UNCLASSIFIED Date: March 2014 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Navy Appropriation/Budget Activity 1319: Research, Development, Test & Evaluation, Navy / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Prior Years FY 2013 FY 2014 R-1 Program Element (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft (MMA) (P-8A) FY 2015 # OCO FY 2015 Base FY 2015 Total FY 2016 FY 2017 FY 2018 Cost To FY 2019 Complete Total Cost Total Program Element 7,232.670 391.364 272.352 308.037 - 308.037 257.692 227.845 202.416 2696: Multi-Mission Maritime Aircraft 7,154.707 306.383 185.211 150.550 - 150.550 115.768 39.386 18.120 - - 7,970.125 61.934 52.280 54.144 68.458 - 68.458 20.385 - - - - 257.201 3218: P-8A Spiral 2 Development 6.029 19.212 27.997 89.029 - 89.029 120.018 186.373 181.223 184.115 Continuing Continuing 3368: P-8 Improvements 0.000 - - - - - 1.521 2.086 3.073 10.240 Continuing Continuing 10.000 13.489 5.000 - - - - - - 3181: P-8A Spiral One Development 9999: Congressional Adds 194.355 Continuing Continuing - - 28.489 MDAP/MAIS Code: 334 # The FY 2015 OCO Request will be submitted at a later date. A. Mission Description and Budget Item Justification The P-8A Multi-mission Maritime Aircraft will replace the aging P-3 aircraft. The P-8A program was initiated in response to the Joint Requirements Oversight Council (JROC) validated Mission Needs Statement, "Broad Area Maritime and Littoral Armed Intelligence, Surveillance and Reconnaissance" and the requirements for the program are defined in the P-8A Capability Production Document #791-88-09, validated and approved on 22 June 2009. A successful Critical Design Review was completed in June 2007. In August 2007 the Design Readiness Review was conducted and resulted in approval to obligate funding for the fabrication of the Stage II flight test aircraft. The first flight of P-8A occurred on 25 Apr 2009. Milestone (MS) C was successfully completed on 11 August 2010. The program completed Initial Operational Test and Evaluation (IOT&E) in March 2013 and achieved Initial Operational Capability (IOC) in November 2013. The Acquisition Decision Memorandum for the Full Rate Production review was approved on January 3, 2014. The primary objectives of Systems Development and Demonstration (SDD) are to perform the system detailed design, develop and produce Systems Integration Labs, develop and build ground and flight test articles, and conduct ground and flight tests to sucessfully achieve program milestones. Ground testing includes the conduct of static testing, fatigue testing and Live Fire Test and Evaluation. Six flight test aircraft have been built during SDD. These test aircraft are grouped into two stages based on which phase of the test program the aircraft will support. SDD Stage I flight test aircraft (FY06/Qty-3) support Integrated Test and Evaluation (IT&E). SDD Stage II flight test aircraft (FY09/Qty-3) support the completion of IT&E and Initial Operational Test and Evaluation (IOT&E) after being updated to the production configuration. The SDD contract includes the development and initial building of training devices to support IOT&E. The scope of SDD includes activities necessary to facilitate an efficient transition of the fleet to achieve the P-8A Initial Operational Capability (IOC) of Increment 1 in CY13. The scope of SDD also includes the engineering and verification of correction of deficiencies identified in testing and Fleet operational use. P-8A entered Production and Deployment phase in the 4th quarter of FY10 after completing MS-C Defense Acquisition Board. PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 1 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Navy Appropriation/Budget Activity R-1 Program Element (Number/Name) 1319: Research, Development, Test & Evaluation, Navy / BA 5: System PE 0605500N / Multi-mssn Maritime Aircraft (MMA) (P-8A) Development & Demonstration (SDD) P-8A program is based on an evolutionary acquisition strategy consisting of sequential incremental enhancements to system capabilities that will retain cost-wise effectiveness for winning major combat operations beyond 2020. In order to pace the threat, Spiral One (Increment 2), the Next Phase of Capabilities, will incorporate the following capabilities into the P-8A: Multi-Static Active Coherent (MAC), Automatic Identification System, Rapid Capabilities Insertion (RCI), updates to the Tactical Operations Center (TOC), as well as additional Anti-Submarine Warfare (ASW), Anti-Surface Warfare (ASuW) and Intelligence Surveillance and Reconnaissance capabilities as Engineering Change Proposals (ECPs). The scope of this effort includes the integration, design, and test of the capability enhancements to the P-8A and associated Tactical Operations Center ground support facilities and initial trainers. Integration and test of these capabilities as well as integration of Advanced Airborne Sensor (AAS) capability will be accomplished incrementally, based on the scope of the integration effort. As part of the P-8A evolutionary acquisition strategy, Spiral 2 (Increment 3) will incorporate the capabilities defined in the Capability Development Document approved by JROC on 25 June 2010. In order to pace the threat, the Spiral 2 (Increment 3) will incorporate the following capabilities into the P-8A: MAC Enhancement, RCI ECP's including ECP3 (early delivery of HAAWC Datalink), updates to the TOC, as well as additional ASW, ASuW and Intelligence Surveillance and Reconnaissance capabilities. These capabilities and other emergent capability requirements will be investigated during the Pre-Engineering Manufacturing Development phase of Spiral 2 (Increment 3) for the P-8A and Tactical Operations Center (ground support facility). Acquisition Decision Memorandum, dated 18 October 2013, approved PreEngineering Development activities leading up to MS-B. The P-8A Multi-mission Maritime Aircraft (MMA) program is based on an evolutionary acquisition strategy including a sequence of Rapid Capability Insertions (RCI) that will retain cost-wise effectiveness for winning major combat operations beyond 2020. In order to pace the threat, RCIs will incorporate incremental software and hardware improvements to existing sensors, communications systems and weapons capabilities to build on the P-8A Spiral 2 (Increment 3) Applications Based Architecture (ABA) and capability baseline. These capabilities, and other emergent capability requirements, will be prioritized through the Navy Integration and Interoperability (I&I)-aligned Capability Prioritization Process (CPP) and P-8A Tier 3 Capability Roadmap. The CPP process will be supported by detailed analysis and the maturation of developing technologies. Budget Activity 5. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision. PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 2 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Navy Appropriation/Budget Activity 1319: Research, Development, Test & Evaluation, Navy / BA 5: System Development & Demonstration (SDD) FY 2013 B. Program Change Summary ($ in Millions) Previous President's Budget Current President's Budget Total Adjustments • Congressional General Reductions • Congressional Directed Reductions • Congressional Rescissions • Congressional Adds • Congressional Directed Transfers • Reprogrammings • SBIR/STTR Transfer • Program Adjustments • Rate/Misc Adjustments • Congressional General Reductions Adjustments • Congressional Add Adjustments R-1 Program Element (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft (MMA) (P-8A) FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total 421.102 391.364 -29.738 - - - - - - -12.390 - - -32.348 317.358 272.352 -45.006 -0.006 -50.000 - 5.000 - - - - - - 356.817 308.037 -48.780 - - - 356.817 308.037 -48.780 66.438 -115.218 - - - - 66.438 -115.218 - 15.000 - - - - Congressional Add Details ($ in Millions, and Includes General Reductions) Project: 9999: Congressional Adds FY 2013 Congressional Add: Small Business Technology Insertion FY 2014 13.489 - - 5.000 Congressional Add Subtotals for Project: 9999 13.489 5.000 Congressional Add Totals for all Projects 13.489 5.000 Congressional Add: P-8A Sensor Development - Cong Change Summary Explanation Technical: Not applicable. Schedule: Project 2696: Initial Operational Test & Evaluation was completed on 25 March 2013. At a 26 June 2013 DAB, the program received approval to change the program strategy to include an LRIP Lot 4 in FY13 and to defer the Full Rate Production (FRP) DAB until FY14. LRIP Lot 4 contract was awarded in July 2013. Initial Operational Capability (IOC) was achieved in November 2013 and the FRP decision was approved on January 3, 2014. IT&E extended through 2Q FY18. FOT&E 3 (VCD) start moved from 2Q FY18 to 4Q FY16 and end date moved from 3Q FY18 to 1Q FY17. FRP Contract Award moved from 4Q FY13 to 2Q FY14. LRIP task end date moved from 3Q FY15 to 3Q FY16. PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 3 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Navy Appropriation/Budget Activity 1319: Research, Development, Test & Evaluation, Navy / BA 5: System Development & Demonstration (SDD) R-1 Program Element (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft (MMA) (P-8A) Project 3181: Technology Development (TD)/Risk Reduction Phase extended to 4Q FY13, OT&E (EOC) shifted from 4Q FY13 start to 3Q FY14 start to correct software deficiencies. Retrofit Kits (ECP1) moved from 1Q FY14 to 3Q FY14. Kit Delivery start date moved from 3Q FY14 to 2Q FY15 and end date moved from 4Q FY17 to 1Q FY18. Project 3218: Scheduling adjustments reflect signed Acquisition Strategy and current funding profile. The Acquisition Strategy signed by OSD on 18 October 2013, authorizes execution of Pre-EMD activities leading up to a MS B, eliminating MS A. Based on current program profile: MS B moved from 3Q FY16 to 2Q FY17. MS C changed from 2Q FY18 to 2Q FY19. Prototyping task end date extended from 2Q FY16 to 2Q FY17. EMD start date moved from 3Q FY16 to 2Q FY17 and end date moved from 1Q FY18 to 2Q FY19. Preliminary Design Review changed from 1Q FY16 to 4Q FY 16, Critical Design Review changed from 1Q FY17 to 2Q FY18. Lab Testing start date moved from 2Q FY15 to 1Q FY16, and the end date moved from 1Q FY17 to 4Q FY18. IT start date moved from 2Q FY17 to 1Q FY18. To add further fidelity to the schedule the following changes were made: Tech Dev / Risk Reduction task became separate lines named H/W Dev and Risk Reduction with the end date extended from 3Q FY16 to 2Q FY17. Tech Dev/Risk Reduction contract award became separate actions named H/W Dev ABA and Risk Reduction with the award shifting from 2QFY14 to 3Q FY14 for Risk Reduction and 4Q FY14 for ABA; Engineering and Manufacturing Development (EMD) Contract Award was separated to become EMD ABA and EMD Platform Integration and moved from 3Q FY16 to 2Q F17; and added Capability Development & Integration task. PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 4 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-2A, RDT&E Project Justification: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 COST ($ in Millions) 2696: Multi-Mission Maritime Aircraft Quantity of RDT&E Articles # R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 2696 / Multi-Mission Maritime Aircraft (MMA) (P-8A) Prior Years FY 2013 FY 2014 FY 2015 # OCO FY 2015 Base FY 2015 Total FY 2016 FY 2017 FY 2018 Cost To FY 2019 Complete 7,154.707 306.383 185.211 150.550 - 150.550 115.768 39.386 18.120 - 0.000 - - - - - - - - - - Total Cost 7,970.125 The FY 2015 OCO Request will be submitted at a later date. A. Mission Description and Budget Item Justification The P-8A Multi-mission Maritime Aircraft (MMA) will replace the aging P-3 aircraft. The P-8A program was initiated in response to the Joint Requirements Oversight Council (JROC) validated Mission Needs Statement (MNS), "Broad Area Maritime and Littoral Armed Intelligence, Surveillance and Reconnaissance" and the requirements for the program are defined in the P-8A Capability Production Document (CPD) #791-88-09, validated and approved on 22 June 2009. A successful Critical Design Review was completed in June 2007. In August 2007 the Design Readiness Review was conducted and resulted in approval to obligate funding for the fabrication of the Stage II flight test aircraft. The first flight of P-8A occurred on 25 Apr 2009. Milestone (MS) C was successfully completed on 11 August 2010. The program completed Initial Operational Test and Evaluation (IOT&E) in March 2013 and achieved Initial Operational Capability (IOC) in November 2013. The Acquisition Decision Memorandum for the Full Rate Production review was approved on January 3, 2014. The primary objectives of System Development and Demonstration (SDD) are to: perform the system detailed design, develop and produce Systems Integration Labs, develop and build ground and flight test articles, conduct ground and flight tests and prepare for milestones. Ground testing includes the conduct of static testing, fatigue testing and Live Fire Test and Evaluation. Six flight test aircraft have been built during SDD. These test aircraft are grouped into two stages based on which phase of the test program the aircraft will support. SDD Stage I flight test aircraft (FY06/Qty-3) support Integrated Test and Evaluation (IT&E). SDD Stage II flight test aircraft (FY09/Qty-3) support the completion of IT&E and Initial Operational Test and Evaluation (IOT&E) after being updated to the production configuration. The SDD contract includes the development and initial builds of training devices to support IOT&E. The scope of SDD includes activities necessary to facilitate an efficient transition of the fleet to achieve the P-8A Initial Operational Capability of Increment 1 in CY13. The scope of SDD also includes the engineering and verification of correction of deficiencies identified in testing and Fleet operational use. P-8A entered Production and Deployment phase in the 4th quarter of FY10 after completing MS-C Defense Acquisition Board. B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) Title: Continue System Development & Demonstration Articles: FY 2013 Accomplishments: SDD phase. Scope of effort included: design and test P-8A SIL, ground and flight test articles (SDD Stage I, FY06, Qty-3; SDD Stage II, FY09, Qty-3), other test articles, associated Tactical Operations Center (TOC) systems, and training devices to support continuation of engineering for correction of deficiencies, completion of Initial Operational Test & Evaluation (IOT&E) and start of Follow-on Operational Test & Evaluation/Verification Corrected Deficiencies (FOT&E/VCD) and verification of correction of PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 5 of 32 R-1 Line #142 FY 2013 258.855 - FY 2014 161.874 - FY 2015 129.318 - UNCLASSIFIED Date: March 2014 Exhibit R-2A, RDT&E Project Justification: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 2696 / Multi-Mission Maritime Aircraft (MMA) (P-8A) B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) deficiencies. Conducted periodic cost and schedule performance reviews associated with Earned Value Management (EVM) and prepared and conducted technical, test and logistic reviews. FY 2013 FY 2014 FY 