r 02000300 TEXAS HIGH PLAINS II FOREWORD r The data contained in this report are based on estimates and actual records of operations within an area described as Texas High Plains II. This area includes the "hardlands" or the Pullman Clay Soils south of the Canadian River in the Texas Panhandle. Variations in inputs and returns exist among farms and managers. However, these budgets should serve as useful guides in planning and decision making for agri culturalists concerned with the area described above. In order to analyze farm enterprises in Texas High Plains II, certain basic assumptions were necessary. Farm size was assumed to be 1,150 acres for irrigation and 3,000 acres for dryland. The complement of equipment associated with this farm size is shown on form 02000500. r Two different levels of management, typical and high level, were assumed. High level man agement was assumed to obtain higher yields with the same fixed resources such as land and irrigation water. In addition, the high level manager made more efficient use of equipment and utilized a more highly skilled labor supply which resulted in lower machinery costs. Thus, machinery and tractor costs for the typical man ager were developed by multiplying high level costs by a factor of 1.1 to differentiate between the two levels of management. Budgets for irri gated crops are based on the assumption of ade quate water availability. No attempt was made to impose a cropping pattern on these budgets for the particular farm size. Grazing data are estimated in pounds of gain. Government payments were based on full allot ments for each crop where applicable. No allow ance was made for increased costs due to culti vation of set aside acres since it was assumed that benefits derived from clean tillage or planting grazing crops on these acres would offset most of these costs. Labor was assumed to include the manager's labor plus any additional labor necessary. Wage rates for various jobs ranged from SI-50 to S2.00. (See 02000400) Land charge was estimated on the basis of cash rent for irrigated land minus the fixed costs on the pump and irrigation well. The cash lease varied for different crops. (See 02000400) Dryland rent was based on 14 of the gross income for cotton and ys of the gross for other crops. The same percentage division was applied to government payments for dryland. It was assumed that government payments would not be divided on irrigated land since the operator would pay all variable costs for pro ducing the crops. HIGH PLAINS II 1/ Assumed Prices Paid And Received By Farmers — Item Unit Price Prices Paid (1975) Seed: Cotton (delinted) Grain Sorghum Soybean Wheat (cleaned and treated) Alfalfa Corn (for grain) Corn (for silage) Forage Sorghum Sugar Beets Custom Rates: Cotton (harvest and haul) Combining soybeans Combining wheat (dryland) Combining wheat (irrigated) Combining grain sorghum (dryland) Combining grain sorghum (irrigated) Sugar beets (harvest and haul) Hay harvest, Swath, bale, haul Corn (harvest and haul) Drying corn Hauling: Grain sorghum Soybeans Wheat Chemical spraying (aerial) Cotton ginning Fuel and lubricants: Gasoline L. P. gas Diesel fuel Motor oil (heavy duty, detergent) Fertilizer (bulk): Nitrogen (anhydrous) Nitrogen (granular) Phosphorous Labor (except hoeing) Labor (hoeing) cwt. cwt. cwt. bu. cwt. cwt. cwt. cwt. cwt. cwt. acre acre acre acre cwt. ton bale bu. bu. cwt. bu. bu. $ 35.00 35.00 10.00 7.50 175.00 90.00 75.00 32.00 60.00 1.00 12.00 7.50 12.00 7.50 .30 3.00 .60 .50 .10 .20 .20 .15 acre cwt. 2.00 1.25 gal. gal. gal. gal. .36 .24 .35 lb. lb. lb. hour hour 1.75 .18 .30 .30 2.75 2.00 Assumed Prices Paid And Received By Farmers (cont'd.) Item Chemicals: Pre-emergence herbicide Methyl parathion Malathion Land Lease (cash rent) Hail insurance: Wheat Cotton Corn Grain Sorghum Interest Capital Operating Unit 5 gal gal. gal. acre Price $135.00 5.25 11.00 50.00 8.00 8.00 8.00 8.00 $100 $100 $100 $100 .08 .10 Prices Received (1975) Cotton Cotton seed Wheat Grain sorghum A l f a l f a h a y ( s t a n d i n g i n fi e l d ) Forage sorghum hay (baled) Ensilage (corn) standing in field Pasture grazing Corn (grain) Soybeans Sugar beets (14% sugar) lb. Lint ton bu. cwt. ton ton ton lb. gain bu. bu. ton .35 80.00 3.25 3.25 20.00 30.00 12.00 .20 2.25 5.00 35.00 1/ These price assumptions are not to be interpreted as predictions or prospective prices. "^-^v TEXAS HIGH PLAINS II Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size Tractor - 100 HP Tractor - 85 HP Tractor - 45 HP Pickup - 1/2 ton Rolling Cultivator - 6 row Moldboard Plow - 4 bottom Chisel Float Border Disc Flex Planter - 6 row Lister-Planter Tandem Disc Offset Disc Grain Drill - 16 feet Shredder - 4 row Rod Weeder Sandfighter Bed Shaper Harrow Clod Buster Beet Thinner Herb Sprayer Tool Bar - 6 row Lister - 6 row Cultipacker Purchase Price Estimated Years of Use Estimated Hours of Use $11025 8400 3675 3400 1785 1470 5 8 12 3 8 8 8 10 10 5 8 8 8 10 8 5 10 12 12 12 10 10 12 10 12 5000 6400 7200 2100 1600 1600 1600 1000 1600 1000 1000 1600 1600 1200 1000 1200 1000 1596 1596 2004 1000 2000 2004 2000 1596 840 1575 210 609 1890 1470 2100 1680 1470 341 315 840 315 404 1890 525 210 945 315 Fixed Costs Per Hour $2.09 1.68 .84 1.31 1.52 1.25 .71 2.42 .20 .64 3.57 1.25 2.78 2.15 2.01 .73 .48 1.26 .34 .34 2.90 .40 .18 .73 .34 Variable Costs Per Hour $2.66 2.29 1.30 1.85 .94 .77 .26 .30 .06 .41 1.27 .45 .67 1.41 1.07 .08 .07 .26 .10 .15 .40 .67 .08 .33 .10 ALFALFA ESTABLISHMENT, IRRIGATED, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT P R I C E O R VA L U E O R UNIT COST/UNIT QUANTITY COST 1. GROSS TO TA L RECEIPTS 2. VARIABLE COSTS PREHARVEST SEED FERTI20-80-0I MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR S MACHINERY) LABOR!IRRIGATION) INTEREST CN OP, CAP. FROM LBS. ACRE ACRE ACRE ACRE HOUR HOUR DOL. PRODUCTIGN 1.75 30.00 2.12 7.08 10.92 2.75 2.75 0.10 15,00 1.00 1.00 1.00 1.00 4.42 1.72 24.50 $. $ * 0.0 26,25 30.00 2.12 7.08 10,92 12.15 4.74 —2*-5 95.70 SUBTOTAL, PRE-HARVEST HARVEST COSTS SUBTOTAL, HARVEST $ $ 0.0 TOTAL VARIABLE COST $ 95.70 $ -95.70 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS $ ACRE ACRE ACRE ACRE 5.06 5.26 15.96 17.02 1.00 1.00 1.00 I.00 5.06 5.26 15,96 .-11*02 $" 43.30 5. TOTAL COSTS $ 139.01 6. NET RETURNS -139.01 LAND CHARGE USES $25/A. (1/2 ANNUAL RENTAL) LESS 50 PERCENT OF I R R I G AT I O N FIXED COSTS. PROJECTED, 1975 BUDGET IDENTIFICATION NUMBER 811002402 220 0 ANNUAL CAPITAL MONTH 12 ALFALFA ESTABLISHMENT, IRRIGATED, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION MBPLOW 4B CLOD BUSTER PICKUP TANOEM DISC FLOAT BORDER DISC F E R T. A P P L I , R E N T D GRAIN DRILL PICKUP PICKUP PICKUP PICKUP ITEM NO. 2,36 64 10 4,48 4,40 4,42 6,86 4,52 10 10 10 10 DATE TIMES LABOR MACHINE HOURS HOURS OVER J U LY J U LY J U LY AUG AUG AUG AUG AUG AUG SEPT OCT NOV I.00 1.00 0.10 2.00 2.00 1.00 I.00 1.00 0.10 0.10 0.10 0.10 TOTALS FIXED FUEL,OIL, COSTS L U B . , R E P. PER ACRE PFR ACRE 0.475 0.371 0.100 0.319 1.173 0.319 0.064 0.179 Oo 100 0.100 0.100 0.37 