UNCLASSIFIED Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Navy DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 7: Operational Systems Development COST ($ in Millions) FY 2009 Actual R-1 ITEM NOMENCLATURE PE 0207163N: AMRAAM FY 2010 Estimate FY 2011 Base Estimate FY 2011 OCO Estimate FY 2011 Total Estimate FY 2012 Estimate FY 2013 Estimate FY 2014 Estimate FY 2015 Estimate Cost To Complete Total Cost Total Program Element 6.902 3.589 2.633 0.000 2.633 2.984 2.994 3.063 3.126 Continuing Continuing 0981: AMRAAM 6.902 3.589 2.633 0.000 2.633 2.984 2.994 3.063 3.126 Continuing Continuing A. Mission Description and Budget Item Justification This joint Navy/Air Force program is structured in response to the Joint Service Operational Requirement and Mission Element Need Statement to develop an air superiority air-to-air missile with significant improvements in operational utility and combat effectiveness. This program supports the integration of the AMRAAM into Navy aircraft with analysis of Navy unique applications, aircraft missile integration tasks, product improvement efforts including missile software upgrade development and procurement of hardware to support Navy test and evaluation tasks. B. Program Change Summary ($ in Millions) Previous President's Budget Current President's Budget Total Adjustments • Congressional General Reductions • Congressional Directed Reductions • Congressional Rescissions • Congressional Adds • Congressional Directed Transfers • Reprogrammings • SBIR/STTR Transfer • Program Adjustments • Rate/Misc Adjustments FY 2009 8.509 6.902 -1.607 0.000 -1.350 -0.257 0.000 0.000 FY 2010 3.604 3.589 -0.015 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -0.015 Change Summary Explanation Technical: Not Applicable UNCLASSIFIED Navy R-1 Line Item #188 Page 1 of 12 FY 2011 Base 0.000 2.633 2.633 FY 2011 OCO 0.000 0.000 0.000 FY 2011 Total 0.000 2.633 2.633 2.633 0.000 0.000 0.000 2.633 0.000 UNCLASSIFIED Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Navy DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE 1319: Research, Development, Test & Evaluation, Navy PE 0207163N: AMRAAM BA 7: Operational Systems Development Schedule: Delays integrating developmental hardware into flight testing and lower than planned flight test efficiencies extended the completion date for Engineering and Manufacturing Development (EMD) to September 2009. This resulted in a corresponding change to the forecasted OT start/complete dates. FY2010 missile contract award has been moved from February to March per executive service (USAF) schedule decision. Phase 4 SIP/SWUP start delayed to 4th quarter FY2009 due to schedule adjustments. MRM Concept Development start delayed to 4th quarter FY2009 due to revisions in task definition. FY11 from previous President's Budget is shown as zero because no FY11-15 data was presented in President's Budget 2010. UNCLASSIFIED Navy R-1 Line Item #188 Page 2 of 12 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Navy DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 7: Operational Systems Development COST ($ in Millions) 0981: AMRAAM R-1 ITEM NOMENCLATURE PE 0207163N: AMRAAM PROJECT 0981: AMRAAM FY 2010 Estimate FY 2011 Base Estimate FY 2011 OCO Estimate FY 2011 Total Estimate FY 2012 Estimate FY 2013 Estimate FY 2014 Estimate 6.902 3.589 2.633 0.000 2.633 2.984 2.994 3.063 0 0 0 0 0 0 0 0 FY 2009 Actual Quantity of RDT&E Articles FY 2015 Estimate Cost To Complete Total Cost 3.126 Continuing Continuing 0 A. Mission Description and Budget Item Justification This joint Navy/Air Force program is structured in response to the Joint Service Operational Requirement and Mission Element Need Statement to develop an air superiority air-to-air missile with significant improvements in operational utility and combat effectiveness. This program supports the integration of the AMRAAM into Navy aircraft with analysis of Navy unique applications, aircraft missile integration tasks, product improvement efforts including missile software upgrade development and procurement of hardware to support Navy