DoD Base Realignment and Closure BRAC Rounds (BRAC 1988, 1991, 1993, 1995 & 2005) Executive Summary Fiscal Year (FY) 2013 Budget Estimates Program Year 2013 Justification Data Submitted to Congress February 2012 FY 2013 Budget Estimates DoD Base Realignment and Closure BRAC Rounds (BRAC 1988, 1991, 1993, 1995 & 2005) Table of Contents I. Prior-Round BRAC Overview A. B. C. D. Background Budget Justification Requirements DoD Base Closure Account Capitalization Financial Management Procedures Page 2 2 3 3 4 II. Budget Summary 6 III. BRAC I, II, III, IV Implementation Costs and Savings 7 IV. Revenue from the Sale of Land and Facilities 28 V. BRAC 2005 Overview 49 A. B. C. D. 49 49 49 50 Background Budget Justification Requirements DoD Base Closure Account Capitalization Financial Management Procedures VI. Homeowners Assistance Program 52 VII. Budget Summary 52 Total DoD Financial Summary Follow-on Environmental & Caretaker Costs BRAC 2005 Construction Project Listing 53 91 92 Prior-Round BRACs (1988, 1991, 1993 & 1995) 1 Prior-Round BRAC Overview A. Background The Defense Secretary’s Commission on Base Realignment and Closures was chartered on May 3, 1988 to recommend military installations within the United States, its commonwealths, territories, and possessions for realignment and closure. The Congress and the President subsequently endorsed this approach through legislation that removed some of the previous impediments to successful base closure actions. The Defense Authorization Amendments and Base Closure and Realignment Act, Public Law 100-526, as enacted October 24, 1988, provides the basis for implementing the recommendations of the 1988 Commission. Under this Act, all closures and realignments were to be completed no later than September 30, 1995. Funding for these actions resides in the Base Realignment and Closure Account - Part I (BRAC-I) which spans fiscal years 1990 through 1995. The National Defense Authorization Act for FY 1990 and 1991, Section 2831, allowed for the one-time transfer of $31 million from BRAC I into the FY 1990 Homeowners Assistance Fund. This Fund is used to assist employees who are forced to move as a consequence of base closures and who find that they must sell their homes in real estate markets which have been adversely affected by the closure decision. In the Committee Reports accompanying the FY 1990 Military Construction Appropriations Act, the Congress began applying some restrictions on the use of BRAC I funds. Concerned that the one-time implementation costs had increased by $1 billion when compared to the 1988 Commission’s estimate, the House Appropriations Committee (HAC) adopted a spending cap for military construction and family housing of $2.4 billion. This cap was reflected in the FY 1990 act itself. The FY 1992 Military Construction Appropriations Act lowered the cap to $1.8 billion commensurate with the budget request. On November 5, 1990, The President signed Public Law 101-510, Title XXIX, Defense Base Closure and Realignment Act of 1990, establishing an independent commission known as the Defense Base Closure and Realignment Commission which met only during calendar years 1991, 1993, and 1995. The purpose of the Commission was to ensure a timely, independent, and fair process for closing and realigning U.S. military installations. The actions to implement the recommendations of the 1991, 1993, and 1995 Commissions are underwritten from the Base Realignment and Closure Account 1990 (BRAC II). Action must be initiated no later than two years after the date on which the President transmits a report to Congress and all closures and realignments must be completed no later than the end of the six-year period beginning on the same date. The implementation period for the last authorized round of base closure is complete as of 13 July 2001. Public Law 101-510 included a number of other provisions affecting base closure, one of which, section 2923, designated the Base Closure Account (BRAC I) to be the exclusive source of funds for environmental restoration projects at round one closure sites. The National Defense Authorization Act for FY 1992, Section 2827, designated Base Closure Account 1990 as the exclusive source of funds for environmental restoration projects at closure sites approved by the 2 1991, 1993, and 1995 Commissions. The intent of this section was to preclude the cleanup actions at bases slated for closure from competing with other sources of funding for environmental cleanup such as the Defense Environmental Restoration Account (DERA). A total of $9,980 million has been requested for cleanup for the prior four rounds of base closures through FY 2009. The FY 2013 budget request includes $349.4 million of new budget authority for environmental restoration and caretaker costs at BRAC bases from the 1988, 1991, 1993, and 1995 rounds. B. Budget Justification Requirements The Defense Authorization Amendments and Base Closure and Realignment Act, Public Law 100-526, is specific in the types of information required as to budget justification. The Act states, “As part of each annual budget request for the Department of Defense, the Secretary shall transmit to the appropriate committees of Congress: (1) a schedule of the closure and realignment actions to be carried out under this title in the fiscal year for which the request is made and an estimate of the total expenditures required and cost savings to be achieved by each such closure and realignment and of the time period in which these savings are to be achieved in each case, together with the Secretary’s assessment of the environmental effects of such actions; and (2) a description of the military installations, including those under construction and those planned for construction, to which functions are to be transferred as a result of such closures and realignments, together with the Secretary’s assessment of the environmental effects of such transfers.” The FY 2013 budget justification material has been developed to comply with the above requirements. The BRAC Executive Summary Book provides an overview of the BRAC costs and savings for each DoD Component through the six-year implementation period. The DoD Components have prepared separate justification books providing detailed information by realignment and closure package, broken out by one-time implementation costs, anticipated revenues from land sales, and expected savings. This comprehensive approach addresses the total financial impact of realignment and closure actions and provides justification for the funds requested in the Base Closure Accounts. C. DoD Base Closure Account Capitalization and Funding The Department has complied with the guidance contained in the House of Representatives Report 101-76, Military Construction Appropriations Bill, 1990, July 26, 1989, to determine the proper method of capitalizing the DoD Base Closure Accounts. In denying general transfer authority to the Secretary of Defense, the Committee expressed the belief that the necessary one-time costs to implement base realignments and closures be requested as new appropriated amounts to facilitate improved accounting of the funds appropriated. Additionally, the Committee indicated that any savings or cost avoidance due to base realignment or closure should be reflected through reduced requirements in the annual budget requests for the affected appropriations. 3 The manner in which the impacts of base realignments and closures are reflected in BRAC appropriations accounts is consistent with this language. The BRAC appropriations requested after FY 2001 represent the costs of environmental restoration and caretaker functions at bases closed under the prior rounds of base closure authority. Also included in the appropriation request are funds to be transferred to the Homeowner’s Assistance Program for the purpose outlined in Section III. Since the FY 1991 budget request, parcels of land have been transferred, without compensation to the Department, thereby reducing projected offsetting receipts. Section IV provides examples of anticipated revenue from the sale of land and facilities and the anticipated revenue loss from land transfers. The implementation of base realignment and closures requires the relocation of units and activities from one site to another. Recurring savings (reduced base operations costs) are realized through the increased efficiencies inherent in the consolidation of functions on fewer bases. The net savings are reflected as savings in the specific appropriations, primarily operation and maintenance, and are not incorporated in the DoD Base Closure Accounts. Estimates for savings or cost avoidance have been incorporated into the DoD Component appropriation account where they are to accrue, resulting in corresponding reduced budget requests for those appropriations. The annual recurring saving from the four authorized rounds of base closure and realignment are projected to be about $7 billion after the implementation period ending in FY 2001. D. Financial Management Procedures The Defense Authorization Amendments and Base Closure and Realignment Act, Public Law 100-526, established the Defense Base Closure Account (BRAC I) as a mechanism to provide the required funding to implement the approved recommendations of the Base Closure and Realignment Commissions. Public Law 101-510, Title XXIX, Defense Base Closure and Realignment Act of 1990, established Base Closure Account 1990 (BRAC II) as a mechanism to provide the required funding to implement the approved recommendations of the BRAC 1991, 1993, and 1995 Commissions. From aspects of management, budgeting and accounting, both accounts are treated in the same fashion. Funding approved by Congress in both accounts is appropriated and authorized in a lump sum amount and may be spent for construction, planning and design, civilian severance pay, permanent change in station, transportation of things, and other costs related to the realignment or closure of the subject bases. The management structure of the program is described below. 1. The Deputy Under Secretary of Defense (Installations & Environment) is responsible for issuing policy for management of the BRAC program and overseeing the DoD Components’ execution of the program. 2. To properly account for and manage appropriated fund resources, the DoD Base Closure Accounts were established on the books of the Treasury to aid the DoD Components in the closure and realignment of certain military installations. Treasury has assigned account symbol 97-0103 to identify the DoD Base Closure Account - Part I, and 97-0510 to identify DoD 4 Base Closure Account 1990 - Part II, Part III, and Part IV and 97-0512 to identify DoD Base Closure Account 2005. Funds made available to the DOD Components are subdivided and distribute to the activities responsible for base closure actions. Separate allocations are made for each of the accounts by program year. Each DoD Component distributes the base closure funds in accordance with its normal fund distribution procedures. The applicable reporting requirements include: Military Construction Construction Planning and Design Family Housing Construction Operations Environmental Operation and Maintenance (O&M) Civilian Severance Pay Permanent Change of Station (PCS) costs Transportation of things Real Property Maintenance Program Management (civilian work years, TDY travel, and related support dedicated to implementation efforts) Military Personnel (limited to PCS expenses dedicated to implementation efforts) Other (including procurement-type items) 3. The Under Secretary of Defense (Comptroller) makes funds available to the DoD Components based on their official financial plans. Financial plans are prepared by the DoD Components in cooperation with and at the direction of the program manager, the Deputy Under Secretary of Defense (Installations & Environment). The DoD Components’ financial plans and the subsequent allocation of funds are supported by detailed, line-item military and family housing construction justification. Separate narrative explanations for other planned expenditures are also submitted to the Under Secretary of Defense (Comptroller) in sufficient detail to support the DoD Component’s Financial plan. The DoD Components are allowed to revise planned execution as the situation dictates but must notify the Deputy Under Secretary of Defense (Installations & Environment) and the Under Secretary of Defense (Comptroller) of all changes. To keep the Under Secretary of Defense (Comptroller) apprised of these changes, the DoD Components are required to submit a revised current year financial plan and supporting documentation on a quarterly basis to reflect the status of the current plan being executed. When a military construction or family housing construction project is to be executed, but does not appear on the approved construction project list, the prior approval of the Under Secretary of Defense (Comptroller), and Congress is required. This will ensure that the Department has complied with the notification requirements of the House of Representatives Report 101-176, Military Construction Appropriation Bill, July 26, 1989, prior to the expenditure of DoD Base 5 Closure Account funds. Each DoD Component is allocated funds based upon its official budget justification and financial plan. 4. Decision Rule for Determining the Validity of Charging Cost to the DoD Base Closure Accounts: In addition to being supported by the detailed budget justification, the general criterion to be applied when deciding whether to charge specific costs to the DoD Base Closure Account is that the cost in question is a one-time implementation cost directly associated with the overall base closure effort. For example, the one-time operation and maintenance-type costs at R&D-funded installations are charged to the appropriate sub-account of “Operation and Maintenance.” Low-dollar value construction projects budgeted as lump sum under the real property maintenance category are charged to that sub-account and not the construction subaccount of military construction, which is reserved for projects listed individually on the financial plan accompanying the fund allocation document. Recurring costs driven by the transfer of workload from one location to another is budgeted for and charged to the non-base closure accounts. II. Budget Summary The tables on the following pages provide information on one-time implementation costs, expected savings, and revenues from land sales by DOD Component and approved BRAC closure round. BRAC I closures and realignments have been projected to cost $2.6 billion and will generate total one-time savings of $2.4 billion and land sale revenue of $65.7 million during the FY 1990 - 1995 implementation period. BRAC II closures and realignments have been projected to cost $4.9 billion and will generate total one-time savings of about $7.1 billion and land sale revenue of $25.7 million during the FY 1992 - 1998 implementation periods. BRAC III closures and realignments have been projected to cost $7.2 billion and will generate total onetime savings of $7.8 billion and land sale revenue of $3.4 million during the FY 1994 - 1999 implementation period. BRAC IV closures and realignments are projected to cost $6.6 billion and will generate total one-time savings of $6.2 billion and land sale revenue of $207.7 million during the FY 1996 - 2001 implementation period. 6 FY 2013 Budget Estimates Base Realignment and Closure Account-Prior Rounds Environmental and Caretaker Costs by Fiscal Year (Dollars in Thousands) A. BRAC Parts I-IV Continuing Environmental and Caretaker Costs: ARMY FY 2002 Military Construction Planning and Design Environmental 156,848 Op & Maint. 20,817 Total Obligation Authority 177,665 Land Sales / Prior Year Financing 7,345 Budget Authority 170,320 FY 2003 162,922 18,456 181,378 22,555 158,823 FY 2004 64,500 10,050 74,550 1,000 73,550 FY 2005 95,124 8,155 103,279 103,279 FY 2006 107,095 10,449 117,544 6,650 110,894 FY 2007 119,559 8,207 127,766 12,880 114,886 FY 2008 96,993 8,256 105,249 1,364 103,885 FY 2009 8,400 240 87,253 6,818 102,711 102,711 FY 2010 136,905 5,315 142,220 142,220 FY 2011 69,082 7,721 76,803 76,803 FY 2012 66,072 4,644 70,716 70,716 FY 2013 75,447 4,446 79,893 79,893 NAVY FY 2002 Environmental 231,162 Op & Maint. 15,414 Total Obligation Authority 246,576 Land Sales / Prior Year Financing 22,325 Budget Authority 224,251 FY 2003 473,027 12,269 485,296 217,356 267,940 FY 2004 119,325 25,482 144,807 45,524 99,283 FY 2005 50 50 50 FY 2006 256,016 58,053 314,069 314,069 - FY 2007 220,037 48,449 268,486 268,486 - FY 2008 259,008 36,346 295,354 239,819 55,535 FY 2009 244,651 4,395 249,046 24,781 224,265 FY 2010 217,223 17,283 234,506 234,506 FY 2011 152,844 9,156 162,000 162,000 FY 2012 FY 2012 212,913 129,535 18,738 17,416 231,651 146,951 (102,300) 129,351 146,951 AIR FORCE FY 2002 Environmental 230,614 Op & Maint. 26,154 Total Obligation Authority 256,768 Land Sales / Prior Year Financing Budget Authority 256,768 FY 2003 125,569 22,975 148,544 9,904 138,640 FY 2004 191,142 4,795 195,937 2,000 193,937 FY 2005 148,772 148,772 148,772 FY 2006 122,661 17,346 140,007 140,007 FY 2007 113,205 18,215 131,420 131,420 FY 2008 123,775 18,535 142,310 142,310 FY 2009 117,718 19,098 136,816 136,816 FY 2010 113,796 11,649 125,445 125,445 FY 2011 113,832 9,288 123,120 123,120 FY 2012 114,528 8,948 123,476 123,476 FY 2012 112,995 9,557 122,552 122,552 7 FY 2013 Budget Estimates Base Realignment and Closure Account-Prior Rounds Environmental and Caretaker Costs by Fiscal Year (Dollars in Thousands) DEFENSE LOGISTICS AGENCY FY 2002 Environmental 7,345 Op & Maint. 1,335 Total Obligation Authority 8,680 Land Sales / Prior Year Financing Budget Authority 8,680 FY 2003 10,168 10,168 10,168 FY 2004 9,811 1,000 10,811 7,600 3,211 FY 2005 6,540 300 6,840 6,840 - FY 2006 5,040 5,040 5,040 FY 2007 5,973 5,973 5,973 FY 2008 3,643 3,643 3,643 FY 2009 2,585 2,585 2,585 FY 2010 4,017 4,017 4,017 FY 2011 - FY 2012 - DOD-WIDE FY 2002 Environmental 625,969 Op & Maint. 