r 03000300 TEXAS HIGH PLAINS III FOREWORD r Enterprise budgets were developed for all of the crops that are produced on at least 1 percent of the cropped land in the mixed lands soil resource area. This area includes Bailey, Borden, Cochran, Dawson, Garza, Hockley, Lamb, Lub bock and Lynn counties. All budgets on irrigated crops reflect the assumption of adequate supplies of underground irrigation water to obtain optimum production. All crops except corn were assumed irrigated by sprinkler systems. Most of the corn in this area is produced in Lamb and Bailey counties; hence, the budgets for corn are applicable spe cifically to these two counties. The enterprise budgets developed for High Plains III were based on the following assumed organizations. Farm size Cotton allotment Feed grain base Other cropland Irrigated (acres) 800 265 400 135 Dryland (acres) 1600 530 800 270 The machinery inventory (03000500) is ap plicable to all situations since no difference in equipment was found between high level and average managers, and dryland units of approxi mately twice the size of irrigated farms have similar equipment inventories. c All calculations of government payments and comments concerning set-aside requirements are based on the 1971 farm program. All govern ment payments indicated herein are net of nor mal crop share rent. Land charges were calculated as the landlords share of the gross income less his proportionate share of the variable inputs, if applicable, and 80 percent of the fixed cost on the irrigation system. Normal crop share rentals in this area provide for the landlord to pay a portion of the cost of chemicals and the harvest on most crops. The exceptions in these budgets are alfalfa and permanent pasture where the landlord pays none of the costs of the variable inputs. A flat land charge of $20 per acre was used for the estab lishment of both alfalfa and permanent pasture. In one instance, permanent pasture typical man agement, the land charge calculated as 14 of the gross return less 80 percent of the fixed cost on the irrigation system was negative. In this case, a land charge of zero was used. The following crop shares were assumed. Crop Cotton Grain sorghum Corn Wheat Forage sorghum Soybeans Alfalfa Permanent pasture Southern peas Landlord's Share Va Vs Va Vs Vs Va Va V a Vs TEXAS HIGH PLAINS III REGION Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size Purchase Price Tr a c t o r - 1 0 0 H P ( 1 - 2 ) $ 11 0 2 5 Tractor 45 HP (5-6) 3675 Tractor 120 HP (7-8) 16275 Pickup 1/2 ton (10) 3402 Rolling cultivator - 6 row (31-32) 1785 Moldboard plow - 4B (33-34) 1470 Chisel 13 feet (35-36) 840 Float 7 feet (36-37) 1575 Ta n d e m D i s c - 1 3 f e e t ( 4 3 - 4 4 ) 1 6 8 0 Drill 16 feet (45-46) 1680 Shredder - 4 row (47-48) 1470 S a n d fi g h t e r - 2 0 f e e t ( 4 9 - 5 0 ) 3 1 5 Clodbuster - 2 row (51-52) 404 Herbicide sprayer - 24 feet (53-54) 525 To o l B a r - 2 0 f e e t ( 5 5 - 5 6 ) 2 1 0 Lister 8 row (59-60) 1800 Lister - Planter - 8 row (61-62) 3000 Bed Planter - 8 row (63-64) 2000 Rolling Cultivator - 8 row (65-66) 2040 Bed Knife - 8 row (67-68) 1000 Shredder 2 row (69-70) 368 Estimated Years of Use Estimated Hours of Use 5 12 5 3 8 8 8 10 8 10 8 10 12 10 12 8 8 8 8 8 8 5000 7200 5000 2100 1280 1600 1600 1000 2000 1200 1000 2000 2004 2000 2004 1600 2000 2000 1200 800 1000 Fixed Costs Per Hour $2.11 .85 3.19 1.31 1.90 1.26 .72 2.43 1.15 2.66 2.02 .24 .34 .41 .18 1.54 2.06 1.37 2.33 1.72 .50 Variable Costs Per Hour $2.64 1.29 3.30 1.86 .83 .72 .24 .28 .57 1.32 1.01 .11 .15 .18 .08 .90 1.20 .80 1.17 .74 .10 ALFALFA FSTAB.. IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT PRICE OR COST/UNIT QUANTITY VALUF OR COST GROSS RECEIPTS FROM PRODUCTION TOTAL 2. VARIABLE COSTS PREHARVEST SEED FERT(20-100-0) MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTRACTOR & MACHINERY) LABOR(IRRIGATION) INTEREST ON OP, CAP, 0,0 .BS, ACRE ACRE ACRE ACRE HOUR HOUR DOL, 1 .75 36.00 1.47 3.18 10,92 2.75 2.75 0.10 38.50 36.00 1.47 3. 18 10.92 4.99 7.70 22.00 1.00 1.00 1.00 1.00 1.82 2.80 29.22 * SUBTOTAL, PRE-HARVEST HARVEST COSTS SUBTOTAL, HARVEST 0.0 s TOTAL VARIABLE COST ^ 105.69 $ -- 1 0 5 . 6 9 3, INCOME ABOVE VARIABLE COSTS A, FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAMD (NET RENT) TOTAL FIXFD COSTS 2*92 105.69 s ACRE ACRE ACRE ACRE 1.83 2.94 15.96 47.02 1.00 1.00 1.00 1.00 1.83 2.94 15.96 —lZ.e_.02 67.75 5. TOTAL COSTS $ 173.44 6, NET RETURNS s-- 1 7 3 . 4 4 * LAND CHARGE BASED ON S55/ACRE LESS 50 PCT. OF IRRIG. FIXED COSTS. PROJECTED. 1975 BUDGET IDENTIFICATION NUMBER ANNUAL CAPITAL MONTH 12 ifjPN 811003302 320 0 ALFALFA ESTAB., IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION MBPLOW 4B CLOD BUSTER TANDEM DISC P E R T. A P ^ L I . R E N T D GRAIN DRILL PICKUP PICKUP PICKUP PICKUP TOTALS ITEM NO, 8,34 52 8,44 6,86 2,46 10 10 to 10 DATE FIXED FUEL,OIL, COSTS MACHINE L U B , , R E P, T I M E S LABOR PER ACRE HOURS PER ACRE HOURS OVER JUNE JUNE AUG AUG AUG AUG OCT NOV DEC 1,00 1.00 I.00 1 .00 l.OC 0.10 0.10 0.10 0.10 0,712 0.0 0.239 0.097 0,269 0,125 0,125 0,125 0.475 0.404 0. 159 0.064 0. 179 0.1 00 0.100 0.100 1 ,816 1.6 8? . i x l S - k _£xlX& 0,34 0*06 0.09 0.0 0,24 0, 19 0,19 0, 19 0,60 0,14 0,18 0,0 0,39 0,13 0,t3 0,13 _£a12 ___&a13 1 ,47 1 .83 1 * L A N D C H A P G E B A S E D O N S 5 5 / A C R E L E S S 5 0 P C T. O F I R R I G . F I X E D C O S T S . ^ PROJECTED, 1975 1 B U D G E T I D E N T I F I C AT I O N N U M B E R 0 8 11 0 0 3 3 0 2 3 2 ANNUAL CAPITAL MONTH 12 <-5^S\ ALFALFA, IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION HAY TOTAL 2, VAPIABLE COSTS PREHARVEST FERT(0-80-40) MACHINERY TRACTORS IRRIGATION MACHINERY LABORITRACTOR & MACHINERY) LABORCIRR IGATION) INTERFST ON OP. CAP. SUBTOTAL. PRE-HARVEST TON PRICE OR VA L U F OR COST/UNtT QUANTITY COST 20.00 6.50 S 130.00 ACRE ACRE ACRE ACRE HOUR HOUR DOL, 32.00 1,30 0,20 18.72 2.75 2.75 0.10 1.00 1.00 1.00 1.00 0.97 4.80 25.17 32.00 1.30 0.20 18.72 2.67 13.20 s HAPVEST COSTS SUBTOTAL, HARVEST 0.0 s TOTAL VARIABLE COST 0*s 70.61 59.39 3, INCOME ABOVE VARIABLE COSTS 4, FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATEO ESTAB, COST LAND (NET RENT) TOTAL FIXED COSTS 2__5£ 70.61 ACRE ACRE ACRE ACRE ACRE 0.9? 0.16 27.36 173.44 41.32 1.00 1.00 1.00 0.14 1.00 0.92 0.16 27.36 24.80 .-±1*22 94.56 5, TOTAL COSTS $ 165.18 6. NET RETURNS $ -35.18 * LA>JD CHARGE BASED ON S55/ACRE LESS 50 PCT. OF IRRIG. FIXED COSTS. * ESTABLISHMENT COST PRORATED OVER 7 YEARS. CROP SOLD STANDING IN FIELD. PROJECTED. 