UNCLASSIFIED Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions) FY 2010 FY 2011 R-1 ITEM NOMENCLATURE PE 0604653N: JT Cntr Radio Controlled IED Elec War (JCREW) FY 2012 Base FY 2012 OCO FY 2012 Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program Element 63.485 56.542 62.044 - 62.044 71.284 55.079 55.783 56.473 Continuing Continuing 3177: Joint Counter RadioControlled IED Elec Warfare 63.485 56.542 62.044 - 62.044 71.284 55.079 55.783 56.473 Continuing Continuing A. Mission Description and Budget Item Justification Provides for the research and development of EW systems, equipment, procedures, and tactical aids for all military services against the threat posed by RadioControlled Improvised Explosive Devices (RCIEDs) and to prevent initiation of RCIEDs across the spectrum of Joint military operations. The Navy has been designated as DOD Executive Agent and Single Manager for Military Ground-Based Counter Radio-Controlled Improvised Explosive Warfare (CREW) Technology by DOD Directive 5101.14 of 11 June 2007, requiring RDT&E to develop capabilities that meet global joint requirements. Utilize Joint requirements to provide a system of systems approach for a suite of equipment for mounted, dismounted, and fixed site operations; provide Joint CREW development of equipment, procedures, and tactical aids to make rapid improvements to performance, supportability and affordability, while maintaining pace with a migrating global threat. This program also includes development of Electromagnetic Environment (EME) data collection and analysis equipment that provides for the research, development and integration of realistic electromagnetic environments for primary use in the development, assessment, modeling, simulation, test and evaluation of CREW systems. Funding for this effort is required for Counter-IED initiatives being transferred from the Joint IED Defeat Organization (JIEDDO) in accordance with DEPSECDEF memo of 14 August 2007 and in accordance with DOD Directive 2000.19E. B. Program Change Summary ($ in Millions) Previous President's Budget Current President's Budget Total Adjustments • Congressional General Reductions • Congressional Directed Reductions • Congressional Rescissions • Congressional Adds • Congressional Directed Transfers • Reprogrammings • SBIR/STTR Transfer • Program Adjustments • Rate/Misc Adjustments • Congressional General Reductions Adjustments Navy FY 2010 FY 2011 FY 2012 Base FY 2012 OCO FY 2012 Total 55.611 63.485 7.874 56.542 56.542 - - - - - - - - - - - 63.653 62.044 -1.609 - - - 63.653 62.044 -1.609 -0.475 -1.134 - - - - -0.475 -1.134 - - 9.820 -1.945 - - -0.001 UNCLASSIFIED Page 1 of 9 R-1 Line Item #77 UNCLASSIFIED Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 4: Advanced Component Development & Prototypes (ACD&P) DATE: February 2011 R-1 ITEM NOMENCLATURE PE 0604653N: JT Cntr Radio Controlled IED Elec War (JCREW) Change Summary Explanation Technical: Not applicable. Schedule: Not applicable. Navy UNCLASSIFIED Page 2 of 9 R-1 Line Item #77 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2012 Navy DATE: February 2011 APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions) 3177: Joint Counter RadioControlled IED Elec Warfare Quantity of RDT&E Articles FY 2010 R-1 ITEM NOMENCLATURE PE 0604653N: JT Cntr Radio Controlled IED Elec War (JCREW) FY 2012 Base FY 2011 FY 2012 OCO FY 2012 Total FY 2013 PROJECT 3177: Joint Counter Radio-Controlled IED Elec Warfare FY 2014 FY 2015 Cost To Complete Total Cost FY 2016 63.485 56.542 62.044 - 62.044 71.284 55.079 55.783 0 0 0 0 0 0 0 0 56.473 Continuing Continuing 0 A. Mission Description and Budget Item Justification Provides for the research and development of EW systems, equipment, procedures, and tactical aids for all military services against the