63,720 Total Obligation Authority 689,689 Land Sales / Prior Year Financing 29,670 Budget Authority 660,019 FY 2003 771,686 53,700 825,386 249,815 575,571 FY 2004 384,778 41,327 426,105 56,124 369,981 FY 2005 250,436 8,505 258,941 6,840 252,101 FY 2006 490,812 85,848 576,660 320,719 255,941 FY 2007 458,774 74,871 533,645 281,366 252,279 FY 2008 483,419 63,137 546,556 241,183 305,373 FY 2009 452,207 30,311 491,158 24,781 466,377 FY 2010 471,941 34,247 506,188 506,188 FY 2011 335,758 26,165 361,923 361,923 FY 2012 FY 2012 393,513 317,977 32,330 31,419 425,843 349,396 (102,300) 323,543 349,396 FY 2012 - The FY 2013 budget request includes $349.4 million of new budget authority for environmental restoration and caretaker costs for facilities closed under the previous four rounds of base closure authority. This funding will ensure bases are continuing to be cleaned efficiently to speed the transfer of property to redevelopment authorities. Annual recurring savings from the prior four BRAC rounds are estimated to be about $7.0 billion. B. BRAC 2005 The FY 2013 budget request includes $126.7 million of new budget authority for environmental restoration and caretaker costs for facilities closed under the recommendations from the BRAC 2005 Commission. The Department has prepared separate budget justification books to address BRAC 2005 funding requirements. 8 FY 2013 Budget Estimates Base Realignment and Closure Account - Part I Cost and Savings by Fiscal Year (Dollars in Millions) ARMY 1995 TOTAL 1990-1995 12.830 12.830 12.830 88.830 88.830 (3.940) 84.890 577.395 0.541 541.108 185.078 38.197 1,342.319 (65.713) 1,276.606 1.489 0.018 1.507 22.727 0.007 22.734 - 19.300 17.257 4.341 15.403 56.301 19.400 18.683 20.735 60.969 119.787 19.400 44.259 89.312 87.346 240.317 19.400 40.137 122.403 77.671 259.611 102.000 135.369 241.923 241.719 721.011 312.576 135.291 (204.753) (174.721) 598.618 1990 1991 1992 1993 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Total One-Time Costs Estimated Land Revenues Budget Request 121.619 38.566 8.925 169.110 (4.337) 164.773 137.511 0.051 166.610 80.348 13.251 397.771 (4.159) 393.612 183.375 0.490 185.215 35.117 3.330 407.527 (40.597) 366.930 122.060 100.453 31.047 12.691 266.251 (12.680) 253.571 Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account 16.675 0.066 16.741 0.040 0.054 0.094 1.915 0.032 1.947 Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings 9.200 1.556 (0.538) 10.218 15.300 15.033 3.576 0.868 34.777 358.929 Net Implementation Costs Less Estimated Land Revenues: 171.296 1994 16.675 26.171 0.177 43.023 9 FY 2013 Budget Estimates Base Realignment and Closure Account - Part I Cost and Savings by Fiscal Year (Dollars in Millions) NAVY 1990 1991 1992 1993 1994 1995 TOTAL 1990-1995 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Total One-Time Costs Estimated Land Revenues Budget Request 76.500 2.108 0.315 1.727 80.650 80.650 65.242 1.287 2.497 1.439 70.465 70.465 14.315 13.587 8.218 0.230 36.350 36.350 36.350 33.801 25.900 0.100 96.151 96.151 - - Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account - - - - - - 7.600 7.600 26.000 26.000 38.900 38.000 76.900 22.700 4.000 26.700 32.600 9.700 42.300 32.200 6.100 38.300 46.500 151.500 19.800 217.800 73.050 44.465 (40.550) 69.451 (42.300) (38.300) 65.816 Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings Net Implementation Costs Less Estimated Land Revenues: 192.407 48.675 38.723 0.415 3.396 283.616 283.616 - 10 FY 2013 Budget Estimates Base Realignment and Closure Account - Part I Cost and Savings by Fiscal Year (Dollars in Millions) AIR FORCE 1990 1991 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Total One-Time Costs Estimated Land Revenues Budget Request 147.485 70.949 3.115 221.549 221.549 Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account 21.300 21.300 - Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings 12.600 4.966 0.445 18.011 1.600 16.900 18.789 24.504 0.465 62.258 224.838 454.606 Net Implementation Costs Less Estimated Land Revenues: 276.042 198.556 37.717 1.314 3.235 516.864 516.864 1992 35.306 0.285 157.976 54.706 2.199 0.080 250.552 250.552 1993 1994 1995 TOTAL 1990-1995 8.999 40.856 1.919 8.910 60.684 60.684 - - 10.359 10.359 2.081 2.081 0.834 0.834 21.300 13.274 34.574 50.300 8.500 4.800 38.311 61.626 0.465 164.002 50.300 9.700 4.800 77.118 126.809 0.665 269.392 50.300 11.300 18.100 149.886 208.622 0.865 439.073 50.300 3.500 23.800 157.815 224.464 0.465 460.344 202.800 62.500 51.500 446.885 646.025 3.370 1,413.080 86.550 (198.349) (436.992) (459.510) - 467.832 0.285 397.388 165.291 12.423 6.430 1,049.649 1,049.649 (328.857) 11 FY 2013 Budget Estimates Base Realignment and Closure Account - Part I Cost and Savings by Fiscal Year (Dollars in Millions) DOD-WIDE 1990 1991 1992 1993 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Total One-Time Costs Estimated Land Revenues Budget Request 345.604 111.623 0.315 13.767 471.309 (4.337) 466.972 478.795 0.051 366.453 120.562 1.314 17.925 985.100 (4.159) 980.941 232.996 0.285 0.490 356.778 98.041 2.199 3.640 694.429 (40.597) 653.832 167.409 175.110 58.866 9.010 12.691 423.086 (12.680) 410.406 Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account 37.975 0.066 38.041 Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings 16.800 12.600 6.522 (0.538) 0.445 35.829 Net Implementation Costs Less Estimated Land Revenues: 469.184 1995 TOTAL 1990-1995 12.830 12.830 12.830 88.830 88.830 (3.940) 84.890 1,237.634 0.285 0.541 987.171 389.092 12.838 48.023 2,675.584 (65.713) 2,609.871 1994 0.040 0.054 0.094 1.915 0.032 1.947 1.489 10.377 11.866 22.727 2.088 24.815 0.834 0.834 37.975 26.171 13.451 77.597 16.900 16.900 15.033 48.365 25.372 0.465 123.035 108.500 8.500 22.057 80.652 77.029 0.465 297.203 69.700 9.700 23.483 120.553 191.778 0.665 415.879 69.700 11.300 62.359 271.798 305.668 0.865 721.690 69.700 3.500 63.937 312.418 308.235 0.465 758.255 351.300 62.500 186.869 840.308 907.544 3.370 2,351.891 858.000 358.576 6.393 (684.045) (672.531) 335.577 12 FY 2013 Budget Estimates Base Realignment and Closure Account - Part II Cost and Savings by Fiscal Year (Dollars in Millions) ARMY 1992 1993 1998 TOTAL 1992-1998 1994 1995 1996 1997 97.992 54.055 23.323 2.831 178.201 (0.162) 178.039 31.777 0.088 236.116 53.850 41.066 362.897 (4.824) 358.073 3.719 3.408 10.655 17.782 (17.549) 0.233 - 558.830 1.357 451.316 283.689 73.333 1,368.525 (22.592) 1,345.933 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Total One-Time Costs Estimated Land Revenues Budget Request 23.600 35.650 0.050 59.300 59.300 140.979 0.934 53.099 146.427 17.382 358.821 358.821 264.482 0.335 68.677 56.631 1.399 391.524 (0.057) 391.467 Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other (DBOF, NAF) Homeowners Assistance Program Total Outside of the Account 7.477 44.728 4.139 0.125 56.469 0.160 11.559 0.186 11.905 20.713 0.454 21.167 1.041 0.890 0.947 2.878 9.009 2.300 11.309 0.728 2.300 3.028 - 7.477 0.160 87.778 5.029 6.312 106.756 Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings 55.068 55.068 105.463 105.463 198.934 198.934 241.312 241.312 276.599 276.599 2.080 301.745 303.825 - 2.080 1,179.121 1,181.201 Net Implementation Costs Less Estimated Land Revenues: 60.701 265.263 213.700 (60.395) 92.783 (300.564) - 271.488 13 FY 2013 Budget Estimates Base Realignment and Closure Account - Part II Cost and Savings by Fiscal Year (Dollars in Millions) NAVY 1992 1993 1994 1995 1996 1997 1998 TOTAL 1992-1998 88.547 82.942 233.682 0.177 2.315 407.663 (1.328) 406.335 51.589 38.098 89.687 (1.393) 88.294 50.875 11.068 61.943 (0.349) 61.594 572.653 0.500 568.902 735.021 11.629 70.211 1,958.916 (3.070) 1,955.846 - - One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Total One-Time Costs Estimated Land Revenues Budget Request 20.262 47.316 0.222 67.800 67.800 152.519 0.500 95.875 88.788 4.728 9.600 352.010 352.010 Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account 5.943 0.829 25.605 0.240 8.083 40.700 4.930 4.930 Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings 13.870 51.128 0.766 12.661 1.623 19.259 99.307 1.768 18.343 18.530 97.719 136.360 13.619 1.618 136.037 49.963 100.758 301.995 6.297 4.522 233.832 81.890 163.944 490.485 3.750 9.387 301.438 123.232 199.893 637.700 8.201 305.557 151.983 183.251 648.992 8.201 305.557 151.983 183.251 648.992 9.193 220.580 356.632 (169.299) (231.365) (560.698) (587.398) Net Implementation Costs Less Estimated Land Revenues: 272.672 145.341 221.839 6.406 12.369 658.627 658.627 - 38.653 94.964 141.324 0.318 45.927 321.186 321.186 - - 5.943 0.829 25.605 0.240 13.013 45.630 37.536 51.128 34.463 1,313.425 579.204 948.075 2,963.831 (962.355) 14 FY 2013 Budget Estimates Base Realignment and Closure Account - Part II Cost and Savings by Fiscal Year (Dollars in Millions) AIR FORCE 1992 1993 1994 1995 1996 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Total One-Time Costs Estimated Land Revenues Budget Request 21.962 181.778 0.618 0.120 204.478 204.478 353.791 162.734 112.866 0.002 1.179 630.572 630.572 31.095 0.200 63.014 88.846 4.559 3.403 191.117 191.117 40.740 62.196 29.421 132.357 132.357 Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account 9.756 48.617 58.373 40.493 40.493 23.308 23.308 8.000 25.286 33.286 Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings 114.528 114.528 12.408 21.851 (3.073) 152.340 183.526 19.012 37.294 117.079 359.911 533.296 21.487 42.372 151.796 451.325 666.980 22.225 43.812 161.958 487.795 715.790 Net Implementation Costs Less Estimated Land Revenues: 148.323 487.539 (318.871) (501.337) (521.482) 49.714 114.136 30.458 194.308 194.308 - 1997 36.422 22.973 121.973 40.312 221.680 221.680 1998 TOTAL 1992-1998 - 533.724 23.173 705.831 302.521 4.561 4.702 1,574.512 1,574.512 - 9.756 56.617 89.087 155.460 22.985 45.290 168.108 507.243 743.626 - 212.645 190.619 595.868 1,958.614 2,957.746 (521.946) - (1,227.774) - 15 FY 2013 Budget Estimates Base Realignment and Closure Account - Part II Cost and Savings by Fiscal Year (Dollars in Millions) DOD-WIDE 1992 1993 1994 1995 1996 1997 1998 TOTAL 1992-1998 568.249 0.200 0.335 277.032 367.316 10.965 17.171 1,241.268 (0.057) 1,241.211 177.385 211.215 194.068 0.318 48.758 631.744 (0.162) 631.582 170.038 0.088 433.194 317.990 0.177 43.381 964.868 (6.152) 958.716 36.422 22.973 177.281 81.818 10.655 329.149 (18.942) 310.207 50.875 11.068 61.943 (0.349) 61.594 1,665.207 23.173 1.857 1,726.049 1,321.231 16.190 148.246 4,901.953 (25.662) 4,876.291 - 23.176 0.989 25.605 144.635 18.042 95.399 307.846 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Total One-Time Costs Estimated Land Revenues Budget Request 65.824 264.744 0.890 0.120 331.578 331.578 647.289 1.434 311.708 348.081 4.730 28.161 1,341.403 1,341.403 Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account 23.176 0.829 25.605 93.585 12.222 0.125 155.542 0.160 11.559 4.930 40.679 57.328 20.713 23.762 44.475 9.041 0.890 26.233 36.164 9.009 2.300 11.309 0.728 2.300 3.028 Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings 128.398 51.128 0.766 67.729 1.623 19.259 268.903 12.408 23.619 120.733 170.870 97.719 425.349 32.631 38.912 452.050 409.874 100.758 1,034.225 27.784 46.894 626.940 533.215 163.944 1,398.777 25.975 53.199 739.995 611.027 199.893 1,630.089 22.985 55.571 775.410 659.226 183.251 1,696.443 8.201 305.557 151.983 183.251 648.992 250.181 51.128 227.162 3,088.414 2,537.818 948.075 7,102.778 Net Implementation Costs Less Estimated Land Revenues: 218.217 973.382 251.461 (1,383.208) (587.398) (1,918.641) (731.031) (660.064) 16 FY 2013 Budget Estimates Base Realignment and Closure Account - Part III Cost and Savings by Fiscal Year (Dollars in Millions) ARMY 1994 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Total One-Time Costs Estimated Land Revenues Budget Request 11.751 11.070 11.170 2.416 36.407 36.407 Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account 11.059 0.014 11.073 Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings 12.750 (1.282) (0.572) 10.896 Net Implementation Costs Less Estimated Land Revenues: 36.584 1995 63.368 17.245 42.929 6.181 129.723 (0.715) 129.008 1996 1997 1998 1999 TOTAL 1994-1999 12.898 25.337 24.248 5.802 68.285 68.285 16.491 9.464 25.955 25.955 3.181 15.050 0.453 0.079 18.763 (0.046) 18.717 5.819 5.819 (0.037) 5.782 91.198 91.012 88.264 14.478 284.952 (0.798) 284.154 1.069 2.113 3.182 2.676 0.384 3.060 4.959 0.919 5.878 2.597 0.061 2.658 0.229 0.229 22.589 3.477 0.014 26.080 (5.280) 3.684 (1.596) 19.902 0.418 20.320 47.739 0.790 48.529 0.409 59.677 0.930 61.016 1.668 64.565 1.494 67.727 12.750 (4.485) 194.995 3.632 206.892 51.025 (16.696) (39.641) (61.716) 103.342 133.786 17 FY 2013 Budget Estimates Base Realignment and Closure Account - Part III Cost and Savings by Fiscal Year (Dollars in Millions) NAVY 1994 1995 1996 1997 1998 1999 TOTAL 1994-1999 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Total One-Time Costs Estimated Land Revenues 272.422 152.120 315.334 11.984 32.604 784.464 - 532.611 200.222 667.008 21.000 18.255 1,439.096 (2.578) 727.964 10.300 136.334 621.452 11.703 6.577 1,514.330 - 216.969 218.068 223.097 14.682 4.267 677.083 - 124.445 196.189 150.308 9.472 480.414 (0.051) 18.800 152.724 71.795 17.734 261.053 - 1,893.211 10.300 1,055.657 2,048.994 86.575 61.703 5,156.440 (2.629) Budget Request 784.464 1,436.518 1,514.330 677.083 480.363 261.053 5,153.811 Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account - - - - Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings 38.860 7.360 0.757 46.872 6.485 2.941 103.275 29.580 7.633 94.515 55.706 15.114 202.548 75.044 11.600 15.464 360.911 96.796 120.198 680.013 39.052 29.814 539.596 190.882 186.012 985.356 Net Implementation Costs Less Estimated Land Revenues: 681.189 1,233.970 834.317 (308.273) - 13.948 49.609 677.959 281.139 201.716 1,224.371 (744.008) - 20.602 37.100 48.986 731.553 315.852 205.741 1,359.834 (1,098.781) - 217.086 56.060 152.263 2,451.406 946.860 731.722 4,555.397 598.414 18 FY 2013 Budget Estimates Base Realignment and Closure Account - Part III Cost and Savings by Fiscal Year (Dollars in Millions) AIR FORCE 1994 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Total One-Time Costs Estimated Land Revenues Budget Request Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings Net Implementation Costs Less Estimated Land Revenues: 1995 1996 120.577 0.511 86.429 60.395 0.740 1.164 269.816 269.816 131.568 107.450 12.574 5.356 0.301 257.249 257.249 51.852 33.775 92.219 0.006 0.595 178.447 178.447 5.079 5.079 71.650 71.650 3.850 8.640 12.490 14.850 19.630 24.840 59.320 5.890 52.700 113.380 171.970 262.405 269.579 6.477 - 1997 24.690 14.929 30.187 43.922 113.728 113.728 - 1998 2.007 46.010 147.405 32.153 227.575 227.575 - 1999 99.898 31.619 131.517 131.517 - 26.400 99.510 153.370 279.280 12.600 111.420 156.620 280.640 25.430 113.860 160.140 299.430 (165.552) (53.065) (167.913) TOTAL 1994-1999 330.694 61.450 505.144 272.882 6.102 2.060 1,178.332 1,178.332 76.729 76.729 89.020 405.760 608.350 1,103.130 151.931 19 FY 2013 Budget Estimates Base Realignment and Closure Account - Part III Cost and Savings by Fiscal Year (Dollars in Millions) DEFENSE LOGISTICS AGENCY 1994 1995 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Total One-Time Costs Estimated Land Revenues Budget Request 1.950 19.300 21.250 21.250 14.068 10.798 30.101 - Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings Net Implementation Costs Less Estimated Land Revenues: 1996 1997 1998 1999 TOTAL 1994-1999 54.967 54.967 - 37.650 14.043 27.204 78.897 78.897 2.098 6.832 8.930 8.930 0.645 4.670 5.315 5.315 51.718 29.534 88.107 169.359 169.359 5.850 6.950 12.800 0.400 21.357 21.757 6.707 6.707 - - - 6.250 35.014 41.264 8.000 18.869 26.869 62.812 0.179 62.991 82.567 0.271 82.838 0.025 111.824 0.590 112.439 0.025 117.299 0.713 118.037 0.025 124.467 0.801 125.293 8.000 0.075 517.838 2.554 528.467 7.181 13.733 (76.131) (33.542) (109.107) (119.978) (317.844) 20 FY 2013 Budget Estimates Base Realignment and Closure Account - Part III Cost and Savings by Fiscal Year (Dollars in Millions) DEFENSE INFORMATION SYSTEMS AGENCY 1994 1995 1996 1997 1998 1999 TOTAL 1994-1999 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Total One-Time Costs Estimated Land Revenues Budget Request 29.745 0.025 29.200 58.970 58.970 72.300 0.220 87.080 159.600 159.600 61.408 0.045 54.455 115.908 115.908 31.309 0.050 10.228 41.587 41.587 1.097 1.097 1.097 - 195.859 0.340 180.963 377.162 377.162 Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account - 28.915 1.772 30.687 48.072 1.995 50.067 51.247 1.995 53.242 51.382 1.995 53.377 51.385 1.995 53.380 231.001 9.752 240.753 8.786 8.786 105.857 2.785 108.642 267.476 15.828 283.304 297.860 18.088 315.948 314.955 19.164 334.119 314.262 19.164 333.426 1,309.196 75.029 1,384.225 50.184 81.645 (117.329) (221.119) (279.645) (280.046) Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings Net Implementation Costs Less Estimated Land Revenues: (766.310) 21 FY 2013 Budget Estimates Base Realignment and Closure Account - Part III Cost and Savings by Fiscal Year (Dollars in Millions) DOD-WIDE 1994 1995 1996 1997 1998 1999 TOTAL 1994-1999 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Total One-Time Costs Estimated Land Revenues 404.750 0.511 251.569 435.944 12.749 65.384 1,170.907 - 741.615 335.715 824.912 26.576 111.817 2,040.635 (3.293) 792.714 10.300 195.446 799.327 11.754 67.429 1,876.970 - 279.309 14.929 278.789 334.996 14.732 14.495 937.250 - 129.633 46.010 360.742 190.843 9.472 0.079 736.779 (0.097) 18.800 259.086 108.084 17.734 403.704 (0.037) 2,366.821 71.750 1,681.347 2,694.106 93.017 259.204 7,166.245 (3.427) Budget Request 1,170.907 2,037.342 1,876.970 937.250 736.682 403.667 7,162.818 5.850 18.009 5.093 28.952 0.400 51.341 3.885 71.650 127.276 57.455 2.379 59.834 56.206 2.914 59.120 53.979 2.056 56.035 51.614 1.995 53.609 6.250 288.604 13.229 76.743 384.826 63.460 7.360 (0.525) 82.595 6.485 2.941 162.316 44.430 2.353 286.498 83.510 15.114 431.905 80.934 11.600 15.464 783.556 226.275 120.616 1,238.445 65.452 29.839 1,096.529 362.930 186.802 1,741.552 26.548 50.043 1,281.310 457.636 202.646 2,018.183 46.032 37.100 50.679 1,348.707 495.957 207.235 2,185.710 326.856 56.060 147.853 4,879.195 1,632.793 735.354 7,778.111 1,732.713 698.359 (1,225.466) (1,728.434) Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings Net Implementation Costs Less Estimated Land Revenues: 1,037.543 (745.182) (230.467) 22 FY 2013 Budget Estimates Base Realignment and Closure Account - Part IV Cost and Savings by Fiscal Year (Dollars in Millions) ARMY 1996 1997 1998 1999 2000 438.963 90.783 0.400 196.130 113.824 8.240 409.377 (16.605) 392.772 28.360 2.008 0.258 313.926 153.716 3.731 501.999 (16.124) 485.875 39.260 107.186 24.842 171.288 (21.360) 0.771 150.699 17.413 17.413 16.343 16.343 21.397 21.397 2.690 2.690 2.163 2.163 2.092 2.092 62.098 62.098 19.910 19.910 0.230 28.297 28.527 2.716 135.646 138.362 4.184 194.694 198.878 6.943 273.658 280.601 7.666 304.947 312.613 21.739 957.152 978.891 228.139 426.779 275.807 289.687 (127.739) (22.344) One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Prior Year Financing Total One-Time Costs Estimated Land Revenues Homeowners Assistance Program Budget Request 84.631 54.818 85.128 6.059 230.636 230.636 255.162 0.489 0.007 60.365 117.024 5.916 438.963 Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings Net Implementation Costs Less Estimated Land Revenues: 2001 257.373 24.431 281.804 6.373 288.177 1996-2001 498.196 2.497 0.665 989.798 518.965 23.946 2,034.067 (54.089) 7.144 1,987.122 1,070.329 23 FY 2013 Budget Estimates Base Realignment and Closure Account - Part IV Cost and Savings by Fiscal Year (Dollars in Millions) NAVY 1996 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Prior Year Financing Total One-Time Costs Estimated Land Revenues Homeowners Assistance Program Budget Request Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account 165.446 91.919 228.950 1.543 1.203 489.061 489.061 - 1997 61.603 81.142 287.670 0.710 0.491 431.616 431.616 13.300 13.300 1998 213.425 102.314 120.642 2.402 438.783 438.783 - 1999 2000 2001 1996-2001 118.368 114.281 73.734 3.401 309.784 309.784 20.635 123.232 55.586 0.076 2.387 201.916 201.916 384.552 41.465 0.009 0.643 426.669 426.669 579.477 897.440 808.047 4.740 8.125 2,297.829 2,297.829 15.000 15.000 17.126 17.126 3.722 3.722 49.148 49.148 Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings 4.900 (11.670) (0.230) 566.082 559.082 1.836 (31.459) (0.520) 509.166 479.023 1.400 9.583 83.674 28.150 549.874 672.681 1.100 20.724 100.058 47.546 465.262 634.690 1.310 21.383 110.464 58.272 491.633 683.062 15.540 22.071 118.636 66.795 505.351 728.393 24.250 75.597 369.703 200.013 3,087.368 3,756.931 Net Implementation Costs Less Estimated Land Revenues: (70.021) (34.107) (233.898) (309.906) (464.020) (298.002) (1,409.954) 24 FY 2013 Budget Estimates Base Realignment and Closure Account - Part IV Cost and Savings by Fiscal Year (Dollars in Millions) AIR FORCE 1996 1997 1998 1999 2000 2001 1996-2001 77.000 0.080 60.968 94.265 0.555 0.826 94.602 328.296 (94.602) 233.694 61.020 0.790 109.071 245.528 7.928 424.337 (30.480) 393.857 37.700 57.887 300.741 1.963 2.628 400.919 (19.017) 381.902 4.722 126.748 185.886 1.273 318.629 (6.836) 0.817 312.610 12.100 149.418 112.690 1.734 275.942 (2.693) 7.093 280.342 210.786 0.870 567.900 968.823 6.866 12.389 94.602 1,862.236 (153.628) 7.910 1,716.518 - 21.093 21.093 12.700 12.700 18.000 18.000 9.890 9.890 0.770 33.374 14.400 48.544 1.676 46.966 14.700 63.342 1.676 80.979 18.900 101.555 1.541 197.035 24.800 223.376 1.541 371.969 27.100 400.610 7.204 740.213 99.900 847.317 125.585 185.150 351.608 293.047 107.234 (120.268) 942.356 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Air Force O'Hare Move Costs Prior Year Financing Total One-Time Costs Estimated Land Revenues Homeowners Assistance Program Budget Request 18.244 63.808 29.713 1.341 1.007 114.113 114.113 Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account 21.362 21.362 Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings Net Implementation Costs Less Estimated Land Revenues: - 73.155 73.155 25 FY 2013 Budget Estimates Base Realignment and Closure Account - Part IV Cost and Savings by Fiscal Year (Dollars in Millions) DEFENSE LOGISTICS AGENCY 1996 1997 1998 1999 2000 2001 1996-2001 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Commission Expenses Prior Year Financing Total One-Time Costs Estimated Land Revenues Homeowners Assistance Program Budget Request 2.350 6.181 55.668 - 9.300 25.749 136.276 - 18.605 27.626 - 19.300 16.891 18.744 - 1.100 1.140 7.120 - 6.543 4.538 - 64.199 64.199 171.325 171.325 46.231 46.231 54.935 54.935 9.360 9.360 11.081 11.081 32.050 75.109 249.972 357.131 357.131 Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account 6.184 6.184 12.300 12.300 - - - - 18.484 18.484 Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings 12.545 12.020 0.109 24.674 0.030 38.970 0.227 39.227 0.071 103.923 0.385 104.379 0.154 115.743 0.603 116.500 0.154 145.565 0.916 146.635 0.154 148.716 0.934 149.804 12.545 0.563 564.937 3.174 581.219 Net Implementation Costs Less Estimated Land Revenues: 45.709 144.398 (58.148) (61.565) (137.275) (138.723) (205.604) 26 FY 2013 Budget Estimates Base Realignment and Closure Account - Part IV Cost and Savings by Fiscal Year (Dollars in Millions) DOD-WIDE 1996 1997 1998 1999 2000 2001 1996-2001 403.065 0.569 0.007 228.224 635.235 1.265 7.233 94.602 1,370.200 (94.602) 1,275.598 365.228 0.790 0.400 426.120 507.620 2.402 16.168 1,318.728 (47.085) 1,271.643 203.728 2.008 0.258 502.985 546.935 1.963 9.760 1,267.637 (35.141) 1,232.496 65.717 358.306 273.434 1.349 2.387 701.193 (28.196) 1.588 674.585 12.100 797.886 183.124 1.743 0.643 995.496 (2.693) 13.466 1,006.269 1,320.509 3.367 0.665 2,530.247 2,545.807 11.606 44.460 94.602 6,551.263 (207.717) 15.054 6,358.600 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Air Force O'Hare Move Costs Prior Year Financing Total One-Time Costs Estimated Land Revenues Homeowners Assistance Program Budget Request 270.671 216.726 399.459 2.884 8.269 898.009 898.009 Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total Outside of the Account 44.959 44.959 41.943 41.943 42.490 42.490 30.390 30.390 37.289 37.289 5.814 5.814 202.885 202.885 Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military Personnel Other Total Savings 17.445 30.150 (0.121) 566.082 613.556 0.770 2.096 69.182 14.107 509.166 595.321 1.400 1.676 12.370 370.209 43.235 549.874 978.764 1.100 1.676 25.062 491.474 67.049 465.262 1,051.623 1.310 1.541 28.480 726.722 83.988 491.633 1,333.674 15.540 1.541 29.891 944.268 94.829 505.351 1,591.420 36.795 7.204 97.899 2,632.005 303.087 3,087.368 6,164.358 Net Implementation Costs Less Estimated Land Revenues: 329.412 722.220 335.369 211.263 (621.800) (579.337) 397.127 27 FY 2013 Budget Estimates Base Realignment and Closure - Part I Anticipated/Realized Land Revenue - Army (Dollars in Thousands) Location Kapalama Military Reservation, HI Pontiac Storage Facility, MI Total 38,529 3,100 Fort Holabird, MD 100 USA Reserve Center Gaithersburg, MD 785 Stand-Alone Housing, Various Locations 23,199 Total 65,713 28 FY 2013 Budget Estimates Base Realignment and Closure - Part I Loss of Land Revenue - Army (Dollars in Thousands) Location Total Lexington AD, KY 7,379 Army Material Tech Lab, MA 3,124 Jefferson Proving Ground, IN 28,925 AMC Other 8,030 Presidio, CA 42,986 Hamilton AAF, CA 49,550 Sheridan, IL 59,092 Fort Douglas, UT 7,379 Fort Meade, MD 447,770 Cameron Station, VA 212,624 Stand Alone Total 62,053 928,912 29 FY 2013 Budget Estimates Base Realignment and Closure - Part I Anticipated/Realized Land Revenue - Navy (Dollars in Thousands) Location Total NRC Coconut Grove, FL 7,134 NH Philadelphia, PA 25 NTB Salton Sea, CA 14 Total 7,173 30 FY 2013 Budget Estimates Base Realignment and Closure - Part I Loss of Land Revenue - Navy (Dollars in Thousands) Location Total Naval Station New York (Brooklyn, NY) 57,000 Naval Station Puget Sound (Sand Point), WA 60,000 Total 117,000 31 FY 2013 Budget Estimates Base Realignment and Closure - Part I Anticipated/Realized Land Revenue - Air Force (Dollars in Thousands) Location Total Chanute Air Force Base, IL 11,419 George Air Force Base, CA 3,823 Mather Air Force Base, CA 10,241 Norton Air Force Base, CA 3,950 Pease Air Force Base, NH Total* 280 29,713 *All anticipated/realized land revenues are accounted for in BRAC IV 32 FY 2013 Budget Estimates Base Realignment and Closure - Part I Loss of Land Revenue - Air Force (Dollars in Thousands) Location Total George Air Force Base, CA 90,000 Mather Air Force Base, CA 305,000 Norton Air Force Base, CA 100,000 Chanute Air Force Base, IL 13,000 Pease Air Force Base, NH 120,000 Total 628,000 33 FY 2013 Budget Estimates Base Realignment and Closure - Part II Anticipated/Realized Land Revenue - Army (Dollars in Thousands) Location Cameron Station, VA Total 15,661 Fort Ben Harrison, IN 4,634 Sacramento Army Depot, CA Fort Devens, MA Total 299 1,998 22,592 34 FY 2013 Budget Estimates Base Realignment and Closure - Part II Loss of Land Revenue - Army (Dollars in Thousands) Location Fort Devens, MA Total 112,000 Fort Dix, NJ* 83,000 Fort Ord, CA 399,750 Harry Diamond Lab, VA Fort Benjamin Harrison, IN Sacramento Depot, CA Total 30,000 102,227 24,879 751,856 * Note: The anticipated revenues from Fort Dix were reduced from $83.0 million to zero. The basis of the reduction is the proposed utilization of Fort Dix by other federal and state agencies which precludes disposal of the anticipated excess land. 35 FY 2013 Budget Estimates Base Realignment and Closure - Part II Anticipated/Realized Land Revenue - Navy (Dollars in Thousands) Location MCAS Tustin, CA Total 203,500 NAS Chase Field, TX 791 NCBC Davisville, RI 63 NAS Moffett Field, CA 6,250 NH Long Beach, CA 14,075 NS Philadelphia, PA 2,000 Total 226,679 36 FY 2013 Budget Estimates Base Realignment and Closure - Part II Loss of Land Revenue - Navy (Dollars in Thousands) Location Total NAS Chase Field, TX 2,000 NCBC Davisville, RI 22,000 NH Long Beach, CA 1,400 NS Long Beach, CA 21,250 NS Philadelphia, PA 18,000 NS Puget Sound (Sand Point) WA 12,800 NCCOSC San Diego, CA 3,000 MCAS Tustin, CA 468,500 Total 548,950 37 FY 2013 Budget Estimates Base Realignment and Closure - Part II Anticipated/Realized Land Revenue - Air Force (Dollars in Thousands) Location Carswell Air Force Base, TX Castle Air Force Base, CA Total 178 5,210 England Air Force Base, LA 784 Grissom Air Force Base, IN 5,981 Loring Air Force Base, ME 335 Lowry Air Force Base, CO 14,868 Myrtle Beach Air Force Base, SC 10,455 Richards-Gebaur Air Force Reserve Station, MO 300 Rickenbacker Air Guard Base, OH 600 Williams Air Force Base, AZ Wurtsmith Air Force Base, MI Total* 4,431 49 43,191 *All anticipated/realized land revenues are accounted for in BRAC IV 38 FY 2013 Budget Estimates Base Realignment and Closure - Part II Loss of Land Revenue - Air Force (Dollars in Thousands) Location Total Williams Air Force Base, AZ 8,000 Eaker Air Force Base, AR 8,000 Castle Air Force Base, CA 27,000 Lowry Air Force Base, CO 100,000 MacDill Air Force Base, FL 50,000 Grissom Air Force Base, IN 8,000 Loring Air Force Base, ME 8,000 Wurtsmith Air Force Base, MI 8,000 Richards Gebaur Air Force Reserve Station, MO 8,000 Rickenbacker Air National Guard Base, OH 8,000 Myrtle Beach Air Force Base, SC 8,000 Bergstrom Air Force Base, TX 8,000 Carswell Force Base, TX 8,000 Total 257,000 39 FY 2013 Budget Estimates Base Realignment and Closure - Part III Anticipated/Realized Land Revenue - Army (Dollars in Thousands) Location Total Various Locations 798 Total 798 40 FY 2013 Budget Estimates Base Realignment and Closure - Part III Anticipated/Realized Land Revenue - Navy (Dollars in Thousands) Location Total DoD Family Housing Niagara Falls, NY 1,125 MCAS El Toro, CA 649,500 NAWC Trenton, NJ 1,812 NTC Orlando, FL 13,626 NAS Cecil Field, CA 48 NTC San Diego, Ca 80 NH Oakland, CA PWC San Francisco, CA NS Staten Island, NY 100,475 10,330 602 NSY Charleston, SC 1,100 Various Locations 1,107 Total 779,805 41 FY 2013 Budget Estimates Base Realignment and Closure - Part III Loss of Land Revenue - Navy (Dollars in Thousands) Location NS Mobile, AL Total 28,000 Various Locations 309,263 Total 337,263 42 FY 2013 Budget Estimates Base Realignment and Closure - Part III Anticipated/Realized Land Revenue - Air Force (Dollars in Thousands) Location Gentile Air Force Station, OH Griffiss Air Force Base, NY Homestead Air Force Base, FL March Air Force Base, CA O’Hare IAP ARS, IL Total 54 1,987 488 4,065 65 Plattsburg Air Force Base, NY 1,288 Total* 7,947 *All anticipated/realized land revenues are accounted for in BRAC IV 43 FY 2013 Budget Estimates Base Realignment and Closure - Part IV Anticipated/Realized Land Revenue - Army (Dollars in Thousands) Location Total Fort Devens, MA 2,500 Fort Ben Harrison, IN 2,297 Cameron Station, VA 14,861 Stratford Army Ammo Plant, CT 7,056 Army Material Technology Lab, MA 6,613 Bayonne Military Ocean Terminal, NJ 278 Hamilton AAF, CA 4,748 Jefferson Proving Ground, IN 3,120 Detroit, Army Tank Plant, MI 5,924 Fort Sheridan, IL 5,750 Stand Alone Housing Savanna Army Depot, IL Fort Ritchie, MD Fitzsimons AMC, CO 110 8 54 172 City of Chicago, IL 15,980 Fort McClellan, AL 499 Fort Ord, CA New Orleans Military Ocean Terminal, LA Fort Polk, LA 7,594 275 24 44 FY 2013 Budget Estimates Base Realignment and Closure - Part IV Anticipated/Realized Land Revenue - Army (Dollars in Thousands) Defense Depot Ogden, UT Defense Depot Memphis, TN Vint Hill Farm Station, VA 680 88 992 Tacony Warehouse, PA 2,410 Bellmore MOT, NY 6,650 Indiana Army Ammo Plant, IN 262 Kelly Support Center, PA 112 Fort Des Moines, IA 48 Tooele Army Depot, UT 73 Pueblo Army Depot, CO 5 Fort Polk, LA 44 DPSC Philadelphia, PA 380 Memphis Distribution Depot, TN 792 Total Army Part IV 90,399 45 FY 2013 Budget Estimates Base Realignment and Closure - Part IV Anticipated/Realized Land Revenue - Navy (Dollars in Thousands) Location San Pedro (Housing) Long Beach, CA NAWC Warminster, PA NAF Key West, FL (Housing) NAS Key West, FL Total 88,000 63 15,100 600 NAS South Weymouth (North Quincy Housing) 2,632 Various Locations 1,283 Total 107,678 46 FY 2013 Budget Estimates Base Realignment and Closure - Part IV Anticipated/Realized Land Revenue – Air Force (Dollars in Thousands) Location Total City of Chicago, Illinois – O’Hare International Airport* 94,602 Kelly Air Force Base, TX 1,096 McClellan 1,218 Reese Air Force Base, TX Roslyn Air Guard Station, NY Total 53 3,031 100,000 *Revenue from the City of Chicago for the movement of the Air National Guard facilities to Scott Air Force Base, Illinois. 47 BRAC 2005 48 BRAC 2005 Overview A. Background The FY 2002 National Defense Authorization Act, authorized an additional round of base realignment and closure in 2005 by amending the Defense Base Closure and Realignment Act of 1990 (Public Law 101-510). The 2005 BRAC Commission recommendations became law on November 9, 2005. The Department of Defense Base Closure Account 2005 (Treasury code 0512) has been established as a single account on the books of the Treasury to execute actions to implement BRAC 2005 approve closures and realignments. The six-year implementation period for the 2005 approved realignment and closures ends on September 15, 2011. B. Budget Justification Requirements The BRAC 2005 Executive Summary Book provides an overview of the BRAC 2005 costs and savings for each DoD Component through the six-year implementation period. The DoD Components have prepared separate justification books providing detailed information by realignment and closure package, broken out by one-time implementation costs, anticipated revenues from land sales, and expected savings. The cost data reflected on all BC-02 financial displays as well as other cost data reflected in the Components Justification Books budget material accurately reflects all BRAC related costs. Costs associated with environmental and caretaker efforts for property not yet conveyed are appropriately reflected elsewhere in the Components Justification Books budget material. This comprehensive approach satisfies the requirement of paragraphs (1) and (2) above. The reporting requirements in Section 2097, paragraphs (3) through (7), as added by P.L. 109-163 Section 2831, will be provided separately. The FY 2008 National Defense Authorization Act Conference Report Section 2706 required the Department to submit a comprehensive accounting of the funding required to ensure that the plan for implementing the final recommendations of the 2005 Defense Base Realignment and Closure Commission remains on schedule for completion by September 15, 2011. The cost data reflected on all BC-02 financial displays as well as other cost data reflected in the Components Justification Books budget materials constitute the comprehensive accounting of the funding required to ensure timely implementation of the 2005 Defense Base Closure and Realignment Commission recommendations. C. DoD Base Closure Account Capitalization and Funding The Department has complied with the guidance contained in the House of Representatives Report 101-76, Military Construction Appropriations Bill, 1990, July 26, 1989, to determine the proper method of capitalizing the DoD Base Closure Accounts. In denying general transfer authority to the Secretary of Defense, the Committee expressed the belief that the necessary one-time costs to implement base realignments and closures be requested as new appropriated amounts to facilitate improved accounting of the funds appropriated. Additionally, the Committee indicated that any savings or cost avoidance due to base realignment or closure should be reflected through reduced requirements in the annual budget requests for the affected appropriations. 