r TEXAS EL PASO REGION FOREWORD r The data contained in this report are based on estimates and actual records of operations within an area described as the Texas El Paso Region. This area includes the El Paso and Hudspeth county area in extreme West Texas. Even in a region so narrowly defined, variation in inputs and returns exists among farms and managers. However, these budgets should serve as useful guides in planning and decision making for agriculturalists concerned with the area de scribed above. The enterprise budgets for this region are based on yields as shown on 07000600. The assumptions used in the development of these budgets include the following things. Farm size varied from 350 acres for the typical manager to 750 acres for the high level manager. Ap proximately two-thirds of the acreage for both management levels was planted to cotton. Adjust ments in the government programs have led to a slight increase in the percentage of total cotton acreage which is planted in pima cotton. It was assumed that pima was planted on 55 per cent of the cotton acreage in this region and upland cotton planted on 45 percent. Annual rotations are practiced on the typical farm using small grains or grain sorghum, and occasionally alfalfa in rotation. The high level farmer typ ically uses rotation which may include 4 years of alfalfa and 1 year of cotton in an attempt to maximize cotton yields per acre. Cotton yields tend to increase 125 pounds per acre for cotton produced under a 2-year rotation with grain sorghum and another 125 pounds for die rota tion with 4 years of alfalfa. Both typical and high level managers enjoy this increase. Pima cotton responds somewhat less to the two differ ent rotation systems. Small grain grazing is practiced by both management levels but with greater intensity on farms of the above average manager. Irrigation is supplied in both cases from the Rio Grande Project. Management differences center primarily on timing of operation, varia tion in rotation pattern and, to some degree, input levels. The high level manager extracts greater yields and usually greater profits from his enterprises due to a superior ability for preparing, planting, tending to and selling his crop. No typical crop share or cash rent determi nation was available. Land rent was therefore computed on present market value and current interest rates on long-term capital investments. TEXAS EL PASO REGION 1/ Assumed Prices Paid and Received by Farmers — Item Unit Price cwt. cwt. cwt. cwt. cwt. cwt. $150.00 13.00 75.00 29.00 27.00 43.00 acre $ Prices Paid (1975) Seed: Alfalfa Barley Corn Cotton-Pima Cotton-Upland Grain Sorghum /df^N Custom Rates: Fertilizer Application Hay Hauling Combining Barley Hauling Barley Cotton Picking-Pima Cotton Picking-Upland Hauling Cotton Cotton Ginning-Pima Cotton Ginning-Upland Combining Grain Sorghum Hauling Grain Sorghum Fertilizer: Nitrogen Phosphorous Fuels: Gasoline Diesel Labor: Tractor & Machinery Irrigation Other ton acre cwt. lb. lint lb.lint cwt. bale bale acre cwt. 1.25 4.50 9.00 .15 .08 .07 .15 35.50 26.00 10.00 .15 lb. lb. $ .15 .24 gal. gal. $ .36 .35 hour hour hour $ 2.50 2.50 2.75 2 /■^%. Assumed Prices Paid and Received by Farmers (cont'd.) Item Unit Price Prices Received (1975) Alfalfa Barley Corn Silage Cotton-Pima Cotton-Upland Cottonseed Grain Sorghum Grazing ton bu. ton lb. $ 55.00 4.00 10.00 ton 120.00 5.00 lb. .15 .80 .40 1/ These price assumptions are not to be interpreted as predictions or prospective prices. s^HHk TEXAS AGRICULTURAL EXTENSION SERVICE College Station Texas 77843 THE TEXAS A&M UNIVERSITY SYSTEM Room 108 B, Agriculture Building May 6, 1975 MEMORANDUM TO: Budget Subscribers SUBJECT: 1975 Projected Budgets for Rolling Plains II Region _ i f4„A 1Q7-. Proiected Budgets for Rolling Plains nZ£« TlLse repllce thf old budglts you nov have for this "eg!- S* t^f-p/ated budgets. Budgets for other areas will be forthcoming as soon as they are ava"a^e- n" J°" Norman questions relating to these budgets P^* c°f *c %%£*£_, Brints, Area Economist-Management, P. 0. Box _i:>y, verno , 76384, telephone number 817-552-9941. Very truly yours, Cecil A. Parker Economist-Management CAP/lac Enclosure Educational programs conducted by the Texas Agricultural Extension Service serve people of all ages regardless of socioeconomic levels, race, color, sex, religion or national origin. C o o p e r a t i v e E x t e n s i o n W o * i n A g r i c u l t u r e a n d H o m e E c o n o m i c s , T h e Te x a s A « * ^ ^ ^ ^ ^ T ^ T ^ of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8,1914, as amenaeo, ^^ ^ 500-4-74, Revision .The Texas A&M University System and U. S. Department of Agriculture Cooperating. TEXAS EL PASO REGION Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size Tractor - 118 HP Tractor - 105 HP Tractor - 50 HP Tractor - 45 HP Pickup - 1/2 ton Swather, self-propelled Shredder - 2 row Shredder - 4 row Offset Disc - 9 feet Offset Disc - 12 feet Plow - 3 bottom Plow - 4 bottom Float Lister - 4 row Rolling Cultivator - 4 row Rolling Cultivator - 6 row Bed-Planter Spray Rig Border Disc Cultivator - 6 row Rotovator Grain Drill Baler Baler Swather Purchase Price Estimated Years of Use Estimated Hours of Use Fixed Costs Per Hour Variable Costs Per Hour $13313 10419 4052 3704 4631 11576 6 8 15 15 4 6 8 8 10 8 10 8 10 8 8 8 10 10 10 10 10 10 5 6 5 5400 9600 10500 7500 2800 $ 2.59 1.35 $3.97 3.40 1.82 1.57 2.38 6.33 405 1389 1389 2315 1042 1563 1389 579 1389 1968 1505 405 290 985 2894 1505 6367 4631 6946 900 1000 1000 2000 1600 2000 2000 1200 1200 1200 1680 1800 760 800 1200 2000 500 1500 1200 1000 .70 .90 1.96 14.67 .54 1.87 1.04 1.93 .78 1.04 1.73 .64 1.54 1.56 1.25 1.21 .54 1.22 2.16 4.49 4.55 4.50 7.44 .12 .40 .15 .50 .34 .69 .30 .19 .53 .85 .47 .17 .13 .33 1.26 .27 1.61 1.10 1.83 A L F A L F A E S T A B L I S H M E N T. I R R I G A T E D . T E X A S E L P A S O R F G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT UNIT PRICE OR COST/UNIT VA L U E O R COST QUANT ITY GROSS RECEIPTS FROM PRODUCTION T O TA L 0 . 