UNCLASSIFIED Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Army DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) COST ($ in Millions) FY 2009 Actual R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System FY 2010 Estimate FY 2011 Base Estimate FY 2011 OCO Estimate FY 2011 Total Estimate FY 2012 Estimate FY 2013 Estimate FY 2014 Estimate FY 2015 Estimate Cost To Complete 0 Total Cost Total Program Element 253.684 91.223 81.247 0.000 81.247 58.718 27.418 0.000 0.000 593.537 F72: NON LINE OF SIGHT LAUNCH SYSTEM 253.684 91.223 81.247 0.000 81.247 58.718 27.418 0.000 0.000 Continuing Continuing A. Mission Description and Budget Item Justification This project funds the System Development and Demonstration (SDD) for the Non-Line of Sight Launch System (NLOS-LS), which is part of the Brigade Combat Team (BCT) modernization program. NLOS-LS has been called upon to deliver its enabling lethality capabilities to the Infantry Brigade Combat Teams (IBCTs). NLOS-LS consists of the Precision Attack Missile (PAM) and a highly deployable, platform-independent Container Launch Unit (CLU) with self-contained technical fire control, electronics, communications and software for remote, unmanned operations. This project focuses on the development of a materiel solution to meet the NLOS-LS operational need as delineated in the Future Combat System (FCS) Operational Requirements Document (ORD) and Increment 1 Early-Infantry Brigade Combat Team (E-IBCT) Capabilities Production Document (CPD). The PAM will be vertically launched directly from the CLU based on fire missions received via the BCT network and will be capable of being updated in-flight via on-board radios by the network. The vertical launch capability permits a system that is highly deployable as well as the ability to engage a wide spectrum of targets in diverse environments and terrain. The PAM will have Automatic Target Acquisition (ATA) capability which can be upgraded in future versions.NLOS-LS, delivered during the Increment 1 timeframe, will equip Current Forces with an Advanced Field Artillery Tactical Data System (AFATDS) command based unmanned precision attack missile system. Increment 2 will address objective requirements to meet the Capability Development Document (CDD). These efforts will include Insensitive Munition requirements, incorporation of the Handheld, Manpack and Small Form Fits(HMS)-J and Ground Mobile Radio (GMR) radios into the system, integration of the Blue Force Tracker into the control cell, Data Storage Device (DSD) modifications to alleviate NSA concerns and Integrated Computing System (ICS) updates. Additional threshold requirements planned for BCT modernization program include interoperability with Battle Command, Level 5 Interactive Electronic Technical Manual System, In-Flight Target Updates, disenable in flight, 72 hour on-board power, functioning Platform Soldier Mission Readiness System/Logistics Decision Support System.In January 2006, the NLOS-LS Project Office entered into a Memorandum of Agreement with the Navy to pursue NLOS-LS as the Navy's materiel solution for small boat threat on its Littoral Combat Ships. UNCLASSIFIED Army R-1 Line Item #86 Page 1 of 30 777 of 1922 UNCLASSIFIED Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System B. Program Change Summary ($ in Millions) Previous President's Budget Current President's Budget Total Adjustments • Congressional General Reductions • Congressional Directed Reductions • Congressional Rescissions • Congressional Adds • Congressional Directed Transfers • Reprogrammings • SBIR/STTR Transfer • Adjustments to Budget Years FY 2009 208.009 253.684 45.675 0.000 51.500 -5.825 0.000 FY 2010 88.660 91.223 2.563 -0.477 0.000 0.000 3.040 0.000 0.000 0.000 0.000 FY 2011 Base 81.675 81.247 -0.428 FY 2011 OCO 0.000 0.000 0.000 FY 2011 Total 81.675 81.247 -0.428 -0.428 0.000 -0.428 Change Summary Explanation Change Summary Explanation: Increased funding in FY 2010 finances FCS Network integration and support NSA Information Assurance. UNCLASSIFIED Army R-1 Line Item #86 Page 2 of 30 778 of 1922 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) COST ($ in Millions) F72: NON LINE OF SIGHT LAUNCH SYSTEM FY 2009 Actual R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System FY 2010 Estimate 253.684 91.223 FY 2011 Base Estimate 81.247 FY 2011 OCO Estimate 0.000 FY 2011 Total Estimate 81.247 FY 2012 Estimate 58.718 FY 2013 Estimate 27.418 PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM FY 2014 Estimate 0.000 FY 2015 Estimate Cost To Complete Total Cost 0.000 Continuing Continuing Quantity of RDT&E Articles A. Mission Description and Budget Item Justification This project funds the System Development and Demonstration (SDD) for the Non-Line of Sight Launch System (NLOS-LS), which is part of the Brigade Combat Team (BCT) modernization program. NLOS-LS has been called upon to deliver its enabling lethality capabilities to the Infantry Brigade Combat Teams (IBCTs). NLOS-LS consists of the Precision Attack Missile (PAM) and a highly deployable, platform-independent Container Launch Unit (CLU) with self-contained technical fire control, electronics, communications and software for remote, unmanned operations. This project focuses on the development of a materiel solution to meet the NLOS-LS operational need as delineated in the Future Combat System (FCS) Operational Requirements Document (ORD) and Increment 1 Early-Infantry Brigade Combat Team (E-IBCT) Capabilities Production Document (CPD). The PAM will be vertically launched directly from the CLU based on fire missions received via the BCT network and will be capable of being updated in-flight via on-board radios by the network. The vertical launch capability permits a system that is highly deployable as well as the ability to engage a wide spectrum of targets in diverse environments and terrain. The PAM will have Automatic Target Acquisition (ATA) capability which can be upgraded in future versions.NLOS-LS, delivered during the Increment 1 timeframe, will equip Current Forces with an Advanced Field Artillery Tactical Data System (AFATDS) command based unmanned precision attack missile system. Increment 2 will address objective requirements to meet the Capability Development Document (CDD). These efforts will include Insensitive Munition requirements, incorporation of the Handheld, Manpack and Small Form Fits(HMS)-J and Ground Mobile Radio (GMR) radios into the system, integration of the Blue Force Tracker into the control cell, Data Storage Device (DSD) modifications to alleviate NSA concerns and Integrated Computing System (ICS) updates. Additional threshold requirements planned for BCT modernization program include interoperability with Battle Command, Level 5 Interactive Electronic Technical Manual System, In-Flight Target Updates, disenable in flight, 72 hour on-board power, functioning Platform Soldier Mission Readiness System/Logistics Decision Support System.In January 2006, the NLOS-LS Project Office entered into a Memorandum of Agreement with the Navy to pursue NLOS-LS as the Navy's materiel solution for small boat threat on its Littoral Combat Ships. B. Accomplishments/Planned Program ($ in Millions) FY 2009 Program #1 86.075 UNCLASSIFIED Army R-1 Line Item #86 Page 3 of 30 779 of 1922 FY 2010 0.000 FY 2011 Base 0.000 FY 2011 OCO 0.000 FY 2011 Total 0.000 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total FY09 Accomplishments - PAM Systems Engineering & Program Mgt: Continued system detailed design and Single Channel Radio System (SCRS) radio integration. Completed qualification testing on the battery, warhead, air data module, electronic safe/arming device, and radio antenna subcomponents. Achieved NLOS-LS Certification & Accreditation PAM Build 4 for Authority to Operate (ATO). FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #2 0.000 FY10 Planned Accomplishments - PAM Systems Engineering & Program Mgt: Increment 1: Collect PAM data/ design NLOS-LS Interactive Electronic Technical Manual System. Completed NSA Type 1 certification of SCRS radio. Completed 10 GTV flight tests. Successfully performed Stockpile-To-Target Sequence (STS) Testing (GTV 12 and GTV 13). Conducted communications testing with AFATDS and the SCRS RV-5 Radio. Continue subcomponent Qualification Testing on the CAS, ISD, Seeker, Radio, Rocket Motor, and Electronics Unit. Completed Qualification Testing on the Container / health monitor, NNS, RV-5 Radio, PAM, and AUR. Design and implementation of new square Wing Spring to ensure meeting max crosswind requirements. Validated PAM/ CLU radio connectivity with DSD sending PAM data. Participate in system integration exercises to improve CONOPS and mission threads. UNCLASSIFIED Army R-1 Line Item #86 Page 4 of 30 780 of 1922 7.517 0.000 0.000 0.000 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #3 0.000 FY10 Planned Accomplishments - PAM Systems Engineering & Program Mgt: Increment 2: Continue design efforts