UNCLASSIFIED DATE: April 2013 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force APPROPRIATION/BUDGET ACTIVITY 3600: Research, Development, Test & Evaluation, Air Force BA 7: Operational Systems Development COST ($ in Millions) All Prior Years FY 2012 R-1 ITEM NOMENCLATURE PE 0305114F: Air Traffic Control, Approach, and Landing System (ATCALS) # FY 2013 FY 2014 ## OCO FY 2014 Base FY 2014 Total FY 2015 FY 2016 FY 2017 Cost To FY 2018 Complete Total Cost Total Program Element - 20.644 43.187 35.674 - 35.674 26.811 9.432 5.162 5.255 Continuing Continuing 673587: Air Traffic Control Systems - 20.644 43.187 35.674 - 35.674 26.811 9.432 5.162 5.255 Continuing Continuing 0 2 2 2 0 0 0 Quantity of RDT&E Articles # 0 FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012 The FY 2014 OCO Request will be submitted at a later date ## Note RDT&E articles are shown in year completed. In FY13 two Deployable Instrument Landing System (D-ILS) pre-production units are completed. In FY14 two Deployable Radar Approach Control (D-RAPCON) pre-produciton units are completed. The two D-ILS PPUs are funded in FY13. The two D-RAPCONs are incrementally funded in FY13 and FY14. A. Mission Description and Budget Item Justification To support the Air Force worldwide flying mission, this program element funds research, development and management of new air traffic control surveillance, positioning, and precision approach landing systems. When applicable, this includes joint efforts with the Federal Aviation Administration (FAA) and coordination with the International Civil Aviation Organization and the North Atlantic Treaty Organization (NATO). ATCALS funding focuses on three main efforts as follows: Deployable Instrument Landing System (D-ILS). This effort develops a deployable Category I (200ft decision height/2400ft runway visual range) ILS with remote monitoring and maintenance capabilities. D-ILS will provide precision approach capability in adverse weather conditions for contingency operations and humanitarian or disaster relief operations. D-ILS will replace the current Air Force mobile Precision Approach Radar (PAR) system used to support operations at deployed locations which were procured in the 1970s, are manpower intensive, and logistically unsupportable. On average, only 18% (three of 17 systems) of the mobile PAR systems are operational on a daily basis. Development and deployment of D-ILS will support increased operations in the area of responsibility, allow phase out of the currently obsolete legacy systems and provide interoperability with the Civil Reserve Air Fleet (CRAF). FY14 funds complete engineering and manufacturing development (EMD) under the EMD contract awarded in Aug 11. Due to a contractor protest, the start of EMD execution was delayed until Dec 11. EMD execution includes assembling two EMD pre-production units for test and evaluation. D-ILS Milestone C is scheduled for FY14. Related OPAF funds are in program element (PE) 0305114F (Weapon System Code 833010). Deployable Radar Approach Control (D-RAPCON). D-RAPCON will replace the 40 year old AN/MPN-14K and AN/TPN-19 Airport Surveillance Radar (ASR) and Operations Shelter (OPS) subsystems with state of the art digital systems. Modification and overhaul of the existing systems has proven to be ineffective due to diminishing manufacturing sources. The D-RAPCON will be used to provide both a terminal and enroute surveillance capability. The D-RAPCON will also be used with the D-ILS and a fixed or mobile control tower to provide a complete air traffic control capability. The D-RAPCON will support tactical military and worldwide humanitarian operations and also provide a capability to support domestic disaster relief. The primary surveillance radar coverage (non-cooperative targets) is out PE 0305114F: Air Traffic Control, Approach, and Landing System ... Air Force UNCLASSIFIED Page 1 of 11 R-1 Line #195 UNCLASSIFIED DATE: April 2013 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE 3600: Research, Development, Test & Evaluation, Air Force PE 0305114F: Air Traffic Control, Approach, and