threat posed by RadioControlled Improvised Explosive Devices (RCIEDs) and to prevent initiation of RCIEDs across the spectrum of Joint military operations. The Navy has been designated as DOD Executive Agent and Single Manager for Military Ground-Based Counter Radio-Controlled Improvised Explosive Warfare (CREW) Technology by DOD Directive 5101.14 of 11 June 2007, requiring RDT&E to develop capabilities that meet global joint requirements. Utilize Joint requirements to provide a system of systems approach for a suite of equipment for mounted, dismounted, and fixed site operations; provide Joint CREW development of equipment, procedures, and tactical aids to make rapid improvements to performance, supportability and affordability, while maintaining pace with a migrating global threat. This program also includes development of Electromagnetic Environment (EME) data collection and analysis equipment that provides for the research, development and integration of realistic electromagnetic environments for primary use in the development, assessment, modeling, simulation, test and evaluation of CREW systems. Funding for this effort is required for Counter-IED initiatives being transferred from the Joint IED Defeat Organization (JIEDDO) in accordance with DEPSECDEF memo of 14 August 2007 and in accordance with DOD Directive 2000.19E. B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) Title: Joint Counter Radio-Controlled IED Elec Warfare Articles: Description: Defines the effort required for the design, engineering, development, fabrication and test of contractor's development models for in-house verification and validation for governmental developmental testing for JCREW System of Systems (SoS) to include the System Development and Demonstration (SD&D) Phase. The JCREW SoS approach includes three distinct capabilities that shall be developed and will utilize common component, software, and hardware solutions for an open, flexible, and compatible system design approach that is modular. These capabilities are: mobile dismounted operations, mobile ground, and waterborne transport and combat systems (mounted) and semi-permanent geographical area (fixed) systems. All capabilities will have coalition sharing capabilities. Multiple awards will be made for all capabilities. FY 2010 Accomplishments: Awarded two contracts for the development of the Joint Counter Radio Controlled IED Electronic Warfare (JCREW) 3.3 program. FY 2011 Plans: Navy UNCLASSIFIED Page 3 of 9 R-1 Line Item #77 FY 2010 63.485 0 FY 2011 56.542 0 FY 2012 62.044 0 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2012 Navy DATE: February 2011 APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 4: Advanced Component Development & Prototypes (ACD&P) R-1 ITEM NOMENCLATURE PE 0604653N: JT Cntr Radio Controlled IED Elec War (JCREW) PROJECT 3177: Joint Counter Radio-Controlled IED Elec Warfare B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 2010 FY 2011 FY 2012 Fabrication and testing of Engineering Development Models (EDMs) for the Joint Counter Radio Controlled IED Electronic Warfare (JCREW) 3.3 program. FY 2012 Plans: Complete Developmental and Operational Testing (OT) for Increment I; Milestone C. Accomplishments/Planned Programs Subtotals C. Other Program Funding Summary ($ in Millions) Line Item • OPN/5509: Explosive Ordnance Disposal Equip FY 2010 0.000 FY 2011 0.000 FY 2012 Base 61.134 FY 2012 OCO 0.000 FY 2012 Total 61.134 FY 2013 18.009 FY 2014 36.692 FY 2015 41.589 63.485 56.542 62.044 Cost To FY 2016 Complete Total Cost 35.174 Continuing Continuing D. Acquisition Strategy Analysis of Alternatives (AOA) studies are always conducted prior to the initiation of new subprojects. The AOA addresses and emphasizes acquisition strategies of the most cost effective solution