CLASSIFICATION: UNCLASSIFIED EXHIBIT R-2, RDT&E Budget Item Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / COST ($ in Millions) Total PE Cost FY 2005 R-1 ITEM NOMENCLATURE PE 0603207N Air/Ocean Tactical Applications BA-4 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 24.561 31.187 31.778 30.895 31.868 31.122 32.009 2341 METOC Data Acquisition 8.167 9.047 10.703 10.566 10.770 10.707 11.045 2342 METOC Data Assimilation and Modeling 7.583 9.454 10.794 10.932 11.731 10.969 11.292 2343 Tactical METOC Applications 6.598 6.902 8.685 8.187 8.105 8.134 8.360 2344 Precise Timing and Astrometry 1.247 1.284 1.596 1.210 1.262 1.312 1.312 9999 Congressional Increases 0.966 4.500 (U) A. MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: The Air Ocean Tactical Applications (AOTA) Program Element is fully aligned with Navy's Sea Power 21 concept to enhance the future mission capabilities of the Navy-Marine Corps Team. New state-ofthe art Government and commercial technologies are identified, transitioned, demonstrated and then integrated into Combat Systems and FORCEnet-related programs of record and Tactical Decision Aids (TDAs) that determine in real-time and near-real-time the operational effects of the physical environment on the performance of combat forces and their new and emerging platforms, sensors, systems and munitions. The AOTA program element focuses on sensing and characterizing the littoral and deep-strike battlespace in the context of regional conflicts and crisis response scenarios. Projects in this program element transition state-of-the art sensing, assimilation, modeling and decision aid technologies from Government and commercial sources. Unique project development efforts include atmospheric and oceanographic data assimilation techniques, forecast models, data base management systems and associated software for use in mainframe, desktop and laptop computers. Global Geospatial Information and Services efforts within this program address the bathymetric and gravimetric needs of the Navy. Also developed are algorithms to process new satellite sensor data for integration into Navy and Marine Corps decision support systems and for display as part of the common operational and tactical pictures. In addition, the projects provide for demonstration and validation of specialized atmospheric and oceanographic instrumentation and measurement techniques, new sensors, communications and interfaces. Included are new capabilities to assess, predict and enhance the performance of current and emerging undersea warfare and mine warfare weapons systems. AOTA capabilities are designed to support the latest versions of the Global Command and Control System (GCCS), the new Joint Command and Control (JC2) system, and specific unit-level combat systems. This program also develops representations of the physical environment for incorporation into Navy and Marine Corps warfare trainers and simulations. Finally, this program develops technological upgrades for the U.S. Naval Observatory's Master Clock system to keep pace with the demands of modern military communications, cryptographic, intelligence, geolocation, and targeting systems; develops near-real-time earth orientation predictions; develops very precise determination of positions of both faint and bright stars; and supports satellite tracking and space debris studies. Funding increases in Projects 2341 and 2342 in FY06 reflect the development of a new networked sensor grid and accelerated data fusion/assimilation efforts in support of the Littoral Battlespace Sensing (LBS) program. These efforts will enhance Intelligence Preparation of the Environment (IPE) capabilities to meet Chief of Naval Operations (CNO) and Commander Fleet Forces Command (CFFC) requirements for remote autonomous, clandestine, littoral battlespace sensing in support of Sea Shield & Sea Basing. Beginning in FY 2007, funding supports Sensors and Observing Systems (in-situ, unmanned, space, through the sensor); Assimilation and Prediction Models (Atmosphere, Ocean, Space); Database and Product Development (Atmosphere, Ocean, Acoustics, Geospacial Information and Services (GI&S)); Tactical Decision Aids (TDA) and Mission Planning; Precise Timing, Astrometry and Reference Frames; and METOC in the Information Technology (IT) Enterprise Environment. FY05 includes Congressional Add for Marine Mammal Tracking and Mitigation. FY06 includes Congressional Adds for 3D-CMAPS, Gateway System and Littoral Acoustic Demonstration Center. R-1 SHOPPING LIST - Item No. 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 1 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2, RDT&E Budget Item Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA 4 PE 0603207N Air/Ocean Tactical Applications (U) B. PROGRAM CHANGE SUMMARY: FY 2005 25.186 24.561 (0.625) (U) Funding: FY06 President's Budget FY07 President's Budget Total Adjustments FY 2006 27.094 31.187 4.093 FY 2007 32.145 31.778 (0.367) Summary of Adjustments Small Business Innovation Research (SBIR) Department of Energy Transfer Program Realignments Execution Realignments Sec 8125: Revised Economic Assumptions Congressional Action 1% Reduction Congressional Increases Contract Support Reduction NWCF CIVPERS Efficiencies Inflation Adjustments CIVPERS Pay Raise Rate Change Subtotal (0.300) (0.019) 0.006 (0.312) (0.124) (0.283) 4.500 (0.371) (0.242) 0.144 0.102 (0.625) 4.093 (0.367) (U) Schedule: Not applicable (U) Technical: Not applicable. R-1 SHOPPING LIST - Item No. 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 2 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY RDT&E, N / BA-4 COST ($ in Millions) Project Cost PROGRAM ELEMENT NUMBER AND NAME PE 0603207N Air/Ocean Tactical Applications FY 2005 8.167 FY 2006 9.047 PROJECT NUMBER AND NAME 2341 METOC Data Acquisition FY 2007 FY 2008 10.703 10.566 FY 2009 10.770 FY 2010 10.707 FY 2011 11.045 RDT&E Articles Qty (U) A. MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: The major thrust of the meteorology and oceanography (METOC) Data Acquisition Project is to provide future mission capabilities to warfighters that will allow them to detect and monitor the conditions of the physical environment throughout the entire battlespace. New sensor technologies (including unmanned vehicles, tactical sensor exploitation, in-situ sensors, etc.) are identified and the most promising candidates are transitioned from the Government's and Commercial Industry's technology base to this project. These new sensor technologies are then demonstrated, validated and integrated into operational programs of record for use by warfighters. These new sensor capabilities are to provide timely and accurate METOC data and products to Operational and Tactical level of war commanders. As the emphasis on Naval Warfare has evolved from blue water operations to the littoral and deep strike battlespace, METOC data requirements have likewise evolved. The littoral and deep strike regions are extremely dynamic and complex, characterized by strong and highly variable oceanographic and atmospheric conditions. As a result, the need to accurately characterize these conditions is more crucial than ever in planning and executing Amphibious Warfare, Mine Warfare, Special Operations, Anti-Submarine Warfare, and Strike Warfare operations. Routinely available data sources, such as climatology, oceanographic and meteorological numerical models, and satellite remote sensing are necessary but not sufficient to support these warfare areas in the littoral and deep strike regions. Current operational sensors, such as the standard balloon launched radiosonde, are deployed from platforms that are frequently located great distances from the target area of interest. The principal challenge is to provide a means for the collection and dissemination of METOC data in highly variable and dynamic littoral environmental conditions or in denied, remote or inaccessible areas over extended periods of time. The principal goals of this project are to: 1) provide the means to rapidly and automatically acquire a broad array of METOC data using both off-board and on-board sensors; 2) provide an on-scene assessment capability for the tactical commander; 3) provide the tactical commander with real-time METOC data and products for operational use; 4) demonstrate and validate the use of tactical workstations and desktop computers for processing and display of METOC data and products using latest networking technologies; 5) demonstrate and validate techniques which employ data compression, connectivity and interface technologies to ingest, store, process, distribute and display these METOC data and products; 6) develop new charting and bathymetric survey techniques necessary to reduce the existing shortfall in coastal hydrographic survey requirements; and, 7) develop an expanded database for predictive METOC models in areas of interest. In FY06 and FY07 a portion of project funding is directed towards the development of the USMC Meteorological Mobile Facility (Replacement) Next Generation (METMF(R) NG) due to emergent critical USMC capability requirements. These efforts will enhance Intelligence Preparation of the Environment (IPE) capabilities to meet CNO and CFFC requirements for remote autonomous, clandestine, littoral battlespace sensing in support of Sea Shield & Sea Basing. R-1 SHOPPING LIST - Item No. 