1975 BUDGET IDENTIFICATION NUMBER ANNUAL CAPITAL MONTH 10 81 003602 320 0 ALFALFA. IRRIGATFD, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION) F E R T. A P P L I , R F N T D PICKUP PICKUP P ICKU^ PICKUP PICKUP PICKUP PICKUP ITEM NO, 2,86 10 10 10 10 10 10 10 DATE FUEL.OIL, FIXED T I M E S LABOR MACHINE L U B . , R E P. COSTS OVER HOURS HOURS PER ACRE PER ACRE MAR MAR MAY JUNF J U LY AUG SEPT OCT 1 ,00 0.10 0,10 0,10 0,10 0,10 0,10 0,10 TOTALS 0,097 0,125 0,125 0,125 0.125 0.125 0.125 0.064 C.100 0. IOC 0.100 0,100 C.100 0.100 -Cul__§ _&a.2£ 0,0 0, 19 0, 19 0. 19 0,19 0, 19 0, 19 -&A12 _-_.-_.12 0.972 0.764 1 .30 0.92 0,0 0,13 0,13 0,13 0,13 0,13 0.13 * I AVJD CHARGE BASED ON S55/ACRE LESS 50 PCT. OF IRRIG. FIXED COSTS. * ESTABLISHMENT COST PRORATED OVER 7 YEARS. CROP SOLD STANDING IN FIF.LD. PROJECTED, 1975 BUDGET IDENTIFICATION NUMBER ANNUAL CAPITAL MONTH 10 081 0036 023 2 ALFALFA ESTAB,, IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION TOTAL 2, VARIABLE COSTS PREHARVEST SEED FERT(20-100-50) MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTPACTOR & MACHINERY) LABOR(IRRIGATION) INTEREST DN OP, CAP, SUBTOTAL, PRE-HARVEST 0,0 LBS, ACRE ACRE ACRE ACRE HOUR HOUR DOL, 1,75 46,00 1.47 3.18 10.92 2.75 2.75 0.10 22.00 1.00 1.00 1.00 1.00 1 .82 2.80 32.74 38.50 46.00 1.47 3. 18 10.92 4.99 7.70 s 2*21 11 6 . 0 4 HARVEST COSTS SUBTOTAL, HARVEST s TOTAL VARIABLE COST $ 11 6 . 0 4 $ --1 16.04 3, INCOME ABOVE VARIABLE COSTS 4, FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TDTAL FIXED COSTS 0.0 ACRE ACRE ACRE ACRE 1.83 2.94 15.96 47.02 5, TOTAL COSTS 6, NET PETUPNS 1 .00 1.00 1.00 1.00 1.83 2.94 15.96 —±1*02 $ 67.75 s 183. 79 -183.79 * LAND CHARGE BASED ON S55/ACRE LESS 50 PCT. OF IRRIG. FIXED COSTS. PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R 8 11 0 0 3 3 0 1 3 2 0 0 ANNUAL CAPITAL MONTH 12 / ^ k ALFALFA ESTAB.. IRPIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT O P E R AT I O N MBPLOW 4B CLOD 3USTER PICKUP TA N D E M D I S C F F R T, A P P L I , R F N T D GRAIN DRILL PICKUP PICKUP PTCKUP ITEM NO, 7,33 51 10 7,43 5,87 1 ,45 10 10 10 D AT E FUEL.OIL, FIXED TIMES LABOR MACHINE L U B . , R E P. COSTS OVER HOURS HOURS PER ACRE PER ACRE J U LY J U LY J U LY AUG AUG AUG AUG SEPT OCT 1,00 1,00 0,10 1.0C 1,00 1 ,00 0,10 0,10 0,1C T O TA L S 0 0 0 0 0 0 0 0 ,71 , 0 .12 .23 .09 .26 .12 .12 2 0.475 0.404 0. 100 0.159 0.064 0.179 0.100 0.100 0,34 0,06 0, 19 0,09 0 , 0 0,24 0.19 0.19 JO riiiS - fi x l - fl fi -1U12 -0*12 1 .47 1 ,83 5 9 7 9 5 5 1 .816 1.682 0 0 0 0 0 0 0 0 .60 .14 .13 .18 . 0 ,39 ,13 , 1 3 / ^ v * L A N D C H A R G E B A S E D O N S 5 5 / A C R E L E S S 5 0 P C T, O F I R R I G , F I X E D C O S T S , PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A . C A P I TA L M O N T H 1 2 0 8 11 0 0 3 3 013 2 ALFALFA. IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT G30SS RECEIPTS FROM PRODUCTION HAY TOTAL 2. VARTABLE COSTS PREHARVEST FERTCO-120-60) MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR & MACHINERY) LABOR(IRRIGATION) INTEREST ON OP. CAP, TON ACRE ACRE ACRE ACRE HOUR HOUR DOL. PRICE OR VA L U E OR COST/UNIT QUANTITY COST 20.00 8.50 48.00 1,30 0,10 26.52 2.75 2.75 0,10 1,00 1,00 1.00 1.00 0.97 6.80 35.42 -110+00 $ 170.00 48,00 1.30 0.10 26.52 2.67 18.70 $ 100.83 SUBTOTAL, PRE-HARVEST HARVEST COSTS SUBTOTAL, HARVEST s TOTAL VARIABLE COST $ 100,83 $ 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATED ESTAB. COST LAND (NET RENT) TOTAL FIXED COSTS 0,0 69.17 $ ACRE ACRE ACRE ACRE ACRE 0,9? 0,07 38.76 183.79 35.62 1.00 1,00 1,00 0,14 1.00 0,92 0,07 38.76 26.28 —25*32 $ 101.65 5. TOTAL COSTS $ 202.48 6. NET RETURNS $ -32.48 * LAND CHARGE BASED ON S55/ACRE LESS 50 PCT. OF IRRIG, FIXED COSTS, * E S TA B L I S H M E N T C O S T S P R O R AT E D O V E R 7 Y E A R S , P R O J E C T E D , 1 9 7 5 * SOLD STANDING IN FIELD TO CUBER, B U D G E T I D E N T I F I C AT I O N N U M B E R 8 1 0 0 3 9 0 1 3 2 0 0 ANNUAL CAPITAL MONTH 10 ALFALFA, IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT O P E R AT I O N F E R T. A P P L I . R E N T D PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP ITEM NO. 5,87 10 10 10 10 10 10 10 D AT E FUEL,OIL, FIXED COSTS M A C H I N E L U B , , R E P , T I M E S LABOR P E R ACRE HOURS P E R A C R E OVER HOURS MAR MAR MAY JUNE J U LY AUG SEPT OCT 1 0 0 0 0 0 0 0 T O TA L S ,00 .10 ,10 ,10 ,10 ,10 ,10 .10 0.0 64 0.1 00 0. 100 0.1 00 0. 1 OC 0.100 0.100 0 , 0 0,19 0, 19 0. 19 0,19 0,19 0,19 0 , 0 0,13 0 , 1 3 0,13 0,13 0,13 0,13 -SUL2S -J&_l1-__-_. -0*19 3U12 1 ,30 0 . 9 - 0 0 0 0 0 0 0 ,097 ,125 ,125 ,125 .125 .125 .125 0.972 0.764 * LAND CHARGE BASED ON S55/ACRE LESS 50 PCT. OF IRRIG. FIXED COSTS. * E S TA B L I S H M E N T C O S T S P R O R AT E D O V E R 7 Y E A R S . P R O J E C T E D . 1 9 7 5 * SOLD STANDING IN FIELD TO CUBER. BUDGET IDENTIFICATION NUMBER — ANNUAL CAPITAL MONTH 10 081 0039 013 2 C O R N , I R R I G AT E D , T E X A S H I G H P L A I N S I I I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT # ^ 1. GROSS RECEIPTS FROM PRODUCTION COPN TOTAL 3U ? . VA R I A B L E C O S T S PREHARVEST SEED INSECTICIDE FERT( 120-40-0) HERBICIDE HAIL INSURANCE MACHINFRY TRACTORS IRRIGATION MACHINFRY LABORCTRACTOR 6 MACHINERY) LABOR(IRR IGATION) I N T E R E S T O N O P. C A P. SUBTOTAL. PRE-HARVEST LBS. ACRE ACRE ACRE DOL. ACRE ACRE ACRE HOUR HOUR DOL. HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL CUSTOM DRYING SUBTOTAL, HARVEST PRICE OR VA L U F OP COST/UNIT QUANTITY COST 2,25 120,00 __tZ£_.go $ 270.00 0.95 4.00 35.00 4.00 0.08 3.65 9.03 17.16 2.75 2.75 0.10 18.00 1 .00 1.00 1.00 125.00 1.00 1.00 1 .00 5.33 4.40 51.62 0.30 0.20 0.10 120.00 120.00 120.00 s 17. 10 4.CO 35.00 4.00 10.00 3.65 9.03 17. 16 14.64 12. 10 5t 16 131.85 s BU. BU. BU. 36.00 24.00 $ ___12i__fi 72.00 TOTAL VARIABLE COST % 203.85 INCOME ABOVE VARIABLE COSTS S FIXED COSTS MACHINERY TRACTORS I P R I G AT I O N M A C H I N E RY LAND (NET RENT) TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 6.74 7.78 25.08 51.81 1.00 1.00 I.00 1 .00 66.15 6.74 7.78 25.08 $ .Sii81 91.41 5. TOTAL COSTS $ 295.26 6. NET RETURNS $ -25.?6 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/3) LESS 1/3 OF FERTILIZER, INSECTICIDE, HAULING, DRYING, AND 50 P C T. OF IRRIG FIXED COSTS. "* P R O J E C T E D , 1975 f** B U D G E T I D E N T I F I C AT I O N N U M B E R 7 2 0 0 3 5 0 2 3 2 C 0 A N N U A L C A P I TA L M O N T H 1 0 CORN, IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT ITEM NO, O P E R AT I O N SHREDDER 4R TA N O E M D I S C TA N D E M D I S C PICKUP MB PLOW 4B CLOD BUSTEP PICKUP TA N D E M D I S C PICKUP F L O AT PICKU° LISTER. 