2015 FY 2014 Plans: SDD phase. Scope of effort includes: ground and flight test articles (SDD Stage I, FY06, Qty-3; SDD Stage II, FY09, Qty-3), other test articles, associated TOC Systems, and training devices to support continuation of engineering for correction of deficiencies and FOT&E/VCD and verification of correction of deficiencies. Conduct the periodic cost and schedule performance reviews associated with EVM and prepare and conduct technical, test and logistic reviews. FY 2015 Plans: SDD phase. Scope of effort includes: engineering for identified deficiencies, support and update to ground and flight test articles (Stage I and II), conduct of fatigue testing, updates and test of TOC Systems and training systems, conduct of Integrated Test and Evaluation (IT&E) and FOT&E/VCD. Conduct of periodic cost and schedule performance reviews associated with EVM and preparation and conduct of technical, test and logistic reviews. Title: Continue Engineering and Technical Development and Test for Sys Dev & Demonstration contracts Articles: FY 2013 Accomplishments: Continued analysis of contracted deliverables; directed technical and logistic support of system development and delivery; assessment of contractors readiness to proceed in design/development; evaluated contract cost, schedule, and performance; test preparations, provided necessary government furnished equipment and test articles, risk assessment/mitigation; program control; performance status; and planned and prepared for future Milestone/Decision Reviews and developed associated documentation. Modeling & Simulation tools developed to assess proposed risk mitigations. Conducted and supported IT&E, IOT&E, Live Fire Test & Evaluation (LFT&E) and Follow-On Test & Evaluation/Verification Corrected Deficiencies (FOT&E/VCD). FY 2014 Plans: Continue analysis of contracted deliverables; direct technical and logistic support of system development test aircraft; engineering for correction of deficiencies; verification of correction of deficiencies; evaluate contract cost, schedule, and performance; test preparations, provide necessary government furnished equipment and test articles, risk assessment/mitigation; program control; and performance status. Conduct and support IT&E and FOT&E/VCD FY 2015 Plans: Continue analysis of contracted deliverables; direct technical and logistic support of system development test aircraft; engineering for correction of deficiencies; verification of correction of deficiencies; evaluate contract cost, schedule, and performance; test PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 6 of 32 R-1 Line #142 47.528 - 23.337 - 21.232 - UNCLASSIFIED Date: March 2014 Exhibit R-2A, RDT&E Project Justification: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 2696 / Multi-Mission Maritime Aircraft (MMA) (P-8A) B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) preparations, provide necessary government furnished equipment and test articles, risk assessment/mitigation; program control; and performance status. Conduct and support IT&E and FOT&E/VCD. Accomplishments/Planned Programs Subtotals C. Other Program Funding Summary ($ in Millions) Line Item • APN1/0193: P-8A MMA • APN6/0605: P-8A Initial Spares • MILCON: P-8A MILCON Remarks FY 2015 FY 2013 FY 2014 Base 2,585.181 3,359.525 2,051.784 151.170 21.858 0.204 - 105.919 27.826 FY 2013 306.383 FY 2014 185.211 FY 2015 150.550 FY 2015 FY 2015 Cost To OCO Total FY 2016 FY 2017 FY 2018 FY 2019 Complete Total Cost - 2,051.784 3,205.188 2,587.718 2,597.225 1,713.216 57.075 24,002.463 - 0.204 9.802 16.206 16.504 - - 471.554 - 27.826 126.694 - - - - 367.873 D. Acquisition Strategy The MMA Milestone 0 was approved 22 March 2000 and the resulting Acquisition Decision Memorandum directed P-8A to begin the Concept Exploration phase consisting of an Analysis of Alternatives and industry concept studies. These activities began 3Q/01 and were funded under Program Element 0702207N Project Unit W2737. Approval to enter Component Advance Development (CAD) was attained from the Overarching Integrated Product Team on 18 Jan 2002 and the Milestone Decision Authority Under Secretary of Defense for Acquisition, Technology, & Logistics approved the program Acquisition Strategy on 8 Feb 2002. The CAD was a competitive award to multiple contractors to define alternative MMA concept system architectures and evaluate associated risks and proposed mitigations. Selection of MMA concept and approval to enter SDD phase occurred at MS B decision review on 28 May 2004. The contract was awarded to Boeing on 14 June 2004. The SDD phase is being used to design, develop and test the P-8A system. The P-8A program was initiated in response to the Joint Requirements Oversight Council validated Mission Needs Statement, "Broad Area Maritime and Littoral Armed Intelligence, Surveillance and Reconnaissance" and the requirements for the program are defined in the Capability Production Document. MS C was successfully completed on 11 August 2010 approving entry into the Production and Deployment Phase. P-8A Initial Operational Capability achieved in November 2013. E. Performance Metrics Completed Initial Operational Test & Evaluation 2nd quarter 2013 PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 7 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-3, RDT&E Project Cost Analysis: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 2696 / Multi-Mission Maritime Aircraft (MMA) (P-8A) Product Development ($ in Millions) FY 2013 FY 2014 Cost Category Item Contract Method & Type Performing Activity & Location Prior Years Award Fee for Primary HW C/CPAF Boeing : Seattle, WA 195.505 10.826 Jun 2013 Primary HW Dev - Boeing C/CPAF Boeing : Seattle, WA 6,384.241 245.442 Oct 2012 Award Date Cost Award Date Cost FY 2015 Base Award Date Cost - FY 2015 OCO Cost - 157.180 Oct 2013 Award Date 124.868 Oct 2014 FY 2015 Total Cost To Complete Cost - - 124.868 - - - 42.326 - - 4.450 9.197 83.502 - - 71.469 - 139.422 7,445.584 - WR SPAWAR : San Diego, CA 41.245 1.081 Nov 2012 Sys Eng (gov) WR NAWC AD : Pax River, MD 63.655 1.506 Nov 2012 Various Various : Various 71.469 - - - - - Subtotal 6,756.115 258.855 161.874 129.318 - 129.318 Prior year Prod Dev cost no longer funded in the FYDP - - 4.694 Nov 2013 4.450 Nov 2014 206.331 Target Value of Contract - Primary HW Dev SPAWAR - Total Cost 206.331 130.225 7,041.956 7,041.956 Remarks Due to sequestration and other budget uncertainties, program office slowed work and subsequently received an underexecution mark in FY15. This underexecution mark is not apparent due to the increase received for correction of deficiencies. The total award fee issued to date was 2.4% of the total budget. No award fee is planned for FY 2014 based on current contract. Support ($ in Millions) Cost Category Item FY 2013 Contract Method & Type Performing Activity & Location Prior Years FY 2014 Award Date Cost Award Date Cost Int. Log Gov WR NAWC AD : Pax River, MD Int. Log Gov WR NAWC TSD : Orlando, FL 15.030 0.709 Nov 2012 Tech Dev Gov WR NAWC AD : Pax River, MD 69.835 1.004 Nov 2012 Various Various : Various 16.082 - - 142.771 3.251 2.335 Prior year Support cost no longer funded in the FYDP Subtotal 41.824 1.538 Nov 2012 PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy 1.335 Nov 2013 - 1.000 Nov 2013 UNCLASSIFIED Page 8 of 32 FY 2015 Base FY 2015 OCO Award Date Cost Award Date Cost FY 2015 Total Cost To Complete Cost Total Cost Target Value of Contract 0.643 Nov 2014 - 0.643 1.170 46.510 - 0.135 Nov 2014 - 0.135 - 15.874 - 1.584 Nov 2014 - 1.584 1.298 74.721 - - - - - 16.082 - 2.362 - 2.362 2.468 153.187 - R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-3, RDT&E Project Cost Analysis: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 2696 / Multi-Mission Maritime Aircraft (MMA) (P-8A) Test and Evaluation ($ in Millions) Cost Category Item Contract Method & Type FY 2013 Performing Activity & Location Prior Years FY 2014 Award Date Cost Award Date Cost FY 2015 Base FY 2015 OCO Award Date Cost Award Date Cost FY 2015 Total Cost To Complete Cost Total Cost Target Value of Contract Dev T&E - Gov WR NAWC AD : Pax River, MD GFE & GFI WR NAWC AD : Pax River, MD 56.093 16.023 Nov 2012 4.933 Nov 2013 LFT&E - Gov WR NAWC WD : China Lake 25.971 2.946 Nov 2012 0.111 Nov 2013 Oper Test & Eval WR NAWC AD : Pax River, MD 2.286 6.680 Nov 2012 3.000 Nov 2013 Various Various : Various 10.487 - - - - - - 10.487 - 164.070 36.231 15.294 14.261 - 14.261 26.249 256.105 - Prior year T&E cost no longer funded in the FYDP Subtotal 69.233 10.582 Nov 2012 7.250 Nov 2013 7.261 Nov 2014 - 7.261 11.757 106.083 - 4.000 Nov 2014 - 4.000 10.592 91.641 - - - - 29.028 - - 3.000 3.900 18.866 - - 3.000 Nov 2014 Remarks Funding increased in FY15 for correction of deficiencies identified during IOT&E and FOT&E. Management Services ($ in Millions) Cost Category Item Contract Method & Type FY 2013 Performing Activity & Location Mgmt Suppt Serv (NONFFRDC) C/CPFF RBC INC : Alexandria, VA Eng Tech Serv (NONFFRDC) C/CPFF ASEC : Lexington Park MD Prior Years FY 2014 Award Date Cost Award Date Cost FY 2015 Base FY 2015 OCO Award Date Cost Award Date Cost FY 2015 Total Cost To Complete Cost Total Cost Target Value of Contract 24.213 2.901 Nov 2012 0.628 Nov 2013 0.622 Nov 2014 - 0.622 1.866 30.230 30.230 6.512 1.113 Nov 2012 0.404 Nov 2013 0.400 Nov 2014 - 0.400 1.200 9.629 9.629 WR NAWC AD : Pax River, MD 37.567 3.805 Nov 2012 4.551 Nov 2013 3.462 Nov 2014 - 3.462 1.821 51.206 - Travel Various NAWC AD : Pax River, MD 3.399 0.227 Oct 2012 0.125 Oct 2013 0.125 Nov 2014 - 0.125 0.248 4.124 - Prior year Mgmt cost no longer funded in the FYDP Various Various : Various 20.060 - - - - - - 20.060 - 91.751 8.046 5.708 4.609 - 4.609 5.135 115.249 - Program Mgmt Support Subtotal PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 9 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-3, RDT&E Project Cost Analysis: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 2696 / Multi-Mission Maritime Aircraft (MMA) (P-8A) Prior Years Project Cost Totals 7,154.707 FY 2013 306.383 FY 2014 185.211 FY 2015 Base 150.550 FY 2015 OCO - Remarks PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 10 of 32 R-1 Line #142 FY 2015 Cost To Total Complete 150.550 Total Cost 173.274 7,970.125 Target Value of Contract - UNCLASSIFIED Date: March 2014 Exhibit R-4, RDT&E Schedule Profile: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 2696 / Multi-Mission Maritime Aircraft (MMA) (P-8A) UNCLASSIFIED Page 11 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-4, RDT&E Schedule Profile: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 2696 / Multi-Mission Maritime Aircraft (MMA) (P-8A) UNCLASSIFIED Page 12 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-4A, RDT&E Schedule Details: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 2696 / Multi-Mission Maritime Aircraft (MMA) (P-8A) Schedule Details Start Events by Sub Project Multi-Mission Maritime Aircraft End Quarter Year Quarter Year Acquisition Milestones: Milestones: Full Rate Production (FRP) Decision 1 2014 1 2014 Acquisition Milestones: Milestones: Initial Operating Capability (IOC) 1 2014 1 2014 Systems Development: Hardware/Software Development: System Development & Demonstration (SDD) 1 2013 3 2013 Systems Development: Hardware/Software Development: Production and Deployment 1 2013 4 2018 Systems Development: Hardware/Software Development: Correction of Deficiencies Engineering 1 2013 4 2018 Test & Evaluation: Technical Evaluation: Integrated Test & Evaluation (Flight Test) 1 2013 2 2018 Test & Evaluation: Operational Evaluation: Initial Operational Test and Evaluation (IOT&E) 1 2013 2 2013 Test & Evaluation: Operational Evaluation: Fatigue Testing 1 2013 4 2018 Test & Evaluation: Operational Evaluation: Follow-on Test & Evaluation 1 (Defferals & High Priority Correction of Deficiencies) 3 2013 1 2014 Test & Evaluation: Operational Evaluation: Follow-on Test & Evaluation 2 (Verification of Correction of Deficiencies) 2 2015 3 2015 Test & Evaluation: Operational Evaluation: Follow-on Test & Evaluation 3 (Verification of Correction of Deficiencies) 4 2016 1 2017 Production Milestones: Low Rate Initial Production (LRIP) 1 2013 3 2016 Production Milestones: Full Rate Production (FRP) 3 2014 4 2019 Production Milestones: Contract Awards: LRIP Lot #4 (APN) 4 2013 4 2013 Production Milestones: Contract Awards: FRP Contract Award 2 2014 2 2014 Deliveries: LRIP 1: LRIP Aircraft (APN) Q1 2013 1 2013 1 2013 Deliveries: LRIP 1: LRIP Aircraft (APN) Q2 2013 2 2013 2 2013 PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 13 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-4A, RDT&E Schedule Details: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 2696 / Multi-Mission Maritime Aircraft (MMA) (P-8A) Start Events by Sub Project Deliveries: LRIP 2: LRIP Aircraft (APN) Q2 2013 End Quarter 2 Year 2013 Quarter 2 Year 2013 Deliveries: LRIP 2: LRIP Aircraft (APN) Q3 2013 3 2013 3 2013 Deliveries: LRIP 2: LRIP Aircraft (APN) Q4 2013 4 2013 4 2013 Deliveries: LRIP 2: LRIP Aircraft (APN) Q1 2014 1 2014 1 2014 Deliveries: LRIP 3: LRIP Aircraft (APN) Q3 2014 3 2014 3 2014 Deliveries: LRIP 3: LRIP Aircraft (APN) Q4 2014 4 2014 4 2014 Deliveries: LRIP 3: LRIP Aircraft (APN) Q1 2015 1 2015 1 2015 Deliveries: LRIP 3: LRIP Aircraft (APN) Q2 2015 2 2015 2 2015 Deliveries: LRIP 3: LRIP Aircraft (APN) Q3 2015 3 2015 3 2015 Deliveries: LRIP 4: LRIP Aircraft (APN) Q3 2015 3 2015 3 2015 Deliveries: LRIP 4: LRIP Aircraft (APN) Q4 2015 4 2015 4 2015 Deliveries: LRIP 4: LRIP Aircraft (APN) Q1 2016 1 2016 1 2016 Deliveries: LRIP 4: LRIP Aircraft (APN) Q2 2016 2 2016 2 2016 Deliveries: LRIP 4: LRIP Aircraft (APN) Q3 2016 3 2016 3 2016 Deliveries: FRP 1: FRP Aircraft (APN) Q3 2016 3 2016 3 2016 Deliveries: FRP 1: FRP Aircraft (APN) Q4 2016 4 2016 4 2016 Deliveries: FRP 1: FRP Aircraft (APN) Q1 2017 1 2017 1 2017 Deliveries: FRP 1: FRP Aircraft (APN) Q2 2017 2 2017 2 2017 Deliveries: FRP 1: FRP Aircraft (APN) Q3 2017 3 2017 3 2017 Deliveries: FRP 2: FRP Aircraft (APN) Q3 2017 3 2017 3 2017 Deliveries: FRP 2: FRP Aircraft (APN) Q4 2017 4 2017 4 2017 Deliveries: FRP 2: FRP Aircraft (APN) Q1 2018 1 2018 1 2018 Deliveries: FRP 2: FRP Aircraft (APN) Q2 2018 2 2018 2 2018 Deliveries: FRP 2: FRP Aircraft (APN) Q3 2018 3 2018 3 2018 Deliveries: FRP 3: FRP Aircraft (APN) Q3 2018 3 2018 3 2018 PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 14 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-4A, RDT&E Schedule Details: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 2696 / Multi-Mission Maritime Aircraft (MMA) (P-8A) Start Events by Sub Project Deliveries: FRP 3: FRP Aircraft (APN) Q4 2018 End Quarter 4 Year 2018 Quarter 4 Year 2018 Deliveries: FRP 3: FRP Aircraft (APN) Q1 2019 1 2019 1 2019 Deliveries: FRP 3: FRP Aircraft (APN) Q2 2019 2 2019 2 2019 Deliveries: FRP 3: FRP Aircraft (APN) Q3 2019 3 2019 3 2019 Deliveries: FRP 4: FRP Aircraft (APN) Q3 2019 3 2019 3 2019 Deliveries: FRP 4: FRP Aircraft (APN) Q4 2019 4 2019 4 2019 PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 15 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-2A, RDT&E Project Justification: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 COST ($ in Millions) R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 