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 3 of 36) CLASSIFICATION: UNCLASSIFIED EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / BA-4 PE 0603207N Air/Ocean Tactical Applications 2341 METOC Data Acquisition (U) B. Accomplishments/Planned Program Autonomous Sensors (AUV/UAV)/ Sensors and Observing Systems (Unmanned Vehicles) Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 0.797 FY 06 0.517 FY 07 2.001 FY05 - Tested/demonstrated communications connectivity of micro and miniaturized sensor suites for mini/micro UAV and AUV platforms. FY06 - Deliver, test, demo prototype micro AUV. Conduct preliminary studies in support of Littoral Battlespace Sensing, Fusion, and Integration (LBSF&I) and develop ISS 60 command and control system interface. Conduct undersea vehicle modeling and simulation and engineering studies. FY07- Deliver/test/demonstrate prototype Sensor Pod on operational UAVs of miniaturized sensor suites for mini/micro UAV platforms. Develop and test Network interoperability of miniaturized sensor suites for emergent UAV and AUV platforms (continued from autonomous sensors (AUV/UAV)). Rugedize vehicles and begin development of a common command and control system. Develop prototype Autonomous Undersea Vehicles (AUV) (buoyancy) and other in-situ sensors in accordance with study results. Integrate new sensing capabilities into prototypes as part of the LBSF&I program. Acoustic Data Inversion/ Sensors and Observing Systems (Through-the-Sensor) Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 1.258 FY 06 0.517 FY 07 1.637 FY05 - Completed assessments of temporal and spatial variability of littoral environments for acoustic data inversions. Continued IV&V on Geophysical Acoustic Inversion Toolkit (GAIT) Version 2 algorithms. Development and demonstration of advanced acoustic inversion techniques incorporating expert systems technology. FY06 -Continue development of the Geophysical Acoustic Inversion Toolkit (GAIT) Version 2 algorithms to Ocean Atmosphere Master Library (OAML). Begin development of advanced PUMA through-thesensor inversion algorithms designed to collected volumetric sound velocity and bottom backscatter. FY07 - Deliver Geophysical Acoustic Inversion Toolkit (GAIT) Version 2 to OAML. Begin integration into Fleet Combat Systems. Mature networked data sharing capabilities. (from acoustic data inversion). Continue investigation of PUMA volumetric sound velocity and backscatter inversion techniques. Complete integration of the AQS-20 inversion techniques into the CNMOC Mine Warfare Workstation and the Mine Warfare Environmental Decision Aids Library (MEDAL). Continue development of the SPS-48E weather radar and SPY-1 Tactical Environmental Processor (TEP) work. Demonstrate and validate automated data acquisition and assimilation efforts as part of the LBSF&I program. Begin integration into Fleet Combat Systems. Test and validate Modular Ocean Data Assimilation System-Light (MODASL) string data ingest capability and volumetric sound velocity assimilation algorithms for Ocean Atmosphere Master Library (OAML) approval. Begin integration of these algorithms into submarine combat systems. Begin development of web-based submarine ambient noise assimilation capability. (Acoustic Data Acquisition). Begin development of Military Aircraft Communications Addressing and Report System (ACARS). Ambient Noise Data/TDA/Mission Planning Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 1.218 FY 06 0.517 FY 07 1.775 FY05 - Conducted IV&V on Dynamic Ambient Noise Prediction System (DAPS) Version 2. Updated historical shipping noise (SN) database. Delivered Dynamic Ambient Noise Prediction System (DAPS) Version 2. FY06 - Deliver updated historical shipping noise database to the Ocean Atmosphere Master Library (OAML). FY07 - Integrate the Dynamic Ambient Noise Prediction System (DAPS) Version 2 and updated historical shipping noise database into Fleet ASW Combat Systems (specifically the Sonar Tactical Decision Aid Variants and USW DSS). Development of Network based on DAPS. Add real-time ship tail Ambient Noise (AN) observations to the Shipping Nose (SN) database (from Ambient Noise Data). Continue the development of the next generation Ambient Noise database modeled after the GDB-V database. Conduct annual pre-release technical analysis and research of new National Geospatial Agency (NGA) products used by the Navy for navigation systems and maritime safety for Quality Control, Suitability of Use, and Interoperability. (from Digital MC and G Analysis Program (DMAP)). Continue to develop Tactical Decision Aids (TDA) uncertainty algorithms (from Acoustic Data Acquisition). R-1 SHOPPING LIST - Item No. 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 4 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / PE 0603207N Air/Ocean Tactical Applications 2341 METOC Data Acquisition BA-4 (U) B. Accomplishments/Planned Program Autonomous Clandestine Sensors/ Sensors and Observing Systems (Through-the-Sensor) Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 1.306 FY 06 0.517 FY 07 FY05 - Delivered final version of web enabled system. Development of follow on autonomous clandestine sensors for data acquisition in denied areas. Conducted Alternatives Analysis for CNMOC AUV procurement. Continued AQS-20 through-the-sensor inversion rapid transition process. Continued development of the SPS-48E through-the-sensor weather radar development. Began development of an automated sensor placement mission planner. FY06 - Deliver prototype capable of automated data assimilation via the Network infrastructure and Tactical Environmental Data Services (TED Services). FY07 - Efforts rolled into the Sensors and Observing Systems (Through-the-Sensor) investment line. Data Connectivity/MetOc in the IT Enterprise Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 1.213 FY 06 0.517 FY 07 1.490 FY05 - Completed development of data connectivity with Joint Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance (C4ISR). Deliver TED Services Version 2 prototype. FY06 - Deliver TED Services Version 3 prototype. FY07 - Demonstrate and validate TED Services Version 3 and continue Network (GIG ES) compatibility effort. (from Data Connectivity). Acoustic Data Acquisition/ Sensors and Observing Systems (Through-the-Sensor) Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 1.289 FY 06 0.662 FY 07 FY05 - Delivered AQS-20 mine hunting sonar prototype Version 1 and conduct IV&V on Precision Undersea Mapper (PUMA) Version 2 software. Evolutionary development of expert system acoustic data acquisition techniques to directly ingest data obtained from tactical sensors. Began addressing acoustic uncertainty and development of advanced metrics. FY06 - Deliver Modular Ocean Data Assimilation System-Light (MODAS-L) string data ingest algorithms. Deliver prototype volumetric sound velocity assimilation algorithms. Begin development of submarine ambient noise assimilation capability. Continue the development of the next generation Ambient Noise database modeled after the GDB-V database. Continue to develop TDA uncertainty algorithms. FY07 - Efforts rolled into the Sensors and Observing Systems (Unmanned Vehicles) investment line. R-1 SHOPPING LIST - Item No. 