0.05 0.19 0.14 0.36 0.02 0.0 0.25 0.19 0.19 0.19 0.59 0.13 0.13 0.40 2.84 0.06 0.0 0.39 0.13 0.13 0.13 -0+125 -0+100 -0+19 -0+13 2.12 5o06 0.712 0.0 0.125 0.478 1.759 0.479 0.097 0.269 0.125 0.125 0.125 4.418 3.399 LAND CHARGE USES S25/A. (1/2 ANNUAL RENTAL) LESS 50 PERCENT OF I R R I G AT I O N FIXED COSTS. PROJECTED, 1975 BUDGET IDENTIFICATION NUMBER — ANNUAL CAPITAL MONTH 12 08110024 022 2 ^Sj ALFALFA ESTABLISHMENT, IRRIGATED, TEXAS HIGH PLAINS I I R E G I O N ESTIMATED COSTS AND RETURNS PER/ACRE HIGH LEVEL MANAGEMENT PRICE OR VA L U r UNIT COST/UNIT QUANTITY COS' 1. GROSS TO TA L RECEIPTS Z , VA R I A B L E C O S T S PREHARVEST SEEO FERT(20-80-0) MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR £ MACHINERY) L A B O R ( I R R I G AT I O N ) I N T E R E S T O N O P. C A P. SUBTOTAL, PRE-HARVEST FROM PRODUCTION $. $ m 0.0 % LBS. ACRE ACRE ACRE ACRE HOUR HOUR DOL. 1.75 30,00 2.16 7.73 10.92 2.75 2.75 0.10 15*00 1^00 1.00 1.00 1,00 5.04 1.72 24.73 26o25 30,00 2.16 7.73 10 92 13.87 4.74 2*<r? $ 98.14 HARVEST COSTS SUBTOTAL, HARVEST $ TOTAL VARIABLE COST $ 98.14 $ 0.0 3. INCOME ABOVE VARIABLE COSTS $ -98>14 4. FIXEO COSTS $ MACHINEPY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 5.20 5.68 15.96 17.02 1,00 1.00 1.00 1,00 5 20 5.68 15^96 17-fl2 $ 4 3.86 5. TOTAL COSTS $ 14? 00 6. NET RETURNS $-142.00 LAND CHARGE USES $25/A. (1/2 ANNUAL RENTAL) LESS 50 PERCENT OF UPIG\T.fj FIXED COSTS. PROJECTED, 1975 BUDGFT IDENTIFICATICN NUMBER ANNUAL CAPITAL MONTH 12 811002401 220 0 A L FA L FA E S TA B L I S H M E N T, I R R I G AT E D , T E X A S H I G H P L A I N S I I R t G I O N ESTIMATED COSTS AND RETURNS PER/ACRE HIGH LEVEL MANAGEMENT OPERATION MBPLOW 4B CLOD BUSTER PICKUP TANDEM DISC FLOAT HARROW BORDER DISC F ^ R T. A P P L I , R E N T D CULTIPACKER G*AIN DRILL CULTIPACKER PICKUP PICKUP P'CKUP FiC.KUP ITEM NO. 1,35 63 10 3,47 3,39 5,61 3,41 5,87 5,73 3,51 5,73 10 3.0 10 10 DATE TIMES LABOR MACHINE HOURS HOURS OVER J U LY J U LY J U LY AUG AUG AUG AUG AUG AUG AUG AUG AUG S PT 1CT NOV 1.00 0.712 1.00 0 . 0 0.10 0.125 2.00 0.478 2.00 1.759 0.208 1.00 1.00 0.479 1.00 0.097 1,00 0,208 1,00 0,269 1,00 0,208 0.10 0.125 0.10 0.125 0.10 0 125 0 . 1 0 -9.+125 TG'ALS 5,044 0o475 0.371 0.100 0,319 1.173 0. 139 0.319 0.064 0ol39 0.179 0, 139 0.100 0.100 0 100 0.1Q0 3 816 FIXED FUEL,OIL, COSTS LUB., REP. PER ACRE PER ACRE 0.37 0.05 0.19 0, 14 0.36 0.01 0.02 0.0 0.01 0.25 0,01 0.19 0, 19 0 19 .0.19 0 59 0.13 0.13 0,40 2.84 0o05 0.06 0.0 0 05 0.39 0,05 0.13 0 13 0 13 0.13 2 16 5 20 LAND CHA^G'; U S r S $ 2 5 / A . ( 1 / . A N N U A L R E N T A L ) L ' S C 5 0 P C R C ' N ~ O F I R R I G * PRr'JvCTEnt 1975 FIXCD COSTS B U D G E T I D N T I F I C AT I C N N U M B " R — A f N ' U A L C A P I TA L M ) N T H 1 2 08110024 Oi2 2 ALFALFA, IRRIGATED, Tc'XAS HIGH PLAINS II RFGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT PRICE OR VA L U ; 0 UNIT COST/UNIT QUANTITY COST GROSS RECEIPTS FRCM PRODUCTION HAY TOTAL 2. VARIABLE COSTS PREHARVEST FERTI0-60-0) MACHINERY TRACTORS I R R I G AT I O N M A C H I N E RY LABORITRACTOR £ MACHINERY) L A B O R ( I P R I G AT I O N ) INTEREST ON OP. C A P. SUBTOTAL, PRE-HARVEST HARVEST COSTS <_MRTnTA! . $ TON 20.00 6.00 -12Q+0Q $ 120.00 $ ACRE ACRE ACRE ACRE HOUR HOUR DOL. 18.00 1.49 0.10 18.72 2.75 2.75 0.10 1.00 1,00 1.00 1»00 1.10 2.95 15.01 18.,00 1.49 0.10 I8a72 3 02 8.12 1*50 $ 50.94 * $ HARVEST o.o 50.94 TOTAL VARIABLE COST $ 69.06 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATED ESTAB. COST LANO (NET RENT) TOTAL FIXED COSTS ACRE ACRE ACRE ACRE