TEXAS CROSS TIMBERS FOREWORD r The enterprise budgets for Texas Cross Tim bers Region are based on estimates of yields, pro duction input quantities, and production practices which represent the best judgment of local produc ers, county Extension agents-agriculture, financial institution representatives, farm machinery dealers and others knowledgeable of the area. Variation in yields, production inputs and production prac tices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. r The machinery inventory is applicable to both typical and high level management. In some bud gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grases were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprise. Land charges were based on the customary land lord's crop share less his proportionate share of certain production and harvesting inputs. A per acre land charge was made when crop share was not used. TEXAS CROSS TIMBERS REGION \ssumed Prices Paid and Received by Farmers 1/ tern Unit Price Prices paid (1976) Seed Coastal Sprigs Forage Sorghum Grain Sorghum Klei ngrass Oats Peanuts Sudangrass Wheat lbs cwt cwt lbs, cwt, lb. cwt, cwt, FertiIi zer Nitrogen Phosphorus Potash lb. lbs lbs Labor Irrigation Tractor hour hour 2.50 2.50 Custom rates BaIi ng Combining HauIi ng grain Hay Hauling Peanut drying Sprigging bale acre cwt. bale ton acre .45 8.00 . 18 .20 0.00 7.00 Capital Investment Operating Fumigants D D Pic Fumazone 86 Nemagon 12.I Tel one .03 24.00 40.00 7.00 I I .00 .46 24.00 13.00 .20 .16 .07 .10 .09 gal gal gal gal 3.50 1.50 1.50 3.50 -2- tem Fuel Gasoli ne Diesel Herbicides TrefIan Cobex Ba Ian Simazine 80W Dianap Lasso 2, 4-D (amine) 2, 4-D (ester) Vernam, I0G Vernam, 6E Insecticides Dasanit, I5G Dasanit, liquid Dyfonate, I0G Sevin, 80W Malathion (55 ga I .) Azodrin Methyl parathion Diazinon, I4G Fungicides Bravo Ben late Manzate 200 Te r r a c h l o r , 1 0 0 Te r r a c h i o r, 2 E C Te r r a c h l o r, 7 5 W P Lannate, I0G Lannate Nudrin Unit Price gal . gal . $ 5 gal. 5 gal. gal . lb. ga 1 . gal . gal. gal . cwt. gal . lb. .51 .47 130.00 120.00 8.55 3.45 7.25 15.00 8.75 9.50 29.40 15.40 .59 ga 1 . 28.50 gal . gal . gal . 1.52 12.00 20.00 10.00 lb. lb. lb. ga 1 . lb. lb. cwt. gal . lb. lb. .47 .60 25.50 8.30 1 .25 22.00 5.50 1.25 .29 gal . gal. 17.00 17.00 ton cwt. ton lb. ton 50.00 4.00 50.00 . 19 50.00 Prices received (1976) CoastaI Hay Grain sorghum Kleingrass hay Peanuts Sorghum or Sudan hay \J These price assumptions are not to be interpreted as predictions or prospective prices. TEXAS CROSS TIMBERS REGION Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size Tractor - 100 HP Tractor - 75 HP Tractor - 50 HP Pickup - 1/2 ton Truck - 2 ton Combine peanut - 6.3 feet Disk-tandem - 13 feet MB Plow 4 bottom - 4.7 feet Planter peanut 4R - 12.7 feet Planter 4R - 12.7 feet Chisel - 12.7 feet Lister/bedder - 12.7 feet Drillgrain - 8 feet Harrow spike - 15 feet Shredder - 6.3 feet Cultivator