C TEXAS ROLLING PLAINS I 05000300 FOREWORD The enterprise budgets for Rollings Plains I are based on yields as shown on form 05000600. Budgets for irrigated crops in Rolling Plains I area were developed only for alfalfa and coastal since almost no irrigation is used on other crops. Pertinent facts include the following: the "high level" managers use mostly 6-row equip ment and farm 1,000 acres of cropland, while the "typical" manager uses 4-row equipment and farms about 600 acres of cropland. Budgets for irrigated crops in Rolling Plains I are based on sprinkler irrigation. The following customary rent arrangements were used: Cotton—One-fourth of production and land lord pays one-fourth of insecticide, fertilizer r and ginning. Vegetables—One-fifth production and land lord pays one-fifth of insecticide, fertilizer, fungicide, harvesting and processing. All Other Crops—One-third of production and landlord pays one-third of fertilizer and harvest. Landlord's share of hay baling is based on 300 per bale when renter owns and operates his own equipment. Income from government payments is shown after the landlord's share has been deducted for rent. For information on groundwater resources and soils for these areas, consult the Area Re sources Section of the Rolling Plains EconomicProgram Report. ROLLING PLAINS I 1/ Assumed Prices Paid and Received by Farmers —' Item Unit Price cwt. cwt* cwt. cwt. bu. cwt. cwt. cwt. $ 32.50 26.50 42.00 16.00 9.00 95.00 32.00 32.00 Prices Paid (1975) Seed: Cotton (di-system) Cotton (delinted) Grain Sorghum Guar Wheat (clean and treated) Alfalfa Forage Sorghum Silage Sudan Fertilizer: Nitrogen Phosphorous lb. lb. Chemicals: Pre-emerge Herbicide Methyl-Parathion Malathion 5 gal. gal. gal. Custom Rates: Combining Wheat acre Combining Grain Sorghum acre Combining Guar acre Hay Harvest (mow, rake, bale, haul) bale Ensilage (.chop, haul, pack) ton Hauling: Grain Guar Wheat . Sorghum .28 .28 135.00 8.00 12.45 6.50 1/ 7.00 9.00 .48 4.50 cw^:. cwt. bu. .20 •.10--7 2Q3/ Chemical Spraying acre 1.75 Hoeing Labor hour 2.Q0 hour 2.75 bale 31. Q0 Tractor, Cotton Irrigation Ginning Fuel and Lubricants: Gasoline L . P. Gas Diesel Motor Oil Lubricant Labor gal. gal. gal. gal. lb. .358 .26 .335 2.00 .28 Item Unit $ .095 Capital Hail Insurance (wheat) Prise acre 2.00 lb. cwt. ton bu. cwt. ton ton ton ton AUM cwt. .38 10.00 120.00 3.25 3.50 50.0Q 35.00 10.00 32.00 1Q.QQ 7.Q0 Prices Received (1975) Cotton Guar Cottonseed Wheat Grain Sorghum Alfalfa Hay Forage Sorghum Hay Ensilage Coastal Hay Pasture Grazing Potatoes 1/ These price assumptions are not to be interpreted as predictions or prospective prices. 2/ Plus 50/bu. over 20 bu. 3/ Plus *$$/bu. over 5 miles. 4/ Does not include government payments. ^ % TEXAS ROLLING PLAINS I Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size Purchase Price Estimated Years of Use Estimated Hours of Use Tractor - 115 HP Tractor - 100 HP Tractor - 80 HP Tractor - 45 HP Pickup - 1/2 ton Lister-Planter - 4 row Lister-Planter - 6 row Cultivator - 4 row Cultivator - 6 row Tandem Disc Chisel - 13 feet Chisel - 17 feet Moldboard - 4 bottom Moldboard - 5 bottom Shredder - 2 row Shredder - 4 row Grain Drill - 1310 Grain Drill - 16 feet, 8 inches Stripper Stripper and Basket Oneway - 12 feet Sandfighter - 8 row Rolling Cultivator - 6 row Knife - 4 row Float Offset Disc Sprayer Herbicide $12075 10500 8400 3675 3014 1260 1890 1050 1680 1680 5 5 8 12 4 8 8 8 8 8 8 8 8 8 8 8 10 10 5 5 10 10 8 10 10 8 10 3750 3750 4800 3600 2000 1200 1200 1600 1600 1600 1600 1600 1600 1600 1000 1000 1200 1200 1500 1500 1500 1000 1600 1200 1000 1600 $3.03 2.62 2.65 2.48 1.36 1.41 2.12 500 .79 840 1050 1470 2100 368 1470 1365 1680 3790 5670 1470 315 1785 840 1575 2100 263 Fixed Costs Per Hour .88 1.41 1.41 .71 .88 1.24 1.77 .50 1.98 1.73 2.12 2.71 4.05 1.48 .48 1.50 1.06 2.39 1.76 Variable Costs Per Hour $2.85 2.52 1.99 1.07 1.79 .38 .57 .28 .45 .34 .17 .21 .56 .80 .10 .40 .30 .37 .43 .64 .39 .06 .68 .04 .04 .63 .21 21 HlNDW IVildVD 1VHNNV 0 OOi. 201SOOI18 b39WHN NDI1VDI3UN3U1 ±39008 S16I *Ci3±3srOdd Z9*__«7- $ Z9*l«? v c ' l l SNbOi^>J $ SISOD $ 13N IVlCi "9 *S 4 SISOD 03X1=1 1V101 (lN3b 13N) 0NV1 SdUlDVdi AbdMHDVhi SISOD 03X13 m*7 8t*9£- $ SiSOD 3l8Vl«VA 3A09V 3K0DNI °fc GP**™ *0'0 00*1 00*1 i 6 M 92*1 8€*9£ 00*002 Lb*\ 92*1 3dDV 3dDV 3dDV $ i S D D 3 1 8 V I . J VA 1 V 1 0 1 $ 1S3A*VH *!VlDi8ns SISOD lS3AdVH 0*0 8£'9£ rr^n™ % iS3AdVH-3bd MViOltins 60*8 H M CO'l C0"1 00*1 £o*fc ZZ*1 9B'0 80*01 00*61 60*0 SJL*2 22.*! 98*0 80*01 S6°0 oo*oz •100 dOOH 3dD? 3bDV 3dDV *S81 •dVD *dO N3 lS3ti31Nl IAd3NIHDVW 3 dOlDVdi)dC«Vl SdOlDVtil Ad3NIHDVw (0-OZ-9T)ib33 u33S lS3AdVH3bd S i S O D 3 1 8 V I d VA * 2 $ O'O $ N3IlDnUDbd * W3d3 SldI3D3ti 1V101 SSObO isod AiiANvno iino/isod iino fcu 3 H 1 VA au 3JIdd 1N3W39VNVW lVDIdAi 3tiOV fa3d SMdfU3y ONV SISOD 031VWUS3 N O I 9 3 b 1 S N I t fl d O N I l l O d S V X 3 1 * O N V l A b Q # i N 3 K H S I 1 8 V 1 S 3 Va l V d l V M \J v**^ 0 _»20 ISOOII80 21 HiNOW IVildVD lvnNUV — d38WON NJUVDI3IiN3al lUOQnS SLb\ 'CJBxDiirubd 92*1 vl*0 9£'0 0*0 */l*G £ZmQ * T 0 *?