0 2. VARIABLE COSTS PREHARVEST SEED FERT«0-80-0) FERTILIZER APPLI OTHER IRIG LABOR WAT E R C H A R G E DISTRI SYSTM COS MACHINERY TRACTORS I R R I G AT I O N M A C H I N E R Y LABOR.TRACTOR & MACHINERY) LABORC IRR I GAT I ON 5 INTEREST ON OP© CAPo S U B T O TA L . P R E - H A R V E S T CWT* ACRE ACRE HOUR ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL* 150*00 19*20 1*25 2*50 2 8*00 9*42 2*02 9*24 7.85 2*50 2*50 0*09 0*40 1*00 1*00 1 .00 1*00 1*00 1 .00 1*00 1 .00 3*95 0*61 51*23 60*00 19*20 1* 25 2*50 2 8*00 9*42 2*02 9*24 7*85 9*88 1* 54 S ±-51 155*51 HARVEST COSTS S U B T O TA L . H A R V E S T $_ T O TA L VA R I A B L E C O S T $ 155*51 s $ -- 1 5 5 * 5 1 3 . I N C O M E A B O V E VA R I A B L E C O S T S 4© FIXED COSTS MACHJNERY TRACTORS I R R I G AT I O N M A C H I N E R Y LAND CNET RENT) T O TA L F I X E D C O S T S o7<T~ s ACRE ACRE ACRE ACRE 4*46 3*74 6*20 375*00 1 .00 1*00 1*00 0*07 4*46 3*74 6*20 _ , _j Qo \ fjjj $ 42*53 5 . T O TA L C O S T S $ 198*04 6. NET RETURNS $ -- 1 9 8 * 0 4 LAND CHARGE BASED ON ONE-HALF YEAR BASIS DUE TO DOUBLE-CROPPING* I R R I G A T I O N F R O M B O T H W E L L A N D F R O M W A T E R D I S T R I C T. PLANTED FALL* PROJECTED. 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 1 2 8 11 0 0 7 3 0 2 750 0 /"*i\ A L FA L FA E S TA B L I S H M E N T. I R R I G AT E O . T E X A S E L PA S O R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION PICKUP PICKUP SHREDER C2R> OFFSET DISC PLOW 3B OFFSET DISC FLOAT BORDER DISC GRAIN DRILL PICKUP PICKUP PICKUP PICKUP ITEM NO* 10 10 2*32 2*34 2*36 2.34 2.38 2.48 4,53 10 10 10 10 DATE JAN AUG SEPT SEPT SEPT SEPT SEPT SEPT SEPT SEPT OCT NOV DEC FUEL»OlL_ FIXED TIMES LABOR MACHINE LUB*.REP* COSTS OVER HOURS HOURS PER ACRE PER ACRE 0* 10 0*10 1*00 1*00 1*00 1*00 2*00 1*00 1.00 0*10 0* 10 0*10 0*10 0*125 0*125 0*477 0 * 3 11 0*849 0 * 3 11 0*924 0*057 0*276 0*125 0* 125 0*125 0*100 0*100 0*354 0* 230 0*629 0*2 30 0*684 0*042 0*2 05 0*100 0* 100 0*100 0.24 0*24 0*04 0* 03 0*22 0*03 0*21 0*01 0*06 0*24 0*24 0*24 0*20 0*20 0*19 0*24 0*49 0*24 1* 18 0*03 0*92 0*20 0*20 0* 20 -0+125 OtlgJ- -0*24 J0+.20. •^\, TO TA L S 3*954 2*973 2*02 4*46 LAND CHARGE BASED ON ONE-HALF YEAR BASIS DUE TO DOUBLE-CROPPING* IRRIGATION FROM BOTH WELL AND FROM WATER DISTRICT* PLANTED FALL. PROJECTED. 1975 BUDGET IDENTIFICATION NUMBER A N N U A L C A P I TA L M O N T H 1 2 0 8 11 0 0 7 3 0 2 7 5 ^^B!\ A L FA L FA , I R R I G AT E D . T E X A S E L PA S O P E G i o n E S T I M AT E D C O S T S A N D R F T U R N S ° E R A C R E TYPICAL MANAGEMENT UNIT GROSS R E C E I P T S F R O M P R O D U C T I O N H AY T O TA L 2 o VA R I A B L E C O S T S PREHARVEST FERT(O-IOO-O) FERTILIZER APPLI OTHER IRIG LABOR WAT E R C H A R G E DISTRI SYSTM COS MACHINERY I R R I G AT I O N M A C H I N E R Y LABOR(TRACTOR & MACHINERY) L A B O R ( I R R I G AT I O N ) INTEREST ON OP* CAP* S U B T O TA L . P R E - H A R V E S T PRICE OR VA L U E OR COST/UNIT QUANTITY COST TON 55*00 6*00 _l!_2a__0 330*00 ACRE ACRE HOUR ACRE ACRE ACRE ACRE HOUR HOUR DOL* 24.00 1*25 2*50 28*00 9*42 2*14 9*42 2*50 2*50 0*09 1 .00 1*00 3*00 1*00 1*00 1*00 1*00 1* 12 0*74 44*23 24*00 1*25 7*50 28*00 9*42 2* 14 9*42 2* 81 1*84 S HARVEST COSTS BALER WIRE CUSTOM HAULING MACHINERY TR AC TOR S LABOR!TRACTOR £, MACHINERY) S U B T O TA L * H A R V E S T ____.2fi 90*36 $ TON TON ACRE ACRE HOUR 4*50 4*50 4*90 14*91 2*50 27.00 2 7*00 4*90 14*91 6*00 6*00 1 .00 1 .00 4*93 $ T O TA L VA R I A B L E C O S T 86*14 S 176*50 3 * I N C O M E A B O V E VA R I A B L E C O S T S $ 4. FIXED COSTS MACHINERY TR AC TOR S I R R I G AT I O N M A C H I N E R Y P R O R AT E O E S TA B * C O S T LANO <NET RENT) T O TA L F I X E D C O S T S ACRE ACRE ACRE ACRE ACRE 2.1*70 5*93 7*44 198*04 750*00 1*00 1*00 1*00 0*25 0.07 153*50 21* 70 5*93 7*44 49*51 $ —55*Z5 140*83 5 * T O TA L C O S T S $ 317*33 6* NET RETURNS S 12*67 E S TA B L I S H M E N T C O S T P R O R AT E D O V E R THE SAME AS BALING COSTS PE% TON, O U R Y E A R S * C U B I N G COSTS APPROX . PROJECTED. 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 1 0 81 007302 750 0 <*^%, A L FA L FA . I R R I G AT E D . T E X A S E L PA S O R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT FUEL.OIL. O P E R AT I O N PICKUP PICKUP PICKUP SWATHER BALER PICKUP SWATHER BALER PICKUP SWA THER BALER PICKUP SWATHER BALER PICKUP SWATHER BALER PICKUP PICKUP SWA THER BALER ITEM NO* 10 10 10 2.66 2.64 10 2.66 2.64 10 2 . 6 6 2.64 10 2 . 6 6 2.64 10 2 . 6 6 2 .64 10 10 2 . 6 6 2.64 D AT E NOV MAR APR APR APR M AY MAY M AY JUNE JUNE JUNE J U LY J U LY J U LY AUG AUG AUG SEPT OCT OCT OCT FIXED TIMES LABOR MACHINE LUB*.REP* COSTS OVER HOURS HOURS PER ACRE PER ACRE 0*100 0*100 0*100 0*198 0*410 0* 100 0*198 0*410 0*100 0*198 0*4 10 0*100 0*198 0*4 10 0*100 0* 198 0*410 0*100 0*100 0*198 0*24 0*24 0*24 0*36 0*45 0*24 0*36 0*45 0*24 0*36 0*45 0*24 0*36 0*45 0*24 0*36 0*45 0*24 0*24 0*36 0*2 0 0*20 0*20 1*48 1*85 0*20 1*48 1*85 0*20 1*48 1*85 0*20 1*48 1* 85 0*20 1*48 1*85 0*20 0* 20 1*48 1 * 0 0 - 0 * 5 5 4 _Q_____U2 -0*45 -1*35 7*03 21*70 0*10 0*10 0* 10 0*125 0*125 0*125 1*00 1*00 0*10 0*268 0*554 1*00 1*00 0*10 0*125 1*00 0*268 0*554 0*125 0*268 0*554 0*10 0*125 1*00 1*00 0*10 0*268 0*554 1*00 1*00 0*10 0*125 0*268 0*554 0*125 0*10 1*00 0*125 0*268 1*00 T O TA L S 6*057 4*553 E S TA B L I S H M E N T C O S T P R O R AT E D O V E R F O U R Y E A R S * THE SAME AS BALING COSTS PE* TON* B U D G E T I D E N T I F I C AT I O N N U M B E R — A N N U A L C A P I TA L M O N T H 1 0 CUBING COSTS APPROX* PROJECTED. 