test and evaluation tasks. B. Accomplishments/Planned Program ($ in Millions) FY 2009 Continued aircraft integration FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total 0.704 1.292 0.873 0.000 0.873 2.507 0.850 0.400 0.000 0.400 Continue Aircraft integration activities and test and evaluation for Navy unique requirements. FY 2009 Accomplishments: Continued aircraft integration activities and test and evaluation for Navy unique requirements. FY 2010 Plans: Continue aircraft integration activities and test and evaluation for Navy unique requirements. FY 2011 Base Plans: Continue aircraft integration activities and test and evaluation for Navy unique requirements. Continued to identify potential improvements UNCLASSIFIED Navy R-1 Line Item #188 Page 3 of 12 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Navy APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 7: Operational Systems Development DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0207163N: AMRAAM PROJECT 0981: AMRAAM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total Continue engineering support of AMRAAM, including investigation and analysis of technologies that offer potential improvements in AMRAAM lethality/performance and compatibility with related weapons systems. FY 2009 Accomplishments: Continued engineering support of AMRAAM, including investigation and analysis of technologies that offer potential improvements in AMRAAM lethality/performance and compatibility with related weapons systems. Conducted Operational Flight Program (OFP) efforts. FY 2010 Plans: Continue engineering support of AMRAAM, including investigation and analysis of technologies that offer potential improvements in AMRAAM lethality/performance and compatibility with related weapons systems. Conducted Operational Flight Program (OFP) efforts. FY 2011 Base Plans: Continue engineering support of AMRAAM, including investigation and analysis of technologies that offer potential improvements in AMRAAM lethality/performance and compatibility with related weapons systems. Conducted Operational Flight Program (OFP) efforts. Continued Phase 4 EMD efforts 3.691 System engineering and test activities in AMRAAM Phase 4 program which include conducting Proof of Manufacturing (POM) testing, final testing of Phase 4 software, aircraft integration/aircraft Operational Flight Program (OFP) efforts and Phase 4 test/equipment tasks. Continue system engineering/ aircraft integration activities for System Improvement Program (SIP) with emphasis on Navy unique compatibility requirements and Navy aircraft integration/compatibility requirements. Commence Medium Range Missile (MRM) Concept Development to fund the initial exploratory efforts for future technological advancements to combat evolving threats. UNCLASSIFIED Navy R-1 Line Item #188 Page 4 of 12 1.447 1.360 0.000 1.360 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Navy APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 7: Operational Systems Development DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0207163N: AMRAAM PROJECT 0981: AMRAAM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total FY 2009 Accomplishments: Continued system engineering and test activities in AMRAAM Phase 4 program which include conducting Proof of Manufacturing (POM) testing, final testing of Phase 4 software, aircraft integration/ aircraft Operational Flight Program (OFP) efforts and Phase 4 test/equipment tasks. Began system engineering/aircraft integration activities for System Improvement Program (SIP) with emphasis on Navy unique compatibility requirements and Navy aircraft integration/compatibility requirements. Commenced Medium Range Missile (MRM) Concept Development to fund the initial exploratory efforts for future technological advancements to combat evolving threats. FY 2010 Plans: Continue system engineering and test activities in AMRAAM Phase 4 program which includes aircraft integration/aircraft Operational Flight Program (OFP) efforts and Phase 4 test/equipment tasks. Continue system engineering/aircraft integration activities