8-R R O L L I N G C U LT, BED PLANTER H F R B S P R AY E R PICKUP R O L L I N G C U LT, TO O L B A R PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP 8,48 44 2,44 10 8,34 52 10 2.44 10 2.38 10 8,60 8R 2,66 8,64 54 10 8R 2,66 2,56 10 10 10 10 10 10 D AT E FIXED FUEL.OIL, C OSTS T I M E S LABOR MACHINE L U B , , R E P, P E R ACRE HOURS PER ACRE OVER HOURS DEC DEC DEC DEC JAN JAN JAN FEB FEB MAR MAR APR APR APR APR APR M AY M AY M AY JUNE J U LY AUG SEPT OCT 0.245 0.163 1,00 0.159 1,00 0.0 0.239 0.159 1,00 0,1 0 0.125 0.1C0 0.475 1,00 0.712 1 ,00 0 . 0 0.404 0.125 0. 100 0,10 0.239 0.159 1,00 0,10 0 .125 0.100 1.173 2,00 1.759 0,10 0. 125 0.100 0.171 0.114 1,00 0 .089 1,00 0.134 0 .114 1,00 3.171 0 . 151 1 ,00 0.0 0,10 0.125 0.100 0.134 0.089 1,00 0.098 1,00 0.146 0.100 0,10 0.125 0,10 0.125 0.100 0,10 0.125 0.100 0,10 0.125 0.100 0.100 0,10 0.125 0 , 1 0 _CLjl12S _£__J_._20 0.16 0.09 0.09 0, 19 0,34 0,06 0, 19 0,09 0 , 1 9 0,33 0 . 1 9 0.10 0.10 0.09 0.03 0 . 1 9 0.10 0.01 0 . 1 9 0.19 0.19 0, 19 0,19 0,33 0 , 1 8 0,18 0 , 1 3 0,60 0.14 0.13 0 . 1 8 0.13 2.85 0,13 0,18 0,21 0 , 1 6 0 . 0 6 0 . 1 3 0.21 0.02 0.13 0,13 0 , 1 3 0 , 1 3 0,13 _a*i2 -0*12 4.448 3,65 6.74 T O TA L S 5.325 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/3) LESS 1 / 3 O F FERTILIZER, INSECTICIDE, HAULING, DRYING, PROJECTED. 1975 AND 50 PCT. OF IRRIG FIXED COSTS. B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 1 0 072 0035 023 2 CORN, IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT JNIT GROSS RECEIPTS FROM PRODUCTION CORN TOTAL ?.. VARIABLE COSTS PREHARVEST SEED INSECTICIDE FERT(160-60-0) HERBICIDE HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR & MACHINERY) LABORdRR IGATION) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST 0^ HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL CUSTOM DRYING SUBTOTAL, HARVEST PRICE OR VA L U E OR COST/UNIT QUANTITY COST S 3U, 2.25 140.00 LBS. ACRE ACRE ACRE DOL. ACRE ACRE ACRE HOUR HOUR DOL. 3U. BU. BU. 0.95 4.00 49.00 4.00 0.08 3.76 9.32 20.28 2.75 2.75 0.10 18.00 1.00 1.00 1.00 140.00 1.00 1.00 1.00 5.46 5.20 61.38 0.30 0.20 0.10 140.00 140.00 140.00 TOTAL VARIABLE COST 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS -.I15...SA $ 315.00 ACRE ACRE ACRE ACRE 6.94 8.01 29.64 57.78 s 17. 10 4.00 49.00 4.00 11 . 2 0 3. 76 9.32 20.28 15.Cl 14.30 &*.!! 154.10 42.00 28.00 $ 84.00 s 238.10 s 76.90 1.00 1.00 1.00 1.00 6.94 8.01 29.64 —51*13 102.37 5 . T D TA L C O S T S $ 340.48 6. NET RETURNS s -25.48 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/3) LESS 1/3 OF FERTILIZER, INSECTICIDE, HAULING, DRYING, A N D 5 0 P C T, O F I R R I G F I X E D C O S T S . P R O J E C T E D , 1 9 7 5 B U D G E T I D E N T I F I C AT I O N N U M B E R 7 2 0 0 3 6 0 1 3 2 0 0 ANNUAL CAPITAL MONTH 10 CORN. IRRIGATED, TEXAS HIGH PLAINS III REGION FSTIMATFD COSTS AND RETURNS PER ACRE HIGH LFVFL MANAGEMENT OPERAT I3N SHREDDER 4R TANDEM DISC TANDEM DISC DICKUP MBPLO* 4B CLOD DUSTER PICKUP TANDEM DISC PICKUP FLOAT LISTER. 8-P PICKUP ROLLING CULT. 8R BED PLANTER HFRR SPRAYFR PICKUP ROLLING CULT. 8R TOOL BAR PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP FUEL.OIL. FIXED MACHINE LUB..REP. COSTS ITEM TIMES LABOR HOURS PER ACRE PER ACRE N O . D AT E O V E R H O U R S 7,47 43 1 ,43 10 7,33 51 10 1,43 10 1 ,37 7,59 10 1 ,65 7,63 53 10 1.65 1 ,55 10 10 10 10 10 10 DEC DEC DEC DEC JAN JAN JAN FEB FEB MAR MAR MAR APR APR APR APR MAY MAY MAY JUNE J U LY AUG SEPT OCT I «▶00 1 t▶00 1<▶00 0 .. 1 0 1,▶00 1 ,▶00 0<• 10 l l▶00 0 ,. 1 0 2 .▶00 1.▶00 0 ,▶10 1,▶00 1.. 0 0 1 1▶00 0 .▶10 2 .▶00 1.▶00 0 ,▶10 0 .. 1 0 0 .▶10 0 .. 1 0 0<. I C 0 ,. 1 0 TOTALS 0.245 0.0 0.239 0.125 0.712 0.0 0.125 D.239 0.125 1 .759 0. 171 3.125 0.134 3.171 0.0 0.125 0.268 0.146 0.125 0.125 0.125 0.125 0.125 0.163 0.159 0. 159 0.1 CO 0.475 0.404 0.100 0.159 0.100 1.173 0.1 14 0.1 OC 0.089 0.1 14 0. 151 0. 100 0.179 0.098 0. 100 0.100 0.1 00 0.100 0.100 -.SU125 ______li_I_ 5.4 59 4.537 0 .. 16 0 .. 0 9 0 .▶ 09 0 .▶ 19 O i▶ 34 0 *. 0 6 0 ,. 1 9 0 ,. 0 9 0 .. 1 9 0 ,, 3 3 0 .. 1 0 0 .. 1 9 0 .. 1 0 C<. 0 9 0 ,. 0 3 0 .▶ 19 0 .• 21 0<. 0 1 0 .. 19 0 .▶ 19 0 .. 1 9 0 ,. 1 9 0«. 19 0 ,▶ 33 0 .. 1 8 O i▶ 18 0«▶ 13 O i▶ 60 O i. 1 4 O i.1 3 O i. 1 8 O i. 1 3 2 i, 8 5 O i. 1 8 O i. 1 3 0 .▶21 O i. 16 !2 0<. 0 6 0 .. 1 3 O i. 4 2 O i. 0 2 0<▶ 13 O i. 1 3 0 ,. 1 3 O i. 1 3 O i. 1 3 - fi i J U L 3 ,. 7 6 6.94 - O il * I AND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/3) LESS 1/3 OF FERTILIZER, INSECTICIDE, HAULING, DRYING, A N D 5 0 P C T . O F I R R I G F I X E D C O S T S . P R O J E C T E D . 1975 BUDGET IDENTIFICATION NUMBER — ANNUAL CAPITAL MONTH 10 07? 0036 013 2 CORN FOR SILAGE, IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACPE TYPICAL MANAGEMENT PRICE OR UNIT COST/UNIT QUANTITY 1, GROSS RECEIPTS FROM PRODUCTION CORN SILAGE TOTAL ?. VARIABLE COSTS PREHARVEST SEED INSECTICIDE F=RT(180-60-0) HERBICIDE HAIL INSURANCE MACHINFRY TRACTORS IRRIGATION MACHINERY LABOR(TR*CTOR & MACHINERY) LABOR(IRR IGATION) INTEREST ON OP, CAP. SUBTOTAL, PRE-HARVEST TON 12.00 VALUF OR COST $ 20.00 -2±0*00 S 240.00 LBS. ACRE ACRE ACRE DOL. ACRE ACRE ACRE HOUR HOUR DOL. 0.75 4.00 52.50 4.00 0.08 3.63 9.64 17.16 2.75 2.75 0. 10 23.00 1.00 1.00 1 .00 125.00 1,00 1,00 1,00 5,43 4.40 52.69 HARVEST COSTS SUBTOTAL, HARVEST 17.25 4.00 52.50 4.00 10.00 3.63 9.64 17. 16 14.93 12.10 150.47 $_ $ 0.0 TOTAL VARIABLE COST 15C.47 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 5*21 $ $ 89.53 ACRE ACRE ACRE ACRE 6.98 8.37 25.08 48.01 1.00 I.00 1.00 1.00 6.98 8.37 25.08 —±2*01 88.45 5 . T O TA L C O S T S $ 238.92 6. NET RETURNS $ 1.08 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/3) LESS 1/3 OF FERTILIZER, INSECTICIDE, AND 50 PCT, OF IRRIG. FIXED COSTS. * CRDP SOLD STANDING IN FIELD, PROJECTED, 1975 BUDGET IDENTIFICATION NUMBER ANNUAL CAPITAL MONTH 9 ^ 723003502 320 0 CORN FOR SILAGE, IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT O P E R AT I O N SHREDDER 4R TA N D E M D I S C TA N D E M D I S C MBPLOW 4B CLOD BUSTER PICKUP PICKUP TA N D E M D I S C PICKUP F L O AT LISTER, 8-R R O L L I N G C U LT, 8 R PICKUP BED PLANTER PICKUP R O L L I G C U LT < 6 P ) TOOL BAR PICKUP R O L L I G C U LT C 6 R ) PICKUP PICKUP PICKUP PICKUP ITEM NO. 8,48 44 8.44 8.34 52 10 10 2,44 10 2,38 8,60 2,66 10 6,64 10 2,32 2.56 10 2.32 10 10 10 10 D AT E FIXED FUEL.OIL, T I M E S LABOR MACHINE L U B . , R E P . COSTS OVER HOURS HOURS PER ACRE PER ACRE DEC DEC DEC DEC DEC DEC JAN FEB FEB MAR MAR MAR MAR APR APR M AY M AY M AY JUNE JUNE J U LY AUG SEPT 1«. 