to meet threshold requirements such as in-flight target updates and disenable in-flight capabilities (requirement compliancy efforts). Support requirements development and system integration of missile improvements with simulations and operational analysis. Continue design efforts to mitigate issues affecting system performance such as soot on dome (affecting performance of both SAL and IR) and improvements to algorithm robustness in high clutter for stationary targets in the IR mode. Continued seeker improvements affecting production (new IR camera core) and system performance. FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 UNCLASSIFIED Army R-1 Line Item #86 Page 5 of 30 781 of 1922 17.062 0.000 0.000 0.000 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #4 0.000 0.000 15.561 0.000 15.561 14.049 0.000 0.000 0.000 0.000 FY11 Planned Accomplishments - PAM Systems Engineering & Program Mgt: Increment 2: Continued development testing and verification of design of in-flight target updates and disenable in-flight capabilities. Continued testing and verification of seeker improvements. Continued support of system simulations, integration of missile improvements and operational analysis. Update PAM Interface Specifications. Perform Independent Verification and Validation (IV&V) of updated tech data package. Continue requirement compliancy efforts to reduce waivers (i.e. Insensitive Munitions compliance and removal of Hazardous Materials). FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #5 UNCLASSIFIED Army R-1 Line Item #86 Page 6 of 30 782 of 1922 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total FY09 Accomplishments - PAM PROTOTYPE: Increment 1: Built and delivered 23 PAM prototypes for developmental testing that began in FY08. FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #6 9.182 FY09 Accomplishments - PAM SOFTWARE: Increment 1: Continued PAM software design, code, testing, and integration of incremental Flight SW builds (PAM Build 5, 5.6, and 6 ) to incorporate Radio Version (RV)4, RV5 radios, and DSD interface. FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base UNCLASSIFIED Army R-1 Line Item #86 Page 7 of 30 783 of 1922 0.000 0.000 0.000 0.000 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total FY 2011 OCO Plans: FY 2011 OCO Program #7 0.000 12.716 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 FY10 Planned Accomplishments - PAM SOFTWARE: : Increment 1: Complete SRW 1.0.1.1C updates on SCRS. Obtain NSA approval of SCRS and DSD SW. Update PAM Software to address open Software Problem Reports (SPRs) on build 6 SW configurations and algorithm updates. Complete final IV&V for tactical PAM SW. FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #8 ***FY10 Planned Accomplishments - PAM SOFTWARE: Increment 2: Continue PAM software design, code, testing, and integration to support new builds to comply with ARMY SW blocking CS13-14. Update PAM network interface for UAV as well as B-Kit Incr 2 communications. Perform incremental Software Formal Qualification testing for build Updates. Assess Tactical Security vulnerability on SW updates to support ATO update. Conduct Single and Multiple Missile Integration Testing on SW updates. Conduct system integration exercises to improve CONOPS and mission threads UNCLASSIFIED Army R-1 Line Item #86 Page 8 of 30 784 of 1922 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #9 0.000 FY11 Planned Accomplishments - PAM SOFTWARE: Increment 2: Fix any problems that emerge during testing and support IOTE. Continuation of PAM network interface for UAV as well as B-Kit Incr 2 communications. Continuation of PAM SW updates to comply with ARMY SW blocking CS13-14. Complete Software Formal Qualification testing for build Updates. Complete Tactical Security vulnerability assessment on SW updates to support ATO update. Complete Single and Multiple Missile Integration Testing on HW and SW updates. Complete system integration exercises to improve CONOPS and mission threads. FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base UNCLASSIFIED Army R-1 Line Item #86 Page 9 of 30 785 of 1922 0.000 13.840 0.000 13.840 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total FY 2011 OCO Plans: FY 2011 OCO Program #10 53.930 0.000 0.000 0.000 0.000 0.000 9.956 0.000 0.000 0.000 FY09 Accomplishments - CLU Systems Engineering & Program Mgt: Increment 1: System engineering analysis of test results. Finalized Training Support Packages/Level III