RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)
DATE
MAY 2009
APPROPRIATION / BUDGET ACTIVITY
RDT&E, DEFENSE-WIDE / 7
COST (Dollars in Millions)
R-1 ITEM NOMENCLATURE / PROJECT NO.
PE 1105219BB MQ-9 UAV/S851
FY08
FY09
FY10
FY11
FY12
FY13
FY14
FY15
Cost to
Complete
Total Cost
PE 1105219BB
4.380
Cont.
Cont.
S851, MQ-9 UAV
4.380
Cont.
Cont.
A. Mission Description and Budget Item Justification: This program element identifies, develops, integrates, and tests Special Operations Forces
(SOF) - unique modifications on MQ-9 Unmanned Aircraft Systems, intelligence payloads, and control systems. As the supported combatant
command, USSOCOM has been designated as the DoD lead for planning, synchronizing, and as directed executing global operations against terrorist
networks. USSOCOM requires the capability to find, fix, and finish time-sensitive high-value targets. These targets can often only be identified with
patient collection of information and require rapid, decisive action during the short periods in which they present themselves. This program element
addresses the primary areas of intelligence, surveillance, reconnaissance, and target acquisition.
B. Program Change Summary:
FY08
Previous President's Budget
Current President's Budget
Total Adjustments
Congressional Program Reductions
Reprogrammings
Other Program Adjustments
R-1 Shopping List Item No. 242
Page 1 of 6 Pages
FY09
FY10
FY11
4.380
4.380
4.380
R-2, RDT&E Budget Item Justification
RDT&E, DW Page 95
RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)
DATE
MAY 2009
APPROPRIATION / BUDGET ACTIVITY
RDT&E, DEFENSE-WIDE / 7
R-1 ITEM NOMENCLATURE / PROJECT NO.
PE 1105219BB MQ-9 UAV/S851
Funding:
FY10: Increase of $4.380 million funds integration of MQ-9 SOF-unique payloads.
Schedule: None.
Technical: None.
R-1 Shopping List Item No. 242
Page 2 of 6 Pages
R-2, RDT&E Budget Item Justification
RDT&E, DW Page 96
Exhibit R-2a, RDT&E Project Justification
Appropriation/Budget Activity
RDT&E BA # 7
Cost ($ in millions)
Date: MAY 2009
MQ-9 UAV/Project S851
FY08
FY09
FY 2010
MQ-9 UAV
FY 2011
FY 2012
FY 2013
FY 2014
FY 2015
4.380
RDT&E Articles Quantity
A. Mission Description and Budget Item Justification: This program element identifies, develops, integrates, and tests Special Operations
Forces (SOF) - unique modifications on MQ-9 Unmanned Aircraft Systems, intelligence payloads, and control systems. As the supported
combatant command in overseas contingency operations (OCO), USSOCOM requires the capability to find, fix, and finish time-sensitive
high-value targets. These targets can often only be identified with patient collection of information and require rapid, decisive action during
the short periods in which they present themselves. This program element addresses the primary areas of intelligence, surveillance,
reconnaissance, and target acquisition.
B. Accomplishments/Planned Program
FY08
FY09
MQ-9 UAV
FY 2010
FY 2011
4.380
RDT&E Articles Quantity
FY10 Development, test, and integration of MQ-9 UAV payload and ground control station improvements.
C. Other Program Funding Summary:
FY08
PROC, MQ-9
FY09
FY10
12.671
FY11
FY12
FY13
FY14
FY15
To
Complete
Total
Cost
D. Acquisition Strategy: MQ-9 is an evolutionary acquisition program that provides improvements to SOF MQ-9 aircraft, payloads, and
ground control stations to increase the ISR&T acquisition capabilities of SOF.
R-1 Shopping List Item No. 242
Page 3 of 6 Pages
Exhibit R-2A, RDT&E Project Justification
RDT&E, DW Page 97
Exhibit R-3 RDT&E Project Cost Analysis
APPROPRIATION / BUDGET ACTIVITY
RDT&E DEFENSE-WIDE / 7
DATE: MAY 2009
MQ-9 UAV/PE1105219BB
MQ-9 UAV/S851
Cost Categories
Actual or Budget Value ($ in millions)
Contract
Total
Budget
Award
Budget
Award
Budget
Award
(Tailor to WBS, or System/Item
Requirements)
Method
& Type
PYs
Cost
Cost
FY09
Date
FY09
Cost
FY10
Date
FY10
Cost
FY11
Date
FY11
Performing Activity & Location
To
Complete
Total
Program
Product Development
Subtotal Product Dev
Cont.
Cont.
Cont.
Cont.
Cont.
Cont.
Cont.
Cont.
Cont.
Cont.
Cont.
Cont.
Remarks:
Support Costs
Subtotal Support Costs
Remarks:
Test & Evaluation
MQ-9 UAV
Subtotal T&E
TBD
TBD
4.380
4.380
Various
Remarks:
Management Services
Subtotal Management
Remarks:
Total Cost
4.380
Remarks
R-1 Shopping List Item No. 242
Page 4 of 6 Pages
Exhibit R-3, Cost Analysis
RDT&E, DW Page 98
Exhibit R-4, RDT&E Program Schedule Profile
Date: MAY 2009
Appropriation/Budget Activity
Program Element and Name
Project Number and Name
RDT&E/7
PE1105219BB/MQ-9 UAV
Project S851/MQ-9 UAV
2009
2008
2010
2011
2012
2013
2014
2015
Fiscal Year
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
MQ-9 UAV
Development/Integration/Test
R-1 Shopping List Item No. 242
Page 5 of 6 Pages
R-4, Schedule Profile
RDT&E, DW Page 99
4
Date: MAY 2009
Exhibit R-4a, RDT&E Program Schedule Detail
Appropriation/Budget Activity
RDT&E/7
Schedule Profile
MQ-9 UAV
Development/Integration/Test
R-1 Shopping List Item No. 242
Page 6 of 6 Pages
Program Element Number and Name
Project Number and Name
PE1105219BB/MQ-9 UAV
FY2008
FY2009
Project S851/MQ-9 UAV
FY2010
FY2011
FY2012
FY2013
FY2014
FY2015
1-4Q
Exhibit R-4A, Schedule Detail
RDT&E, DW Page 100
Download