rolling - 12.7 feet Digger peanut - 6.3 feet Sprayer herbicide - 13 feet Sprayer insecticide - 12.7 feet Sprayer fungicide - 13 feet Purchase Price $13,480 10,900 6,350 5,100 9,895 6,785 1,480 1,230 2,015 1,615 1,280 1,210 1,345 520 675 1,885 2,150 375 775 375 Estimated Years of Use 8 8 12 4 4 6 10 10 10 10 10 8 10 10 8 10 10 10 10 10 Estimated Hours of Use 6400 4800 3600 2000 2000 900 2000 1750 1000 500 1000 960 1000 1000 600 1500 1400 750 2000 750 Fixed Costs Per Hour $2.63 2.83 3.52 2.39 4.63 8.41 1.08 1.04 3.00 4.81 1.91 1.67 2.00 .78 1.50 1.87 2.28 .75 .58 .75 Variable Costs Per Hour $ 3.15 2.94 2.85 4.91 10.22 3.94 .32 .52 1.20 1.81 .56 .71 .59 .23 .55 .94 1.15 .22 .17 .22 I CO I -4COASTAL BERMUDAGRASS HAY, DRYLAND, TEXAS CROSS TIMBERS ESTIMATED COSTS AND RETURNS DER *CRE TYPICAL MANAGEMENT UNIT i. CROSS RECEIPTS FROM PRODUCTION HAY TOTAL TON REGION VALUE 13 R COST PRICE OR C O S T / U N I T QUANTITY 50.0 0 4.00 $ 200.00 VARIABLE COSTS PPFHARVEST EERT( 120-40-40) FERTILIZER APPLI INSECTICIDE * MACHINERY TRACTORS LABOR ( TRACTOR' £ MACHINERY) INTEREST CN OP. CAP. ACRE APPL ACRE ACRE ACRE HOUR DOL. 39.20 1.00 3.0 4 5.8 9 1 ,°4 2 .50 0.0 9 1.00 3.00 0 . 3.3 1.00 1.00 1.92 18.93 1*21 i SUBTOTAL, PKE-HAPVEST HARVEST COSTS CUSTOM BALING CUSTOM HAUL SUBTOTAL, 39.20 3.00 1. 00 5.89 1.^4 4.80 57.55 * RALE BALE 0.45 0.20 120.00 120.00 HARVEST 54.00 ._2i*.0_0_ $ 78.00 ■$ 1 3 5 . 5 5 TOTAL VARIABLE COST BREAKEVEN PRICE, VARIABLE COSTS TON EI XED COSTS MACHINERY TRACTORS PRORATED ESTAB. COST LAND (NET RFNT) TOTAL FIXED COSTS 3.3.837 % ACRE ACRE ACRE ACRE 2.5 5 1.S1 82.3 7 10.00 5. TOTAL COSTS 6 . B R E A K E V E N P R I C E , T O TA L C O S T S T O N * I N S E C T I C I D E A P P L I C AT I O N N E E D E D E A C H 3 Y E A R S . **ESTAB. COST PRORATED OVER 15 YEA1 S. 1.00 1.00 0.07 1.00 2.55 1.51 5.77 —IP.jlO.Q % 19.82 I 155.37 38.843 PROJECTED, 1976 -5- COASTAL BERMUDAGRASS HAY, DRYLAND, TEXAS CROSS TIMBERS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPEKAT ION PICKIR FEPT .APPL I,RtNTD PICKUP PICKUP F E R T. A P P L I , R E N T O PICKUP PICKUP PICKUP SPRAYER INSECT. FERT.APPL I,RENTD PICKUP PICKUP TO fALS ITEM NO. 10 3, 86 10 10 3,06 10 10 1J 5,77 3,86 10 10 DATE T I ME S LABOR MACHINE OVER HOURS HOURS MAR APR APR MAY JUNE JUNE J UL Y AUG SEPT SEPT SEPT OCT 0.13 1 .00 0.13 0.13 l.OO 0.13 0.13 0.13 L.OO 1.00 0.13 0.13 0. L56 0 .090 0. L56 0. L56 0. j90 0. L56 0. 156 J. 156 0. 599 0.0 90 J. 156 0. 125 O.J 64 0.125 0. 125 0.064 0.125 0.125 0.125 0.285 0.0 64 0.125 .a*156 _0n_lZ£ 1 .920 * I N S E C T I C I D E A P P L I C AT I O N N E E D E D E A C H **CSTAR. COST PRORATED OVER 15 YEARS. 1.478 FIXED FUEL, OIL, LUB. , REP. COSTS PEP ACRE PER ACRE 0. 7 3 0.2 8 0.73 0.7 3 J.23 0.73 0.73 0.73 1. 16 0.23 0.73 -a*.n 0. 