IETM; continued to evaluate UID/IUID marking. Continued developing NLOS-LS Independent Data Acquisition System (NIDAS). Integration of Nav system into the CLU and transfer alignment to the PAM. Subsystem qualification and CLU-level environmental qualification. Development of Automated Test Equipment (ATE). FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #11 FY10 Planned Accomplishments - CLU Systems Engineering & Program Mgt: Increment 1: Update Safety Release. Complete NSA Type 1 certification of Data Storage Device. CLU integration and software development. Update CLU Interface Specifications for Build to Final Software. Perform IV&V of updated tech data package. DSD system task integration; validation and certification of crypto key management procedures. Continued UNCLASSIFIED Army R-1 Line Item #86 Page 10 of 30 786 of 1922 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total support of field exercises at Ft. Bliss. Incorporation of SRW Rev 5 SCRS radio and DSD into Control Cell per NSA requirements. Complete qualification and delta qualification of subsystems and CLU. FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #12 0.000 FY10 Planned Accomplishments - CLU Systems Engineering & Program Mgt: Increment 2: Begin integration of the HMS-J radio into the CLU. FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base UNCLASSIFIED Army R-1 Line Item #86 Page 11 of 30 787 of 1922 14.934 0.000 0.000 0.000 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total FY 2011 OCO Plans: FY 2011 OCO Program #13 0.000 0.000 23.088 0.000 23.088 0.000 0.000 0.000 0.000 0.000 FY11 Planned Accomplishments - CLU Systems Engineering & Program Mgt: Increment 1: Provide support to Increment 1 testing, including IOTE. Increment 2: CLU and System requalification; Data Storage Device redesign and recertification (requirement compliancy effort) to address NSA concerns. Update CLU Interface Specifications to include radio changes and NSA evolving requirements. Perform IV&V of updated tech data package. Complete integration of the HMS-J radio into the CLU. Continued support of field exercise at Ft. Bliss. Participate in AFATDS system integration exercises to validate mission threads for the system. Continue requirement compliancy efforts to reduce waivers. Achieve final NSA certification for unattended operations. Integration of JCR/Blue Force Tracker (BFT) into Control Cell. FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #14 FY11 Planned Accomplishments - CLU Systems Engineering & Program Mgt: Increment 2: CLU and System requalification; Data Storage Device redesign and recertification (requirement compliancy effort) to address UNCLASSIFIED Army R-1 Line Item #86 Page 12 of 30 788 of 1922 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total NSA concerns. Update CLU Interface Specifications to include radio changes and NSA evolving requirements. Perform IV&V of updated tech data package. Complete integration of the HMS-J radio into the CLU. Continued support of field exercise at Ft. Bliss. Participate in AFATDS system integration exercises to validate mission threads for the system. Continue requirement compliancy efforts to reduce waivers. Achieve final NSA certification for unattended operations. Integration of JCR/Blue Force Tracker (BFT) into Control Cell. FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #15 3.773 FY09 Accomplishments - CLU PROTOTYPE: Increment 1: Build and delivered 7 CLU prototypes for developmental testing that began in FY08. FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 UNCLASSIFIED Army R-1 Line Item #86 Page 13 of 30 789 of 1922 0.000 0.000 0.000 0.000 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #16 50.510 0.000 0.000 0.000 0.000 0.000 3.581 0.000 0.000 0.000 FY09 Accomplishments - CLU SOFTWARE: Continued CLU software design, code, testing, and integration of incremental Flight SW builds (CLU Build 12,13, and 14 ) to incorporate DSD interface and Radio Version RV5 radios PAM Interface. Achieved NLOS-LS Certification and Accreditation on CLU ITR 14.x with SOSCOE RE 2.1 for Authority To Operate and continued software design testing. FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #17 FY10 Planned Accomplishments - CLU SOFTWARE: Increment 1: Update CLU Software to address open Software Problem Reports (SPRs) on build 14.x SW configurations. Complete final IV&V for tactical CLU SW. Complete Software Formal Qualification testing for build Updates. UNCLASSIFIED Army R-1 