\'0 98*0 520*1 1£V1 §Tvo" ronn smr oi*o ido oi 81*0 90*0 0*0 81*0 50*0 81 *0 £0*0 3bDV b3d 3dDV bJd SiSuD 0d3d'*8m N^-/ Nul03b I S1V101 aiOAOlo d fl X D i d OOTO S2T0 OTO xd3S 01 8 0 2 * 0 l l £ * 0 0 0 * 1 i d 3 S * / v • V 0 1 £ 1 111 « Q N I Va O OlN3d* ilddV°l-_d V90*0 160*0 00*1 id_»S 93'«7 dO^lDld OOTO S2T0 01*0 onv 01 6-.T0 6£2*0 00*1 oo v v£*2 • tI-JS10 yydUNVl dDHDld 001 °0 S2TG 01*0 Ainr 01 00*1 Ainr 9£*2 i£I 13SIHD £61*0 062*0 s^noH s«noH d 3 M ) JNlHDVfc d 0 8 V l S 3 W I I 31V0 •UN h J l l NOI±Vd3dO !M3w30VNVk IVDIdAi 3dDV d3d SVdOidd ONV SlSOD 03lV*vliS3 S N l V l d O N I l l O d S V X 3 1 ' U N V l A d Q * i N 3 k » H S 11 8 V 1 S 3 V 3 1 V 3 1 V A L FA L FA , D RY L A N D , T E X A S P C L L I N G P L A I N S I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANACEMFMT PRICE OR VA L U E 0^ UNIT COST/UMT QUANTIFY COST 1 . GROSS RECEIPTS FROM PRODUCTICN HAY TOTAL 2 , VARIABLE COSTS PREHARVEST Fprt(o-20-O) MACHINERY TPACT9«S LABOR(TRACTOR G MACHINERY) I N T E R E S T C N O P. C A P. SUBTOTAL, PRE-HARVEST HARVEST COSTS CUSTOM HARVEST SUBTCTAL, HARVEST $ TON 50.00 2.50 $ ACRE ACRE ACRE HOUR DOL. 5*60 1.07 0.15 2.75 0.09 BALE 0.48 5.60 1.07 0.15 2.33 l.OO 1.00 1.00 0.85 2.62 .—0*25 9.40 $~ * 22*25 82.00 TOTAL VARIABLF COST 3 . INCOMF ABOVE VARIABLE COSTS 4 . FIXED COSTS MACHINEPY TRACTORS PRORATED ESTAB. COST LAND (NET RENT) TOTAL FIXED COSTS ,JL25__Q_3 *"" 1 2 5 . 0 0 $ 39.36 $ 48.76 * 76.24 $ ACPE ACRE ACRE ACRE 0.81 0.20 47.62 26.41 0.81 0.20 7.95 1.00 1.00 0.17 1.00 % -25*41 35.39 5 . TOTAL COSTS 84.15 6 . NET RETURNS 40.85 LANO CHARGE USFS LANDLORD SHARE OF GRTSS (1/3) LESS 1/3 OP FFRTRTZF? AND HARVEST. E S T A B L I S H M E N T C O S T S P R O R A ^ D C V E R S I X Y F A P. S . P R O J E C T E D , 1 9 7 5 B U D G E T I O E N T I F I C AT I C N N U M B E R 8 1 0 0 5 0 0 0 5 0 0 0 A N N U A L C A P I TA L M O N T H 9 J ^ ^ A L FA L FA , D RY L A N D , T E X A S R C L L I N G P L A I N S I R E G I O N ^ \ E S T I M AT E D C O S T S A N O R E T U R N S P E P & C R * = ' TYPICAL MANAGEMENT OPEPATION F E R T. A P P L I , R E N T D PICKUP PICKU° PICKUP PICKUP PICKUP PICKUP TO TA L S ITEM NO. 4,86 10 10 10 10 10 10 DATE TIMES LABOR MACHINE HOURS HOURS OVER APR APR MAY JUNE J U LY AUG SFPT 1.00 0.10 0.10 0.10 0.10 0.10 0.10 0.847 <=IXED FUEL,OIL. COSTS L U B . , R E P. PEP ACRE PER ACRE 0.064 0.100 0.100 0.100 0.100 0.100 0.0 0.18 0.18 0.18 0. 18 0.18 -0*125 -0+10- -0*13 0.097 0.125 0.125 0.125 0.125 0.125 0.664 1.07 0.0 0. 14 0.14 0.14 0.14 0.14 __}__!* 0.81 LAND CHARGE USES LANDLORD SHARE OF GRCSS (1/3) LESS 1/3 0* FERTILIZER AND HARVEST. E S TA B L I S H M E N T C O S T S P R O R AT E D C V E R S I X Y E A R S . P R O J E C T E D , 1 9 7 5 B U D G E T I D E N T I F I C AT I O N N U M B E R 0 8 1 0 0 5 0 0 0 5 0 A N N U A L C A P I TA L M O N T H 9 ^ \ ALFALFA ESTABLISHMENT, IRRIGATED, TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT 0 ^ P R I C E C P VA L U p Q * UNIT COST/UNIT QUANTITY COST 1. GROSS TO TA L RFCFIPTS FROM * PRODUCTION * °-° 2. VARIABLE COSTS PREHARVEST * SEED LBS. 0.95 20.00 FERTC16-20-0) ACRE 10.08 1.00 INSECTICIDF APPL 3.50 3.00 I N S E C T. APPLI. APPL 1.75 3.00 MACHINERY ACRE 1.04 1.00 TRACTORS ACRE 1.72 1.00 I R R I G AT I C N MACHINERY ACRE 3.88 1.00 LABORTRACTOR 6 MACHINERY) HOUR 2.75 1.56 L A B O R ( I R R I G AT I O N ) HOUR 2.75 0.49 INTEREST CN O P. C A P. DOL. 0.09 14.44 S U B TO TA L , PRE-HARVEST * HARVEST S U B T C TA L , J^' TO TA L 3. 4. VA R I A B L E INCOMP ABOVE COSTS HARVEST * CCST VA R I A B L E 19.00 10.08 10.50 5.25 1.04 1.72 3.88 4.30 1.35 1+21 58.49 COSTS * 0.0 * 58.49 * -58.40 FIXED COSTS * MACHINERY ACRE 1.40 I.00 1.40 TRACTORS ACRE 1.97 1.00 1.97 I R R I G AT I O N MACHINERY ACRE 4.92 1.00 4.92 LAND (NET RENT) *CRE 250.00 0.04 10*QQ TO TA L FIXED COSTS * 18.29 5. TO TA L 6. NET COSTS RETURNS * * 76.78 -76.78 PROJFCEn, 1975 BUDGET IDENTIFICATICN NUMBER 311005100 520 0 ANNUAL CAPITAL MONTH 12 21 HiNOrt IVildVD 1V11NNV 2 600 1S001T80 d39rtnN NDUVDI3I1N3G1 130U08 5161 *03xD3rGbd Xi^-^ Ov°l ♦7TB" v T O «?T0 9£*0 0*0 <?T0 £2*0 * T 0 ♦/TO V0*I snr CTO 8 T 0 90*0 0*0 81*0 50*0 8 T 0 £0*0 3 b J V d a d 3dDV d3d •d3b**8ni S1SUD • 11 0 * 1 3 11 3 U3X13 &2T1 mmr ZTriT 001*0 OOTO 802*0 v90*0 OOT'O 6SI*0 OOTO £61*0 S2T0 S 2 T 0 1I£*0 160*0 521*0 6£2*0 S2T0 062*0 29SM 01*0 01*0 01*0 00*1 00*1 01*0 00*1 OTO 00*1 AON 1D0 id3S Xd3S ld3S SbOUH SbOOH b3A0 3N1HDVK b u 8 V l S3WI1 31VG onv onv Ainr Ainr 01 01 01 V74*7 98*7 01 ♦/C'2 01 9£*2 •ON W31I SIViOi dn>lDid d0>Old dO>tDld 0I£T l l i d O N l Va D QlN3d • l l d d V - l a 3 d dnXDId • £1- DS10 W3QNV1 dO>IJId •EI 13S1HD N O U Va 3 d O 1N3W30VNVH IVDldAl _ibOV b3d SNb013b QNV SISOD a31VwUS3 NUIO-jiJ 1 SNiVld ONIllDb SVXal 'QSiVOIbbl 4iN3fcHSI1HV1S3 V31VJ1V ALFALFA, IRRIGATED, TEXAS ROLLING PLAINS I REGION ESTIMATEO COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT 1. 2. GROSS RECEIPTS FROM PRODUCTION HAY TOTAL VARIABLE COSTS PREHAPVEST FERT(0-46-0) INSECTICIDE I N S E C T. A P P L I . MACHINERY TRACTORS IRRIGATION MACHINERY LABORTRACTOR 6 MACHINERY) L A B O R ! I R R I G AT I O N ) INTEREST CN S U B TO TA L , O P. HARVEST COSTS CUSTOM HARVEST SUBTOTAL, HARVEST _ TCN 50.00 .225+00 6.50 $" 3 2 5 . 0 0 % ACRE APPL APPL ACRE ACRE ACRE HOUR HCUR 12.88 3.50 1.75 1.07 0.15 34.92 2.75 2.15 I.00 3.00 3.00 1.00 1.00 1.00 0.85 4.43 12.88 10.50 5.25 1.07 0.15 34.92 2.33 12.18 C A P. DOL. 0.09 16.77 1^2 PRE-HARVEST i 80.87 _ BALE 0.48 215.00 .102*20 $" 1 0 3 . 2 0 TOTAL VARIABLE CCST $ 184.07 3. INCOME ABOVE VARIABLE CCSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATED ESTAB. COST LAND (NET RENT) TOTAL FIXED COSTS VA L U E 0 * COST PRICE CR C O S T / U N I T QUANTITY $ 140.93 »1 ACRE ACRE ACRE ACRE ACRE 0.81 0.20 44.28 76.7Q 68.94 I.00 1.00 1.00 0.17 1.00 0.81 0.20 44.28 12.82 -52+24 $" 1 2 7 . 0 7 5. TOTAL COSTS $ 111. 