49 The manner in which the impacts of base realignments and closures are reflected in BRAC 2005 appropriations accounts is consistent with this language. The budget request includes any funds that are required to be transferred to the Homeowner’s Assistance Program for the purpose outlined in Section II. The implementation of base realignment and closures requires the relocation of units and activities from one site to another. Recurring savings (reduced base operations costs) are realized through the increased efficiencies inherent in the consolidation of functions on fewer bases. The net savings are reflected as savings in the specific appropriations, primarily operation and maintenance, and are not incorporated in the DoD Base Closure Accounts. Estimates for savings or cost avoidance have been incorporated into the DoD Component appropriation account where they are to accrue, resulting in corresponding reduced budget requests for those appropriations. The recurring savings reflected on all BC-02 financial displays reflect those cost avoidances that are estimated to accrue each year as a result of implementing the closure and/or realignment recommendations. These savings, attributable to such areas as civilian salaries, military personnel entitlements and overhead, are used to fund the implementation of BRAC recommendations and/or fund other Defense priorities such as equipment, facilities, and military personnel billets for our forces. The BRAC decisions free up military personnel authorizations that, in many cases, are re-applied within each Military Department to support new capabilities and to improve operational efficiencies at worldwide locations. To the extent that savings generated from military personnel reductions at closing or realigning installations are immediately used to fund military personnel priorities, these resources are not available to fund other Defense priorities. D. Financial Management Procedures The Defense Authorization Amendments and Base Closure and Realignment Act of 1990 (as amended) established the Defense Base Closure Account 2005 as a mechanism to provide the required funding to implement the approved recommendations of the 2005 BRAC Commission. Funding approved by Congress in the BRAC 2005 account is appropriated and authorized in a lump sum amount and may be spent for construction, planning and design, civilian severance pay, civilian permanent change in station, transportation of things, and other costs directly related to bases approved for realignment or closure after January 2005. The management structure of the BRAC 2005 program is described below. 1. The Deputy Under Secretary of Defense (Installations & Environment) is responsible for issuing policy for management of the BRAC program and overseeing the DoD Components’ execution of the program. 2. To properly account for and manage appropriated fund resources, the DoD Base Closure Account 2005 was established on the books of the Treasury under code 97 X 0512 to aid the DoD Components in the closure and realignment of military installations. 50 Funds made available to the DoD Components are subdivided and distribute to the activities responsible for base closure actions. Separate sub-allocations are made for each of the accounts by program year. Each DoD Component distributes the base closure funds in accordance with its normal fund distribution procedures. The applicable reporting requirements include: Military Construction Construction Planning and Design Family Housing Construction Operations Environmental Operation and Maintenance (O&M) Civilian Severance Pay Civilian Permanent Change of Station (PCS) costs Transportation of things Real Property Maintenance Program Management (civilian work years, TDY travel, and related support dedicated to implementation efforts) Military Personnel (limited to PCS expenses dedicated to implementation efforts) Other (including procurement-type items) 3. The Under Secretary of Defense (Comptroller) makes funds available to the DoD Components based on their official financial plans. Financial plans are prepared by the DoD Components in cooperation with and at the direction of the program manager, the Deputy Under Secretary of Defense (Installations & Environment). The DoD Components’ financial plans and the subsequent sub-allocation of funds are supported by detailed, line-item military and family housing construction justification. Separate narrative explanations for other planned expenditures are also submitted to the Under Secretary of Defense (Comptroller) in sufficient detail to support the DoD Component’s Financial plan. The DoD Components are allowed to revise planned execution as the situation dictates but must notify the Deputy Under Secretary of Defense (Installations & Environment) and the Under Secretary of Defense (Comptroller) of all changes. To keep the Under Secretary of Defense (Comptroller) apprised of these changes, the DoD Components are required to submit a revised current year financial plan and supporting documentation on a quarterly basis to reflect the status of the current plan being executed. When a military construction or family housing construction project is to be executed, but does not appear on the approved construction project list, the prior approval of the Under Secretary of Defense (Comptroller), and Congress is required. This will ensure that the Department has complied with the notification requirements of the Congress, prior to the expenditure of DoD Base Closure Account funds. Each DoD Component is sub-allocated funds based upon its official budget justification and financial plan. 51 II. Homeowners Assistance Program The Homeowners Assistance Program (HAP) provides assistance to eligible service members and civilian employee homeowners who have suffered losses through the depression of the real estate market. Funding to support the FY 2013 HAP requirement has been separately requested as a direct appropriation to the Homeowners Assistance Program. Budget justification materials have been submitted with the Department of the Army’s Family Housing justification material. III. Budget Summary The tables on the following pages provide information on one-time implementation costs, and expected savings from the approved BRAC 2005 round. The Department fully funded BRAC 2005 requirements through the six-year implementation period (FY 2006 – 2011). FY 2013 funding request total $126.7 million and represents the resources necessary to provide for environmental clean-up and caretaker efforts at property not yet conveyed to another entity. 52 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Department of Defense Summary 2006 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Costs Outside of the Account Grand Total One-Time Implementation Costs Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 2007 2008 2009 2010 2011 2006-2011 1,126.019 0.000 0.000 82.676 270.465 0.571 22.728 0.000 1,502.459 0.000 1,502.459 4,933.060 0.000 0.000 53.708 548.029 17.400 81.927 0.000 5,634.124 0.000 5,634.124 7,339.746 0.000 0.000 55.497 736.615 7.675 338.944 0.000 8,478.477 0.000 8,478.477 7,315.549 0.000 0.000 74.271 1,140.064 15.535 483.494 0.000 9,028.913 0.000 9,028.913 3,808.886 0.000 0.000 194.708 2,782.202 6.504 654.752 0.000 7,447.052 0.000 7,447.052 254.116 0.000 0.000 138.396 1,754.218 1.456 175.062 0.000 2,323.248 0.000 2,323.248 24,777.376 0.000 0.000 599.256 7,231.593 49.141 1,756.907 0.000 34,414.273 0.000 34,414.273 26.521 0.000 0.000 1.472 0.000 0.000 27.993 0.000 0.000 0.000 1.786 3.400 0.000 5.186 0.000 0.000 0.000 2.676 6.492 0.000 9.168 0.000 0.000 0.000 165.303 83.046 0.000 248.349 0.000 0.000 0.000 45.747 164.568 0.000 210.315 0.000 0.000 0.000 56.645 152.438 0.000 209.083 26.521 0.000 0.000 273.629 409.944 0.000 710.094 1,530.452 5,639.310 8,487.645 9,277.262 7,657.367 2,532.331 35,124.367 0.986 0.000 1.055 2.041 64.792 52.797 29.597 147.186 373.823 127.631 38.335 539.788 726.046 271.965 48.453 1,046.464 1,056.147 359.320 102.838 1,518.305 1,289.520 417.449 114.440 1,821.409 3,511.314 1,229.160 334.719 5,075.193 Exhibit BC-02 BRAC Implementation Costs and Savings 53 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Department of Defense Summary 2006 One-Time Savings Military Construction Family Housing - Construction Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 48.152 0.000 23.273 35.170 106.595 0.000 0.000 33.703 61.888 95.591 10.826 0.000 25.484 108.065 144.375 6.139 0.753 15.735 105.161 127.788 2.021 2.339 24.321 231.181 259.862 67.138 3.092 122.517 541.465 734.211 8.594 103.949 280.648 459.229 755.562 1,027.846 2,635.829 0.190 0.406 0.000 38.716 160.103 44.017 103.575 407.862 102.584 197.022 668.357 171.655 332.951 1,055.288 258.767 445.135 1,340.776 306.254 1,117.589 3,632.793 883.275 0.000 0.000 25.439 0.000 0.000 21.263 51.457 36.139 0.000 54.222 147.733 105.343 4.709 183.577 201.055 282.683 12.280 226.306 229.073 416.724 14.611 277.658 241.924 510.659 31.600 763.026 896.680 1,351.547 0.000 0.000 4.633 39.262 6.707 108.692 85.184 656.227 50.317 170.702 189.736 1,612.723 63.152 277.910 315.266 2,824.615 68.570 403.462 486.840 4,245.822 79.522 428.255 636.176 5,308.816 268.268 1,389.022 1,717.835 14,687.466 39.262 762.823 1,708.314 2,968.990 4,373.610 5,568.678 15,421.677 (628) (73) 1,491.190 (2,047) (4,021) 4,876.487 (1,881) (2,488) 6,779.331 (3,019) (4,846) 6,308.272 (1,565) (3,219) 3,283.757 (4,066) (4,037) (3,036.347) (13,205) (18,684) 19,702.690 Exhibit BC-02 BRAC Implementation Costs and Savings 54 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Department of the Army 2006 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request One-Time Costs Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account: Grand Total One-Time Implementation Costs Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add): 2007 2008 2009 788.147 3,358.050 3,655.970 3,772.211 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 38.522 16.111 17.668 39.831 45.461 192.882 216.632 316.152 0.000 0.000 0.000 0.000 0.752 39.092 97.459 195.785 0.000 0.000 0.000 0.000 872.882 3,606.135 3,987.729 4,323.979 0.000 0.000 0.000 0.000 872.882 3,606.135 3,987.729 4,323.979 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1,901.964 0.000 0.000 0.000 0.000 0.000 147.693 71.940 1,462.676 887.231 0.000 0.000 436.714 51.678 0.000 0.000 3,949.047 1,010.849 0.000 0.000 3,949.047 1,010.849 13,476.342 0.000 0.000 331.765 3,121.034 0.000 821.480 0.000 17,750.621 0.000 17,750.621 872.882 3,606.135 3,987.729 4,469.131 3,949.047 1,012.420 17,896.164 247.209 31.942 5.377 284.528 0.000 0.000 0.000 145.152 0.000 0.000 145.152 2006-2011 0.000 0.000 0.000 145.152 0.000 0.000 145.152 0.152 0.000 0.000 0.152 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2010 502.680 117.840 8.894 629.415 0.000 0.000 0.000 0.000 0.000 0.000 0.000 704.053 808.716 160.839 196.070 29.691 33.831 894.584 1,038.618 2,262.811 506.692 77.793 2,847.297 55 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Department of the Army One-Time Savings: Military Construction Family Housing - Construction Military PCS Cost Avoidance Other Total One-Time Savings: 2006 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 48.152 0.000 11.233 0.000 59.385 0.000 0.000 23.617 4.269 27.886 0.000 0.000 17.385 37.079 54.464 0.000 0.000 7.244 37.594 44.838 0.000 0.000 12.365 17.087 29.452 48.152 0.000 71.844 96.029 216.025 0.000 0.000 25.543 93.821 246.412 344.308 710.084 0.000 0.000 0.000 0.000 0.000 0.000 15.354 31.673 30.575 69.954 173.578 68.044 159.443 444.790 116.709 198.183 589.660 138.329 442.935 1,239.700 353.658 0.000 91.012 55.915 170.379 1.963 114.821 78.007 222.386 2.902 129.419 81.561 255.960 4.865 364.738 252.940 680.985 Recurring Savings: Civilian Salary: Military Personel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.186 0.000 0.000 29.486 37.270 32.260 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.186 31.389 5.922 3.124 242.596 39.909 48.453 56.356 15.593 28.109 40.125 44.938 92.236 127.466 823.142 1,553.330 1,964.270 176.107 89.749 267.764 4,583.525 Grand Total Savings 0.000 59.571 270.482 877.607 1,598.168 1,993.722 4,799.550 0 0 49 60 (400) (812) Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: (1,042) (3,496) (378) (1,900) 872.882 3,546.564 3,717.247 3,591.524 2,350.879 (2,133) (2,020) (981.302) (3,904) (8,168) 13,096.614 56 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year Overall Summary (Dollars In Millions) Department of the Navy 2006 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel Other Homeowners Assistance Program Total One-Time Costs Estimate Land Revenues Budget Request 2007 2008 2009 2010 2011 2006-2011 178.801 0.000 0.000 23.400 48.933 0.571 0.000 0.000 251.705 0.000 251.705 564.780 0.000 0.000 21.063 101.922 1.359 0.000 0.000 689.124 0.000 689.124 498.595 0.000 0.000 19.664 179.723 2.499 0.000 0.000 700.481 0.000 700.481 571.607 0.000 0.000 8.441 155.015 9.785 0.000 0.000 744.848 0.000 744.848 225.929 0.000 0.000 19.660 322.495 6.504 16.984 0.000 591.572 0.000 591.572 0.000 0.000 0.000 15.201 321.888 1.456 2.032 0.000 340.577 0.000 340.577 2,039.712 0.000 0.000 107.429 1,129.976 22.174 19.016 0.000 3,318.307 0.000 3,318.307 One-Time Costs Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 251.705 689.124 700.481 744.848 591.572 340.577 3,318.307 0.000 0.000 0.000 0.000 8.431 0.337 0.000 8.768 7.567 1.169 0.000 8.736 22.719 11.955 0.000 34.674 61.125 14.188 0.000 75.313 83.153 14.774 0.000 97.927 182.995 42.423 0.000 225.418 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 57 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year Overall Summary (Dollars In Millions) Department of the Navy 2006 One-Time Savings Military Construction: Family Housing - Construction: Military PCS Cost Avoidance: Other: Total One-Time Savings 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.538 32.746 35.284 0.000 0.000 4.329 48.283 52.612 10.826 0.000 4.670 56.383 71.879 6.139 0.753 7.011 55.960 69.863 2.021 2.339 7.535 51.340 63.235 18.986 3.092 26.083 244.712 292.873 0.000 16.567 29.877 45.795 117.048 184.836 394.123 0.000 0.000 0.000 7.651 22.435 6.583 14.509 44.202 12.717 21.685 64.212 19.236 34.144 105.923 31.045 45.584 152.917 43.400 123.573 389.689 112.981 Recurring Savings: Civilian Salary: Military Personnel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 8.981 10.125 2.170 0.000 11.987 41.323 17.000 0.000 28.550 42.686 24.687 0.654 46.227 43.573 52.929 0.823 58.953 45.266 86.868 1.477 154.698 182.973 183.654 0.000 0.000 0.000 0.000 0.000 67.239 0.000 141.751 0.000 106.735 0.000 278.350 0.000 197.717 0.000 444.568 0.000 256.105 0.000 687.648 0.000 264.555 0.000 883.202 0.000 892.351 0.000 2,435.519 Grand Total Savings 0.000 177.035 330.962 516.447 757.511 946.437 2,728.392 Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: 0 0 251.705 (438) (955) 512.089 (313) (296) 369.519 (592) (616) 228.401 (585) (872) (457) (941) (165.939) (605.860) (2,385) (3,680) 589.915 58 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Department of the Air Force 2006 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation and Maintenance Military Personnel - PCS Other Home Owners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request One-Time Costs Funded Outside of the Account Military Construction Family Housing - Construction Environmental Operation and Maintenance Other Home Owner Assistance Program Total One-Time Costs Outside of the Account Grand Total One-Time Implementation Costs Recurring Costs: (memo non-add) Operation and Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 2009 2010 2011 2006-2011 102.662 0.000 0.000 20.550 87.397 0.000 20.819 0.000 231.428 0.000 231.428 688.747 976.973 680.492 0.000 0.000 0.000 0.000 0.000 0.000 16.318 18.165 25.999 156.694 56.595 281.514 16.041 5.176 5.750 29.141 29.613 55.933 0.000 0.000 0.000 906.941 1,086.522 1,049.688 0.000 0.000 0.000 906.941 1,086.522 1,049.688 149.588 0.000 0.000 27.355 206.930 0.000 31.946 0.000 415.819 0.000 415.819 0.000 2,598.462 0.000 0.000 0.000 0.000 51.255 159.642 74.431 863.561 0.000 26.967 0.000 167.452 0.000 0.000 125.686 3,816.084 0.000 0.000 125.686 3,816.084 0.000 0.000 0.000 0.000 0.000 0.000 0.000 231.428 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 906.941 1,086.522 1,049.688 0.000 0.000 0.000 0.000 0.000 0.000 0.000 415.819 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 125.686 3,816.084 44.088 52.460 13.123 109.671 173.212 183.183 10.096 366.491 196.227 654.097 200.779 670.975 10.298 47.756 407.304 1,372.828 0.217 0.000 1.055 1.272 2007 2008 95.603 93.466 3.548 192.617 144.750 141.088 9.634 295.473 59 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Department of the Air Force One-Time Savings Military Construction Family housing - Construction Military Personnel Cost Avoidance PCS Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: 2006 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 9.366 0.418 9.784 0.000 0.000 5.388 0.005 5.393 0.000 0.000 3.321 0.000 3.321 0.000 0.000 1.370 0.000 1.370 0.000 0.000 3.004 1.007 4.011 0.000 0.000 22.450 1.430 23.879 0.000 36.678 94.028 131.892 158.079 179.846 600.524 0.000 0.000 0.000 26.474 129.222 36.840 58.949 311.253 56.027 85.010 404.932 80.991 108.926 470.552 91.698 117.730 397.088 533.728 1,849.688 94.690 360.246 0.000 0.000 25.065 0.000 0.000 1.053 26.359 32.665 0.000 1.098 27.113 52.020 4.709 21.593 27.803 82.001 9.663 21.758 28.642 132.695 9.915 27.879 31.944 155.543 0.000 0.000 0.000 25.065 25.065 6.707 33.470 20.713 350.182 359.966 18.928 35.330 34.668 689.413 694.807 0 0 (714) (2,918) (325) (1,163) 206.363 546.975 391.715 23.243 20.117 41.308 63.363 51.772 63.238 955.255 1,168.732 958.575 1,170.102 (56) (486) 91.113 (152) (321) 24.287 73.382 166.927 454.924 23.166 92.161 64.881 238.352 87.269 257.660 1,326.593 4,515.240 1,330.604 4,539.119 (202) (500) (1,449) (5,388) (754.283) (1,204.918) (723.035) 60 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Contract Management Agency 2006 2007 2008 2009 2010 2011 2006-2011 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request 0.000 0.000 0.000 0.000 2.771 0.000 0.000 0.000 2.771 0.000 2.771 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.000 0.000 0.000 0.000 4.000 0.000 4.000 0.000 0.000 0.000 0.000 17.071 0.000 0.000 0.000 17.071 0.000 17.071 0.000 0.000 0.000 0.000 16.689 0.000 0.000 0.000 16.689 0.000 16.689 0.000 0.000 0.000 0.000 1.837 0.000 0.000 0.000 1.837 0.000 1.837 0.000 0.000 0.000 0.000 42.368 0.000 0.000 0.000 42.368 0.000 42.368 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Costs Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 2.771 0.000 4.000 17.071 16.689 1.837 42.368 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 61 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Contract Management Agency 2006 One-Time Savings Military Construction Family Housing - Construction Military PCS Cost Avoidance Other Total One-Time Savings 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary Military Personel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0.000 0.000 2.771 0.000 4.000 17.071 16.689 1.837 42.368 Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: 62 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Commissary