1975 081 0073 027 5 ^"X A L F A L F A E S T A B L I S H M E N T. I R R I G A T E D , T E X A S E L P A S O R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT UNIT PRICE OR VA L U E OR COST/UNIT QUANTITY COST GROSS RECEIPTS FROM PRODUCTION TOTAL J^^s 2 * VA R I A B L E C O S T S PREHARVEST SEED FERTCO-80-0) FERTILIZER APPLI OTHER IRIG LABOR WATER CHARGE DISTRI SYSTM COS MACHINERY TRACTORS I R R I G AT I O N M A C H I N E R Y LABORfTRACTOR & MACHINERY) L A B O R C I R R I G AT I O N ) INTEREST ON OP* CAP* S U B T O TA L . P R E - H A R V E S T 0*0 CWT* ACRE ACRE HOUR ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL* 15 0*00 19*20 1*25 2*50 28*00 9*42 2*26 8*60 9*42 2*50 2*50 0*09 60*00 19*20 1*25 2*50 28*00 9*42 2* 26 8*60 9*42 8*33 1*84 0.40 1*00 1*00 1*00 1*00 1*00 1*00 1*00 1*00 3*33 0*74 50*74 ±-51 $ 155.39 HARVEST COSTS S U B T O TA L . H A R V E S T $_ s T O TA L VA R I A B L E C O S T s 155.39 $-• 1 5 5 * 3 9 3 * I N C O M E A B O V E VA R I A B L E C O S T S 4* FIXED COSTS MACHINERY TRACTORS I R R I G AT I O N M A C H I N E R Y LAND .NET RENT ) T O TA L F I X E D C O S T S 0.0 $ ACRE ACRE ACRE ACRE 4*76 5*48 7*44 375*00 4* 76 5*48 7*44 1*00 1*00 1*00 0*07 $ .-23-H 45*81 5 * T O TA L C O S T S s 6* NET RETURNS s-• 2 0 1 * 201*20 20 LAND CHARGE BASED ON ONE-HALF YEAR BASIS DUE TO DOUBLE-CROPPING* I R R I G AT I O N F R O M B O T H W E L L A N D F R O M W AT E R D I S T R I C T * PLANTED FALL. * PROJECTED. 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 1 2 jfftPN 8 11 0 0 7 3 0 1 7 5 0 0 A L F A L F A E S T A B L I S H M E N T. I R R I G A T E D . T E X A S F L P A S O R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT O P E R AT I O N PICKUP PICKUP SHREDER C4P) OFFSET DISC PLOW 4B OFFSET DISC F L O AT BORDER DISC GRAIN DRILL PICKUP PICKUP PICKUP PICKUP ITEM NO* 1 1 1 1 1 I 3 10 10 .31 .33 .35 .33 .37 .47 .53 10 10 10 10 z**^. O AT E FUEL.OIL. FIXEC COSTS T I M E S L A B O R M A C H I N E L U B . , R E P. P E R A C R E PER ACRE OVER HOURS HOURS JAN AUG SEPT SEPT SEPT SEPT SEPT SEPT SEPT SEPT OCT NOV DEC 0*10 0* 10 1*00 1*00 1*00 1*00 2*00 1*00 1*00 0*10 0*10 0* 10 0*10 0*100 0*100 0*163 0*173 0.4 75 0.173 0.6 84 0.042 0.205 0. 100 0*100 0*100 0*24 0*24 0*07 0*09 0*33 0*09 0*21 0*01 0*06 0*24 0*24 0*24 0*20 0*20 0* 30 0*33 0*49 0*33 1*18 0*02 0*92 0*20 0*20 0*20 -0*125 -0*100 -Q*2± __.__.2P 0*125 0*125 0*220 0*233 0*641 0*233 0*924 0*057 0*276 0*125 0*125 0*125 ■**%. T O TA L S 3*333 2*514 2*26 4* 76 LAND CHARGE BASED ON ONE-HALF YEAR BASIS DUE TO DOUBLE-CROPPING* I R R I G AT I O N F R O M B O T H W E L L A N D F R O M W AT E R D I S T R I C T * PLANTED FALL. PROJECTED. 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R — A N N U A L C A P I TA L M O N T H 1 2 08110073 017 5 10 A L FA L FA , I R R I G AT E D . T E X A S E L PA S O R E G I O N E S T I M AT E D C O S T S A M D R E T U R N S P E R A C R F HIGH LEVEL MANAGFMENT UNIT PRICE OR COST/UNIT QUANTITY S GROSS RECEIPTS FROM PRODUCTION H AY T O TA L VA R I A B L E C O S T S PREHARVEST FERTCO-100-0) FERTILIZER APPLI OTHER IRIG LABOR WATER CHARGE DISTRI SYSTM COS MACHINERY I R R I G AT I O N M A C H I N E R Y LABOR(TRACTOR & MACHINERY) L A B O R ( I R R I G AT I O N ) I N T E R E S T O N O P. C A P * S U B T O TA L . P R E - H A R V E S T TON 55.00 8*00 ACRE ACRE HOUR ACRE ACRE ACRE ACRE HOUR HOUR DOL. 24.00 1.25 2.50 28*00 9*42 2*14 9*42 2*50 2*50 0*09 1*00 1*00 3*00 1*00 1*00 1*00 1*00 1 .12 0.74 46*09 TON TON ACRE ACRE HOUR 4*50 4*50 9*58 9*79 2*50 ■__.44 0fl.fl0 $ 440*00 24*00 1*25 7.50 28* 00 9*42 2*14 9.42 2.81 1. 84 _._-_A-_lS 90.53 S HARVEST COSTS BALER WIRE CUSTOM HAULING MACHINERY TRACTORS LABOR!TRACTOR & ACHINERY) S U B T O TA L . H A R V E S T 8*00 8*00 1.00 1*00 4.0 1 36* 00 36*00 9*58 9* 79 10*02 $ 101*39 $ 191*93 T O TA L VA R I A B L E C O S T $ 248*07 3 * I N C O M E A B O V E VA R I A B L E C O S T S $ 4* FIXED COSTS MACHINERY TR AC TOR S I R R I G AT I O N M A C H I N E R Y P R O R AT E D E S TA B * C O S T LAND (NET RENT) T O TA L F I X E D C O S T S Ar-^S VA L U E O R COST ACRE ACRE ACRE ACRE ACRE 25.66 6.38 7.44 201.20 750*00 1*00 1*00 1*00 0*25 0.07 25*66 6*38 7. 44 50*30 .-53*25 $ 146*03 5 * T O TA L C O S T S $ 33 7* 95 6* NET RETURNS s 102.05 E S TA B L I S H M E N T C O S T P R O R AT E D O V E R F O U R Y E A R S . C U B I N G C O S T S A P P R O X . THE SAME AS BALING COSTS PER TON. PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 11 81 007301 750 0 A L FA L FA , I R R I G AT E D , T E X A S E L PA S O R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT O P E R AT I O N PICKUP SWATHER BALER PICKUP SWATHER BALER PICKUP SWATHER BALER PICKUP SWATHER BALER PICKUP SWATHER BALER PICKUP SWATHER BALER PICKUP PICKUP SWATHER BALER PICKUP ITEM NO* S. P. 1 S. P. 1 S . P. 1 S . P. 1 S . P. 1 S . P. 1 S.P* 1 10 21 . .63 10 21 .63 10 21 .63 10 21 .63 10 21 ,63 10 21 .63 10 10 21 .63 10 11 D AT E Fl XED FUEL,OIL, T I M E S LABOR MACHINE L U B o . R E P * COSTS OVER HOURS HOURS PER ACRE PER ACRE MAR APR APR APR M AY M AY MAY JUNE JUNE JUNE J U LY J U LY J U LY AUG AUG AUG SEPT SEPT SEPT OCT NOV NOV NOV 0* 10 1*00 1.00 0*10 1*00 1*00 0*10 1*00 1*00 0*10 1*00 1*00 0* 10 1*00 1*00 0*10 1*00 1*00 0*10 0*10 1*00 1*00 0* 10 T O TA L S 0*125 0*177 0*396 0*125 0*177 0*396 0*125 0.177 0*396 0*125 0*177 0*396 0* 125 0*177 0*396 0*125 0*177 0*396 0*125 0*125 0*177 0*396 0* 100 0*142 0*2 93 0*100 0*142 0*293 0*100 0*142 0*293 0*100 0* 142 0*293 0* 1 00 0*142 0*293 0* 100 0*142 0*2 93 0*100 0*100 0* 142 0*293 0*24 0*90 0*47 0*24 0*90 0*47 0*24 0*90 0*47 0*24 0*90 0*47 0*24 0*90 0*47 0*24 0*90 0*47 0*24 0*24 0 * 9 0 0*47 0*2 0 2*08 1*33 0*20 2*08 1*33 0*20 2*08 1*33 0*20 2*08 1*33 0*20 2* 08 1*33 0*20 2*08 1*33 0*20 0*20 2*08 1*33 (-•123 - 1 * 1 0 0 -0-2±. JO-ZSl 5*136 11 * 7 2 25*66 3*944 E S TA B L I S H M E N T C O S T P R O R AT E D O V E R F O U R Y E A R S * C U B I N G C O S T S A P P R O X * THE SAME AS BALING COSTS PER TON* PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 11 081 0073 017 5 >-=BSv /#*^ UNIT 1* GROSS RECEIPTS BARLEY GRAZ ING T O TA L j f * ^ 12 B A R L E Y, I R R I G A T E D . T E X A S E L P A S O R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT PRICE OR VA L U E OR COST/UNIT QUANTITY COST FROM PRODUCTION 4*00 0*15 CWT* LBGN 2 * VA R I A B L E C O S T S PREHARVEST SEED FERT(IOO-O-O) FERTILIZER APPLI OTHER IRIG LABOR WAT E R C H A R G E DISTRI SYSTM COS MACHINERY TRACTORS I R R I G AT I O N M A C H I N E R Y LABOR<TRACTOR & MACHINERY) L A B O R ! I R R I G AT I O N ) I N T E R E S T O N O P * C A P. S U B T O TA L * P R E - H A R V E S T 31*20 175*0 0 1 24* 80 $ 151*05 S C W T. ACRE ACRE HOUR ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL* 13*00 15*00 1*25 2*50 28*00 9*42 2*52 6*67 9*42 2*50 2*50 0*09 1 .00 1*00 1*00 1*50 1*00 1*00 1*00 1*00 1*00 3*48 0*74 36*83 13*00 15*00 1*25 3*75 28*00 9*42 2*52 6*67 9*42 8*70 1*84 3t31 $ 10 2*89 HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL S U B T O TA L . H A R V E S T ACRE CWT* 9*00 0*15 1.00 31.20 T O TA L VA R I A B L E C O S T 3 . I N C O M E A B O V E VA R I A B L E C O S T S 4. FIXEC COSTS S 9.00 4*68 13.68 $ 1 1 6. 