3181 / P-8A Spiral One Development (MMA) (P-8A) Prior Years FY 2013 FY 2014 FY 2015 # OCO FY 2015 Base FY 2015 Total FY 2016 FY 2017 FY 2018 Cost To FY 2019 Complete 3181: P-8A Spiral One Development 61.934 52.280 54.144 68.458 - 68.458 20.385 - - - Quantity of RDT&E Articles 0.000 - - - - - - - - - # - Total Cost 257.201 The FY 2015 OCO Request will be submitted at a later date. A. Mission Description and Budget Item Justification The P-8A Multi-mission Maritime Aircraft (MMA) program is based on an evolutionary acquisition strategy consisting of sequential incremental enhancements to system capabilities that will retain cost-wise effectiveness for winning major combat operations beyond 2020. In order to pace the threat, Spiral One (Increment 2), the Next Phase of Capabilities (NPC-1), will incorporate the following capabilities into the P-8A: Multi-Static Active Coherent (MAC), Automatic Identification System (AIS), Rapid Capabilities Insertion (RCI), updates to the Tactical Operations Center (TOC), as well as additional Anti-Submarine Warfare (ASW), Anti-Surface Warfare (ASuW) and Intelligence Surveillance and Reconnaissance (ISR) capabilities. Spiral One (Increment 2) will be executed as an Engineering Change Proposal (ECP) to the baseline program. B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) Title: Perform technology demonstrations and analyses of proposed new capabilities Articles: FY 2013 36.683 - FY 2014 38.712 - FY 2015 45.316 - 15.597 - 15.432 - 23.142 - FY 2013 Accomplishments: Continued development of integration design of new P-8A capabilities. Conducted ECP2 design review. Conducted laboratory and preliminary development testing. Awarded primary Integration/Engineering & Manufacturing Development (EMD) contract for comprehensive design, installation, test and initial fielding of all Spiral One (Increment 2) capabilities. FY 2014 Plans: Continue development of integration design of new P-8A capabilities. Achieve MAC Early Operational Capability. Conduct laboratory and development testing. Incrementally fund primary Integration/EMD contract for comprehensive design, installation, test and initial fielding of all Spiral One (Increment 2) capabilities such as MAC, AIS, and RCI. Maintain integration alignment with external development programs. FY 2015 Plans: Continue development of integration design of new P-8A capabilities. Conduct laboratory and development testing. Incrementally fund primary Integration/EMD contract for comprehensive design, installation, test and initial fielding of all Spiral One (Increment 2) capabilities such as MAC, AIS, and RCI. Maintain integration alignment with external development programs. Title: Conduct technical, cost, risk and logistics analysis of proposed technologies PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 16 of 32 Articles: R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-2A, RDT&E Project Justification: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 3181 / P-8A Spiral One Development (MMA) (P-8A) B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 2013 FY 2014 FY 2015 FY 2013 Accomplishments: Conducted technical, cost, risk and logistics analysis of proposed technologies. Provided technical and management support for the development of acquisition documentation. Provided engineering and management of technical development effort. Conducted flight testing of Spiral One (Increment 2) capabilities. Provided technical and management support for the development of training courseware. FY 2014 Plans: Conduct technical, cost, risk and logistics analysis of proposed technologies. Provide technical and management support for the development of acquisition documentation. Provide engineering and management of technical development effort. Conduct flight testing of Spiral One (Increment 2) capabilities. Provide technical and management support for the development of training courseware. FY 2015 Plans: Conduct technical, cost, risk and logistics analysis of proposed technologies. Provide technical and management support for the development of acquisition documentation. Provide engineering and management of technical development effort. Conduct flight testing of Spiral One (Increment 2) capabilities. Provide technical and management support for the development of training courseware. Accomplishments/Planned Programs Subtotals C. Other Program Funding Summary ($ in Millions) Line Item • APN5/0586: P-8 Series Remarks FY 2013 4.895 FY 2014 9.485 FY 2015 Base 29.797 FY 2015 OCO - FY 2015 Total 29.797 FY 2016 30.042 FY 2017 20.372 FY 2018 21.532 52.280 54.144 68.458 Cost To FY 2019 Complete Total Cost 208.514 2,389.538 2,714.175 D. Acquisition Strategy The P-8A MMA program is based on an evolutionary acquisition strategy consisting of sequential incremental enhancements to system capabilities that will retain costwise effectiveness for winning major combat operations beyond 2020. As part of the P-8A evolutionary acquisition strategy, Spiral One (Increment 2) will incorporate the capabilities defined in the Capabilitiy Development Document approved by JROC on 25 June 2010. Next Phase of Capabilities (NPC-1) will incorporate the following capabilities into the P-8A: Multi-Static Active Coherent, Rapid Capabilities Insertion, updates to the Tactical Operations Center, as well as additional Anti-Submarine Warfare, Anti-Surface Warfare and Intelligence Surveillance and Reconnaissance capabilities. E. Performance Metrics Approval of Spiral One (Increment 2) Engineering Change Proposals (ECPs). PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 17 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-3, RDT&E Project Cost Analysis: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 3181 / P-8A Spiral One Development (MMA) (P-8A) Product Development ($ in Millions) Cost Category Item FY 2013 Contract Method & Type Performing Activity & Location C/CPFF Boeing : Seattle, WA Primary HW Dev Integration/EMD Sys Eng (gov) Prior year Prod Dev cost no longer funded in the FYDP Prior Years Prior year Support cost no longer funded in the FYDP Cost Award Date Cost Award Date Cost FY 2015 Total Cost To Complete Cost Total Cost Target Value of Contract 31.271 Nov 2012 33.443 Nov 2013 39.189 Nov 2014 - 39.189 13.502 117.405 117.405 5.412 Nov 2012 5.269 Nov 2013 6.127 Nov 2014 - 6.127 4.666 40.838 - NAWC AD : Pax River, MD 19.364 Various Various : Various 23.455 - - - - - - 23.455 - 42.819 36.683 38.712 45.316 - 45.316 18.168 181.698 - FY 2013 Contract Method & Type Performing Activity & Location Prior Years FY 2014 Award Date Cost Award Date Cost WR NAWC AD : Pax River, MD 2.192 Various Various : Various 0.742 - - 2.934 0.561 0.509 Subtotal Test and Evaluation ($ in Millions) Cost Category Item Cost Award Date FY 2015 OCO 0.000 Support ($ in Millions) Integrated Logistics Sup Award Date FY 2015 Base WR Subtotal Cost Category Item FY 2014 Contract Method & Type 0.561 Nov 2012 FY 2013 Performing Activity & Location Prior Years Cost Dev Test & Eval WR GFE/GFI/GFP WR NAWC AD : Pax River, MD 2.983 Oper Test & Eval WR NAWC AD : Pax River, MD 0.000 - 5.711 12.841 Subtotal FY 2014 Award Date NAWC AD : Pax River, MD 0.509 Nov 2013 Cost Award Date FY 2015 Base FY 2015 OCO Award Date Cost Award Date Cost 0.728 Nov 2014 FY 2015 Total Cost To Complete Cost Total Cost Target Value of Contract - 0.728 0.723 4.713 - - - - - 0.742 - 0.728 - 0.728 0.723 5.455 - FY 2015 Base Cost FY 2015 OCO Award Date Award Date Cost FY 2015 Total Cost Cost To Complete Total Cost Target Value of Contract 2.728 4.384 Nov 2012 7.561 Nov 2013 5.920 Nov 2014 - 5.920 - 20.593 - 8.457 Nov 2012 3.598 Nov 2013 