Agency 2006 2007 2008 2009 2010 2011 2006-2011 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request 1.821 0.000 0.000 0.000 0.000 0.000 0.013 0.000 1.834 0.000 1.834 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24.003 0.000 0.000 0.000 7.527 0.000 0.000 0.000 31.530 0.000 31.530 0.000 0.000 0.000 0.000 4.753 0.000 0.000 0.000 4.753 0.000 4.753 0.000 0.000 0.000 0.000 1.244 0.000 0.011 0.000 1.255 0.000 1.255 0.000 0.000 0.000 0.000 0.000 0.000 0.053 0.000 0.053 0.000 0.053 25.824 0.000 0.000 0.000 13.524 0.000 0.077 0.000 39.425 0.000 39.425 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Costs Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 1.834 0.000 31.530 4.753 1.255 0.053 39.425 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.698 0.000 0.772 1.470 1.743 0.000 0.889 2.632 2.045 0.000 0.908 2.953 2.045 0.000 0.927 2.972 6.531 0.000 3.496 10.027 63 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Commissary Agency 2006 One-Time Savings Military Construction Family Housing - Construction Military PCS Cost Avoidance Other Total One-Time Savings 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.131 1.131 0.000 0.000 0.000 0.268 0.268 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.399 1.399 3.425 6.849 9.927 11.185 11.642 11.830 54.858 0.141 0.000 0.000 0.282 0.000 0.000 0.296 0.000 0.000 0.303 0.000 0.000 0.311 0.000 0.000 0.333 0.000 0.000 1.666 0.000 0.000 Recurring Savings Civilian Salary Military Personnel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.566 0.000 0.000 0.000 7.131 0.000 0.000 0.000 10.223 0.000 0.000 1.208 12.696 0.000 0.000 2.460 14.413 0.000 0.000 2.487 14.650 0.000 0.000 6.155 62.679 Grand Total Savings 3.566 7.131 11.354 12.964 14.413 14.650 64.078 0 0 0 0 Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: (103) (2) (1.732) 0 0 (7.131) (10) 0 20.176 (12) 0 (8.211) (13.158) (14.597) (125) (2) (24.653) 64 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Finance & Accounting Service 2006 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 48.372 0.000 0.000 0.000 48.372 0.000 48.372 0.000 0.000 0.000 0.000 63.999 0.000 0.000 0.000 63.999 0.000 63.999 0.000 0.000 0.000 0.000 129.152 0.000 0.000 0.000 129.152 0.000 129.152 0.000 0.000 0.000 0.000 28.593 0.000 0.000 0.000 28.593 0.000 28.593 0.000 0.000 0.000 0.000 44.763 0.000 0.000 0.000 44.763 0.000 44.763 0.000 0.000 0.000 0.000 9.370 0.000 0.000 0.000 9.370 0.000 9.370 0.000 0.000 0.000 0.000 324.249 0.000 0.000 0.000 324.249 0.000 324.249 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Costs Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 48.372 63.999 129.152 28.593 44.763 9.370 324.249 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 65 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Finance & Accounting Service 2006 One-Time Savings Military Construction Family Housing - Construction Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: 0.000 0.000 0.000 0.000 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.804 36.859 96.955 139.523 166.217 165.242 0.049 0.406 0.000 0.549 4.742 0.000 1.397 8.695 0.000 1.739 8.962 0.000 1.781 9.120 0.000 1.781 9.120 0.000 608.600 0.000 7.296 41.045 0.000 0.000 0.000 0.374 0.000 0.000 6.269 0.000 0.000 15.729 0.000 0.000 25.917 0.000 0.000 28.868 0.000 0.000 31.327 0.000 0.000 108.484 0.000 0.000 4.633 0.000 0.000 48.419 0.000 0.000 122.776 0.000 0.000 176.141 0.000 0.000 205.986 0.000 0.000 207.470 0.000 0.000 765.425 4.633 48.419 122.776 176.141 205.986 207.470 765.425 (525) (71) 43.739 (788) (88) 15.580 (640) (4) 6.376 (798) (7) (367) 0 (334) 0 (3,452) (170) (147.548) (161.223) (198.100) (441.176) 66 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Intelligence Agency 2006 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request 2007 2008 2009 2010 2011 2006-2011 10.327 0.000 0.000 0.169 0.255 0.000 0.000 0.000 10.751 0.000 10.751 3.883 0.000 0.000 0.000 0.336 0.000 0.000 0.000 4.219 0.000 4.219 44.779 0.000 0.000 0.000 7.311 0.000 0.000 0.000 52.090 0.000 52.090 21.000 0.000 0.000 0.000 0.112 0.000 0.000 0.000 21.112 0.000 21.112 0.667 0.000 0.000 0.000 18.755 0.000 0.000 0.000 19.422 0.000 19.422 0.000 0.000 0.000 0.000 26.333 0.000 0.000 0.000 26.333 0.000 26.333 80.656 0.000 0.000 0.169 53.102 0.000 0.000 0.000 133.927 0.000 133.927 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Costs Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.604 0.000 0.000 0.604 0.000 0.000 0.000 7.717 0.000 0.000 7.717 0.000 0.000 0.000 1.480 0.000 0.000 1.480 0.000 0.000 0.000 9.801 0.000 0.000 9.801 Grand Total One-Time Implementation Costs 10.751 4.219 52.090 21.716 27.139 27.813 143.728 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.152 0.000 0.000 0.152 0.575 0.000 0.000 0.575 10.027 1.440 0.000 11.467 10.754 1.440 0.000 12.194 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 67 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Intelligence Agency 2006 One-Time Savings Military Construction Family Housing - Construction Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.262 0.262 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.725 0.000 0.725 0.000 0.000 0.725 0.262 0.987 0.000 0.000 0.000 0.000 0.000 1.533 1.533 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.882 0.000 0.000 0.882 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.885 0.000 0.000 0.000 1.885 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.723 0.723 0.000 0.000 0.732 0.732 0.000 0.000 0.732 0.732 0.000 0.000 10.320 14.620 0.000 0.000 12.507 16.807 0.000 0.000 0.985 0.732 0.732 15.345 17.794 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10.751 4.219 51.105 20.984 26.407 12.468 125.934 68 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Information Systems Agency 2006 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request 2007 2008 2009 2010 2011 2006-2011 9.986 0.000 0.000 0.000 4.655 0.000 0.010 0.000 14.651 0.000 14.651 0.140 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.140 0.000 0.140 182.118 0.000 0.000 0.000 5.870 0.000 87.991 0.000 275.979 0.000 275.979 130.128 0.000 0.000 0.000 0.855 0.000 0.000 0.000 130.983 0.000 130.983 144.795 0.000 0.000 0.000 0.000 0.000 0.000 0.000 144.795 0.000 144.795 0.000 0.000 0.000 0.000 36.083 0.000 6.831 0.000 42.914 0.000 42.914 467.167 0.000 0.000 0.000 47.463 0.000 94.832 0.000 609.462 0.000 609.462 One-Time Costs Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Costs Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 14.651 0.140 275.979 130.983 131.662 42.914 609.462 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.500 0.000 0.000 5.500 17.870 0.000 0.000 17.870 23.370 0.000 0.000 23.370 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 69 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Information Systems Agency 2006 One-Time Savings: Military Construction: Family Housing - Construction: Military PCS Cost Avoidance: Other: Total One-Time Savings Recurring Savings: Civilian Salary: Military Personnel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.500 7.162 7.327 7.495 10.098 35.582 0.000 0.000 0.000 0.057 0.000 0.014 0.130 0.000 0.014 0.134 0.000 0.014 0.137 0.000 0.014 0.140 0.000 0.015 0.598 0.000 0.071 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.998 0.000 0.000 0.000 2.037 0.000 0.000 0.000 2.080 0.000 0.000 0.000 2.124 0.000 0.000 0.000 2.433 0.000 0.000 0.000 9.672 0.000 0.000 0.000 0.000 0.000 0.000 2.574 7.143 0.000 0.000 6.352 15.695 0.000 0.000 6.537 16.092 0.000 0.000 6.712 16.482 0.000 0.000 19.254 31.940 0.000 0.000 41.429 87.352 0.000 7.143 15.695 16.092 16.482 31.940 87.352 0 0 0 0 0 0 33 0 (7.003) 260.284 114.891 115.180 10.974 0 0 14.651 (102) (1) (69) (1) 522.110 70 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Logistics Agency 2006 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request 2007 2008 2009 2010 2011 2006-2011 8.078 0.000 0.000 0.000 11.284 0.000 0.000 0.000 19.362 0.000 19.362 60.526 0.000 0.000 0.216 17.596 0.000 13.242 0.000 91.580 0.000 91.580 53.350 0.000 0.000 0.000 66.676 0.000 71.789 0.000 191.815 0.000 191.815 0.000 0.000 0.000 0.000 68.046 0.000 120.614 0.000 188.660 0.000 188.660 0.000 0.000 0.000 0.000 64.363 0.000 55.152 0.000 119.515 0.000 119.515 0.000 0.000 0.000 0.000 16.453 0.000 0.000 0.000 16.453 0.000 16.453 121.954 0.000 0.000 0.216 244.418 0.000 260.797 0.000 627.385 0.000 627.385 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Costs Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 19.362 91.580 191.815 188.660 119.515 16.453 627.385 0.769 0.000 0.000 0.769 1.182 0.000 0.000 1.182 1.613 0.000 0.000 1.613 2.068 0.000 0.000 2.068 2.545 0.000 0.000 2.545 2.599 0.000 0.000 2.599 10.776 0.000 0.000 10.776 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 71 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Logistics Agency 2006 One-Time Savings Military Construction Family Housing - Construction Military PCS Cost Avoidance Other Total One-Time Savings 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 7.692 7.692 0.000 0.000 0.000 3.557 3.557 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 11.249 11.249 1.365 2.736 6.848 10.300 19.406 23.812 64.467 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary Military Personnel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 11.196 8.493 0.000 0.000 11.474 8.704 0.000 0.000 42.241 30.693 1.399 0.000 43.315 31.474 1.737 0.000 44.265 32.227 1.776 0.000 152.491 111.591 4.912 0.000 0.000 0.000 1.365 0.000 0.000 1.222 23.647 0.000 0.000 1.252 28.278 0.000 0.000 12.951 97.584 0.000 0.000 24.742 120.674 0.000 0.000 7.775 109.855 0.000 0.000 47.942 381.403 Grand Total Savings 1.365 23.647 28.278 105.276 124.231 109.855 392.652 0 0 0 0 6 0 17.997 67.933 163.537 Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: (364) 0 83.384 (74) 0 (41) 0 (4.716) (93.402) (472) 0 234.733 72 FY 2013 Budget Estimate Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Media Activity 2006 2007 2008 2009 2010 2011 2006-2011 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel -PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request 0.913 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.913 0.000 0.913 6.419 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6.419 0.000 6.419 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.821 0.000 0.000 0.000 0.821 0.000 0.821 0.000 0.000 0.000 0.000 15.401 0.000 8.951 0.000 24.352 0.000 24.352 0.000 0.000 0.000 0.000 16.915 0.000 16.549 0.000 33.464 0.000 33.464 7.332 0.000 0.000 0.000 33.137 0.000 25.500 0.000 65.969 0.000 65.969 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Costs Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 0.913 6.419 0.000 0.821 24.352 33.464 65.969 Recurring Costs: (Memo Non-Add) Operation & Maintenance Military Personnel Other Total Recurring Costs (Memo Non-Add) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 73 FY 2013 Budget Estimate Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Media Activity One-Time Savings Military Construction Family Housing - Construction Military PCS Cost Aviodance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Savings 2006 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.672 0.672 0.000 0.000 0.000 0.672 0.672 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.308 1.308 0.000 0.000 1.308 1.308 0.000 0.000 0.000 0.000 0.000 1.980 1.980 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.913 6.419 0.000 0.821 24.352 35.444 67.949 74 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Department of Defense Education Activity 2006 2007 2008 2009 2010 2011 2006-2011 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request 0.000 0.000 0.000 0.000 0.000 0.000 0.440 0.000 0.440 0.000 0.440 0.000 0.000 0.000 0.000 0.238 0.000 0.021 0.000 0.259 0.000 0.259 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.022 0.000 0.022 0.000 0.022 0.000 0.000 0.000 0.000 0.000 0.000 11.089 0.000 11.089 0.000 11.089 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.238 0.000 11.572 0.000 11.810 0.000 11.810 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Costs Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 0.440 0.259 0.000 0.022 11.089 0.000 11.810 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.624 0.624 0.000 0.000 0.735 0.735 0.000 0.000 1.359 1.359 75 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Department of Defense Education Activity 2006 One-Time Savings Military Construction Family Housing - Construction Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.530 1.530 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.530 1.530 0.000 0.000 0.000 0.000 2.519 2.577 5.096 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.519 0.000 0.000 1.596 4.173 0.000 0.000 1.596 6.692 0.000 0.000 0.000 0.000 4.049 4.173 8.222 0 0 0 0 0 0 0 0 0.440 0.259 0.000 0.022 (26) 0 7.040 0 0 -4.173 (26) 0 3.588 76 FY 2013 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Security Service 2006 2007 2008 2009 2010 2011 2006-2011 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request 0.000 0.000 0.000 0.000 1.605 0.000 0.000 0.000 1.605 0.000 1.605 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.085 0.000 0.000 0.000 4.085 0.000 4.085 0.000 0.000 0.000 0.000 7.259 0.000 0.000 0.000 7.259 0.000 7.259 0.000 0.000 0.000 0.000 14.709 0.000 0.000 0.000 14.709 0.000 14.709 0.000 0.000 0.000 0.000 12.480 0.000 0.000 0.000 12.480 0.000 12.480 0.000 0.000 0.000 0.000 42.340 0.000 0.000 0.000 40.138 0.000 40.138 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Costs Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 1.605 0.000 4.085 7.259 14.709 12.480 40.138 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.069 0.000 0.530 1.599 1.069 0.000 0.530 1.599 77 FY 2013 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Security Service 2006 One-Time Savings Military Construction Family Housing - Construction Military PCS Cost Avoidance Other Total One-Time Savings 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary Military Personel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.605 0.000 4.085 7.259 14.709 12.480 40.138 Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: 78 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Threat Reduction Agency 2006 2007 2008 2009 2010 2011 2006-2011 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request 0.180 0.000 0.000 0.035 0.396 0.000 0.000 0.000 0.611 0.000 0.611 0.900 0.000 0.000 0.000 2.076 0.000 0.431 0.000 3.407 0.000 3.407 0.000 0.000 0.000 0.000 0.234 0.000 0.516 0.000 0.750 0.000 0.750 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.249 0.000 0.000 0.000 0.249 0.000 0.249 0.000 0.000 0.000 0.000 1.747 0.000 0.350 0.000 2.097 0.000 2.097 1.080 0.000 0.000 0.035 4.702 0.000 1.297 0.000 7.114 0.000 7.114 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Costs Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 0.611 3.407 0.750 0.000 0.249 2.097 7.114 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 79 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Defense Threat Reduction Agency 2006 One-Time Savings Military Construction Family Housing - Construction Military PCS Cost Avoidance Other Total One-Time Savings 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.052 0.000 0.052 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.052 0.000 0.052 0.000 0.000 0.021 0.022 0.022 0.023 0.088 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.226 0.000 0.000 0.233 0.000 0.000 0.239 0.000 0.000 0.245 0.000 0.000 0.943 Recurring Savings Civilian Salary Military Personel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.247 0.000 0.000 0.000 0.255 0.000 0.000 0.000 0.261 0.000 0.000 0.000 0.268 0.000 0.000 0.000 1.031 Grand Total Savings 0.000 0.000 0.299 0.255 0.261 0.268 1.083 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.611 3.407 0.451 1.829 6.031 Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: (0.255) (0.012) 80 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Missile Defense Agency 2006 2007 2008 2009 2010 2011 2006-2011 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request 1.758 0.000 0.000 0.000 6.550 0.000 0.000 0.000 8.308 0.000 8.308 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 108.400 0.000 0.000 0.000 1.619 0.000 0.000 0.000 110.019 0.000 110.019 127.000 0.000 0.000 0.000 32.938 0.000 0.000 0.000 159.938 0.000 159.938 27.800 0.000 0.000 0.000 58.822 0.000 0.000 0.000 86.622 0.000 86.622 0.000 0.000 0.000 0.000 8.679 0.000 0.000 0.000 8.679 0.000 8.679 264.958 0.000 0.000 0.000 108.608 0.000 0.000 0.000 373.566 0.000 373.566 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Costs Outside of the Account 2.761 0.000 0.000 1.472 0.000 0.000 4.233 0.000 0.000 0.000 1.786 0.000 0.000 1.786 0.000 0.000 0.000 2.165 0.000 0.000 2.165 0.000 0.000 0.000 0.065 0.000 0.000 0.065 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.761 0.000 0.000 5.488 0.000 0.000 8.249 Grand Total One-Time Implementation Costs 12.541 1.786 112.184 160.003 86.622 8.679 381.815 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.748 1.748 0.000 0.000 7.415 7.415 0.000 0.000 9.163 9.163 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 81 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Missile Defense Agency 2006 One-Time Savings Military Construction Family Housing - Construction Military PCS Cost Avoidance Other Total One-Time Savings 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.006 2.006 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 23.600 23.600 0.000 0.000 0.000 25.606 25.606 0.000 0.202 0.394 0.594 0.688 1.741 3.619 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary Military Personel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.565 1.767 0.000 0.000 2.131 2.525 0.000 0.000 2.175 2.769 0.000 0.000 16.387 17.075 0.000 0.000 31.957 33.698 0.000 0.000 54.215 57.834 Grand Total Savings 0.000 3.773 2.525 2.769 17.075 57.298 83.440 0 0 0 0 0 0 0 0 0 0 0 0 0 0 109.659 157.234 69.547 Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: 12.541 (1.987) (48.619) 298.375 82 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) National Geospatial-Intelligence Agency 2006 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 122.200 0.000 0.000 0.000 1.911 0.000 0.000 0.000 124.111 0.000 124.111 425.565 0.000 0.000 0.000 