for System Improvement Program (SIP) with emphasis on Navy unique compatibility requirements and Navy aircraft integration/compatibility requirements. FY 2011 Base Plans: Continue system engineering and test activities in AMRAAM Phase 4 program which includes aircraft integration/aircraft Operational Flight Program (OFP) efforts and Phase 4 test/equipment tasks. Continue system engineering/aircraft integration activities for System Improvement Program (SIP) with emphasis on Navy unique compatibility requirements and Navy aircraft integration/compatibility requirements. Accomplishments/Planned Programs Subtotals UNCLASSIFIED Navy R-1 Line Item #188 Page 5 of 12 6.902 3.589 2.633 0.000 2.633 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Navy DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 7: Operational Systems Development C. Other Program Funding Summary ($ in Millions) Line Item • WPN/ 220600: AMRAAM • MPAF/3479: AMRAAM • RDTE,AF/673777: AMRAAM FY 2009 88.525 202.741 48.633 FY 2010 138.079 272.714 49.971 R-1 ITEM NOMENCLATURE PE 0207163N: AMRAAM FY 2011 Base 155.553 355.358 63.252 FY 2011 OCO 0.000 0.000 0.000 FY 2011 Total 155.553 355.358 63.252 FY 2012 191.018 311.456 61.322 PROJECT 0981: AMRAAM FY 2013 230.197 473.683 58.078 FY 2014 238.201 458.075 77.145 Cost To FY 2015 Complete Total Cost 262.368 1,807.545 4,605.190 462.619 4,556.857 13,986.103 58.898 0.000 837.399 D. Acquisition Strategy Annualized AMRAAM production procurements will continue across the FYDP with periodic pre-planned product improvements and Value Engineering Change Proposals (VECP). The 328th Armament Systems Group (328 ARSG) will revisit instituting a Long Term Pricing Agreement (LTPA) upon Raytheon's ability to consistently achieve monthly deliveries of 30 - 35 AIM120Ds. E. Performance Metrics The AIM-120 AMRAAM program is meeting cost, schedule, performance, funding and life cycle sustainment in accordance with the Acquisition Program Baseline. Contractor is meeting the production schedule. UNCLASSIFIED Navy R-1 Line Item #188 Page 6 of 12 UNCLASSIFIED Exhibit R-3, RDT&E Project Cost Analysis: PB 2011 Navy DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 7: Operational Systems Development R-1 ITEM NOMENCLATURE PE 0207163N: AMRAAM PROJECT 0981: AMRAAM Product Development ($ in Millions) FY 2011 Base FY 2010 Cost Category Item Contract Method & Type Performing Activity & Location Primary Hdw Development (EGLIN)) SS/CPAF RAYTHEON COMPANY Tucson AZ Award Fees (EGLIN) SS/CPAF Total Prior Years Cost Cost Award Date Award Date Cost FY 2011 OCO Cost Award Date FY 2011 Total Cost Cost To Complete Total Cost Target Value of Contract 42.453 0.789 Jan 2010 0.701 Jan 2011 0.000 0.701 4.050 47.993 47.993 Various Various 5.990 0.139 Jan 2010 0.124 Jan 2011 0.000 0.124 0.715 6.968 6.968 NSWC DAHLGREN D C XDM1 Dahlgren VA 0.067 0.025 Nov 2009 0.025 Nov 2010 0.000 0.025 0.107 0.224 Continuing Various Various 2.150 0.000 0.000 0.000 0.000 2.150 Continuing Primary Hdw Development (DAHLGREN) WR Primary Hdw Development Various/ Various Primary Hdw Development (NAWCAD) WR NAWCAD Patuxent River MD 0.562 0.207 Nov 2009 0.221 Nov 2010 0.000 0.221 0.866 1.856 Continuing Primary Hdw Development (NAWCWD) WR NAWCWD China LakeCA 0.540 0.087 Nov 2009 0.089 Nov 2010 0.000 0.089 0.361 1.077 Continuing 20.520 0.000 0.000 0.000 0.000 0.000 20.520 Continuing 72.282 1.247 1.160 0.000 1.160 6.099 80.788 54.961 Prior Years Hardware Dev Various/ Various Various Various Subtotal 0.000 Remarks Remarks: Percentage of award fees actually awarded in past award fee periods is 15% UNCLASSIFIED Navy R-1 Line Item #188 Page 7 of 12 UNCLASSIFIED Exhibit R-3, RDT&E Project Cost Analysis: PB 2011 Navy DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 7: Operational Systems Development R-1 ITEM NOMENCLATURE PE 0207163N: AMRAAM PROJECT 0981: AMRAAM Support ($ in Millions) FY 2011 Base FY 2010 Contract Method & Type Performing Activity & Location Development Support (BOEING) SS/CPAF MCDONNELL DOUGLAS CORP St Louis MO 5.654 0.400 Jan 2010 0.000 Development Support (NSMA) WR NAVY SYST MGT ACT