6.400 Nov 2014 - 6.400 - 21.438 - 2.100 Nov 2013 8.405 Nov 2014 - 8.405 - 10.505 - - 20.725 - 52.536 - PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy 13.259 UNCLASSIFIED Page 18 of 32 20.725 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-3, RDT&E Project Cost Analysis: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 3181 / P-8A Spiral One Development (MMA) (P-8A) Management Services ($ in Millions) Cost Category Item Contract Method & Type FY 2013 Performing Activity & Location Prior Years Cost FY 2014 Award Date Cost Award Date Engineering Services C/CPFF ASEC : Lexington Park, MD Mgmt Suppt Serv (NONFFRDC) C/CPFF RBC INC : Alexandria, VA 5.592 0.539 Nov 2012 0.752 Nov 2013 Program Mgmt Support WR NAWC AD : Pax River, MD 3.424 1.498 Nov 2012 Travel WR NAWC AD : Pax River, MD 0.166 Subtotal 1.288 0.127 Nov 2012 0.200 Nov 2013 10.470 Prior Years Project Cost Totals 61.934 FY 2015 Base FY 2015 OCO Award Date Cost Award Date Cost Cost Total Cost Target Value of Contract - - 1.615 1.615 0.729 Nov 2014 - 0.729 0.728 8.340 8.340 0.662 Nov 2013 0.910 Nov 2014 - 0.910 0.716 7.210 - 0.031 Oct 2012 0.050 Oct 2013 0.050 Oct 2014 - 0.050 0.050 0.347 - 2.195 1.664 1.689 - 1.689 1.494 17.512 - FY 2013 FY 2014 54.144 FY 2015 Base 68.458 FY 2015 OCO - Remarks PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy Cost To Complete - 52.280 - FY 2015 Total UNCLASSIFIED Page 19 of 32 R-1 Line #142 FY 2015 Cost To Total Complete 68.458 20.385 Total Cost 257.201 Target Value of Contract - UNCLASSIFIED Date: March 2014 Exhibit R-4, RDT&E Schedule Profile: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 3181 / P-8A Spiral One Development (MMA) (P-8A) UNCLASSIFIED Page 20 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-4A, RDT&E Schedule Details: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 3181 / P-8A Spiral One Development (MMA) (P-8A) Schedule Details Start Events by Sub Project End Quarter Year Quarter Year Acquisition Milestones: Milestones: Early Operational Capability (EOC) 4 2014 4 2014 Acquisition Milestones: Milestones: Initial Operational Capability (IOC) 2 2016 2 2016 Systems Development: Acquisition Phases: Technology Development (TD)/Risk Reduction 1 2013 4 2013 Systems Development: Acquisition Phases: Integration/EMD 1 2013 2 2016 Test & Evaluation: Technical Evaluation: Developmental Testing (Integration Testing) 1 2013 2 2015 Test & Evaluation: Operational Evaluation: Operational Test & Evaluation (OT&E) (EOC) 3 2014 4 2014 Test & Evaluation: Operational Evaluation: Operational Test & Evaluation (OT&E) (IOC) 3 2015 4 2015 Production Milestones: Contract Awards: Contract Award Integration/ Engineering, Manufacturing, and Development (EMD) 1 2013 1 2013 Production Milestones: Contract Awards: Retrofit Kits (ECP1) 3 2014 3 2014 Production Milestones: Contract Awards: Retrofit Kits (ECP2) 2 2015 2 2015 Deliveries: Kit Deliveries (APN) 2 2015 1 2018 P-8A Spiral One Development PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 21 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-2A, RDT&E Project Justification: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 COST ($ in Millions) R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 3218 / P-8A Spiral 2 Development (MMA) (P-8A) Prior Years FY 2013 FY 2014 FY 2015 # OCO FY 2015 Base FY 2015 Total FY 2016 FY 2017 FY 2018 3218: P-8A Spiral 2 Development 6.029 19.212 27.997 89.029 - 89.029 120.018 186.373 181.223 Quantity of RDT&E Articles 0.000 - - - - - - - - # Cost To FY 2019 Complete Total Cost 184.115 Continuing Continuing - The FY 2015 OCO Request will be submitted at a later date. A. Mission Description and Budget Item Justification The P-8A Multi-mission Maritime Aircraft (MMA) program is based on an evolutionary acquisition strategy consisting of sequential increments that will retain cost-wise effectiveness for winning major combat operations beyond 2020. In order to pace the threat, Spiral 2 (Increment 3) will incorporate improvements in aircraft systems, such as Architecture Upgrades, Net-Ready Key Performance Parameters (KPP) implementation, integration of a network enabled Anti-Surface Warfare (ASuW) weapon, Survivability Upgrades, Precision Targeting improvements, and Rapid Capabilities Insertion (RCI), as well as additional Anti-Submarine Warfare (ASW), ASuW and Intelligence Surveillance and Reconnaissance (ISR) capabilities. These capabilities and other emergent capability requirements will be investigated during the Pre-Engineering Manufacturing Development phase of Spiral 2 (Increment 3) for the P-8A and Tactical Operations Center (TOC)(ground support facility). Acquisition Decision Memorandum, dated 18 October 2013, approved Pre-Engineering Development activities leading up to MS-B. B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) Title: Perform technology demonstrations and analyses of proposed new capabilities Articles: FY 2013 Accomplishments: Initiated design for integrating new capabilities into P-8A TOC. Completed engineering studies and prepared Spiral 2 (Increment 3) technology development system specifications. Continued government led competitive prototyping efforts. FY 2014 Plans: Continue government led competitive prototyping efforts for Spiral 2 (Increment 3) Architecture. Award development contracts for Spiral 2 (Increment 3) Architecture and other Spiral 2 (Increment 3) capabilities such as Multi-Static Active Coherent (MAC) Enhancement development. Begin Risk Reduction Interface for architecture to include development of system interfaces. Continue P-8A TOC design and integration efforts. FY 2015 Plans: Increase government led Lead System Integrator (LSI) Spiral 2 (Increment 3) architecture prototyping, capability application prototyping, and integration analysis efforts. Ramp up initial Spiral 2 (Increment 3) execution of Applications Based Architecture competitive software development contracts. Continue execution of Spiral 2 (Increment 3) Risk Reduction Interface contracting efforts. Initiate execution of Risk Reduction Capabilities Analysis contract effort to identify capability Size Weight Power PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 22 of 32 R-1 Line #142 FY 2013 15.331 - FY 2014 22.991 - FY 2015 80.084 - UNCLASSIFIED Date: March 2014 Exhibit R-2A, RDT&E Project Justification: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 3218 / P-8A Spiral 2 Development (MMA) (P-8A) B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) and Cooling (SWAP-C) efficiencies. Continued ramp up of Capability Development and Integration efforts to include MAC Enhancements, Net Enabled Weapon, and Sensor Upgrades. Continue P-8A TOC design and integration efforts. Title: Conduct technical, cost, risk and logistics analysis of proposed technologies FY 2013 Articles: FY 2014 FY 2015 3.881 - 5.006 - 8.945 - 19.212 27.997 89.029 FY 2013 Accomplishments: Conducted technical, cost, risk and logistics analysis of proposed technologies. Evaluated system requirements through cost/ performance trade-off analysis. Provided technical and management support for the development of acquisition documentation. Provided engineering and management of technical development effort. FY 2014 Plans: Conduct technical, cost, risk and logistics analysis of proposed technologies. Evaluate system requirements through cost/ performance trade-off analysis. Provide technical and management support for the development of acquisition documentation. Provide engineering and management of technical development effort. Continue government prototyping. FY 2015 Plans: Conduct technical, cost, risk and logistics analysis of proposed technologies. Evaluate