UNCLASSIFIED

advertisement
UNCLASSIFIED
Date: February 2015
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy
Appropriation/Budget Activity
1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational
Systems Development
COST ($ in Millions)
Prior
Years
FY 2014
FY 2015
R-1 Program Element (Number/Name)
PE 0305421N / RQ-4 Modernization
FY 2016
Base
FY 2016
OCO
FY 2016
Total
FY 2017
FY 2018
FY 2019
Cost To
FY 2020 Complete
Total
Cost
Total Program Element
0.000
- 5.000
150.854
- 150.854
220.219
108.038
41.027
42.181 Continuing Continuing
2939: RQ-4 Modernization
0.000
- 5.000
150.854
- 150.854
220.219
108.038
41.027
42.181 Continuing Continuing
Program MDAP/MAIS Code: 373
Note
MQ-4C Triton RDTE funding for modernization has been segregated into a new program element (from PE 0305220N to PE 0305421N) in order to satisfy Congressional
direction for increased transparency. In the FY2015 Appropriations Act, Congress limited the amount of FY2015 funding in the modernization line (PE 0305421N) to
$5M until a review of the capability development document is completed by the Joint Requirements Oversights Council (JROC). In concert with completion of the JROC
review, the Navy will request a reprogramming from Congress to move the remaining required FY15 funding from PE 0305220N into PE 0305421N in order to maintain
the Triton Multi-Intelligence phased capability upgrade schedule.
A. Mission Description and Budget Item Justification
MQ-4C Triton Unmanned Air System (UAS). The popular name Triton was approved for the MQ-4C UAS in June 2012, designating the RQ-4 Broad Area Maritime
Surveillance (BAMS) UAS as the MQ-4C Triton.
The MQ-4C Triton is a high altitude-long endurance UAS designed to provide Fleet and combatant commanders with persistent maritime Intelligence, Surveillance
and Reconnaissance (ISR) of nearly all the world's high-density sea-lanes, littorals, and areas of national interest. Teamed with its manned-capability counterpart, the
P-8A, Triton will be a key component of the Navy's family of systems to achieve maritime domain awareness. MQ-4C Triton will seek to leverage Maritime Patrol and
Reconnaissance Force manpower, training and maintenance efficiencies.
The MQ-4C Triton features sensors designed to provide near worldwide coverage through a network of five orbits inside and outside continental United States, with
sufficient air vehicles to remain airborne for 24 hours a day, 7 days a week, out to ranges of 2000 nautical miles. Onboard sensors will provide detection, classification,
tracking and identification of maritime targets and include maritime radar, electro-optical/infra-red and Electronic Support Measures systems. Additionally, the MQ-4C will
have a communications relay capability designed to link dispersed forces in the theater of operations and serve as a node in the Navy's FORCEnet strategy. Tacticallevel data analysis will occur in real-time at shore-based mission control sites connected to the air vehicle via satellite communications. Further intelligence exploitation
can be conducted at Fleet shore-based sites or aboard aircraft carriers and other ships.
The MQ-4C Triton UAS will implement phased capability upgrades within the ongoing acquisition program to pace capability with rapidly evolving technologies
and threats to ensure the Navy maintains persistent ISR dominance through the system's lifecycle, and to support the OPNAV N2/N6 Intelligence, Surveillance,
Reconnaissance and Targeting transition plan. System upgrades will include Multi-Intelligence capabilities, Counter Electronic Attack upgrades, a more robust
electronic support capability and continue improvements to baseline mission system payloads.
PE 0305421N: RQ-4 Modernization
Navy
UNCLASSIFIED
Page 1 of 11
R-1 Line #227
UNCLASSIFIED
Date: February 2015
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy
Appropriation/Budget Activity
R-1 Program Element (Number/Name)
1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational
PE 0305421N / RQ-4 Modernization
Systems Development
MQ-4C will play a significant role in the Sea Shield and FORCEnet pillars of Sea Power 21. In its Sea Shield role, the system will rely on its key attribute of persistence
to provide the supported combatant command or fleet commander with unparalleled situational awareness of the maritime battle space as it develops and sustains
the common operational tactical picture. The system will also serve as a Fleet response plan enabler, while acting as a trip wire for intelligence preparation of the
environment. Additionally, Triton Unmanned Air System will be a FORCEnet enabler and relay platform, directly connected to both the Global Information Grid and the
Distributed Common Ground System-Navy information backbone.