14 6. NET RFTURNS % 13.86 LAND CHARGE LSES LANDLORD SHARE OF GRCSS (1/3) LFSS 1/3 PE^TILIZF^ AND HARVEST. ESTABLISHMENT COSTS PRORATED OVER SIX YEARS. PROJECTED, 1975 8UDGET IDENTIFICATICN NUMBER 81 005902 520 0 ANNUAL CAPITAL MONTH 9 A L FA L FA , I R R I G AT E C , T E X A S R O L L I N G P L A I N S T R E G I O N FSTIMATFD COSTS ANO RETURNS PER ACRF TYPICAL *AN-\GFMFNT O P E P. A T I O N NO. ITEM O AT E F E R T. A P P L I , R E N T D PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP 10 SEPT TO TA L S FUEL,OIL, FIXFD T I M E S L A B O R M A C H I N E L U B . , R E P. C O S T S OV!:R HOURS HOURS PER ACRE PER ACRF 4,86 10 10 10 10 10 APR APR MAY JUNE JULY AUG 0.10 0.847 1.00 0.10 0.10 0.10 0.10 0.10 0.097 0.125 0.125 0.125 0.125 0.125 ^0*125 0.064 0.100 0.100 0.100 0.100 0.100 -0+100 0.664 0.0 Ooi 8 o.ia 0.18 0.18 0.18 -0*13 1.07 0.0 0.14 0.14 0.14 0.14 0.14 .__.ili.lit 0.81 LAND CHARGE USES LANDLORD SHARE OF GROSS (1/3) LESS 1/3 FERTILIZER AND HARVEST. ESTABLISHMENT COSTS PRORATED OVER SIX YEARS. PF.CJECTcD, 1975 B U D G F T I D E N T I F I C AT I O N N U M B E R 0 8 1 0 0 5 9 0 ? 5 2 ANNUAL CAPITAL MONTH 9 A L FA L FA E S TA B L I S H M E N T, D RY L A N D , T E X A S R O L L I N G P L A I N S I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT # ^ - PRICE OR VA L U E OP UNIT COST/UNIT QUANTTY COST GROSS TO TA L RECEIPTS FRCM PRODUCTICN $ * 0.0 2. VARIABLE COSTS PREHARVEST * SEED IBS. 0.95 20.00 FERT( 16-20-0) ACRE 10.08 1.00 MACHINERY ACPE 0.91 1.00 TRACTORS ACRF 1.63 1.00 LABORTRACTOR £ MACHINERY) HOUR 2.75 1.31 INTFREST CN O P. C A P. OOL. 0.09 8.08 S U B TO TA L , PRE-HARVEST HARVEST S U B TO TA L , TO TA L tf^- 3. 4. 5. 6. COSTS HARVEST VA R I A B L E INCOME ABOVE VA R I A B L E NET 36.00 $ $ COST FIXED MACHINERY ACRE TRACTORS ACRE LAMP (MET RENT) TO TA L FIXED TO TA L f> $ CCSTS COSTS 1.32 1.74 ACRE 200.00 COSTS COSTS RETURNS 19.00 10.08 0.91 1.63 3.62 0 * 11 0.0 36.00 * -36.00 * 1.00 1.00 0.04 * 1.32 1.74 flA£Q 11 . 0 6 * 47.06 T> -47.06 PROJECTED, 1975 BUDGET IDENTIFICATICN NUMBER 811005000 500 0 ANNUAL CAPITAL MONTH 12 ALFALFA ESTABLISHMENT, DRYLAND, TEXAS P.PI LINO PLAINS I RFGIPN ESTIMATED COSTS AND RETURNS PER ACPE HIGH LEVEL MANAGE^EN"" OPFPATION CHISEL 17' PICKUP OFFSET DISC PICKUP F F R T 0 A P P L I , !*ENTQ GRAIN DRILL 16» 8 PICKUP PICKUP TO TA L S ITEM NC. 1,37 10 1,59 10 3,87 3,45 10 10 DATE TIMES LABOR MACHINE HCURS HOURS OVER J U LY J U LY AUG AUG SEPT SEPT SEPT OCT 1.00 0.10 1.00 0.10 1.00 1.00 0.10 0,10 1.315 0.222 0.125 0.239 0.125 0.097 0.257 0.125 FIXFD FUEL,OIL, LUB. , REP. COSTS PER ACR.E PFR ACRE 0.148 0. 100 0.159 0.100 0.064 0.172 0. 100 0.03 0. 18 0.10 0.18 0.0 0.06 0. 18 0.13 0.14 0.28 0.14 0.0 0.36 0.14 -0+125 - 0 + 1 0 0 -0+13 -0+14 0.943 0.91 1.32 PROJECTED, 1975 B U D G E T I D E N T I F I C AT I C N N U M B E R 0 8 11 0 0 5 0 0 0 5 0 ANNUAL CAPITAL MCNTH 12 >*^V ^J 6 HINOrt IVildVD 1VON.W 0 O O - i O O O S O O 1 8 b 3 8 W n N N D I i V D I 3 11 N 3 Q I 1 3 0 Q n 8 6Z.61 4G3iD3rLbd *SbV3A XIS b3Aj 03lVb0bd SiSUD 1N3WHSI19V1S3 *!S3AbVH ONV - 3 2 11 U b 3 d _ » U £ / I S S 3 1 ( £ / l ) S S D d O 3 0 3 b V H S O b O l O N V l S 3 S 1 3 0 d V H D Q N V 1 $ SNbni3b i3N *9 7£*I£I $ sisoD ivioi •_; 99*1*7 $ SiSOD 03X13 1V1U1 (iN3b 13N) UNV1 iSOD *QV1S3 Q3iVbOdd SbGlDVbl Ab3NlHDVW SiSOD 03X13 *v 8V*iOl $ SiSOO 31QVIbVA 3A08V 3KDDNI *£ 28*£9 $ $ZV*7S-' COM i T O 00*1 00*1 98*i n*o 18*0 25*19 $ 02*55 * OT'Sr" 2£*21 QfU" $ 86*75 90*i7 1T0 18*0 3d0V 3dJV 3dDV 3aOV iSDD 319VIbVA iViUi 0 0 * 5 11 87*C 31V9 60*0 Si*2 91*0 L0*\ 07#8 •130 dnOH 3bDV 3bDV 3bDV $ 61*£ 58°0 00*1 00*1 00*1 ££•2 91*0 10*1 07#8 % 0 0 * 5 11 OSy^rT" % ^J 0S*£ NCJliDnOObd iS3AbVH 4ivioiyns 1S3AWVH ttUlSnD SiSOD iS3AbVH !S3AbVH-3bd 4lV10x8ns *dVD *dU N3 lS3d3iNl (AdaNIHDVW 3 dOlDVdi)b08Vl SbOlDVbi Ab3NIHDVK (0-0£-0)ib33 iS3AdVH3bd SiSOD 319VldVA *2 * 00*05 hObd N01 SidI3D3b IViOl AV H SSObO *I ISOD AiiiNVnO ilMO/iSOD UNO dU a O l VA b_i 3DIbd lN3w30VNVW 13A31 HOIH 3bDV b3d S?Jdni3d QNV SiSOD 03iVrtIlS3 N0I03b 1 SNiVld ONIllOb SVX3i 4QNVlAbO *V31V31V '^J ALFALFA, DRYLAND, TEXAS ROLLING PLAINS I REGION E S T I M AT E D COSTS AND RETURN'S PER ACRE HIGH LEVEL MANAGEMENT FUEL,OIL, FIXED I T E M T I M E S L A B O R M A C H I N E L U B . , R E P. C O S T S O P E R AT I O N N O . D AT E O V E R H O U R S H O U R S P E R A C R E P E R A C R E F E R T. A P P L I , R E N T D 3,87 10 10 10 10 10 10 PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP TOTALS APR MAY JUNE JULY AUG SFPT APR 1.00 0.097 0,.10 0. 125 0. 100 0,,10 0. 125 0. 100 0.,10 0. 125 0. 100 0,,10 0. 125 0. 100 0,,10 0,,125 0 . 100 0*▶1 0 -0*125 -0+100 0,,847 0 . 664 0.064 0. 0. 0. 0, 0. 0.0 18 18 18 18 18 0.0 0. 14 0. 14 0.,14 0. 14 0, 14 -0*.1- -0*14 1. 07 o. 81 LAND CHARGE USES LANDLORD SHARE OF GROSS (1/3) LESS 1/3 OF FERTILIZER AND HARVEST. ESTABLISHMENT COSTS PRORATED CVER SIX YEARS. PROJECTED, 1975 B U D G E T I D E N T I E I C AT I C N N U M B E R 0 8 1 0 0 5 0 0 0 5 0 ANNUAL CAPITAL MCNTH 9 ^t ; ^ ^ ALFALFA ESTABLISHMENT, IRRIGATED, TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST 1. GROSS RECEIPTS FROM PRODUCTIGN TOTAL 2. VARIABLE COSTS PREHAPVEST SEED FERT(16-20-0) INSECTICIDE INSECT. APPLI. HERBICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LARORTRACTOR £ MACHINEPY) LABOR!IPRIGATION) INTEREST CN OP. CAP. SUBTOTAL, PRE-HARVEST 0.0 LBS. ACRE APPL APPL ACRE ACRE ACRE ACRE HOUR HCUR DOL. 0.95 10.08 3.50 1.75 6.00 1.35 3.27 4.28 2.75 2.75 0.09 25.00 1.00 3.00 3.00 I.00 1.00 1.00 1.00 2.33 0.49 18.36 HARVEST COSTS SUBTOTAL, HARVEST —.1*24 73.97 0.0 73.97 TOTAL VARIABLE COST -73.<*7 3. INCOME ABOVE VARIABLE CCSTS 4. PIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LANO (NET RENT) TOTAL FIXED COSTS 23.75 10.08 10.50 5.25 6.00 1.35 ^.27 4.28 6.40 1.