Arlington VA 2.597 0.250 Dec 2009 0.200 Studies & Analyses JHU/APL SS/FFP NAVSEASYSCOM Washington DC 0.860 0.200 Jan 2010 0.200 Prior Years Dev/Acft Integ Various/ Various Various Various 11.366 0.000 20.477 0.850 Cost Category Item Subtotal Total Prior Years Cost Award Date Cost Award Date Cost FY 2011 OCO Award Date Cost FY 2011 Total Cost Cost To Complete Total Cost Target Value of Contract 0.000 0.000 0.000 6.054 6.054 Dec 2010 0.000 0.200 0.842 3.889 Continuing Jan 2011 0.000 0.200 0.846 2.106 2.106 0.000 0.000 0.000 0.000 11.366 Continuing 0.400 0.000 0.400 1.688 23.415 8.160 Remarks Test and Evaluation ($ in Millions) FY 2011 Base FY 2010 Cost Category Item Dev Test & Eval (NAWCWD) Contract Method & Type WR Performing Activity & Location NAWCWD China LakeCA Subtotal Total Prior Years Cost Cost 5.806 1.292 5.806 1.292 Award Date Nov 2009 Award Date Cost 0.873 Nov 2010 0.873 Remarks UNCLASSIFIED Navy R-1 Line Item #188 Page 8 of 12 FY 2011 OCO Cost Award Date FY 2011 Total Cost Cost To Complete Total Cost 0.000 0.873 3.574 11.545 0.000 0.873 3.574 11.545 Target Value of Contract Continuing UNCLASSIFIED Exhibit R-3, RDT&E Project Cost Analysis: PB 2011 Navy DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 7: Operational Systems Development R-1 ITEM NOMENCLATURE PE 0207163N: AMRAAM PROJECT 0981: AMRAAM Management Services ($ in Millions) FY 2011 Base FY 2010 Cost Category Item Travel Prior Years Management Contract Method & Type MIPR Various/ Various Performing Activity & Location Total Prior Years Cost Award Date Cost PMA-259 Eglin AFB FL 2.369 0.200 Various Various 4.002 0.000 6.371 0.200 Subtotal Oct 2009 Award Date Cost 0.200 Oct 2010 FY 2011 OCO Award Date Cost FY 2011 Total Cost Cost To Complete Total Cost Target Value of Contract 0.000 0.200 0.844 3.613 Continuing 0.000 0.000 0.000 0.000 4.002 Continuing 0.200 0.000 0.200 0.844 7.615 Remarks Total Prior Years Cost Project Cost Totals 104.936 FY 2010 3.589 FY 2011 Base 2.633 Remarks UNCLASSIFIED Navy R-1 Line Item #188 Page 9 of 12 FY 2011 OCO 0.000 FY 2011 Total 2.633 Cost To Complete 12.205 Total Cost 123.363 Target Value of Contract 63.121 UNCLASSIFIED Exhibit R-4, RDT&E Schedule Profile: PB 2011 Navy APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 7: Operational Systems Development DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0207163N: AMRAAM UNCLASSIFIED Navy R-1 Line Item #188 Page 10 of 12 PROJECT 0981: AMRAAM UNCLASSIFIED Exhibit R-4A, RDT&E Schedule Details: PB 2011 Navy APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 7: Operational Systems Development DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0207163N: AMRAAM PROJECT 0981: AMRAAM Schedule Details Start Event Quarter Year Quarter Year EMD Completion Phase 4 4 2009 4 2009 Phase 4 SIP/SWUP Start (P3I Follow-0n) 4 2009 4 2015 System DT/OT (F/A-18 E/F) 2 2010 2 2011 IOC F/A18 E/F (Threshold) 2 2011 2 2011 IOC F/A18 C/D 3 2011 3 2011 Medium Range Missile Concept Development 4 2009 4 2010 Production Lot 23 Contract Award 3 2009 3 2009 Production Lot 24 Contract Award 2 2010 2 2010 Production Lot 25 Contract Award 2 2011 2 2011 Production Lot 26 Contract Award 2 2012 2 2012 Production Lot 27 Contract Award 2 2013 2 2013 Production Lot 28 Contract Award 2 2014 2 2014 Production Lot 29 Contract Award 2 2015 2 2015 Production Deliveries - Lot 20 4 2009 4 2010 Production Deliveries - Lot 21 2 2010 4 2010 Production Deliveries - Lot 22 3 2010 3 2011 Production Deliveries - Lot 23 3 2011 2 2012 Production Deliveries - Lot 24 2 2012 2 2013 UNCLASSIFIED Navy End R-1 Line Item #188 Page 11 of 12 UNCLASSIFIED Exhibit R-4A, RDT&E Schedule Details: PB 2011 Navy APPROPRIATION/BUDGET ACTIVITY 1319: Research, Development, Test & Evaluation, Navy BA 7: Operational Systems Development DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0207163N: AMRAAM PROJECT 0981: AMRAAM Start Event Quarter Year Quarter Year Production Deliveries - Lot 25 2 2013 2 2014 Production Deliveries - Lot 26 2 2014 2 2015 Production Deliveries - Lot 27 2 2015 4 2015 UNCLASSIFIED Navy End R-1 Line Item #188 Page 12 of 12