B. Program Change Summary ($ in Millions)
Previous President's Budget
Current President's Budget
Total Adjustments
• Congressional General Reductions
• Congressional Directed Reductions
• Congressional Rescissions
• Congressional Adds
• Congressional Directed Transfers
• Reprogrammings
• SBIR/STTR Transfer
• Rate/Misc Adjustments
FY 2014
FY 2015
FY 2016 Base
FY 2016 OCO
FY 2016 Total
- - - - - - - - - - - - 5.000
5.000
- - - - 5.000
- - - - 150.854
150.854
- - - - 150.854
150.854
150.854
- 150.854
Change Summary Explanation
Technical: MQ-4C Triton RDTE funding for modernization, which includes Multi-Intelligence capabilities, has been segregated into a new program element (PE
0305421N) in order to satisfy Congressional direction for increased transparency.
Schedule: N/A
PE 0305421N: RQ-4 Modernization
Navy
UNCLASSIFIED
Page 2 of 11
R-1 Line #227
UNCLASSIFIED
Date: February 2015
Exhibit R-2A, RDT&E Project Justification: PB 2016 Navy
Appropriation/Budget Activity
1319 / 7
COST ($ in Millions)
2939: RQ-4 Modernization
Quantity of RDT&E Articles
R-1 Program Element (Number/Name)
PE 0305421N / RQ-4 Modernization
Prior
Years
FY 2014
- FY 2015
FY 2016
Base
FY 2016
OCO
FY 2016
Total
FY 2017
Project (Number/Name)
2939 / RQ-4 Modernization
FY 2018
FY 2019
- 5.000
150.854
- 150.854
220.219
108.038
41.027
- - - - - - - - Cost To
FY 2020 Complete
Total
Cost
42.181 Continuing Continuing
- A. Mission Description and Budget Item Justification
MQ-4C Triton Unmanned Air System (UAS). The MQ-4C Triton is a high altitude-long endurance UAS designed to provide Fleet and combatant commanders with
persistent maritime Intelligence, Surveillance and Reconnaissance (ISR) of nearly all the world's high-density sea-lanes, littorals, and areas of national interest. Teamed
with its manned-capability counterpart, the P-8A, Triton will be a key component of the Navy's family of systems to achieve maritime domain awareness. MQ-4C Triton
will seek to leverage Maritime Patrol and Reconnaissance Force manpower, training and maintenance efficiencies.
The MQ-4C Triton features sensors designed to provide near worldwide coverage through a network of five orbits inside and outside continental United States, with
sufficient air vehicles to remain airborne for 24 hours a day, 7 days a week, out to ranges of 2000 nautical miles. Onboard sensors will provide detection, classification,
tracking and identification of maritime targets and include maritime radar, electro-optical/infra-red and Electronic Support Measures systems. Additionally, the MQ-4C
will have a communications relay capability designed to link dispersed forces in the theater of operations and serve as a node in the Navy's FORCEnet strategy.
Tactical-level data analysis will occur in real-time at shore-based mission control sites connected to the air vehicle via satellite communications. Further intelligence
exploitation can be conducted at Fleet shore-based sites or aboard aircraft carriers and other ships.
The MQ-4C Triton UAS will implement phased capability upgrades within the ongoing acquisition program to pace capability with rapidly evolving technologies
and threats to ensure the Navy maintains persistent ISR dominance through the system's lifecycle, and to support the OPNAV N2/N6 Intelligence, Surveillance,
Reconnaissance and Targeting transition plan. System upgrades will include Multi-Intelligence capabilities, Counter Electronic Attack upgrades, a more robust
electronic support capability and continue improvements to baseline mission system payloads.
MQ-4C will play a significant role in the Sea Shield and FORCEnet pillars of Sea Power 21. In its Sea Shield role, the system will rely on its key attribute of persistence
to provide the supported combatant command or fleet commander with unparalleled situational awareness of the maritime battle space as it develops and sustains
the common operational tactical picture. The system will also serve as a Fleet response plan enabler, while acting as a trip wire for intelligence preparation of the
environment. Additionally, Triton UAS will be a FORCEnet enabler and relay platform, directly connected to both the Global Information Grid and the Distributed
Common Ground System-Navy information backbone.
B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each)
Title: Product Development
FY 2014 FY 2015
- 4.279
- - Articles:
Description: MQ-4C Triton UAS modernization effort for incorporation of phased capability upgrades.
