0.09
21.00
3.00
6.29
5.89
7.36
1 .00
l.CO
1.00
l.CO
3.27
31 .93
51.41
HARVEST COSTS
SUBTCTAL, HARVEST
$
TOTAL VARIABLE CCST
$
0.0
% -31.41
3. INCOME ABOVE VARIABLE COSTS
1.
4. FIXED COSTS
MACHINERY
TRACTORS
LAND {NET RENT)
TOTAL FIXED COSTS
51.41
ACRE
ACRE
ACRE
4.40
4.58
8.00
1.00
1.00
1.00
4.40
4.58
$
16.9 3
5. TOTAL COSTS
68.39
6. NET RETURNS
$ -68.39
LAND CHARGE BASED CN PREVAILING RATES IN REGION.
PROJECT CD, 1976
-5-
COASTAL BERMUDAGRASS ESTAB., DRYLAND, TEXAS EDWARDS PLATEAU EASTERN
ESTIMATED COSTS AND RETURNS PER ACRE
TYPICAL MANAGEMENT
OPERATION
DISK PLOW 3 DISK
DISK-TANDEM
PICKUP
F e R T. A P P L I , R E N T D
DISK-TANDEM
PICKUP
PICKUP
PICKUP
PICKUP
FERT.APPL I,RENTD
PICKUP
PICKUP
PICKUP
PICKUP
PICKUP
TOTALS
ITEM
NO.
2,36
2,30
10
2,86
2,30
10
10
10
10
2,86
10
10
10
10
10
DATE
FIXFD
FUEL,OIL,
COSTS
TIMES LABOR MACHINE LUB. , REP.
HOURS
PER ACRE PER ACRE
OVER
HOURS
JAN
JAN
JAN
FEB
FEB
FEB
MAR
APR
MAY
JUNE
JUNE
J U LY
AUG
SEPT
OCT
1.00
1.00
0.10
1.00
2.00
0.10
0.10
0.10
0.10
1 .00
0.10
0.10
0.10
0.10
0.10
I . 11 0
0.239
0.125
0.097
0.478
0.125
0.125
0.125
0.125
0.097
0.125
0.125
0.125
0.125
0. 740
0.159
0. 100
0.064
0.319
0.100
0. 100
0.100
0.100
0.064
0.100
0. 100
O.iOO
0.100
3.72
0.80
0. 55
0.28
1.60
0.55
0.55
0.55
0.55
0.28
0.55
0.55
0.55
0.55
JQ.*LZ5. _a*.ia£
_Q*.55
3.43
0.89
0.24
0.22
1.79
0.24
0.24
0.24
0.24
0.22
0.24
0.24
0.24
0.24
_Q_*24_
12.18
8.98
3.270
2.347
LAND CHARGE BASED ON PREVAILING RATES IN REGION
B U D G E T I D E N T I F I C AT I O N N U M B E R 8 3 4 0 1 0 0 G 2 1 0 0 0 0
A N N U A L C A P I TA L M O N T H 1 2
PROJECTED, 1976
-6COASTAL BERMUDAGRASS PASTURE, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN
ESTIMATED COSTS AND RETURNS PER ACRE
TYPICAL MANAGEMENT
PRICE
OR
VA L U E
OR
UNIT COST/UNIT QUANTITY COST
GROSS RECEIPTS FROM PRCDUCTICN
FERT(32-40-0)
TOTAL
ACRE
VARIABLE COSTS
PREHARVEST
MACHINERY
TRACTORS
LABOR(TRACTOR £ MACHINERY)
I N T E R E S T C N O P. C A P.
SUBTOTAL, PRE-HARVEST
ACRE
ACRE
HOUR
DOL.
16.00
1.00
-Lhs.Q.0.