Landing System (ATCALS) BA 7: Operational Systems Development to 60 nautical miles (nm) and the secondary surveillance radar coverage (cooperative targets) is out to 120 nm. FY14 funds continue EMD efforts which include the completion of two pre-production systems and the start of contractor testing. Related OPAF funds are in PE 0305114F (Weapon System Code 833010). Next Generation Air Transportation System (NextGen). This is an interagency effort designed to enable the transition from a ground infrastructure dominated Air Traffic Management capability for the U.S. National Airspace System (NAS) to a capability that leverages advances in Performance Based Navigation (PBN), nonradar based surveillance services, and transition from voice communications to digital data exchange. Per Deputy Secretary of Defense direction, the Air Force is the DoD lead Service for NextGen implementation and architecture development. NextGen will be built on key elements from existing programs and technologies and on new systems under development. As these technologies and architectures mature, ground system upgrades will be coordinated and fielded concurrently with aircraft avionics capabilities that are acquired and integrated into Air Force aircraft (manned and unmanned). These efforts will also run in close parallel with the Communication, Navigation and Surveillance/Air Traffic Management (CNS/ATM) program in PE 0305099F. FY14 efforts will continue proof of concept demonstrations and analysis leading to Remotely Piloted Aircraft (RPA) Ground Based Sense and Avoid (GBSAA), RPA Pilot/Controller Communications, and Automatic Dependent Surveillance-Broadcast (ADS-B) ground system implementation. These efforts will improve the display of aircraft position to air traffic controllers, enhance flight safety, and support the seamless integration of RPAs into the National Airspace System and the airspaces of other nations. FY14 funding also begins development/test of new Instrument Procedures Development System (IPDS) software (joint effort with FAA and Services); upgrade of surveillance radar and automation systems with new capabilities such as Mode 5 Identification Friend or Foe; and continues NextGen Lead Service Office efforts which include preparation of NextGen Concept of Operations and Implementation Plans, PBN and ADS-B Benefits/Business Cases, a DoD Integrated Work Plan, RPA GBSAA Engagement Plan, and a DoD NextGen Enterprise Architecture Strategic Roadmap. Activities also include studies and analysis to support both current program planning and execution and future program planning. This program is in Budget Activity 7, Operational System Development, these budget activities include development efforts to upgrade systems currently fielded or has approval for full rate production and anticipate production funding in the current or subsequent fiscal year. B. Program Change Summary ($ in Millions) Previous President's Budget Current President's Budget Total Adjustments • Congressional General Reductions • Congressional Directed Reductions • Congressional Rescissions • Congressional Adds • Congressional Directed Transfers • Reprogrammings • SBIR/STTR Transfer • Other Adjustments PE 0305114F: Air Traffic Control, Approach, and Landing System ... Air Force FY 2012 FY 2013 FY 2014 Base FY 2014 OCO FY 2014 Total 20.644 20.644 0.000 - - 0.000 - - 0.000 0.000 0.000 43.187 43.187 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 28.526 35.674 7.148 - - - 28.526 35.674 7.148 7.148 - 7.148 UNCLASSIFIED Page 2 of 11 R-1 Line #195 UNCLASSIFIED DATE: April 2013 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force APPROPRIATION/BUDGET ACTIVITY 3600: Research, Development, Test & Evaluation, Air Force BA 7: Operational Systems Development R-1 ITEM NOMENCLATURE PE 0305114F: Air Traffic Control, Approach, and Landing System (ATCALS) Change Summary Explanation FY14 funding adjustment reflects requested funds for D-RAPCON to fully fund development which will lead to a Milestone C in FY16. C. Accomplishments/Planned Programs ($ in Millions) Title: NextGen FY 2012 7.945 