MUNICIPAL CENTER FOR TEMPE, ARIZONA by John Anton Berg Submitted in Partial Fulfillment of the Requirements for the Degree of Bachelor of Architecture at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY June, 1965 Author Department of Architecture, ril 5, 1965 Certified by Thesis Supervisor Accepted by Chairman, Departmental Committee on Theses 1 5 Westgate, Apt. E-1 Cambridge, Massachusetts April 5, 1965 Pietro Belluschi Dean of the School of Architecture and Planning Massachusetts Institute of Technology Cambridge, Massachusetts Dear Dean Belluschi: In partial fulfillment of the requirements for the degree of Bachelor of Architecture, I respectfully submit my thesis, "A Municipal Center for Tempe, Arizona." Sincerely yours, John Anton Berg 2 U- _____________________ ACKNOWLEDGEMENTS I would like to acknowledge the following people for their work and support in the development of this thesis: Mr. Louis C. Cooper, City Manager of Tempe Mr. Harry Higgins, City Planner, Tempe City employees of Tempe for their help and cooperation in gathering information Mr. James Chilton for his help in maintaining a liaison with the City of Tempe and the gathering of invaluable data for the project. Mr. Richard Caviness for the gathering of site information and photographing the site. Thesis Committee for their advise and consultation I would like to give special acknowledgement and thanks to my wife Carolyn, for without her help I could not have completed my architectural training, and for her work in editing and typing this thesis document. 3 - U ~ - - TABLE OF CONTENTS Title Page - - - - - - - - - - - - - - - - - - - - - - - - 2 - - - - - - 3 - - - 4 - - - - - - - - - - - - - - - - 6 - - - Acknowledgements - - - - Table of Contents- - I. II. - - - - - - - - - - - - - - List of Illustrations- - - - - - - - - - - - - - - - - - - - - - - Statement of the Problem - - - - - 7 - - - - 8 - - - Population Projection- - - D. Organization of Government - - E. Scope of Problem - - - - - - - - - - - - - - - 8 - - - 9 - - - - - - - - - - - 10 - - - - - - - - 10 - - - - - - - 11 - - - - - - - 17 - - 17 - - - - - - - - - - - - - - C. - - - - - Desaeiption of City- - - - - - - B. - - - - - - - - General- - - - - - - - - A. Site Analysis - - Page - 1 - - Letter of Submittal- - Abstract - - - - A. Site Selection and Description - - - - - - B. Traffic Analysis - - - - - - - - - - - - C. Climate- - - - - - - - - - D. - - - - 1. Temperature- 2. Sunshine - 3. Atmospheric Pressure - 4. Winds- - - - - - - - 5. Humidity - - - - - - - 6. Cloudiness - - - - - - 7. Precipitation- - - - - - - - - - 19 - - - 22 - - - - - - - - - - - 22 - - - - - - - - - - - - 24 - - - - - 25 - - - 25 - - - - 25 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 26 - - - - - 26 - - - 26 - - - - - - - Geological Conditions- - - - - - - - - A - - - - - - - - - - - - - - - Landscape-Material E. 29 Spacial Analysis - - - - - - - - - - - - - A. Municipal Departments-------- - - - - B. Other than Municipal Functions C. Common Usage - - - - - - - - - - - 49 D. Tabulation of Spacial Requirements 51 Statement of Intent - - - - - - - - - 53 A. Symbolic Needs - - - - - - - - - - 53 B. Citizen Participation- - - - - - - C. Strengthening the Business Street- 54 D. Regional Character - - - - - - - - 54 E. Accessibility to Public- - - - - - 55 Bibliography - - - - - - - - - - - - - - - 57 III. IV. 5 - - - 31 31 47 - - - - 53 LIST OF ILLUSTRATIONS Page Fig. . . . Tempe, Arizona, 70 Years of Growth. . . . 1 - Tempe, Arizona Population Chart . 12 Fig. 2 - . . . 13 Fig. 3 - Population--Arizona vs. United States . . . 14 Fig. 4 - Actual and Vrojected Population Growth . . 15 Fig. 5 - Organization Chart, City of Tempe, Arizona. 16 Fig. 6 - Tempe Civic Center Site Study Map . . . . . 18 Fig. 7 - Site Map. . . . . . 20 Fig. 8 - Map of Tempe and surrounding cities . . . . 21 Fig. 9 - . 27 in Arizona. . . Climate for . . . . Tempe, . . . . . . . . . . . . . . . . Arizona. . . . . . . . . . . . 28 Fig. 11 - Employee and Space Data, Tempe Municipal . .. .. . . .. . . .. Complex . . .. 32 Fig. 12 - Summary Sheet, Municipal Complex Survey . . 33 Fig. 13 - Federal, State, and Local Government . . Employment in Arizona . .. .... 34 10 - Sun Angles. Fig.o .... 6 . .. . . . . . .. . . . ABSTRACT This thesis is a study of the needs of the City of Tempe, Arizona for the development of their proposed Civic Center. There are five major parts of this study. First, an analysis of the City's general problem of development which includes a description of the City, organization of the government, population projection, and scope of this study. Second, the site is studied from the general point of view of the climate and landscape material, to the specific site selection and traffic conditions around the site. The third part is a comprehensive study of spaces needed including; a description of the function, space allocation, and list of facilities. Fourth is a statement of the conclusion of the author about the data and of why he made the design choices that comprise the fifth part of this thesis. 