10.001 0.000 3.314 0.000 438.880 0.000 438.880 743.868 0.000 0.000 0.000 93.620 0.000 12.889 0.000 850.377 0.000 850.377 168.749 0.000 0.000 0.000 200.028 0.000 12.400 0.000 381.177 0.000 381.177 83.328 0.000 0.000 0.000 44.746 0.000 6.223 0.000 134.297 0.000 134.297 1,543.710 0.000 0.000 0.000 350.306 0.000 34.826 0.000 1,928.842 0.000 1,928.842 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Costs Outside of the Account 23.760 0.000 0.000 0.000 0.000 0.000 23.760 0.000 0.000 0.000 0.000 3.400 0.000 3.400 0.000 0.000 0.000 0.511 6.492 0.000 7.003 0.000 0.000 0.000 19.482 83.046 0.000 102.528 0.000 0.000 0.000 38.030 164.568 0.000 202.598 0.000 0.000 0.000 55.165 152.438 0.000 207.603 23.760 0.000 0.000 113.188 409.944 0.000 546.892 Grand Total One-Time Implementation Costs 23.760 127.511 445.883 952.905 583.775 341.900 2,475.734 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 83 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) National Geospatial-Intelligence Agency 2006 One-Time Savings Military Construction Family Housing - Construction Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6.254 6.254 0.000 0.000 0.000 6.386 6.386 0.000 0.000 0.000 6.520 6.520 0.000 0.000 0.000 8.653 8.653 0.000 0.000 0.000 27.813 27.813 0.000 0.000 0.000 0.000 0.000 0.571 0.571 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.571 0.000 0.000 0.000 0.571 0.000 0.000 6.254 6.386 6.520 9.224 28.384 0 0 0 0 0 0 0 0 0 0 23.760 127.511 439.629 946.519 577.255 (15) 0 332.676 (15) 0 2,447.350 84 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) National Security Agency 2006 2007 2008 2009 2010 2011 2006-2011 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request 0.203 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.203 0.000 0.203 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.170 0.000 0.274 0.000 0.444 0.000 0.444 0.000 0.000 0.000 0.000 2.932 0.000 0.000 0.000 2.932 0.000 2.932 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.203 0.000 0.000 0.000 3.102 0.000 0.274 0.000 3.579 0.000 3.579 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Costs Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 0.203 0.000 0.000 0.444 2.932 0.000 3.579 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 85 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) National Security Agency 2006 One-Time Savings Military Construction Family Housing - Construction Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 39 0 39 0 0.203 0.000 0.000 0.444 2.932 0.000 3.579 86 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) TRICARE Management Activity 2006 2007 2008 2009 2010 2011 2006-2011 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request 0.000 0.000 0.000 0.000 3.252 0.000 0.000 0.000 3.252 0.000 3.252 10.000 0.000 0.000 0.000 6.330 0.000 0.000 0.000 16.330 0.000 16.330 1,048.447 0.000 0.000 0.000 40.281 0.000 46.891 0.000 1,135.619 0.000 1,135.619 994.913 0.000 0.000 0.000 127.293 0.000 95.938 0.000 1,218.144 0.000 1,218.144 828.861 0.000 0.000 0.000 267.970 0.000 74.127 0.000 1,170.958 0.000 1,170.958 165.178 0.000 0.000 0.000 205.836 0.000 19.022 0.000 390.036 0.000 390.036 3,047.399 0.000 0.000 0.000 650.962 0.000 235.978 0.000 3,934.339 0.000 3,934.339 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Costs Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 3.252 16.330 1,135.619 1,218.144 1,170.958 390.036 3,934.339 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 0.000 0.000 0.000 0.000 10.938 0.000 16.474 27.412 20.435 1.054 27.865 49.354 50.190 1.081 28.147 79.418 104.495 1.109 58.863 164.467 146.320 4.386 59.777 210.483 332.378 7.630 191.126 531.134 87 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) TRICARE Management Activity 2006 One-Time Savings Military Construction Family Housing - Construction Military PCS Cost Avoidance Other Total One-Time Savings 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.137 0.000 0.137 0.000 0.000 0.316 0.104 0.420 0.000 0.000 0.108 0.000 0.108 0.000 0.000 0.110 0.000 0.110 0.000 0.000 0.692 52.964 53.656 0.000 0.000 1.363 53.068 54.431 0.000 0.558 9.613 18.388 25.643 100.612 154.814 0.000 0.000 0.000 3.703 3.704 0.580 12.940 12.040 3.025 18.198 16.674 3.137 28.209 24.903 19.061 81.384 55.350 28.692 144.434 112.671 54.495 Recurring Savings Civilian Salary Military Personel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.033 0.024 0.306 0.000 0.177 17.594 2.026 0.000 0.180 18.040 2.137 0.000 0.185 18.509 4.852 0.971 17.141 19.599 6.194 0.971 17.716 73.766 15.515 0.000 0.000 0.000 0.000 0.000 7.983 10.691 27.582 0.000 22.716 18.430 98.561 0.000 23.292 18.430 118.476 0.000 55.884 73.956 251.202 0.000 56.660 136.422 503.025 0.000 166.535 257.929 998.846 Grand Total Savings 0.000 27.719 98.981 118.584 251.312 556.681 1,053.277 0 0 (54) (119) 3.252 (11.39) Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: (197) (213) 1036.64 (165) (241) 1099.56 17 (126) 919.65 (950) (576) (166.64) (1,349) (1,275) 2881.06 88 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Washington Headquarters Service 2006 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request 2007 2008 2009 2010 2011 2006-2011 23.143 0.000 0.000 0.000 9.534 0.000 0.694 0.000 33.371 0.000 33.371 117.415 0.000 0.000 0.000 4.045 0.000 0.000 0.000 121.460 0.000 121.460 321.546 0.000 0.000 0.000 6.909 0.000 1.371 0.000 329.826 0.000 329.826 274.330 0.000 0.000 0.000 5.852 0.000 2.039 0.000 282.221 0.000 282.221 360.533 0.000 0.000 0.000 84.176 0.000 7.378 0.000 452.087 0.000 452.087 5.610 0.000 0.000 0.000 90.189 0.000 72.324 0.000 168.123 0.000 168.123 1,102.577 0.000 0.000 0.000 200.705 0.000 83.806 0.000 1,387.088 0.000 1,387.088 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Costs Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 33.371 121.460 329.826 282.221 452.087 168.123 1,387.088 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.552 0.000 0.000 0.552 19.449 0.000 0.000 19.449 20.001 0.000 0.000 20.001 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 89 FY 2013 Budget Estimates Base Realignment and Closure Account 2005 Cost and Savings by Fiscal Year (Dollars in Millions) Washington Headquarters Service 2006 One-Time Savings Military Construction Family Housing - Construction Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: 0.000 0.000 0.000 0.000 0.000 2007 2008 2009 2010 2011 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.580 1.580 0.000 0.000 0.000 0.257 0.257 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 75.858 75.858 0.000 0.000 0.000 77.695 77.695 0.000 0.000 0.280 0.382 0.391 0.817 1.870 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.280 0.000 0.000 0.382 0.000 0.000 0.391 0.000 2.035 2.852 0.000 2.035 3.905 0.000 0.000 1.860 0.639 0.391 78.710 81.600 0 0 0 0 10 0 0 0 33.371 121.460 281.582 451.696 (2) 0 327.966 (6) 0 89.413 2 0 1,305.488 90 FY 2013 Budget Estimates Base Realignment and Closure Account-Prior Rounds Environmental and Caretaker Costs by Fiscal Year (Dollars in Thousands) BRAC 2005 Continuing Environmental and Caretaker Costs: ARMY FY 2012 Environmental 112,312 Op & Maint. 116,878 Total Obligation Authority 229,190 Land Sales / Prior Year Financing Budget Authority 229,190 FY 2013 57,790 48,429 106,219 106,219 NAVY Environmental Op & Maint. Total Obligation Authority Land Sales / Prior Year Financing Budget Authority 13,353 12,476 25,829 25,829 13,172 5,038 18,210 18,210 AIR FORCE Environmental Op & Maint. Total Obligation Authority Land Sales / Prior Year Financing Budget Authority 1,646 320 1,966 1,966 2,138 130 2,268 2,268 1,791 1,791 1,791 - DEFENSE-WIDE Environmental Op & Maint. Total Obligation Authority Land Sales / Prior Year Financing Budget Authority FY 11 Continuing Resolution Adj. Total with FY 11 Adjustment TOTAL Environmental Op & Maint. Total Obligation Authority Land Sales / Prior Year Financing Budget Authority 127,311 131,465 258,776 258,776 73,100 53,597 126,697 126,697 The FY 2013 budget request includes $126.697 million of new budget authority for environmental restoration and caretaker costs for facilities closed under the previous four rounds of base closure authority. This funding ensures bases are cleaned efficiently in order to transfer the property to redevelopment authorities. 91 FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Component Army Army Army Army Army Army Army Army Army Army Army Army Army Army Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Air Force DeCA DIA DIA DIA DIA DIA DISA DISA DLA DMA DTRA MDA NSA WHS Commission Number 13 6 142 21 10 9 53 55 10 10 10 54 PM PM 184 75 72 184 65 67 67 64 61 77 64 72 64 149 130 131 131 167 167 140 140 177 134 130, 133 Location Chaffee Carson Scott AFB Camp Dodge Riley Knox Dix Jackson Bliss Bliss Bliss McCoy Various Various China Lake, CA Great Lakes, IL Great Lakes, IL Indian Head, MD Jacksonville, FL Jacksonville, FL Jacksonville, FL Millington, TN Newport, RI Norfolk, VA Norfolk, VA Norfolk, VA NSA Mid South Millington, TN Patuxent River, MD Washington, DC Various Various Various Various Marine Corps Base Quantico Rivanna Station Rivanna Station Various Ft. Meade Various Various Various Various Various Various State AR CO IL IA KS KY NJ SC TX TX TX WI WW WW CA IL IL MD FL FL FL TN RI VA VA VA TN MD DC WW WW WW WW VA VA VA WW MD WW WW WW WW WW WW Project Title Armed Forces Reserve Center Brigade Combat Team Complex, Incr 1 SDDC Temporary Facilities Armed Forces Reserve Center Division HQ & Sustainment Bde HQ, Incr 1 BCT Facilities, Incr 1 Armed Forces Reserve Center Armed Forces Reserve Center Brigade Combat Team Complex #1, Incr 1 Digital Multipurpose Training Range Site Infrastructure, Incr 1 Armed Forces Reserve Center Planning and Design Planning and Design (IGPBS) Fuse Test Facilities Relocate Navy Region South to Navy Region Midwest Relocations Southern Division to NAVFAC Midwest Explosives Development Facility Hangar/Parking Apron Fleet Parking Bachelor Enlisted Quarters Construct New BLDG for EPMAC/NRPC Renovate Building 370 for OTC-P Relocation Building Renovation For REDCOM MID-ATLANTIC NAVRESFORCOM Administrative Complex Z140 Addition for EFA NE Renovate Portion of Bldg 750 for NRRC Aircraft Research Support Facility Planning and Design Planning and Design Planning and Design Planning and Design Planning and Design Collocate MILDEP Investigative Agencies Inc.1 Joint-Use Intelligence Analysis Facility, Inc. 1 Joint-Use Intelligence Analysis Facility, Inc. 2 Planning and Design DISA HQ Planning and Design Planning and Design Planning and Design Planning and Design Planning and Design Planning & Design Fiscal Year 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 Total 2006 Dollar Amount 19,500 124,506 3,784 34,750 90,157 113,000 36,798 15,523 152,618 843 101,000 12,397 56,403 27,779 466 61 853 2,971 71,600 846 11,849 10,820 7,525 845 32,221 4,918 1,301 22,025 10,500 102,662 1,821 6 40 3,509 4,772 2,000 6,656 3,330 8,078 913 180 1,758 203 23,143 1,126,930 92 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army 11 2 12 56 14 56 14 6 6 6 9 9 9 9 9 142 10 10 10 10 10 10 22 9 9 143 22 5 5 24 52 27 30 30 53 33 34 4 4 126 55 10 10 10 10 10 Birmingham Redstone Buckeye North Little Rock Bell Hunter-Liggett Moffett Field Carson Carson Carson Benning Benning Benning Benning Benning Scott AFB Riley Riley Riley Riley Riley Riley Bluegrass Knox Knox Knox Paducah Aberdeen PG Aberdeen PG Detrick WestoverAFB Cambridge Hastings Kearney Dix Kirtland AFB (Albuquerque) Stewart Newburgh Bragg Bragg Sill Jackson Bliss Bliss Bliss Bliss Bliss AL AL AZ AR CA CA CA CO CO CO GA GA GA GA GA IL KS KS KS KS KS KS KY KY KY KY KY MD MD MD MA MN NE NE NJ NM NY NC NC OK SC TX TX TX TX TX Armed Forces Reserve Center Recruiting Brigade Operations Building Armed Forces Reserve Center Organizational Maintenance Shop Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Brigade Combat Team Complex, Incr 1 Brigade Combat Team Complex, Incr 2 Division Headquarters Complex, Incr 1 Brigade Headquarters Complex Child Development Center Trainee Barracks Complex 1 Trainee Barracks Complex 2 Training Support Brigade Complex, Ph 1 SDDC Temporary Facilities Battle Command Training Center Child Development Center - Whitside Combat Aviation Brigade Complex, Incr 1 Division HQ & Sustainment Bde HQ, Incr 1 Division HQ & Sustainment Bde HQ, Incr 2 Runway Improvements Armed Forces Reserve Center BCT Facilities, Incr 1 BCT Facilities, Incr 2 Human Resources Command Complex, Incr 1 Armed Forces Reserve Center C4ISR, Phase 1, Incr 1 Site Infrastructure Upgrades Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center, Add/Alt Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Brigade Combat Team Complex Vehicle Maintenance Complex ADA School Complex Armed Forces Reserve Center Ammunition Supply Point Battle Command Training Center Brigade Combat Team Complex #1, Incr 1 Brigade Combat Team Complex #1, Incr 2 Brigade Combat Team Complex #2, Incr 1 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 27,169 9,090 19,500 1,360 66,137 13,149 82,720 1,465 199,238 84,000 32,600 6,800 135,500 135,500 55,800 146 24,931 6,628 147,600 1,439 82,600 17,000 20,611 1,895 68,866 101,821 15,503 145,000 33,000 14,210 34,730 8,443 11,325 3,735 1,239 26,512 21,252 32,061 48,271 203,700 204 20,500 23,643 1,201 65,181 157,076 93 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy 10 10 10 10 10 10 10 10 10 10 10 10 44 44 174 148 44 132 121 46 54 54 49 PM PM 165 184 184 189 184 59 59 59 59 68 138 172 172 64 62 184 65 65 72 73 64 64 Bliss Bliss Bliss Bliss Bliss Bliss Bliss Bliss Bliss Bliss Bliss Bliss Camp Bullis Grand Prairie Sam Houston Sam Houston Seagoville Belvoir Lee Fairchild AFB Lewis McCoy Cheyenne Various Various Cherry Point, NC China Lake, CA China Lake, CA China Lake, CA China Lake, CA Concord, CA Concord, CA Concord, CA Concord, CA Cookstown, NJ Fort Dix, NJ Fort Sam Houston, TX Fort Sam Houston, TX Fort Worth, TX Fort Worth, TX Indian Head, MD Jacksonville, FL Jacksonville, FL Jacksonville, FL Mobile, AL New Orleans, LA New Orleans, LA TX TX TX TX TX TX TX TX TX TX TX TX TX TX TX TX TX VA VA WA WA WI WY WW WW NC CA CA CA CA CA CA CA CA NJ NJ TX TX TX TX MD FL FL FL AL LA LA Central Wash Facility Combat Aviation Brigade Complex, Incr 1 Combat Pistol Qualification Range Demolition Range Complex Dental Clinic Infantry Platoon Battle Course Live Fire Shoot House Live Fire Shoot House Multipurpose Machine Gun Range Site Infrastructure, Incr 1 Site Infrastructure, Incr 2 Urban Assault Course Armed Forces Reserve Center Armed Forces Reserve Center Battlefield Health Trauma Youth Center Armed Forces Reserve Center AMC HQ Building Purchase Combat Service Support Center, Ph 1, Incr 1 Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Army Aviation Support Facility Planning and Design Planning and Design (IGPBS) FRC Maintenance Facility Weapons and Armanment Tech Center Building Renovation and Storage Fuse Test Facilities Renovate Lab Buildings Railroad Equipment/Engine Maintenance Shop Administrative Building Fire Station Electrical Substation Navy VR Fleet Logistics Ops Facility (INC II of II) Relocate West Trenton NJ to Fort Dix NJ Dining Facility BRAC P & D Administrative Facility, 8th MCD Reconfigure Hangar 1404 for VR-46 Explosives Development Facility Fleet Support Facility Hangar/Parking Apron Facility Engineering Center SE Engineering Operation AFRC Mobile Military Entrance Processing Station Medical and Dental Clinic Addition 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 12,000 182,000 2,700 1,440 13,530 7,260 2,320 2,362 4,818 1,701 98,299 2,594 39,320 31,085 110,999 6,316 18,998 19,905 251,451 29,913 27,175 174 38,583 201,436 49,389 6,548 60,436 7,924 490 3,776 2,997 3,050 3,380 1,418 7,500 6,516 3 17,232 6,810 8,367 12,302 5,133 42,375 16,025 14,021 9,320 6,050 94 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force 64 64 64 64 64 64 64 64 64 64 64 63 63 63 71 70 181 71 71 71 62 73 71 165 71 57 165 195 195 80, 110 80, 110 80, 110 85 85 92, 93, 103 92, 93, 103 92, 93, 103 92, 93, 103 83 84 91 113, 115 113, 115 104 104 104 New Orleans, LA New Orleans, LA New Orleans, LA New Orleans, LA New Orleans, LA New Orleans, LA New Orleans, LA New Orleans, LA New Orleans, LA New Orleans, LA New Orleans, LA Newport, RI Newport, RI Newport, RI Norfolk, VA Norfolk, VA NS Norflk, VA Point Loma, CA Point Loma, CA Point Loma, CA Robins AFB, TX Rome, GA San Diego, CA San Diego, CA San Diego, CA Tobyhanna Army Depot, PA Washington, DC Yuma, AZ Eielson AFB Eielson AFB Elmendorf AFB Elmendorf AFB Elmendorf AFB Fort Smith Regional APT AGS Fort Smith Regional APT AGS Little Rock AFB Little Rock AFB Little Rock AFB Little Rock AFB March ARB Vandenberg AFB Buckley AFB Homestead ARB Homestead ARB MacDill AFB MacDill AFB MacDill AFB LA LA LA LA LA LA LA LA LA LA LA RI RI RI VA VA VA CA CA CA TX GA CA CA CA PA DC AZ AK AK AK AK AK AR AR AR AR AR AR CA CA CO FL FL FL FL FL Indoor Physical Fitness Facility Addition General Purpose Instructional Building Youth Center Road Infrastructure Support NAVAIRSECFAC Calibration Lab Police Station, Security Support Facilities Family Service Center Bachelor Enlisted Quarters Applied Instruction Building Administrative Support Building Child Development Center Addition Dental Clinic Addition Training Building for NSCS Relocate CSS Aircraft Maintenance Hangar NWDC Administrative Facility Building Renovations Refurbish Bldg 139 for MCMRON Hqs Expand Parking Structures 608 and 636 Refurbish Bachelor Enlisted Quarters Hangar Marine Corps Reserve Center MINEWARTRACEN Training Facilities FRC Maintenance Facility Squadron Support Facility Radar Maintenance Facility Planning and Design FRC Maintenance Shop Repair Combat Alert Cell Aprons Repair Combat Alert Cell B1300 C-17 Acft Parking Apron C-17 Engine Facility Construct Infra Utilities A10 Consolidated Corr Control/Fuel Cell A10 Mun Load Crew Fac 1-Bay Corrosion Control Hangar 1-Bay Flight Simulator Bldg AMC HQ Wing Bldg Squadron Ops / AMU BRAC AFR Add/Alter Squadron Operations Construct Satellite Control Facility BRAC AFR Security Forces Squadron Training BRAC AFR Add Weapons Release Shop BRAC AFR Add/Alter Squad Ops/AMXS Add/Alter Bldg 6. BRAC AFR Aerospace Medicine Flt Training BRAC AFR Training Facility 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 3,150 8,346 4,743 3,014 9,751 829 2,182 24,160 