FY 2013 3.512 FY 2014 2.914 0.937 27.888 25.149 Description: Includes efforts to implement NextGen efficiencies and capabilities. Focus is on seamlessly integrating Remotely Piloted Aircraft (RPAs) into civil airspace, ADS-B implementation, windfarm clutter mitigation, Instrument Procedures Development System software development, and Lead Service Office technical support/architecture development. FY 2012 Accomplishments: Continued efforts to implement NextGen efficiencies focusing on integrating RPAs into civil airspace (GBSAA at Cannon AFB), ADS-B ground system integration, radar windfarm clutter mitigation, initiation of pilot/controller RPA communications demo, preparation of CNS/ATM Initial Capability Document, NextGen Concept of Operations and Implementation Plans, NextGen architecture development/capability mapping and benefits/ business case development for Performance Based Navigation and ADS-B. FY 2013 Plans: Continues efforts to implement NextGen efficiencies. Tasks include RPA GBSAA demo at Cannon AFB, pilot/controller RPA communications demo at Creech, Nellis, and Cannon AFBs, installation of ADS-B equip for capability assessment at McGuire/ Nellis, continuation of CNS/ATM ICD preparation, radar windfarm clutter mitigation flight tests, NextGen architecture development, capability mapping, preparation of implementation roadmaps, Concept of Operations Implementation Plans, and Performance Based Navigation and ADS-B benefits/business case development. FY 2014 Plans: Will continue maturing GBSAA technology at Cannon AFB, refinement of pilot/controller communications procedures (demo at Cannon/Creech/Nellis) and civil approval of the GBSAA concept of operations (GBSAA Engagement Plan), and completion of ADS-B CNS/ATM ICD efforts. Additional tasks will include start of development of the Instrument Procedures Development System (IPDS) with the other Services and FAA, integration of Mode 5 IFF into legacy surveillance radars and automation systems, and through the Lead Service Office, refinement of NextGen implementation roadmaps, Concept of Operations and Implementation Plans, and NextGen benefits/business cases. Title: D-RAPCON Description: Effort leads to award of D-RAPCON engineering, manufacturing and development (EMD) contract and test of two pre-production units and two automation system test units. FY 2012 Accomplishments: PE 0305114F: Air Traffic Control, Approach, and Landing System ... Air Force UNCLASSIFIED Page 3 of 11 R-1 Line #195 UNCLASSIFIED DATE: April 2013 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force APPROPRIATION/BUDGET ACTIVITY 3600: Research, Development, Test & Evaluation, Air Force BA 7: Operational Systems Development R-1 ITEM NOMENCLATURE PE 0305114F: Air Traffic Control, Approach, and Landing System (ATCALS) C. Accomplishments/Planned Programs ($ in Millions) Finalized SRD and Draft Request for Proposal (RFP) package; analyzed vendor feedback; completed the RFP package to include conducting the appropriate Multi-Independent Review Teams (MIRTs); released revised RFP package to industry; continued Milestone (MS) B documentation preparation, preparation and start of source selection. FY 2012 FY 2013 FY 2014 FY 2013 Plans: Continues source selection briefings to the Source Selection Authority and completion of source selection efforts; supports obtaining MS B approval from the Milestone Decision Authority (MDA)/award of the EMD contract, conduct of the preliminary and critical design reviews, begins fabrication/integration/assembly of two pre-production units and continues development and coordination of test, evaluation and certification related plans and procedures. FY 2014 Plans: Will continue fabrication, integration and assembly of two D-RAPCON pre-production systems and two automation system test units, begin contractor testing and continue support of government test plans, procedures and certifications. Title: D-ILS 2.049 2.667 0.955 9.713 9.120 6.656 Description: Includes conduct of design, development, and testing of pre-production units leading to the fielding of the new Deployable