May 2009 ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Budget Item J ustif ication Exhibit R-2 BUDGET ACTIVITY PE NUMBER AND TITLE 4 - Advanced Component Development and Prototypes 0603627A - Smoke, Obscurant and Target Defeating Sys-Adv Dev 0603627A Smoke, O bscurant and Target Defeating Sy s-Adv Dev COST (In Thousands) E79 SMOKE/OBSCURANT SYSTEM FY 2008 Actual FY 2009 Estimate 9104 FY 2010 Estimate 3826 Cost to Complete 4920 Continuing Total Cost Continuing A. Mission Description and Budget Item Justification: Project supports the development and improvement of an array of obscurant agents, munitions, and devices to improve survivability of the combined armed forces, support extended range capability, complement combined weapon systems, and enhance force effectiveness and combat power. This program element supports critical management studies and analyses that are conducted on a continuing basis to ensure that engineering and manufacturing development efforts are targeted against the emerging threat. US Forces must be able to effectively neutralize and degrade energy weapon systems and electro-optical systems/smart weapons that operate in the full range of the electromagnetic spectrum. Improvements are sought across the entire multi-spectral range from visual through infrared (IR) and millimeter wavelengths (MMW) radar for incorporation into self-protection large area and launched smoke systems. 0603627A Smoke, Obscurant and Target Defeating Sys-Adv Dev Item No. 58 Page 1 of 7 63 Exhibit R-2 Budget Item Justification ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) May 2009 Budget Item J ustif ication Exhibit R-2 BUDGET ACTIVITY PE NUMBER AND TITLE 4 - Advanced Component Development and Prototypes 0603627A - Smoke, Obscurant and Target Defeating Sys-Adv Dev 0603627A Smoke, O bscurant and Target Defeating Sy s-Adv Dev B. Program Change Summary FY 2008 FY 2009 FY 2010 Previous President's Budget (FY 2009) 9363 3840 18544 Current BES/President's Budget (FY 2010) 9104 3826 4920 Total Adjustments -259 -14 -13624 Congressional Program Reductions -14 Congressional Recissions Congressional Increases Reprogrammings SBIR/STTR Transfer -259 Adjustments to Budget Years -13624 Change Summary Explanation: Funding - FY 10: Funds realigned to higher priority Army programs. 0603627A Smoke, Obscurant and Target Defeating Sys-Adv Dev Item No. 58 Page 2 of 7 64 Exhibit R-2 Budget Item Justification May 2009 ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2a Exhibit) Budget Item J ustif ication Exhibit R-2a BUDGET ACTIVITY PE NUMBER AND TITLE PROJECT 4 - Advanced Component Development and Prototypes 0603627A - Smoke, Obscurant and Target Defeating Sys-Adv Dev E79 0603627A (E79) SMOKE/OBSCU RANT SYST EM COST (In Thousands) E79 FY 2008 Actual SMOKE/OBSCURANT SYSTEM FY 2009 Estimate 9104 FY 2010 Estimate 3826 Cost to Complete 4920 Total Cost Continuing Continuing A. Mission Description and Budget Item Justification: Project supports the development and improvement of an array of obscurant agents, munitions, and devices to improve survivability of the combined armed forces, support extended range capability, complement combined weapon systems, and enhance force effectiveness and combat power. This program element supports critical management studies and analyses that are conducted on a continuing basis to ensure that engineering and manufacturing development efforts are targeted against the emerging threat. US Forces must be able to effectively neutralize and degrade energy weapon systems and electro-optical systems/smart weapons that operate in the full range of the electromagnetic spectrum. Improvements are sought across the entire multi-spectral range from visual through infrared (IR) and millimeter wavelengths (MMW) radar for incorporation into self-protection large area and launched smoke systems. FY 2008 Accomplishments/Planned Program: Conducted test and evaluation of Screening Obscuration Devices (SOD) alternatives. FY 2009 FY 2010 1986 Initiate and continue environmental studies. 414 Initiate and continue SOD and SOM visible items development. 4671 Conducted and completed SOD Milestone C and Low Rate Initial Production 1330 Initiate test and evaluation of SOD and SOM alternatives. 