5,210 6,449 3,068 974 28,690 4,825 60,618 28,053 12,960 1,486 6,632 3,053 25,460 3,190 25,050 3,164 44 4,825 40,000 3,181 3,044 5,013 6,400 3,000 16,685 6,650 2,850 12,100 4,250 7,400 12,800 2,250 43,800 4,400 2,350 3,800 16,500 2,167 7,200 95 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force 104 104 104 79, 103 79, 103 79, 103 87 89 90 142 118 112 79, 91 79, 91 94 94 94 94 94 94 129 91 91 91 128 128 128 128 94 94 94 94 104 104 104 104 104 119 91 89, 100 89, 100 89, 100 89, 100 170, 187, 188A 170 108 128 MacDill AFB MacDill AFB MacDill AFB Moody AFB Moody AFB Moody AFB Robins AFB Mountain Home AFB Capital APT AGS Scott AFB Scott AFB McConnell AFB Barksdale AFB Barksdale AFB Barnes MPT AGS Barnes MPT AGS Barnes MPT AGS Barnes MPT AGS Barnes MPT AGS Barnes MPT AGS Andrews AFB Whiteman AFB Whiteman AFB Whiteman AFB Columbus AFB Columbus AFB Columbus AFB Columbus AFB Great Falls IAP AGS Great Falls IAP AGS Great Falls IAP AGS Great Falls IAP AGS Seymour Johnson AFB Seymour Johnson AFB Seymour Johnson AFB Seymour Johnson AFB Seymour Johnson AFB Seymour Johnson AFB Nellis AFB Nellis AFB Nellis AFB Nellis AFB Nellis AFB Wright-Patterson AFB Wright-Patterson AFB Tinker AFB Vance AFB FL FL FL GA GA GA GA ID IL IL IL KS LA LA MA MA MA MA MA MA MD MO MO MO MS MS MS MS MT MT MT MT NC NC NC NC NC NC NV NV NV NV NV OH OH OK OK Reconfigure B54 Consolidated CP Reconfigure B55 for MXG/MOS Repair KC135 Parking Apron Weapons Release Shop (A-10 BD) A-10 Engine Trim Pad Fuel Cell Hangar, 2 Bay (A-10 BD) Relocate 202 EIS Veh Maintenance Install Fire Suppression in Hangar 205 F-16 CIRF Sound Suppressor Foundation HQ USTRANSCOM Facilities Mobility Air Force Logisitcs Support Center Munitions Delivery Road BRAC AFR Aircraft Maintenance Squadron BRAC AFR Squad Ops/Life Support ADAL Engine Shop ADAL Fuel Cell /Corr ADAL Maint Facilities ADAL Squad Ops Facility Barnes - Install Aircraft Arresting System Upgrade F-15 Apron BRAC Headquarters ANG and Readiness Center BRAC AFR Munitions Igloos BRAC AFR Munitions Maintenance BRAC AFR Squad Ops ADAL SUPT Operations Bldg 236 Add Alter Flight Simulator Bldg 268 Expand CASS System IFF Squadron Operations Facility ADAL ASE Shop ADAL Weapons & Rel Shop Squadron Operations Facility Upgrade Avionics and ECM BRAC AFR Add.Alter Maintenance Shop BRAC AFR Aircraft Parts Store BRAC AFR Corrosion Control Hangar BRAC AFR Flight Simulator BRAC AFR Squad Ops/AMU F100 Engine CIRF Propulsion Shop/parts store BRAC AFR Training Facility Construct Aircraft Maintenance Complex Construct Aircraft Maintenance Shop Facilities Construct Aircraft Operations Facilities Construct Flight Simulator Facility Facilities Infrastructure Upgrade USAF School of Aerospace Medicine (Inc 2) BRAC AFR Expand Fuel Hydrant System ADAL Aircraft Parking Apron 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 4,245 2,926 1,100 3,806 1,633 7,548 818 1,387 1,600 85,500 8,545 1,421 1,726 1,950 830 3,200 1,300 4,300 380 2,900 57,817 2,900 2,304 8,430 1,550 2,000 830 2,700 2,530 1,875 8,500 1,150 1,500 2,300 9,400 3,500 13,081 2,800 10,800 13,200 7,192 25,000 10,100 17,735 24,942 1,800 7,401 96 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Air Force Air Force Air Force Air Force Air Force Air Force 128 128 128 92 79 113 Air Force 113 Air Force 113 Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force DIA DIA DIA DISA 170 128 128 128 128 128 128 128 128 118 DLA 177 DLA DLA DMA DTRA NGA TMA WHS 177 177 141 131 131 167 140 168 169 133 Vance AFB Vance AFB Vance AFB Will Rogers World APT AGS Shaw AFB Carswell ARS, NAS Fort Worth JRB Carswell ARS, NAS Fort Worth JRB Carswell ARS, NAS Fort Worth JRB Lackland AFB Laughlin AFB Laughlin AFB Laughlin AFB Laughlin AFB Laughlin AFB Laughlin AFB Laughlin AFB Randolph AFB Langley AFB Various Various Marine Corps Base Quantico Rivanna Station Ft. Meade Defense Distribution Depot Warner Robins Defense Distribution Depot Susquehanna/New Cumberland Various Ft. Meade Various Ft. Belvoir Fort Belvoir Ft. Belvoir OK OK OK OK SC TX Add/Alter Survival Equipment Shop Renovate Simulator Facility 672 Squadron Facilities Relocate Air Traffic Operations Add Alter ECM Pod shop; ALQ-184 CIRF BRAC AFR Add Munitions Maintenance 2007 2007 2007 2007 2007 2007 955 1,820 4,465 7,200 1,850 1,320 TX BRAC AFR Add Weapons Release Shop 2007 2,350 TX BRAC AFR Add/Alter Squad Ops 2007 2,900 Intelligence Operations Center ADAL Aircraft Parking Apron ADAL Aircraft Weather Shelter ADAL Egress Shop ADAL Fuels Systems Maintenance Facility ADAL NDI Shop ADAL Simulator Facility ADAL Student Training Complex IFF Renovate Hangar 6 Logistics Support Center Planning and Design Planning and Design Collocate MILDEP Investigative Agencies Inc.1 Joint-Use Intelligence Analysis Facility, Inc. 2 DISA HQ 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 13,593 2,957 1,993 1,612 860 1,981 1,469 3,980 4,861 12,787 76,683 2,387 496 1,000 140 GA Consolidation Containerization Palletization 2007 21,400 PA WW MD WW VA VA VA General Purpose Warehouse Planning & Design DMA HQ Planning and Design NGA HQ BRAC Hospital Replacement Inc 1 Mark Center 2007 2007 2007 2007 2007 2007 2007 2007 38,350 776 6,419 900 122,200 10,000 117,415 4,941,129 2008 2008 2008 2008 2008 2008 2008 2008 44,200 130,197 31,300 39,580 20,000 51,090 21,335 12,422 TX TX TX TX TX TX TX TX TX VA WW WW VA VA MD Total Army Army Army Army Army Army Army Army 11 148 13 6 6 6 6 6 Montgomery Redstone Chaffee Carson Carson Carson Carson Carson AL AL AR CO CO CO CO CO Headquarters Building, Joint Forces AMC & USASAC Headquarters, Incr 1 Vehicle Maintenance Facility, Joint Forces Brigade Combat Team Complex, Incr 3 Division Headquarters Complex, Incr 2 Troop Health Clinic Hospital Addition Vehicle Maintenance Facility 97 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army 9 9 9 9 9 9 9 9 9 9 9 9 18 19 19 151 20 162 138 10 10 143 73 23 5 5 25 27 28 29 34 53 34 3 4 37 37 38 38 10 38 126 40 7 50 124 44 Benning Benning Benning Benning Benning Benning Benning Benning Benning Benning Benning Benning Keaukaha Lake County Mt Vernon Rock Island Lafayette Iowa AAP Leavenworth Riley Riley Knox Baton Rouge Baton Rouge Aberdeen PG Aberdeen PG Ayer Faribault Jefferson Barracks Missoula Farmingdale Hamilton Niagara Falls Bragg Bragg Columbus Springfield Norman Oklahoma City Sill Sill Sill Bristol Letterkenny Jackson Jackson Bliss GA GA GA GA GA GA GA GA GA GA GA GA HI IL IL IL IN IA KS KS KS KY LA LA MD MD MA MN MO MT NY NY NY NC NC OH OH OK OK OK OK OK PA PA SC SC TX Fire and Movement Range Infrastructure Support, Incr 1 Modified Record Fire Range Modified Record Fire Range 1 Modified Record Fire Range 2 Stationary Veh Gun Rng Training Aid Support Center Conversion Training Support Brigade Complex, Ph 2 Troop Dental Clinic - Solomon, Sand Hill Troop Health Clinic - Harmony Church Troop Health Clinic - Winder, Sand Hill Vehicle Maintenance Facility Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Metal Parts Production Add/Alt Armed Forces Reserve Center Industrial Waste Treatment Plant Regional Correctional Facility Combat Aviation Brigade Complex, Incr 2 Consolidated Health/Dental Clinic Human Resources Command Complex, Incr 2 Armed Forces Reserve Center Armed Forces Reserve Center C4ISR, Phase 1, Incr 2 Site Infrastructure Upgrades Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center, Incr 1 Armed Forces Reserve Center Armed Forces Reserve Center Headquarters Bldg, FORSCOM/USARC, Incr 1 Troop Medical Clinic Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center ADA Brigade Complex, Incr 1 Armed Forces Reserve Center Training Aids Support Center Armed Forces Reserve Center Guided Missle Launcher Eqmt Shop, Depot Drill Sergeant School Joint Religous Education & Training Center Armed Forces Reserve Center 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2,473 74,000 4,577 3,759 4,465 8,152 4,033 75,171 4,365 15,488 5,127 49,109 49,200 25,000 19,838 24,821 25,725 3,125 94,049 111,400 16,482 110,000 8,000 40,666 378,220 12,754 81,886 14,924 27,859 17,599 65,000 58,610 24,811 25,000 14,998 28,441 15,681 47,200 41,000 131,300 45,202 7,946 24,125 11,901 24,301 11,450 49,900 98 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 44 44 148 129 169 121 121 123 123 46 49 PM PM 166 184 188 184 68 68 68 184 62 76 184 71 65 65 73 64 64 64 64 Bliss Bliss Bliss Bliss Bliss Bliss Bliss Bliss Bliss Bliss Bliss Bliss Bliss Bliss Bliss East Houston NW Houston Sam Houston Arlington Hall Belvoir Lee Lee Lee Lee Yakima Cheyenne Various Various Bremerton, WA China Lake, CA China Lake, CA China Lake, CA Cookstown, NJ Cookstown, NJ Cookstown, NJ Dahlgren, VA Fort Gillem, GA Fort Lewis, WA Indian Head, MD Ingleside, TX Jacksonville, FL Kittery, ME Lehigh Valley, PA New Orleans, LA New Orleans, LA New Orleans, LA New Orleans, LA TX TX TX TX TX TX TX TX TX TX TX TX TX TX TX TX TX TX VA VA VA VA VA VA WA WY WW WW WA CA CA CA NJ NJ NJ VA GA WA MD TX FL ME PA LA LA LA LA Brigade Combat Team Complex #2, Incr 2 Brigade Combat Team Complex #3, Incr 1 Child Development Center Close Combat Tactical Trainer Facility Combat Aviation Brigade Complex, Incr 2 Combined Arms Collective Training Facility Convoy Live Fire Training Range Digital Multipurpose Training Range Health Clinic Infantry Squad Battle Course Physical Fitness Facility Site Infrastructure, BCT 3 Urban Assault Course Youth Activity Center - Biggs Youth Center Expansion Armed Forces Reserve Center Armed Forces Reserve Center Budge Dental Clinic Add/Alt Armed Forces Reserve Center, Add/Alt, Incr 1 Infrastructure Support, Incr 1 Combat Service Support School, Ph 1, Incr 2 Combat Service Support School, Ph 2, Incr 1 Dining Facility, USAF Dormitory, USAF Armed Forces Reserve Center Armed Forces Reserve Center Planning and Design Planning and Design (GDPR) Ship Maintenance Engineering Consolidation Fuse Test Facilities Fixed Wing Transfer Facility Hardware-In-The Loop Facility Construct Helicopters Hangars & MAG Headquarters Inc I Navy VR Fleet Logistics Ops Facility (INC I of II) Joint Use Reserve Training Center R DA - T & E Consolidated Facility Reserve Intelligence Area 14 Facilities Relocate Navy Cargo Handling Facility Battalion Five Explosives Development Facility MOMAU 15 Collocation to Building 78 Hangar/Parking Apron SERE School and Addition to BLDG 315 NMCRC Reading to NMCRC Lehigh Valley PA General Administrative Building Library Flag Housing Flag Housing 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 39,924 221,000 7,118 9,394 204,000 24,600 4,900 18,757 42,000 5,420 21,950 55,000 2,652 5,365 4,300 36,000 31,900 1,350 16,000 27,600 156,302 177,253 7,800 41,216 18,784 32,500 149,425 7,730 130 9,476 10,319 23,460 37,809 27,558 20,580 28,930 3,764 7,333 33,361 4,927 19,761 12,740 9,081 6,247 1,855 1,510 17 99 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force 164 166 131 71 71 71 149 Norfolk, VA Norfolk, VA Quantico, VA San Diego, CA San Diego, CA San Diego, CA Washington, DC Washington, DC 65 Westover ARB, MA 174 Wright Patterson AFB, OH 80, 110 Elmendorf AFB 80 Elmendorf AFB 80 Elmendorf AFB 80 Elmendorf AFB 92, 93, 103 Little Rock AFB 187 Davis-Monthan AFB 187 Davis-Monthan AFB 91, 143B Buckley AFB 125 Eglin AFB 113, 115 Homestead ARB 104 MacDill AFB 104 MacDill AFB 104 MacDill AFB 104 MacDill AFB 104 MacDill AFB 128 NAS Pensacola 128 NAS Pensacola 79, 103 Moody AFB 79 Moody AFB 87 Robins AFB 108 New Orleans ARS, NAS New Orleans JRB 94 Barnes MPT AGS 94 Barnes MPT AGS 95 Selfridge ANGB 94 Great Falls IAP AGS 104, 119 Seymour Johnson AFB 104 Grand Forks AFB 187 Kirtland AFB 187 Rome Laboratory 170 Wright-Patterson AFB 170 Wright-Patterson AFB 187 Wright-Patterson AFB 170, 188A Wright-Patterson AFB 170 Wright-Patterson AFB 170, 187, 188A Wright-Patterson AFB 170 Wright-Patterson AFB VA VA VA CA CA CA DC DC MA OH AK AK AK AK AR AZ AZ CO FL FL FL FL FL FL FL FL FL GA GA GA LA Ship Maint Engineering Facility Modernization Engineering Management Facility Conversion Collocate MILDEP Investigation Agencies (INCR I of II) Renovate COMINEWARCOM Headquarters Upgrade Magnetic Silencing Facility for MCMS Child Development Center Convert Bldg #15 NSF-Arlington Planning and Design NMCB 27 Facilities Naval Aerospace Medical Research Lab Aircraft Maintenance Complex Alter Alert Helicopter Hangar Alter Helicopter Maintenance Hangar Pararescue Operations Complex C-130 Maintenance Facility Addition to Ops Group HQ for Bed Down of TSSC Construct TSSC Storage Utility Infrastructure Construction JSF Integrated Training Center BRAC AFRC Add Avionics and ECM Shop BRAC AFR Add Services Flight Training BRAC AFR Aeromedical Stag Sqd Training BRAC AFR CE and Disaster Prep Training BRAC AFR Comm Squadron Trainng BRAC AFR SF Squadron Training CSO Applied Instr Fac USAF Navigate Tng Hangar BRAC Dormitory, 120-PN TF-34 Engine CIRF (A-10 BD) Relocate 202 EIS Ops Relocate 214 EIS Ops 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 16,524 10,306 143,132 13,967 6,223 7,480 10,020 10,127 8,095 13,863 16,300 5,416 4,640 16,000 2,700 3,670 790 10,080 25,000 2,150 840 2,811 935 856 2,200 12,843 36,400 16,921 6,800 1,221 1,300 MA MA MI MT NC ND NM NY OH OH OH OH OH OH OH ASA Alert Complex Add To Munitions Storage BRAC Add Fuel Cell/Corrosion Control ADAL Munitions Maintenance Construct Flightline Kitchen Facility Convert Hangar for UAV Corrosion Control Space Vehicle Battlespace Environment Lab Add Alter Information Directorate Lab AFIOH Facility AFRL/HE (Brooks) AFRL/HE (MESA) Alter Acquisition Mgt Fac (HSG/YA & Fixed Wing) Alter Materials Laboratory (HSG/YA Labs) Dining Facility Radiation Calibration Factiliy 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 13,248 4,293 1,027 2,300 960 1,275 59,600 10,251 52,300 30,002 32,002 14,400 6,200 919 4,600 100 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force 170 170 108 3A 3A 3A 3A 113 Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force DeCA DIA DIA DISA 172 172 172 172 172 172 172 170 170 170 170 147, 170 137C 113 106 49 DLA 177 Wright-Patterson AFB Wright-Patterson AFB Tinker AFB Shaw AFB Shaw AFB Shaw AFB Shaw AFB Carswell ARS, NAS Fort Worth JRB Fort Sam Houston Fort Sam Houston Fort Sam Houston Fort Sam Houston Fort Sam Houston Fort Sam Houston Fort Sam Houston Fort Sam Houston Lackland AFB Lackland AFB Lackland AFB Lackland AFB Randolph AFB Hill AFB Cheyenne MAP AGS Francis E. Warren AFB Various Ft. Lee Marine Corps Base Quantico Rivanna Station Ft. Meade Defense Distribution Depot Oklahoma City DLA MDA MDA NGA TMA TMA TMA TMA TMA TMA WHS 177 134 134 168 169 169 169 169 172 172 133 Defense Distribution Depot Susquehanna/New Cumberland Ft. Belvoir Redstone Arsenal Ft. Belvoir Various WRNMMC Bethesda Fort Belvoir WRNMMC Bethesda Fort Sam Houston Fort Sam Houston Ft. Belvoir 139 131 167 140 OH OH OK SC SC SC SC TX USAF School of Aerospace Medicine (Inc 1) USAFSAM Consult Service BRAC AFR Squad Ops/Life Support BRAC Child Development Center BRAC Fitness Center BRAC Transient Lodging Facility BRAC Visiting Officer Quarters BRAC AFR Munitions Igloos 2008 2008 2008 2008 2008 2008 2008 2008 51,000 17,356 8,721 3,400 7,100 3,300 3,250 2,124 TX TX TX TX TX TX TX TX TX TX TX TX TX UT WY WY WW VA VA VA MD METC Dining Facilities METC Medical Instructional Facility (Inc 1) METC Medical Instructional Facility (Inc 2) METC Student Dorm #1 (Inc 1) METC Student Dorm #1 (Inc 2) METC Student Dorm #2 (Inc 1) METC Student Dorm #2 (Inc 2) Tri-Service Research Facility ADAL B5075 for Defense Courier Service ADAL for IAAFA Airfield Training Construct Equipment Warehouse for Tops In Blue Renovate Bldgs 171 & 254 for HQ Admin Center Administrative Center F110 Engine CIRF Squadron Operations Addition Upgrade Missile Operations Gate Planning and Design DeCA HQ Collocate MILDEP Investigative Agencies Inc.1 Joint-Use Intelligence Analysis Facility, Inc. 1 DISA HQ 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 33,042 96,400 96,400 46,500 35,000 47,000 37,000 7,200 1,285 21,987 2,850 28,950 10,836 2,200 2,130 4,700 3,992 24,003 2,779 42,000 182,118 OK Consolidation Containerization Palletization 2008 21,000 PA VA AL VA WW MD VA MD TX TX VA General Purpose Warehouse HQ Command Center Von Braun Complex, Inc.1 NGA HQ Planning and Design BRAC-MEDCEN Add/Alt Incr 1 BRAC-Hospital Replacement Incr 2 BRAC - Comsolidation of Administrative Spaces Incr 1 BRAC-ADAL for San Antonio Military MEDCEN (SAMMC) North In BRAC-Health Clinic Mark Center, Inc. 1 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 32,350 41,400 67,000 425,565 5,500 349,599 403,400 91,400 156,035 42,513 321,546 7,343,273 Total 101 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army 148 189 13 13 13 15 169 16 4 9 9 9 9 9 9 9 2 2 2 2 19 2 20 9 23 187 5 5 136 169 174 174 141 130 176 176 127 30 53 186 186 34 53 53 5 3 37 Redstone Redstone Arkadelphia Jonesboro NW Arkansas (Bentonville) Middletown Dover AFB Newark Eglin AFB Benning Benning Benning Benning Benning Benning Benning Gillem Gillem Gillem Hunter AAF Carbondale Rock Island Greenwood (Indianapolis) Knox Shreveport Aberdeen PG Aberdeen PG Aberdeen PG Aberdeen PG Aberdeen PG Aberdeen PG Detrick Meade Meade Detroit Arsenal Detroit Arsenal Leonard Wood Beatrice Lakehurst Picatinny Picatinny Farmingdale Hamilton Totten West Point Bragg Columbus AL AL AR AR AR CT DE DE FL GA GA GA GA GA GA GA GA GA GA GA IL IL IN KY LA MD MD MD MD MD MD MD MD MD MI MI MO NE NJ NJ NJ NY NY NY NY NC OH AMC & USASAC Headquarters, Incr 2 Rotary Wing Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center, Incr 1 Joint Medical Examiner Facility Armed Forces Reserve Center Special Forces Complex, Incr 1 General Instruction Complex 1 General Instruction Complex 2, Incr 1 Headquarters Bldg, Armor Officer Basic Crs Infrastructure Support, Incr 2 Medical Facility, Incr 1 Trainee Reception Barracks Vehicle Maintenance Instruction Facility Armed Forces Reserve Center, Add/Alt Communications Network Building Enclave Force Protection Requirements CIDC Field Operations Bldg Armed Forces Reserve Center Army Headquarters Building Renovation Armed Forces Reserve Center Army Reserve Center Armed Forces Reserve Center Army Research Lab Vehicle Technology C4ISR, Phase 1, Incr 3 C4ISR, Phase 2, Incr 1 Headquarters Bldg, Army Test and Eval Cmd Medical Research Lab, Chem Bio Defense Non-Medical Chem Bio Fac Medical Biological Defense Research Lab Defense Media