7 I. STATEMENT OF THE PROBLEM A. GENERAL I selected the Tempe Municipal Center as a project for several reasons. First, Tempe is a city that is faced with a problem that is common to many small cities It today. is a city that is tangent to another large city and is surrounded by other smaller cities, all of which are growing and becoming more dense. This has the effect of taking a once clearly defined city and submerging it in a morass of growth that tends to make it an obscure entity. It will become less and less possible to clearly see or experience its extremities. For this reason, I believe we must develop clearly defined nodes or places in the city in order that its citizens can identify with it and establish a sense of ownership. I believe that a good deal of citizen apathy and consequent irresponsibility is due to the fact that no longer can they identify with their town other than in the sense that they live out in that general direction. In addition to the morass of houses that have been developed around the older city, they also are in danger of losing a sense of significance due to the growth of Arizona State University which is located in Tempe. I believe Tempe and cities like it need to give special care to the development of their civic center and other nodes, such as the main street, in order to overcome this problem. I have not tried to propose a monument that will give importance to the center by simple punctuation, but rather try to develop a unique area that produces a vital piece of environment for functions of civic government as well as a place for the public function of the Tempe citizens. I have concentrated on the experience of the participant in this environment rather than the design of a beautiful object for tourists' entertainment. 3. DESCRIPTION OF CITY In 1964, Tempe was a city of 43,445 undergoing a fantas- tically rapid growth. Most of this growth has taken form of a large increase in residential development rather than the development of an expanding business community. Its major economy is based on retail sales and the providing of services to a rapidly growing university and a large tourist trade. Its major attraction is its very pleasant climatic conditions through the winter months. Tempe Councilmen and businessmen are vitally interested in rejuvenating their business street, Mill Avenue, in order that they may better compete with the surrounding towns for the tourist trade, as well as attract a projected 30,000 student enrollment, plus faculty, that forms the university community, into their market place. They feel that this community center complex will play an important role in beginning this reconstruction. 9 C. POPULATION PROJECTION Tempe, in 1964, exceeded a prediction of its population made by the College of Business Administration, Arizona State University, by 3,445 people. This projection predicts that Tempe will have 60,000 people in 1970 (see figure 1). Figure 2 demonstrates graphically what this means in actual physical growth from 1894 to 1964. The City predicts that by 1980 it will have a population of 80,000 people. This project has been designed for a population of 96,000 people. The City feels that their growth will level off at about this number. This total population does not include students and faculty who do not live in Tempe, which is a large part of the projected student enrollment. This optimism about growth is based primarily on the comparative ratio of growth in Arizona and the United States generally (see figure 3). Figure 4 shows the projected population growth of Arizona from 1945 to 1970. D. ORGANIZATION OF GOVERNMENT Tempe has a City Manager form of government. The Manager is responsible for the administration of the government, while the City Council and Mayor form the primary policy making body. (See figure 5 on the Organization of the Government) 10 E. SCOPE OF PROBLEM This project will accommodate all of the functions of the municipal government with the exception of the Fire Department, i.e., Mayor and City Council, City Manager, Municipal Court, City Clerk, Finance, Personnel, Law, Planning, Building Inspection, Parks and Recreation, Public Works Administration, Public Works - Engineering, Public Works - Construction, Public Works - Property Service, Police. In addition, a public library facility, a little theater, post office, general lounge, and health office are part of this complex. I have added to the complex, space to accommodate exhibits both for the police station and the library, also, general exhibit space, commissary facility, cafeteria, and barber shop. In addition, I have provided office, as well as activity space, for such functions as 4H, Boy Scouts, Junior Achievement, Junior Chamber of Commerce, Civic Club Spaces. the Chamber of Commerce, and General I have not provided for a convention facility that the city is entertaining as part of this complex. 11 Fig. 1 TEMPE, ARIZONA POPUL ATION CHART THOUSANDS 60 50 40 30 20 POPUL ATION 1940 1950 1960 1964 1970 10 2,906 7,684 24,897 40,000 (est.) 60,000 (est.) 0 0 Q 0 0% 0 0% Sources: U.S. Bureau of the Census, U.S. Census of Population: 1960, Number of Inhabitants, Arizona, Final Report PC (1)-4A (Washington: Government Printing Office, 1960), Table 8, P. 9. 