0 0 2 .▶OC 1<▶ 00 l i, 0 0 1<. 0 0 O i. 1 0 O i. 1 0 l i. 0 0 O i. 1 0 2 i. 0 0 l i. 0 0 1 ,▶ 00 O i. 1 0 l i. 0 0 O i. 1 0 l i. 0 0 l i. 0 0 O i. 1 0 1 .00 0 .. 1 0 0 .10 0 *. 1 0 0«. 1 0 T O TA L S 0,245 0 . 0 0.239 0,712 0 . 0 0,125 0,125 0.239 0.125 I ,759 0.171 0.134 0.125 0,171 0.125 0.181 0,146 0,125 0,181 0.125 0.125 0.125 0.163 0.319 0.159 0,475 0,404 0.100 0,100 0.159 0.100 1.173 0.1 14 0,089 0.100 0.1 14 OolOO 0.121 0.098 0.100 0.121 0.100 0.100 0.100 0,16 0.18 0.09 0,34 0,06 0.19 0,19 0 , 0 9 0, 19 0.33 0,10 0,10 0, 19 0,09 0, 19 0.10 0,01 0.19 0 . 1 0 0. 19 0.19 0. 19 0 . 3 3 0.37 0,18 0,60 0.14 0 , 1 3 0 , 1 3 0 , 1 8 0 , 1 3 2,85 0 , 1 8 0,21 0,13 0.16 0.13 0.23 0.02 0 , 1 3 0,23 0.13 0.13 0 . 1 3 _-Q.jJL££ - f t a l Q f t _Gjl±2 -0.*L2 3.63 6.98 5,428 4.508 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/3) LESS 1/3 OF FERTILIZER, INSECTICIDE, AND 50 PCT. OF IRRIG. FIXED COSTS. * CROP SOLD S TA N D I N G IN FIELD. PROJECTED, 1975 BUDGET IDENTIFICATION NUMBER ANNUAL CAPITAL MONTH 9 07230035 023 2 C O R N F O R S I L A G E . I R R I G AT E D , T E X A S H I G H P L A I N S I I I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT ^ ^ 1. GROSS RECEIPTS FROM PRODUCTION CORN SILAGE TOTAL TON ? . VA R I A B L F C O S T S PREHARVEST SEED INSECTICIDE FERT(2lC-60-0) HER3ICIDE HAIL INSURANCE MACHINERY TRACTORS I R R I G AT I O N M A C H I N E RY LABOR(TRACTOR & MACHINERY) L A 3 0 R ( I R R I G AT I O N ) I N T F R F S T O N O P, C A P, SUBTOTAL, PRE-HARVEST LBS. ACRE ACRE ACRF DOL. ACRE ACRE ACRE HOUR HOUR DOL. PRICE OR VA L U E OR COST/UNIT QUANTITY COST 12,00 27,00 S 324.00 0.75 4.00 57.60 4.00 0.08 3.56 9.51 18.72 2.75 2.75 0.10 25.00 1 .00 1 .00 1 .00 140.00 1.00 1.00 1.00 5.43 4.80 51.53 18.75 4.00 57.60 4.0C 11 . 2 0 3.56 9.51 18.72 14.93 13.20 5x15 160.63 HARVEST COSTS SUBTOTAL, HARVEST $ TOTAL VARIABLE COST * 0.0 s 163.37 3. INCOMF ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINFRY TRACTORS I R R I G AT I O N M A C H I N E RY LAND (NET RENT) TOTAL FIXED COSTS 160.63 $ ACRF ACRE ACRE ACRE 6.86 8.1 7 27.3ft 72.91 1 1 1 I .00 .00 .00 .00 6. 86 8. 17 27.36 s _Z2._i.21 11 5 . 3 0 5 . T D TA L C O S T S 275.92 ft. NET RETURNS 48.08 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/3) LESS 1/3 OF F E R T I L I Z E R , I N S E C T I C I D E , A N D 5 0 P C T, O F I R R I G . F I X E D C O S T S . * CPDP SOLD S TA N D I N G IN FIELD. PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R 7 2 3 0 0 3 6 0 1 3 2 0 0 A N N U A L C A P I TA L M O N T H 9 Jpv CORN FOR SILAGE. IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION SHRFDDER 4R TANDEM DISC TANDEM DISC PICKUP MBPLOW 4B CLOD BUSTER PICKUP TANDEM DISC PICKUP FLOAT LISTER, 8-R R O L L I N G C U LT, 8 R PICKUP BED PLANTER HERB SPRAYER PICKUP POLL IG CULTI6R) TOOL BAR PICKUP PICKUP PICKUP PICKUP PICKUP ITEM NO. 7^47 43 1 ,43 10 7,33 51 10 1 ,43 10 1,37 7,59 1 ,65 10 7,63 53 10 1 ,31 1,55 10 10 10 10 10 DATE FUEL,OIL, FIXED COSTS T I M E S LABOR MACHINE L U B , * R E P, PER ACRE PER ACRE OVER HOURS HOURS DEC DEC DEC DEC JAN JAN JAN FEB FEB MAR MAR MAR MAR APR APR APR MAY MAY MAY JUNE J U LY AUG SEPT 1,00 1.00 1.00 0.10 1.00 1 .00 0.10 1.00 0.10 2.00 1.00 1.00 0.10 1.00 1.00 0.10 2.00 1.00 0.1C 0.10 0,10 0,10 0,10 TOTALS 0, too 0,16 0,09 C 0 9 0,19 0,34 0,06 0, 19 0,09 0, 19 0,33 0, 10 0,10 0,19 0,09 0,03 0, 19 0,20 0,01 0, 19 0. 19 0, 19 0, 19 0,33 0,18 0.18 0,13 0,60 0,14 0,13 0,18 0,13 2,85 0,18 0,21 0,13 0,16 0,06 0,13 0,46 0,02 0,13 0,13 0,13 0,13 _£L__12__ ...CtlflP- -0*19 -0*12 3,56 6,86 0,245 0,0 0.239 0.125 0.712 0.0 0.125 0.239 0,125 1 .759 0.171 0.134 0.125 0.171 0.0 0.125 0,362 0,146 0.125 0.125 0.125 0 .125 5.428 0. 163 0.159 0.1 59 0.1 00 0.475 0.4 04 0.100 0.159 0.10C 1.173 0. 1 14 0.089 0.100 0,1 14 0,151 0, 100 0,241 0,098 0,100 0,100 0,100 4,500 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/3) LESS 1/3 OF FERTILIZER, INSECTICIDE, AND 50 PCT. OF IRRIG. FIXED COSTS. * CRDP SOLD S TA N D I N G IN FIELD. PROJECTED. 1975 RUOGFT IDENTIFICATION NUMBER ANNUAL CAPITAL MONTH 9 07230036 013 2 C O T T O N . I R R I G AT E D , T E X A S H I G H P L A I N S I I I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE (SPRINKLERS) TYPICAL MANAGEMENT (PREPLANT ONLY) UNIT GROSS RFCEIPTS FROM PRODUCTION COTTON LINT COTTONSEFD TOTAL ? . VA R I A B L E C O S T S OREHARVEST SEED FERTI20-20-0) HERBICIDE HAIL INSURANCE MACHINERY TRACTORS I R R I G AT I O N MACHINERY LABOR!TRACTOR C MACHINERY) LABOR(IRR I G AT I O N ) INTEREST ON O P. C A P. SUBTOTAL, PRE-HARVEST HARVEST COSTS GIN, BAG, TIES CUSTOM HARV&HAUL SUBTOTAL, HARVEST .BS. TON PRICE OR VA L U F OP COST/UNIT QUANTITY COST 0.35 80.00 375.00 0.26 131.25 2o___a_> S 152.05 LBS. ACRE ACRE DOL. ACRE ACRE ACRE HOUR HOUR DOL. 0,35 12,00 5,20 0.08 3.21 5.55 6.68 2.75 2.75 0.10 CWT. CWT. 1.25 1.0 17.00 1.00 1.00 60.00 1.00 1.00 1.00 3.76 0.80 26.39 5.95 12.00 5.20 4.8C 3.21 5.55 6.68 10.33 2.20 2.64 58.56 S S 20.63 16*50 37.13 * 95.68 3. INCOME ABOVE VARIABLE COSTS * 56.37 4. FIXED COSTS MACHINERY TRACTORS I R R I G AT I O N M A C H I N E RY LAND (NET PENT) TDTAL FIXED COSTS s 0 16.50 16.50 TDTAL VARIABLE COST ACRE ACRE ACRE ACRE 3.9? 4.92 8.44 25.64 I.00 1.00 1.00 1.00 3.92 4.92 8.44 ____________ S 42.91 5 . TO TA L C O S T S S 138.59 ft. NET RETURNS S 13.46 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF F E R T I L I Z E R , G I N N I N G A N D 5 0 P C T. O F I R R I G . F I X E D C O S T S . PLANTED 2 X 1 SKIPROW. P R O J E C T E D , 1975 B U O G E T I D E N T I F I C AT I O N N U M B E R > 9 3 0 0 3 1 0 2 3 7 0 0 A N N U A L C A P I TA L M O N T H 11 COTTON, IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS ANO RETURNS PER ACRE (SPRINKLERS) TYPICAL MANAGEMENT (PREPLANT ONLY) OPERATION SHREDDER 4R TANDEM DISC PICKUP MBPLOW 48 CLOD BUSTFR CHISEL PICKUP F E R T. A P P L I , R E N T D TANDEM DISC PICKUP TANDEM DISC HERB SPRAYFR PICKUP LISTER, 8-P PICKUP R O L L I N G C U LT, 8 R 8ED PLANTER PICKUP SANOFIGHTER (2) R O L L I N G C U LT. 8 R PICKUP PICKUP PICKUP PICKUP ITEM NO. 8,48 44 10 8.34 52 2,36 10 6,86 2,44 10 2,44 54 10 8,60 10 2,66 8,64 10 6.50 2,66 10 10 10 10 D AT E FIXED FUEL,OIL, COSTS T I M E S LABOR MACHINE L U B , , R E P, PER ACRF HOURS PER ACRE HOURS OVER DEC DEC DEC JAN JAN JAN JAN FEB FEB FEB MAR MAR MAR APR APR MAY MAY MAY JUNE JUNE JUNE J U LY SEPT NOV 1,00 1.00 0,10 0,75 0,75 0,25 0,10 1.00 1,00 0,10 1.00 1 .00 0.10 1.00 0.10 1.00 1 .50 0,10 2,00 2,00 0,10 0,10 0.1C 0,10 TO TA L S 0, 163 0,159 0, 1 00 0,356 0.303 0.048 0,100 0.064 0.159 0.100 0.159 0.151 0.100 Oo 1 14 0. 