system requirements through cost/ performance trade-off analysis. Provide technical and management support for the development of acquisition documentation. Provide engineering and management of technical development effort. Increase in government led prototyping. Accomplishments/Planned Programs Subtotals C. Other Program Funding Summary ($ in Millions) Line Item • APN5/0586: P-8 Series Remarks FY 2013 4.895 FY 2014 9.485 FY 2015 Base 29.797 FY 2015 OCO - FY 2015 Total 29.797 FY 2016 30.042 FY 2017 20.372 FY 2018 21.532 Cost To FY 2019 Complete Total Cost 208.514 2,389.538 2,714.175 D. Acquisition Strategy The P-8A MMA program is based on an evolutionary acquisition strategy consisting of sequential increments that will retain cost-wise effectiveness for winning major combat operations beyond 2020. As part of the P-8A evolutionary acquisition strategy, Spiral 2 (Increment 3) will incorporate the capabilities defined in the Capability Development Document approved by JROC on 25 June 2010. In order to pace the threat, Spiral 2 (Increment 3) will incorporate improvements in aircraft systems such as Architecture Upgrades, Net-Ready Key Performance Parameters (KPP) implementation, integration of a network enabled Anti-Surface Warfare (ASuW) weapon, Survivability Upgrades, Precision Targeting improvements, and Rapid Capabilities Insertion Capabilities, as well as additional Anti-Submarine Warfare, ASuW and Intelligence Surveillance and Reconnaissance capabilities. The scope of this effort includes the integration design and test of capability enhancements to the P-8A. PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 23 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-2A, RDT&E Project Justification: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 3218 / P-8A Spiral 2 Development (MMA) (P-8A) Fleet introduction is planned to be accomplished, based on the scope of change, in FY21. These capabilities and other emergent capability requirements will be investigated during the Pre-Engineering Manufacturing Development phase of Spiral 2 (Increment 3) for the P-8A and Tactical Operation Center (ground support facility). E. Performance Metrics The Acquisition Strategy signed by OSD on 18 October 2013, authorizes execution of Pre-EMD activities leading up to a MS B, eliminating MS A; Milestone B to be completed 2nd quarter 2017. PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 24 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-3, RDT&E Project Cost Analysis: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 3218 / P-8A Spiral 2 Development (MMA) (P-8A) Product Development ($ in Millions) Cost Category Item Primary HW Dev Engineering Studies Contract Method & Type FY 2013 Performing Activity & Location Prior Years FY 2014 Award Date Cost 2.665 Nov 2012 Award Date Cost C/FP Various : Various 1.000 Primary Hdw Dev - R/R (Interface) C/CPIF Boeing : Seattle 0.000 - Primary HW Dev - R/R (Capability Analysis) C/CPIF Boeing : Seattle 0.000 - Primary HW Dev - ABA (Vendor A) C/CPIF TBD : TBD 0.000 - Primary HW Dev - ABA (Vendor B) C/CPIF TBD : TBD 0.000 - Primary HW Dev - EMD ABA TBD TBD : TBD 0.000 - - Primary HW Dev - EMD Platform Integration TBD TBD : TBD 0.000 - - - Primary HW Dev Prototyping Various Various : Various 0.000 Primary HW Dev - MAC Enhancements Various Various : Various 0.000 RCI2 - ECP3 C/CPIF Boeing : Seattle 0.000 - Capability Development & Integration Various Various : Various 0.000 - WR NAWC AD : Pax River, MD 2.227 Sys Eng (gov) Subtotal 3.227 Award Date Cost Award Date Cost - FY 2015 Total Cost Total Cost Target Value of Contract - 3.665 3.665 5.532 Nov 2014 - 5.532 5.803 14.679 14.679 5.599 Nov 2014 - 5.599 9.257 14.856 14.856 0.625 Aug 2014 11.834 Nov 2014 - 11.834 13.184 25.643 25.643 0.625 Aug 2014 11.834 Nov 2014 - 11.834 13.184 25.643 25.643 - - - 85.864 85.864 85.864 - - - 95.864 95.864 95.864 2.642 Nov 2013 2.642 Nov 2014 - 2.642 3.519 8.803 - 7.000 Nov 2013 11.000 Nov 2014 - 11.000 70.589 93.312 - 7.716 Nov 2014 - 7.716 39.317 47.033 - 1.110 Nov 2013 11.505 Nov 2014 - 11.505 271.799 284.414 - 7.645 Nov 2013 12.422 Nov 2014 - 12.422 75.612 105.849 - 80.084 - 80.084 683.992 805.625 - - 22.991 Remarks Scheduling adjustments reflect signed Acquisition Strategy and current funding profile. $33M reduction in FY15 due to underexecution of FY13 funding. To provide further clarification of Product Development activities, a decomposition of specific contracting actions has been provided. PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy Cost To Complete - - 7.943 Nov 2012 FY 2015 OCO - 3.344 May 2014 4.723 Jun 2013 15.331 - FY 2015 Base UNCLASSIFIED Page 25 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-3, RDT&E Project Cost Analysis: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 3218 / P-8A Spiral 2 Development (MMA) (P-8A) Support ($ in Millions) Cost Category Item Integrated Logistics Sup Studies & Analysis FY 2013 Contract Method & Type WR C/CPFF Performing Activity & Location Prior Years Cost Award Date Cost FY 2015 OCO Award Date Cost Award Date Cost FY 2015 Total Cost To Complete Cost Total Cost Target Value of Contract 0.504 0.243 Nov 2012 0.489 Nov 2013 0.757 Nov 2014 - 0.757 5.175 7.168 - JHU : Pax River, MD 0.644 0.373 Dec 2012 0.413 Dec 2013 0.762 Nov 2014 - 0.762 1.642 3.834 3.834 1.148 0.616 0.902 1.519 - 1.519 6.817 11.002 - Test and Evaluation ($ in Millions) Cost Category Item Award Date FY 2015 Base NAWC AD : Pax River, MD Subtotal Contract Method & Type FY 2014 FY 2013 Performing Activity & Location Prior Years FY 2014 Award Date Cost Award Date Cost FY 2015 Base FY 2015 OCO Award Date Cost Award Date Cost FY 2015 Total Cost To Complete Cost Total Cost Target Value of Contract Dev Test & Eval WR NAWC AD : Pax River, MD GFE/GFI/GFP WR NAWC AD : Pax River, MD 0.000 - - - - - 22.622 22.622 - Oper Test & Eval WR NAWC AD : Pax River, MD 0.000 - - - - - 62.332 62.332 - Test Assets WR NAWC AD : Pax River, MD 0.000 - - - - - 32.832 32.832 - 0.000 0.328 0.370 2.295 - 2.295 - - - Subtotal 0.000 Management Services ($ in Millions) Cost Category Item Contract Method & Type Performing Activity & Location 0.328 Nov 2012 FY 2013 Prior Years FY 2014 Award Date Cost 0.370 Nov 2013 Cost Award Date 2.295 Nov 2014 FY 2015 Base Cost - 2.295 Continuing Continuing Continuing FY 2015 OCO Award Date Award Date Cost FY 2015 Total Cost Cost To Complete Total Cost Target Value of Contract Eng Tech Serv (NONFFRDC) C/CPFF Various : Various 0.204 1.031 Nov 2012 1.181 Nov 2013 1.868 Nov 2014 - 1.868 4.387 8.671 8.671 Mgmt Suppt Serv (NONFFRDC) C/CPFF RBC : Alexandria, VA 1.102 0.959 Nov 2012 1.163 Nov 2013 1.824 Nov 2014 - 1.824 11.511 16.559 16.559 Program Mgmt Support WR NAWC AD : Pax River, MD 0.348 0.947 Nov 2012 1.290 Nov 2013 1.339 Nov 2014 - 1.339 7.783 11.707 - Travel WR NAWC AD : Pax River, MD 0.000 0.100 Oct 2013 0.100 Oct 2014 - 0.100 0.600 0.800 - PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy - UNCLASSIFIED Page 26 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-3, RDT&E Project Cost Analysis: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 3218 / P-8A Spiral 2 Development (MMA) (P-8A) Management Services ($ in Millions) Cost Category Item Contract Method & Type FY 2013 Performing Activity & Location Subtotal Prior Years 1.654 Cost FY 2014 Award Date 2.937 Cost Award Date 3.734 FY 2015 Base Cost Award Date 5.131 FY 2015 OCO Award Date Cost - FY 2015 Total Cost 5.131 Cost To Complete 24.281 Total Cost 37.737 Target Value of Contract - Remarks Continued engineering and management support reflected in FY15 profile are necessary to mature prototyping efforts. Prior