57 $ 34.48 $ MACHINERY TRACTORS IRRIGATION MACHINERY LAND <NET RENT) TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 4*56 2*72 7.44 5.00 1 .00 1.00 1.00 0.07 4.56 2.72 7.44 $ 29fil«. 42.85 5. TOTAL COSTS s 1 59. 42 6. NET RETURNS s LAND CHARGE BASED ON ONE-HALF YEAR DUE TO DOUBLE-CROPPING. * 1974-1975 C R O P. PROJECTED. B U D G E T I D E N T I F I C AT I O N N U M 8 E R A N N U A L C A P I TA L M O N T H 5 71 007302 750 0 -8.37 1975 13 B A R L E Y. I R R I G A T E D , T E X A S E L P A S O R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT FUEL.OIL. NO* ITEM D AT E PICKUP 10 PICKUP 10 SHREDER (2R) OFFSET DISC F L O AT 2,38 BORDER DISC GRAIN DRILL PICKUP 10 PICKUP 10 PICKUP 10 p|CKUp 10 PICKUp 10 p|CKUP 10 JUNE OCT 2,32 2.34 NOV 2.48 4.53 NOV DEC JAN FEB MAR APR O P E R AT I O N pICKUP 10 M AY FIXED TIMES LABOR MACHINE LUBooREP* COSTS OVER HOURS HOURS PER ACRE PER ACRE 0*10 0*125 0*100 0.10 0*125 0*100 NOV 1.00 0.477 0.354 NOV 2*00 0*621 0*460 2*00 0*924 0*664 NOV 1*00 0*057 0*042 NOV 1*00 0*276 0*205 0*10 0*125 0*100 0*10 0*125 0*100 0*10 0*125 0*100 0*10 0.125 0.100 0.10 0.125 0*100 0*10 0*125 0*100 0.10 _£j_125 3.480 T O TA L S -0*100 0.24 0*24 0.04 0*07 0*21 0*01 0*06 0*24 0*24 0*24 0.24 0*24 0*24 -0*Z± 2.644 0.20 0*20 0*19 0*48 1*18 0*03 0*92 0*20 0*20 0*20 0.20 0*20 0*20 -0*-0. 2*52 LAND CHARGE BASED ON ONE-HALF YEAR DUE TO DOUBLE-CROPPING, ♦ 1974-1975 C R O P. PROJECTED, B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 5 071 0073 027 5 4*56 1975 14 B A R L E Y, I R R I G AT E D . T E X A S E L PA S O R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION BARLEY GRAZ ING TOTAL 2* VARIABLE COSTS PREHARVEST SEED FERT(150-0-0) FERTILIZER APPLI OTHER IRIG LABOR WATER CHARGE DISTRI SYSTM COS MACHINERY TRACTORS I R R I G AT I O N M A C H I N E RY LABORCTRACTOR t MACHINERY) L A B O R C I R R I G AT I O N ) INTEREST ON OP* CAP* SUBTOTAL, PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL, HARVEST s CWT* LBGN 4*00 0*15 45*00 I8O0OO 250*00 37_,S0 $ 217*50 CWT* ACRE ACRE HOUR ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL* 1 3*00 2 2.50 1*25 2*50 28*00 9*42 2*64 6*33 9*42 2*50 2*50 0*09 1 .00 1*00 2*00 1*50 1*00 1 .00 1*00 1*00 1*00 3*07 0*74 39*07 ACRE CWT* 9*0 0 0*15 1*00 45*00 13*00 22*50 2*50 3*75 28*00 9*42 2*64 6*33 9*42 7*67 1*84 2*52 s 1 10* 60 $ 9*00 $ TOTAL VARIABLE COST 5*1-5 15*75 $ 126*35 3* INCOME ABOVE VARIABLE COSTS 4* FIXED COSTS MACHINERY TRACTORS I R R I G AT I O N M A C H I N E RY LAND (NET RENT) TOTAL FIXED COSTS VALUE OR COST PRICE OR COST/UNIT QUANTITY $ 91*15 $ ACRE ACRE ACRE ACRE 4*86 4*01 7*44 175*00 1*00 1*00 1 .00 0*07 4*86 4* 01 7*44 $ 23-12 44*43 5 * TO TA L C O S T S $ 170* 78 6. NET RETURNS $ 4 6*72 LAND CHARGE BASED ON ONE-HALF YEAR OUE TO DOUBLE-CROPPING. * 1974-1975 CROP* PROJECTED, B U D G E T I D E N T I F I C AT I O N N U M B E R — A N N U A L C A P I TA L M O N T H 5 71 007301 750 0 1975 B A R L E Y. I R R I G A T E D , T E X A S E L P A S O R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT O P E R AT I O N SHREDER (4R) OFFSET DISC F L O AT BOROER DISC PICKUP GRAIN DR ILL PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP PICKUP ITEM NO* 1 1 1 1 ,31 ,33 .37 .47 10 3,53 10 10 10 10 10 10 10 10 D AT E TIMES OVER SEPT SEPT SEPT SEPT SEPT OCT OCT NOV DEC JAN FEB MAR APR MAY 1*00 2*00 2*00 1*00 0*10 1*00 0*10 0* 10 0*10 0*10 0*10 0*10 0. 10 0*10 T O TA L S 15 Fl XED FUEL.OIL. LABOR M A C H I N E L U B e o R E P * COSTS HOURS HOURS PER ACRE PER ACRE 0* 163 0*345 0*6 84 0*042 0*100 0*2 05 0*100 0*100 0* 100 0*100 0* ICO 0* 100 0*100 0*07 0*17 0*21 0*01 0*24 0*06 0*24 0*24 0*24 0*24 0*24 0*24 0*24 0*30 0*67 1*18 0* 02 0*20 0*92 0*20 0*20 0*20 0*20 0*20 0*20 0*20 - 0 * 1 2 5 -0*10-1 -0*24 -OmJLO 2*64 4*86 0*220 0*466 0*924 0*057 0*125 0*276 0*125 0*125 0*125 0*125 0* 125 0*125 0*125 3*068 2*3 39 LAND CHARGE BASED ON ONE-HALF YEAR DUE TO D O U B L E - C R O P P I N G . PROJECTED. * 1974-1975 CROP* B U D G E T I D E N T I F I C AT I O N N U M B E R — A N N U A L C A P I TA L M O N T H 5 071 0073 017 5 1975 L6 C C R N F O R S I L A G E . I R R I G AT E D . T E X A S E L PA S O R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT UNIT 1* GROSS RECEIPTS FROM PRODUCT ION CORN SILAGE TOTAL 2 * VA R I A B L E C O S T S PREHARVEST SEED FERT(200-80-0 ) FERTILIZER APPLI INSECTICIDE IRRIG* LABOR WAT E R C H A R G E DISTRI SYSTM COS MACHINERY TR AC TOR S LABOR(TRACTOR & MACHINERY) INTEREST ON OP* CAP* S U B T O TA L . P R E - H A R V E S T VALUE OR COST PRICE OR COST/UNIT QUANTITY TON $ 10*00 25*00 _35Paftft S 250*00 CWT* ACRE ACRE ACRE HOUR ACRE ACRE ACRE ACRE HOUR DOL* 75*00 49*20 1*25 4*20 2*50 28*00 9*42 3*10 7.36 2*50 0*09 11 * 2 5 49*20 1*25 4*20 10*00 28*00 9*42 3* 10 7*36 9.46 0*15 1*00 1*00 1*00 4*00 1 .00 1*00 1*00 1*00 3*78 48*74 -*2l $ 137*63 HARVEST COSTS S U B T O TA L . H A R V E S T $ $ T O TA L VA R I A B L E C O S T $ 137*63 0*0 3* INCOME ABOVE VARIABLE COSTS S 11 2 * 3 7 4* FIXEC COSTS MACHINERY TRACTORS LAND (NET RENT) TOTAL FIXED COSTS $ ACRE ACRE ACRE 4.52 4*33 750*00 4*52 4*33 1 .00 1*00 0*07 55*25 $ 65*10 5* TOTAL COSTS $ 202*73 6* NET RETURNS $ CROP SOLD STANDING IN FIELD* B U D G E T I D E N T I F I C AT I O N N U M B E R 7 2 3 0 0 7 0 0 1 7 5 0 0 ANNUAL CAPITAL MONTH 9 47*27 PROJECTED. 