100 0.089 0.171 0.100 0. 167 0.179 0.100 0,100 0,100 0, 16 C.09 0,19 0,26 0,04 0,01 0.19 0.0 0.09 0.19 0.09 0.03 0,19 0, 10 0.19 0, 10 0,14 0,19 0,02 0,21 0.19 0.19 0.19 0.33 0.18 0.13 0.45 0.10 0.03 0.13 0.0 0.18 0.13 0.18 0.06 0.13 0.18 0.13 0.21 0.23 0.13 0.04 0.42 0.13 0.13 0.13 _a_i2_ _£*.!.£_& _£_t!2 J0*12 3.21 3.92 0.245 0.0 0.125 0.534 0.0 0.073 0.125 0.097 0.239 0.125 0.239 0.0 0.125 0.171 0.125 3.134 0.257 0.125 0.250 0.268 0.125 0.125 3.125 3,755 3.284 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTILIZFR, GINNING AND 50 PCT, OF IRRIG, FIXED COSTS, PROJFCTED, 1975 PLANTED 2 X 1 SKIPROW, BUDGET IDENTIFICATION NUMBER ANNUAL CAPITAL MONTH 11 093 0031 023 7 COTTON, IRRIGATED, TEXAS HIGH PLAINS I I I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE (FURPOW) TYPICAL MANAGEMENT (PREPLANT ONLY) PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEED TDTAL ?. VARIABLE COSTS PREHARVEST SEED FFRT(20-20-0) HER3ICIDE HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR & MACHINERY) LABORURR IGATION) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST HARVEST COSTS GIN, BAG, TIES CUSTOM HARV&HAUL SUBTOTAL, HARVEST .BS. TON 0,35 80,00 375.00 0.26 __2__aQL $ 152.05 LBS. ACRE ACRE DOL. ACRE ACRE ACRE HOUR HOUR DOL. 0.35 !2.00 5.20 0.08 3.21 5.55 4.68 2.75 2.75 0.10 17,30 1.00 1.00 60.0 0 1 .00 1.00 1.00 3.76 1.20 25.22 5.95 12.00 5.20 4.80 3.21 5.55 4.68 10.33 3.30 2a.5£ S 57.54 S CWT. CWT. 1.25 1.00 16.50 16.50 TOTAL VARIABLE COST 3, INCOME ABOVE VARIABLE COSTS 4, FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 131.25 20.63 i£a.5Q. 37. 13 $ 94.67 $ 57.38 $ ACRE ACRE ACRE ACRE 3.92 4.92 6.84 26.44 5. TOTAL COSTS ft, NET RETURNS 1.00 1.00 1.00 1.00 3.92 4.92 6.84 s $ —25+±± 42. 1 I 136.77 15.28 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTILIZER, INSECTICIDE, AND 50 PCT. OF IRRIG. FIXED COSTS. PLANTED 2 X 1 SKIPROM. PROJECTED, 1975 Jjp^s B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 0 0 3 2 0 2 3 ? 0 0 A N N U A . C A P I TA L M O N T H 11 COTTON, IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS =>ER ACRE (FURROW) TYPICAL MANAGEMENT (PREPLANT ONLY) ITEM « O P E R AT I D N NO, D AT E SHREDDER 4R TANDEM DISC PICKUP MBPl.Orf 4B CLOD 3USTFP CHISEL PICKUP FFRT.AOPLI.RENTD TANDEM DISC »ICKUP TANDEM DISC HFRB SPRAYEP PICKUP LISTER, 8-R PICKUP ROLLING CULT. 8R RED P.ANTER P ICKUP SANDFIGHTER (?) ROLLING CULT. 8R PICKUP PICKUP PICKUP PICKUP 8,48 44 10 8,34 52 ?,36 10 6,86 ?,44 13 2,44 54 10 8.60 10 2,66 8,64 10 6.50 2,66 10 10 10 10 DEC DFC DEC JAN JAN JAN JAN FEB FFB FEB MAR MAR MAR APR APR MAY MAY MAY JUNE JUNE JUNE JULY SEPT NOV TOTALS FUEL,OIL, FIXED T I M E S L A B O R M A C H I N E L U B , , R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE l l. 0 0 1.. 0 0 0 ,. 1 0 O i▶ 75 O i. 7 5 0 ,. 2 5 O i. 1 0 0 0 0 0 0 , , , , , 11. 0 0 11. 0 0 9 9 3 3 0 ,0 9 7 .2 3 9 ,1 2 5 ,2 3 9 ,0 O i. 1 0 l l▶ 00 1 .▶ 00 O i▶ 10 1 .▶ 00 O i▶ 10 l l. 0 0 l l. 5 0 O i. 1 0 2<. 0 0 2 i▶ 00 O i. 1 0 O i. 1 0 O i. 1 0 0 .▶ 10 ? 4 5 0 125 5 3 4 0 0 ,073 0 , 125 3 , 1 2 5 0 ,171 0 , 1 2 5 0 .1 3 4 3 0 0 0 0 0 0 .2 5 7 .1 2 5 ,2 5 0 ,2 6 8 ,1 2 5 , 1 2 5 , 1 2 5 O i▶ 33 O i▶ 163 O i. 159 O i, 1 CO 0 ..3 56 0 ,. O i. O i. O i. 0 9 1 9 2 6 O i. 1 8 O i. 3 0 3 O i, 0 4 8 O i. 1 0 0 O i.0 64 O i. 159 O i. 1 0 0 O i▶ 159 O i. O i. O i. c.. O i. 0 4 01 1 9 0 0 9 0 ,. 1 0 O i▶ 03 O i. 1 3 0 ,. 0 0 .. 1 8 0 ,. 1 3 O i. 1 8 O i▶ 06 O i▶ 13 O i. 1 8 O i. 1 3 O i. 2 1 O i▶ 23 O i▶ 13 0 ,▶ 04 D i▶ 42 O i▶ 13 O i▶ 13 O i▶ 13 O i. 1 5 1 O i. 1 0 0 O i,1 14 O i▶ 1 00 O i,0 89 O i. 1 7 1 O i. 1 0 0 O i. 1 6 7 O i. 1 7 9 O i. 1 0 0 0 .. 1 0 0 O i. 1 0 0 - 0 + 125 - O il 1 £ £ 3,755 3,2 84 1 6 O i. 19 O i. 0 9 O i▶ 03 O i▶ 19 O i. 1 0 O i. 1 9 C i. 10 0 ,. 1 4 0 «. 19 O i. 0 2 O i. 2 1 C i▶ 19 C«. 1 9 O i. 19 O i. 1 3 O i. 4 5 ! 2 -JU12 3,21 3,92 - O il LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF F E RT I L I Z E R , INSECTICIDE, AND 50 PCT, OF IRRIG, FIXED COSTS. PLANTED 2 X 1 SKIPROW, PROJECTED, 1975 BUDGET IDENTIFICATION NUMBER ANNUAL CAPITAL MONTH 11 093 0032 023 2 f^ COTTON, IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE (SPRINKLERS) TYPICAL MANAGEMENT (PREPLANT PLUS 1 POSTPLANT) UNIT GROSS RECEIPTS FROM PRODUCTION COTTON LINT CDTTONSFED TOTAL 2. VARIABLE COSTS PREHARVEST SEED F E RT C 4 0 - 2 0 - 0 ) HERBICIDE HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR & MACHINERY) LABOR!IRR IGATION) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST HARVEST COSTS GIN, BAG, TIES CUSTOM HARV&HAUL SUBTOTAL, HARVEST -BS. TON PRICE OR VA L U E OR COST/UNIT QUANTITY COST 0,35 80,00 4 75.0 0 0.33 166.25 —23**0 S 192.65 LBS, ACRE ACRE DOL, ACRE ACRE ACRE HOUR HOUR DOL, 0,35 18,00 5,20 0.08 3.21 5.55 1 1.69 2.75 2.75 0.10 20.00 1.00 1.00 70.00 I.00 1.00 1.00 3.76 1.40 32.98 WT. 1,25 1,00 20,90 20,90 WT. 7.00 18.00 5. 20 5.6C 3.21 5.55 11 . 6 9 10.33 3.85 li.20. 73. 73 26, 12 __2£t_20 S 47,02 TOTAL VARIABLE COST S 120.75 INCOME ABOVE VARIABLE COSTS * 71.90 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 3.92 4.92 14.77 29.74 1.00 1.00 1.00 1.00 3.92 4.92 14.77 $ 22*Zi 53.34 5. TDTAL COSTS $ 174.09 6. NET RETURNS $ 18.56 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTILIZER. GINNING AND 50 PCT, OF IRRI, FIXED COSTS, PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 0 0 3 2 0 2 3 7 0 0 ANNUAL CAPITAL MONTH 11 COTTON, IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS =>ER ACRE (SPRINKLERS) TYPICAL MANAGEMENT (PREPLANT PLUS 1 POSTPLANT) DPERATION SHREDDER AR TANDEM DISC PICKUP MRPLOtf AB CLOD BUSTER CHISEL PICKUP F F R T, A P » L I . R E N T D TANDEM DISC PICKUP TANDEM DISC HFRB 5=>RAYER PICKUP LISTER, 8-R PICKU* R O L L I N G C U LT. 8 R BED PLANTER PICKUP SANDFIGHTER (2) R O L L I N G C U LT. R R PICKUP PICKU=> PICKU3 'ICKU? ITEM NO. 8.48 44 10 8,34 52 2,36 10 6,86 2,44 10 2,44 54 10 8,60 10 2,66 8,64 10 6,50 2,66 10 10 10 10 DATE FIXED FUEL.OIL, COSTS T I M F S LABOR MACHINE L U B , , R E P, PER ACRE PER ACRE OVER HOURS HOURS DEC DEC DEC JAN JAN JAN JAN FEB FEB FEB MAR MAR MAR APR APR MAY MAY MAY JUNE JUNE JUNE J U LY SEPT NOV 1.00 0.245 0.163 1.00 3.0 0.159 C.100 0.10 0.125 0.534 0.356 0.75 0,303 0.75 0.0 0,048 0.25 0.073 0,100 0.10 0.125 0,064 1 .00 0.097 1.00 3.239 0,159 0.10 3.125 C.100 0.239 0.159 1.00 9.0 0.151 1.00 0.125 0.10C 0.10 3.171 0 . 