$
16.00
$
5.49
0.56
2.25
0.09
5.49
0.56
3.25
1.00
1.00
1.44
2.25
$~
9.51
HARVEST COSTS
SUBTOTAL, HARVEST
$
$
0.0
TOTAL VARIABLE CCST
s
9.51
9.508
3 . B R E A K E V E N P R I C E , VA R I A B L E C C S T S AACRE
CRE
4. FIXED COSTS
MACHINERY
TRACTORS
PRORATED ESTAB. COST
LAND (NET RENT)
TOTAL FIXED COSTS
$
ACRE
ACRE
ACRE
ACRE
2.38
0.44
6.84
a*QQ
17.66
$
5 . TO TA L C C S T S
6. BREAKEVEN PRICE, TOTAL COSTS
2.38
0.44
68.39
8.00
1.00
1.00
0.10
1.00
ACRE
27.17
27.169
* ESTABLISHMENT CCST
PRORATED OVER 10 YEARS. LAND CHARGE BASED ON PREVAILING RATE IN REGION,
I N C O M E F R O M C R O P R E F L E C T E D I N T H E L I V E S TO C K B U D G E T S . P R O J E C T E D , 1 9 7 6
-7-
COASTAL BERMUDAGRASS PASTURE, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN
ESTIMATED COSTS AND RETURNS PER ACRE
TYPICAL MANAGEMENT
OPERATION
PICKUP
PICKUP
PICKUP
F E R T. A P P L I , R E N T D
PICKUP
PICKUP
PICKUP
PICKUP
F E R T. A P P L I , R E N T D
PICKUP
PICKUP
PICKUP
TOTALS
ITEM
NO.
10
10
10
2,86
10
10
10
10
2,86
10
10
10
DATE
FIXED
FUEL,OIL,
LUB.
,REP.
COSTS
TIMES LABOR MACHINE
PER
ACRE
HOURS
HOURS
PER ACRE
OVER
JAN
FEB
MAR
APR
APR
MAY
JUNE
J U LY
AUG
AUG
SEPT
OCT
0.10
0.10
0.10
1.00
0.10
0.10
0.10
0.10
I.00
0.10
0.10
0.10
0. 100
0.100
0.100
0.064
0.100
0. 100
0. 100
0.100
0.064
0. 10 0
0.100
JCbJL&Q.
0.55
0.55
0.55
0.28
0.55
0.55
0.55
0.55
0.28
0.55
0.55
0.24
0.24
0.24
0.22
0.24
0.24
0.24
0.24
0.22
0.24
0.24
_Q*.55
_fl*24
1.443 1.129
6.06
2.82
0.125
0.125
0.125
0.097
0.125
0.125
0.125
0.125
0.097
0.125
0.125
_0_*125
ESTABLISHMENT COST
PRORATED OVER 10 YEARS. LAND CHARGE BASED ON PREVAILING RATE IN REGION.
I N C O M E F R C M C R O P R E F L E C T E D I N T H E L I V E S TO C K B U D G E T S . P R O J E C T E D , 1 9 7 6
B U D G E T I D E N T I F I C AT I O N N U M B E R 8 . 3 5 0 1 0 0 0 2 1 0 0 0 0
A N N U A L C A P I TA L M O N T H 1 0
"
-8COASTAL BERMUDAGRASS ESTAB., DRYLAND, TEXAS EDWARDS PLATEAU EA1
ESTIMATED COSTS AND RETURNS PER ACRE
HIGH LEVEL MANAGEMENT
ERN
PRICE
CR
VA L U E
OR
UNIT COST/UNIT QUANTITY COST
1. GRCSS RECEIPTS FROM PRODUCTION
TOTAL
VARIABLE CCSTS
PREHARVEST
CUSTOM SPRIGGING
FERTI32-4C-0)
FERBICIDE
MACHINERY
TRACTORS
LABOR(TRACTOR £ MACHINERY)
I N T E R E S T C N O P. C A P.
SUBTOTAL, PRE-HARVEST
0.0
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
DOL.