Line Item #86 Page 14 of 30 790 of 1922 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #18 0.000 FY10 Planned Accomplishments - CLU SOFTWARE: : Increment 2: Continue CLU software design, code, testing, and integration to support new builds to comply with ARMY SW blocking CS13-14. Update CLU network interface for B-Kit Incr 2 communications. Update CLU SW to incorporated SOSCOE Interop and Secure RMI CLU-CLU communication. Perform incremental Software Formal Qualification testing for build Updates. Assess Tactical Security vulnerability on SW updates to support ATO update. Conduct Single and Multiple Missile Integration Testing on SW updates to assess system compatibility. Conduct system integration exercises to improve CONOPS, mission threads, and test out SOSCOE Interop functions. Upgrade SINCGARS to CLU communication software. FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 UNCLASSIFIED Army R-1 Line Item #86 Page 15 of 30 791 of 1922 6.650 0.000 0.000 0.000 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #19 0.000 0.000 10.013 0.000 10.013 14.415 8.468 8.045 0.000 8.045 FY11 Planned Accomplishments - CLU SOFTWARE: Increment 2: Fix any problems that emerge during testing and support IOTE. Continuation of CLU network interface for B-Kit Incr 2 communications. Continuation of CLU SW updates to comply with ARMY SW blocking CS13-14. Integrate HMS-J and GMR radio for JTRS communication to and from Battle command. Complete Software Formal Qualification testing for build Updates. Complete Tactical Security vulnerability assessment on SW updates to support ATO update. Complete Single and Multiple Missile Integration Testing on SW updates. Complete system integration exercises to improve CONOPS, mission thread and SoSCOE Interop Functions FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #20 UNCLASSIFIED Army R-1 Line Item #86 Page 16 of 30 792 of 1922 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total FY09, FY10, FY11 Accomplishments - Government Systems Engineering & Prog Mgt: Increment 1 & 2: Continued Gov't management of NLOS-LS acquisition program to include: program management, contract management, system and subsystem level engineering analysis, budget planning and execution, cost analysis, milestone documentation preparation, test program management, PAM and CLU products management, production planning, system software management, AETF support, logistics planning, engineering and logistics subject management expert support, and management of NLOS-LS efforts performed by other government agencies. FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #21 21.750 FY09 Accomplishments - GOVERNMENT TEST: Increment 1: Continued Gov't validation of the IFS in support of Army Technical Evaluation Command (ATEC) accreditation package for the Guided Test Vehicle (GTV). Continued support for developmental test. Supported GTV flight tests with Integrate Flight Simulation and HWIL pre-test predictions and post-test analysis. Conducted 11 PAM GTV flight tests. Began Electronic Warfare (EW) Test; and Nuclear Test; and Electromagnetic Environmental Effects (E3) Tests. Continued AETF evaluations; prepared for Operational Test (OT); updated NLOS-LS Certification and Accreditation of CLU iteration 12 software for ATO. Prepared for Flight LUT and continued support for Live Fire Test and Evaluation with tests, UNCLASSIFIED Army R-1 Line Item #86 Page 17 of 30 793 of 1922 0.000 0.000 0.000 0.000 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total models, and simulations; model and simulations (IFS and Hardware-in-the-Loop) support for LUT pre-test and associated evalutions; Electronic Warfare Susceptibility tests; Nuclear Effects testing; completed system qualification; participate in ground LUT. FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #22 0.000 FY10 Planned Accomplishment - GOVERNMENT TEST: Increment 1: Modeling and simulation support for system and System of Systems (SoS) testing. Conducted 3 PAM GTV flight tests. Conduct 4 GTV flight tests at Cold Region Test Center, Ft. Greeley, AK. Conduct Flight Limited User Test (6 total PAM flights), Support Increment 1 Technical Test and FY10 LUT of hardware in a classified environment using Single Channel Ground to Air Radio System (SINCGARS) Radios. SRW-compatible radio integration into control cell. Test updated software. Post LUT updates to HW/SW based on tests and prepare for initial Operational Test and Evaluation (IOT&E). Conduct associated