Years Project Cost Totals 6.029 FY 2013 19.212 FY 2014 27.997 FY 2015 Base 89.029 FY 2015 OCO - Remarks PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 27 of 32 R-1 Line #142 FY 2015 Cost To Total Complete 89.029 - Total Cost - Target Value of Contract - UNCLASSIFIED Date: March 2014 Exhibit R-4, RDT&E Schedule Profile: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 3218 / P-8A Spiral 2 Development (MMA) (P-8A) UNCLASSIFIED Page 28 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-4A, RDT&E Schedule Details: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 3218 / P-8A Spiral 2 Development (MMA) (P-8A) Schedule Details Start Events by Sub Project End Quarter Year Quarter Year Acquisition Milestones: Milestones: Increment 3 MS B 2 2017 2 2017 Acquisition Milestones: Milestones: Increment 3 MS C 2 2019 2 2019 Systems Development: Hardware Development 2 2013 2 2017 Systems Development: Risk Reduction 2 2013 2 2017 Systems Development: Prototyping 2 2013 2 2017 Systems Development: Capability Development &Integration 4 2014 4 2019 Systems Development: Engineering Manufacturing & Development (EMD) 2 2017 2 2019 Systems Development: Engineering Sudies 1 2013 2 2013 Systems Development: Reviews: Preliminary Design Review (PDR) 4 2016 4 2016 Systems Development: Reviews: Critical Design Review (CDR) 2 2018 2 2018 Test & Evaluation: Integrated Test (IT) 1 2018 4 2019 Test & Evaluation: Lab Testing 1 2016 4 2017 Production Milestones: Contract Awards: Contract Award - Hardware Development ABA 4 2014 4 2014 Production Milestones: Contract Awards: Contract Award - Risk Reduction 3 2014 3 2014 Production Milestones: Contract Awards: Engineering Manufacturing & Development (EMD) ABA 2 2017 2 2017 Production Milestones: Contract Awards: Engineering Manufacturing & Development (EMD) Platform Integration 2 2017 2 2017 P-8A Spiral 2 Development PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 29 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-2A, RDT&E Project Justification: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 COST ($ in Millions) 3368: P-8 Improvements Quantity of RDT&E Articles # R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 3368 / P-8 Improvements (MMA) (P-8A) Prior Years FY 2013 FY 2014 FY 2015 # OCO FY 2015 Base FY 2015 Total FY 2016 FY 2017 FY 2018 - - - - - - 1.521 2.086 3.073 0.000 - - - - - - - - Cost To FY 2019 Complete Total Cost 10.240 Continuing Continuing - The FY 2015 OCO Request will be submitted at a later date. A. Mission Description and Budget Item Justification The P-8A Multi-mission Maritime Aircraft (MMA) program is based on an evolutionary acquisition strategy including a sequence of Rapid Capability Insertions (RCI) that will retain cost-wise effectiveness for winning major combat operations beyond 2020. In order to pace the threat, RCIs will incorporate incremental software and hardware improvements to existing sensors, communications systems and weapons capabilities to build on the P-8A Spiral 2 (Increment 3) Applications Based Architecture (ABA) and capability baseline. These capabilities, and other emergent capability requirements, will be prioritized through the Navy Integration and Interoperability (I&I)-aligned Capability Prioritization Process (CPP) and P-8A Tier 3 Capability Roadmap. The CPP process will be supported by detailed analysis and the maturation of developing technologies. B. Accomplishments/Planned Programs ($ in Millions) N/A C. Other Program Funding Summary ($ in Millions) N/A Remarks D. Acquisition Strategy The P-8A Multi-mission Maritime Aircraft (MMA) program is based on an evolutionary acquisition strategy including a sequence of Rapid Capability Insertions (RCI) that will retain cost-wise effectiveness for winning major combat operations beyond 2020. In order to pace the threat, RCIs will incorporate incremental software and hardware improvements to existing sensors, communications systems and weapons capabilities to build on the P-8A Spiral 2 (Increment 3) Applications Based Architecture (ABA) and capability baseline. These capabilities, and other emergent capability requirements, will be prioritized through the Navy Integration and Interoperability (I&I)-aligned Capability Prioritization Process (CPP) and P-8A Tier 3 Capability Roadmap. The CPP process will be supported by detailed analysis and the maturation of developing technologies. E. Performance Metrics RCI4 contract award scheduled for 2nd quarter 2019. PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 30 of 32 R-1 Line #142 UNCLASSIFIED Date: March 2014 Exhibit R-2A, RDT&E Project Justification: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 COST ($ in Millions) R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 9999 / Congressional Adds (MMA) (P-8A) Prior Years FY 2013 FY 2014 FY 2015 # OCO FY 2015 Base FY 2015 Total FY 2016 FY 2017 FY 2018 Cost To FY 2019 Complete 9999: Congressional Adds 10.000 13.489 5.000 - - - - - - - Quantity of RDT&E Articles 0.000 - - - - - - - - - # The FY 2015 OCO Request will be submitted at a later date. A. Mission Description and Budget Item Justification Congressional Add. B. Accomplishments/Planned Programs ($ in Millions) FY 2013 FY 2014 13.489 - Congressional Add: Small Business Technology Insertion FY 2013 Accomplishments: N/A FY 2014 Plans: N/A Congressional Add: P-8A Sensor Development - Cong - 5.000 13.489 5.000 FY 2013 Accomplishments: N/A FY 2014 Plans: N/A Congressional Adds Subtotals C. Other Program Funding Summary ($ in Millions) N/A Remarks D. Acquisition Strategy Not required for Congressional Adds. E. Performance Metrics Not required for Congressional Adds. PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 31 of 32 R-1 Line #142 - Total Cost 28.489 UNCLASSIFIED Date: March 2014 Exhibit R-3, RDT&E Project Cost Analysis: PB 2015 Navy Appropriation/Budget Activity 1319 / 5 R-1 Program Element (Number/Name) Project (Number/Name) PE 0605500N / Multi-mssn Maritime Aircraft 9999 / Congressional Adds (MMA) (P-8A) Product Development ($ in Millions) Cost Category Item Primary HW Dev NAWCAD Contract Method & Type WR FY 2013 Performing Activity & Location Prior Years FY 2014 Award Date Cost Award Date Cost FY 2015 Base Award Date Cost FY 2015 OCO Award Date Cost FY 2015 Total Cost To Complete Cost Total Cost Target Value of Contract NAWC AD : Patuxent River, MD 0.048 0.012 Dec 2013 - - - - - 0.060 - Primary HW Dev - Progeny C/CPFF PROGENY : Manassas, VA 8.417 4.700 Nov 2013 - - - - - 13.117 13.117 Primary HW Dev - SBIR Various Various Various : Various 0.583 2.846 Dec 2013 - - - - - 3.429 - Primary HD Dev Prototyping - Various Various Various : Various 0.000 4.600 Nov 2013 - - - - - 4.600 - Primary HD Dev - Sensor Development Various Various : Various 0.000 - 5.000 May 2014 - - - - 5.000 - 9.048 12.158 5.000 - - - - 26.206 - Subtotal Management Services ($ in Millions) Cost Category Item Engineering Services Mgmt Suppt Serv (NONFFRDC) Contract Method & Type WR C/CPFF FY 2013 Performing Activity & Location Prior Years Cost FY 2014 Award Date Award Date Cost FY 2015 Base Award Date Cost FY 2015 OCO Award Date Cost FY 2015 Total Cost To Complete Cost Total Cost Target Value of Contract NAWC AD : Paxtuxent River, MD 0.061 0.061 Apr 2014 - - - - - 0.122 - RBC INC : Alexandria, 0.891 1.270 Mar 2014 - - - - - 2.161 2.161 0.952 1.331 - - - - - 2.283 - Subtotal Prior Years Project Cost Totals 10.000 FY 2013 13.489 FY 2014 5.000 FY 2015 Base - FY 2015 OCO - Remarks PE 0605500N: Multi-mssn Maritime Aircraft (MMA) (P-8A) Navy UNCLASSIFIED Page 32 of 32 R-1 Line #142 FY 2015 Cost To Total Complete - - Total Cost 28.489 Target Value of Contract -