21.00
16.00
1.20
6.29
5.89
2.25
0.09
1.00
1.00
1.00
1.00
1.00
3.27
38.59
21.00
16.00
1.20
6.29
5.89
7.36
_.2*42
$
61.21
HARVEST COSTS
SUBTOTAL, HARVEST
$
$
0.0
TOTAL VARIABLE COST
*
61.21
$ -61.21
3. INCOME ABOVE VARIABLE COSTS
$
4. FIXED COSTS
MACHINERY
TRACTORS
LAND (NET RENT)
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
4.40
4.58
8.00
4.40
4.58
1.00
1.00
1.00
a*Qo
$
16.98
5. TOTAL COSTS
$
78.19
6. NET RETURNS
$ -78.19
**LAND CHARGE BASED ON PREVAILING RATE IN REGION.
PROJECTED, 1976
COASTAL BERMUDAGRASS ESTAB., DRYLAND, TEX4S EDWARDS PLATEAU EASTERN
ESTIMATED COSTS AND RETURNS PER ACRE
HIGH LEVEL MANAGEMENT
OPERATICN
DISK PLOW 3 DISK
DISK-TANDEM
PICKUP
F E R T. A P P L I , R E N T D
DISK-TANDEM
PICKUP
PICKUP
PICKUP
PICKUP
F E R T. A P P L I , R E N T O
PICKUP
PICKUP
PICKUP
PICKUP
P I CK UP
TOTALS
ITEM
NO.
2,36
2,30
10
2,86
2,30
10
10
10
10
2,86
10
10
10
10
10
DATE
TIMES LABOR MACHINE
HOURS
OVER
HOURS
JAN
JAN
JAN
FEB
FEB
FEB
MAR
APR
MAY
JUNE
JUNE
J U LY
AUG
SEPT
OCT
1 . 11 0
1.00
0.478
2*00
0.10 0.125
1.00 0.097
1.00 0.239
0.10
0.125
0.125
0.10
0.10 0.125
O.iO
0.125
1.00 0.097
0.10 0.125
0.10
0.125
0.10 0.125
0.10 0.125
0 . 1 0 _0_a.L25.
3.270
FIXED
FUEL,OIL,
COSTS
L U B . , R E P.
PER ACRE PER ACRE
3.72
1.60
0.55
0.28
0.80
0.55
0.55
0.55
0.55
0.28
0.55
0.55
0.55
0.55
3.48
1.79
0.24
0.22
0.89
0.24
0.24
0.24
0.24
0.22
0.24
0.24
0.24
0.24
-Q^iaa
_a*55
-2*24
2.347
12.18
8.98
0.740
0.319
0.100
0.064
0.159
0. 100
0. 100
0.100
0.100
0.064
0.100
0.100
0.100
0.100
**LAND CHARGE BASED CN PREVAILING RATE IN REGION.
B U D G E T I D E N T I F I C AT I O N N U M B E R 8 3 4 0 1 0 C 0 11 0 0 0 0
A N N U A L C A P I TA L M O N T H 1 2
PROJECTED, 1976
-10COASTAL BERMUDAGRASS PASTURE, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN
ESTIMATED COSTS AND RETURNS PER ACRE
HIGH LEVEL MANAGEMENT
UNIT
PRICE OR
C O S T / U N I T QUANTITY
VALUE OR
COST
1. GROSS RECEIPTS FRCM PRODUCTION
TOTAL
VARIABLE COSTS
PREHARVEST
FERT( 120-40-0)
MACHINERY
TRACTORS
LABCRITRACTOR & MACHINERY)
INTEREST CN OP. CAP.
0.0
ACRE
ACRE
ACRE
HOUR
DOL.
33.00
5.79
3.20
2.25
0.09
1.00
1.00
1.00
2.35
18.52
SUBTOTAL, PRF-HARVEST
3 8.00
5.79
3.20
5.23
__1..67.
$
53.94
HARVEST CCSTS
SUBTCTAL, HARVEST
$
0.0
TOTAL VARIABLE COST
$
53.94
INCOME A8CVE VARIABLE COSTS
$ -53.94
4. FIXED COSTS
MACHINERY
TRACTORS
PRORATED ESTAB. COST
LAND (NET RENT)
TOTAL FIXED COSTS
$
ACRE
ACRE
ACRE
ACRE
3.19
2.49
82.44
3.00
5. TOTAL COSTS
6. NET RETURNS
* ESTABLISHMENT COST PRORATED CVER 15 YEARS.
LAND CHARGE BASED ON PREVAILING RATE IN REGION.