1975 17 C O R N F O R S I L A G E . I R R I G AT E D , T E X A S E L PA S O R E G I O N E S T I M AT E D C O S T S A N O R E T U P N S P E R A C R E HIGH LEVEL MANAGEMENT O P E R AT I O N PICKUP PLOW 4B OFFSET DISC F L O AT LISTER 4R PICKUP PICKUP R O L L * C U LT I VAT O R PICKUP PICKUP BED-PLANTER PICKUP R O L L * C U LT I VAT O R C U LT I VAT O R PICKUP PICKUP PICKUP FUEL,OIL. FIXEO ITEM TIMES LABOR MACHINE LUB*.REP* COSTS N O * D AT E O V E R H O U R S H O U R S P E R A C R E P E R A C R E 10 .35 .33 .37 .39 10 10 3,41 10 10 3,43 10 3,41 3,61 10 10 10 1 1 1 1 OCT DEC DEC JAN FEB FEB MAR APR APR M AY JUNE JUNE J U LY J U LY J U LY AUG SEPT T O TA L S 0*10 0*50 2*00 1*00 1*00 0*10 0* 10 1*00 0*10 0* 10 1*00 0* 10 1*00 1*00 0*10 0*10 0*10 0*125 0*320 0*466 0*462 0*346 0*125 0*125 0*233 0*125 0*125 0*346 0*125 0*233 0*254 0*125 0*125 0.100 0. 237 0*345 0*342 0*257 0*100 0*100 0*172 0*100 0* 100 0*257 0*100 0*172 0*188 0* 100 0*100 0*24 0* 16 0*17 0*10 0*05 0*24 0*24 0*15 0*24 0*24 0*12 0*24 0*15 0*06 0*24 0*24 0*20 0*25 0*67 0*59 0* 16 0*20 0*20 0*27 0*20 0*20 0*32 0*20 0*27 0*23 0*2 0 0*20 -0*125 -0*100 -0*2± -0*20 3*10 4*52 3.785 2*870 C R O P S O L D S TA N D I N G I N F I E L D * PROJECTED. 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 9 07230070 017 5 18 PIMA COTTON. IRRIGATED. TEXAS EL PASO REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT PRICE OR COST/UNIT LBS, TON 0*80 120*00 $ 1. GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEED TOTAL 2 . VA R I A B L E C O S T S PREHARVEST SEED FERT(100-60-0) HERBICIDE INSECTICIDE HAIL INSURANCE FERTILIZER APPLI IRRIG* LABOR WAT E R C H A R G E DISTRI SYSTM COS MACHINERY TRACTORS LABOR( TRACTOR & MACHINERY) OTHER LABOR INTEREST ON OP* CAP* S U B T O TA L . P R E - H A R V E S T HARVEST COSTS CUST COTTON PICK GIN, BAG. TIES CUSTOM HAULING S U B T O TA L . H A R V E S T 500*00 0*40 400*00 £Q____9. $ 448*00 $ CWT* ACRE ACRE APPL ACRE ACRE HOUR ACRE ACRE ACRE ACRE HOUR HOUR DOL* 29*00 29*40 12*00 5*50 6*00 1*25 2*50 28*00 9*42 3*61 14*22 2*50 2*75 0*09 10*44 29*40 12*00 33*00 6*00 1*25 12*50 2 8*00 9*42 3*61 14*22 16*86 16*50 0*36 1*00 1*00 6*00 1*00 1*00 5*00 1*00 1*00 1 .00 1*00 6*75 6*00 66*14 5*95 $ 199*16 $ LBS* BALE CWT* 0*06 35*50 0*15 40*00 35* 50 500*00 1*00 15*00 $ 2*25 77.75 $ 276.91 T O TA L VA R I A B L E C O S T s 171.09 3 * I N C O M E A B O V E VA R I A B L E C O S T S 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT ) T O TA L F I X E D C O S T S VA L U E O R COST QUANTITY $ ACRE ACRE ACRE 6*90 6*02 750*00 1*00 1*00 0*07 6.90 6*02 55-25 69*17 5 . T O TA L C O S T S s 346*07 6. NET RETURNS $ 101*93 PROJECTED. 1975 J f ^ \ B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 1 0 931007002 750 0 19 P I M A C O T T O N , I R R I G AT E D , T E X A S E L PA S O R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A £ R E TYPICAL MANAGEMENT O P E R AT I O N ITEM NO* D AT E SHREDER (2R) 4.32 JAN OFFSET DISC 2.34 JAN PICKUP 10 JAN PLOW 3B 2,36 FEB OFFSET DISC 2,34 FEB F L O AT 2.38 FEB PICKUP 10 FEB LISTER 4R 2.40 MAR PICKUP 10 MAR S P R AY RIG 4.46 APR PICKUP 10 APR BED-PLANTER 4,44 M AY PICKUP 10 M AY R O L L * C U LT I VATO R 4 , 4 2 J U N E PICKUP 10 JUNE C U LT I VATO R 2.50 J U LY PICKUP 10 J U LY C U LT I VATO R 2.50 AUG PICKUP 10 AUG PICKUP 10 SEPT PICKUP 10 OCT T O TA L S FUEL.OIL. FIXED T I M E S L A B O R M A C H I N E L U B . . R E P. C O S T S OVER HOURS HOURS PER ACRE PER ACRE 1• 1 • 0• 1 • 1 • 2• 0 • I• 0• 1• 0• 1 • 0• 1 • 0• 2• 0• 2• 0• 0• 0• 00 0.477 0.354 00 0 . 3 1 1 0.2 30 10 0 . 1 2 5 0. 100 00 0 * 8 4 9 0*629 00 0 . 3 1 1 0.2 30 00 0 . 9 2 4 0.6 84 10 0 . 1 2 5 0.100 00 0 . 3 4 6 0.2 57 10 0 . 1 2 5 0 . 1 0 0 00 0 . 3 0 5 0 . 2 2 6 10 0 . 1 2 5 0. 100 20 0 . 4 1 6 0 * 3 0 8 0* 100 10 0 . 1 2 5 00 0 . 2 7 1 0*201 10 0 . 1 2 5 0 . 1 0 0 00 0.643 0*4 76 10 0 . 1 2 5 0 * 1 0 0 00 0 . 6 4 3 0.4 76 10 0 . 1 2 S 0 * 1 0 0 10 0 . 1 2 5 0 . 1 0 0 10 .0*125 -0*100 0.04 0.03 0.24 0.22 0.03 0.21 0*24 0*05 0.24 0*04 0*24 0*20 0*24 0 . 11 0*24 0*15 0*24 0*15 0*24 0*24 0* 19 0*24 0*20 0*49 0*24 1* 18 0*20 0*16 O. 20 0*27 0*20 0*69 0*20 0*31 0*20 0*58 0*20 0.58 0*20 0*20 .0*24 -0*20 6*745 5*070 3*61 6*90 PROJECTED. 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 1 0 09310070 027 5 ^*^\ 20 P I M A C O T T O N , I R R I G AT E D , T E X A S E L PA S O R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEED T O TA L 2 * VA R I A B L E C O S T S PREHARVEST SEED FERT(120-60-0) HERBICIDE INSECTICIDE SCOUTING HAIL INSURANCE FERTILIZER APPLI IRRIG* LABOR WAT E R C H A R G E DISTRI SYSTM COS MACHINERY TRACTORS LABOR(TRACTOR t MACHINERY) OTHER LABOR I N T E R E S T O N O P. C A P * S U B T O TA L , P R E - H A R V E S T PRICE OR COST/UNIT $ LBS* TON 0*80 120*00 600*00 0*48 CWT* ACRE ACRE APPL ACRE ACRE ACRE HOUR ACRE ACRE ACRE ACRE HOUR HOUR DOL. 29.00 32*40 12*00 5.50 2*50 6*00 1*25 2*50 28*00 9*42 4*52 14.39 2.50 2*75 0*09 0*36 1*00 1*00 4*00 1*00 1*00 1*00 5*00 1*00 1 .00 1*00 1*00 6*21 6*00 70*59 LBS. BALE C W T. 0*08 35*50 0*15 600*00 1*20 18*00 10*44 32*40 12*00 22*00 2*50 6* 00 1*25 12*50 28*00 9*42 4* 52 14*39 15.52 16.50 5ft 35 $ 193.79 48.00 42.60 2*70 93*30 $ $ 287*09 T O TA L VA R I A B L E C O S T $ 250*51 3 * I N C O M E A B O V E VA R I A B L E C O S T S 4. FIXED COSTS MACHINERY T R A C TO R S LAND (NET RENT) T O TA L F I X E D C O S T S 480*00 §Zfl.£9_ $ 537*60 $ HARVEST COSTS CUST COTTON PICK GIN. BAG, TIES CUSTOM HAULING S U B T O TA L . H A R V E S T VA L U E O R COST QUANT ITY $ ACRE ACRE ACRE 7.39 e*76 750*00 1.00 1*00 0*07 7*39 8*76 —55*25: $ 72*41 5 . T O TA L C O S T S $ 359*50 6. NET RETURNS $ 178*10 PROJECTED. 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R - — 9 3 1 0 0 7 0 0 1 7 5 0 0 A N N U A L C A P I TA L M O N T H 1 0 21 P I M A C O T T O N , I R R I G AT E D . T E X A S E L PA S O R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT O P E R AT I O N PICKUP SHREDER (4R) OFFSET DISC PLOW 4B PICKUP OFFSET DISC F L O AT LISTER 4R R O T O VAT O R PICKUP PICKUP S P R AY R I G PICKUP R O L L * C U LT I VAT O R BED-PLANTER PICKUP R O L L * C U LT I VAT O R PICKUP C U LT I VAT O R PICKUP PICKUP PICKUP PICKUP ITEM NO* 10 3.31 1 .33 1 .35 10 1 .33 1 .37 1 .39 1 ,51 10 10 3 . 