Instrument Landing System (D-ILS). FY 2012 Accomplishments: Continued Engineering Manufacturing Development (EMD) tasks which included successful completion of the functional, preliminary, and critical design reviews. FY 2013 Plans: Supports execution of the EMD phase to include development/integration/assembly of two pre-production units for contractor testing and preparation/review of Government DT/OT test plans and procedures. FY 2014 Plans: Will support and conduct Government developmental and operational testing and preparation of all required documentation to achieve Production Readiness Review and Milestone C decision. Also includes initial preparation of the production line for units ordered in the FY14 timeframe. Title: Program Management Administration Description: Provides engineering, cost, test, logistics, and implementation planning and analysis support as applicable for the DRAPCON, D-ILS, and NextGen programs. FY 2012 Accomplishments: PE 0305114F: Air Traffic Control, Approach, and Landing System ... Air Force UNCLASSIFIED Page 4 of 11 R-1 Line #195 UNCLASSIFIED DATE: April 2013 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force APPROPRIATION/BUDGET ACTIVITY 3600: Research, Development, Test & Evaluation, Air Force BA 7: Operational Systems Development R-1 ITEM NOMENCLATURE PE 0305114F: Air Traffic Control, Approach, and Landing System (ATCALS) C. Accomplishments/Planned Programs ($ in Millions) Provided analysis and supported preparation of D-RAPCON system requirements document, request for proposal package, and Milestone B approval documents. Supported D-ILS and D-RAPCON source selections. Continued to support NextGen RPA Ground Based Sense and Avoid, ADS-B integration demonstrations and NextGen program office. FY 2012 FY 2013 FY 2014 FY 2013 Plans: Supports D-RAPCON sources selection, preparation of Milestone B approval document and follow-on EMD efforts to include preliminary and critical design reviews. Provides technical support for fabrication of two D-ILS pre-production units and follow-on developmental and operational testing. Continues NextGen efforts to develop technical solution for integration of RPAs into civil airspace and develop NextGen implementation plans and roadmaps. FY 2014 Plans: Will continue engineering and program support for: D-RAPCON pre-production system integration and preparation/review of DT/OT test plans and procedures;completion of D-ILS DT/OT; and continue with implementation of NextGen GBSAA solutions (GBSAA, pilot controller communications), asessment of surveillance and air traffic control automation upgrades, and updates to NextGen Enterprise Architecture and benefits/business cases. Accomplishments/Planned Programs Subtotals D. Other Program Funding Summary ($ in Millions) Line Item • OPAF: BA03: 833010: Air Traffic Control and Landing Systems • OPAF: BA 05: 861900: Spares and Repair Parts Remarks FY 2012 0.000 FY 2013 0.000 FY 2014 Base 22.170 0.000 0.000 0.000 FY 2014 OCO 20.644 43.187 35.674 FY 2014 Total 22.170 FY 2015 30.738 FY 2016 65.612 FY 2017 89.804 Cost To FY 2018 Complete Total Cost 86.313 Continuing Continuing 0.000 0.135 2.340 3.420 2.260 Continuing Continuing E. Acquisition Strategy Acquisition strategy includes the award of competitive fixed price incentive firm contracts for the D-ILS and D-RAPCON acquisitions emphasizing off-the-shelf technology and maximizing the use of non-developmental items (NDIs). Contracts will include production options. F. Performance Metrics Please refer to the Performance Base Budget Overview Book for information on how Air Force resources are applied and how those resources are contributing to Air Force performance goals and most importantly, how they contribute to our mission. PE 0305114F: Air Traffic Control, Approach, and Landing System ... Air Force UNCLASSIFIED Page 5 of 11 R-1 Line #195 UNCLASSIFIED DATE: April 2013 Exhibit R-3, RDT&E Project Cost Analysis: PB 2014 Air Force APPROPRIATION/BUDGET ACTIVITY 3600: Research, Development, Test & Evaluation, Air Force BA 7: Operational Systems Development Product Development ($ in Millions) R-1 