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 5 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / PE 0603207N Air/Ocean Tactical Applications 2341 METOC Data Acquisition BA-4 (U) B. Accomplishments/Planned Program Digital MC and G Analysis Program (DMAP)/ Tactical Decision Aid and Mission Planning Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 1.086 FY 06 0.400 FY 07 FY05 - 06 Conduct annual pre-release technical analysis and research of new National Geospatial Agency (NGA) products used by the Navy for navigation systems and maritime safety for Quality Control, Suitability of Use, and Interoperability. FY06 - Deliver Annual Report. FY07 - Efforts rolled into the Tactical Decision Aid (TDA) and Mission Planning investment line. Littoral Battlespace Data Acquisition/ Sensors and Observing Systems (In-Situ) Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 FY 06 1.000 FY 07 2.400 FY06 - Develop initial Integrated Littoral Battlespace Data Acquisition Plan. Complete the AQS-20 through the sensor inversion rapid transition process. Conduct AQS-20 end-to-end demonstration. Continue work on the development of automated adaptive survey algorithms. Complete development of the joint NOAA/USN International Oceanographic Observation System (IOOS). Continue development of an automated sensor placement mission planner. Begin development of a prototype upper air measurement system. FY07 - Continue work on adaptive hydrographic survey work for transition to the T-AGS 60 class ships. Complete development of the joint NOAA/USN International Oceanographic Observation System (IOOS). Continue development of an advanced sensor placement mission planning system for Littoral Warfare Team (LWT) transition. Begin development of micro-miniature disposable wave and surf sensors. Complete development of a prototype upper air measurement system. USMC Acquisition Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 FY 06 4.400 FY 07 1.400 FY06 - Continue development of METMF(R) NG Variant I EDM, Variant II prototype. FY07 - Conduct METMF(R) NG software, hardware, radar, and communications upgrades. Deliver Variant I EDM and Variant II prototype. R-1 SHOPPING LIST - Item No. 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 6 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / PE 0603207N Air/Ocean Tactical Applications 2341 METOC Data Acquisition BA-4 (U) C. OTHER PROGRAM FUNDING SUMMARY: Line Item No. & Name Not Applicable RELATED RDT&E: PE 0604218N, Air/Ocean Equipment Engineering - AN/SMQ-11 satellite receiver/recorder system engineering to receive data from on-orbit Defense Meteorological Satellite Program (DMSP) sensors onboard selected ships and shore sites. (U) D. ACQUISITION STRATEGY: Acquisition, management and contracting strategies are to support the meteorology and oceanography (METOC) Data Acquisition Project to develop, demonstrate, and validate METOC data collection methods and sensors, and to evolve the ability to provide timely and accurate METOC data and products to the Tactical Commander, all with management oversight by the Program Executive Officer for Command, Control, Communications, Computers, and Intelligence and Space (PEO C4I & Space). (U) E. MAJOR PERFORMERS: Not applicable (U) F. METRICS: Earned Value Management (EVM) is used for metrics reporting and risk management. R-1 SHOPPING LIST - Item No. UNCLASSIFIED 30 Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 7 of 36) UNCLASSIFIED CLASSIFICATION: DATE: Exhibit R-3 Cost Analysis (page 1) February 2006 APPROPRIATION/BUDGET ACTIVITY RDT&E, N / BA-4 Cost Categories Software Development Contract Performing Method Activity & & Type Location PROGRAM ELEMENT PE 0603207N Air/Ocean Tactical Applications Total FY 05 PY s FY 05 Award Cost Cost Date WX NRL WX NAWC-AD Lake 0.923 CP ARL/APL 4.454 0.400 N/A 0.440 N/A WX NSWC 2.362 0.300 N/A 0.330 CP New Age 2.528 0.705 N/A CP PSI/R.L. Phillips 1.555 0.500 CP Neptune 1.415 0.400 WX FNMOC 1.661 N/A MISC Subtotal Software Development 21.688 4.376 PROJECT NUMBER AND NAME 2341 METOC Data Acquisition FY 06 FY 06 Award FY 07 Cost Date Cost N/A 4.656 1.351 48.215 8.032 1.525 0.135 1.525 0.135 Total Cost Target Value of Contract CONT CONT N/A CONT CONT 0.437 N/A CONT CONT N/A 0.305 N/A CONT CONT 0.775 N/A 0.807 N/A CONT CONT N/A 0.550 N/A 0.548 N/A CONT CONT N/A 0.440 N/A 0.436 N/A CONT CONT N/A CONT CONT N/A CONT CONT CONT CONT CONT CONT CONT CONT N/A N/A 11.629 5.507 Cost to Complete N/A N/A N/A FY 07 Award Date N/A N/A 1.537 N/A 8.727 2.044 10.083 Remarks: Systems Engineering Subtotal Support CP SSA/CSC N/A 0.180 0.180 N/A 0.220 0.220 N/A Remarks: R-1 SHOPPING LIST - Item No. 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 8 of 36) UNCLASSIFIED CLASSIFICATION: DATE: Exhibit R-3 Cost Analysis (page 1) February 2006 APPROPRIATION/BUDGET ACTIVITY RDT&E, N / BA-4 Cost Categories Developmental Test & Evaluation Subtotal Software Development Contract Performing Method Activity & & Type Location PD OPTEVFOR PROGRAM ELEMENT PE 0603207N Air/Ocean Tactical Applications Total FY 05 PY s FY 05 Award Cost Cost Date 0.000 0.000 0.000 0.000 PROJECT NUMBER AND NAME 2341 METOC Data Acquisition FY 06 FY 06 Award FY 07 Cost Date Cost N/A 0.140 0.140 N/A FY 07 Award Date 0.400 N/A Cost to Complete Total Cost Target Value of Contract CONT CONT 0.400 CONT CONT Remarks: Increased funding in FY07 for testing to support delivery of the Next Generation Meteorological Mobile Facility prototypes. Subtotal Support 0.000 0.000 0.000 0.000 CONT CONT 49.740 8.167 9.047 10.703 CONT CONT Remarks: Total Cost R-1 SHOPPING LIST - Item No. 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 9 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R4, Schedule Profile DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / PE 0603207N Air/Ocean Tactical Applications 2341 METOC Data Acquisition BA-4 2005 2006 2007 2008 2009 2010 2011 Fiscal Year 1 Acoustic Data Inversion/ Sensors/Obs Sys (TTS) 2 3 4 GAIT Ver 1.0 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 GAIT Ver 2.0 OAML PUMA Auto Clandestine Sensors/ Sensors/Obs Sys (TTS) Acoustic Data Acquisition/ Sensors/Obs Sys (TTS) Sensors/Obs Sys (TTS) Web-Enabled System TED Services Int AQS-20 Prototype MODAS SubCTD Uncertainty, AN Database GAIT V2.0 PUMA Inversions AQS-20 SPS048E NITES NEXT Integration TED Services Integration GAIT V3.0 PUMA Inversions GAIT V3.0 PUMA Inversions SPS-48E AQS-20 GAIT V2.0 AQS-20 R-1 SHOPPING LIST - Item No. PUMA GAIT V3.0 NITES NEXT Integration TED Services Integration NEXGEN TTS NEXGEN TTS Algorithms NITES/TED Services 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 10 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R4, Schedule Profile DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / PE 0603207N Air/Ocean Tactical Applications 2341 METOC Data Acquisition BA-4 2005 2006 2007 2008 2009 2010 2011 Fiscal Year 1 Autonomous Sensors (UVs)/ Sensors/Obs Sys (UVs) 2 3 4 1 Comm Demo 2 3 4 1 1 2 3 4 1 2 3 4 TED Services GIG-ES Integration Integration DEM/VAL 1 2 3 4 1 2 3 4 NEXTGEN Sensor Integration DEM/VAL AQS-20/SPS-48E TTS DAPS Ver 2.0 DAPS V2.0 Int DAPS V2.0 Intl Web based DAPS SN Database NGA Prod Eval SN Database OAML Navy Unique Navy Unique AUV TAGS-60 C2/Adap Surv TED Services V2.0 SN Database DAPS V3.0 NITES/TEDS NGA Prod Eval DAPS V3.0 Uncertainty DAPS V3.0 Web based DAPS Automated Sensor Assimilation Web based DAPS Web based DAPS Advanced Uncertainty SN Database NGA Prod Eval NITES/TEDS Integration NGA Prod Eval OAML TDA/Mission Planning Data Connectivity/ MetOc in the IT Enterprise 4 DEM/VAL CNMOC AUV Sensor Int DMAP/ TDA/Mission Planning 3 AUV Prototype and Sensor Dev/C2 Studies Littoral Battlespace Sensing/ Sensors/Obs Sys (In-Situ) Ambient Noise Data/ TDA/Mission Planning 2 TED Services V3.0 Adaptive Survey AUV Integration GIG-ES DEM/VAL A AUV Int DEM/VAL TED Services V4.0 Data Transfer TED Services V3.0 DEM/VAL DCGS-N Integration NITES NEXT Integration TED Services Integration Sensor Upgrades NITES NEXT Integration TED Services Integration NITES/TEDS Automated Sensor Assimilation Data Transfer TED Services V4.0 DCGS-N Integration GIG-ES Integration Data Transfer S/W, H/W, Radar, Comm Upgrades USMC Acquisition 1 V1 EDM 1 V2 EDM 1 V2 Prototype 1 V3 2 V1 4 V2 3 V3 3 V2 S/W, H/W, Radar, Comm Upgrades 2 V1 4 V2 R-1 SHOPPING LIST - Item No. S/W, H/W, Radar, Comm Upgrades 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 11 of 36) UNCLASSIFIED CLASSIFICATION: Exhibit R-4a, Schedule Detail DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT PE 0603207N Air/Ocean Tactical Applications RDT&E, N / BA-4 Schedule Profile FY 2005 Acoustic Data Inversion/Sensors/Obs Sys (TTS) 4Q Auto Clandestine Sensors/Sensors/Obs Sys (TTS) 4Q Acoustic Data Acquisition/Sensors/Obs Sys (TTS) Sensors/Obs Sys (TTS) 4Q Autonomous Sensors (UVs)/Sensors/Obs Sys (UVs) Littoral Battlespace Sensing/Sensors/Obs Sys (in-Situ) Ambient Noise Data/TDA/Mission Planning DMAP/TDA/Mission Planning 4Q TDA/Mission Planning Data Connectivity/METOC in the IT Enterprise USMC Acquisition FY 2006 PROJECT NUMBER AND NAME 2341 METOC Data Acquisition FY 2007 FY 2008 4Q 4Q FY 2009 FY 2010 FY 2011 4Q Q1 Q3 4Q 4Q 2Q 1Q 4Q 2Q 2Q 4Q 2Q 2Q 4Q 4Q 3Q 4Q 3Q 4Q 4Q 4Q R-1 SHOPPING LIST - Item No. 4Q 4Q 4Q 4Q 4Q 3Q 4Q 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 12 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY RDT&E, N / BA-4 COST ($ in Millions) Project Cost PROGRAM ELEMENT NUMBER AND NAME PE 0603207N Air/Ocean Tactical Applications FY 2005 7.583 FY 2006 9.454 PROJECT NUMBER AND NAME 2342 METOC Data Assimilation and Modeling FY 2007 FY 2008 10.794 