1964 and 1970 Estimates, Bureau of Business Services, College of Business Administration, Arizona State University. Rev. 6-64 12 Fig. 2 4 4 I, I----- I I S ~ I I I & I. S - - J I - - - - - I I I WI.. I T0W NSITE - poPp C ----WI..I ' L -, / 194 -1950 eI so AS t , .16 A . N KL1' I Wi 4, 'Ic --A 4, I ~~1 L / I 1 1955 -I 3 72 P' I AREA - 5T 70 30 TEMPE. MI ARIZONA 70 Years of Growth AREA -- 4 54 )1 Fig. POPULATION - 3 ARIZONA vs. UNITED STATES (Ratio Scale.) MILLION MILLION I 1910 1920 1930 14 1940 1950 1960 Fig. 4 ACTUAL AND PROJECTED POPULATION GROWTH IN ARIZONA MILLIONS 1945 1955 1950 15 1960 1965 1970 OROANIZATION CNAnT CITY OF TEMPE. ARIZONA q0 Hoi m . s-e. 1 II. A. SITE ANALYSIS SITE SELECTION The City of Tempe has appointed a committee to investi- gate possible sites for their Center. three alternative sites, A, B & B', They have proposed and C (see figure 6). Site C is located by the existing Tempe recreation area. This site offers the possibility of integrating the complex with those recreation facilities. The existing City municipal building is on site B & B prime. B prime is that section that contains the present city library. This site does not offer the possibility of using older structure as part of the scheme. These structures are not capable of being rejuvenated to serve their needs. This site, however, has the advantage that it is mostly owned by the City (see figure 6). Neither site C nor B has a frontage on Mill Avenue, the main business street. However, B & B' does have frontage on Fifth Street which is an important link to the University (see figure 6). I have chosen site A because I believe it has advantages of considerable merit over the other two sites. First, it is bordered on the north and southeast by Tempe Butte which is the most prominent visual form of the City. I believe that the complex can draw strength from this Butte as a visual backdrop for its own development. Secondly, site A has a frontage on both Mill Avenue and Fifth Street. The intersection of these streets forms the boundries of the site 17 on the south Fig, 6 CITY OF' TEMPE MARICOPA COUNTY ARIZONA T-1-N -P-4-E TEMPE CIVIC CEN' SITE STUDY MAI 18 The complex is therefore in the presence of the and west. This also will and out of the City. flow in major traffic help strengthen Mill Avenue and begin the rejuvenation of In addition, site A contains a the business district. This canal could provide large section of the Hayden Canal. irrigation for the site as well as be developed into an important part of the landscape development. Site A is also the location of the most depressed part of the older city, and its usage for the City provides an excellent opportunity Site A is partially owned by the to revitalize this area. City (see figure 7). owns, In addition to the lots that the City they have control over the streets and alleys and rights-of-way in this area which is a large percent of the Also, site. a of this large part site not presently is occupied by structures. B. TRAFFIC ANALYSIS Both Mill Avenue streets. Mill Avenue Phoenix and Mesa. 80, 89, 93. which has a link Fifth large It and Fifth is are heavily traveled Street the major connecting link to of Highway 60, 70, carries the traffic Street is the major link to the campus, off-campus to Transmission Road, student body. a major link Also, to Mesa, it is a and Scottsdale Road, a major link to Scottsdale (see figure 8). Mill is about 100 feet wide, and Fifth is 99 feet wide. Mill's average daily traffic in this section is 14,402 cars 19 I ~ K, - L .car4 v~ ! 4 AA51 I'-P 4 1~~ 4 1' I I OWND R~. O. 5TIET + A L&( V I CiTy - 000 -, TKAFFIC VoCL-i".x A 0 Y1(ACK!G RAIN ('3 L S CA L- t~C '-I IL I;;' 5 TH I 5Taf T +-71 315 '-* F'** U E t 1. T - I 4' 'P iii - - I -"--~ '4 --- - I - I - ll I -filA 11 ! T 4', Le -'l'r71l~1 -- ~-1~ 12 ],-~ " - ill _ I 8 I -Mr p I 71 i IM LU I----*& oil -- - 4 11 fZ . ~ nL "I - - -7 -- II,' r -li Fig. Alm 1 Ir 1.1 - "~4TFflTF1 ir'- 1~* J4no dt' 1J a en -~. rn L fill - 21 1 -I- r >1 LIZ >1 - I, * I U 4- - 4-( I IU --I going north and 13,621 cars going south (see figure 7). Fifth Street carries approximately 7,400 cars both ways. This site offers the possibility of bringing cars and services into the site both at Third Street and its most eastward boundry (see figure 7). This allows for an easy access to the public parking facilities and services. C. CLIMATE Arizona is divided into three distinct geographic areas-- a high northern plateau, central mountains, and a low southern desert. Each has its own typical flora and founa. Tempe is located in the desert region. This area is relatively low in elevation and dry, with hot summers and mild winters. Clear weather predominates, with most areas averaging 80 to 83 percent of the possible sunshine. Average rainfall in this desert area ranges from 3 to 10 inches a year (see figure 9). From the desert rise several substantial mountain ranges, and the broad river valleys lying between are irrigated. It is these valleys contain 80 percent of the state's population. that The irrigated areas produce exceptional yields in the fertile soil and have a long growing 1. Temperature season. Temperature in Tempe is characterized by extreme heat intensity. The problem for the architect is to counter the heat that penetrates into the building. 