11 4 1.0C 0.100 0.10 0.125 0.0 89 I .00 3.134 0.171 1,50 0.257 0.125 0.100 0,10 2,00 0.250 0. 167 3.268 0.179 2,00 0.125 0.10C 0,10 0. 125 0.100 0,10 0.100 0,10 0.125 0 . 1 0 - 1 * 1 2 5 __-__L_2-_ 0,16 0,09 0,19 0,26 0,04 0,01 0. 19 0,0 0,09 0, 19 0,09 0,03 0,19 C I O 0,19 0, 10 0, 14 0,19 0,02 0,21 0, 19 0, 19 0, 19 0.33 0,18 0,13 0,45 0, 10 0,03 0.13 0.0 0.18 0.13 0,18 0,06 0,13 0,18 0,13 0,21 0,23 0,13 0.04 0.42 0.13 0.13 0.13 __U12 __i__i2 3.2 84 3,21 3.92 TDTALS 3.755 LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTILIZER. GINNING AND 50 PCT OF IRRI, FIXED COSTS, PROJECTED, 1975 BUDGET IDENTIFICATION NUMBER ANNUAL CAPITAL MONTH 11 093 0032 023 7 COTTON, IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATFD COSTS AND RETURNS PER ACRE (FURROW) TYPICAL MANAGEMENT (PREPLANT PLUS 1 POSTPLANT) JNIT GROSS RECEIPTS FROM PRODUCTION COTTON LINT CDTTONSEED TOTAL VARIABLE COSTS PREHARVEST SEED FERT(40-?0-0) HER3ICIDE HAIL INSURANCE MACHINFRY TRACTORS IRRIGATION MACHINERY LA30R(TRACTOR & MACHINERY) LA30R(IRRIGATION) INTEREST ON OP. CAP. PRICE OR VA L U E OR COST/UNIT QUANTITY CO.ST _BS. TON 0.35 80.00 475.00 0.33 166.25 __6_,fLa S 192.65 LBS. ACRE ACRE DOL. ACRF ACRE ACRE HOUR HOUR DOL. 0.35 18.00 5.20 0.08 3.21 5.55 7.80 2.75 2.75 0.10 20.00 1.00 1.00 70.00 1.00 1.00 1.00 3.76 2.00 31. t9 7.00 18.00 5.20 5.60 3.21 5.55 7.80 10.33 5.50 2*12 71.31 SUBTOTAL, PRE-HARVEST HARVEST COSTS GIN, BAG, TIES CUSTOM HARV&HAUL SUBTOTAL, HARVEST CWT. CWT. 1.25 1.00 20.90 20.90 26. 12 —20*20 % $ 11 8 . 3 3 TOTAL VARIABLE COST 74.32 3, INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 47.02 ACRE ACRE ACRE ACRE 3.92 4.92 1 1.40 31.43 1 .00 1.00 1.00 1.00 3.9? 4.92 11 . 4 0 S —21**2 51.66 5. TDTAL COSTS $ 169.99 6. NET RETURNS $ 22.65 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTILIZER. GINNING AND 50 PCT. OF IRRI. FIXED COSTS. PROJECTED. 1975 ^ B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 0 0 3 3 0 2 3 ? 0 0 ANNUAL CAPITAL MONTH 11 COTTON, IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE (FURROW) TYPICAL MANAGEMENT (PREPLANT PLUS 1 POSTPLANT) O P E R AT I O N NO. D AT E FUEL.OIL, FIXED COSTS T I M E S L A B O R M A C H I N E L U B . , REP. P E R ACRE P E R A C R F OVER HOURS HOURS SHREDDER 4R TA N D E M D I S C PICKUP MBPLOW AB CLOD BUSTER CHISEL PICKUP F F R T, A P » L I , R E N T D TA N D E M D I S C PICKUP TA N D E M D I S C H F R B S P R AY F R PICKUP LISTER. 8-R PICKUP R O L L I N G C U L T. 8 R BED PLANTER PICKUP SANDFIGHTER (2) R O L L I N G C U L T. 8 R PICKUP PICKUP PICKUP PICKU3 8,48 DEC DEC DEC JAN JAN l i▶ 00 l i▶ 00 O i▶ 10 0 i. 7 5 0 i▶ 75 JAN JAN FEB FEB FEB MAR 0 «▶ 25 O i▶ 10 ITEM 4 4 10 8,34 5 2 2,36 10 6,86 2,44 10 2,44 5 4 10 8,60 10 2,66 8,64 10 MAR MAR APR APR M AY M AY M AY to JUNE JUNE JUNE J U LY SEPT 10 NOV 6,50 2,66 10 10 1 i▶ 00 1 .. 0 0 O i. 1 0 1 ., 0 0 l l▶ 00 O i. 1 0 l l. 0 .. 1 ,. 1 .. O i. 2 <. 2 ,. 0 . O i. 0 1 0 5 1 0 0 1 1 0 0 0 0 0 0 0 0 0 0 .. 1 0 O i. 1 0 TOTALS 0, 163 0,159 0, 1 00 0,356 0,303 0,048 0,100 0,064 0,159 0.100 0.159 0. 151 0.100 0.1 14 0. 1 00 0.089 0.171 0.100 0.167 0.179 0.100 0.100 0.100 0 .▶ 16 0 «• 09 0 ,i 19 O i▶ 26 0 «▶ 04 O i▶ 01 O i▶ 19 O i▶ 19 O i▶ 19 0,18 0,13 0,18 0,06 0,13 0.18 0.13 0.21 0.23 0.13 0.04 0.42 0.13 0.13 0.13 J U 1 2 5 -0*100. - f c j6.12 -JU12 3.755 3.284 3.21 3.92 0.245 0 . 0 0.125 0.534 0 . 0 0 0 0 3 3 0 .073 .125 .097 ,239 ,125 ,239 0 . 0 0.125 0.171 0.125 3 .134 0.257 0.125 0,250 0,268 0,125 0,125 3,125 0 ,▶0 0 .▶ 09 O i. 19 0 .▶ 09 O i▶ 03 0 .. 1 9 0 .. 1 0 O i▶ 19 O i▶ 10 O i. 1 4 O i. 19 0 .. 0 2 0<. 2 1 O i▶ 19 0,33 0.18 0 . 1 3 0.45 0.10 0,03 0,13 0 , 0 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTILIZER. GINNING AND 50 PCT, OF IRRI. FIXED COSTS. PROJECTED, 1975 BUDGET IDENTIFICATION NUMBER — ANNUA.. CAPITAL MONTH 11 093 0033 023 2 /<^. COTTON, IRRIGATED. TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS "ER ACRE (SPPINKLFRS) TYPICAL MANAGEMENT (PREPLANT PLUS TWO POSTPLANTS) JNIT GROSS RFCEIPTS FROM PRODUCTION C3TTON LINT COTTONSEED TDTAL ?. VARIABLE COSTS PREHARVEST SEED FERT(60-40-0) HEPBICIDE HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR & MACHINERY) LA80RORR IGATION) INTFRFST ON OP. CAP. SUBTOTAL. PRE-HARVFST HARVEST COSTS GIN, BAG, TIES CUSTOM HARV&HAUL SUBTOTAL, HARVEST LBS, TON PRICE OR VA L U E OR COST/UNIT QUANTITY COST 0,35 80.00 550.00 0.39 —31*20 $ 223.70 LBS. ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. CWT. CWT. 0.35 24.80 5.20 0.08 3.21 5.55 16.70 2.75 2.75 0.10 1 .25 1.00 8.75 24.80 5.20 6.40 3.21 5.55 16.70 10.33 5.50 25.00 1.00 1.00 80.00 1.00 1.00 1.00 3.76 2.00 40.46 $ 24.20 24.20 ±*05 90.48 30.25 .-2±*20 54.45 TOTAL VARIABLE COST 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXFD COSTS 192.50 $ 144.93 s 78.77 < 6 ACRE ACRF ACRE ACRE 3.92 4.92 21.10 42.16 5. TDTAL COSTS 6. NET RETURNS 3.92 4.92 21. 10 1.00 1.00 1.00 1.00 —*2*13 72.09 s 217.03 6.67 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FFRTILIZER. GINNING. AND 50 PCT. O* IRRRI. FIXED COSTS. PROJECTED. 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 0 0 3 3 0 2 3 7 0 0 ANNUAL CAPITAL MONTH 11 COTTON, IRRIGATED. TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE (SPRINKLERS) TYPICAL MANAGEMENT (PREPLANT PLUS TWO POSTPLANTS) OPERATIDN SHRFDDER 4P TANDFM DISC oICKUP MBPLOW 4B CLOD BUSTER CHISEL PTCKUP F E R T. A P P L I . R E N T D TANDEM DISC PICKUP TANDEM DISC HERB SPRAYFR PICKUP LISTER, 8-R PICKU3 R O L L I N G C U LT. 8 R BED P.ANTFR PICKUP SANOFIGHTFR (2) R O L L I N G C U LT. 8 R PICKUP PICKUP PICKUP PICKUP ITEM NO. 8,48 44 10 8,34 52 2,36 10 6,86 2,44 10 2,44 54 10 8,60 10 2,66 8,64 10 6,50 2,66 10 10 10 10 DATE DEC DEC DEC JAN JAN JAN JAN FEB FEB FEB MAR MAR MAR APR APR MAY MAY MAY JUNE JUNE JUNE J U LY SEPT NOV FIXED FUEL.OIL, COSTS TIMES LABOR MACHINE L U B . . R E P, PER ACRE PER ACRE HOURS HOURS OVER 0.10 1.00 1 .50 0.10 2.00 2.00 0.10 0.10 0,10 0 . 1 0 _<U1£5 _ £ , . ! £ £ 0,16 0.09 0. 19 0.26 0.04 0.01 0. 19 0.0 0,09 0. 19 0,09 0,03 0,19 0, 10 0, 19 0, 10 0, 14 0, 19 0,02 0,21 0, 19 0,19 0, 19 0,33 0,18 0,13 0 ,45 0, 10 0,0 3 0,13 0.0 0.18 0.13 0.18 C .06 0.13 0.18 0.13 0.21 0.23 0.13 0.04 0,42 0.13 0.13 0.13 _P_*19 ___12 3.755 3.284 3.21 3.92 1,00 1,00 0,10 0.75 0.75 0.25 0.1C 1 .00 1.30 0.10 1.00 1.00 0. 10 l. on TOTALS 0,245 3,0 0,125 0.534 0.0 3.073 0. 125 0.097 3.239 0.125 0.239 3.0 3.125 3.171 3.125 ^.134 0.257 0.125 0.250 3.268 0.125 0.125 3.125 0.163 0.159 0.100 0.356 0.303 0.048 0.100 0.064 0.159 0.100 0.159 0.151 0.100 0. 