10.932 FY 2009 FY 2010 11.731 10.969 FY 2011 11.292 RDT&E Articles Qty (U) A. MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: The meteorological and oceanographic (METOC) Data Assimilation Project is a multi-faceted project that provides future mission capabilities for warfighters to characterize the physical environment within their battlespace. This project includes: 1) development, demonstration and validation of atmospheric and oceanographic data assimilation techniques, forecast models, database management systems, and associated software for use in both mainframe and tactical scale computers. Included are numerical oceanographic and atmospheric models for the Large Scale Computers at the Navy Fleet Numerical Meteorology and Oceanography Center, Monterey, CA and the Naval Oceanographic Office, Stennis Space Center, MS. These models, combined with a global communications network for data acquisition and distribution, form a prediction system which provides METOC data and products necessary to support naval operations worldwide in virtually every mission area; 2) other models, which focus on ocean thermal structure and circulation, and surf and tide prediction; 3) techniques to process and manage satellite remotely-sensed environmental data at Oceanography Centers ashore and on ships equipped with the AN/SMQ-11 satellite receiver/recorder; 4) National Polar-orbiting Operational Environmental Satellite System (NPOESS) readiness and risk reduction preparations to develop hardware and software that will allow ground stations to receive, ingest and exploit the NPOESS Preparatory Project (NPP) data. These techniques allow for the integration and tactical application of significant oceanographic and atmospheric data derived from satellite-borne sensors. Included are techniques and algorithms for the processing of sensor measurements, conversion of raw signal data to geophysical information, analysis schemes encompassing Artificial Intelligence and Expert Systems, and other satellite data applications and field validation of end products; and, 4) a family of acoustic system performance models beginning with active system models and databases in the low-, mid-, and high-frequency regimes and culminating with high fidelity simulation products. As weapons and sensors become more sophisticated and complex, the marine environment has an increasingly significant impact on system performance. Operational limitations induced by the ocean and atmosphere must be understood, and the resulting constraints on mission effectiveness and system employment minimized. Hence, the operating forces require more accurate worldwide forecasts of METOC conditions with increased temporal and spatial resolution. An additional challenge is posed by the emergence of new satellite sensors, which are continually adding new sources of disparate data types. In order to fully exploit this dynamic and massive volume of data, modern data base management systems (DBMS) are required, and must be tailored for individual computer configurations. Improved representation of smaller-scale phenomena, particularly in the littoral, is also an important consideration. Intelligence Preparation of the Environment (IPE) Sensor R&D to meet CNO and CFFC requirements for remote autonomous, clandestine, littoral battlespace sensing in near shore areas in support of Sea Shield & Sea Basing. R-1 SHOPPING LIST - Item No. UNCLASSIFIED 30 Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 13 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / BA-4 PE 0603207N Air/Ocean Tactical Applications 2342 METOC Data Assimilation and Modeling (U) B. Accomplishments/Planned Program Modeling and Simulation (M&S)/Tactical Design Aids (TDA) and Mission Planning Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 0.431 FY 06 0.450 FY 07 1.993 FY05 - CSG/ESG Environmental Simulator in support of Naval and Joint M&S efforts. Delivered progress report and Program Officer briefing. FY06 - Deliver Version 1.0 of CSG/ESG Environmental Simulator to NAVOCEANO. Conduct demonstration and validation. Begin development of Version 2.0. FY07 - Deliver Joint Modeling and Simulations support capabilities to Naval Oceanography Command (NAVOCEANO) (M&S). Continue development of Version 2.0 of the CSG/ESG Environmental Simulator. Begin development of automated quality control algorithms, sensor command and control interfaces, and communications interfaces in support of Littoral Battlespace Sensing, Fusion and Integration (LBSF&I). Participate in selected Naval Exercises and deliver post exercise strawman and final reports (from Fleet Exercises). New applications and data are delivered from the program and require verification and validation on an annual basis. Deliver annual report (from Fleet Applications and Data Verification and Validation). Continue development of automated ASW reconstruction and data collection efforts. Coupled Data Assimilation/ Assimilation and Prediction Models (Atmosphere) Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 0.505 FY 06 0.550 FY 07 1.992 FY05 - Delivered NRL Atmospheric Variational Data System (NAVDAS) Version 2. Development of next generation coupled assimilation techniques incorporating Automated Expert Systems. FY06 - Begin operational test of NRL Atmospheric Variational Data System (NAVDAS) Version 3. Re-code NAVDAS to conform to Weather Research and Forecasting (WRF) compatibility requirements. Development of next generation coupled assimilation techniques incorporating direct satellite derived radiance data. FY07 - Complete NRL Atmospheric Variational Data System (NAVDAS) Version 3 OPTEST and deliver to FNMOC. Investigate and incorporate Automated Techniques into the next generation data assimilation system. Re-code NRL Atmospheric Variational Data System (NAVDAS) to conform to Weather Research and Forecasting (WRF) compatibility requirements (from Coupled Data Assimilation). Continue implementing Weather Research and Forecasting (WRF) compatibility requirements. Explore incorporation of high-resolution Aerosol analyses and forecasts (from High-Resolution Models). Begin development of COAMPS V4. Continue investigations into improved Tropical Cyclone forecasting techniques. Begin Development of Hi-Res (~27km) Global Model. Complete COAMPS Dust algorithm integration. Begin COAMPS OS/NOWCAST integration. Develop advanced data fusion algorithms for weather radars in support of the LBSF&I program. Fleet Exercises/TDA and Mission Planning Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 0.500 FY 06 0.550 FY 07 FY05 - Participated in selected Naval Exercises and deliver post exercise strawman and final reports. Expanded scope of fleet exercise participation to include integrated multi-sensor (data collection to application) demonstrations. Continued development of Automated ASW Reconstruction efforts. FY06 - Participate in selected Naval Exercises and deliver post exercise strawman and final reports. Continue development of Automated ASW Reconstruction efforts. FY07 - Efforts incorporated into the TDA and Mission Planning investment line. R-1 SHOPPING LIST - Item No. 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 14 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / PE 0603207N Air/Ocean Tactical Applications 2342 METOC Data Assimilation and Modeling BA-4 (U) B. Accomplishments/Planned Program High-Resolution Forecast Models/ Assimilation and Prediction Models (Atmosphere) Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 0.756 FY 06 0.928 FY 07 FY05 - Delivered prototype advanced land-surface modeling system for integration into Coupled Atmospheric Mesoscale Prediction Systems (COAMPS). Continued research directed towards improved Tropical Cyclone forecasts. FY06 - Deliver Version 3 of Coupled Atmospheric Mesoscale Prediction Systems (COAMPS). Re-code Coupled Atmospheric Mesoscale Prediction Systems (COAMPS) to conform to Weather Research and Forecasting (WRF) compatibility requirements. Begin integration of COAMPS Dust algorithms. Continue research directed towards improved Tropical Cyclone forecasts. FY07 - Efforts incorporated into the "Assimilation and Prediction Models (Atmosphere)" product line. Basin Scale Ocean Models/ Assimilation and Prediction Models (Oceans) Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 0.856 FY 06 0.900 FY 07 2.622 FY05 - Developed prototype Adriatic Sea model. Completed development of next generation coastal and enclosed basin tactical scale oceanographic models. Completed validation of the EAS model. Began development of NCOM relocateable grid, dynamic MODAS, and HYCOM. FY06 - Complete the transition of Adriatic Sea model. Transition rapid relocatability capability. Incremental development of coupled air/ocean