ACRE 1,05 0.07 27.36 141.75 36.32 1*00 1.00 1,00 0,20 1.00 1.05 0.07 27,36 28 35 —23+22 $ 93.14 5. TOTAL COSTS $ 144 08 6. NET RETURNS $ -24.08 LAND CHARGE USES $50/A. LESS 50 PERCENT OF IRRIGATION FIXED COSTS. PROJECTED, 197r^ ESTABLISHMENT COSTS PRORATED OVER 5 YEARS, BUDGET IDENTIFICATICN NUMBER 81 002602 220 0 ANNUAL CAPITAL MONTH 9 ALFALFA, IRRIGATEC, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION PICKUP F F - RT. A P P L I , R E N T D PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP ITEM NG. 10 6,86 10 10 10 10 10 10 10 D AT E FIXED FUEL,OIL, COSTS TIMES LABOR MACHINE L U B . , R E P. PER ACRE PER ACRE OVER HOURS HOURS OCT MAP MAR APR MAY JUNE J U LY AUG SEPT 0.10 0.125 1.00 0.097 0.10 0.125 0.10 0.125 0.10 0.125 0.10 0.125 0.10 0.125 0.10 0.125 0 . 1 0 ,-0+125 0. 100 0.064 0.100 0.100 0.100 0.100 0.100 0,100 0.19 0.0 0.19 0.19 0.19 0.19 0. 19 0. 19 0.13 0.0 0.13 0.13 0.13 0.13 0.13 0.13 -0+100 -0+19 -0+12 1.097 0.864 1.49 1.05 TOTALS LAND CHARGE USES $50/A. LESS 50 PERCENT OF IRRIGATION FIXED COSTS. ESTABLISHMENT COSTS PRORATED OVER 5 YEARS. PROJECTED, 1975 BUDGET IDENTIFICATICN NUMBER ANNUAL CAPITAL MONTH 9 081 0026 022 2 ALFALFA, IRRIGATED, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT PRICE OR VA L U r OP UNIT COST/UNIT QUANTITY C^ST 1. GROSS RECEIPTS FROM PRODUCTION HAY TOTAL 2. VARIABLE CCSTS PREHARVEST FERT(0-100-0) MACHINERY TRACTORS IRRIGATION MACHINERY LABORITRACTOR & MACHINERY) LABORITRP IGATION) INTEREST ON OP. CAP. TON 20.00 8.00 -130-QQ i 160.00 ACRE ACRE ACRE ACRE HOUR HOUR COL. 30.00 1.49 0.10 26.52 2.75 2.75 0.10 I.00 1.00 1.00 1.00 1.10 4.18 21.79 30.00 1.49 0.10 HARVEST COSTS SUBTCTAL, HARVEST 2-13 0.0 74.80 TO TA L VA R I A B L E C C S T 85-20 3. INCOME AROVE VARIABLE COSTS MACHINERY TRACTORS IRRIGATION MACHINERY PRORATED ESTAB. COST LAND (NET RENT) TOTAL FIXED COSTS 11.50 74.80 SUBTOTAL, PRE-HARVEST 4. FIXED COSTS 26.52 3.02 ACRE ACRE ACRE ACRE ACRE 1.05 0.07 38.76 144.79 30.62 5 . TO TA L C O S T S 6. NET RETURNS 1.00 1.00 1.00 0.14 1.00 1,05 0.07 38,76 20 70 —20+32 % 91.20 $ 166,00 $ -6.00 LANO CHARGE USES $50/A. LESS 50 PERCENT OF IRRIGATION FIXED COSTS. PROJECTED, 1975 ESTABLISHMENT COSTS PRORATED OVER 7 YEARS. BUDGFT IDENTIFICATICN NUMBER 81 002801 220 0 ANNUAL CAPITAL MONTH 9 ALFALFA, IRRIGATED, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPEPATION PICKUP F F R T. A P P L I , R E N T D PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP I TEM NO. 10 5,87 10 10 10 10 10 10 10 DATE TIMES OVER LABOR MACHINE HOURS HOURS OCT MAR MAR APR MAY JUNE J U LY AUG SEPT 0.10 1.00 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.125 0.097 0.125 0.125 0.125 0.125 0.125 0.125 TOTALS FIXED FUEL,OIL, COSTS LUB. , REP. PER ACRE PER ACRE 0.100 0.064 0.100 0.100 0. 100 0.100 0.100 0.100 0.19 0.0 0.19 0.19 0.19 0.19 0.19 0.19 •0.13 0.0 0.13 0.13 0. 13 0.13 0.13 0.13 -0*125 - Q + 1 Q - -0*19 -0*12 1.097 0.864 1.49 1.05 LAND CHARGE USES S50/A. LESS 50 PERCENT OF IRRIGATION FIXED COSTS. ESTABLISHMENT COSTS PRORATED CVER 7 YEARS. PROJECTED, 1975 BUDGET IDENTIFICATICN NUMBER — ANNUAL CAPITAL MONTH 9 081 0028 012 2 ^Sk CORN FOR GRAIN, IRRIGATED, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT P R I C E O R VA L U E U P UNIT COST/UNIT QUANTITY COST 1. GROSS RECEIPTS FROM PRODUCTION CORN TOTAL 2. VARIABLE COSTS PREHARVEST SEED FERT(150-60-0) INSECTICIDE HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABORITRACTOR £ MACHINERY) LABOR(IRRIGATION) INTEREST ON OP. CAP. $ BU, LBS. ACRE ACRE DOL. ACRE ACRE ACRE HOUR HOUR DOL. 2.25 130.00 0.90 48.60 4.00 0.08 3.47 7.60 17.16 2.75 2.75 0.10 25.00 I.00 1.00 125.00 1.00 1.00 1.00 5.48 2.71 59.65 —5*3- $ BU. BU. BU. 0.30 0,20 0.10 39.00 26,00 130.00 130.00 130.00 .