( (R2

advertisement
UNCLASSIFIED
(
OSD RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)
Date: February 2006
I
APPROPRIATION/ BUDGET ACTIVITY
RDTZEI Defense Wide BA# 6
Pl 00
Cost ($ in Millions)
Total Program Element (PE) Cost
Joint Mission Environment Test Capability
(JMETC)
PE NUMBER AND TITLE
0605100D8Z - Joint Mission Environment Test Capability (JMETC)
FY 2006
FY 2005
0.000
0.000
FY 2007
FY 2008
FY 2009
FY 2010
FY 201 1
0.000
10.600
7.156
9.093
9.813
10.699
0.000
10.600
7.156
9.093
9.813
10.699
r
/
A. Mission Descri~tionand Budpet Item Justification: Adequate Testing of joint system acquisitions and net-centric capabilities is required for successful milestone decisions for
capabilities with joint mission requirements.(e.g. the F-35 Joint Strike Fighter, the Deployable Joint Command and Control System, the Joint Command and Control, the Network Centric
Enterprise Services, the Distributed Ground Station family of systems, the Global Combat Service Support Family of Systems, the Future Combat System, the Joint Tactical Radio System
family of systems, DDX)
The Testing in a Joint Environment Roadmap was provided to the Staff of four Congressional committees in April 2005 by the Director, Operational Test and Evaluation in response to a
request during testimony. Testing in a joint environment is a Department Policy that requires all programs, regardless of Acquisition Category demonstrate their joint capability early and
throughout their respective development cycles. The Joint Mission Environment Test Capability (JMETC) program will implement the infastructure capabilities defined in the Roadmap to
provide testers and developers a robust nation-wide distributed engineering capability to "Test Like We Fight".
JMETC will create a common corporate networking capability to link live systems with virtual and constructive representations to generate a realistic joint mission test environment for the
systems being tested. JMETC will be a widely applicable, persistent, service provider for Department acquisition and net-centric programs. A mature JMETC will provide the ability to
lower the cost and speed development of major programs, and will provide significant added value to ACAT II/III/IV programs which typically cannot afford distributed testing alone, or
compete for time with large programs. This common integration capability will ensure interoperability between JMETC and the Joint National Training Capability (JNTC), streamlining
reuse of technical resources across test and training communities, and enabling combined test and training exercises. JMETC capabilities will eventually migrate to the Global Information
Grid (GIG) as that capability matures.
JMETC will provide a readily available, repeatable, consistent, operationally realistic customer-defined joint mission test environemnt for systems engineering and testing, extensible to
training and experimentation, in a timely and cost effective manner. JMETC's institutional funding will build, maintain, upgrade and operate the JMETC, and will pay for persistent
availability of national connectivity for testing; data communications middleware, identification and enforcement of interface standards; common software tools and components; and a
data archive and reuse repository. 1t will also fund JMETC program management, facilities, equipment, and operating costs. When the JMETC is established, customer funding will pay
for the direct costs of the development, sustainmant, and operating costs for systems and net-centric capabilities under test, consistent with the proven Department approach for
development and operational testing. Key attributes of the JMETC include: persistency; interoperability; reuse; composability of distributed capabilities (reconfigurable infrastructure to
meet customer requirements); M&S linkage (live-virtual-constructive integration); common support to both Service and Joint needs(universa1 data transport solution set). System
engineering, training, and experimentation will all benefit from a universal JMETC developed for T&E.
The Test Resource Management Center (TRMC) will be the Department's corporate lead for JMETC, and will program for and oversee both its development and its operations. The
TRMC will establish and oversee the centralized JMETC program office. The JMETC Program Manager will report to Director, TRMC, who is accountable to the USD(AT&L) for
JMETC.
k
B. Program Change Summarv
1
FY 2005 I
FY 2006
FY 2007
1
R-1 Budget Line ltem No. 119 Page 1 of 1
UNCLASSIFIED
Exhibit R-2
Budget Item Justification
UNCLASSIFIED
OSD RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)
APPP.OPRIATION1 BUDGET ACTIVITY
RDTKrEI Defense Wide BA# 6
Date: February 2006
PE NUMBER AND TITLE
-
0605100DSZ Joint Mission Environment Test Capability (JMETC)
-- -
'revious President's Budgct (FY 2006)
Zurrent BESPresidentfs Budget BY 2007)
rota1 Adjustments
0.000
0.000
0.000
0.000
10.600
10.600
Congressional Program Reductions
Congressional Rescissions
Congressional Increases
Reprogrammings
SBIRtSTTR Transfer
10.600
Other
C. Other Propram Funding Summary: Not Applicable.
U c a u i s i t i o n S t r a t e a N o t Applicable.