ITEM NOMENCLATURE PROJECT PE 0305114F: Air Traffic Control, Approach, 673587: Air Traffic Control Systems and Landing System (ATCALS) FY 2012 FY 2013 Contract Method & Type Performing Activity & Location Instrument Procedure Development System (IPDS) SS/T&M FAA:Washington, DC - 0.000 D-RAPCON C/FPIF TBD:TBD, - 0.000 C/FPIF Northrop Grumman:San Diego, CA - 1.787 Mar 2012 Cost Category Item D-ILS Subtotal All Prior Years 0.000 Support ($ in Millions) Cost Category Item Cost Award Date 0.000 26.125 Mar 2013 1.787 Performing Activity & Location All Prior Years Cost 1.667 Mar 2013 27.792 FY 2012 Contract Method & Type Cost Award Date FY 2013 Award Date Cost Award Date FY 2014 Base Cost FY 2014 OCO Award Date Award Date Cost FY 2014 Total Cost Cost To Complete Total Cost Target Value of Contract 1.810 Jan 2014 - 1.810 0.000 1.810 TBD 23.342 Feb 2014 - 23.342 0.000 49.467 TBD 0.000 - 0.000 0.000 3.454 TBD 25.152 0.000 25.152 0.000 54.731 FY 2014 Base Cost FY 2014 OCO Award Date Award Date Cost FY 2014 Total Cost Cost To Complete Total Cost Target Value of Contract Lead Service Office Technical Support/ Requirements Documentation Various Various:, - 2.410 Jul 2012 2.153 Apr 2013 0.441 Feb 2014 - 0.441 Continuing Continuing TBD D-RAPCON Support Cost Various Various:, - 0.611 Nov 2012 0.161 Apr 2013 0.000 - 0.000 0.000 0.772 TBD D-ILS Support Cost Various Various:, - 0.000 0.500 Mar 2013 0.116 Feb 2014 - 0.116 0.000 0.616 TBD 0.000 3.021 2.814 0.557 0.000 0.557 Subtotal Test and Evaluation ($ in Millions) Cost Category Item NextGen ADS-B Integration/Demo RPA GBSAA Demo Contract Method & Type Performing Activity & Location FY 2012 All Prior Years Cost FY 2013 Award Date Cost Award Date FY 2014 Base Cost FY 2014 OCO Award Date Award Date Cost FY 2014 Total Cost Cost To Complete Total Cost Target Value of Contract SS/FFP ITT/Volpe Center:Herdon, VA - 0.235 Jul 2012 0.165 Apr 2013 0.165 Feb 2014 - 0.165 0.000 0.565 TBD SS/T&M Volpe Center:Cambridge, MA - 3.274 Mar 2012 1.094 May 2013 0.100 Jan 2014 - 0.100 0.000 4.468 TBD PE 0305114F: Air Traffic Control, Approach, and Landing System ... Air Force UNCLASSIFIED Page 6 of 11 R-1 Line #195 UNCLASSIFIED DATE: April 2013 Exhibit R-3, RDT&E Project Cost Analysis: PB 2014 Air Force APPROPRIATION/BUDGET ACTIVITY 3600: Research, Development, Test & Evaluation, Air Force BA 7: Operational Systems Development Test and Evaluation ($ in Millions) Cost Category Item Contract Method & Type R-1 ITEM NOMENCLATURE PROJECT PE 0305114F: Air Traffic Control, Approach, 673587: Air Traffic Control Systems and Landing System (ATCALS) FY 2012 Performing Activity & Location All Prior Years Cost FY 2013 Award Date Cost Award Date FY 2014 Base Cost FY 2014 OCO Award Date Award Date Cost FY 2014 Total Cost Cost To Complete Total Cost Target Value of Contract RPA Pilot/Controller Comm Demo SS/T&M 412th Test Wing:Edwards AFB, CA Surveillance Radar/ Automation System Upgrades C/T&M FAA:Washington, DC - 0.000 0.000 0.350 Feb 2014 - 0.350 0.000 0.350 TBD Massachusetts Institute of Technology Lincoln Labs:Bedford, MA - 1.500 Apr 2012 0.000 0.000 - 0.000 0.000 1.500 TBD AF/DoE Joint Windfarm Clutter Mitigation SS/T&M - 0.526 Mar 2013 0.100 May 2013 0.100 Jan 2014 - 0.100 0.000 0.726 TBD D-RAPCON MIPR Various:Various, - 0.326 Mar 2012 1.602 Mar 2013 1.807 Mar 2014 - 1.807 0.000 3.735 TBD D-ILS MIPR 46th Test Wing:Eglin AFB, FL - 0.262 Jan 2012 0.500 Jan 2013 0.839 Oct 2013 - 0.839 0.000 1.601 TBD 6.123 3.461 3.361 0.000 3.361 0.000 12.945 Subtotal 0.000 Remarks D-RAPCON contract award delayed due to funding changes which caused reassessment of user requirements, update of the acquisition strategy, and preparation of a revised request for proposal. Management Services ($ in Millions) Cost Category Item Contract Method & Type FY 2012 Performing Activity & Location All Prior Years Cost FY 2013 Award Date Cost Award Date FY 2014 Base Cost FY 2014 OCO Award Date Award Date Cost FY 2014 Total Cost Cost To Complete Total Cost Target Value of Contract Program Management Administration (PMA) NextGen Various ESC/HBA:Bedford, MA - 3.073 Oct 2011 