^5 ACRE ACRE ACRE ACRE 3.09 3.51 5.72 250.00 1.00 1.00 1.00 0.04 3.09 3.51 5.72 .-10*00 22.31 5. TOTAL COSTS 96.29 6. NET RETURNS -96.29 PRnjrrTFn, 1975 BUDGET IDENTIFICATION NUMBER 811005100 520 0 ANNUAL CAPITAL MONTH 12 A L F A L F A E S TA B L I S H M E N T, I R R I G AT E C , T E X A S R O L L I N G P L A I N S I R E G I O N ^ \ E S T I M AT E D COSTS AND RETURNS PER ACRE ' HIGH LEVEL MANAGEMENT ITEM NO. OPFRATION MCLDBOARD 5 BTM. PICKUP OFFSET DISC SPRAYER HERBICID FLOAT PICKUP F E R T. A P P L I , R E N T D GRAIN DRILL 16*8 PICKUP PICKUP pickup 10 TO TA L S 1,39 10 1,59 61 3,55 10 1,87 3,45 10 10 NOV DATE TIMES LABOR MACHINE HOURS OVER HOURS J U LY J U LY AUG AUG AUG AUG SEPT SEPT SEPT OCT 0.75 0.10 1.00 1.00 1.00 0.10 1.00 1.00 0.10 0.10 0.10 2.326 0.424 0.125 0.239 0.0 0.684 0.125 0.097 0.257 0.125 0.125 JO+125 0.283 0.100 0.159 0.220 0.456 0.100 0.064 0. 172 0.100 0.100 -0+1QQ 1.855 FIXED FUEL,CU , L U B , , R E P. COSTS PEP ACRE PER ACPE 0.23 0.18 0.10 0.05 0.02 0.18 0.0 0.06 0.18 o.ie ..0*13 1.35 0.50 0. 14 0.28 0.17 1.0^ 0.14 0.0 0.36 0.14 0.14 -0*14 3.09 ^^ PRPjFCTED, 1975 B U O G F T I D E N T I F I C AT I C N N U M B E R 0 8 11 0 0 5 1 0 0 5 2 A N N U A L C A P I TA L M O N T H 1 2 /^S ALFALFA, IRRIGATED, TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT i^N VALUC Oi COST PRICE OR UNIT CPST/UMT QUANTITY 2. >* GROSS RECEIPTS ERGM PRODUCTICN HAY TOTAL TON 50.00 VARIABLE COSTS PREHARVEST FERT(0-92-0) INSECTICIDE I N S E C T. A P P L I . MACHINERY TRACTORS I R P I G AT I O N M A C H I N E RY LABORTRACTOR £ MACHINERY) L A B O R ! I R R I G AT I O N ) I N T E R E S T C N P P. C A P. SUBTOTAL, PRE-HARVEST ACRE APPL APPL ACRE ACRE ACRE HOUR HOUR DOL. 25.76 3.50 1.75 1.07 0.16 38.52 2.75 2.75 0.09 HARVEST COSTS CUSTOM HARVEST SUBTOTAL, HARVEST 402*112 8.00 * ~ 400.00 H 2 5.76 10.50 5.25 1.07 0. 16 38.52 2.33 12.13 I.00 3.00 3.00 1.00 1.00 1.00 0.85 4.43 23.01 2*12 97.95 $ $ BALE 0.48 264.00 * -125*12 126.72 TOTAL VARIABLE CCST % 224.67 INCOME ABOVE VARIABLE COSTS $ 175.33 FIXFD COSTS MACHINERY TRACTORS I R R I G AT I C N M A C H I N E RY PRORATED ESTAB. COST LAND (NET RENT) TOTAL FIXED COSTS $ ACRE ACRE ACRE ACRE ACRE 0.81 0.17 51.48 96.29 81.68 0.81 0.17 51.48 12.04 1.00 1.00 1.00 0.13 1.00 ...ai-i-ha $ 146.18 TOTAL COSTS $ 370.85 NET RETURNS $ 29.15 LANO CHARGE USES LANDLORD SHARE OF GROSS (1/3) LESS 1/3 OF FERTILIZE' AND HARVEST. ESTABLISHMENT COSTS PRORATED CVER EIGHT YEARS. PROJECTED, 1975 B U D G E T I D E N T I F I C AT I C N N U M B E R 8 1 0 0 5 4 0 0 5 2 0 0 ANNUAL CAPITAL MONTH 9 6 HINOrt IVildVD 1VONNV 2 500 7500 18C d39WON NO IiVDI 3UN3G1 __30Cjii9 5 / . 5 I * G 3 1 D 3 r O b d * S b V 3 A i H 0 I 3 b 3 A 3 Q d l V b O b d S i S O D 1 N 3 H H S 11 8 V 1 S 3 •lS3AdVH ONV bi'ZllIld^i dCl £/l SS31 (£/I) SSObO 30 3bVHS GdOlONVl S3S0 30bVHD QNVl 18*0 iCM 799*0 l*/8#0 rr1^ 0"STO~ 7l*0 7 I *0 7l*0 81*0 81 °0 81*0 81*0 81*0 0*0 srrir 7T0 vTO 0*0 001*0 001 *0 OOTO OOTO 001*0 790*0 521*0 52T0 52T0 52T0 52T0 160*0 S1V101 C1*0 01*0 O TO O TO 01*0 OTO 00*1 ld3S onv Ainr 3N0T AVh bdV ddV 01 01 01 01 01 01 iB4£ dO>lDId dn^DId dH>TJid dO MD I d dhVJld dn>OId QiN3b<k l l d d V * l b d 3 3 t i D V b 3 d 3 a D V b 3 d S b fi O H S b O O H b 3 A 0 3 1 V 0 * 0 N N O U V b 3 d O SiSoD #d3d4*ani 3NIHDVW b09Vl S3WI1 *3il G_.X13 4110413H3 1N3W39VNV* 13A31 HOIH 3bDV b3d SNb013b ONV SiSOD 031VWI1S3 NOlObb I SNlVld ONlllUb SVX31 *Q3iV01bbI 4V31V31V I REGION COASTAL BERMUDAGRASS ESTAB., IRRIGATED, TEXAS ROLLING PLAINS ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT PRICE CR VA L ' J OR UNIT COST/UNIT QUANTITY COST 1. GROSS RECEIPTS FRCM PRODUCTICN TOTAL 2. VARIABLE COSTS PREHARVEST CLSTOM SPRIGGING FERT(16-20-0) HERBICIDE MACHINERY TRACTORS IRRIGATICN MACHINFRY LA80R(TRACT0R £ MACHINERY) LABOR!IRR IGATION) INTEREST CN OP. CAP. SUBTOTAL, PRE-HARVEST 0.0 ACRE ACPE ACRE ACRE ACRE ACRE HOUR HCUR DOL. 22.50 10.08 3.90 1.03 1.12 t.76 2.75 2.75 0.09 I.00 1.00 1.00 1.00 1.00 1.00 1.25 0.98 28.39 22.50 10.08 3.90 L.03 1.12 7.76 3.44 2.71 _ 2*10 55.23 HARVEST COSTS SUBTOTAL, HARVEST 57o~ $ TOTAL VARIABLE CCST 3. INCOME ABOVE VARIABLE CCSTS 4. EIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINEPY LAND (NET RFNT) TOTAL FIXED COSTS 55.21 $ -55.23 % ACRE ACRE ACRE ACRE 1.22 1.32 9.84 250.00 1.00 1.00 1.00 0.04 1.22 1.32 9.84 ,-10*00 22.37 5. TOTAL COSTS % 77.60 6. NET RETURNS $ -77.60 PROJECTED, 1975 B U D G E T I D F N T I F I C AT I C N N U M B E R 8 3 4 0 0 5 2 0 0 5 2 0 0 ANNUAL CAPITAL MONTH 12 \ _ ^ 21 HiNGW IVildVD 1VMNNV 5 0 0 2 5 0 0 7 £ 8 0 b 3 9 W 0 N N D I 1 V D I 3 11 N 3 Q I 1 3 9 Q n 8 5161 403lD3rjbd \_^ 22°1 sr*®- 8£T1 vxyrir srr'sY' 152*1 01*0 01*0 00*1 01*0 01*0 00*1 00*1 01*0 00*1 AVW bdV bdV dVW 833 93d 933 NVT NVT d3<\0 SbOUH SbnDH 3oDV b3d 3oDV bad SiSOD • o 3 d 4 # 9 i n 3iMlHDtfM b 0 9 V l S 3 w l i 03X1:1 4110413fl3 31VU tT*"^ 7l*0 0*0 VI *0 7l*0 £1*0 £2*0 7 T 0 7l*0 \ ^ ^ £0*1 81*0 0°0 81*0 81 *0 50*0 50*0 81 *0 £0*0 001*0 b90*0 001*0 001 a0 022*0 65T0 001 *0 £61 *0 52T0 160*0 521*0 52T0 0*0 6£2*0 52T0 062*0 01 01 98 4 7 01 01 09 7£*7 01 9£42 *0N W31I SlVxUi dn>IDld dn*Dld 0iN3b 4 I l d d V l b i 3 dnMDId dn>lDId QIDI8b3H b3AVodS • £I- DSIO W30NV1 dOXDld •£I 13SIHD NDIiVbddO 1M3W30VNVW IVDldAl 3oDV b3d SNbni3d ONV SlSOD 031VWUS3 N0i03b 1 SNIVld ONIllOd SVX51 403iV01bbI 4*8VlS3 SSVbOVQOWb39 1V1SV0D C O A S TA L B E R M U C A G R A S S , I R R I G AT E D , T E X A S R O L L I N G P L A I N S I R F G I O ' ESTIMATED COSTS AND RETURNS PER ACRF TYPICAL MANAGEMENT UNIT 1. GROSS RFCEIPTS FROM PRODUCTION HAY TOTAL VALUE Q5 PRICE C« COST/UNIT QUANTITY crsr $ TCN 32.00 7.00 -224+00 224.00 % VARIABLE COSTS PREHARVEST FERT(211-46-0) MACHINERY TRACTORS IRRIGATION MACHINERY LABORTRACTOR £ MACHINERY) LABOR?IRRIGATION) INTEREST CN OP. CAP. SUBTOTAL, PRE-HARVEST ACRE ACRE ACRE ACRE HOUR HCUR DOL. 71.96 1.07 0.62 22.31 2.75 2.75 0.09 HARVEST COSTS CUSTOM HARV£HAUL SUBTOTAL, HARVEST BALE 0.48 $ 1.00 1.00 1.00 loOO 1.14 2.83 36.77 71.96 1.07 0.62 22.31 3.13 7.78 2*42 %' 110.36 $ 231.00 _lli_ +35 110.88 $" TOTAL VARIABLE CCST $ 221.24 INCOME ABOVE VARIABLE COSTS $ 2.76 FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATED ESTAB. COST LANO (NET RENT) TOTAL FIXED COSTS $ ACRE ACRE ACRE ACRE ACRE 0.81 0.82 28.29 77.60 13.58 TOTAL COSTS 6. NFT RETURNS 1.00 1.00 1.00 0.10 1.00 0.81 0.82 28.29 7.76 -12+52 $" 51.27 % 272.