The prime contractor is responsible for integration of upgrades into the Triton UAS including associated
PE 0305421N: RQ-4 Modernization
Navy
UNCLASSIFIED
Page 3 of 11
R-1 Line #227
FY 2016 FY 2016 FY 2016
Base
OCO
Total
144.433
- 144.433
- - - UNCLASSIFIED
Date: February 2015
Exhibit R-2A, RDT&E Project Justification: PB 2016 Navy
Appropriation/Budget Activity
1319 / 7
R-1 Program Element (Number/Name)
PE 0305421N / RQ-4 Modernization
B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each)
management, engineering and logistics activities. Capability upgrades will also include development of system
payloads directly with original equipment manufacturers.
Project (Number/Name)
2939 / RQ-4 Modernization
FY 2014
FY 2015
FY 2016
Base
FY 2016
OCO
FY 2016
Total
FY 2014 Accomplishments:
N/A
FY 2015 Plans:
Initiate development of phased capability upgrades, including Multi-Intelligence capabilities in support of the
OPNAV N2/N6 Intelligence, Surveillance, Reconnaissance and Targeting transition plan.
FY 2016 Base Plans:
Funding increases from FY15 to FY16 to continue development of phased capability upgrades, including
Multi-Intelligence capabilities in support of the OPNAV N2/N6 Intelligence, Surveillance, Reconnaissance and
Targeting transition plan. Funding includes acquisition of development assets for capability upgrades including
electro-optical/infra-red, Signals Intelligence (SIGINT) High Band and SIGINT Low Band systems.
FY 2016 OCO Plans:
N/A
Title: ILS, Support, Studies & Analysis
Articles:
- - Description: Integrated Logistics Support, Studies and Analysis.
FY 2014 Accomplishments:
N/A
FY 2015 Plans:
Integrated logistics support, technical engineering services, sensor risk reduction, logistics supportability
analyses and environmental planning, modeling and simulation, development of manpower and basing
assessments, and development of technical data to support fielding of the MQ-4C Triton Unmanned Aircraft
System (UAS) capabilities.
FY 2016 Base Plans:
Integrated logistics support, technical engineering services, sensor risk reduction, logistics supportability
analyses and environmental planning, modeling and simulation, development of manpower and basing
assessments, and development of technical data to support fielding of the MQ-4C Triton UAS capabilities.
FY 2016 OCO Plans:
PE 0305421N: RQ-4 Modernization
Navy
UNCLASSIFIED
Page 4 of 11
R-1 Line #227
0.400
- 1.608
- - - 1.608
- UNCLASSIFIED
Date: February 2015
Exhibit R-2A, RDT&E Project Justification: PB 2016 Navy
Appropriation/Budget Activity
1319 / 7
R-1 Program Element (Number/Name)
PE 0305421N / RQ-4 Modernization
B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each)
FY 2014
N/A
Title: Test & Evaluation (T&E)
Project (Number/Name)
2939 / RQ-4 Modernization
Articles:
FY 2015
FY 2016
Base
FY 2016
OCO
FY 2016
Total
- - - - 3.800
- - - 3.800
- - - 0.321
- 1.013
- - - 1.013
- Description: T&E efforts.
FY 2014 Accomplishments:
N/A
FY 2015 Plans:
N/A
FY 2016 Base Plans:
Begin Developmental Testing and Operational Testing support activities to allow test and fielding of the MQ-4C
Triton Unmanned Air System phased capability upgrades in accordance with the program schedule.
FY 2016 OCO Plans:
N/A
Title: Program Management (PM)
Articles:
Description: PM support and travel.
FY 2014 Accomplishments:
N/A
FY 2015 Plans:
PM support and travel, development of milestone and acquisition-related documentation, capability refinement
and open systems architecture development, resource justification, affordability assessments and cost analyses,
risk reduction and risk management, system integration and interoperability planning, technology maturity
reviews, program protection planning, corrosion prevention planning, and joint and international cooperation
efforts.