-12*00 $~ 78.00 $ 219.3 1 TOTAL VARIABLE COST $ 3. INCOME ABOVE VARIABLE COSTS 72,69 $ 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 22,50 48 60 4.00 10.00 3.47 7.60 17. 16 15.07 7.44 $~ 1 4 1 . 8 1 SUBTOTAL, PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL CUSTOM DRYING SUBTCTAL, HARVEST -292. $ 292 ,50 ACRE ACRE ACRE ACRE 6.32 5.69 25.08 40.89 1.00 1.00 1.00 1.00 6, 32 5.69 25,08 .--0-39 $" 7 7.97 5 . TO TA L C O S T S $ 297,79 6. NET RETURNS $ -5.2-") LAND (NET PENT) BASED ON LANDLORDS SHARE OF 1/3 OF GROSS INCOME LESS 1/3 OF FERTILIZER, INSECTICIDE, HARVESTING, HAULING, DRYING AND 50% OF FIXED IRRIGATICN COSTS. PROJECTED, 1975 BUDGET IDENTIFICATION NUMBER 72 002402 220 0 ANNUAL CAPITAL MONTH 10 C O R N F O R G R A I N , I R R I G AT E D , T E X A S H I G H P L A I N S I I REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION SHREDDER 4R TANDEM DISC TANDEM D I S C PICKUP CHISEL PICKUP PICKUP OFFSET D I S C TANDEM D I S C PICKUP FLOAT HARROW LISTER, 6-R PICKUP LISTER, 6-R FLEX PLANTER 6R HERB SPRAYER ROD WEEDER PICKUP ROLLING CULT(6R ) TOOL BAR, 6-.ROW PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP ITEM NO. 2,54 48 4,48 10 2,38 10 10 2,50 4,48 10 4,40 4,62 2,72 10 2,72 44 68 4,56 10 4,32 4,70 10 10 10 10 10 10 DATE TIMES LABOR MACHINE OVER HOURS HOURS NOV NOV NOV NOV DEC OEC JAN FEB FEB FEB MAR MAR MAR MAR APR APR APR APR APR MAY MAY MAY JUNE J U LY AUG SEPT OCT 1.00 1.00 1.00 0.10 1.00 0.10 0.10 1.00 I.00 0.10 2.00 1.00 1.00 0.10 1.00 1.00 1.00 1.00 0.10 1.00 1.00 0.10 0.10 0.10 0.10 0.10 0.10 TOTALS 0.239 0.0 0.239 0.125 0.290 0.125 0,125 0.239 0.239 0.125 1.759 0.208 0.146 0.125 0.146 0.0 0.0 0.146 0.125 0.181 0.146 0.125 0.125 0.125 0.125 0.125 FIXED FUEL,OIL, LUB. • REP. COSTS PER ACRE PER ACPE 0.160 0.159 0.159 0.100 0.193 0.100 0. 100 0.159 0.159 0.100 1.173 0.139 0.098 0.100 0.098 0,154 0.121 0.098 0,100 0.121 0.098 0.100 0.100 0.100 0.100 0.100 0.17 0.07 0.07 0.19 0.05 0.19 0.19 0 . 11 0.07 0.19 0.36 0.01 0.03 0.19 0.03 0.06 0.08 0.01 0.19 0 . 11 0.01 0.19 0.19 0.19 0. 19 0.19 0.32 0.20 0.20 0.13 0.14 0.13 0.13 0.28 0.20 0.13 2.84 0.05 0.07 0.13 0.07 0.10 0.05 0.03 0, 13 0.18 0.02 0.13 0.13 0.13 0.13 0.13 JO+125. -0+100 -0+19 -0+12 3.47 6o32 5.481 4.288 LAND (NET RENT) BASED ON LANDLORD'S SHARE OF 1/3 OF GROSS INCOME L E S S 1 / 3 O F F E RT I L I Z E R , I N S E C T I C I D E , H A RV E S T I N G , HAULING, DRYING PROJECTED, 1975 A N D 5 0 $ O F F I X E D I R R I G AT I O N C O S T S . B U D G E T I D E N T I F I C AT I O N N U M B E R — A N N U A L C A P I TA L M O N T H 1 0 072 0024 022 2 CORN FOR GRAIN, IRRIGATED, TEXAS HIGH PLAINS II RFGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT PRICE OR VA L U E OR UNIT COST/UNIT QUANTITY COST 1. GROSS RECEIPTS FROM PRODUCTICN CORN TOTAL BU. 2.25 150.00 -221+50 $ 337.50 2. VARIABLE COSTS PREHARVEST SEED FERT(180-60-0) INSECTICIDE HAIL INSURANCE MACHINEPY TRACTORS IRRIGATICN MACHINERY LABORITRACTOR 6 MACHINERY) LABOR! IRRIGATION) INTEREST CN OP. CAP. LBS. ACRE ACRE DOL. ACRE ACRE ACRE HOUR HOUR DOL. 0.90 54.00 4.00 0.08 3.47 7.44 18.72 2.75 2.75 0.10 25.00 I.00 1.00 140.00 1.00 1.00 1.00 5.48 2.95 63.69 0.30 0.20 0.10 150.00 150.00 150.00 SUBTOTAL, PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL CUSTOM DRYING SUBTOTAL, 22.50 54,00 4.00 11,20 3.47 7„44 18,72 15.07 8.12 3*21 $" 150.89 $ BU. BU. BU. HARVEST TOTAL VARIABLE CCST 45.00 30,00 .