models for selected geographical locations in response to emergent requirements. Complete development of NCODA MVOI. Continue development of NCOM relocateable grid, dynamic MODAS, and HYCOM. Begin development of NCODA Vert Cov. FY07 - Incremental development of coupled air/ocean models for selected geographical locations in response to emergent requirements. Complete development of MODAS dynamic. Begin development of MODAS NEXGEN. Continue development of HYCOM. Complete development of NCOM relocateable. Begin development of NCOM Region A. Complete development of NCODA Vertical Cov. Begin development of NCODA Horizontal Cov. Continue development of advanced ADCIRC and coastal wave and surf algorithms. Develop advanced data fusion algorithms in support of the LBSF&I program. Data Assimilation/ Assimilation and Prediction Models (Space) Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 0.688 FY 06 1.248 FY 07 1.317 FY05 - Transitioned applications using WindSat, Meteosat Second Generation (MSG), the Special Sensor Microwave Imager and Sounder (SSMIS), and MTSAT (Japanese replacement). FY06 - Continue to transition applications using next generation WindSat, Meteosat Second Generation (MSG), the Special Sensor Microwave Imager and Sounder (SSMIS), and MTSAT (Japanese replacement). Begin development of the next generation of Satellite Workstations. FY07 - Continue to transition applications using next generation WindSat, Meteosat Second Generation (MSG), the Special Sensor Microwave Imager and Sounder (SSMIS), and MTSAT (Japanese replacement). Incorporation of Automated Expert System techniques (from Data Assimilation). Continue improvements to the Satellite Workstation. R-1 SHOPPING LIST - Item No. 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 15 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / PE 0603207N Air/Ocean Tactical Applications 2342 METOC Data Assimilation and Modeling BA-4 (U) B. Accomplishments/Planned Program Automated Objective Processing/ Assimilation and Prediction Models (Oceans) Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 0.916 FY 06 0.800 FY 07 FY05 - Delivered data assimilation upgrades. FY06 - Deliver prototype global Navy Coastal Ocean Model (NCOM) prediction system upgrades to the Naval Oceanography Command for testing. FY07 - Incorporated into the "Assimilation and Prediction Models (Oceans)" investment line. Tide/Surf Data Visualization/ Assimilation and Prediction Models (Oceans) Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 0.483 FY 06 0.550 FY 07 FY05 - Developed and delivered documentation for Atmospheric Modeling Oversight Panel Transition to Naval Oceanography Command (NAVOCEANO) for approval. FY06 - Finalize approved documentation and deliver Version 1 to Ocean Atmosphere Master Library (OAML). Begin development of advanced ADCIRC and coastal wave and surf algorithms. FY07 - Incorporated into the "Assimilation and Prediction Models (Oceans)" investment line. NEXGEN Acoustic Models/ Assimilation and Prediction Models (Acoustics) Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 1.106 FY 06 1.200 FY 07 1.870 FY05 - Delivered Semi-Empirical Surface Scattering Strength Algorithm (SESSS) Version 2. Began development of SESSS Version 3.0 (4-10 kHz gap). Incorporated Digital Bathymetric Database (DBDB) Version 5 APIs and consolidated existing databases, upgrade NAUTILUS run options. Continued annual upgrades to the STAPLE system. FY06 - Incorporate variable range-step option in Range Acoustic Model (RAM) 4.0, consolidate disparate bottom databases into one consolidated database Geoacoustic Database Variable Resolution (GDB-V). Integrate latest acoustic models into the Geo Acoustic Inversion Toolkit (GAIT). Continue development of SESSS Version 3.0 (4-10 kHz gap). Continue annual upgrades to the STAPLE system. FY07 - Demonstrate and validate RAM 4.0 3D and deliver to Ocean Atmosphere Master Library (OAML). Begin development of RAM 5.0 4D. Complete bottom database consolidation. Continue development of SOA GAIT. Begin development of active algorithms for the Geo Acoustic Inversion Toolkit (GAIT). Incorporate Automated Expert Systems model selection algorithms into the next generation Range Acoustic Model (RAM) (from NEXGEN Acoustic Models). Complete integration of initial uncertainty algorithms into Fleet Tactical Decision Aids (TDAs). Continue development of next generation mid-frequency bottom loss/bottom scatter models and databases for shallow water environments. Begin development of a fully automated version of Geophysical Acoustic Inversion Toolkit (GAIT) (from Shallow Water Acoustics). Continue annual upgrades to the STAPLE system. Complete SESSS 3.0 (4-10 kHz gap). R-1 SHOPPING LIST - Item No. 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 16 of 36) CLASSIFICATION: UNCLASSIFIED EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / PE 0603207N Air/Ocean Tactical Applications 2342 METOC Data Assimilation and Modeling BA-4 (U) B. Accomplishments/Planned Program Shallow Water Acoustics/ Assimilation and Prediction Models (Acoustics) Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 FY 06 0.748 0.800 FY 07 FY05 - Completed final Comprehensive Acoustic System Simulation (CASS)/Active System Performance Model (ASPM) assessment and delivered final report. Integrated multistatics modeling and performance prediction techniques. FY06 - Begin development of a Ship of Opportunity version of Geophysical Acoustic Inversion Toolkit (GAIT). Integration of uncertainty predictions into Fleet Tactical Decision Aids (TDAs). FY07 - Incorporated into the "Assimilation and Prediction Models (Acoustics)" investment line. Fleet Applications and Data Verification & Validation/ TDA and Mission Planning Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 FY 06 0.594 0.450 FY 07 FY05 - New applications and data were delivered from the program and required verification and validation on an annual basis. Delivered Annual Report. FY06 - Deliver Annual Report. FY07 - Efforts incorporated into the TDA and Mission Planning investment line. Littoral Battlespace Sensor Data Assimilation/ Sensors and Observing Systems (Unmanned Vehicles) Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 FY 06 FY 07 1.028 1.000 FY06 - Develop and deliver initial engineering documentation. Develop in-depth data assimilation methods to support various evolving littoral sensors such as the Next Generation Upper Air Sensor, Seaglider, and Helicopter and/or Unmanned Aerial Vehicle (UAV) specific sensors. Develop new sensors and/or reconfigure existing littoral sensors to support littoral Undersea Warfare (USW), Mine Warfare (MIW), Special Operations (SPECOPS) and other Naval Operations. Develop Next Generation Upper Air Sensor prototype. Conduct glider Alternatives Analysis, data compression and transmission investigations, system hardening, common control interface development, and automated trim and balance capability development. FY07 - Develop in-depth next generation data assimilation methods to support various evolving littoral sensors such as the Next Generation Upper Air Sensor, UUV gliders, and Helicopter and/or Unmanned Aerial Vehicle (UAV) specific sensors. Demonstrate prototype sensors and deliver post-demonstration report (from Littoral Battlespace Sensor Data Assimilation). Continue development of UV data compression, system hardening, common control interface, and an automated balance and trim capability. Begin integration of a UUV acoustic sensor capability. Conduct demonstration of new capabilities in support of LBSF&I program. R-1 SHOPPING LIST - Item No. UNCLASSIFIED 30 Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 17 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / PE 0603207N Air/Ocean Tactical Applications 2342 METOC Data Assimilation and Modeling BA-4 (U) C. OTHER PROGRAM FUNDING SUMMARY: Line Item No. & Name Not applicable (U) D. ACQUISITION STRATEGY: Acquisition, management and contracting strategies to support the meteorological and oceanographic (METOC) Data Assimilation Project which is a multi-faceted program which includes: 1) development, demonstration and validation of atmospheric and oceanographic data assimilation techniques, forecast models, database management systems, and associated software for use in both mainframe and tactical scale computers; 2) other models, which focus on ocean thermal structure and circulation, and surf and tide prediction; 3) techniques to process and manage satellite remotely-sensed environmental data at Oceanography Centers ashore and on ships equipped with the AN/SMQ-11 satellite receiver/recorder; and, 4) a family of acoustic system performance models beginning with active system models and databases in the low-, mid-, and