™ S -48.50 LAND CHARGE USES LANDLORD SHARE OF GRCSS (1/3) LESS 1/3 OF FERTILISE* AND HARVEST. E S TA B L I S H M E N T C O S T S P R O R AT E D O V E R T E N Y E A R S . P R O J E C T E D , 1 9 7 5 B U C G E T I D E N T I F I C AT I C N N U M B E R 8 3 6 0 0 5 3 0 0 5 2 0 0 A N N U A L C A P I TA L M O N T H 9 J***^ 6 H1NDW IVildVD 1VMNNV 2 500 £5009£80 b38*nN NJ IlVDI3I1N3UI jl30UH9 5£6I 4u31D3rObd *SdV3A N31 b3AD OJiVbObo SISOD 1N3WHSi19VlSj •iS3AbVH ONV b3ZIllid33 30 £/I SS31 (£/l) SSObO 30 3dVHS UaOlONVl S3S0 30bVH'J ONVl 18*0 tT»(T 7l*0 7l*0 0*0 7T0 0#0 7 l •0 0 •0 7 l •0 0 •0 £0*1 ffT£T (JffTCr 858*0 57TCT i£TI CT*0 SlViOi idiS 01 dH>Did 8T0 001*0 52T0 0l*0 00V 01 d fl > i j i d 8T0 001*0 521*0 OTO Ainr 01 dOMDId 0*0 790*0 160*0 00*1 Ainr 9847 QiN3b4IlddV°l_ j_i 81*0 001*0 521*0 01*0 aNOP 01 d0>Old 0*0 790°0 i60*0 00°l 3N0T 9347 GiN3b4IIddV*lb33 dnXOId 81 • 0 OOI • 0 521*0 01 • 0 AVlrt 01 AVW 0'0 790 •0 ibO*0 00 ' I 98 **/ OiN3b* I l d d V i b d d bdV 01 dllMJld 81 • 0 001 °0 521*0 01 • 0 00• I bdV 98 4 7 QiN3b4 l l d d V l a j d 0 *0 790 •0 iSO'O 3bDV a d d 3dDV b 3 d * d 3 b 4 •8 01 S1SILID • 1 I G 4 1303 OiXld SaiiuH sanoH 3 N I H D VA a D 9 V l b J iAO S3wli 31VG . ON n3 i i N0Ilwa3dU iM3d39VNVto lVDidAl 3dDV d3d SNbOi3b ONV SISOD a31VfciUS3 \^ NGI03b I SUiVld ONlllOb SVX3A 403lV0IdbI 4SSVdOV30Wb38 IVISVOD COASTAL BERMUDAGRASS ESTAB., IRRIGATED, TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PFR ACRE HIGH LEVEL MANAGEMENT UNIT PRICE OR COST/UNIT QUANTITY 1. GROSS RECEIPTS FROM PRODUCTICN TOTAL 2. VARIABLE CCSTS PRFHARVEST CUSTOM SPRIGGING FERT(16-20-0) HERBICIDE MACHINERY TRACTORS IRRIGATICN MACHINERY LABOR(TRACTOR £ MACHINERY) LABOR!IPP IGATION) INTEREST CN OP. CAP. SUBTOTAL, PRE-HARVEST VALUE OR COST $ $ i ACRE ACRE ACRE ACRE ACRE ACRE HCUR HCUR DOL. 22.50 10.08 3.50 1.07 1.21 8.56 2.75 2.75 0.09 I.00 1.00 1.00 1.00 I.00 1.00 1.18 0.98 29.08 <f HARVEST COSTS SUBTCTAL, HARVEST 22.50 10.08 3.50 1.07 1.21 8.56 3.25 2.T1 2+15 55.64 0.0 $ 55.64 TOTAL VARIABLE CCST % -55.64 3. INCOME ABOVE VARIABLE CCSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATICN MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 0.0 $ ACRE ACRE ACRE ACRE 1.26 1.29 11 . 4 4 250.00 1.00 1.00 loOO 0.04 1.26 1.29 11.44 —10+00 % 23.99 5. TOTAL COSTS $ 79.63 6. NET RETURNS * -79.63 PROJEFTED, 1975 BUDGET IDENTIFICATICN NUMBER ANNUAL CAPITAL MONTH 12 834005200 520 0 COASTAL BERMUDAGRASS ESTAB., IRRIGATED, TEXAS ROLLING PLAINS I RFGIPN ^%, E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R F ' HIGH LEVFL MANAGEMENT FUEL,OIL, FIXED I T E M T I M E S L A B O R M A C H I N E L U B . , R E P. C O S T S O P E R AT I O N N O . D AT E O V E R H O U R S H O U R S P E R A C P E P ™ A C R F CHISEL 17' PICKUP OFFSET DISC SPRAYER HERBICID PICKUP PICKUP F F R T. A P P L l , R E N T D PICKUP pickup 10 may TO TA L S 1,37 10 1,59 61 10 10 3,87 10 JAN JAN FEB FEB FEB MAR APR APR O.io I.00 0.10 1.00 1.00 0.10 0.10 1.00 0.10 0.222 0.125 0.239 0.0 0.125 0.125 0.097 0.125 _0_125 1.183 0.148 0. 100 0.159 0.220 0.100 0.100 0.064 0. 100 -0*100 0.03 0.18 0.10 0.05 0. 18 0.18 0.0 0. 18 -0+12 1.092 1.07 0.13 0.14 0.28 0.17 0.14 0.14 0<.0 0. 14 .JCUJLi 1.26 >5B\ PROJECTED, 1975 BUDGET IDENTIFICATICN NUMBER 08340052 005 2 ANNUAL CAPTAL MONTH 12 y-5\. COASTAL BERMUDAGRASS, IRRIGATEO, TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER AC»E HIGH LEVEL MANAGEMENT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST 1. GROSS H AY TO TA L RECEIPTS TCN FROM 32.00 * PRODUCTION 10.00 2. VARIABLE COSTS PREHARVEST FFRT(411-48-0) MACHINERY TRACTORS IRRIGATICN MACHINERY LABOR(TRACTOR £ MACHINERY) LABOR(IRRIGATION) INTEREST CN OP. CAP. SUBTOTAL, PRE-HARVEST ACRE ACRE ACRE ACRE HOUR HOUR DOL. 128.52 0.89 0.79 31.03 2.75 2.75 0.09 I.00 1.00 1.00 1.00 1.11 3.57 61.55 HARVEST COSTS CUSTOM HARV£HAUL SUBTOTAL, HARVEST BALE 0.48 334.00 * 128.52 0.89 0.79 31.03 3.05 9.31 5*25 17Q.94 .150*22 $" 160.32 $ 340.26 TOTAL VARIABLE CCST $ -20.26 3. INCOME ABOVE VARIABLE CCSTS 4. FIXFD COSTS MACHINERY TRACTORS IRRIGATICN MACHINERY PRORATED ESTAB. COST LAND (NET RENT) TOTAL FIXED COSTS % -220+00 320.00 % ACRE ACRE ACRE ACRE ACRE 0.68 0.85 41.47 79.36 10.28 1.00 1.00 I.00 0.10 1.00 0.68 0.85 41.47 7.Q4 .