UNCLASSIFIED Date: February 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Appropriation/Budget Activity 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Prior Years FY 2014 FY 2015 FY 2016 Base R-1 Program Element (Number/Name) PE 0300349A / Win-T Increment 2 - Initial Networking FY 2016 OCO FY 2016 Total FY 2017 FY 2018 FY 2019 Cost To FY 2020 Complete Total Cost Total Program Element - - 3.247 3.800 - 3.800 - - - - - 7.047 EE7: WIN-T Increment 2 - Initial Networking - - 3.247 3.800 - 3.800 - - - - - 7.047 A. Mission Description and Budget Item Justification Warfighter Information Network (WIN-T) Increment (Inc) 2 provides the Army with On-The-Move (OTM) networking capability. The WIN-T Inc 2 network retains capabilities delivered by WIN-T Inc 1 and by leveraging proven government and commercial technologies, adds greater network throughput and automated Network Management to optimize planning (to include spectrum use), initialization, monitoring and troubleshooting. WIN-T Inc 2 employs Beyond Line of Sight (BLOS) Satellite Communications (SATCOM) OTM to extend the network in maneuver Brigade Combat Teams (BCTs) to Company level for the first time. Using equipment mounted on combat platforms, WIN-T Increment 2 delivers a mobile capability that reduces reliance on fixed infrastructure and allows key leaders to move on the battlefield while retaining Situational Awareness and Mission Command capabilities. Using the Highband Networking Radio (HNR), with the Highband Networking Waveform (HNW) and high performance antennas, the WIN-T Inc 2 Line-of-Sight (LoS) network offers an adaptive 30 Megabit per second (Mbps) aggregate throughput to key leaders in their Command Post or in their vehicle. The WIN-T Inc 2 network is self-forming, which means that it automatically creates transmission paths based on terrain and environmental conditions; and self-healing, meaning that the paths will automatically re-route traffic to complete network transactions and calls even if one or more nodes break down or loses connectivity. This offers greater network reliability and better end-to-end connectivity than traditional point-to-point networks. WINT Inc 2 introduces the network management capability needed to keep the mobile and dispersed forces networked together through automated planning, initialization, monitoring, and troubleshooting. Finally, WIN-T adopts "Colorless Core" technology that encrypts both classified and unclassified user information in the network and minimizes the number of users on the "core" of the network. The Colorless Core allows commanders to utilize the tactical network without fear of the enemy intercepting information. Colorless Core is a technical insertion in the WIN-T Inc 1b network which enables efficient information sharing between Inc 1b and Inc 2. WIN-T Inc 3 mature Network Operations (NetOps) technologies will be inserted into WIN-T Increment 2 units. FY16 funds support Operational Testing (NIE 16.2) and tech insertion of NetOps Build 5 and upgrade to NetCentric Waveform (NCW) 10.x. PE 0300349A: Win-T Increment 2 - Initial Networking Army UNCLASSIFIED Page 1 of 9 R-1 Line #201 UNCLASSIFIED Date: February 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Appropriation/Budget Activity 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development FY 2014 B. Program Change Summary ($ in Millions) Previous President's Budget Current President's Budget Total Adjustments • Congressional General Reductions • Congressional Directed Reductions • Congressional Rescissions • Congressional Adds • Congressional Directed Transfers • Reprogrammings • SBIR/STTR Transfer • Adjustments to Budget Years PE 0300349A: Win-T Increment 2 - Initial Networking Army - - - - - - - - - - - R-1 Program Element (Number/Name) PE 0300349A / Win-T Increment 2 - Initial Networking FY 2015 FY 2016 Base FY 2016 OCO FY 2016 Total 3.249 3.247 -0.002 -0.002 - - - - - - - 18.209 3.800 -14.409 - - - 18.209 3.800 -14.409 -14.409 - -14.409 UNCLASSIFIED Page 2 of 9 R-1 Line #201 UNCLASSIFIED Date: February 2015 Exhibit R-2A, RDT&E Project Justification: PB 2016 Army Appropriation/Budget Activity 2040 / 7 COST ($ in Millions) R-1 Program Element (Number/Name) PE 0300349A / Win-T Increment 2 - Initial Networking Prior Years FY 2014 FY 2015 FY 2016 Base FY 2016 OCO FY 2016 Total FY 2017 Project (Number/Name) EE7 / WIN-T Increment 2 - Initial Networking FY 2018 FY 2019 Cost To FY 2020 Complete EE7: WIN-T Increment 2 - Initial Networking - - 3.247 3.800 - 3.800 - - - - Quantity of