FY 2016 Base Plans:
Continue the following: PM support and travel, development of milestone and acquisition-related documentation,
capability refinement and open systems architecture development, resource justification, affordability
assessments and cost analyses, risk reduction and risk management, system integration and interoperability
PE 0305421N: RQ-4 Modernization
Navy
UNCLASSIFIED
Page 5 of 11
R-1 Line #227
UNCLASSIFIED
Date: February 2015
Exhibit R-2A, RDT&E Project Justification: PB 2016 Navy
Appropriation/Budget Activity
1319 / 7
R-1 Program Element (Number/Name)
PE 0305421N / RQ-4 Modernization
B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each)
Project (Number/Name)
2939 / RQ-4 Modernization
FY 2014
planning, technology maturity reviews, program protection planning, corrosion prevention planning, and joint and
international cooperation efforts.
FY 2015
FY 2016
Base
FY 2016
OCO
FY 2016
Total
FY 2016 OCO Plans:
N/A
- Accomplishments/Planned Programs Subtotals
C. Other Program Funding Summary ($ in Millions)
Line Item
• RDT&E/0305220N:
RQ-4 UAV (MQ-4C Triton)
• APN-4/044200: RQ-4
UAV (Triton UAV)
• APN-6/044200: RQ-4
UAV (Triton UAV)
• OMN/1D4D:
Weapons Maintenance
• OMN/1A1A: Mission and
Other Flight Operations
• MILCON/0212176N: Facilities
New Footprint - Fleet Ops
• MILCON/0712876N: Facilities
New Footprint - Main and Prod
• MILCON/0815976N: Facilities
New Footprint - Training
• MILCON/0203176N:
Facilities Restoration and Mod
• MILCON/0816376N:
Facilities New Footprint - T&E
• MILCON/0805976N: Facilities
Restoration and Mod-Training
Remarks
PE 0305421N: RQ-4 Modernization
Navy
5.000
150.854
- 150.854
FY 2014
375.235
FY 2015
451.442
FY 2016
Base
227.188
FY 2016
OCO
- FY 2016
Total
227.188
FY 2017
5.208
FY 2018
- FY 2019
- Cost To
FY 2020 Complete Total Cost
- - 3,184.123
- 67.670
548.836
- 548.836
582.360
635.984
704.135
718.463 7,096.336 10,353.784
- - 153.954
- 153.954
110.263
105.532
6.758
- - - - - 5.738
30.153
32.886
35.338 Continuing Continuing
- - - - - - 2.216
12.773
44.119 Continuing Continuing
17.469
- 8.296
- 8.296
71.091
- - - - 129.001
- - 40.641
- 40.641
- - - - - 40.641
38.031
- - - - - - 28.118
- - 82.707
- - - - - - - - - - 20.753
- - - - - - - - - - 33.034
- - 2.974
- 2.974
- - - - - 2.974
UNCLASSIFIED
Page 6 of 11
R-1 Line #227
6.881
283.685
667.073
UNCLASSIFIED
Date: February 2015
Exhibit R-2A, RDT&E Project Justification: PB 2016 Navy
Appropriation/Budget Activity
1319 / 7
R-1 Program Element (Number/Name)
PE 0305421N / RQ-4 Modernization
Project (Number/Name)
2939 / RQ-4 Modernization
D. Acquisition Strategy
The MQ-4C Triton acquisition approach encompasses delivery of detection, tracking, imaging and data dissemination capabilities at Initial Operational Capability (IOC)
with activities to enhance sensor and system performance via phased capability upgrades for post IOC delivery as part of the Triton acquisition program. This approach
of phased capability upgrades within the acquisition program enables MQ-4C to pace capability with rapidly evolving technologies and threats to ensure the Navy
maintains persistent Intelligence, Surveillance and Reconnaissance dominance through the system's lifecycle.
The MQ-4C Triton program office is pursuing joint efficiency with the Air Force on the Global Hawk Unmanned Aircraft System (UAS). However, the integration of
the Triton UAS into the Maritime Patrol Reconnaissance Force and the unique maritime sensors employed dictate a Navy-led acquisition program focused on joint
efficiencies, where possible.
E. Performance Metrics
Successfully achieve Milestone C, Integrated Test, Operational Evaluation and IOC.