-15+QQ $" 90.00 $ 240.89 3. INCOME ABOVE VARIABLE COSTS $ 4. FIXED COSTS MACHINEPY TRACTORS IRRIGATION MACHINERY LANO (NET RENT) TOTAL FIXED COSTS $ ACRE ACRE ACRE ACRE 6.32 5.55 27.36 48.85 96,61 6. 32 5.55 27,36 1,00 1.00 1.00 1,00 .--2-25 $" 88.08 5. TOTAL COSTS $ 328.97 6. NET RETURNS $ 8.53 LAND (NET PENT) BASED ON LANDLORD'S SHARE OF 1/3 OF GROSS INCOME LESS 1/3 OF FERTILIZER, INSECTICIDE, HARVESTING, HAULING, DRYING A N D 5 0 $ O F F I X E D I R R I G AT I O N C C S T S . P R O J E C T E D , 1 9 7 5 BUDGET IDENTIFICATION NUMBER 72 002601 220 0 ANNUAL CAPITAL MONTH 10 C O R N F O R G R A I N , I R R I G AT E D , T E X A S H I G H P L A I N S I I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION SHPFDDER 4R TANDEM DISC TANDEM DISC PICKUP CHISEL PICKUP PICKUP OFFSET DISC TANDEM DISC PICKUP FLOAT HARROW LISTER, 6-R PICKUP ROD WEEDER LISTER, 6-R HERB SPRAYER FLEX PLANTER 6P PICKUP R O L L I G C U LT I 6 R ) TOOL BAR, 6-.R0W PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP ITFM NO. 1,53 47 3,47 10 1,37 10 10 1,49 3,47 10 3,39 5,61 1,71 10 3,55 1,71 67 43 10 3,31 3,69 10 10 10 10 10 10 DATE TIMES LABOR !MACHINE HOURS OVER HOURS NOV NOV NOV NOV DEC DEC JAN FEB FEB FEB MAR MAR MAR MAR APR APR APR APR APR MAY MAY MAY JUNC J U LY AUG SEPT OCT 1.00 1.00 1.00 0.10 1.00 0.10 0.10 1.00 1.00 0.10 2.00 1.00 1.00 0.10 1.00 1.00 1.00 1.00 0.10 1.00 1.00 0.10 0.10 0.10 0.10 0.10 0.10 TOTALS FIXED FUEL,OIL, COSTS LUB. , REP. PER ACRE PER ACRE 0.160 0.159 0.159 0. 100 0.193 0.100 0.100 0.159 0.159 0.100 1.173 0.139 0.098 0.100 0.098 0.098 0,121 0.154 0,100 0.121 0.098 0.100 0.100 0.100 0.100 0.100 0.17 0.07 0.07 0.19 0.05 0.19 0.19 0 . 11 0.07 0.19 0.36 0.01 0.03 0.19 0.01 0.03 0.08 0.06 0.19 0 . 11 0.01 0.19 0.19 0.19 0.19 0.19 0.32 0.20 0.20 0. 13 0.14 0.13 0. 13 0.28 0.20 0.13 2.84 0.05 0.07 0.13 0.03 0.07 0.05 0.10 0.13 0.18 0.02 0.13 0.13 0.13 0.13 0.13 - 0 * 1 2 5 -0+100 -0+19 -0+12 3.47 6.32 0.239 0.0 0.239 0.125 0.290 0.125 0.125 0.239 0.239 0.125 1.759 0.208 0.146 0.125 0.146 0.146 0.0 0.0 0.125 0.181 0.146 0.125 0.125 0.125 0.125 0.125 5.481 4.288 LAND (NET PENT) BASED ON LANDLORD'S SHARE OF 1/3 LESS 1/3 OF FERTILIZER, INSECTICIDE, HARVESTING, A N D 5 0 * O F F I X E D I R R I G AT I O N C O S T S . B U D G E T I D E N T I F I C AT I O N N U M B E R — A N N U A L C A P I TA L M O N T H 1 0 072 0026 012 2 OF GROSS INCOME HAULING, DRYING PROJECTED, 1975 CORN FOR SILAGE, IRRIGATED, TEXAS HIGH PLAINS II PEGION FSTIMATFD COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT I. GROSS RECEIPTS FROM PRODUCTION CORN SILAGE TOTAL 2. VARIABLE COSTS PREHARVEST SEED FERT(180-60-0) INSECTICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABOP(TRACTOR £ MACHINERY) LABOR(IRRIGATION) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST VALUE 0R COST PRICE OR C O S T / U N I T QUANTITY $ TON 12.00 20.00 -2-0+QQ $ 240.00 LBS. ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. 0.75 54.00 4.00 3.29 7.60 17.16 2.75 2.75 0.10 25.00 I.00 1.00 1.00 1.00 1.00 5.36 2.71 47.19 18„75 54,00 4.00 3,29 7,60 17.16 14,73 7.44 —-+12 $~ 1 3 1 . 6 9 HARVEST COSTS SUBTOTAL, HARVEST $ $ 0.0 TOTAL VARIABLE CCST $ 131.69 $ 108,31 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINEPY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS $ ACRE ACRE ACRE ACRE 6,18 5.69 25.08 37.46 5. TOTAL COSTS 6. NET RETURNS 6, IB 5.69 25.OB 1.00 1.00 1.00 1.00 .