high-frequency regimes and culminating with high fidelity simulation products, all with management oversight by Program Executive Officer for Command, Control, Communications, Computers, and Intelligence and Space (PEO C4I & Space). (U) E. MAJOR PERFORMERS: Not applicable (U) F. METRICS: Earned Value Management (EVM) is used for metrics reporting and risk management. R-1 SHOPPING LIST - Item No. UNCLASSIFIED 30 Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 18 of 36) UNCLASSIFIED CLASSIFICATION: DATE: Exhibit R-3 Cost Analysis (page 1) February 2006 APPROPRIATION/BUDGET ACTIVITY RDT&E, N / BA-4 Cost Categories Software Development Contract Performing Method Activity & & Type Location PROGRAM ELEMENT PE 0603207N Air/Ocean Tactical Applications Total FY 05 PY s FY 05 Award Cost Cost Date PROJECT NUMBER AND NAME 2342 METOC Data Assimilation and Modeling FY 06 FY 07 FY 06 Award FY 07 Award Cost Date Cost Date Cost to Complete Total Cost Target Value of Contract WX NRL 50.283 6.247 N/A 7.502 N/A 8.597 N/A CONT CONT WX NAWC-WD, Pax 1.520 0.208 N/A 0.253 N/A 0.285 N/A CONT CONT PD APL 0.985 0.290 N/A 0.353 N/A 0.397 N/A CONT CONT Grant Univ. S. Miss. 2.413 N/A CONT CONT CP Neptune 1.001 0.325 N/A 0.396 N/A 0.445 N/A CONT CONT CP New Age 0.700 0.325 N/A 0.396 N/A 0.445 N/A CONT CONT N/A MISC 12.033 0.188 N/A 0.554 N/A 0.623 N/A CONT CONT 68.935 7.583 CONT CONT 0.295 CONT CONT 0.295 CONT CONT CONT CONT Subtotal Software Development N/A N/A 9.454 10.794 Remarks: Systems Engineering Subtotal Support CP SSA/CSC Remarks: Total Cost 69.230 7.583 R-1 SHOPPING LIST - Item No. 9.454 10.794 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 19 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R4, Schedule Profile DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / PE 0603207N Air/Ocean Tactical Applications 2342 METOC Data Assimilation and Modeling BA-4 2005 2006 2007 2008 2009 2010 2011 Fiscal Year 1 Coupled Data Assimilation/ Assim/Pred Models (Atm) 2 3 4 NAVDAS V2.0 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 NAVDAS V3.0 WRF Hi-Res Forecast Models/ Assim/Pred Models (Atm) COAMPS V2.0 COAMPS V3.0 Radar Assim WRF NAVDAS V3 Hi-Res Aerosols Radar Assim Assim/Pred Models (Atm) COAMPS NOWCAST/NAVDAS NEXGEN Hi-Res Re-locatable Hi-Res Global (~27km) Radar Assim High model top (~67km) Multi constitutes (aero) WRF Basin Scale Ocean Models/ Assim/.Pred Models (Ocn) EAS NCOM Relocateable Dynamic MODAS HYCOM NCOM Upgrades Automated Obj Processing/ Assim/Pred Models (Ocn) Tide/Surf/Data Visualization/ Assim/Pred Models (Ocn) ADCIRC Costal Wave/Surf MODAS Dyn Assim/Pred Models (Ocn) MODAS 3.0 MODAS NEXGEN NCOM Relocat Region A NEXGEN Acoustic Models/ Assim/Pred Models (Ac) SESSS V2.0 STAPLE Upgrades Shallow Water Acoustics/ Assim/Pred Models (Ac) Assim/Pred Models (Ac) CASS/ASPM HYCOM Regional HYCOM Region A RAM 4.0 SESSS 3.0 SOA GAIT Uncertainty RAM 4.0 3D SESSS V3.0 STAPLE Upgrades RAM V5.0 4D SOA/Active GAIT NEXGEN RAM SOA GAIT Active GAIT NEXGEN Inversions STAPLE TTS R-1 SHOPPING LIST - Item No. 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 20 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R4, Schedule Profile DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / PE 0603207N Air/Ocean Tactical Applications 2342 METOC Data Assimilation and Modeling BA-4 2005 2006 2007 2008 2009 2010 2011 Fiscal Year 1 Modeling and Simulation/ TDA and Mission Planning Fleet Apps/Data V&V/ TDA and Mission Planning Fleet Exercises/ TDA and Mission Planning 2 3 4 1 2 3 CSG/ESG Env Sim V1.0 V&V Littoral Battlespace Sensing/ Sensors/Obs Systems (UVs) 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 V2.0 V&V Strawman Strawman Auto ASW Reconstruct TDA/Mission Planning Data Assimilation/ Assim/Pred Models (Space) 4 CSG/ESG Env Sim V2.0 Auto ASW Reconstruction V1.0 WindSat SSMIS NEXGEN Sat Workstation CSG/ESG Env Sim V3.0 Auto ASW Reconstruction V2.0 WindSAT, Meteosat, SSMIS Satellite Workstation Upgrades Glider Enhancements AUV Dev R-1 SHOPPING LIST - Item No. Joint Integration NPP/NEXGEN Sensor Integration Glider/AUV Sensor Upgrades 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 21 of 36) 4 UNCLASSIFIED CLASSIFICATION: Exhibit R-4a, Schedule Detail DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT PROJECT NUMBER AND NAME PE 0603207N Air/Ocean Tactical Applications 2342 METOC Data Assimilation and Modeling RDT&E, N / BA-4 Schedule Profile Coupled Data Assimilation/Assim/Pred Models (Atmosphere) High-Resolution Forecast Models/Assim/Pred Models (Atmosphere) Assim/Pred Models (Atmosphere) Basin Scale Ocean Models/Assim/Pred Models (Ocean) Automated Objective Processing/Assim/Pred Models (Ocean) Tide/Surf/Data Visualization/Assim/Pred Models (Ocean) Assim/Pred Models (Ocean) NEXGEN Acoustic Models/Assim/Pred Models (Acoustics) Shallow Water Acoustics/Assim/Pred Models (Acoustics) Assim/Pred Models (Acoustics) Modeling and Simulation/TDA and Mission Planning Fleet Apps/Data V&V/TDA and Mission Planning Fleet Exercises/TDA and Mission Planning TDA and Mission Planning Data Assimilation/Assim/Pred Models (Space) Littoral Battlespace Sensing/Sensors/Observing Systems (UVs) FY 2005 FY 2006 4Q 4Q 4Q FY 2007 FY 2008 FY 2009 4Q 4Q 4Q 3Q 4Q 4Q 4Q 4Q FY 2010 FY 2011 1Q 1Q 4Q 4Q 1Q 4Q 4Q 4Q 4Q 3Q 4Q 4Q 4Q 4Q 4Q 4Q R-1 SHOPPING LIST - Item No. 4Q 4Q 4Q 4Q 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 22 of 36) 4Q UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY RDT&E, N / BA-4 COST ($ in Millions) Project Cost PROGRAM ELEMENT NUMBER AND NAME PE 0603207N Air/Ocean Tactical Applications FY2005 6.598 FY2006 6.902 PROJECT NUMBER AND NAME 2343 Tactical METOC Applications FY2007 FY2008 8.685 FY2009 8.187 8.105 FY2010 8.134 FY2011 8.360 RDT&E Articles Qty (U) A. MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: The METOC Data Applications Project provides future operational effects decision aid capabilities for Navy and Marine Corps warfighters in the context of Joint Operations. This project identifies and transitions state-of-the-art decision support software technologies from the Government's and Commercial Industry's technology base and then demonstrates and validates these capabilities before fielding. These future software decision support tools are intended to provide platform, sensor, communications, and weapon systems performance assessments for warfighters in terms of their littoral and deep-strike battlespace environments. These assessments allow mission planners and warfighters, from the unit to theater level, to optimize their sensor employment on airborne, surface, and subsurface platforms in support of all Naval Composite Warfare mission areas including Undersea Warfare (USW), Anti-Submarine Warfare (ASW), Mine Warfare (MIW), Amphibious Warfare (AMW), Anti-Surface Warfare (ASUW), Anti-Air Warfare (AAW), Strike Warfare (STW), and Special Warfare. Performance assessments leading to improvements in operational and tactical control are conducted through a two-tiered approach: 1) METOC Decision Aids (MDAs); and, 2) Operational Effects Decision Aids (OEDAs). MDAs consist of a series of analysis tools which characterize the physical environment conditions of the battlespace based on the best set of physical environment data available at the time (i.e., some combination of historical and/or real-time (or near real-time) insitu data. OEDAs then use the MDA information by fusing it with relevant, often-classified sensor and target data to predict how own-force weapons and sensor systems will perform against hostile targets. Performance results are displayed in tabular and graphic formats for use by mission planners and combat/weapon system operators to develop ASW and MIW search and localization plans, USW/AAW/ASUW screens, STW profiles, AMW ingress and egress points, and for other warfare considerations. MDAs and OEDAs typically use data derived from sensors developed in Project 2341 (METOC Data Acquisition) and assimilated by software produced by Project 2342 (METOC Data Assimilation and Modeling). MDAs and OEDAs also use data obtained through direct interfaces to Navy combat systems. A current emphasis area of the project is the development of new combat system and mine warfare performance prediction and MDA/OEDA capabilities required to characterize and/or predict sensor and weapons system performance in the highly complex littoral environments in support of regional conflict scenarios. It addresses multi-warfare areas, particularly Mine Warfare, shallow water ASW, and missile and air defense/strike capabilities. R-1 SHOPPING LIST - Item No. UNCLASSIFIED 30 Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 23 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / BA-4 PE 0603207N Air/Ocean Tactical Applications 