114 0.1 CO 0.089 0.171 0.100 0.167 0.179 0.100 0.100 0.100 LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF F E RT I L I Z E R , GINNING, AND 50 PCT, OF IRRRI, FIXED COSTS, PROJECTED, 1975 BUDGET IDENTIFICATION NUMBER — ANNUAL CAPITAL MONTH 11 093 0033 023 7 #** COTTON, IRRIGATED. TEXAS HIGH PLAINS III REGION FSTIMATED COSTS AND RETURNS »ER ACRE (FURROW) TYPICAL MANAGEMENT (PREPLANT PLUS TWO POSTPLANTS) PRICF OR VA L U F OR JNIT COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEED TOTAL ?. VARIABLE COSTS PREHARVEST SEED FFRT(60-40-0) HERBICIDE HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR & MACHINERY) LABOR(IRRIGATION) INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST J ^ HARVEST COSTS GIN, BAG, TIES CUSTOM HARV&HAUL SUBTOTAL, HARVEST LBS. TON 0.35 80.00 550.00 0.39 192.50 21*.2G t 223.70 LBS, ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL, CWT. CWT. 0.35 24.80 5,20 0,08 3,21 5,55 10,92 2,75 2.75 0.10 1.25 1 .00 25.00 1.00 1.00 80.00 1.00 1.00 1.00 3.76 2.80 37.77 8.75 24.80 5.20 6.40 3.21 5.55 10.92 10.33 7.70 s 30.25 24.20 24.20 s -2**21 54.45 141.09 TOTAL VARIABLE COST s 3, INCOME ABOVE VARIABLE COSTS A, FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LANO (NET RENT) TOTAL FIXFD COSTS 2*15 86.64 82.61 s ACRE ACRE ACRE ACRE 3.92 4.92 15.96 42.16 1 .00 1.00 1.00 1.00 3.9? 4.92 15.96 s —±2*1- 66.95 5, TDTAL COSTS 208.04 6, NET RETURNS 15.66 * LANO CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTLIZER. GINNING AND 50 PCT. OF IRRI. FIXED COSTS. PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 0 0 3 4 0 2 3 2 0 0 ANNUAL CAPITAL MONTH 11 COTTON, IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE (FURROW) TYPICAL MANAGEMENT (PREPLANT PLUS TWO POSTPLANTS) OPFRATION SHREDDER 4R TANDEM DISC PICKUP MBPLOtf 4B CLOD BUSTER CHISEL PICKUP F E R T. A P P L I . R E N T D TANDEM DISC PICKUP TANOEM DISC HERB SPRAYER PICKUP LISTER, 8-R PICKU3 R O L L I N G C U LT. 8 R BED PLANTER PICKUP SANDFIGHTER (2) R O L L I N G C U LT. 8 R PICKUP PICKUP PICKUP PICKUP ITEM NO. 8,48 44 to 8,34 52 2,36 10 6,86 2*44 10 2,44 54 19 8,60 10 2.66 8,64 10 6,50 2,66 10 10 10 10 DATF FIXED FUEL.OIL, COSTS T I M E S LABOR MACHINE L U B , , R E P, PER ACRE HOURS PER ACRE OVER HOURS DEC DEC DEC JAN JAN JAN JAN FEB FEB FEB MAR MAR MAR APR APR MAY MAY MAY JUNF JUNE JUNE J U LY SEPT NOV 1 ,00 0,245 1.00 3,0 0.10 3,125 0.75 0,534 0,75 0,0 0,073 0,25 0,10 0.125 3.097 1,00 1 ,90 3.239 0,10 0.125 1.00 0.239 1.00 0.0 0.125 0.10 3,171 1 .00 0.10 0,125 1,00 0 .134 1,50 0.257 0.125 0.10 0.250 2,00 3.268 2,00 0,10 0.125 0.125 0,10 0,10 0.125 0 , 1 0 _ft*.125 0.163 0.159 0.10C 0.356 0.303 0.048 0.100 0.064 0,159 0,100 0,159 0,151 0,100 0 , 11 4 0,100 0.0 89 0.171 0.100 0.167 0.179 0. 100 0.100 0.100 0, 16 0,09 0, 19 0,26 0.04 0.01 0. 19 0.0 0.09 0. 19 0.09 0.03 0. 19 0. 10 0.19 0. 10 0.14 0. 19 0.02 0.21 0. 19 0.19 0.19 0.33 0.18 0.13 0.45 0. 10 0.03 0.13 0 .0 0.18 0.13 0,18 0.06 0.13 0.18 0.13 0.21 0.23 0.13 0.04 0.42 0.13 0.13 0.13 ______1£_- -0*19 -0*12 3.755 3.284 3.21 3.92 TOTALS * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTLI7ER, GINNING AND 50 PCT, OF IRRI, FIXED COSTS, PROJECTED, 1975 BUDGET IDENTIFICATION NUMBER — ANNUAL CAPITAL MONTH 11 093 0034 023 2 $F* COTTON, IRRIGATED, TEXAS HIGH PLAINS III REGION FSTIMATED COSTS AND RETURNS *ER ACRE (SPRINKLERS) TYPICAL MANAGEMENT (PREPLANT PLUS 3 POSTPLANTS) UNIT GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEED TOTAL ?.. VARIABLE COSTS PREHARVEST SEED FFRT(60-40-0) HERBICIDE HAIL INSURANCE MACHINFRY TRACTORS IRRIGATION MACHINERY LA30R(TRACT0R & MACHINERY) LABOR(IRRIGATION) INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST HARVEST COSTS GIN, BAG, TIES CUSTOM HARV&HAUL SUBTOTAL, HARVEST PRICE OR VA L U E OR COST/UNIT QUANTITY COST LBS, TON 0,35 80,00 LBS. ACRE ACRE DOL. ACRE ACRE ACRE HOUR HOUR DOL. 0.35 24.80 5.20 0.08 3.21 5.55 20.04 2.75 2.75 0.10 __22_aa S 233.25 25.00 1.00 1.00 80.00 1.00 I.00 1.00 3.76 2.40 41.57 $ 8.75 24.80 5.20 6.40 3.21 5.55 20.04 10.33 6.60 ________ 95.OA $ CWT. CWT. 1.25 1.00 25.30 25.30 TOTAL VARIABLE COST 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 201.25 575,00 0.40 31 .62 ._25a.3p_ 56,92 $ $ 151,96 S 81,29 $ ACRE ACRE ACRE ACRE 3.92 4.92 25.32 30.49 1.00 1.00 1.00 1.00 3,9? 4,9? 25.32 -_2.L-l_-9 $ 64.64 5. TDTAL COSTS $ 216.60 6. NET RETURNS 16.65 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTILIZER. GINNING. AND 50 PCT. OF IRRI. FIXED COSTS. PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 0 0 3 4 0 2 3 7 0 C ANNUA. CAPITAL MONTH 11 COTTON, IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS >ER ACRE (SPRINKLERS) TYPICAL MANAGEMENT (PREPLANT PLUS 3 POSTPLANTS) OPERATION SHRFODCR 4R TANDEM DISCPICKUP MB°LOW 4B CLOD BUSTFR CHISEL PICKU3 FFRT,AO»Ll,PENTD TANDEM DISC PICKUP TANDEM DISC HERB SPPAYER PICKU* LISTFR, 8-R PICKUP POLLING CULT, 8R BCD PLANTER PICKUP SANDFIGHTER (2) POLLING CULT, 8R PICKUP PICKUP PICKU° PICKU* ITEM NO, 8,48 44 10 8,34 52 2,36 to 6,86 2,44 10 2,44 54 10 8,60 10 2,66 8,64 10 6,50 ?,66 10 10 10 to DATE F U E L . O I L , FIXED COSTS TIMES LABOR 1MACHINE L U B . . R E P. PER ACRE PER ACRE OVER HOURS HOURS DEC DEC DEC JAN JAN JAN JAN FEB FEB FEB MAR MAR MAR APR APR MAY MAY MAY JUNE JUNE JUNE JULY SEPT NOV 1,00 0,245 0,163 0,159 1.00 0 , 0 0 . 1 0 0 , 1 2 5 0. 1 CO 0.75 0,534 0,356 0,303 0,75 0,0 0,25 0,073 0,048 0.100 0,10 0,125 1.00 0.097 0,064 0,159 1.00 0.239 0.10 0.125 0,100 1.00 0.239 0.159 0.151 t.oo 0,0 0 . 1 0 0 , 1 2 5 0.10C 0 . 11 4 1 . 0 0 0,171 0.100 0 , 1 2 5 0.10 3 , 1 3 4 0 .089 1.00 1.50 0.257 0,171 0.10 0,125 0,100 2 . 0 0 0,250 0.167 2.00 0,268 0 . 1 7 9 0.10 3,125 0.100 0.10 3,125 0.100 0.10 0,125 0.100 0 . 1 0 ___!