over subprojects' life-cycle. At significant decision points, the AOA will be re-validated or updated to reflect changes in technology and threat. The acquisition strategies observe the following hierarchy of alternatives: commercial item (including modification), non-developmental item (including modification), and lastly, developmental programs. Contracting for RDT&E, if required, is always competitive and when feasible, production options are included. Procurements across the services may be combined to gain quantity discounts. E. Performance Metrics Gate 6 Milestone B complete 10 Jul 2009; Contract for Preliminary Design Review (PDR) awarded 01 Oct 2009; Achieved successful Preliminary Design Reviews (PDRs) April 2010 and awarded options for Critical Design Reviews (CDRs) in April 2010; Milestone C anticipated in Q2 FY12. Navy UNCLASSIFIED Page 4 of 9 R-1 Line Item #77 UNCLASSIFIED Exhibit R-3, RDT&E Project Cost Analysis: PB 2012 Navy DATE: February 2011 APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 4: Advanced Component Development & Prototypes (ACD&P) Product Development ($ in Millions) Cost Category Item Contract Method & Type R-1 ITEM NOMENCLATURE PE 0604653N: JT Cntr Radio Controlled IED Elec War (JCREW) FY 2012 Base FY 2011 Performing Activity & Location Total Prior Years Cost Award Date Cost Cost Award Date PROJECT 3177: Joint Counter Radio-Controlled IED Elec Warfare FY 2012 OCO FY 2012 Total Award Date Cost Cost Cost To Complete Total Cost Target Value of Contract Primary Hardware Development C/CPIF ITT:CA 7.540 12.452 Nov 2010 4.219 Oct 2011 - 4.219 0.000 24.211 Continuing Software Development C/CPIF ITT:CA 8.328 9.888 Nov 2010 2.810 Oct 2011 - 2.810 0.000 21.026 Continuing Systems Engineering C/CPIF ITT:CA 6.890 6.410 Oct 2010 1.100 Nov 2011 - 1.100 Continuing Continuing Continuing ILS C/CPIF ITT:CA 1.960 2.450 Oct 2010 1.200 Nov 2011 - 1.200 0.000 5.610 Continuing System Integration C/CPIF ITT:CA 2.700 2.830 Oct 2010 2.400 Nov 2011 - 2.400 0.000 7.930 Continuing Loadset Development C/CPIF ITT:CA 3.630 0.070 Oct 2010 0.500 Nov 2011 - 0.500 0.000 4.200 Continuing 31.048 34.100 - 12.229 Subtotal Support ($ in Millions) Cost Category Item FY 2012 Base FY 2011 Contract Method & Type Loadset Development FFRDC Systems Engineering Performing Activity & Location Total Prior Years Cost Award Date Cost JHU/APL:Laurel, MD - 0.030 WR NSWC:Various - - Program Management Support WR NAVEODTECHDIV:Indian Head, MD 5.620 2.090 System Integration WR NSWC:Various - - SDI, GOV'T SOLUTIONS:LaPlata, MD 0.880 0.490 Training Development 12.229 C/CPFF Cost Feb 2011 Award Date FY 2012 OCO FY 2012 Total Award Date Cost Cost Cost To Complete Total Cost Target Value of Contract 2.998 Nov 2011 - 2.998 0.000 3.028 2.424 Nov 2011 - 2.424 0.000 2.424 3.720 Nov 2011 - 3.720 0.000 1.938 Nov 2011 - 1.938 0.000 1.938 Oct 2010 3.033 Nov 2011 - 3.033 0.000 4.403 Continuing Oct 2010 11.430 Continuing Integrated Logistics Support WR NSWC:Various 0.500 0.500 Oct 2010 8.383 Nov 2011 - 8.383 0.000 9.383 Continuing Configuration Management WR NSWC:Various 0.980 1.220 Oct 2010 1.446 Nov 2011 - 1.446 0.000 3.646 Continuing Technical Data WR NSWC:Various - 2.750 Oct 2010 2.831 Nov 2011 - 2.831 0.000 7.980 7.080 - 26.773 0.000 Subtotal Navy 26.773 UNCLASSIFIED Page 5 of 9 R-1 Line Item #77 5.581 Continuing 41.833 UNCLASSIFIED Exhibit R-3, RDT&E Project Cost Analysis: PB 2012 Navy DATE: February 2011 APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 4: Advanced Component Development & Prototypes (ACD&P) Test and Evaluation ($ in Millions) Cost Category Item Development Test & Evaluation Operational Test & Evaluation Contract Method & Type WR MIPR Performing Activity & Location Total Prior Years Cost Cost Category Item Miscellaneous C/CPFF WR Award Date Cost