703 500 2426 2170 1138 1750 Initiate SOD infrared alternatives Milestone B. 500 Small Business Innovative Research/Small Business Technology Transfer Program 262 Total B. Other Program Funding Summary 9104 FY 2008 FY 2009 FY 2010 To Compl 3826 4920 Total Cost New OFS item Comment: C. Acquisition Strategy Acquisition Strategy: The Advanced Component Development effort acquisition strategy uses full and open competition and cost plus fixed fee (CPFF) contracting to test and build multispectral grenades and smart dischargers. 0603627A (E79) SMOKE/OBSCURANT SYSTEM Item No. 58 Page 3 of 7 65 Exhibit R-2a Budget Item Justification May 2009 ARMY RDT&E COST ANALYSIS (R3) ARMY RDT&E C OST ANA LYSI S Exhibit R-3 BUDGET ACTIVITY PE NUMBER AND TITLE PROJECT 4 - Advanced Component Development and Prototypes 0603627A - Smoke, Obscurant and Target Defeating Sys-Adv Dev E79 0603627A (E79) SMOKE/OBSCU RANT SYST EM I. Product Development Contract Method & Type Hardware Development Performing Activity & Location JPM NBCCA, APG, MD Hardware Development MIPR Hardware Development C/CPFF TBD Contract Method & Type FY 2008 Cost FY 2008 Award Date 10094 4290 1-2Q 730 2Q Pine Bluff Arsenal, AR Performing Activity & Location Environmental Tox Studies 10094 5020 Total PYs Cost FY 2008 Cost FY 2008 Award Date 414 2Q 1084 1Q 800 Engineering Studies Subtotal: III. Test And Evaluation Contract Method & Type Performing Activity & Location 1139 1Q 1986 2Q 900 2-3Q OGA Various Total Cost 1000 1-2Q 16009 1000 1-2Q 2861 FY 2010 Cost 500 FY 2009 Award Date SOM Test & Evaluation 0603627A (E79) SMOKE/OBSCURANT SYSTEM FY 2009 Award Date FY 2009 Cost 200 Performing Activity & FY 2009 Cost FY 2008 Award Date 2230 FY 2010 Cost To Award Complete Date 2000 FY 2008 Cost OGA Various Contract 1236 Total PYs Cost OGA Various FY 2010 Cost Target Value of Contract 730 1-2Q 1498 SOD Test & Evaluation Subtotal: FY 2009 Award Date 800 SOD Eng Design Test IV. Management Services FY 2009 Cost 1236 Subtotal: II. Support Costs Total PYs Cost 1139 19600 FY 2010 Cost To Award Complete Date 1-2Q Total Cost Target Value of Contract 1964 2223 500 FY 2010 Cost 4187 FY 2010 Cost To Award Complete Date Total Cost Target Value of Contract 100 5116 1250 2430 1986 Total FY 2008 900 FY 2008 Item No. 58 Page 4 of 7 66 FY 2009 1-2Q 1250 1250 FY 2009 FY 2010 6466 FY 2010 Cost To Total Target Exhibit R-3 ARMY RDT&E COST ANALYSIS May 2009 ARMY RDT&E COST ANALYSIS (R3) ARMY RDT&E C OST ANA LYSI S Exhibit R-3 BUDGET ACTIVITY PE NUMBER AND TITLE PROJECT 4 - Advanced Component Development and Prototypes 0603627A - Smoke, Obscurant and Target Defeating Sys-Adv Dev E79 0603627A (E79) SMOKE/OBSCU RANT SYST EM Method & Type Engineering Support JPMNBCCA, APG, MD Subtotal: Project Total Cost: 0603627A (E79) SMOKE/OBSCURANT SYSTEM Location PYs Cost Cost Award Date Cost Award Date Cost 300 600 1Q 551 1Q 1170 300 600 551 1170 2621 13624 9104 3826 4920 32874 Item No. 58 Page 5 of 7 67 Award Complete Date 1Q Cost Value of Contract 2621 Exhibit R-3 ARMY RDT&E COST ANALYSIS Exhibit R-4 Budget Item Justification May 2009 Schedule Profile (R4 Exhibit) BUDGET ACTIVITY PE NUMBER AND TITLE PROJECT 4 - Advanced Component Development and Prototypes 0603627A - Smoke, Obscurant and Target Defeating Sys-Adv Dev E79 0603627A (E79) SMOKE/OBSCU RANT SYST EM Event Name FY 08 1 (1) Milestone C (Screening Obscuration Devices -Visual Restricted Terrain (SOD-VR)) (2) Milestone C (SOD-Visual) Full Rate Production (FRP) 2 3 FY 09 4 1 2 3 FY 10 4 1 2 3 FY 11 4 1 3 4 1 2 3 FY 13 4 1 2 3 FY 14 4 1 2 3 FY 15 4 1 2 3 1 2 (3) Milestone B (SOD Bi-spectral) 0603627A (E79) SMOKE/OBSCURANT SYSTEM 2 FY 12 3 Item No. 58 Page 6 of 7 68 Exhibit R-4 Budget Item Justification 4 May 2009 Schedule Detail (R4a Exhibit) Exhibit R-4a Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE PROJECT 4 - Advanced Component Development and Prototypes 0603627A - Smoke, Obscurant and Target Defeating Sys-Adv Dev E79 0603627A (E79) SMOKE/OBSCU RANT SYST EM Schedule Detail Milestone C (Screening Obscuration Devices -Visual Restricted Terrain (SOD-VR)) Milestone C (SOD-Visual) Full Rate Production (FRP) FY 2008 FY 2009 FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 1Q 3Q Milestone B (SOD Bi-spectral) 0603627A (E79) SMOKE/OBSCURANT SYSTEM FY 2012 3Q Item No. 58 Page 7 of 7 69 Exhibit R-4a Budget Item Justification