_& QsiOO TOTALS 3,755 3,284 0, 16 0,09 0,19 C.26 0,04 0,01 0,19 0,0 0,09 0,19 0,09 0,03 0,19 0,10 0.19 0,10 0.14 0.19 0,02 0.21 0.19 0,19 0, 19 0,33 0,18 0,13 0,45 0,10 0,03 0,13 0.0 0.18 0.13 0,18 0,06 0,13 0.18 0.13 C.21 0,23 0,13 0,04 0,42 0,13 0.13 0.13 _ft_tl2 -0*12 3.21 3,92 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTILIZER, GINNING, ANO 50 PCT. OF IRRI. FIXED COSTS. PROJECTED, 1975 OUDGFT IDENTIFICATION NUMBER — ANNUAL CAPITAL MONTH 11 093 0034 023 7 COTTON, IRRIGATED, TFXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS "ER ACRE (FURROW) TYPICAL MANAGEMENT (PREPLANT PLUS 3 POSTPLANTS) ^ PRICE OR VA L U E OR JNIT COST/UNIT QUANTITY COST 1. GROSS RECEIPTS FROM PRODUCTION C3TTON LINT COTTONSEED TOTAL ?. VARIABLE COSTS PREHARVEST SEED FERT(60-40-0) HFR3ICIDE HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR & MACHINERY) LABOR(IRRIGATION) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST HARVEST COSTS GIN, BAG, TIES CUSTOM HARV&HAUL SUBTOTAL, HARVEST .BS. TON 0,35 80.0 575.00 0 0.40 LBS. ACRE ACRF DOL. ACRE ACRE ACRE HOUR HOUR DOL. 0.35 24.80 5.20 0.08 3.21 5.55 14.04 2.75 2.75 0.10 25.00 1.00 1.00 80.00 1.00 1.00 1.00 3.76 3.60 39.07 8.75 24.80 5.20 6.40 3.21 5.55 14.04 10.33 9.90 3__21 92.09 CWT. CWT. 1.25 1.00 25.30 25.30 31.62 $ —25*20 56.92 S 149.01 TOTAL VARIABLE COST $ 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 201.25 32*00 * 233.25 ACRE ACRE ACRE ACRF 3.92 4.92 20,52 33,95 1.00 1.00 I .00 1.00 84,24 3.92 4.9? 20.52 . _3.a_.25 $ 63.30 5 . T D TA L C O S T S $ 212.31 6. NET RETURNS •fc 20.94 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTILIZER. GINNING, AND 50 PCT. OF IRRI. FIXED COSTS. PPOJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 0 0 3 5 0 2 3 2 0 0 ANNUAL CAPITAL MONTH 11 COTTON, IRRIGATED, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS »ER ACRE (FURROW) TYPICAL MANAGEMENT (PREPLANT ^LUS 3 POSTPLANTS) OPERATION SHREDDER 4P TANDEM DISC PICKUP MBPLOW AB CLOD BUSTER CHISEL PICKUP FERT.APPLI.RENTD TANDEM DISC PICKUP TANDEM DISC HFP3 SPRAYER PICKUP LISTER, 8-R PICKUP ROLLING CULT, 8R BED PLANTER PICKUP SANDFIGHTEP (2) ROLLING CULT, 8R PICKUP PICKUP PICKUP PICKU=> ITEM NO, 8,48 44 10 8,34 52 2,36 10 6,86 2,44 10 2,44 54 10 8,60 10 2,66 8,64 10 6,50 2,66 to 10 10 10 DATE DEC DEC DEC JAN JAN JAN JAN FEB FEB FEB MAR MAR MAR APR APR MAY MAY MAY JUNE JUNE JUNF J U LY SEPT NOV TOTALS FUEL,OIL. FIXED TIMES LABOR MACHINE LUB,,REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE 1.0C 1 ,00 0,1 0 0,75 0,75 0,25 0,10 1 .00 1 .00 0.10 1.00 1.00 0.10 1 .OC 0.10 1.00 1.50 0.10 2.00 2.00 0.10 0.10 0.10 0.1C 0.245 3.0 0.125 0.534 0.0 0.073 0.125 0.097 0.239 0.125 0.239 0.0 0.125 0.171 3.125 0.134 0.257 3.125 0.250 0.268 0.125 3.125 0.125 0 ,. 163 0 .159 0 .100 o.. 3 5 6 0 .. 3 0 3 0,▶ 048 Oi▶ 100 Oi▶ 064 Oi. 159 Oi▶ 1 00 Oi. 1 5 9 0 . 151 0 .▶ 100 0 , 1 14 0 . 100 0. 089 0 , 171 0. 100 0 . 167 0 . 179 0 . 100 0 . 100 0 . 100 0. 16 0.09 0. 19 0.26 0.04 0.01 0. 19 0.0 0.09 0. 19 0.09 0.03 0.19 0.10 0.19 0.10 0. 14 0. 19 0.02 0.21 0. 19 0.19 0. 19 - 1 * 1 2 5 _fi_a_2__ ___a!2 -Q:*13 3,755 3,2 84 3,21 3.92 0 .33 0 • 18 0 • 13 0 .45 0 • 10 0 • 03 0 .13 0 .0 0 .18 0 ,▶ 13 Oi▶18 0<. 0 6 Oi▶13 Oi. 1 8 0«▶13 0 ,▶21 0 .▶23 Oi 1 3 0 . 04 0 , 42 0 . 13 0 . 13 0 . 13 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTILIZEP, GINNING, AND 50 PCT. OF IRRI. FIXED COSTS. PROJECTED, 1975 BUDGET IDENTIFICATION NUMBER ANNUAL CAPITAL MONTH 11 093 0035 023 2 COTTON, DRYLAND, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT 1 . GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEED TOTAL LRS. TON PRICE OR VA L U E OR COST/UNIT QUANTITY COST 0.35 80.00 300.00 0.23 105.00 1_Ll3L__ S 123.40 ? . VARIABLE COSTS J ^ PREHARVEST SEED HERBICIDE HAIL INSURANCE MACHINERY TRACTORS LABOR(TRACTOR & MACHINERY) I N T E R F S T O N O P. C A P. SUBTOTAL, PRE-HARVEST LBS. ACRE DOL. ACRE ACRE HOUR DOL. % HARVEST COSTS GIN, BAG, TIES CUSTOM HARV&HAUL SUBTOTAL, HARVEST CWT. CWT. 0.35 3.50 0.08 3.2 3 6.20 2.75 0. 10 15.00 I.00 40.00 1.00 1.00 3.83 12.21 5.25 3.50 3.20 3.23 6.20 10.53 1*_2_£ S 33. 13 $ 1.25 I.00 1 3.20 13.20 16.50 -13*20 s 29.70 TOTAL VARIABLE COST $ 62.83 INCOME ABOVE VARIABLE COSTS $ 6C.57 FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS s ACRE ACRE ACRE 4.01 5.76 26.72 1.00 1.00 1.00 4.01 5.76 $ _ _2___Z2 36.50 TOTAL COSTS % NET RETURNS $ 24,08 99.32 * LAND (NET RENT) BASED ON LANDLORD'S SHARE OF 1/4 OF GROSS INCOME LESS 1/4 OF GINNING. BAGGING AND TIES, PLANTED 2 X 1 SKIPROW, PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 0 0 3 0 0 2 3 1 0 0 ANNUAL CAPITAL MONTH I I COTTON, DRYLANO, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PFR ACRE TYPICAL MANAGEMENT OPERATION SHREODER 2R TANDEM DISC PICKUP PICKU* MBPLOW 4B CLOD BUSTER PICKUP L I S T E R - P L A N T 8R PICKUP ROLLING CULT.▶ 8R PICKUP L I S T E R - P L A N T 8R HERB SPRAYER PICKUP SANDFIGHTFP (2) BED KM IFE RR PICKUP PICKUP PICKUP PICKUP ITEM NO, 8,70 44 10 10 8,34 52 10 8,62 10 2,66 10 8,62 54 10 6,50 2,68 10 10 10 to DATE DEC DEC DEC JAN FEB FEB FEB MAR MAR APR APR MAY MAY MAY JUNE JUNE JUNE J U LY SEPT NOV TOTALS FIXED FUEL,OIL, TIMES LABOR MACHINE L U B , , R E P, COSTS OVER HOURS HOURS PER ACRE PER ACRE 1 i. 0 0 t i. 5 0 O i▶10 O i. 1 0 0.475 0.0 3.125 9.125 1 .068 0.0 0.125 3.171 0 .125 0,134 3.125 3.214 0.0 0.125 0.250 0.268 0. 125 0.125 3.125 0.317 0.2 39 0. 1 00 O.i 00 0.712 0.6 06 0.100 0, 1 14 0,100 0,089 0,100 0,143 0.1 88 1.. 5 0 1 1▶50 0 .▶10 l l▶00 O i▶10 l l▶O C O i. 1 0 1.. 2 5 1 1. 2 5 0 ..1 0 o. too 2 i▶O C 0. T67 0.179 2 i. 0 0 0 .▶10 0.100 O i▶C I 0.100 O i▶ to 0.100 O i. 1 0 ._.aAi2S - fi i l - Q O 3.830 3.754 0.03 0.14 0. 19 0.19 0.52 0.09 0.19 0.14 0.19 0.10 0. 19 0.17 0.03 0. 19 0.02 0. 13 0.19 0.19 0.19 0.16 0.27 0.13 0.13 0.89 0.21 0.13 0.23 0.13 0.21 0.13 0.29 0 .08 0.13 0.04 0.31 0.13 0.13 0.13 -0*19 -0*12 3.23 4.01 * LAND (NET RENT) BASED ON LANDLDRD^S SHARE OF 1/4 OF GROSS INCOMF LESS 1/4 OF GINNING, BAGGING AND TIES, PLANTED 2 X I SKIPROW, PROJECTED, 1975 BUDGET IDENTIFICATION NUMBER ANNUAL CAPITAL MONTH 11 093 0030 023 I COTTON, DRYLAND, TEXAS HIGH PLAINS III REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEED TOTAL 2 , VA R I A B L E C O S T S PREHARVEST SEED F*RT(20-20-0) HERBICIDE HAIL INSURANCE MACHINFRY TRACTORS LABOR(TRACTOR & MACHINERY) INTEREST ON OP. C A P, S U B TO TA L , PRE-HARVEST HARVEST COSTS GIN, BAG, TIES CUSTOM HARV&HAUL SUBTOTAL, HARVEST TON 0.35 80,00 375.00 0.26 131.25 20+2.0 « 152.05 LBS. ACRE ACRE DOL. ACRE ACRE HOUR DOL, 0,35 12,00 2.50 0,08 3,15 6,03 2.75 0.10 15.00 1.00 1.00 50.00 1.00 1.00 3.85 19.1 1 5.25 12.00 2.50 4.00 3.15 6.03 10.58 ._1il21 45,43 1.25 I.00 16.50 1 6.50 20.63 __!__*&__ S 37.13 LBS. CWT CWT TDTAL VARIABLE COST 3, INCOME ABOVE VARIABLE COSTS 4, FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TO TA L F I X F D C O S T S $ 82.55 * 69.50 $ ACRF ACRE ACRE 3.81 5.46 2 9.86 1.00 1.00 1 .00 3.31 5.46 __22__86 $ 39.13 5, TOTAL COSTS * 121.68 ft, NFT RETURNS $ 30.37 * LAND CHARGE BASED ON LANDLORDS SHARE OF GROSS (1/4) LESS 1/4 OF FERTILIZER ANO GINNING, PROJECTED, 1975 PLANTED 2 X 1 SKIPROW, PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 0 0 3 0 0 1 3 1 C C A N N U A L C A P I TA L M O N T H 11