PE 0305421N: RQ-4 Modernization
Navy
UNCLASSIFIED
Page 7 of 11
R-1 Line #227
UNCLASSIFIED
Date: February 2015
Exhibit R-3, RDT&E Project Cost Analysis: PB 2016 Navy
Appropriation/Budget Activity
1319 / 7
R-1 Program Element (Number/Name)
PE 0305421N / RQ-4 Modernization
Product Development ($ in Millions)
Cost Category Item
Contract
Method
& Type
FY 2014
Performing
Activity & Location
Prior
Years
Award
Date
Cost
Primary Hardware
Development
C/CPFF
Northrop Grumman :
Rancho Bernardo,
CA
Systems Engineering
Various
Various : Various
0.000
- NAWC-AD :
Patuxent River, MD
0.000
- Systems Engineering
WR
FY 2015
0.000
- Award
Date
Cost
3.379 Apr 2015
- 0.900 Jan 2015
FY 2016
Base
FY 2016
OCO
Award
Date
Cost
Project (Number/Name)
2939 / RQ-4 Modernization
Award
Date
Cost
FY 2016
Total
Cost To
Complete
Cost
Total
Cost
Target
Value of
Contract
105.694 Nov 2015
- 105.694
302.994
412.067
412.067
2.000 Nov 2015
- 2.000
7.555
9.555
- 9.739 Nov 2015
- 9.739
31.473
42.112
- Primary Hardware
Development
SS/FFP
Raytheon :
McKinney, TX
0.000
- - 10.000 Feb 2016
- 10.000
- 10.000
10.000
Primary Hardware
Development
C/CPFF
Sierra Nevada
Corporation : Beaver
Creek, OH
0.000
- - 9.500 Jan 2016
- 9.500
- 9.500
9.500
Primary Hardware
Development
C/CPFF
Boeing Argon ST :
Fairfax, VA
0.000
- - 7.500 Nov 2015
- 7.500
- 7.500
7.500
0.000
- 4.279
- 144.433
342.022
490.734
- Subtotal
Support ($ in Millions)
Cost Category Item
FY 2014
Contract
Method
& Type
Performing
Activity & Location
Prior
Years
FY 2015
Award
Date
Cost
144.433
Award
Date
Cost
Development Support
Various
Various : Various
0.000
- - Integrated Logistics
Support
Various
Various : Various
0.000
- - Integrated Logistics
Support
WR
NAWC-AD :
Patuxent River, MD
0.000
- 0.400 Jan 2015
0.000
- 0.400
Subtotal
Test and Evaluation ($ in Millions)
Cost Category Item
Developmental Test &
Evaluation
Contract
Method
& Type
Various
Performing
Activity & Location
Various : Various
PE 0305421N: RQ-4 Modernization
Navy
FY 2014
Prior
Years
0.000
Cost
- Award
Date
Cost
- UNCLASSIFIED
Page 8 of 11
Award
Date
Cost
FY 2016
Total
Cost To
Complete
Cost
Total
Cost
Target
Value of
Contract
- 0.508
1.300
1.808
- - - 3.710
3.710
- 1.100 Nov 2015
- 1.100
4.807
6.307
- 1.608
- 1.608
9.817
11.825
- - Award
Date
Cost
FY 2016
OCO
0.508 Nov 2015
FY 2015
Award
Date
FY 2016
Base
FY 2016
Base
Cost
FY 2016
OCO
Award
Date
Award
Date
Cost
1.150 Nov 2015
- R-1 Line #227
FY 2016
Total
Cost
1.150
Cost To
Complete
5.428
Total
Cost
6.578
Target
Value of
Contract
- UNCLASSIFIED
Date: February 2015
Exhibit R-3, RDT&E Project Cost Analysis: PB 2016 Navy
Appropriation/Budget Activity
1319 / 7
R-1 Program Element (Number/Name)
PE 0305421N / RQ-4 Modernization
Test and Evaluation ($ in Millions)
Cost Category Item
Developmental Test &
Evaluation
Operational Test &
Evaluation
Developmental Test &
Evaluation
Contract
Method
& Type
FY 2014
Performing
Activity & Location
Prior
Years
Travel
Program Management
Support
Cost
Award
Date
Cost
Cost
FY 2016
OCO
Award
Date
FY 2016
Total
Award
Date
Cost
Cost
Cost To
Complete
Total
Cost
Target
Value of
Contract
0.000
- - 1.400 Nov 2015
- 1.400
35.589
36.989
- Various
Various : Various
0.000
- - 0.250 Nov 2015
- 0.250
7.900
8.150
- MIPR
DITCO : Various
0.000
- - 1.000 Nov 2015
- 1.000
5.398
6.398
- 0.000
- - 3.800
- 3.800
54.315
58.115
- WR
Management Services ($ in Millions)
Cost Category Item
Award
Date
FY 2016
Base