-10+22 s 61.22 5. TOTAL COSTS 401.48 6. NET RETURNS -81.48 LAND CHARGE tSES LANDLORD SHARF OF GRCSS (1/3) LESS 1/3 OP FERTILIZE*? AND HARVEST. E S TA B L I S H M E N T C O S T S P R O R AT E D C V E R T E N Y E A R S . P R O J E C T E D , 1 9 7 5 B U D G E T I D E N T l c I C AT I C N N U M B E R 8 3 6 0 0 5 5 0 0 5 2 0 0 A N N U A L C A P I TA L M C N T H 9 C O A S TA L B E R M U D A G R A S S , I R R I G AT E D , T E X A S R O L L I N G P L A I N S I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPEPATION F F R T. A P P L I , R F N T D PICKUP F E R T. A P P L I , R E N T D PICKUP F E R T. A P P L ! , R E N T D PICKUP F E R T. A P P L I , R E N T D PICKUP FFP.T.APPLI , RENTD PICKUP TOTALS ITFM NO. 3,87 10 3,87 10 3,87 10 3,87 10 3,87 10 DATE FIXFD FUEL,OIL, C°STS TIMES LABOR MACHINF L U B . , P E P. OVER HOURS HOURS PEP ACRE PER ACRF APR APR MAY MAY JUNE JUNE J U LY J U LY AUG AUG 1.00 0.10 1.00 0.10 1.00 0.10 1.00 0.10 1.00 0.10 0.097 0.125 0.057 0.125 0.097 0.125 0.097 0.125 0.097 0.064 0.100 0.064 0.100 0.064 0.100 0.064 0.100 0.064 0.0 0.18 0.0 0.18 0.0 0.18 0.0 0.19 0.0 0.0 0.14 0.0 0.14 0,0 0.14 0.0 0. 14 0.0 -12*125 -0*100 -0*13 -0*14 1.108 0.822 0.89 0.68 LAND CHARGE USES LANDLORD SHARE OF GROSS (1/3) LESS 1/3 OF FERTILIZER AND HARVEST. E S TA B L I S H M E N T C O S T S P R O R AT E D C V E R T E N Y E A R S . P R O J E C T E D , 1 9 7 5 B U D G E T I D F N T I F I C AT I C N N U M B E R 0 8 3 6 0 0 5 5 0 0 5 2 A N N U A L C A P I TA L M O N T H 9 - ^ COTTON, DRYLAND, TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RFTURNS PF» ACRE TYPICAL MANAGEMENT PRICE OP VA L U E P=> UNIT COST/UNIT QUANTITY C^ST 1. GROSS RECEIPTS FRCM PRODUCTION COTTON LINT COTTONSEEO TOTAL 2. VARIABLE COSTS PREHARVEST SEED HERBICIDE MACHINERY TRACTORS LABOR(TRACTOR £ MACHINEPY) INTEREST CN OP. C A P. 0.38 120.00 175.00 0.21 LBS. ACRE ACRE ACRE HOUR DOL. 0.26 5.06 2.38 5.03 2.75 0.09 8.00 1.00 1.00 1.00 4.29 8.74 BALE ACRE ACRE HOUR 31.00 0.14 0.79 2.75 0.35 1.00 1.00 0.50 LBS. TON SUBTOTAL, PRE-HARVEST /^"*N HARVEST COSTS GIN, BAG, TIES MACHINERY TRACTORS LABOR(TRACTOP. £ MACHINERY) SUBTCTAL, HARVEST *"" 91.70 2.08 5.06 2.38 5.03 11.80 &*22 $ 27.18 10.85 0.14 0.79 1*24 $ 13.15 $ 40.33 TOTAL VARIABLE COST * 51.37 3. INCOME ABOVE VARIABLE CCSTS 4. FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TO TA L F I X E D COSTS 66.50 -25*20 $ ACRE ACRE ACRE 4.63 7.38 18.95 1.00 1.00 1.00 4.63 7.38 * 12*95 30.96 5. TOTAL COSTS 71.29 6. NET RETURNS 20.41 350 POUNDS CN ACRE OF COTTCN. LAND CHARGE BASED CN LANDLORD SHARE OF CROP (1/4) LESS 1/4 OF CHEMICALS, HAUL, GIN, BAG, AND TIES. PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 0 0 5 0 0 0 5 0 0 0 A N N U A L C A P I TA L M O N T H 11 \ _ B ^ 0 500 0500 £6C II H1NDW IVildVD lVONi.V — b39wnN NOIlVDl3liN30I 130009 52.61 403lD3rObd •S3I1 ONV 4 0 V 9 4 N I 0 4mVH 4S1VDIW3HD 3G 7/1 S S 3 1 ( 7 / 1 ) d O b D 3 0 J b V H S U b U l G N V l NG 03SV9 3 0 d V H D 0 N V 1 * N O i i G D d O 3dDV ND SONOGd 05£ £9°7 \ ^ s tT'O*" 06*0 7l*0 7 T 0 71*0 bTO £2*0 £0*0 ££*0 7l*0 7 T 0 ££'0 7 T 0 11 * 0 57*0 VTG 7l*0 01*0 ♦/I *0 e i ' o £2°0 91*0 25 °2 6l5°£ 181*7 \rrrr vurvr 7 T 0 81*0 81 Q0 8 T 0 90*0 10*0 00*0 60*0 81*0 8 TO 60'0 81*0 50"0 11 * 0 8Ia0 81*0 20*0 8 T 0 80*0 S0°0 £0-0 3dDV o3d 3dDV d3d biSuD •d3b4*801 03X13 4lIU4l3f.3 ZZVTT SIVlGi 01*0 05*0 01*0 PTO 01*0 OOM 00*1 OOM 00*1 OTO OTO 00*1 OTO 00*1 00*2 OTO 01*0 01*0 OTO 0£*0 00*1 00*1 AON AON ld3S Ainr 3N0T 3Nnr 3Nnr 3Nnr 3Ninr AVh bdV bdV bVh dVW bVh 933 Nvr Nvr D30 D3G D30 D30 SbnOH SbOOH b3AD 3NIHDVK b09Vl S3WI1 31V0 I££*0 001*0 001*0 OOTO 5I2°0 512*0 £90*0 1£2*0 001*0 OOTO 1£2'0 OOI *0 022*0 6I£*0 OOTO 001*0 5£1*0 OOI °0 27T0 651 °0 i.T£*0 967*0 521*0 5 2 T 0 521*0 2 2 T 0 22£*0 760*0 i7£*0 S2T0 5 2 T 0 l7£*0 521*0 0*0 8*7*0 S 2 T 0 521*0 £02*0 S2T0 712*0 6£2*0 52.7*0 01 9747 01 01 01 2£42 7S47 0549 0£42 01 01 0£42 01 09 7£*7 01 01 9£42 01 8£42 7£47 0749 dP>OId b3ddIblS dnXDld d(l>lDld dP>iDId d 7 b O i VA I i l O D b7 331NX b8 d3lH0I3GNVS b3lNVld ddiSIl dn>iDId dn>IDId b31NVld b3lSil df.>IDId 0 I D 1 8 b 3 H d 3 AV b d S »£I-DSiG W3GNV1 dOXDld dOXDId »EI 13S1HD dn>JDld *W19 7 abVG8GlGrt •£l-DSia hdONVl oZ b3GU3bHS •ON U31I 1N3W3DVMVW lVDldAl roW b3d SNd013b ONV SlSGD 03iVWIiS3 N0103b I SNIVld ONIllDb SVX31 40NVlAbQ 4N01iOD N0IiVd3dG COTTON, DRYLAND, TEXAS POLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT PRICE PR VA I U E OP UNIT COST/UNIT QUANTITY COS^ 1. GROSS RECEIPTS FROM PRODUCTICN COTTON LINT COTTONSEED TOTAL VARIABLE COSTS PREHARVEST SEED FERTI33-0-0) HERBICIDE INSECTICIDE I N S E C T. APPLI. MACHINERY TRACTORS LABOR!TRACTOR £ MACHINERY) INTEREST CN O P. C A P. SUBTOTAL, PRE-HARVFST HARVFST COSTS HAUL,GIN,B£T MACHINERY TRACTORS LABOR(TRACTOR SUBTOTAL, £ MACHINERY) HARVEST IBS. TON 0.38 225.00 120.00 0.27 LBS. ACRE ACRE APPL APPL ACRE ACRE HOUR DOL. 0.32 9.24 5.06 2.70 1.75 2.48 4.38 2.75 0.09 BALE ACRE ACRE HOUR 31.00 0.21 0.81 2.75 8.00 1.00 1.00 1.00 1.00 1.00 1.00 3.32 17.04 2.56 9.24 5.06 2.70 1.75 2.48 4.38 9.13 -1*32 38.91 0.45 I.00 1.00 0.50 13.95 0.21 0.81 * 1*25 16.34 !» 55.25 TOTAL VARIABLE CCST % 62.65 3. INCOME ABOVE VARIABLE CCSTS 4. FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS 85.50 22*40 * 117.90 ACRE ACRE ACRE 5.05 5.57 21.74 1.00 1.00 1.00 5.05 5.57 —21*14 $ 32.37 5. TOTAL COSTS * 87.62 6. NET RFTURNS % 30.28 450 POUNDS CN ACRE OF COTTCN. LAND CHAPGE BASEC ON LANDLORD SHA^F OF CROP Ii/4) LESS 1/4 OF CHEMICALS, HAUL, GIN, BAG, ANP TIES. PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 0 0 5 0 0 0 5 0 0 0 A N N U A L C A P I TA L M O N T H 11 s^%. C O T TO N , D RY L A N D , T E X A S R O L L I N G P L A I N S I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION SHREDDER 4R OFFSET DISC MOLDBOARD 5 BTM. PICKUP CHISEL 17« PICKUP PICKUP F E R T. A P P L I , R E N T D TA N D E M D I S C - 1 6 * SPRAYER HEPBICID PICKUP LISTER PLANTER PICKUP PICKUP LISTER PLANTER SANDFIGHTER 8R POLLING CULT 6R PICKUP PICKUP PICKUP STRIPPER£BASKET PICKUP ITEM NC. 3,41 1,59 1,39 10 1,37 10 10 3,87 1,35 61 10 1,31 10 10 1,31 5,51 1,53 10 10 10 3,47 10 DATE FUFUOIL, FIXED T I M E S L A B O R M A C H I N E L U B . , R E P. C O S T S OVER HOURS H1U0S PER ACRF PFR ACRE DEC DEC DEC OEC JAN JAN FEB MAR MAR MAR MAR APR APR MAY JUNE JUNE JUNE JUNE J U LY SEPT NOV NOV 1.00 I.00 0.30 0.10 0.70 0.10 0.10 1.00 2.00 LOO 0.10 1.00 0.10 0.10 1.20 1.00 1.00 0.10 0.10 0.10 0.50 0.10 TOTALS 0. 