4 5 10 3.41 3.43 10 3.41 10 1 .61 10 10 10 10 z'*^. D AT E T I M E S LABOR MACHINE L U B . . R E P. COST OVER HOURS HOURS PER ACRE P E R A O NOV JAN JAN JAN JAN FEB FEB FEB FEB FEB MAR APR APR M AY M AY MAY JUNE JUNE J U LY J U LY AUG SEPT OCT 0 ,, 1 0 1. 00 1 .. 0 0 1. 00 O t. 1 0 1«. 0 0 2«, 0 0 1«, 0 0 2 ., 0 0 0 «▶ 10 0 «, 1 0 1«, 0 0 0<, 1 0 1«, 0 0 1 ,, 2 0 0 ,, 1 0 1 ., 0 0 0 ,. 1 0 2 ,, 0 0 O i, 1 0 0 ,i 10 0 ,• IO o,, 10 T O TA L S 0*125 0*220 0*233 0*641 0*125 0*233 0*924 0*346 0*543 0*125 0*125 0*305 0*125 0*233 0*416 0*125 0*233 0*125 0*508 0* 125 0* 125 0*125 0*100 0* 163 0*1 73 0.4 75 0.100 0.173 0*6 84 0*257 0*4 02 0*100 0*100 0*226 0*100 0*172 0*308 0*100 0*172 0*100 0*376 0*100 0* 100 0*100 0*24 0*07 0*09 0*33 0*24 0*09 0*21 0*05 0*51 0*24 0*24 0*03 0*24 0*15 0*15 0*24 0*15 0*24 0*12 0*24 0*24 0*24 0*20 0*30 0 . 3 3 0.49 0.20 0*33 1* 18 0*16 0*87 0*20 0*20 0*18 0*20 0*27 0*38 0*20 0*27 0*20 0*46 0*20 0*20 0*20 -0*125 -0*100 -0-2± p*_?o 4*52 7*39 6*209 4*6 80 '^5\ PROJECTED. 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 1 0 09310070 017 5 ^ 2.2 U P L A N D C O T T O N , I R R I G AT E D . T E X A S E L PA S O R K G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT ^ P N UNIT 1 . G R O S S R E C E I P T S FROM PRODUCT ION COTTON LINT COTTONSEED T O TA L 2 . VA R I A B L E C O S T S PREHARVEST SEED FERT(120-60-0) HERBICIDE INSECTICIDE HAIL INSURANCE FERTILIZER APPLI IRRIG. LABOR WAT E R C H A R G E DISTRI SYSTM COS MACHINERY TR AC TOR S LABORITRACTOR & MACHINERY) OTHER LABOR I N T E R E S T O N O P. C A P * S U B T O TA L . P R E - H A R V E S T HARVEST COSTS CUST COTTON PICK GIN. BAG. TIES CUSTOM HAULING S U B T O TA L . H A R V E S T LBS* TON 0*40 120*00 280*00 700*00 0*56 $ 347.20 S CWT* ACRE ACRE APPL ACRE ACRE HOUR ACRE ACRE ACRE ACRE HOUR HOUR DOL. 27.00 32*40 12*00 £.50 6*00 1*25 2*50 28*00 9*42 3*71 1 6*55 2*50 2*75 0*09 0*36 1 .00 1 oOO 6*00 1.00 1*00 5*00 1*00 1*00 1*00 1 .00 7*02 6*00 68*61 0*07 26*00 0.15 700*00 1*40 21*00 9*72 32*40 12*00 33*00 6*00 1*25 12*50 28*00 9*42 3.71 16*55 17. 54 16*50 ____.!!_. S 20 4*77 s LBS. BALE C W T. T O TA L VA R I A B L E C O S T 3 . I N C O M E A B O V E VA R I A B L E C O S T S 4. FIXED COSTS MACHINERY TR AC TOR S LAND (NET RENT ) T O TA L F I X E D C O S T S VA L U E O R COST PRICE OR COST/UNIT QUANTITY 52*50 36*40 3ft *5 $ 92*05 $ 296*82 $ 50* 38 s ACRE ACRE ACRE 7.21 6*72 750*00 7. 21 6.72 1*00 1*00 0*07 $ 70*18 5 . T O TA L C O S T S $ 367* 00 6. NET RETURNS s -19*80 PROJECTED. 1975 ^ ^ \ B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 1 0 93 007002 750 0 23 U P L A N D C O T T O N , I R R I G AT E D . T E X A S E L PA S O R E G I O N E S T I M AT E O C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT s * ^ * FUEL.OIL. ITEM NO* O P E R AT I O N D AT E SHREDER (2R) 2.32 JAN 1*00 0*477 0*354 0*04 OFFSET DISC 2.34 JAN I.00 0 * 3 11 0*230 0*03 PICKUP 10 JAN 0*10 0*125 0*100 0*24 p_Q* 3B 2.36 FEB 1*00 0*849 0*629 0*22 OFFSET DISC 2.34 FEB I.00 0 . 3 11 0.230 0.03 F L O AT 2.38 FEB 2*00 0*924 0*684 0.21 pICKUp 10 FEB 0*10 0*125 0*100 0*24 LISTER 4R 2.40 MAR 1*00 0*346 0*257 0*05 piCKUp 10 MAR 0.10 0.125 0.100 0.24 S P R AY RIG 2.46 APR 1*00 0*305 0*226 0*04 PICKUP 10 APR 0*10 0*125 0*100 0*24 BED-PLANTER 2.44 M AY 1*20 0.416 0.308 0*20 piCKUp 10 M AY 0*10 0*125 0*100 0*24 ROLL. C U LT I VATO R 4.42 JUNE 2.00 0.543 0.402 0.21 PICKUP 10 JUNE 0.10 0*125 0*100 0*24 C U LT I VATO R 2.50 J U LY 2*00 0*643 0*476 0*15 PICKUp 10 J U LY 0*10 0*125 0.100 0*24 C U LT I VATO R 2.50 AUG 2*00 0*643 0*476 0*15 PICKUp 10 AUG 0*10 0*125 0*100 0*24 pICKUP 10 SEPT 0*10 0*125 0*100 0*24 pickup io OCT o. lo _0*125 T O TA L S FIXED TIMES LABOR MACHINE LUB*.REP* COSTS OVER HOURS HOURS PER ACRE PER ACRE __JQ_Ll.flja 7.017 5*271 0*19 0*24 0.20 0*49 0*24 1*18 0*20 0*16 0.20 0*27 0*20 0*69 0*20 0.62 0*20 0*58 0*20 0*58 0*20 0*20 0»2± JO-20. 3.71 7.21 PROJECTED. 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 1 0 093 0070 027 5 y * ^ 24 U P L A N D C O T T O N , I R R I G AT E D , T E X A S E L PA S O R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT J ^ UNIT 1. GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEED T O TA L 2 * VA R I A B L E C O S T S PREHARVEST SEED FERT(140-60-0) HERBICIDE INSECTICIDE HAIL INSURANCE FERTILIZER APPLI IRRIG* LABOR WAT E R C H A R G E DISTRI SYSTM COS MACHINERY TRACTORS LABOR!TRACTOR £ MACHINERY) OTHER LABOR INTEREST ON OP* CAP* S U B T O TA L . P R E - H A R V E S T LBS. TON VA L U E O R COST PRICE OR COST/UNIT QUANTITY 0.40 120*00 825*00 0*66 330*00 19-20 $ CWT* ACRE ACRE APPL ACRE ACRE HOUR ACRE ACRE ACRE ACRE HOUR HOUR DOL* 27*00 32*40 12*00 5*50 6*00 1*25 2*50 26*00 9*42 4*52 14*39 2*50 2*75 0*09 0.36 1.00 1*00 4*00 1*00 1*00 5*00 1*00 1*00 1 .00 1*00 6*21 6*00 67.01 409*20 9*72 32*40 12*00 22*00 6*00 1* 25 12*50 28*00 9*42 4*52 14*39 15*52 16*50 3*03 s 190*25 s HARVEST COSTS CUST COTTON PICK GIN, BAG. TIES CUSTOM HAULING S U B T O TA L . H A R V E S T LBS* BALE CWT* 0*07 26*00 0*15 825*00 1*65 24*75 T O TA L VA R I A B L E C O S T 61*87 42*90 3i7H $ 108*49 $ 298*74 $ 1 1 0* 46 3 . I N C O M E A B O V E VA R I A B L E C O S T S s 4. FIXEC COSTS MACHINERY TR AC TOR S LAND (NET RENT) T O TA L F I X E D C O S T S ACRE ACRE ACRE 7.39 8.76 750.00 7.39 8.76 1 .00 1*00 0*07 s —53-25 72.41 5 * T O TA L C O S T S $ 371.15 6* NET RETURNS $ 38. 05 PROJECTED. 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 1 0 93 007001 750 0 U P L A N D C O T T O N . I R R I G AT E D . T E X A S E L PA S O R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT ITEM NO. O P E R AT I O N D AT E 25 /^^v FUEL.OIL. FIXED TI MES L A B O R M A C H I N E L U B * . R E P . C O S T S HOURS HOURS PER ACRE PER ACRE OVER PICKUP 10 NOV 0.10 0.125 0.100 0*24 SHREDER (4R) 3.31 JAN 1*00 0*220 0*163 0*07 OFFSET DISC 1.33 JAN 1*00 0*233 0*173 0*09 PLOW 4B 1.35 JAN 1*00 0*641 0*475 0*33 PICKUP 10 JAN 0*10 0*125 0*100 0*24 OFFSET DISC 1.33 FEB 1.00 0.233 0.173 0.09 F L O AT 1.37 FEB 2.00 0.924 0*684 0*21 LISTER 4R 1.39 FEB 1*00 0*346 0*2 57 0*05 R O TO VATO R 1.51 FEB 2.00 0.543 0*402 0*51 PICKUP 10 FEB 0*10 0*125 0*100 0*24 PICKUP 10 MAR 0*10 0*125 0*100 0*24 ROLL* C U LT I VATO R 3.41 APR 1*00 0*233 0*172 0*15 S P R AY RIG 3.45 APR 1*00 0*305 0*226 0*03 PICKUP 10 APR 0*10 0*125 0.100 0*24 BED-PLANTER 3.43 M AY 1*20 0.416 0.308 0»15 pICKUP 10 M AY 0.10 0.125 0.100 0.24 ROLL. C U LT I VATO R 3.41 JUNE 1.00 0.233 0.172 0.15 PICKUP 10 JUNE 0.10 0.125 0.100 0.24 C U LT I VATO R 1.61 J U LY 2.00 0.508 0.376 0.12 pICKUP 10 J U LY 0.10 0.125 0.100 0.24 PICKUP 10 AUG 0.10 0.125 0.100 0.24 PICKUP 10 SEPT 0*10 0*125 0*100 0*24 PICKUP 10 OCT 0*10 TOTALS ,Ptl25 -0-100 6*209 4*680 SL*2± 0*20 0*30 0*33 0*49 0.20 0.33 1*18 0*16 0*87 0*20 0*20 0*27 0*18 0.20 0#38 0.20 0.27 0.20 0.46 0.20 0*20 0*20 ^^%. JOa.20 4.52 7.39 PROJECTED. 