Preparatory Review Timeline Final Timeline Institution: UC Santa Cruz ACTION CHAIR Visit Date: February 4-6, 2004 ASSISTANT CHAIR WASC STAFF ACCREDITATION LIAISON OFFICER OPTIMAL TIMELINE TARGET DATE Before the Visit Staff mail Guide to ALOs, "Preparing for Institutional Reviews and Hosting Teams" 1. Mail Visit Info to ALOs 2. Mail Visit Info to Team Receive/Review Receive/Review Staff send materials about visit and institution to team Presentation 4. Disuss preparations for Staff hosts call; review timeline and visit preparations the visit with institution 5. Discuss Assistant Chair's 6. Send First Email to team Varies 12 weeks before visit Institution sends Institutional 12 weeks before Presentation to WASC Office and the visit team. 3. Send Institutional Role and Preliminary Strategy for the Visit Receive/Review Conference Call Conference call Participate in call Staff places call to Chair and Assistant Chair to discuss visit strategy, team assignments, institutional proposal, Assistant Chair role and this timeline 10-12 weeks before the visit Team chair sends first email to team outlining team responsibilities, dates, & visits strategy. Chair makes and hosts the conference call to build personal relationships, set visit 7. Make call to CEO and ALO context, and learn of any special issues for visit. Discuss draft schedule with ALO 10-12 weeks before visit 8-9 weeks before the visit Conference Call Conference call 6-9 weeks before the visit Page 1 of 4 Sept. 2, 2003 Final Timeline Preparatory Review Timeline Final Timeline ACTION CHAIR ASSISTANT CHAIR WASC STAFF team room information team visit 11. Hold Team Conference 12. Discuss Team Informational Needs 13. Send Second Email to team TARGET DATE ALO sends suggested schedule to Chair and WASC for them to discuss in conference call. 9. Send draft schedule for Call OPTIMAL TIMELINE ALO sends email survey to team and WASC requesting information about team needs: computer, local transportation, dietary, 7 weeks before the arrival times, etc. ALO also sends visit list of team room exhibits to team, suggested individuals and groups with which to meet and tentative schedule of meetings. 8. Email team survey and 10. Send Conference Call Worksheets to team, WASC ACCREDITATION LIAISON OFFICER Send Compiles team worksheets into one consolidated document for conference call Receive Team chair arranges and hosts Team Conference Call using Team Conference Call consolidated worksheet Conference call Staff will place call for team at the appointed time Chair places call to ALO and WASC Staff to discuss team informational needs, follow up questions and schedule changes. Team chair sends second email to team and WASC staff, confirming team's plans and institutional responses. Conference call 5 weeks before the visit Conference call 4 weeks before the visit 3 weeks before the visit Page 2 of 4 Sept. 2, 2003 Final Timeline Preparatory Review Timeline Final Timeline ACTION CHAIR ASSISTANT CHAIR WASC STAFF ACCREDITATION LIAISON OFFICER OPTIMAL TIMELINE TARGET DATE During the Visit Institutional representatives 1. Meet with Team Members meet with team members. Institutional representatives meet with team members. Institutional representatives meet Institutional representatives meet according to visit with team members. with team members. schedule ALO and others on campus provide logistical support for team. 2. Provide Logistical Support as needed by the team After the Visit 1. Asst. Chair Sends Compiled First Draft to Team Receives Chair 2. Send First Draft to Team Members 3. Team Members send Comments to Team Chair Sends synthesized draft of Preparatory Review team report to team chair Team chair sends first draft of Preparatory Review team report and team recommendation to team members and Staff for review. Receive comments 1 weeks after visit Receive/Review Receive/Review Send Send 2 weeks after visit Team chair revises draft and 4. Send Correction of Errors sends to institution for of Fact to Institution 5. Send Corrections of Errors to Team Chair correction of errors of fact only. Receive Receive/Review 5 weeks after visit Institution sends response to draft 6 weeks after visit team report to team chair. Page 3 of 4 Sept. 2, 2003 Final Timeline Preparatory Review Timeline Final Timeline ACTION 6. Revise Report CHAIR ASSISTANT CHAIR WASC STAFF ACCREDITATION LIAISON OFFICER Team chair revises team report based on factual errors. OPTIMAL TIMELINE TARGET DATE 6-8 weeks after visit Team chair sends Confidential 7. Send Team Rec and Final Recommendation and final PR Report to Staff 8. WASC staff send final report to institution 8. EE Report sent to WASC Receive 8 weeks after visit report to Staff Send Receive/Review Educational Effectiveness Report sent to WASC; includes Consistent with supplemental update to WASC schedule Institutional Presentation. Page 4 of 4 Sept. 2, 2003 Final Timeline