training, provide logistics support and data collectors for soldier test events. FY 2009 Accomplishments: FY 2009 UNCLASSIFIED Army R-1 Line Item #86 Page 18 of 30 794 of 1922 7.870 0.000 0.000 0.000 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #23 0.000 0.000 10.700 0.000 10.700 0.000 2.469 0.000 0.000 0.000 FY11 Planned Accomplishment - GOVERNMENT TEST: Increment 1: Modeling and simulation support for system and System of System (SoS) testing Participate in TFT, FDT&E, Ground IOTE and Flight IOTE. Conduct associated training, provide logistics support, and data collectors for soldier test events. Test and verify Current Force interoperability improvements (Pocket-Sized Forward Entry Device (PFED), Forward Observer Software/ System (FOS), Advanced Field Artillery Tactical Data System (AFATDS), Control Cell) FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Program #24 UNCLASSIFIED Army R-1 Line Item #86 Page 19 of 30 795 of 1922 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM B. Accomplishments/Planned Program ($ in Millions) FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total Small Business Innovative Research/Small Business Technology Transfer Programs FY 2009 Accomplishments: FY 2009 FY 2010 Plans: FY 2010 FY 2011 Base Plans: FY 2011 Base FY 2011 OCO Plans: FY 2011 OCO Accomplishments/Planned Programs Subtotals 253.684 91.223 81.247 0.000 81.247 C. Other Program Funding Summary ($ in Millions) Line Item • Ord. #1: 0604647A Non-Line of Sight - Cannon • Ord. #2: 0604661A FCS Manned Ground Vehicles & Common Grd Vehicle Components • Ord. #3: 0604660A FCS System of Systems Engr & Program Management • Ord. #4: 0604662A FCS Reconnaissance (UAV) Platforms FY 2009 87.038 FY 2010 47.964 FY 2011 Base 0.000 FY 2011 OCO 0.000 FY 2011 Total 0.000 FY 2012 0.000 FY 2013 0.000 FY 2014 0.000 FY 2015 0.000 760.744 275.116 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1,022.165 912.399 568.711 0.000 568.711 566.378 582.775 618.755 55.923 75.107 50.304 0.000 50.304 12.058 4.180 0.000 UNCLASSIFIED Army R-1 Line Item #86 Page 20 of 30 796 of 1922 Cost To Complete Total Cost 0 135.002 0 1,035.860 727.415 Continuing Continuing 0.000 0 197.572 UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM C. Other Program Funding Summary ($ in Millions) Line Item • Ord. #5: 0604663A FCS Unmanned Ground Vehicles • Ord. #6: 0604664A FCS Unattended Ground Sensors • Ord. #7: 0604665A FCS Sustainment & Training R&D • Ord. #8: 0604666A Spin Out Technology/Capability Insertion • Ord. #9: 0605625A Manned Ground Vehicle • Ord. #10: WTCV G86100 FCS Core Program • Ord. #11: WTCV G86200 FCS Spin Out Program • Ord. #12: WTCV G86000 Ground Combat Vehicle (GCV) • Ord. #13: ACFT A00015 BCT Unmanned Aerial Veh (UAVs) Incr 1 • Ord. #14: ACFT A00016 BCT Unmanned Aerial Veh (UAVs) Incr 2 • Ord. #15: OPA B00001 BCT Unattended Ground Sensor • Ord. #16: OPA B00004 BCT Unattended Ground Sensor Incr 2 • Ord. #17: OPA B00002 BCT Network • Ord. #18: OPA B00003 BCT Network Incr 2 FY 2009 104.571 FY 2010 124.962 FY 2011 Base 249.948 FY 2011 OCO 0.000 FY 2011 Total 249.948 FY 2012 98.737 FY 2013 25.368 FY 2014 0.000 FY 2015 0.000 20.135 26.778 7.515 0.000 7.515 1.071 1.071 0.000 0.000 819.721 655.745 610.389 0.000 610.389 523.580 366.647 253.810 122.788 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 79.583 934.366 0.000 934.366 1,882.839 2,242.756 1,375.128 154.127 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 154.127 67.268 326.909 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 394.177 0.000 0.000 0.000 0.000 0.000 0.000 0.000 98.030 778.220 Continuing Continuing 0.000 0.000 44.206 0.000 44.206 40.216 12.770 3.718 1.850 Continuing Continuing 0.000 0.000 0.000 0.000 0.000 2.141 85.345 90.245 92.686 Continuing Continuing 0.000 0.000 29.718 0.000 29.718 60.578 9.582 1.544 1.328 Continuing Continuing 0.000 0.000 0.000 0.000 0.000 19.093 87.478 96.172 86.259 Continuing Continuing 0.000 0.000 176.543 0.000 176.543 192.632 20.619 0.317 0.187 Continuing Continuing 0.000 0.000 0.000 0.000 0.000 81.277 301.864 454.480 431.835 Continuing Continuing 0.000 0.000 20.046 0.000 20.046 42.703 6.002 2.288 1.870 Continuing Continuing UNCLASSIFIED Army R-1 Line Item #86 Page 21 of 30 797 of 1922 Cost To Complete Total Cost 0 603.586 0 56.570 258.367 Continuing Continuing 0.000 0 122.788 744.771 Continuing Continuing UNCLASSIFIED Exhibit R-2A, RDT&E Project Justification: PB 2011 Army DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM C. Other