1975 BUDGET IDENTIFICATION NUMBER A N N U A L C A P I TA L M O N T H 1 0 093 0070 017 5 ^ 26 G R A I N S O R G H U M . I R R I G AT E D . T E X A S E L PA S O R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT UNIT 1. GROSS RECEIPTS FROM PRODUCTION GRAIN SORGHUM T O TA L VA R I A B L E C O S T S PREHARVEST SEED FERTU00-50-0) INSECTICIDE FERTILIZER APPLI IRRIG* LABOR WAT E R C H A R G E DISTRI SYSTM COS MACHINERY TRACTORS LABOR!TRACTOR & MACHINERY) INTEREST ON OP* CAP* S U B T O TA L . P R E - H A R V E S T VA L U E O R COST PR ICE OR COST/UNIT QUANTITY $ CWT, 5*00 40*00 2 $ LBS* ACRE ACRE ACRE HOUR ACRE ACRE ACRE ACRE HOUR DOL* 0*43 22*50 4.20 1*25 2*50 28*00 9.42 3.38 12.19 2.50 0.09 00* 00 200.00 8*00 1*00 1 .00 1*00 4*00 1*00 1*00 1*00 1*00 5*57 37*35 3*44 22*50 4*20 1* 25 10*00 2 8*00 9*42 3*38 12*19 13*94 2*23. 111 * 6 8 $ HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL S U B T O TA L . H A R V E S T ACRE CWT* 10.00 0.15 1*00 30*00 T O TA L VA R I A B L E C O S T 3 . I N C O M E A B O V E VA R I A B L E C O S T S 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) T O TA L F I X E D C O S T S ACRE ACRE ACRE 5.99 4*98 750*00 10*00 &LS0 $ 1 4* 50 $ 126*18 $ 73*82 1*00 1*00 0*07 5 * T O TA L C O S T S 6* NET RETURNS PROJECTED. 1975 /ffP*^ B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 9 73 007002 750 0 27 G R A I N S O R G H U M , I R R I G AT E D , T E X A S E L PA S O R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT O P E R AT I O N PICKUP SHREDER (2R) OFFSET DISC PLOW 3B PICKUP OFFSET DISC F L O AT PICKUP LISTER 4R R O L L * C U LT I VAT O R PICKUP PICKUP PICKUP BED-PLANTER R O L L * C U LT I VAT O R PICKUP C U LT I VAT O R PICKUP PICKUP PICKUP ITEM NO* 10 2.32 2.34 2.36 10 2 .34 2.38 10 2.40 4.42 10 10 10 2.44 4,42 10 2.50 10 10 10 ^ ^ \ D AT E T I M E S LABOR MACHINE L U B . . R E P . COST! OVER HOURS HOURS PER ACRE PER ACf OCT JAN JAN JAN JAN JAN FEB FEB MAR MAR MAR APR M AY JUNE JUNE JUNE J U LY J U LY AUG SEPT 0*10 1*00 1*00 0*50 0* 10 1*00 2*00 0*10 1*00 1*00 0*10 0*10 0*10 1*00 1*00 0*10 2*00 0*10 0*10 0*10 T O TA L S 0*125 0*477 0 * 3 11 0*424 0*125 0*311 0*924 0*125 0*346 0*271 0*125 0*125 0*125 0*346 0*271 0*125 0*643 0*125 0*125 0*100 0*3 54 0*2 30 0*314 0* 100 0*2 30 0*6 84 0*100 0*257 0*201 0*100 0*100 0* 100 0*257 0* 201 0* 100 0*4 76 0*100 0.100 0 . 2 4 0.04 0.03 0.11 0.24 0.03 0.21 0.24 0.05 0.11 0.24 0.24 0.24 0 . 1 6 0. 11 0.24 0.15 0 . 2 4 0 . 2 4 0 . 2 0 0.19 0.24 0.24 0.20 0.24 1.18 0.20 0 . 1 6 0.31 0.20 0.20 0.20 0 . 5 8 0.31 0.20 0*58 0.20 0.20 -0*125 -0*100 .0*24 -0*20 3.38 5.99. 5*575 4. 204 PROJECTED. 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R — A N N U A L C A P I TA L M O N T H 9 073 0070 027 5 *—*%. ( , R A I N S O R G H U M . I R R I G AT E D , T E X A S F l PA S T R F G K 1 N E S T I M AT E D C O S T S A N D R E T U R N S P F R A C r ? E HIGH LEVEL MANAGEMENT I'H J ^ ^ UNIT 1. GROSS RECEIPTS FROM PRODUCTION GRAIN SORGHUM T O TA L PRICE OR COST/UNIT QUANTITY VA L U E O R COST $ CWT* 5*00 50*0 0 -250-00 $ 250*00 2 . VA R I A B L E C O S T S PREHARVEST SEED FERT!100-50-0) INSECTICIDE FERTILIZER APPLI IRRIG* LABOR WATER CHARGE DISTRI SYSTM COS MACHINERY TRACTORS LABOR!TRACTOR £ MACHINERY) INTEREST ON OP* CAP* S U B T O TA L , P R E - H A R V E S T HARVEST COSTS CUSTOM COMBINE C U S TO M H A U L S U B T O TA L . H A R V E S T LBS* ACRE ACRE ACRE HOUR ACRE ACRE ACRE ACRE HOUR DOL* 0*43 22*50 4*20 1*25 2*50 28*00 9*42 3.46 9.52 2.50 0*09 8.00 1 .00 1*00 1*00 4*00 1*00 1*00 1*00 1*00 4*38 36*35 3-Z1 $ 10 6*03 $ ACRE CWT* 1 0*00 0*15 1 .00 50*00 10*00 $ T O TA L VA R I A B L E C O S T 7-A+O 17.50 $ 123*53 3 * I N C O M E A B O V E VA R I A B L E C O S T S 4* FIXED COSTS MACHINERY TRACTORS LAND (NET RENT) T O TA L F I X E D C O S T S 3* 44 22*50 4*20 1*25 10*00 28*00 9*42 3*46 9*52 10*96 $ 126*47 $ ACRE ACRE ACRE 5*25 5*85 50.00 1*00 1*00 0*07 5*25 5*85 s —53*25 6 7*35 5 . T O TA L C O S T S $ 190*87 6* NET RETURNS $ 59*13 PROJECTED. 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 9 j 0 ^ \ 73 0 0 700 1 750 0 29 G R A I N S O R G H U M . I R R I G AT E D , T E X A S E L PA S O R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT O P E R AT I O N PICKUP SHREDER !4R) OFFSET DISC PLOW 4B OFFSET DISC PICKUP F L O AT LISTER 4R PICKUP PICKUP R O L L * C U LT I VAT O R PICKUP PICKUP BED-PLANTER R O L L * C U LT I VAT O R PICKUP C U LT I VAT O R PICKUP PICKUP PICKUP ITEM NO* 10 1.31 1 .33 1.35 1 ,33 10 1 .37 1 .39 10 10 3.41 10 10 3.43 3.41 10 1 .61 10 10 10 D AT E FUEL.OIL. FIXED T I M E S LABOR MACHINE L U B * . R E P * COSTS OVER HOURS HOURS PER ACRE PER ACRE OCT DEC DEC JAN JAN JAN JAN FEB FEB MAR APR APR MAY JUNE JUNE JUNE J U LY J U LY AUG SEPT 0. 10 1<, 0 0 l i, 0 0 0. 5 0 1«, 0 0 0 ,, 1 0 1 ., 0 0 l l, 0 0 0«, 1 0 O i, 1 0 11, 0 0 Oii 10 O i, 1 0 1«, 0 0 l l▶ 00 0 ,▶ 10 2 ,▶ 00 0 ,▶ 10 Oi» 1 0 0 ,. 1 0 T O TA L S 0*1 00 0*163 0*173 0*2 37 0*173 0*100 0* 342 0*257 0*100 0*100 0*172 0* 100 0* 100 0*2 57 0*172 0*100 0* 376 0*100 0*100 0*24 0*07 0*09 0*16 0*09 0*24 0*10 0*05 0*24 0*24 0*15 0*24 0*24 0*12 0* IS 0*24 0*12 0*24 0*24 0*20 0*30 0*33 0*25 0* 33 0*20 0*59 0*16 0*20 0*20 0*27 0*20 0*20 0*32 0*27 0*20 0*46 0*20 0*20 -0*125 -0*100 -0*24 -0*20 3*46 5*25 0. 