NAWC-AD :
Patuxent River, MD
Subtotal
Program Management
FY 2015
Project (Number/Name)
2939 / RQ-4 Modernization
Contract
Method
& Type
FY 2014
Performing
Activity & Location
Prior
Years
FY 2015
Award
Date
Cost
Cost
Award
Date
FY 2016
Base
Cost
FY 2016
OCO
Award
Date
FY 2016
Total
Award
Date
Cost
Cost
Cost To
Complete
Various : Various
0.000
- 0.100 Jan 2015
0.163 Nov 2015
- 0.163
Allot
Various : Various
0.000
- 0.025 Jan 2015
0.050 Nov 2015
- 0.050 Continuing Continuing Continuing
C/CPFF
Ausley : Lexington
Park, MD
0.000
- 0.196 Jan 2015
0.800 Nov 2015
- 0.800
2.851
3.847
3.847
0.000
- 0.321
1.013
- 1.013
- - - Prior
Years
Project Cost Totals
0.000
FY 2014
- FY 2015
5.000
FY 2016
Base
150.854
FY 2016
OCO
FY 2016 Cost To
Total
Complete
- Remarks
MQ-4C Triton RDTE funding for modernization has been segregated into a new program element (from PE 0305220N to PE 0305421N) in order to satisfy Congressional
direction for increased transparency. All Triton modernization funding was previously included in PE 0305220N PU 4020 MQ-4C Triton.
PE 0305421N: RQ-4 Modernization
Navy
UNCLASSIFIED
Page 9 of 11
R-1 Line #227
150.854
- 2.548
Target
Value of
Contract
Various
Subtotal
2.285
Total
Cost
Total
Cost
- - Target
Value of
Contract
- UNCLASSIFIED
Date: February 2015
Exhibit R-4, RDT&E Schedule Profile: PB 2016 Navy
Appropriation/Budget Activity
1319 / 7
PE 0305421N: RQ-4 Modernization
Navy
R-1 Program Element (Number/Name)
PE 0305421N / RQ-4 Modernization
UNCLASSIFIED
Page 10 of 11
Project (Number/Name)
2939 / RQ-4 Modernization
R-1 Line #227
UNCLASSIFIED
Date: February 2015
Exhibit R-4A, RDT&E Schedule Details: PB 2016 Navy
Appropriation/Budget Activity
1319 / 7
R-1 Program Element (Number/Name)
PE 0305421N / RQ-4 Modernization
Project (Number/Name)
2939 / RQ-4 Modernization
Schedule Details
Start
Events by Sub Project
End
Quarter
Year
Quarter
Year
Acquisition Milestones: Milestone C
1
2016
1
2016
Acquisition Milestones: Full Rate Production
2
2018
2
2018
Acquisition Milestones: Initial Operational Capability
3
2018
3
2018
System Development: Phased Capability Upgrades - Multi-INT
2
2015
3
2020
System Development: System Development and Demonstration
1
2014
3
2020
Test & Evaluation Activities: Integrated Test (Combined/Developmental/Operational)
1
2014
2
2017
Test & Evaluation Activities: Follow-on Integrated Test
2
2018
4
2020
Test & Evaluation Activities: Operational Test Readiness Review
3
2017
3
2017
Test & Evaluation Activities: OPEVAL
4
2017
1
2018
Production Milestones: Contracts: Low Rate Initial Production 1 Contract Award
2
2016
2
2016
Production Milestones: Contracts: Low Rate Initial Production 2 Contract Award
2
2017
2
2017
Production Milestones: Contracts: Full Rate Production Lot 3 Contract Award
2
2018
2
2018
Production Milestones: Contracts: Full Rate Production Lot 4 Contract Award
2
2019
2
2019
Production Milestones: Contracts: Full Rate Production Lot 5 Contract Award
2
2020
2
2020
Production Milestones: Deliveries: System Demonstration Test Articles Delivery
1
2017
2
2017
Production Milestones: Deliveries: Low Rate Initial Production Lot 1 Delivery
2
2018
1
2019
Production Milestones: Deliveries: Low Rate Initial Production Lot 2 Delivery
2
2019
1
2020
Production Milestones: Deliveries: Full Rate Production Lot 3 Delivery
2
2020
4
2020
Proj 2939
PE 0305421N: RQ-4 Modernization
Navy
UNCLASSIFIED
Page 11 of 11
R-1 Line #227
Download