160 0.159 0 . 11 3 0. 100 0. 104 0.100 0.100 0.064 0.259 0.220 0.100 0.154 0.100 0.100 0.185 0.063 0.121 0.100 0.100 0.100 0.331 0.06 0. 10 0.09 0. 18 0.02 0.18 0. 18 0.32 0,28 0.20 0.14 0.09 0.14 0.14 0.0 0.0 0.09 0.0*5 0.18 0.09 0. 18 0.18 0.00 0.08 0. 18 0.18 0.18 0.21 0.37 0.17 0.14 0.33 0. 14 0.14 0.39 0.03 0.18 0.14 0.14 0.14 1.34 -O+lsU - 0 + 1 0 0 -0+13 -0+14 2.69 5.05 0.239 0.239 0.170 0.125 0.155 0.125 0.125 0.097 0.388 C O 0.125 0.231 0.125 0.125 0.277 0.094 0.181 0.125 0.125 0.125 0.496 3.817 2.932 O . l l 450 POUNDS ON ACRF OF COTTCN. LAND CHARGE BASED ON LANDLORD SHAPE OF CROP !l/4) LESS 1/4 OF CHEMICALS, HAUL, GIN, BAG, AND TIES. PROJECTED, 1975 BUCGET IDENTIFICATION NUMBER A N N U A L C A P I TA L M O N T H 11 093 0050 005 0 FORAGF SORGHUM SILAGE, DRYLAND, TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST 1. GROSS RECEIPTS FROM PRODUCTICN SILAGE TOTAL TCN 10.00 7.50 2 . VA R I A B L E C O S T S PREHARVEST SEEn FERT(4C-0-0) MACHINFRY TRACTORS L A B I R T R A C T O R £ MACHINERY) INTEREST ON OP. C A P. SUBTOTAL, PRE-HARVEST LBS. ACRE ACRE ACRE HOUR DOL. 0.32 11 . 2 0 2.32 5.3? 2.75 0.09 10.00 I.00 1.00 1.00 4.37 9.93 4.5 0 7.50 HARVEST COSTS CUSTOM HARV£HAUL SUBTOTAL, HARVEST 3.20 11.20 2.32 5.33 12.03 —Q-2$"" 35.02 $ TCN TOTAL VARIABLE CCST 3. INCOME ABOVE VARIABLE COSTS -22*25 %~ 33.75 $ 68.77 t 6.23 $ 4. FIXED COSTS MACHINERY TRACT0°S LAND (NCT TOTAL FIXEO COSTS —15+00 % 75.00 RENT) ACRE ACRE ACRE 3.44 6.50 9.92 5« TOTAL COSTS 6. NET RETURNS I.00 I.00 1.00 3.44 6.50 $ * _,—2*22 19.85 88.62 * -13.62 LAND CHARGE USES LANDLORD SHARP OF GROSS (1/3) L^SS 1 / 3 O F F C P T I L I Z E R AND HARVEST. PROJECTED, 1975 B U D G F T I D E N T I F I C AT I C N N U M B E R — - 8 7 6 0 0 5 0 0 0 5 0 0 0 A N N U A L C A P I TA L M O N T H 9 FORAGE SORGHUM SILAGE, DRYLAND, TEXAS ROLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION SHREDDER 2R PICKUP TA N D E M D I S C - 1 3 * MOLDBOARD 4 BTM. CHISEL 13* PICKUP PICKUP F E R T. A P P L I , R E N T D TA N D E M D I S C - 1 3 * LISTER PLANTER PICKUP PICKUP LISTER PLANTER SANDFIGHTER 8R KNIFE 4R PICKUP CULTIVATOR 4R PICKUP CULTIVATOR 4R PICKUP PICKUP PICKUP TO TA L S ITEM NO. 6,40 10 4,34 2,38 2,36 10 10 4,86 4,34 2,30 10 10 2,30 6,50 4,54 10 2,32 10 2,32 10 10 10 DATE TIMES LABOR MACHINE OVER HCURS HOURS DEC DEC JAN JAN JAN JAN FEB MAR MAR MAR MAR APR MAY MAY MAY MAY JUNE JUNE J U LY J U LY AUG SEPT 1.00 0.10 I.00 0.30 0.70 0.10 0.10 1.00 0.30 LOO 0.10 0.10 1.20 1.00 LOO 0.10 1.00 0.10 1.00 0.10 0.10 0.10 4.373 0.475 0.125 0.239 0.214 0.203 0.125 0.125 0.097 0.072 0.347 0.125 0.125 0.417 0.094 0.322 0.125 0.322 0.125 0.322 0.125 0.125 0.317 0.100 0.159 0.142 0.135 0.100 0. 100 0.064 0.048 0.231 0.100 0.100 0.278 0.063 0.215 0.100 0.215 0.100 0.215 0. 100 0.100 -0*125 -0+100 3.082 FIXED FUEL,OIL, COSTS L U B . , R E P. PER ACRE PER ACRE 0.03 0.18 0.05 0.08 0.02 0.18 0.18 0.0 0.02 0.09 0.18 0.18 0 . 11 0.00 0.01 0.18 0.06 0.18 0.06 0.18 o.ie -0*12 2.32 0.16 0.14 0.23 0.18 0.10 0.14 0.14 0.0 0.07 0.33 0.14 0.14 0.39 0.03 0.23 0.14 0.19 0.14 0.19 0.14 0.14 _a*JLii 3.44 LAND CHARGE USES LANDLORD SHARE OF GROSS (1/3) LESS 1/3 OF FERTILIZER AND HARVEST. PROJECTED, 1975 BUDGET IDENTIFICATION NUMBER 08760050 005 0 ANNUAL CAPITAL MONTH 9 FORAGE SORGHUM SILAGE, DRYLAND, TEXAS POLLING PLAINS I RrGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT PRICE OR VA L U F 0°. UNIT COST/UNIT QUANTITY COST 1. GROSS SILAGE TO TA L RECEIPTS TCN FROM 10.00 % PRODUCTICN 11 . 2 5 $ _ 11 2 . i 5 < 2 11 2 . 5 0 2 . VA R I A B L E C O S T S PREHARVEST $ SEED LBS. 0.32 10.00 FERT(60-0-0) ACRE 16.80 1.00 MACHINERY ACRE 2.48 1.00 TRACTORS ACRE 4.15 1.00 LABOR(TRACTOR £ MACHINERY) HOUR 2.75 3.42 INTEREST CN O P. C A P. DOL. 0.09 11 . 0 1 S U B TO TA L , PRE-HARVEST $ HARVEST CUSTOM HARV£HAUL S U B TO TA L , TO TA L 3. 4. COSTS TON HARVEST VA R I A B L E INCOME VA R I A B L E FIXED MACHINERY ACRE TRACTORS ACRE LAND (NET RENT) TO TA L FIXED 5. TO TA L 6. NET % 4.50 11 . 2 5 50*52 50.63 $ P7.70 $ COST ABOVE 3.20 16.80 2.48 4.15 9.40 1_$5 37.08 COSTS COSTS 3.63 4.55 ACRE 14.87 COSTS COSTS RETURNS $ 24.80 u 1.00 1.00 1.00 $ 3.63 4.55 14*31 $~~23.06 UO.76 $ I.74 LAND CHARGE USES LANDLORD SHARE OF GROSS (1/3) LESS 1/3 OF FEptILI7Ep AND HARVEST. PPOJEC-TED, 1975 BUDGET IDENTIFICATION NUMBER 876005000 500 0 ANNUAL CAPITAL MONTH 9 FORAGE SORGHUM SILAGE, DRYLAND, TEXAS-ROLLING PLAINS I PFGIHN ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPFRATION SHREDDER 4P PICKUP ■nEFSET DISC MOLDBOARD 5 BTM. CHISEL 17» PICKUP PICKUP P E R T. A P P L I , R F N T D TA N D E M D I S C - 1 6 * LISTER PLANTEP PICKUP PICKUP LISTER PLANTER SANDFIGHTER 8P POLLING CULT 6P PICKUP CULTIVATOR 6R PICKUP C U LT I VAT P P 6 R PICKUP PTCKUP PICKUP TO TA L S ITEM NO. D AT E 5,41 10 1,59 1,39 1,37 10 10 3,87 1,35 1,31 10 10 1,31 5,51 1,53 10 3,33 10 3,33 10 10 10 DEC DEC JAN JAN JAN JAN FEB MAR MAR MAR MAP APR MAY MAY MAY MAY JUNF JUNE J U LY J U LY AUG SEPT 3.420 TIMES; LABOR MACHINE CVER HOURS HOURS LOO 0.10 1.00 0.30 0.70 0.10 0.10 1.00 0.30 1.00 0.10 0.10 1.20 1.00 1.00 0.10 1.00 0.10 1.00 0.10 0.10 0.239 0.125 0.239 0.170 0.155 0.125 0.125 0.097 0.058 0.231 0.125 0.125 0.277 0.094 0.181 0.125 0.214 0.125 0.214 0.125 0.125 0.160 0.100 0.159 0 . 