-21-^.3 $" 74.42 $ 2 0 6 , 11 $ 33.89 LAND CHARGE USES $50/A. LESS 50 PERCENT OF IRRIGATION FIXED COSTS. C R O P S O L D S TA N D I N G I N F I E L D . P R O J E C T E D , 1 9 7 5 BUDGET IDENTIFICATION NUMBER 723002502 220 0 ANNUAL CAPITAL MONTH 9 C O R N F O R S I L A G E , I R R I G AT E D , T E X A S H I G H P L A I N S I I R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION SHPEDDER 4R TANDEM DISC TANDEM DISC PICKUP CHISEL PICKUP PICKUP OFFSET DISC TANDEM DISC PICKUP FLOAT HARROW LISTER, 6-R PICKUP ROD WFEDER LISTER, 6-R FLEX PLANTER 6R HERB SPRAYER PICKUP POLLING CULTJ6R ) TOOL BAR, 6-ROW PICKUP PICKUP PICKUP PICKUP PICKUP ITEM NO. 2,54 48 4,48 10 2,38 10 10 2,50 4,48 10 4,40 4,62 2,72 10 4,56 2,72 44 68 10 4,32 4,70 10 10 10 10 10 DATE FUEL,OIL, FIXEO COSTS TIMES LABOR MACHINE L U B . , R E P. PEP ACRE PER ACRE OVER HOURS HOURS NOV NOV NOV NOV DEC DEC JAN FEB FEB FEB MAR MAR MAR MAR APR APR APR APR APR MAY MAY MAY JUNE J U LY AUG SEPT 1.00 I.00 1.00 0.10 1.00 0.10 0.10 1.00 1.00 0.10 2.00 1.00 1.00 0.10 1.00 1.00 1.00 1.00 0.10 1.00 1.00 0.10 0.10 0.10 0.10 0.10 TOTALS 0.160 0.159 0.159 0.100 0.193 0.100 0.100 0.159 0.159 0.100 1.173 0.139 0.098 0.100 0.098 0.098 0.154 0.121 0,100 0.121 0.098 0.100 0.100 0.100 0.100 0.17 0.07 0.07 0.19 0.05 0.19 0.19 0 . 11 0.07 0.19 0.36 0.01 0.03 0.19 0.01 0.03 0.06 0.08 0. 19 0 . 11 0.01 0.19 0.19 0.19 0.19 0.32 0.20 0.20 0.13 0.14 0.13 0. 13 0.28 0.20 0.13 2.84 0.05 0.07 0.13 0.03 0.07 0.10 0.05 0.13 0.18 0.02 0.13 0.13 0.13 0.13 -0*125 -0*100 -0+19 -0+13 3.29 6, 18 0.239 0.0 0.239 0.125 0.290 0.125 0.125 0.239 0.239 0.125 1.759 0.208 0.146 0.125 0.146 0.146 0.0 0.0 0.125 0.181 0.146 0.125 0.125 0.125 0.125 5.356 4.188 L A N D C H A R G E U S E S $ 5 0 / A . L E S S 5 0 P E R C E N T O F I R R I G AT I O N F I X E D C O S T S . CROP SOLD S TA N D I N G IN FIELD. PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R — A N N U A L C A P I TA L K O N T H 9 07230025 022 2 CORN FOR SILAGE, IRRIGATED, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT 1. GROSS RECEIPTS FRCM PRODUCTION CORN SILAGE TOTAL 2. VARIABLE COSTS PREHARVEST SEED FERT(200-60-0) INSECTICIDE MACHINERY TRACTORS IRRIGATION MACHINERY LABOR(TRACTOR £ MACHINERY) LABOR(IRRIGATION) INTEREST CN OP. CAP. VALUE OP COST PRICE OR COST/UNIT QUANTITY TCN 12.00 27.00 LBS. ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. 0.75 57.60 4.00 3.29 7.60 18.72 2.75 2.75 0.10 30.00 1,00 1.00 1.00 1.00 1.00 5.36 2.95 51.15 SUBTOTAL, PRE-HARVEST -22-+00 $ 324.00 22.50 57.60 4.00 3.29 7.60 18.72 14.73 8.12 .—5*11 $" 141.67 HARVEST COSTS SUBTOTAL, HARVEST $__ $ TOTAL VARIABLE CCST $ 141.67 $ 182.33 3. INCOME ABOVE VARIABLE CCSTS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS oTo" $ ACRE ACRE ACRE ACRE 6.18 5.69 27.36 36.32 1.00 1.00 1.00 1.00 6, 18 5.69 27,36 .-23-2Z $" 7 5 . 5 6 5 . TO TA L C O S T S $ 217.23 6. NET RETURNS $ 106,77 LAND CHARGE USES $50/A. LESS 50 PERCENT OF IRRIGATION FIXED COSTS. C R O P S O L D S TA N D I N G I N F I E L D . P R O J E C T E D , 1 9 7 5 BUDGET IOENTIFICATICN NUMBER 723002601 220 0 ANNUAL CAPITAL MONTH 9 C O R N F O P S I L A G E , I R R I G AT E D , T E X A S H I G H P L A I N S I I R E G I O N FSTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION SHREDDER 4R TANDEM D I S C TANDEM D I S C PICKUP CHISEL PICKUP PICKUP OFFSET D I S C TANDEM D I S C PICKUP FLOAT HARROW L I S T E R ,. 6 - R PICKUP ROD WFEDER L I S T E R ,. 