2343 Tactical METOC Applications (U) B. Accomplishments/Planned Program Electromagnetic and Electro-optical (EM/EO) Decision Aids/ TDA/Mission Planning Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 1.447 FY 06 1.266 FY 07 8.685 FY05 - Completed development of Target Acquisition Weather Software (TAWS) and delivered Version 2.0 including new sensor data and backgrounds consistent with US Navy and US Marine Corp missions. Continued development of the TAWS 3.0 stand alone version, to include integration of DTED Terrain and JAWS targets. FY06 - Complete development of Target Acquisition Weather Software (TAWS) Version 3.0 to include new sensor data and backgrounds consistent with Joint Operations. Continue development of TAWS 4.0 (webenabled). Development of upgrades to next generation electromagnetic and electro-optical (EM/EO) performance prediction systems to include incorporation of new Naval and Joint Sensor Suites. Begin porting Advanced Refractive Effects Prediction System (AREPS) code to JAVA. Begin development of the Naval Integrated Tactical Environmental System Next Generation (NITES NG). FY07 - Complete development of TAWS 4.0. Begin development of TAWS 4.4 Enterprise Portal. Complete development of AREPS JAVA port. Begin development of an advanced EM Model Server. Conduct annual update of MEDAL acoustic databases and models. Continue development of NITES NG (DCGS-N integration, etc.). Mine Littoral Warfare Tactical Decision Aids (TDA)/ TDA/Mission Planning Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 1.447 FY 06 1.567 FY 07 FY05 - Delivered Mine Warfare Environmental Data Applications Library (MEDAL) Build 10. FY06 - Development to incorporate additional mine littoral warfare decision aids in applicable performance prediction systems. Develop Mine Warfare Environmental Data Applications Library (MEDAL) Build 11 to include the incorporation of the new Geoacoustic Database - Variable Resolution (GDB-V) as well as the incorporation of the new Battlespace Profiling System (BPS). FY07 - Efforts rolled into the "TDA/Mission Planning" investment line. Tactical Decision Aids (TDA) COTS Visualization/ TDA/Mission Planning Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 1.385 FY 06 1.672 FY 07 FY05 - Delivered 4D-Vis prototype. Delivered technical reports. Incremental development of next generation multi-dimensional Tactical Decision Aid (TDA) COTS visualization techniques and integrate into appropriate platform Advanced Development Models (ADMs). FY06 - Development of Network integration via Commercial Joint Mapping Tool Kit (CJMTK) and integration of evolving GIS based technology. FY07 - Efforts rolled into the "TDA/Mission Planning" investment line. R-1 SHOPPING LIST - Item No. 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 24 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / PE 0603207N Air/Ocean Tactical Applications 2343 Tactical METOC Applications BA-4 (U) B. Accomplishments/Planned Program Platform Vulnerability/TDA/Mission Planning Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 1.126 FY 06 1.266 FY 07 FY05 - Delivered platform vulnerability assessment Tactical Decision Aid (TDA) Version 3 into surface ship, submarine and air ADMs to perform vulnerability assessment for acoustic and non-acoustic sensors and weapons. Evaluated functionality during at-sea tests. Deliver technical reports. FY06 - Development of Tactical Decision Aid (TDA) Version 4 to include integration of new electromagnetic and electro-optical (EM/EO), Target Acquisition Weather Software (TAWS), and advanced visualization techniques such as 4D Visualization. FY07 - Efforts rolled into the "TDA/Mission Planning" investment line. Sensor Interface Capabilities/TDA/Mission Planning Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 1.193 FY 06 1.131 FY 07 FY05 - Developed and deliver Build 3.0. Delivered technical reports. Incremental development of environmental sensor interface capabilities. Continued Integrated Ocean Observing System (IOOS) effort. FY06 - Evolutionary development of Build 3.5. Evaluate functionality during at-sea tests and deliver technical reports. Complete Integrated Ocean Observing System (IOOS) effort. FY07 - Efforts rolled into the "TDA/Mission Planning" investment line. R-1 SHOPPING LIST - Item No. 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 25 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / PE 0603207N Air/Ocean Tactical Applications 2343 Tactical METOC Applications BA-4 (U) C. OTHER PROGRAM FUNDING SUMMARY: Line Item No. & Name Not applicable RELATED RDT&E: PE 0604218N (Air/Ocean Equipment Engineering). TESS/NITES will incorporate METOC data applications. (U) D. ACQUISITION STRATEGY: Acquisition, management and contracting strategies are to support the METOC Data Applications project to continue the development of state-of-the-art software capabilities that provide sensor, communication, and weapon system performance assessments across the full spectrum of open ocean and littoral operating environments, meteorology and oceanography , all with management oversight by Program Executive Officer for Command, Control, Communications, Computers, and Intelligence and Space (PEOC4I & Space). (U) E. MAJOR PERFORMERS: N/A R-1 SHOPPING LIST - Item No. UNCLASSIFIED 30 Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 26 of 36) UNCLASSIFIED CLASSIFICATION: DATE: Exhibit R-3 Cost Analysis (page 1) February 2006 APPROPRIATION/BUDGET ACTIVITY RDT&E, N / BA-4 Cost Categories Software Development Contract Performing Method Activity & & Type Location PROGRAM ELEMENT PE 0603207N Air/Ocean Tactical Applications Total FY 05 PY s FY 05 Award Cost Cost Date PROJECT NUMBER AND NAME 2343 Tactical METOC Applications FY 06 FY 06 Award FY 07 Cost Date Cost FY 07 Award Date Cost to Complete Total Cost Target Value of Contract WX NUWC 1.400 CONT CONT WX SSC SD 2.775 0.335 N/A 0.349 N/A 0.430 N/A CONT CONT WX NRL 1.761 0.285 N/A 0.297 N/A 0.366 N/A CONT CONT CP NAVSEA 30.167 5.603 N/A 5.982 N/A 7.539 N/A CONT CONT CP LOCKHEED 1.053 CONT CONT N/A MISC 5.720 0.375 CONT CONT 42.876 6.598 Subtotal Product Development N/A 0.275 6.902 N/A 0.350 N/A 65.061 8.685 Remarks: CP Subtotal Support IPD 0.595 CONT CONT 0.595 CONT CONT CONT CONT Remarks: Total Cost 43.471 6.598 R-1 SHOPPING LIST - Item No. 6.902 8.685 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 27 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R4, Schedule Profile DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / PE 0603207N Air/Ocean Tactical Applications 2343 Tactical METOC Applications BA-4 2005 2006 2007 2008 2009 2010 2011 2012 Fiscal Year 1 EM/EO Decision Aids/ TDA/Mission Planning Mine Warfare TDAs/ TDA/Mission Planning TDA COTS Visualization/ TDA/Mission Planning Platform Vulnerability/ TDA/Mission Planning Sensor Interface Capabilities/ TDA/Mission Planning 2 3 4 TAWS 2.0 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 TAWS 3.0 JAVA AREPS MEDAL Update MEDAL Update 4D Prototype NITES NG NITES II Upgrade NITES II Upgrade IOOS TAWS 4.0 EM Server NITES NG TAWS 4.4 NITES NG EM Server TAWS 4.6 TDA/Mission Planning MEDAL Upgrade MEDAL Upgrade R-1 SHOPPING LIST - Item No. MEDAL Upgrade NITES NG LBSI&F TAWS 5.0 MEDAL Upgrade NITES NG DCGS-N MEDAL Upgrade MEDAL Upgrade 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 28 of 36) 4 UNCLASSIFIED CLASSIFICATION: Exhibit R-4a, Schedule Detail DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT PE 0603207N Air/Ocean Tactical Applications RDT&E, N / BA-4 Schedule Profile EM/EO Decision Aids/TDA and Mission Planning Mine Warfare TDAs/TDA and Mission Planning TDA COTS Visualization/TDA and Mission Planning Platform Vulnerability/TDA and Mission Planning Sensor Interface Capabilities/TDA and Mission Planning TDA and Mission Planning FY 2005 FY 2006 4Q 4Q 4Q 4Q 4Q 4Q R-1 SHOPPING LIST - Item No. PROJECT NUMBER AND NAME 2343 Tactical METOC Applications FY 2007 FY 2008 FY 2009 4Q 4Q 4Q FY 2010 FY 2011 4Q 4Q 1Q 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 29 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY RDT&E, N / BA-4 COST ($ in Millions) Project Cost PROGRAM ELEMENT NUMBER AND NAME PE 0603207N Air/Ocean Tactical Applications FY 2005 1.247 FY 2006 1.284 PROJECT NUMBER AND NAME 2344 Precise Timing and Astrometry FY 2007 FY 2008 1.596 1.210 FY 2009 FY 2010 1.262 1.312 FY 2011 1.312 RDT&E Articles Qty (U) A. MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: The major thrust of the Precise Timing and Astrometry Project is to provide future capabilities that directly support the mission of the U.S. Naval Observatory (USNO). These future mission capabilities are intended to: 1) address DoD requirements for needed increases in positioning accuracies of modern weapons