INCOME FRCM CROP REFLECTED IN THE LIVESTOCK BUDGETS
3.19
2.49
8.24
__8_j,00
21.93
1.00
1.00
0. 10
1.00
$
7^.37
-75. 37
PROJECTFD, 197o
-11-
COASTAL BERMUDAGRASS PASTURE, DRYLAND, TEXAS EDWARDS PLATEAU EASTERN
ESTIMATED COSTS AND RETURNS PER ACRE
HIGH LEVEL MANAGEMENT
OPERATION
PICKUP
PICKUP
PICKUP
F E R T. A P P L I , R E N T D
PICKUP
PICKUP
SHREDDER
F E R T. A P P L I , R E N T D
PICKUP
PICKUP
SHREDDER
F E R T. A P P L I , R E N T D
PICKUP
PICKUP
PICKUP
ITEM
NO.
, 10
10
10
2,86
10
10
2,61
2,86
10
10
2,61
2,86
10
10
10
DATE
FIXED
FUEL,OIL,
COSTS
TIMES LABOR MACHINE L U B . , R E P.
HOURS
PER ACRE PER ACRE
OVER
HCURS
JAN
FEB
MAR
APR
APR
MAY
JUNE
JUNE
JUNE
J U LY
AUG
AUG
AUG
SEPT
OCT
O.IO 0.125
0.125
0.10
0.10 0.125
1.00 0.097
0.10 0.125
O.iO
0.125
0.404
1.00
1.00 0.097
0.125
0.10
0.10 0.125
0 .404
1.00
1.00 0.097
0.10 0.125
0.10
0.125
0 . 1 0 _Q_^125
TOTALS
0.100
0.100
0.100
0.064
0.100
0.100
0.269
0.064
0.100
0. 100
0.269
0.064
0.100
0.100
-a*.iaG
0.55
0.55
0.55
0.28
0.55
0.55
1.33
0.28
0.55
0.55
1.33
0.28
0.55
0.55
-0^££
0.24
0.24
0.24
0.22
0.24
0.24
1.32
0.22
0.24
0.24
1.32
0.22
0. 24
0.24
-.0.^24.
2.348 1.732
8.99
5.68
LAND CHARGE BASED ON PREVAILING RATE IN REGION.
INCOME FROM CROP REFLECTED IN THE LIVESTOCK BUDGETS.
BUDGET IDENTIFICATION NUMBER
A N N U A L C A P I TA L M O N T H 1 0
8350100011000 0
PROJECTED, 1976
-12COASTAL BERMUDAGRASS ESTAB., IRRIGATED, TEXAS EDWARDS PLATEAU EASTERN
ESTIMATED COSTS AND RETURNS PER ACRE
TYPICAL MANAGEMENT
UNIT
VUUF OP
COST
PRICF OR
C O S T / U N I T QUANTITY
1. GROSS RECEIPTS FRCM PRODUCTION
TOTAL
VARIABLE COSTS
PREHAPVFST
CUSTOM SPRIGGING
FERT (16-20-0)
HERBICIDE
MACHINERY
TRACTORS
IRR IGATICN MACHINERY
LA80R(TRACTOR G MACHINERY)
LABOR( IRR IGATION)
INTEREST CN CP. CAP.
0.0
ACRE
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
22.50
8.00
2.7 5
4.43
4.21
2.34
2.25
2 .25
0.0 9
22.5V
8.00
2.75
4.43
4.21
2.34
5.22
2.70
1.00
1.00
1.00
l.CO
1.00
1.03
2.32
1.20
28.61
$
SUBTCTAL, PRE-HARVEST
__2^2
54.72
HARVEST COSTS
SUBTOTAL, HARVEST
$
$
O.o
TOTAL VARIABLE CCST
$
54.7?
$ -5 4.72
3. INCOME ABOVE VARIABLE COSTS
4. FIXED CCSTS
MACHINERY
TRACTORS
IRR IGATICN MACHINERY
LAND (NET RENT)
TOTAL FIXED COSTS
5. TOTAL COSTS
6. NET RETURNS
$
ACRE
ACRE
ACRE
ACRE
2.98
3.32
2.6 4
12.00
2.98
3.32
?. 64
1.00
1.00
1.00
1.00
$
20.94
*
75.67
-75.67
PROJECTED, 197
Download