30 0.20 0.30 O.30 0.20 0.30 0.30 0.30 1.06 0.20 0.30 -Q.s.10 7.84 4.06 3 YEARS. •HJPGET IDENT IFICATICN N U M B E R 8 3 6 0 1 3 0 0 2 1 3 0 0 0 ANNUAL CAPITAL MCNTII 10 PROJECTED, 1976 ^ -6ASTAL BERMUDAGRASS ESTAo., UKYiANU, TEXAS CROSS TIM3FRS REGION' ESTIMATED COSTS AND I-TURNS PEP ACRE TYPICAL MANAl, ML NT UNIT PRICE OR COST/UNIT QUANTITY VALUE OR COST GROSS RECEIPTS FROM PRODUCTION TOTAL 2. VAR I ABLE COSTS PRE HARVEST CUSTOM SPRIGGING FERT(60-40-0) FERTILIZER APPLI HERBIC IDE INSECTICIDE * MACHINERY TRACTORS LABOR ( TRACTOR P. MACHINERY) INTEREST CN OP. CAP. SUBTOTAL, PRE-HARVEST 0.0 ACRE ACRE APPL ACRE ACRF ACRE ACRE HOUR DOL. 17.00 2 0.00 1 .00 1. 10 3.0 4 6.38 6.7 3 2.5 0 0.09 1.0 0 1 .00 2.00 1.00 ?.oo 1.10 1.00 6.3 3 6.73 3.74 0 .3 3 1.00 1.0 0 ?.5u 4 3 .2 0 HARVEST COSTS SUBTOTAL, HARVEST TOTAL VARIABLE COST 3. INCOME ABOVE VARIABLE COSTS $ 66.57 $ 5. 0.0 $ 66.57 $ -66.57 4. FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS 17.00 20.00 $ ACRE ACRE ACRE 3.7^ S.08 8 .00 5. TOTAL COSTS 6. NET RETURNS INSFCTIC IDE APPLICATION NEEDED EvCH 3 YEARS. LAND CHARGE BASED ON PREVAILING ".ATES IN REGION. 1.00 1.00 3.7o 5.08 L. 0 J __a*oo 16.87 * 83.44 -83.44 PROJECTED, 1976 -7- COASTAL BERMUDAGRASS ESTAB., DRYLAND, TEXAS CROSS TIMBERS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERAT ION M« PLOW 4 BOTTOM DISK-TANDEM PICKUP F E R T. A P P L I , R E N T D DISK-TANDEM HARROW SPIKE PICKUP PICKUP PICKUP SPRAYER HERBICID PICKUP F E R T. A P P L I , R E N T D P I CK UP PICKUP PICKUP SPRAYER INSECT. PICKUP PICKUP ITEM NO. 3,37 3,33 10 3,86 3,33 5,57 10 10 10 5,73 10 3,86 10 10 10 5,77 10 10 LABOR MACHINE HOURS HOURS DATE TIMES OVER JAN JAN JAN FEB FEB FEB FEB MAR APR MAY MAY JUNE JUNE J U LY AUG SEPT SFPT OCT 1.00 -x.749 0.5^5 l.Ou J. 223 0. 159 0.10 .125 0.100 L .00 0.090 0.064 2.00 u.446 0.3 19 1.00 0.208 0.148 0.10 0. 100 0.125 0.10 .125 0. 100 .125 0.10 0.100 1.00 0.220 '.308 0.10 . .125 0. 100 1.00 •J. 090 0.064 0.10 0.125 0.100 0.10 0.125 0.100 0.10 0.125 0.100 0.33 ).132 0.094 0.10 ,125 0. 100 0 . 1 0 . _0_*.LZ5. _Q*.1Q_Q TOTALS 3.496 2.605 * I N S E C T I C I D E A P P L I C AT I O N N E E D E D E A C H 3 Y E A R S . LAND CHARGE BASED ON PREVAILING RATES IN REGION. BUDGET IDENTIFICATION NUMBER A N N U A L C A P I TA L M O N T H 1 2 8340!30021300 0 FIXED FUEL,OIL, COSTS LUB., REP. PEP ACRE PER ACRE 2.59 0.74 0.5 8 0.28 1.48 0.61 0.58 0.58 0.58 0.91 0.58 0.28 0.58 0.58 0.58 0.38 0.58 _£*.£« 2.26 0.68 0.24 0.20 1.36 0.53 0.24 0.24 0.24 0.86 0.24 0.20 0.24 0.24 0.24 0.35 0.24 -£,.24. 13. 10 8.87 PROJECTED, 1976 -8COASTAl BERMUDAGRASS PASTURE, DRYLAND, TEXAS CROSS TIMBERS REGION ESTIMATED COSTS AND RETURNS PER. ACRE TYPICAL MANAGEMENT UNI T PRICE OR COST/UN IT QUANTITY VALUE OR COST GROSS RECEIPTS FROM PRODUCTION TOTAL 2 . VA R I A B L E C O S T S PREHAPVEST FERT(60-0-0) FERTILIZER APPLI INSECTICIDE * MACHINERY TRACTORS LABOR(TRACTOR C MACHINERY) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST o.o ACRE APPL ACRE ACRE ACRE HOUR DOL. 12.00 1.00 3.04 5.89 1.67 2.5 0 0.09 1.00 2.00 0.33 1.00 1.00 1.83 3.22 12.00 2.00 1.00 5.89 1.67 4.57 _fl*ZA $" 27.88 HARVEST COSTS SUBTOTAL, HARVEST $ $ 0.0 TOTAL VARIABLE COST $ 27.88 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS PRORATED ESTAB. COST LAND (NET RENT) TOTAL FIXED COSTS $ -27.38 $ ACRE ACRE ACRE ACRE 2.55 1.30 82.37 10.00 1.00 1.00 0.07 1.00 2.55 1.30 5. 