E. Performance Metrics: Not Applicable.
R-1 Budget Line ltem No. 1 19 Page 2 of 2
UNCLASSIFIED
Exhibit R-2
Budget ltem Justification
UNCLASSIFIED
I
OSD RDT&E PROJECT JUSTIFICATION (R2a Exhibit)
APPROPRIATION/ BUDGET ACTIVITY
RDT&E/ Defense Wide BA# 6
Cost ($ in Millions)
PI00
Joint Mission Environment Test Capability
(JMETC)
I
I
Date: February 2006
PE NUMBER AND TITLE
I
FY 2005
0.000
1
FY 2006
1
FY 2007
0.000
1
10.600
FY 2008
7.156
1
FY 2009
9.093
1
1
PROJECT
0605100DSZ - Joint Mission Environment Test Capability (JMETC)
PlOO
FY 2010
9.813
1
FY 201 1
I
10.699
A. Mission Descri~tionand Proiect Justification: Adequate Testing of joint system acquisitions and net-centric capabilities is required for successful milestone decisions for capabilities
-
1
1
with joint mission requirements.(e.g. the F-35 Joint Strike Fighter, the Deployable Joint Command and Control System, the Joint Command and Control, the Network Centric Enterprise
Services, the Distributed Ground Station family of systems, the Global Combat Service Support Family of Systems, the Future Combat System, the Joint Tactical Radio System family of
systems, DDX)
The 'Testing in a Joint Environment Roadmap was provided to the Staff of four Congressional committees in April 2005 by the Director, Operational Test and Evaluation in response to a
request during testimony. Testing in a joint environment is a Department Policy that requires all programs, regardless of Acquisition Category demonstrate their joint capability early and
throughout their respective development cycles. The Joint Mission Environment Test Capability (JMETC) program will implement the infrastructure capabilities defined in the Roadmap
to provide testers and developers a robust nation-wide distributed engineering capability to "Test Like We Fight".
JMETC will create a common corporate networking capability to link live systems with virtual and constructive representations to generate a realistic joint mission test environment for the
systems being tested. JMETC will be a widely applicable, persistent, service provider for Department acquisition and net-centric programs. A mature JMETC will provide the ability to
lower the cost and speed development of major programs, and will provide significant added value to ACAT IlilIlllV programs which typically cannot afford distributed testing alone, or
compete for time with large programs. This common integration capability will ensure interoperability between JMETC and the Joint National Training Capability (JNTC), streamlining
reuse of technical resources across test and training communities, and enabling combined test and training exercises. JMETC capabilities will eventually migrate to the Global Information
Grid (GIG) as that capability matures.
JMETC will provide a readily available, repeatable, consistent, operationally realistic customer-defined joint mission test environment for systems engineering and testing, extensible to
training and experimentation, in a timely and cost effective manner. JMETC's institutional funding will build, maintain, upgrade and operate the JMETC, and will pay for persistent
availability of national connectivity for testing; data communications middleware, identification and enforcement of interface standards; common software tools and components; and a
data archive and reuse repository. It will also fund JMETC program management, facilities, equipment, and operating costs. When the JMETC is established, customer funding will pay
for the direct costs of the development, sustainment, and operating costs for systems and net-centric capabilities under test, consistent with the proven Department approach for
development and operational testing. Key attributes of the JMETC include: persistency; interoperability; reuse; compensability of distributed capabilities (reconfigurable infrastructure to
meet customer requirements); MLS linkage (live-virtual-constructive integration); common support to both Service and Joint needs(universa1 data transport solution set). System
engineering, training, and experimentation will all benefit from a universal JMETC developed for T&E.