6 - R PLEX PLANTER 6R HERB SPRAYER PICKUP ROLLIG C U LT I 6 R ) TOOL BAR, 6-ROW PICKUP PICKUP PICKUP PICKUP PICKUP ITFM NO. 1,53 47 3,47 10 1,37 10 10 1,49 3,47 10 3,39 3,61 1,71 10 3,55 1,71 43 67 10 3,31 3,69 10 10 10 10 10 DATE TIMES LABOR MACHINE OVER HOURS HOURS NOV NOV NOV NOV OEC DEC JAN FEB FE8 FEB MAR MAR MAR MAR APR APR APR APR APR MAY MAY MAY J UN? J U LY AUG SEPT I.00 1.00 1.00 0,10 1.00 0.10 0.10 1.00 1.00 0.10 2.00 1.00 1.00 0.10 1.00 1.00 1.00 1.00 0.10 1.00 1.00 0.10 0.10 0.10 0.10 0.10 TOTALS FIXEO FUEL,OIL, COSTS LUB., REP. PER ACRE PER ACRE 0*32 0.20 0.20 0.13 0,14 0.13 0.13 0.28 0.20 0.13 2.84 0.05 0.07 0.13 0.03 0.07 0.10 0.05 0.13 0.18 0.02 0.13 0.13 0.13 0.13 0. 160 0.159 0.159 0.100 0.193 0.100 0.100 0.159 0.159 0.100 1.173 0.139 0.098 0.100 0.098 0,098 0.154 0.121 0.100 0.121 0.098 0.100 0.100 0.100 0.100 0.17 0.07 0.07 0. 19 0.05 0.19 0.19 0 . 11 0.07 0.19 0.36 0.01 0.03 0.19 0.01 0.03 0.06 0.08 0.19 0 . 11 0.0 I 0.19 0.19 0.19 0.19 -0*125 -0*100 -0*19 -0*13 5.356 4.188 3.29 6, 18 0.239 0.0 0.239 0.125 0.290 0.125 0.125 0.239 0.239 0.125 1.759 0.208 0.146 0.125 0.146 0.146 0.0 0.0 0.125 0.181 0.146 0.125 0.125 0.125 0.125 L A N D C H A R G E U S E S $ 5 0 / A . L E S S 5 0 P E R C E N T O F I R R I G AT I O N F I X E D C O S T S . CROP SOLD S TA N D I N G IN FIELD. PROJECTED, 1975 BUDGET IDENTIFICATION NUMBFR A N N U A L C A P I TA L H C N T H 9 07230026 012 2 COTTON, DRYLAND, TEXAS HIGH PLAINS II R^GICN ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT 1 . GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEED TOTAL 2 . VARIABLE COSTS PREHARVEST SEED HERBICIDE HAIL INSURANCE MACHINERY TRACTORS LABOR(TRACTOR £ MACHINERY) I N T E R E S T C N O P. C A P, SUBTOTAL, PRE-HARVEST HARVEST COSTS STRIP £ HAUL GIN, BAG, TIES SUBTOTAL, HARVEST LBS. TON VALUE 0! COST PRICE OR r C O S T / U N I T QUANTITY 0.35 80.00 52.50 150.00 0.12 —9x50 62.10 $ LBS. PINT DOL. ACRE ACRE HOUR DOL. 0.35 4.00 0.08 2.47 2.80 2.75 0.10 5,25 4,00 2.00 2.47 2,80 6.97 15.00 1.00 25.00 1.00 1.00 2.53 10.44 .—1+0$~ 24.53 $ CWT. C W T. 1.00 1.25 7.00 7.00 7.00 3+15 $ 15.75 TOTAL VARIABLE CCST $ 40. 2fl 3. INCOME ABOVE VARIABLE COSTS $ 21.82 4. FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS $ ACRE ACRE ACRE 2.79 2.15 13.34 1.00 1.00 1,00 2. 79 2.15 .-12*2'J $" 1 8 . 2 8 5 . TOTAL COSTS $ 58 57 MPT RPTMRNS $ 3.53 LAND CHARGE BASED CN LANDLORD SHARE (1/4) OF GROSS, L^SS 1/4 OF GINNING. PROJECTED, 1975 B U D G E T I D E N T I F I C AT I C N N U M B E R 9 3 0 0 2 0 0 2 2 0 1 0 A N N U A L C A P I TA L M O N T H 11 COTTON, DRYLAND, TEXAS HIGH PLAINS II REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION TANDEM DISC SHREDDER 4R PICKUP PICKUP CHISCL PICKUP LISTER, 6-R PICKUP P O L L I N G C U LT ( 6 R ) PICKUP LISTER-PLANTER PICKUP SANDFIGHTFR R O L L I N G C U LT I 6 R ) PICKUP PICKUP PICKUP ITEM NO. 2,48 54 10 10 2,38 10 2,72 10 4,32 10 2,46 10 6,58 4,32 10 10 10 D AT E FIXED FUEL,OIL, COSTS TIMES LABOR MACHINE L U B . , R E P. OVER HOURS HOURS PER ACRE PER ACRE DEC DEC DEC JAN FEB FEB MAR MAR APR APR MAY MAY JUNE JUNE JUNE J U LY OCT 1.00 1.00 0.10 0.10 1.00 0.10 1.00 0.10 1.00 0.10 1.25 0.10 1.00 1.00 0.10 0.10 0.10 TOTALS 0.159 0.160 0.100 0.100 0.193 0.100 0.098 0.100 0.121 0.100 0.192 0.100 0.056 0.121 0.100 0.100 0.07 0.17 0. 19 0.19 0.05 0.19 0.03 0.19 0. 11 0.19 0.24 0.19 0.00 0 . 11 0.19 0.19 0*20 0.32 0.13 0,13 0.14 0.13 0.07 0.13 0. 18 0.13 0.49 0.13 0.03 0.18 0.13 0.13 -0*125 -0*100 -0*19 -0*12 2.47 2.79 0.239 0.0 0.125 0.125 0.290 0.125 0,146 0.125 0.181 0.125 0.289 0.125 0.083 0.181 0.125 0.125 2.534 1.999 LAND CHARGE BASED ON LANDLORD SHAPE (1/4) OF GROSS, LESS 1/4 OF GINNING. PROJECTED, 1975 BUDGET IDENTIFICATICN NUMBER ANNUAL CAPITAL MONTH 11 093 0020 02 2 0