Cost Award Date PROJECT 3177: Joint Counter Radio-Controlled IED Elec Warfare FY 2012 OCO FY 2012 Total Award Date Cost Cost Total Cost Target Value of Contract 9.230 6.930 Oct 2010 11.000 Nov 2011 - 11.000 0.000 27.160 Continuing ATEC:Arlington, VA 1.890 0.300 Oct 2010 5.800 Mar 2012 - 5.800 0.000 7.990 Continuing 11.120 7.230 - 16.800 0.000 16.800 FY 2012 Base FY 2011 Performing Activity & Location Total Prior Years Cost Award Date Cost Cost Award Date FY 2012 OCO Award Date Cost Cost Cost To Complete 4.830 4.890 Oct 2010 4.470 Nov 2011 - 4.470 0.000 NSWC:Various 0.633 3.242 Oct 2010 1.772 Nov 2011 - 1.772 0.000 5.463 8.132 - 6.242 0.000 Total Prior Years Cost Project Cost Totals 55.611 6.242 FY 2011 56.542 FY 2012 Base 62.044 FY 2012 OCO FY 2012 Total - Remarks UNCLASSIFIED Page 6 of 9 35.150 FY 2012 Total CACI:Fairfax, VA Subtotal Navy Cost To Complete NSWC:Various Management Services ($ in Millions) Program Management Support FY 2012 Base FY 2011 Subtotal Contract Method & Type R-1 ITEM NOMENCLATURE PE 0604653N: JT Cntr Radio Controlled IED Elec War (JCREW) R-1 Line Item #77 62.044 Cost To Complete Total Cost Target Value of Contract 14.190 Continuing 5.647 Continuing 19.837 Total Cost Target Value of Contract UNCLASSIFIED Exhibit R-4, RDT&E Schedule Profile: PB 2012 Navy APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 4: Advanced Component Development & Prototypes (ACD&P) Navy DATE: February 2011 R-1 ITEM NOMENCLATURE PE 0604653N: JT Cntr Radio Controlled IED Elec War (JCREW) UNCLASSIFIED Page 7 of 9 PROJECT 3177: Joint Counter Radio-Controlled IED Elec Warfare R-1 Line Item #77 UNCLASSIFIED Exhibit R-4A, RDT&E Schedule Details: PB 2012 Navy APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 4: Advanced Component Development & Prototypes (ACD&P) DATE: February 2011 R-1 ITEM NOMENCLATURE PE 0604653N: JT Cntr Radio Controlled IED Elec War (JCREW) PROJECT 3177: Joint Counter Radio-Controlled IED Elec Warfare Schedule Details Start Events by Sub Project End Quarter Year Quarter Year JCREW 3.3 (Increment I) 1 2010 1 2015 System Development & Demonstration (Increment I) 1 2010 2 2012 JCREW 3.3 Tactical Decision Aid Development 1 2010 2 2012 JCREW 3.3 System Demonstration, Test and Eval of TDA and EME 1 2011 1 2013 JCREW 3.3 Electromagnetic Environment (EME) Data Collection and Analysis (Increment I) 1 2011 1 2013 Developmental Testing/Operational Assessment 1 2010 2 2012 Developmental Testing/Operational Testing 1 2011 4 2012 Milestone C (Increment I) 2 2012 2 2012 LRIP (Increment I) 2 2012 1 2014 Full Rate Production Decision (Increment I) 3 2013 3 2013 Production (Increment I) 4 2013 2 2016 JCREW 3.3 (Increment II) 1 2010 4 2016 Technology Demonstration 1 2010 4 2011 Tech Readiness Assessment and Performance Specification Development 1 2011 3 2012 System Development & Demonstration (Increment II) 2 2012 1 2014 JCREW 3.3 Tactical Decision Aid Upgrade 1 2013 1 2015 JCREW 3.3 System Demonstration, Test & Eval of TDA and EME 2 2012 3 2015 JCREW 3.3 Electromagnetic Environment (EME) Data Collection and Analysis (Increment II) 2 2012 3 2015 Milestone C (Increment II) 2 2014 2 2014 LRIP (Increment II) 3 2014 2 2015 Proj 3177 Navy UNCLASSIFIED Page 8 of 9 R-1 Line Item #77 UNCLASSIFIED Exhibit R-4A, RDT&E Schedule Details: PB 2012 Navy APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 4: Advanced Component Development & Prototypes (ACD&P) DATE: February 2011 R-1 ITEM NOMENCLATURE PE 0604653N: JT Cntr Radio Controlled IED Elec War (JCREW) PROJECT 3177: Joint Counter Radio-Controlled IED Elec Warfare Start Events by Sub Project Full Rate Production Decision (Increment II) Navy End Quarter 3 Year 2015 Quarter 3 Year 2015 Production (Increment II) 4 2015 4 2016 Tech Refresh 1 2015 4 2016 UNCLASSIFIED Page 9 of 9 R-1 Line Item #77