Activity, Incr 1 MILDEP Adjudication Activities Administrative Office Buildings, Incr 1 Weapons Maintenance and Operations Facility Prime Power School Complex Armed Forces Reserve Center Equipment Concentration Site Fuze Eng Cmplx/Explosive Magazines Packaging, Handling, Shipping & Trans Ctr Armed Forces Reserve Center, Incr 2 Armed Forces Reserve Center Armed Forces Reserve Center US Military Academy Prep School, Incr 1 Headquarters Bldg, FORSCOM/USARC, Incr 2 Armed Forces Reserve Center 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 12,832 53,628 13,969 25,512 24,375 58,733 57,411 24,100 148,000 33,370 39,000 3,417 81,700 124,935 20,214 57,463 12,995 2,500 5,500 3,613 11,602 14,631 29,257 9,500 15,381 16,700 4,080 169,000 55,500 17,562 25,216 24,048 56,300 36,909 75,000 5,891 29,000 10,587 28,649 17,903 19,212 27,000 2,000 8,624 147,815 176,917 51,166 102 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army 37 73 38 38 38 10 38 39 40 40 40 41 41 41 41 3 43 44 10 10 10 10 10 10 10 10 10 44 44 44 44 44 45 45 129 132 168 169 8 121 121 121 122 123 122 121 46 Mansfield Broken Arrow Broken Arrow McAlester AAP Muskogee Sill Vance AFB Camp Withycombe Lewisburg Scranton Willow Grove Allen Buchanan Ceiba Mayaguez Shaw AFB Kingsport Amarillo Bliss Bliss Bliss Bliss Bliss Bliss Bliss Bliss Bliss Dyess AFB Lewisville (Dallas) Round Rock (Austin) San Marcos Tyler Rutland White River Arlington Hall Belvoir Belvoir Belvoir Eustis Lee Lee Lee Lee Lee Lee Lee Everett OH OK OK OK OK OK OK OR PA PA PA PR PR PR PR SC TN TX TX TX TX TX TX TX TX TX TX TX TX TX TX TX VT VT VA VA VA VA VA VA VA VA VA VA VA VA WA Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center ADA Brigade Complex, Incr 2 Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Headquarters Building, Third US Army, Incr 1 Armed Forces Reserve Center Armed Forces Reserve Center Brigade Combat Team Complex #2, Incr 3 Brigade Combat Team Complex #3, Incr 2 Combat Aviation Brigade Complex, Incr 3 Commissary Community Infrastructure Division Headquarters Building Information System Processing Center Tactical Equipment Maintenance Facility 1 Tactical Equipment Maintenance Facility 2 Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center, Add/Alt, Incr 2 Infrastructure Support, Incr 2 Infrastructure Support, Incr 2 Infrastructure Support, Incr 2 Headquarters Building, TRADOC, Incr 1 Combat Service Support School, Ph 1, Incr 3 Combat Service Support School, Ph 2, Incr 2 Combat Service Support School, Ph 3, Incr 1 HQ, Transportation Management Detachment JCOE for Culinary Training USAF Transportation Management School Warrior Training Facilities Armed Forces Reserve Center 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 16,852 12,100 54,900 17,860 23,000 4,700 20,000 65,214 19,039 28,220 17,340 16,214 18,851 24,566 21,804 65,000 13,100 16,047 14,099 89,000 38,000 21,240 32,901 64,633 7,000 77,800 82,900 24,356 18,793 28,016 27,796 24,400 50 19,427 80,755 23,000 36,600 12,400 90,000 34,348 265,747 90,000 466 17,131 15,924 13,682 19,983 103 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Army Army Army Army Army Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force 54 73 48 PM PM 138 184 184 184 184 68 68 68 68 68 68 138 137 181 8 137 73 65 131 57 149 149 149 80, 110 80, 110 80 80, 110 80, 110 80 80 80, 110 80 80 80 80 91 143B 143B 85 85 125 125 Vancouver Madison Madison Various Various Chesapeake, VA China Lake, CA China Lake, CA China Lake, CA China Lake, CA Cookstown, NJ Cookstown, NJ Cookstown, NJ Cookstown, NJ Cookstown, NJ Cookstown, NJ Miramar, CA Miramar, CA Newport, RI Norfolk, VA Philadelphia, PA Pittsburgh, PA Portsmouth, ME Quantico, VA Tobyhanna Army Depot, PA Washington, DC Washington, DC Washington, DC Elmendorf AFB Elmendorf AFB Elmendorf AFB Elmendorf AFB Elmendorf AFB Elmendorf AFB Elmendorf AFB Elmendorf AFB Elmendorf AFB Elmendorf AFB Elmendorf AFB Elmendorf AFB Buckley AFB Buckley AFB Buckley AFB Bradley IAP AGS Bradley IAP AGS Eglin AFB Eglin AFB WA WI WI WW WW VA CA CA CA CA NJ NJ NJ NJ NJ NJ CA CA RI VA PA PA ME VA PA DC DC DC AK AK AK AK AK AK AK AK AK AK AK AK CO CO CO CT CT FL FL Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Planning and Design Planning and Design (GDPR) Joint Regional Correctional Facility (INCR I of II) Weapons and Armanment Facility #1 Ordnance Storage Facilities Renovate Facilities, Ordnance Area Ordnance Storage Facilities Aviation Supply Dept & AIMD Ops Facility Munitions Maintenance Facility Aviation Support Facility Hangar Renovation C-130 Flight Simulator Facility Helicopters Hangars & MAG Headquarters (INC II of II) Navy VR Fleet Logistics Ops Facility (INC II of II) Construct & Alter Regional Confinement Facility HRSC Consolidation Maritime Subsurface Sensor Operations Facility Renovate V47 for Combat Craft Facility Renovate Building 9 MCRC Moundsville to NMCRC Pittsburgh PA Special Purpose BN Operations Facillity Collocate MILDEP Investigation Agencies (INCR II of II) Radar Maintenance Facility Arlington Service Center Navy Systems Management Activity Relocation Navy Systems Management Activity Warehouse Acft Support Eq Shop Add to Aerial Port Add to Combat Arms Maintenance and Training Simulator Add to and Alter for Squad Ops and AMU Aircraft Parking Apron Phase II Alter Bldg 8515 for Supply and Security Forces Base Engineer Complex Fuel Cell/Corrosion Control Facility Medical Training Facility Operations and Training Facility Training Fire Station Vehicle Maintenance Shop BRAC AFR Training Facility BRAC ARPC Administrative Mississippi Gate Modification A-10 CIRF Sound Suppressor Upgrade A-10 Engine CIRF BRAC F-35 Construction Haul Road BRAC F-35 Duke Field Barriers 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 28,962 10,648 15,482 103,608 6,640 30,520 32,870 13,100 9,270 12,110 26,820 1,629 12,711 4,260 41,938 28,177 31,120 20,940 13,320 10,800 20,570 1,920 5,590 213,109 2,450 15,810 14,963 7,610 3,000 2,200 1,000 13,000 3,000 7,200 500 22,000 5,400 8,900 2,500 2,500 5,800 17,300 4,400 1,092 1,100 2,000 3,820 104 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force 4B, 125 4B, 125 125 125 125 125 125 125 125 125 128 79, 103 79, 103 79, 103 79, 103 79, 103 79, 103 104 116 90 112 112 119 Air Force 119 Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force 94 129 129 94 94 89, 100 187 170 3A 82 113 Air Force 113 Air Force Air Force Air Force Air Force Air Force Air Force Air Force 111 172 172 172 172 172 172 Eglin AFB Eglin AFB Eglin AFB Eglin AFB Eglin AFB Eglin AFB Eglin AFB Eglin AFB Eglin AFB Eglin AFB NAS Pensacola Moody AFB Moody AFB Moody AFB Moody AFB Moody AFB Moody AFB Hickam AFB Sioux Gateway APT Capital APT AGS McConnell AFB McConnell AFB New Orleans ARS, NAS New Orleans JRB New Orleans ARS, NAS New Orleans JRB Barnes MPT AGS Andrews AFB Andrews AFB Lambert - St. Louis IAP AGS Great Falls IAP AGS Nellis AFB Wright-Patterson AFB Wright-Patterson AFB Shaw AFB McGhee Tyson APT AGS Carswell ARS, NAS Fort Worth JRB Carswell ARS, NAS Fort Worth JRB Ellington Field Fort Sam Houston Fort Sam Houston Fort Sam Houston Fort Sam Houston Fort Sam Houston Fort Sam Houston FL FL FL FL FL FL FL FL FL FL FL GA GA GA GA GA GA HI IA IL KS KS LA Child Development Center Dental Clinic Replacement F-35 (JSF) Renovate Building 1312 F-35 (JSF) Renovate Maintenance Dock B1318 F-35 (JSF) Renovate Maintenance Dock B1344 F-35 (JSF) Renovate Warehouse B1404 F-35 (JSF) Utility Infrastructure Upgrades JSF IFT Dining Facility JSF Marine Corps/Navy Hangar JSF Munition Maintenance BRAC-CSO Bachelor Quarters BRAC Add/Alter Dental Clinic BRAC Child Development Center BRAC Community Activity Center BRAC Transient Lodging Facility BRAC Visiting Quarters LOLA/Ramp/Gun Berm Flight Simulator Training Facility KC-135 Test Apron and Taxiway Upgrade F-16 Engine CIRF STAMP Relocation STRAPP Relocation Establish F-15 CIRF 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 9,900 12,800 1,300 3,810 2,006 2,200 6,500 6,430 41,680 8,900 31,307 1,000 4,000 4,400 1,800 2,300 2,550 5,000 3,000 5,745 3,878 1,800 5,100 LA F-15 CIRF Sound Suppressor Foundation 2009 1,750 MA MD MD MO MT NV OH OH SC TN TX EOD Facility BRAC Construct Administrative Facility BRAC Construct POV Lane, Pearl Harbor Gate Relocate 157 AOG Upgrade NDI Shop Construct Airfield Pavements Add to and Alter Sensors Laboratory (AFRL/SN) Pipeline Dormitory BRAC Construct East Gate Expand Parking Apron & Hydrant Sys BRAC AFR Add Avionics Shop 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 1,750 52,531 1,819 1,000 890 7,800 46,879 12,600 3,000 5,200 1,270 TX BRAC AFR ECM Shop 2009 1,535 TX TX TX TX TX TX TX Relocate 272 EIS HQ METC - Student Activity Ctr METC Medical Instructional Facility (Inc 3) METC Physical Fitness Facility METC Student Dorm # 3 (Inc 2) METC Student Dorm #3 (Inc 1) Medical Field Training Complex 2009 2009 2009 2009 2009 2009 2009 2,650 5,100 68,500 11,800 34,400 48,000 18,000 105 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Air Force Air Force Air Force Air Force Air Force DIA DISA MDA NGA TMA TMA TMA TMA WHS 170 170 113 116 97 167 140 134 168 169 169 172 173G 133 Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army 11 11 11 148 11 12 13 13 13 13 15 15 4 9 17 2 9 9 9 9 9 9 9 9 9 21 21 21 43 2 55 Fort Sam Houston Randolph AFB Hill AFB Fairchild AFB Gen Mitchell IAP AGS Rivanna Station Ft. Meade Redstone Arsenal Ft. Belvoir WRNMMC Bethesda Fort Belvoir Fort Sam Houston Keesler AFB, MS Ft. Belvoir TX TX UT WA WI VA MD AL VA MD VA TX TX VA Tri-Service Research Facility AF Audit Agency Relocation Renovate LANTIRN CIRF Bldgs 584 & 578 Relocate Combat Communications Add Hydrant Refueling Outlet Joint-Use Intelligence Analysis Facility, Inc. 2 DISA HQ Von Braun Complex, Inc. 2 NGA HQ BRAC-MEDCEN Add/Alt Incr 2 BRAC-Hospital Replacement Incr 3 BRAC-ADAL for San Antonio Military MEDCEN (SAMMC) North In BRAC-Community Hospital Mark Center, Inc. 2 Total 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 Anniston (Pelham Range) Birmingham Mobile Redstone Tuscaloosa Marana Camden El Dorado Hot Springs Pine Bluff Middletown Newtown Eglin AFB Benning Benning Benning Benning Benning Benning Benning Benning Benning Benning Benning Benning Cedar Rapids Iowa AAP Muscatine Campbell Campbell Knox AL AL AL AL AL AZ AR AR AR AR CT CT FL GA GA GA GA GA GA GA GA GA GA GA GA IA IA IA KY KY KY Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Cafeteria Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center, Incr 2 Armed Forces Reserve Center Special Forces Complex, Incr 2 AAFES Troop Store Armed Forces Reserve Center Equipment Concentration Site General Instruction Complex 2, Incr 2 Headquarters Bldg, Armor Officer Basic Crs Infrastructure Support, Incr 3 Maneuver Ctr HQ & CDI Bldg Expansion Trainee Reception Barracks Training Area Infrastructure - Good Hope Training Area Infrastructure - Southern Area Training Area Roads - Paved Vehicle Recovery Course Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Headquarters Building, Group HQ Building, USAR Division 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 68,150 2,500 2,500 5,600 1,150 21,000 130,128 127,000 743,868 399,550 252,750 294,074 48,539 274,330 7,322,649 8,000 11,124 20,430 3,400 18,000 31,000 9,800 12,876 17,044 14,261 18,267 45,000 8,000 2,220 18,000 19,066 38,116 5,300 41,800 28,313 6,486 50,830 11,701 54,000 15,815 41,611 27,000 8,800 5,939 14,700 2,300 106 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army 187 5 5 174 169 141 176 176 26 28 29 30 30 31 32 186 186 5 3 3 3 35 36 7 126 40 150 40 42 3 43 10 10 10 44 44 44 44 44 148 148 148 148 45 132 132 168 Aberdeen PG Aberdeen PG Aberdeen PG Detrick Forest Glen Meade Detroit Arsenal Detroit Arsenal Ft. Custer (Augusta) Kirksville Great Falls Columbus McCook Pease Camden Picatinny Picatinny West Point Bragg Bragg Bragg Wilmington Fargo McAlester AAP Sill Allentown Tobyhanna Williamsport Bristol Shaw AFB Chattanooga Bliss Bliss Bliss Brownsville Huntsville Kingsville Lufkin Red River Sam Houston Sam Houston Sam Houston Sam Houston Rutland Belvoir Belvoir Belvoir MD MD MD MD MD MD MI MI MI MO MT NE NE NH NJ NJ NJ NY NC NC NC NC ND OK OK PA PA PA RI SC TN TX TX TX TX TX TX TX TX TX TX TX TX VT VA VA VA Army Research Lab Vehicle Technology C4ISR, Phase 1, Incr 4 C4ISR, Phase 2, Incr 2 Joint Bio-Med RDA Management Center Museum Defense Media Activity, Incr 2 Administrative Office Buildings, Incr 2 Weapons Systems Support and Training Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Guns & Weapons Systems Lab (Turret) Guns & Weapons Systems Tech Data US Military Academy Prep School, Incr 2 Band Training Facility Headquarters Bldg, FORSCOM/USARC, Incr 3 Warehouse Complex Armed Forces Reserve Center Armed Forces Reserve Center Missile Storage Facility Joint Fires & Effects Simulator Building Armed Forces Reserve Center Electronics Maintenance Shop, Depot Level Armed Forces Reserve Center Armed Forces Reserve Center Headquarters Building, Third US Army, Incr 2 Armed Forces Reserve Center Brigade Combat Team Complex #2, Incr 4 Brigade Combat Team Complex #3, Incr 3 Combat Aviation Brigade Complex, Incr 4 Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Add/Alt Building 2270 Headquarters Bldg, IMCOM Housing, Enlisted Permanent Party IMCOM Campus Area Infrastructure Armed Forces Reserve Center Administrative Facility Infrastructure Support, Incr 3 Infrastructure Support, Incr 3 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 18,300 2,800 156,000 8,300 12,200 7,000 2,384 4,646 11,573 6,600 7,600 9,300 7,900 7,000 21,000 10,491 13,000 6,990 5,439 97,083 21,602 17,500 11,200 4,250 25,050 15,000 3,589 15,100 17,500 37,202 8,900 5,000 30,000 56,000 13,692 16,000 17,500 15,500 14,200 18,817 29,724 10,398 6,512 22,950 122,000 22,300 67,400 107 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Army Navy Navy Navy Navy Navy Navy Navy Navy Navy Navy Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force Air Force 169 8 8 8 8 3 121 133 121 121 121 121 121 47 47 47 PM 73 149 57 65 181 138 184 138 181 149 146 125 125 125 125 4B, 125 125 4B, 125 125 125 125 125 95 95 95 95 92 68 Air Force 172 Belvoir Eustis Eustis Eustis Eustis Eustis Lee Lee Lee Lee Lee Lee Lee Elkins Fairmont Spencer-Ripley Various Akron, OH Arlington, VA Barstow, CA Brunswick, ME Charleston, SC Chesapeake, VA China Lake, CA Goose Creek, SC Norfolk, VA Washington, DC Elmendorf AFB Eglin AFB Eglin AFB Eglin AFB Eglin AFB Eglin AFB Eglin AFB Eglin AFB Eglin AFB Eglin AFB Eglin AFB Eglin AFB Selfridge ANGB Selfridge ANGB Selfridge ANGB Selfridge ANGB Will Rogers World APT AGS Willow Grove ARS, NAS Willow Grove JRB Fort Sam Houston VA VA VA VA VA VA VA VA VA VA VA VA VA WV WV WV WW OH VA CA ME SC VA CA SC VA DC AK FL FL FL FL FL FL FL FL FL FL FL MI MI MI MI OK PA TX NARMC HQ Building Bldg 705 Renv (AAA & 902d MI) Headquarters Bldg, IMCOM Eastern Region Headquarters Building, TRADOC, Incr 2 Joint Task Force-Civil Support Renovation for ACA and NETCOM AAFES Troop Store Administrative Building (DCMA) Combat Service Support School, Ph 1, Incr 4 Combat Service Support School, Ph 2, Incr 3 Combat Service Support School, Ph 3, Incr 2 Consolidated Troop Med/Dental Clinic USMC Training Facilities Armed Forces Reserve Center Armed Forces Reserve Center Armed Forces Reserve Center Planning and Design Armed Forces Reserve Center Crystal Park 5 to Arlington Service Center Industrial Machine Shop Facility Marine Corps Reserve Center SPAWAR Data Center Joint Regional Correctional Facility (INCR II of II) Weapons Dynamics RDT&E Center Consolidated Brig Addition Building 1558 Renovations for SPAWAR Navy Systems Management Activity Relocation JBER EOC BRAC F-35 Fresh Water Rinse Facility BRAC F-35 Live Ordnance Load Area (LOLA) CE Facility F-35 (JSF) Duke Field Control Tower Fitness Facility STOVL Simulated Carrier Practice Landing Deck School Age Facility Security Forces Facility Taxiway Extension Traffic Management Cargo Processing Facility DAR Project A10 Arm/Disarm Apron Repair Munitions Admin Building 891 Upgrade Munitions Maintenance Shop Upgrade Munitions Missile Maintenance Bays Relocate Global Air Traffic Operation Program Office Establish Enclave 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 15,642 1,600 5,464 14,300 13,259 4,800 1,850 16,359 9,170 11,000 22,161 13,839 14,189 22,000 21,000 19,540 26,100 13,840 37,570 13,106 12,960 10,694 47,560 5,970 9,790 2,510 71,929 2,110 1,684 6,624 3,720 2,280 3,653 25,890 3,210 1,362 13,000 1,399 15,000 1,040 3,100 1,650 2,350 2,000 4,000 502 ABW BOS Admin Facility 2010 5,216 108 Base Realignment and Closure Construction Projects Exhibit (BC-05) FY 2013 BASE REALIGNMENT AND CLOSURE DATA 2005 COMMISSION BRAC CONSTRUCTION PROJECT LISTING (Dollars in Thousands) Air Force Air Force Air Force Air Force Air Force DIA DISA MDA NGA TMA TMA TMA TMA TMA TMA WHS 172 146 172 146 128 167 140 134 168 169 169 169 169 169 172 133 Fort Sam Houston Fort Sam Houston Fort Sam Houston Fort Sam Houston Randolph AFB Rivanna Station Ft. Meade Redstone Arsenal Ft. Belvoir WRNMMC Bethesda Fort Belvoir Fort Belvoir WRNMMC Bethesda WRNMMC Bethesda Fort Sam Houston Ft. Belvoir TX TX TX TX TX VA MD AL VA MD VA VA MD MD TX VA Ft Sam-BAMC Entry Control Point Joint Base San Antonio Headquarters Facility METC Student Activity Ctr Working Dog Facility Renovate Building 38 JUIAF, Inc. 1 DISA HQ Von Braun Complex, Inc. 3 NGA HQ BRAC-MEDCEN Add/Alt Incr 3 BRAC-Hospital Replacement Incr 4 BRAC-Dental Clinic Traffic Mitigation Measures at WRNMMC Incr 1 Site Utility Infrastructure Upgrade for NiCOE BRAC-ADAL for San Antonio Military MEDCEN (SAMMC) North In Mark Center, Inc. 3 Total 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 13,400 4,700 28,000 2,150 2,050 667 144,795 27,800 168,749 233,950 300,428 10,034 18,400 7,799 258,250 360,533 3,808,886 NGA TMA TMA TMA TMA WHS 168 169 169 169 172 133 Ft. Belvoir WRNMMC Bethesda WRNMMC Bethesda Fort Belvoir Fort Sam Houston Ft. Bevloir VA MD MD VA TX VA NGA HQ Traffic Mitigation Measures at WRNMMC Incr 2 Defense Access Roads Medical Center Station Entrance BRAC-Hospital Replacement Incr 5 BRAC-ADAL for San Antonio Military MEDCEN (SAMMC) North In Mark Center, Inc. 4 Total 2011 2011 2011 2011 2011 2011 2011 83,328 7,600 20,000 63,637 93,941 5,610 274,116 109 Base Realignment and Closure Construction Projects Exhibit (BC-05)