1.418 Apr 2013 0.835 Oct 2013 - 0.835 Continuing Continuing TBD Program Management Administration (PMA) - DRAPCON Various ESC/HBA:Bedford, MA - 3.823 Oct 2011 4.777 Oct 2012 5.031 Oct 2013 - 5.031 0.000 13.631 TBD Program Management Administration (PMA) - DILS Various ESC/HBA:Bedford, MA - 2.817 Oct 2011 2.925 Oct 2012 0.738 Oct 2013 - 0.738 0.000 6.480 TBD 9.713 9.120 6.604 0.000 6.604 Subtotal 0.000 PE 0305114F: Air Traffic Control, Approach, and Landing System ... Air Force UNCLASSIFIED Page 7 of 11 R-1 Line #195 UNCLASSIFIED DATE: April 2013 Exhibit R-3, RDT&E Project Cost Analysis: PB 2014 Air Force APPROPRIATION/BUDGET ACTIVITY 3600: Research, Development, Test & Evaluation, Air Force BA 7: Operational Systems Development All Prior Years Project Cost Totals 0.000 R-1 ITEM NOMENCLATURE PROJECT PE 0305114F: Air Traffic Control, Approach, 673587: Air Traffic Control Systems and Landing System (ATCALS) FY 2012 20.644 FY 2013 43.187 FY 2014 Base 35.674 FY 2014 OCO 0.000 Remarks PE 0305114F: Air Traffic Control, Approach, and Landing System ... Air Force UNCLASSIFIED Page 8 of 11 R-1 Line #195 FY 2014 Cost To Total Complete 35.674 Total Cost Target Value of Contract UNCLASSIFIED DATE: April 2013 Exhibit R-4, RDT&E Schedule Profile: PB 2014 Air Force APPROPRIATION/BUDGET ACTIVITY 3600: Research, Development, Test & Evaluation, Air Force BA 7: Operational Systems Development PE 0305114F: Air Traffic Control, Approach, and Landing System ... Air Force R-1 ITEM NOMENCLATURE PROJECT PE 0305114F: Air Traffic Control, Approach, 673587: Air Traffic Control Systems and Landing System (ATCALS) UNCLASSIFIED Page 9 of 11 R-1 Line #195 UNCLASSIFIED DATE: April 2013 Exhibit R-4A, RDT&E Schedule Details: PB 2014 Air Force APPROPRIATION/BUDGET ACTIVITY 3600: Research, Development, Test & Evaluation, Air Force BA 7: Operational Systems Development R-1 ITEM NOMENCLATURE PROJECT PE 0305114F: Air Traffic Control, Approach, 673587: Air Traffic Control Systems and Landing System (ATCALS) Schedule Details Start Events ADS-B Integration Study/Demo Contract Award End Quarter 4 Year 2012 Quarter 4 Year 2012 ADS-B Integration Study/Demo Install 4 2012 3 2013 ADS-B Integration Study/Demo Data Collection/Eval 3 2013 4 2014 RPA GBSAA Demo Cannon/Gray Butte Demo/Flt Test 1 2012 1 2013 RPA GBSAA Demo Cannon/Edwards Follow-on 1 2013 4 2014 RPA Pilot/Controller Comm Demo 4 2012 2 2015 RPA Pilot/Controller Comm Demo Equip Mod 2 2013 4 2013 RPA Pilot/Controller Comm Demo/Eval 1 2014 2 2015 Instrument Procedure Development System (IPDS) Software Dev 2 2014 3 2015 IPDS Test 3 2015 2 2016 Lead Service Office Technical Support/Requirements Documentation 1 2012 4 2018 Surveillance Radar and Automation System Upgrade 2 2014 4 2016 AF/DOE Joint Wind Farm Clutter Mitigation Tests 1, 2, and 3 1 2012 1 2014 AF/DoE Joint Wind Farm Clutter Mitigation Report 1 2014 1 2014 Terminal Flight Data Management Sys OUE Vance/Altus Install 2 2015 4 2015 Terminal Flight Data Management Sys OUE 4 2015 4 2016 D-RAPCON 1 2012 4 2018 D-RAPCON Milestone B 2 2013 2 2013 D-RAPCON PDR 4 2013 4 2013 D-RAPCON CDR 1 2014 1 2014 D-RAPCON CT/DT/OT 4 2014 2 2016 D-RAPCON Milestone C 2 2016 2 2016 PE 0305114F: Air Traffic Control, Approach, and Landing System ... Air Force UNCLASSIFIED Page 10 of 11 R-1 Line #195 UNCLASSIFIED DATE: April 2013 Exhibit R-4A, RDT&E Schedule Details: PB 2014 Air Force APPROPRIATION/BUDGET ACTIVITY 3600: Research, Development, Test & Evaluation, Air Force BA 7: Operational Systems Development R-1 ITEM NOMENCLATURE PROJECT PE 0305114F: Air Traffic Control, Approach, 673587: Air Traffic Control Systems and Landing System (ATCALS) Start Quarter 4 Year 2016 Quarter 4 Year 2016 D-ILS 1 2012 4 2018 D-ILS PDR 3 2012 3 2012 D-ILS CDR 4 2012 4 2012 D-ILS CT/DT/OT 2 2013 2 2014 D-ILS Milestone C 2 2014 2 2014 D-ILS Initial Operational Capability (IOC) 4 2014 4 2014 D-ILS Full Operational Capability (FOC) 4 2015 4 2015 D-ILS Operations/Sustainment 1 2016 4 2018 D-RAPCON IOC Events End PE 0305114F: Air Traffic Control, Approach, and Landing System ... Air Force UNCLASSIFIED Page 11 of 11 R-1 Line #195