systems by the determination of star positions (including objects at other than optical wavelengths) and the stellar inertial reference system (to which all navigation, guidance, and positioning systems are ultimately referred); 2) develop techniques for the prediction of the Earth's instantaneous orientation with respect to the stellar inertial reference system; 3) oversee the determination and dissemination of precise time information using the Navy/DoD Master Clock System and precise time distribution networks; and, 4) develop advanced electronic light detectors and interferometry in the optical and infrared wavelength regions for very precise determination of the positions of both faint and bright stars, satellite tracking, and space debris studies. DoD Instruction 5000.2 assigns to the Navy the responsibility for coordinating Precise Time and Time Interval (PTTI) requirements and for maintaining a PTTI reference standard (astronomical and atomic) for use by all DoD Services, Federal agencies, and related scientific laboratories. The Navy is also responsible for providing astronomical data for navigation, positioning, and guidance, including space. Some operational and many emerging requirements surpass current support capabilities. In response to these DoD requirements, this project transitions Research (6.1) and Exploratory Development (6.2) efforts, as well as developments in the civilian sector, into the operational capabilities of the USNO. R-1 SHOPPING LIST - Item No. UNCLASSIFIED 30 Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 30 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / BA-4 PE 0603207N Air/Ocean Tactical Applications 2344 Precise Timing and Astrometry (U) B. Accomplishments/Planned Program Time Transfer/ Precise Timing, Astrometry, & Reference Frames Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 0.437 FY 06 0.391 FY 07 1.596 FY05 - Delivered technical reports, incremental developments of time transfer techniques. Completed production of six SAASM Rx units Began development of M Code Timing Rx. FY06 - Development of next generation GPS Independent Time Transfer. Complete design of preliminary Prototype M Code Timing Rx. FY07 - Begin development of the algorithm for the atomic fountain timescale. Begin a 24/7 demonstration of the Ensemble Fountain Clock Systems. Complete and demonstrate the Prototype M Code GPS receiver. Begin development of the USNO Robotic Astrometric Telescope (URAT) Focal Plane Array (FPA). Conduct a pre-operational demonstration of the CCD array for the USNO Robotic Astrometric Telescope. Earth Orientation/Astrometry/ Precise Timing, Astrometry, & Reference Frames Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 0.349 FY 06 0.430 FY 07 FY05 - Evolutionary developments of next-generation earth orientation techniques. Delivered technical reports. Demonstrated Complex Focal Plane Array for Astrometry. FY06 - Complete Orion Array Prototype Detector. Incremental development of next generation earth orientation techniques (Astrometric Telescope). Begin development of radiation mitigation techniques for space operations. FY07 - Efforts rolled into the "Precise Timing, Astrometry & Reference Frames" Investment line. Master Clock/ Precise Timing, Astrometry, & Reference Frames Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 0.461 FY 06 0.463 FY 07 FY05 - Performed initial testing of next generation Master Clock. Exploitation of emergent Master Clock technologies (Rubidium Fountain). Completed Rubidium Fountain Prototype (pre-operational status). FY06 - Perform initial testing and complete initial Technical Reports. Demonstrate 24/7 operational capability of Rubidium Fountain Clock. Begin development of Ensemble Fountain Clock Systems. FY07 - Efforts rolled into the "Precise Timing, Astrometry & Reference Frames" Investment line. R-1 SHOPPING LIST - Item No. 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 31 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / PE 0603207N Air/Ocean Tactical Applications 2344 Precise Timing and Astrometry BA-4 (U) C. OTHER PROGRAM FUNDING SUMMARY: Line Item No. & Name Not applicable. (U) D. ACQUISITION STRATEGY: Acquisition, management and contracting strategies are to support the Precise Timing and Astrometry Project in direct support of the U.S. Naval Observatory (USNO) in: 1) addressing DoD requirements for needed increases in positioning accuracies of modern weapons systems by the determination of star positions and the stellar inertial reference system ; 2) developing techniques for the prediction of the Earth's instantaneous orientation with respect to the stellar inertial reference system; 3) overseeing the determination and dissemination of precise time information using the Navy/DoD Master Clock System and precise time distribution networks; and, 4) developing advanced electronic light detectors and interferometry in the optical and infrared wavelength regions for very precise determination of the positions of both faint and bright stars, satellite tracking, and space debris studies, all with management oversight by Program Executive Officer for Command, Control, Communications, Computers, and Intelligence and Space (PEOC4I & Space). (U) E. MAJOR PERFORMERS: N/A R-1 SHOPPING LIST - Item No. UNCLASSIFIED 30 Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 32 of 36) UNCLASSIFIED CLASSIFICATION: DATE: Exhibit R-3 Cost Analysis (page 1) February 2006 APPROPRIATION/BUDGET ACTIVITY RDT&E, N / BA-4 Cost Categories Software Development Subtotal Software Development Contract Performing Method Activity & & Type Location PROGRAM ELEMENT PE 0603207N Air/Ocean Tactical Applications Total FY 05 PY s FY 05 Award Cost Cost Date WX Naval Observatory 8.115 N/A MISC 0.094 1.247 PROJECT NUMBER AND NAME 2344 Precise Timing and Astrometry FY 06 FY 06 Award FY 07 Cost Date Cost N/A 1.284 N/A FY 07 Award Date 1.596 N/A Cost to Complete Total Cost Target Value of Contract CONT CONT CONT CONT 8.209 1.247 1.284 1.596 CONT CONT 8.209 1.247 1.284 1.596 CONT CONT Remarks: Subtotal Support Remarks: Total Cost R-1 SHOPPING LIST - Item No. 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 33 of 36) UNCLASSIFIED CLASSIFICATION: EXHIBIT R4, Schedule Profile DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY RDT&E, N / BA-4 2005 PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME PE 0603207N Air/Ocean Tactical Applications 2344 Precise Timing and Astrometry 2006 2007 2008 2009 2010 2011 Fiscal Year 1 2 3 Time Transfer/ Precise Timing, Astrometry, & Reference Frames SAASM Rx Earth Orientation/ Precise Timing, Astrometry, & Reference Frames Focal Plane Array Master Clock/ Precise Timing, Astrometry, & Reference Frames Rubidium Prototype 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 1 2 3 M Code Timing Rx Radiation Mitigation Demo Rubidium Demo Optical Atomic Clock Ensemble Fntn Clck Precise Timing, Astrometry, & Reference Frames 4 M Code Demo Atomic Fountain URAT FPA Ensemble Clk Demo R-1 SHOPPING LIST - Item No. UNCLASSIFIED Ens Clk Demo URAT FPA Demo GPS III Timing Rx Space Focal Plane Array 30 Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 34 of 36) 4 UNCLASSIFIED CLASSIFICATION: Exhibit R-4a, Schedule Detail DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT PE 0603207N Air/Ocean Tactical Applications RDT&E, N / BA-4 Schedule Profile FY 2005 Time Transfer/Precise Timing, Astrometry & Reference Frames Earth Orientation/Precise Timing, Astrometry & Reference Frames Master Clock/Precise Timing, Astrometry & Reference Frames Precise Timing, Astrometry & Reference Frames FY 2006 FY 2007 PROJECT NUMBER AND NAME 2344 Precise Timing and Astrometry FY 2008 FY 2009 FY 2010 FY 2011 4Q 4Q 4Q 4Q R-1 SHOPPING LIST - Item No. 4Q 3Q 30 UNCLASSIFIED Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 35 of 36) CLASSIFICATION: UNCLASSIFIED EXHIBIT R-2a, RDT&E Project Justification DATE: February 2006 APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT NUMBER AND NAME PROJECT NUMBER AND NAME RDT&E, N / BA 4 PE 0603207N Air/Ocean Tactical Applications Various Congressional Increases (U) B. Accomplishments/Planned Program 9204 Marine Mammal Tracking and Mitgation FY 05 0.966 FY 06 0.000 FY 07 0.000 9890 3D-CMAPS Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 0.000 FY 06 2.500 FY 07 0.000 9891 Gateway System Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 0.000 0 FY 06 1.000 0 FY 07 0.000 0 9892 Littoral Acoustic Demonstration Center Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity FY 05 0.000 FY 06 1.000 FY 07 0.000 #REF! #REF! #REF! Accomplishments/Effort/Subtotal Cost RDT&E Articles Quantity Page 1 UNCLASSIFIED R-1 SHOPPING LIST - Item No. 30 Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 36 of 36)