11 3 0.104 0.100 0.100 0.064 0.039 0.154 0.100 o.ioo 0.185 0.063 0.121 0.100 0.143 0. 100 0.143 0.100 0. 100 0.10 _0_125 .- 0 * 1 0 0 2.446 FUEL,OIL, FIXFD L U B . , R F P. COSTS PER ACRE PEP ACRE 0.06 0.18 Oo 10 0.09 0.0? 0. 18 0.18 0.0 0.01 0.09 0. 18 0.18 0. 11 0.00 0.08 0. 18 0.06 0. 18 0.06 0.18 0.18 0.32 0. 14 Oo 28 0.20 0.09 0.14 0. 14 0.0 0.05 9.33 0. 14 0. 14 0. 39 0.03 0. 18 0. 14 0.20 0. 14 0.20 Oo 14 0. 14 -0*12 -0+14 2.48 3.63 •"-^^ LAND CHARGF USES LANDLORD SHARE OF GROSS (1/3) LFSS 1/3 OF FFRTIL'7FR AND H A R V E S T. " PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R 0 8 7 6 0 0 5 0 0 0 5 0 A N N U A L C A P I TA L M C N T H 9 ^^S. GUAR, DRYLAND, TEXAS ROLLING PLAINS T REGION ESTIMATED COSTS AND RETURNS PEP ACRF TYPICAL MANAGFME_NT p o i c e O R VA L U E 0 ° UNIT COST/UNIT QUANTITY CnST 1. GROSS RECEIPTS FROM PRODUCTION GUAR TOTAL * CWT. 2. VARIABLE COSTS PREHARVEST SEED MACHINERY TRACTORS LABORITRACTOR £ MACHINERY) INTEREST CN OP. CAP. SUBTOTAL, PRE-HARVEST LBS. ACRE ACRE HOUR POL. HAPVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL, HARVEST ACRE CWT. 10.00 6.00 JiO*Q3 60.00 * 0.16 2.38 4.67 2.75 0.09 1.28 2.38 4.67 10.86 8.00 LOO 1.00 3.95 3.78 —0*25 19.55 9.00 0.20 9.00 1.00 6.00 —1*20 10.20 * TOTAL VARIABLE COST 29.75 30.25 3. INCOME ABOVE VARIABLE CCSTS 4. FIXED COSTS MACHINERY TRACTOPS LAND (NET RENT) TOTAL FIXED COSTS ACRE ACRE ACRE 3.32 5.39 16.43 1.00 1.00 LOO 3.32 5.39 -15*42 25.15 5. TOTAL COSTS t 54.90 6. NET RETURNS $ 5.10 LAND CHARGE USES LANDLORD SHARE OF GROSS (1/3) LESS 1/3 OF HAUL AND HARVEST. PROJECTED, 1975 BUDGET IDENTIEICATICN NUMBER 903005000 500 0 ANNUAL CAPITAL MONTH 10 /■"^Ik G U A R , D RY L A N D , T E X A S P O L L I N G P L A I N S I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT O P F R AT I O N NO. FUEL,OIL, FIXED I T E M T I M E S L A B O R M A C H I N E L U B . , R E P. C O S T S D AT E O V E R H O U R S H G U R S P E P A C R E P E R A C R E MOLDBOARC 4 BTM. 2,38 DEC 0.30 0.214 0.142 0.08 0.18 PICKUP 10 DEC 0.10 0.125 0.100 0.18 0.14 CHISFL 13* 2,36 JAN 1.40 0.406 0.271 0.05 0.19 PICKUP 10 JAN 0.10 0.125 0.100 0.18 0.14 PICKUP 10 FEB 0.10 0.125 0.100 0.18 0.14 TA N D E M DISC-131 4,34 MAR 0.30 0.072 0.048 0.02 0.07 LISTER PLANTER 2,30 MAR LOO 0.347 0.231 0.09 0.33 PICKUP 10 MAR 0.10 0.125 0.100 0,18 0.14 PICKUP 10 APR 0.10 0.125 0.100 0.18 0.14 SANDETGHTER 8R 6,50 M AY 2.00 0.188 0.125 0.01 0.06 KNIFE 4R 4,54 M AY 1.00 0.322 0.215 0.01 0.23 PICKUP 10 M AY 0.10 0.125 0.100 0.18 0.14 LESTER PLANTER 2,30 JUNE 1.10 0.382 0.255 0. 10 0.36 KNIFE 4R 4,54 JUNE 1.00 0.322 0.215 0.01 0.23 PICKUP 10 JUNF 0.10 0.125 0.100 0.18 0.14 C U LT I VATO R 4R 2,32 J U LY 1.00 0.322 0.215 0.06 0.19 PICKUP 10 J U LY 0.10 0.125 0.100 0.18 0. 14 PICKUP 10 AUG 0.10 0.125 0.100 0.18 0.14 PICKUP 10 SEPT 0.10 0.125 0.100 0.18 0.14 PICKUP 10 OCT 0.10 JL+125 -0+100 -0*12 _J__-l_t TO TA L S 3.950 2.817 2.38 3.32 LAND CHARGE USES LANDLORD SHARE OF GROSS (1/3) LESS 1/3 OF HAUL AND HARVEST. PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R 0 9 0 3 0 0 5 0 0 0 5 0 A N N U A L C A P I TA L M O N T H 1 0 GUAR, DRYLAND, TEXAS POLLING PLAINS I REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVFL MANAGEMENT PRICE CR VA L U F OP UNIT COST/UNIT QUANTITY COST 1. GROSS RECEIPTS FROM PRODUCTION GUAR TOTAL CWT. 10.00 10.00 * 2 . VA R I A B L E C O S T S PREHARVEST MACHINERY TRACTORS LABOR(TRACTOR £ MACHINERY) INTEREST CN OP. CAP. 2.53 3.68 2.75 0.09 2.53 3.68 8.70 LOO 1.00 3.16 3.04 0+22 15.20 ACRE CWT. 9.50 0.20 9.50 LOO 10.00 2*00 11 . 5 0 TOTAL VARIABLE COST ^ 100.00 $ ACRE ACRE HOUR DCL. SUBTOTAL, PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL, HARVEST .12!3aJBQ 26.70 3. INCOME ABOVE VARIABLE COSTS 73.30 4. FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS ACRE ACRE ACRE 3.24 3.99 29.20 1.00 LOO I.00 3.24 3.99 .-22*20 36.43 5. TOTAL COSTS 6. NET RFTURNS 63.13 $ 36.87 LANC CHARGE USES LANDLORD SHARE OF GROSS (1/3) LESS 1/3 OP HAUL AND HARVEST. PROJECTED, 1975 BUDGET IDENTIFICATICN NUMBER 903005000 500 0 ANNUAL CAPITAL MONTH 10 GUAR, DRYLAND, TEXAS POLLING PLAINS I RPGTON ESTIMATED COSTS AMU RETURNS PER ACRE HIGH LEVEL MANAGFMCNT OPERATION MCLDBOARD 5 BTM. PICKUP CHISEL 17* PICKUP PICKUP TAN D EM D ISC -1 6 * LISTER PLANTFP PICKUP ROLLING CULT 6P PICKUP SANDFIGHTER 8R PICKUP LISTER PLANTER POLLING CULT 6R PICKUP CULTIVATOR 6P PICKUP PICKUP PICKUP PICKUP TO TA L S ITFM NO. DATE 1,39 10 1,37 10 10 1,35 1,31 10 1,53 10 5,51 10 1,31 1,53 10 3,33 10 10 10 10 DEC DEC JAN JAN FEB MAR MAP MAR APR APR MAY MAY JUNE JUNE JUNE J U LY J U LY AUG SEPT OCT 3.163 FIXED PUEL,0!L, TIMES LABOR MACHINE L U B . , R E P. COSTS OVER HOURS HOURS PER ACRE PER. ACRE 0.30 0.10 1.40 0.10 0.10 0.30 LOO o.io 1.00 0.10 2.00 0.10 1.10 LOO 0.10 LOO 0.10 0.10 0.10 0.10 0.170 0.125 0 . 3 11 0.125 0.125 0.058 0.231 0.125 0.181 0.125 0.188 0.125 0.2 54 0.181 0.125 0.214 0.125 0.125 0.125 -0*125 0 . 11 3 0.100 0.20 7 0.100 OolOO 0.039 0.154 0. 100 0.121 0.100 0.125 0.100 0. 169 0.121 0.100 0.143 0.100 0.100 0.100 - j Q x l fi i Q 2.292 0.09 0.18 0.04 0.18 0.18 0.01 0.09 0.18 0.08 0.18 0.01 0.18 0.10 0.08 0.18 0.06 0.18 0.18 0.18 0.20 0.14 0.18 0.14 0.14 0.05 0.33 0.14 0.18 0. 14 0.06 0.14 0.36 0.13 0.14 0.20 0.14 0.14 0.14 -0*13 _£«.!* 2.53 3.24 LAND CHARGE USES LANDLORD SHARE OF GROSS (1/3) LESS 1/3 OF HAUL AND HARVEST. PROJECTED, 1975 B U D G F T I D E N T I F I C AT I O N N U M B E R 0 9 0 3 0 0 5 0 0 0 5 0 A N N U A L C A P TA L M O N T H 1 0 ^ * \