Program Funding Summary ($ in Millions) Line Item • Ord. #19: OPA F00001 BCT Unmanned Ground Vehicle • Ord. #20: OPA F00002 BCT Unmanned Ground Vehicle Incr 2 • Ord. #21: OPA G80001 BCT Training/Logistics/Management • Ord. #22: OPA G00002 BCT Training/Logistics/Management Incr 2 • Ord. #23: MSLS C64501 BCT NLOSLS Incr 1 • Ord. #24: MSLS C64601 BCT NLOSLS Incr 2 FY 2009 FY 2010 FY 2011 Base FY 2011 OCO FY 2011 Total FY 2012 FY 2013 FY 2014 0.000 0.000 0.000 0.000 0.000 373.193 710.680 676.230 711.940 Continuing Continuing 0.000 0.000 61.581 0.000 61.581 12.178 94.491 68.033 50.468 Continuing Continuing 0.000 0.000 0.000 0.000 0.000 75.069 387.173 396.593 446.806 Continuing Continuing 0.000 0.000 350.574 0.000 350.574 758.657 112.115 0.000 0.000 0.000 0.000 0.000 0.000 0.000 605.192 679.078 FY 2015 Cost To Complete Total Cost 0.000 0 1,221.346 579.210 Continuing Continuing D. Acquisition Strategy The Army awarded the NLOS-LS SDD contract on 19 March 2004 to Netfires Limited Liability Company (LLC), consisting of Lockheed Martin Corporation, doing business through its Missiles and Fire control and operating entity in Grand Prairie, TX; and the Raytheon Corporation, doing business through its Missile Systems Business Unit in Tuscon, AZ. The NLOS-LS SDD contract was definitized 20 August 2004. The NLOS-LS is technologically mature enough to be included as a desired capability into Current Force Early-Infantry Brigade Combat Teams (E-IBCTs) Increment 1. E. Performance Metrics Performance metrics used in the preparation of this justification material may be found in the FY 2010 Army Performance Budget Justification Book, dated May 2010. UNCLASSIFIED Army R-1 Line Item #86 Page 22 of 30 798 of 1922 UNCLASSIFIED Exhibit R-3, RDT&E Project Cost Analysis: PB 2011 Army DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM Product Development ($ in Millions) FY 2011 Base FY 2010 FY 2011 OCO FY 2011 Total Contract Method & Type Performing Activity & Location Design C/Various See remarks Location could not be determined. 210.174 0.000 0.000 0.000 0.000 Continuing Continuing 0 Prototype C/Various See remarks Location could not be determined. 46.189 0.000 0.000 0.000 0.000 Continuing Continuing 0 Software C/Various See remarks Location could not be determined. 26.418 0.000 0.000 0.000 0.000 Continuing Continuing 0 PAM Software C/Various See remarks Location could not be determined. 0.000 12.716 13.840 0.000 13.840 Continuing Continuing 0 CLU Design C/Various See remarks Location could not be determined. 0.000 24.890 23.088 0.000 23.088 Continuing Continuing 0 PAM Prototype C/Various See remarks Location could not be determined. 0.000 0.000 0.000 0.000 0.000 Continuing Continuing 0 CLU Prototype C/Various See remarks Location could not be determined. 0.000 0.000 0.000 0.000 0.000 Continuing Continuing 0 PAM Design C/Various See remarks Location could not be determined. 0.000 24.579 15.561 0.000 15.561 Continuing Continuing 0 CLU Software C/Various See remarks Location could not be determined. 0.000 10.231 10.013 0.000 10.013 Continuing Continuing 0 Cost Category Item Total Prior Years Cost Cost Award Date Cost Award Date UNCLASSIFIED Army R-1 Line Item #86 Page 23 of 30 799 of 1922 Cost Award Date Cost Cost To Complete Total Cost Target Value of Contract UNCLASSIFIED Exhibit R-3, RDT&E Project Cost Analysis: PB 2011 Army DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM Product Development ($ in Millions) FY 2011 Base FY 2010 Cost Category Item Contract Method & Type Performing Activity & Location Subtotal Total Prior Years Cost 282.781 Cost Award Date 72.416 Cost Award Date 62.502 FY 2011 OCO Cost Award Date 0.000 FY 2011 Total Cost Cost To Complete Total Cost 62.502 Target Value of Contract 0.000 Remarks Prime contractors: #1 Lockheed, Dallas, Texas #2 Raytheon, Tuscon, Arizona Sub Contractors: #3 Lockheed, Baltimore, MD #4 ATK, Rocket City, WV #5 Raytheon, Fullerton, CA #6 IGS, Minneapolis, MN #7 IEC, Anaheim, CA #8 KDI, Cincinatti, OH #9 Raytheon, Louisville, KY #10 Sparta, San Diego, CA #11 General Dynamics, Niceville, FL #12 BrenTronics, Commack, NY #13 MOOG, Salt Lake City, UT Support ($ in Millions) FY 2011 Base FY 2010 Cost Category Item Various Contract Method & Type Performing Activity & Location C/Various MULTI Location could not be determined. Subtotal Total Prior Years Cost Cost Award Date Cost Award Date Cost Award Date FY 2011 Total Cost 2.793 2.167 2.067 0.000 2.067 2.793 2.167 2.067 0.000 2.067 Remarks UNCLASSIFIED