RDT&E Articles - - - - - - - - - - - Total Cost 7.047 A. Mission Description and Budget Item Justification Warfighter Information Network (WIN-T) Increment (Inc) 2 provides the Army with On-The-Move (OTM) networking capability. The WIN-T Inc 2 network retains capabilities delivered by WIN-T Inc 1 and by leveraging proven government and commercial technologies, adds greater network throughput and automated Network Management to optimize planning (to include spectrum use), initialization, monitoring and troubleshooting. WIN-T Inc 2 employs Beyond Line of Sight (BLOS)Satellite Communications (SATCOM) OTM to extend the network in maneuver Brigade Combat Teams (BCTs) to Company level for the first time. Using equipment mounted on combat platforms, WIN-T Inc 2 delivers a mobile capability that reduces reliance on fixed infrastructure and allows key leaders to move on the battlefield while retaining Situational Awareness and Mission Command capabilities. Using the Highband Networking Radio (HNR), with the Highband Networking Waveform (HNW) and high performance antennas, the WIN-T Inc 2 Line-of-Sight (LoS) network offers an adaptive 30 Megabit per second (Mbps) aggregate throughput to key leaders in their Command Post or in their vehicle. The WIN-T Inc 2 network is self-forming, which means that it automatically creates transmission paths based on terrain and environmental conditions; and self-healing, meaning that the paths will automatically re-route traffic to complete network transactions and calls even if one or more nodes break down or loses connectivity. This offers greater network reliability and better end-to-end connectivity than traditional point-to-point networks. WINT Inc 2 introduces the network management capability needed to keep the mobile and dispersed forces networked together through automated planning, initialization, monitoring, and troubleshooting. Finally, WIN-T adopts "Colorless Core" technology that encrypts both classified and unclassified user information in the network and minimizes the number of users on the "core" of the network. The Colorless Core allows commanders to utilize the tactical network without fear of the enemy intercepting information. Colorless Core is a technical insertion in the WIN-T Inc 1b network which enables efficient information sharing between Inc 1b and Inc 2. WIN-T Inc 3 mature Network Operations (NetOps) technologies will be inserted into WIN-T Increment 2 units. FY16 funds support Operational Testing (NIE 16.2) and tech insertion of NetOps Build 5 and upgrade to NetCentric Waveform (NCW) 10.x. B. Accomplishments/Planned Programs ($ in Millions) FY 2014 - Title: Product Development Description: Product Development FY 2015 Plans: Development efforts for Technical Insertions. FY 2016 Plans: PE 0300349A: Win-T Increment 2 - Initial Networking Army UNCLASSIFIED Page 3 of 9 R-1 Line #201 FY 2015 0.208 FY 2016 1.127 UNCLASSIFIED Date: February 2015 Exhibit R-2A, RDT&E Project Justification: PB 2016 Army Appropriation/Budget Activity 2040 / 7 R-1 Program Element (Number/Name) PE 0300349A / Win-T Increment 2 - Initial Networking Project (Number/Name) EE7 / WIN-T Increment 2 - Initial Networking B. Accomplishments/Planned Programs ($ in Millions) Development efforts for Technical Insertions. FY 2014 Title: Test and Evaluation FY 2015 FY 2016 - 3.039 2.673 - 3.247 3.800 Description: Test and Evaluation FY 2015 Plans: FY15 funding will be used for the second FOT&E activities, including test report required for Full Rate Production Defense Acquisition Board (DAB) and NIE 15.1 which will test Stryker Platform flat bottom variant. FY 2016 Plans: FY16 funds support Operational Testing (NIE 16.2) and tech insertion of NetOps Build 5 and upgrade to NetCentric Waveform (NCW) 10.x. Accomplishments/Planned Programs Subtotals C. Other Program Funding Summary ($ in Millions) Line Item • WIN-T Inc 2: WINT Inc 2 Procurement • Inc 2 Spares: WIN-T Inc 2 Procurement Spares • PE 0603782A/367 RDTE: Research, Development, Test and Evaluation (RDTE) PE 643782/367 Remarks FY 2014 364.438 FY 2015 361.709 FY 2016 Base 504.463 FY 2016 OCO - FY 2016 Total 504.463 FY 2017 523.513 FY 2018 617.337 FY 2019 627.618 Cost To FY 2020 Complete Total Cost 630.365 Continuing Continuing 21.629 26.100 39.532 - 39.532 22.178 49.562 50.799 124.989 - 334.789 1.064 - - - - - - - - - 1.064 D. Acquisition Strategy The Acquisition Decision Memorandum of September 27, 2013 authorized the procurement of 98 additional communications nodes for Low Rate Initial Production (LRIP), bringing the total LRIP quantity to 1,030 communications nodes. The Project Manager (PM) procured the authorized quantities on the current initial production contract (W15P7T-10-D-C007). This contract was awarded in 2010 as a three year contract with three option years. Lots 1, 2, 3, 4 (minus Soldier Network Extensions [SNE]) and Lot 5 training bases have been procured. Lot 4 SNEs and Lot 5 CIs will be awarded in May 2015, following a successful Full Rate Production Decision. WIN-T Inc 2 provides the Army with On-The-Move (OTM) networking capability. Inc 3 NetOps will be technically inserted into Inc 2 and these inserts will be tested in subsequent Network Integration Evaluation 16.2 (NIE 16.2) events. PE 0300349A: Win-T Increment 2 - Initial Networking Army UNCLASSIFIED Page 4 of 9 R-1 Line #201 UNCLASSIFIED Date: February 2015 Exhibit R-2A, RDT&E Project Justification: PB 2016 Army Appropriation/Budget Activity 2040 / 7 R-1 Program Element (Number/Name) PE 0300349A / Win-T Increment 2 - Initial Networking Project (Number/Name) EE7 / WIN-T Increment 2 - Initial Networking E. Performance Metrics N/A PE 0300349A: Win-T Increment 2 - Initial Networking Army UNCLASSIFIED Page 5 of 9 R-1 Line #201 UNCLASSIFIED Date: February 2015 Exhibit R-3, RDT&E Project Cost Analysis: PB 2016 Army Appropriation/Budget Activity 2040 / 7 R-1 Program Element (Number/Name) PE 0300349A / Win-T Increment 2 - Initial Networking Product Development ($ in Millions) Cost Category Item Product Development FY 2014 Contract Method & Type Performing Activity & Location SS/IDIQ various : various Subtotal Prior Years Cost Category Item Award Date Cost Performing Activity & Location SS/IDIQ Various : Various Subtotal Award Date Cost Cost Cost To Complete Total Cost Target Value of Contract 1.127 - 1.127 - 1.335 - 0.000 - 0.208 1.127 - 1.127 - 1.335 - Prior Years FY 2015 Award Date Cost Cost Award Date FY 2016 Base Cost Award Date FY 2016 OCO Award Date Cost FY 2016 Total Cost Cost To Complete Total Cost Target Value of Contract 0.000 - 3.039 2.673 - 2.673 - 5.712 - 0.000 - 3.039 2.673 - 2.673 - 5.712 - 0.000 FY 2014 - FY 2015 3.247 FY 2016 Base 3.800 FY 2016 OCO - Remarks PE 0300349A: Win-T Increment 2 - Initial Networking Army FY 2016 Total 0.208 Prior Years Project Cost Totals Cost Award Date FY 2016 OCO - FY 2014 Contract Method & Type Cost Award Date FY 2016 Base 0.000 Test and Evaluation ($ in Millions) Test FY 2015 Project (Number/Name) EE7 / WIN-T Increment 2 - Initial Networking UNCLASSIFIED Page 6 of 9 R-1 Line #201 FY 2016 Cost To Total Complete 3.800 - Total Cost 7.047 Target Value of Contract - UNCLASSIFIED Date: February 2015 Exhibit R-4, RDT&E Schedule Profile: PB 2016 Army Appropriation/Budget Activity 2040 / 7 PE 0300349A: Win-T Increment 2 - Initial Networking Army R-1 Program Element (Number/Name) PE 0300349A / Win-T Increment 2 - Initial Networking UNCLASSIFIED Page 7 of 9 Project (Number/Name) EE7 / WIN-T Increment 2 - Initial Networking R-1 Line #201 UNCLASSIFIED Date: February 2015 Exhibit R-4, RDT&E Schedule Profile: PB 2016 Army Appropriation/Budget Activity 2040 / 7 PE 0300349A: Win-T Increment 2 - Initial Networking Army R-1 Program Element (Number/Name) PE 0300349A / Win-T Increment 2 - Initial Networking UNCLASSIFIED Page 8 of 9 Project (Number/Name) EE7 / WIN-T Increment 2 - Initial Networking R-1 Line #201 UNCLASSIFIED Date: February 2015 Exhibit R-4A, RDT&E Schedule Details: PB 2016 Army Appropriation/Budget Activity 2040 / 7 R-1 Program Element (Number/Name) PE 0300349A / Win-T Increment 2 - Initial Networking Project (Number/Name) EE7 / WIN-T Increment 2 - Initial Networking Schedule Details Start Quarter 2 Year 2010 Quarter 3 Year 2015 Network Integrated Evaluation 14.1 1 2014 1 2014 Developmental Test 1 2 2014 2 2014 Delivery Order Award 1 2 2014 2 2014 Network Integrated Evaluation 14.2 3 2014 3 2014 Developmental Test 2 3 2014 3 2014 Network Integrated Evaluation 15.1 (FOT&E) (Stryker) 1 2015 1 2015 M-Demo 2 2015 2 2015 Army Material Release 3 2015 3 2015 Full Rate Production Decision Review 3 2015 3 2015 Delivery Order Award 2 3 2015 3 2015 Full Rate Production/Fielding 3 2015 4 2020 Follow-on Production Award & Del. Order Award 3 1 2016 1 2016 NIE 16.2 NetOps/NCW 3 2016 3 2016 Delivery Order Award 4 1 2017 1 2017 Delivery Order Award 5 1 2018 1 2018 Contract Award & Delivery Order Award 6 1 2019 1 2019 Delivery Order Award 7 1 2020 1 2020 LRIP Production Events End PE 0300349A: Win-T Increment 2 - Initial Networking Army UNCLASSIFIED Page 9 of 9 R-1 Line #201