125 0.220 0.233 0*320 0*233 0*125 0*462 0*346 0*125 0*125 0*233 0*125 0*125 0*346 0*233 0*125 0*508 0*125 0*125 4*384 3* 322 PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R A N N U A L C A P I TA L M O N T H 9 073 0070 017 5 GAIN UPLAND COTTON BUDGET COMPARISONS 1973 vs im El Paso, Texas Region On page 2 is presented the 1973 estimated per acre costs and returns for irrigated upland cotton under typical management as of October 16, 1973 Page 3 contains 1974 projected cost and returns per acre for upland cotton as of February 18, 1974. Page 4 lists the prices paid and received used to prepare the budgets. SUMMARY Costs of producing upland cotton 1973 vs 1974 are projected to increase about $21.00 per acre or 7%. Gross returns are projected to remain in 1973 since average prices are estimated no government payment due to market value target price. Net returns will, therefore, approximately the same in 1974 as at $ .60 per pound for 1974 and being above the $ .38 per pound be about 12% lower. O000000000000000000000000000000000000000000000000000 ° Budgets developed by Agricultural Economists Te x a s A g r i c u l t u r a l E x t e n s i o n S e r v i c e ° Te x a s A&M University 0 For more information contact Area Economists: ° Calvin L. Brints phone: 915/543-7417 ° or ° Phillip N. Johnson phone: 915/336-2632 ° ° ° ° ° o ° OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO Issued 2/22/74 599.41-1 Upland Cotton TAMU Budgets 1973 UPLAND COTTON Estimated Costs and Returns Per Acre, Texas El Paso Region Irrigated, Typical Management UNIT GROSS RECEIPTS FROM PRODUCTION COTTON LINT LBS. SEED TON TOTAL VARIABLE COSTS PREHARVEST SEED F E RT ( 1 2 0 - 6 0 - 0 ) = L B S , N , P , K / a c r e HERBICIDE INSECTICIDE HAIL INSURANCE C U S T. F E RT. A P P L I . OTHER IRRI. LABOR MACHINERY (REPAIRS,FUEL,LUB) TRACTORS(REPAIRS,FUEL,LUB) LABOR (TRACTOR & MACHINERY) OTHER LABOR INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST HARVEST COSTS CHEMICALS COTTONPICKER GINNING CUSTON HAULING SUBTOTAL, HARVEST PRICE OR COST/UNIT QUANTITY 0.45 11 0 . 0 0 700.00 0.56 315.00 61.60 376.60 CWT. ACRE ACRE APPL ACRE ACRE HOUR ACRE ACRE HOUR HOUR DOL. 18.00 15.60 4.50 3.25 7.50 1.00 1.50 2.69 7.45 2.00 1.30 0.09 0.36 1.00 1.00 6.00 1.00 1.00 5.00 1.00 1.00 6.59 6.00 26.76 6.48 15.60 4.50 19.50 7.50 1.00 7.50 2.69 7.45 13.18 7.80 2.41 95.60 ACRE BALE BALE CWT. 4.00 30.00 17.60 0.15 1.00 1.40 1.40 21.00 4.00 42.00 24.64 3.15 73.79 169.39 TOTAL VARIABLE COST 207.21 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS TAXES (LAND, WATER) LAND (NET RENT) TOTAL FIXED COSTS VALUE OR COST ACRE ACRE ACRE ACRE 6.17 4.71 25.00 95.20 1.00 1.00 1.00 1.00 6.17 4.71 25.00 95.20 131.08 5. TOTAL COSTS 300.47 6. NET RETURNS 76.13 7. GOVERNMENT PAYMENT LBS. 8. NET RETURNS INCLUDING GOVERNMENT PAYMENT .15 700.00 105.00 181.13 BASED ON PLANTED ACRES. NO ALLOWANCE FOR SET-AS IDE ACREAGE OF 20 PERCENT. LANDLORD RECEIVES 1/4 OF CROP AND PAYS LAND AND WATER TA X > REVISED 10/16/73 599.41-2 ^ 1974 UPLAND C 0 T T 0 fl P r o j e c t e d C o s t s a n d R e t u r n s P e r A c r e , Te x a s E l P a s o R e g i o n I r r i g a t e d , Ty p i c a l M a n a g e m e n t 1. GROSS RECEIPTS FROM PRODUCTION COTTON LINT SEED TOTAL UNIT PRICE OR COST/UNIT LBS. TON 0.60 110.00 2. VARIABLE COSTS PREHARVEST SEED C W T. F E R T ( 1 2 0 - 6 0 - 0 ) = L B S . N , P, K / a c r e A C R E HERBICIDE ACRE INSECTICIDE APPL HAIL INSURANCE $6/$100Insured ACRE C U S T. F E R T. A P P L I . ACRE OTHER IRRI. LABOR HOUR M A C H I N E RY ( R E PA I R S , F U E L , L U B ) A C R E T R A C T O R S ( R E PA I R S , F U E L , L U B ) A C R E LABOR(TRACTOR & MACHINERY) HOUR OTHER LABOR HOUR I N T E R E S T O N O P. C A P. D O L . SUBTOTAL, PRE-HARVEST QUANTITY 700.00 0.56 VALUE OR COST % CHANGE 1973 to 1974 420.00 61.60 481.60 +33%^ +28% +36% +28% 23.00 21.19 4.50 3.50 12.00 1.10 2.00 3.01 10.42 2.00 1.75 0.09 0.36 1.00 1.00 6.00 1.00 1.00 5.00 1.00 1.00 6.59 6.00 32.48 8.28 21.19 4.50 21.00 12.00 1.10 10.00 3.01 10.42 13.18 10.50 2.92 118.09 0.00 30.00 19.36 0.15 1.00 1.40 1.40 21.00 0.00 42.00 27.10 3.15 72.25 +10% TOTAL VARIABLE COST 190.35 +12% INCOME ABOVE VARIABLE COSTS 291.25 +40% HARVEST COSTS CHEMICALS COTTONPICKER GINNING CUSTOM HAULING SUBTOTAL, HARVEST FIXED COSTS MACHINERY TRACTORS TAXES (LAND, WATER) LAND (NET RENT) TOTAL FIXED COSTS TO TA L ACRE BALE BALE C W T. ACRE ACRE ACRE ACRE 6.17 4.71 25.00 95.20 1.00 1.00 1.00 1.00 +8% +60% +10% +33% +12% +40% +35% +21% +23% -2% 6.17 4.71 25.00 95.20 131.08 COSTS 321.43 NET RETURNS (NOTE: NO GOVERNMENT PAYMENT SINCE PRICE IS ABOVE 160.17 THE $.38 PER POUND TARGET PRICE.) BASED ON PLANTED ACRES. LANDLORD RECEIVES 1/4 OF CROP AND PAYS LAND AND WATER TAX. REVISED 2/18/74 r 599.41-3 +7% -12% T E X A S E L PA S O R E G I O N Assumed Prices Paid and Received by Farmers 1973 and 1974 and Percentage Change % CHANGE ITEM UNIT PRICE 1973 to 1974 1973 1974* (as of (as of Oct. 17,1973) Feb. 18, 1973) Prices Paid Seed: Cotton (delinted) Pima, Upland, Grain Sorghum Barley Alfalfa Fertilizer: Nitrogen Phosphorus Herbicide: Pre-emerge Fuel: Gasoline Diesel Labor: Hoeing Machinery Irrigation Custom Rates: Insecticide plus ;materials Fertilizer application Cotton picking Ginning, upland Ginning, pima Grain combining (30<=/cwt. min) Grain hauling Swath, bale, haul hay Hay hauling Baling wire Capital: Investment Operating Hail Insurance: Cotton Taxes: Land and Water cwt. cwt. cwt. $ 20.00 18.00 20.00 $ 25.00 23.00 32.00 +25% +27% +60% cwt. cwt. 10.00 150.00 8.00 165.00 -20% +10% +23% +60% lb. lb. .08 .10 qt. 6.25 6.25 .25 .17 .33 .31 +32% +82% 1.30 1.50 2.00 1.75 2.00 2.00 + 34% +33% 3.60 1.00 30.00 17.60 25.00 9.00 .10 .40 3.50 1.10 30.00 19.36 27.50 9.00 .125 .40 .15 .10 -3% +10% gal. gal. h r. h r. h r. acre acre bale bale bale acre cwt. bale bale bale $ $ .075 .09 .098 .16 ; - +10% +10% +25% .075 .09 $100 7.50 6.00 acre 25.00 25.00 lb. .45 1.00 lb. 110.00 ton cwt. 4.75 6.00 ton cwt. 3.50 ton 40.00 .20 lb. gain .60 1 . 11 11 0 . 0 0 4.75 6.00 3.80 55.00 .20 -20% Prices Receive<3 Cotton, upland Cotton, pima Cottonseed Grain Sorghum C o r n S i l a g e i n fi e l d Barley Alfalfa Grazing Government Payments Upland Cotton Pima co/400 lb. lb. 599.41-4 .15 .16 .1086 +33% +11% +8.5% +37% -32% ~