Army FY 2011 OCO R-1 Line Item #86 Page 24 of 30 800 of 1922 Cost To Complete Continuing Total Cost Continuing Target Value of Contract 0 0.000 UNCLASSIFIED Exhibit R-3, RDT&E Project Cost Analysis: PB 2011 Army DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM Test and Evaluation ($ in Millions) FY 2011 Base FY 2010 Cost Category Item Various Contract Method & Type Performing Activity & Location C/Various MULTI Location could not be determined. Subtotal Total Prior Years Cost Cost Award Date Cost Award Date FY 2011 OCO Cost Award Date FY 2011 Total Cost 7.292 7.870 10.700 0.000 10.700 7.292 7.870 10.700 0.000 10.700 Cost To Complete Continuing Total Cost Target Value of Contract Continuing 0 0.000 Remarks Test Sites: WSMR; Eglin Air Force Base; CRTC, Ft. Greeley, AK; RTTC, Redstone Arsenal, AL; APG, Aberdeen, Maryland; Ft. Bliss, TX Management Services ($ in Millions) FY 2011 Base FY 2010 Cost Category Item Various Contract Method & Type Performing Activity & Location C/Various MULTI Location could not be determined. Subtotal Total Prior Years Cost Cost Award Date Cost Award Date FY 2011 OCO Cost Award Date FY 2011 Total Cost 21.115 8.770 5.978 0.000 5.978 21.115 8.770 5.978 0.000 5.978 Cost To Complete Continuing Total Cost Target Value of Contract Continuing 0 0.000 Remarks Total Prior Years Cost Project Cost Totals 313.981 FY 2010 91.223 FY 2011 Base 81.247 UNCLASSIFIED Army R-1 Line Item #86 Page 25 of 30 801 of 1922 FY 2011 OCO 0.000 FY 2011 Total 81.247 Cost To Complete Total Cost Target Value of Contract 0.000 UNCLASSIFIED Exhibit R-3, RDT&E Project Cost Analysis: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) Total Prior Years Cost DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System FY 2010 FY 2011 Base Remarks UNCLASSIFIED Army R-1 Line Item #86 Page 26 of 30 802 of 1922 FY 2011 OCO PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM FY 2011 Total Cost To Complete Total Cost Target Value of Contract UNCLASSIFIED Exhibit R-4, RDT&E Schedule Profile: PB 2011 Army DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM FY 2014 FY 2015 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Spin Out (Early) to IBCT (LUT) Spin Out Long Lead Items Flight LUT CRTC Flights FY10 LUT # # # # # # FY11 FDTE/IOTE Spin Out MS C # # # # # # # # Increment 2 LRIP # # # # # # # # # # # # # # # # # # # # # # # # # Flight OT # IOC # 1st E-IBCT FUE # # 2nd E-IBCT # 3rd E-IBCT Incr 2 PDR Incr 2 CDR Incr 2 Production # # # # # # # # # # # # # # Incr 2 FDTE&E/STX/LUT 13 # # Incr 2 Milestone C # Incr 2 Initial Operational Capability # UNCLASSIFIED Army R-1 Line Item #86 Page 27 of 30 803 of 1922 UNCLASSIFIED Exhibit R-4A, RDT&E Schedule Details: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM Schedule Details Start Event Quarter Year Quarter Year Spin Out (Early) to IBCT (LUT) 3 2009 3 2009 Spin Out Long Lead Items 4 2009 4 2009 Flight LUT 1 2010 1 2010 CRTC Flights 4 2009 1 2010 FY10 LUT 1 2010 1 2010 FY11 FDTE/IOTE 1 2011 3 2011 Spin Out MS C 4 2009 4 2010 Increment 2 2 2011 2 2015 LRIP 2 2010 1 2012 Flight OT 3 2010 3 2010 IOC 1 2012 1 2012 1st E-IBCT FUE 3 2011 4 2011 2nd E-IBCT 1 2012 1 2012 3rd E-IBCT 3 2012 3 2012 Incr 2 PDR 2 2010 2 2010 Incr 2 CDR 2 2011 2 2011 Incr 2 Production 1 2010 3 2012 Incr 2 FDTE&E/STX/LUT 13 3 2012 4 2012 UNCLASSIFIED Army End R-1 Line Item #86 Page 28 of 30 804 of 1922 UNCLASSIFIED Exhibit R-4A, RDT&E Schedule Details: PB 2011 Army APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) DATE: February 2010 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM Start Event Quarter Year Quarter Year Incr 2 Milestone C 2 2013 2 2013 Incr 2 Initial Operational Capability 2 2015 2 2015 UNCLASSIFIED Army End R-1 Line Item #86 Page 29 of 30 805 of 1922 UNCLASSIFIED Exhibit R-5, RDT&E Termination Liability: PB 2011 Army DATE: February 2010 APPROPRIATION/BUDGET ACTIVITY 2040: Research, Development, Test & Evaluation, Army BA 5: Development & Demonstration (SDD) Cost ($ in Millions) Program Termination Liability FY 2009 9.874 R-1 ITEM NOMENCLATURE PE 0604646A: Non-Line of Sight Launch System FY 2010 0.345 FY 2011 0.350 FY 2012 0.000 FY 2013 0.000 FY 2014 0.000 PROJECT F72: NON LINE OF SIGHT LAUNCH SYSTEM FY 2015 0.000 Notes The NLOS-LS prime contract incorporates the "Limitation of Funds" clause, FAR 52.232-22, to limit the Government's liability and FAR 52.249-6, Termination (Cost Reimbursement), for contract termination. UNCLASSIFIED Army R-1 Line Item #86 Page 30 of 30 806 of 1922