The Test Resource Management Center (TRMC) will be the Department's corporate lead for JMETC, and will program for and oversee both its development and its operations. The
TRMC will establish and oversee the centralized JMETC program office. The JMETC Program Manager will report to Director, TRMC, who is accountable to the USD(AT&L) for
R- l Budget Line Item No. 119 Page 3 of 3
UNCLASSIFIED
Exhibit R-2A
Project Justification
UNCLASSIFIED
OSD RDT&E PROJECT JUSTIFICATION (R2a Exhibit)
APPROPRIATION1 BUDGET ACTIVITY
RDT&E/ Defense Wide BA# 6
PE NUMBER AND TITLE
Date: February 2006
0605100DSZ - Joint Mission Environment Test Capability (JMETC)
PROJECT
PI00
QccomplishmenWlannedProgram Title
FY 2005
FY 2006
FY 2007
IMETC:
0.000
0.000
10.600
Initiate Phase I (FY2007-FY20 I I) which will begin development of the initial core technical capability and provide a provisional JMETC infrastructure foundation capable of supporting real-time test events
in 2007 as follows:
- Initiate Development of Core Technical Infrastructure.
-
Initiate Persistent Data Transport Capability. Establish persistent network connections on existing Department networks with applicable security agreements, and expend the needed communication
bandwidth. Integrate initial test sites to the network in FY 2007. Connections will be determined on the basis of projected test schedules. Consolidate and optimize the Department's purchase of bandwidth
for distributed testing, aligning the distributed testing network with the distributed training network to achieve economies of scale.
-
Incorporate Middleware. Maintain and improve common integration software that was originally developed by the Central Test and Evaluation Investment Program (CTEIP). Optimized the common
middleware for embedded instrumentation applications as an organic component of the weapons system or net-centric capability, to enable easier conduct o f distributed testing throughout the acquisition
process from the laboratory, to the open-air range, and to the battlefield.
-
-
Evolve Basic Interface Standards. Define common, open interface standards for testing laboratories, open-air ranges, system integration facilities, and simulations for specific test events, and enable
alignment of the technical distributed laboratories, ranges, and simulations for specific test events, and enable alignment of the technical architecture for testing with the JNTC to promote interoperability and
reusability among test and training assets.
- Begin acquisition/Development of software Tools.
Provide functionality that allows the joint mission infrastructure to serve as a useful test environment and to operate efficiently and cleanly. Enable event
planning, integration, and analysis. Include an assessment of commercially available software tools for utilization with the standard support tools, and development of new tools to satisfy shortfalls. Design
analysis tools to assist evaluators in tracing the root cause of problems discovered to the individual causal system, during large system-of-systems test events.
-Initiate Data Archive. Store all of the persistent information associated with a test that takes place in the joint mission environment. Serve as a high-performance, distributed, temporally-organized database
capable of supporting realtime queries.
- Initiate Reuse Repository.
Store all the pertinent information regarding systems and net-centric capabilities that is either a part of the joint mission infrastructure, or interfaces with the joint mission
infrastructure. Unify all the information necessary Defense and industry capabilities (virtual prototypes, threat simulations, Hardware-in-the-Loops laboratories, ranges, environment generators, etc.) s o that it
can be easily reused in future events.
- Establish Initial Customer Support.
Provide single-face-to-the-customer support for use of JMETC. customer Support will be a central resource that provides customers with information about system
capabilities and limitations; available nodes; models and simulations; and JNTC joint training events. Customer Support will assist acquisition program managers and operation Test Agencies (or other
customers), as requested, in designing their test plans to exploit the joint mission infrastructure capabilities, and facilitate scheduling. It will maintain close liaison with the JNTC Joint Management Office to
provide for coordination of the test community's participation in joint training events and exercised, as well as participation by the training and experimentation communities in test venues.
- Establish Management Oflice.
Execute the development and enhancement of the technical infrastructure and coordinate its operations. Develop, operate, sustain, and modernize the technical infrastructure;
provide configuration control; and provide program management services and customer support as required. Included a program manager, government labor travel and contractor support.
R-l Budget Line Item No. 119 Page 4 of 4
UNCLASSIFIED
Exhibit R-2A
Project Justification
UNCLASSIFIED
OSD RDT&E PROJECT JUSTIFICATION (R2a Exhibit)
APPROPRIATION/ BUDGET ACTIVITY
RDT&EI Defense Wide BA# 6
PE NUMBER AND TITLE
Date: February 2006
0605100D8Z - Joint Mission Environment Test Capability (JMETC)
PROJECT
PI00
C. Other Program Fundine Summary: Not Applicable.
D. Acquisition Stratew: Not Applicable.
,
E. Maior Performers Not Applicable.
R-1 Budget Line ltem No. 119 Page 5 of 5