7? $ _l£xQ£ 19.62 5. TOTAL COSTS $ 47.49 6. NET RETURNS * -47.49 * I N S E C T I C I D E A P P L I C AT I O N N E E D E D E a C H 3 Y E A R S . E S TA B L I S H M E N T C O S T PRORATED OVER 15 YEARS. LAND CHARGE BASED ON PREVAILING RATE IN REGION*. I N C O M E F R C M C R O P R E F L E C T E D I N T H E L I V E S TO C K B U D G E T S . P R O J E C T E D , 1 9 7 6 -9- COASTAL BERMUDAGRASS PASTURE, DRYLAND, TEXAS CROSS TIMBERS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UPEPATION ITEM NO. DATE PICKUP 10 JAN PICKUP 10 FEB PICKUP 10 MAR F E R T. A P P L I , R E N T D 3 , 8 6 A P R PICKUP 10 APR PICKUP 10 M AY PICKUP 10 JUNE PICKUP 10 J U LY F E R T. A P P L I , R E N T D 3 , 8 6 A U G PICKUP 10 AUG S P R AY E R I N S E C T. 5 , 7 7 S E P T PICKUP 10 SEPT PICKUP 10 OCT TOTALS FUFL»OIL, FIXED T I M E S L A B O R M A C H I N E L U B . , R E P. C O S T S OVER HOJRS HOURS PER ACRE PER ACRE O.LO 0.10 0.10 1.00 O.lu 0.10 0.10 0.10 1.00 0.10 1.00 0.10 0.10 0. 125 0.125 0. 125 0.090 0. 125 0.125 0. L25 0. L25 0.090 0.125 0.399 0. 125 0. 100 0.100 0.100 0.064 0.100 0.100 0. 100 0. 100 0.064 0.100 0.285 0.100 0.58 0.5 8 0.58 0.28 0.58 0.5 8 0.5 8 0.58 0.28 0.58 1.16 0.58 0.24 0.24 0.24 0.20 0.24 0.24 0.24 0.24 0.20 0.24 1.06 0.24 1.329 1.414 7.56 3.85 JUU5 .CbuiaQ * I N S E C T I C I D E A P P L I C AT I O N N E E D E D E A C H 3 Y E A R S . E S TA B L I S H M E N T C O S T PRORATED OVER 15 YEARS. LAND CHARGE BASED ON PREVAILING RATE IN REGIOM. INCOME FROM CROP REFLECTED IN THE LIVESTOCK BUDGETS. PROJECTED, 1976 BUDGET IDENTIFICATION NUMBER A N N U A L C A P I TA L M O N T H 1 0 8350130021300 0 ^ -10COASTAL BERMUCAGRASS ESTAB., DRYLAND, TEXAS CROSS TIMBFRS ESTIMATED COSTS. AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT REGION P R I C E O R VA L U E O R UNIT COST/UNIT QUANTITY COST I. GROSS RECEIPTS FROM PRODUCTION TOTAL VAR IABLE COSTS uREHARVEST CUSTOM SPRIGGING FERT(60-40-0) FERTILIZER APPLI HERBICIDE INSECTICIDE * MACHINERY TRACTORS LABOR( TRACTOR ci MACHINERY) I N T E R E S T C N O P. C A P. SUBTOTAL, PRE-HARVEST 0.0 ACRE ACRE APPL ACRE ACRE ACRE ACRE HOUR DOL. 17.00 20.00 1.00 1.20 3.04 6.36 7.26 2.50 0.09 1.00 1.00 2.00 1.00 0.33 1.00 1.00 3.46 40.63 $ 17.00 20 .00 2.00 1.20 1.00 6.36 7.26 8.64 2.-£6 67.12 HARVEST COSTS SUBTOTAL, HARVFST s $ 0.0 TOTAL VARIABLE COST $ 67.12 3. INCOME ABOVE VARIABLE COSTS FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS $ -67.12 % ACRE ACRE ACRE 3.74 4.76 8.00 1.00 1.00 1.00 3.74 4.76 — &..00 $ 16.50 5. TOTAL COSTS 83.62 6. NFT RETURNS $ -8 3.6 2 * I N S E C T I C I D E A P P L I C AT I O N N E E D E D E \ C H 3 Y E A R S . **LAND CHARGE BASED ON PREVAILING *ATE IN REGION PROJECTED, 1976