22 There are several things that can be done to minimize penetration. First, careful consideration must be given to the time lag characteristics of different materials and types of screening walls, in that, different walls conduct heat through them at different rates. If the architect can design a wall that will slow down heat penetration during the heat of the day, then when the temperature change occurs, penetration will reverse itself and the main body of heat will never enter the interior spaces. The following are examples of time lags of various materials: 8" block wall 8" brick wall 16" stone wall A 4 hours 6 hours 12 hours cavity wall has little value other than the material characteristic itself in alleviating the penetration problem unless the exterior side of the interior wall is covered by a reflective surface such as aluminum foil, or unless there is a movement of air through the cavity to prevent the heat from entering the interior wall. Second, heat penetration depends on the angle at which heat rays strike a surface. The maximum heat is transferred when the rays strike a surface at a 900 angle. So, if one can minimize the area of any surface that will be at 900 to the sun at any time, heat penetration will be minimized. This problem can be handled by the creation of an infinite amount of small 23 I surfaces on either exterior walls or roofs; rocks or rough textured wall materials. such as The use of and changing wall planes would also battered walls minimize that area that would be at 900 to the sun at any one time. Third, the color of a surface will influence heat penetration. A light smooth surface reflects the most heat where a dark coarse surface absorbs the most heat. Fourth, glass is a good conductor of heat, so a minimum of glass should be used on the walls that have the most exposure to the sun. Fifth, a maximum of shadow cast on the building, especially over penetrated areas, will serve to cut down heat penetration. Shadow may be the result of overhangs, recessed glass, proximity to other exterior structures or the proper location of vegetation. 2. Sunshine Sunshine in Tempe is characterized as being exceptionally bright and hot in the summer. The problem of sunlight is primarily one of shelter and glare, and exposure to the sunlight in Tempe is often a source of discomfort. Shelter from sunshine can be handled by properly orientating areas with respect to time of day, of maximum use, and angles of sun during those times of day. Glare poses a more serious problem in that 24 reflected glare off of exterior surfaces will serve to increase undesirable exposure. Rough textured surfaces such as mentioned when discussing heat penetration, on ground cover and adjacent buildings, in accordance with location of the sun, will eliminate the problem somewhat, both internally and externally (see figures 9 & 10). 3. Atmospheric Pressure Atmospheric pressure, in itself, poses no particular architectural problem other than it determines the direction of wind, as stated previously. 4. Winds Winds in Tempe are characterized by frequent wind and dust storms. Because of this, careful consideration must be given to the direction controlling of dust infiltration of the wind and the into the structure. All outside court areas must be oriented in such a way as to be protected from the winds. Careful detailing of doors and windows will help eliminate the dust problem (see figure 9). 5. Humidity The relative humidity in Tempe varies from normal to abnormal conditions. From April to July the air is extremely dry, and it is because of this fact that the control of humidity is important, relevant to Tempe. This extremely dry air can be a source of discomfort for the occupant if it is not controlled. Any type of air conditioning system to be used must be capable of controling the humidity 6. (see figure 9). Cloudiness The lack of cloudiness only serves to intensify the problems due to sunshine and temperature in the Tempe area. (see figure 9). 7. Precipitation The amount of precipitation for any day, week, month or year, is very small for Tempe. Therefore, the control of moisture penetration is not critical. However, this fact allows for the use of materials, structural systems and details that would not otherwise be possible. For example, the control of water drainage for a roof is a small problem. Synthetic and organic materials may combine and few, if any, problems will arise due to moisture. Also, drainage from the under side of a concrete slab or retaining wall is not difficult (see figure 9). D. GEOLOGICAL CONDITIONS The soil in this valley, which is bordered by Camelback Mountain, Four Peaks Mountains, South Mountain, and the Superstition Mountains, is considered to be Valley Fill. is a mixture of sand, gravel, and conglomerate. It Since this valley was formed by the Salt River, the soil was distributed 26 Fig. 9 CLIMATE FOR TEMPE, ARIZONA Jan. Feb. TEMP. r. Apr. Ma une uly Aug. Sept. Oct. Nov. Dec. Min. 8 42 46 52 61 69 78 75 70 57 46 39 Max. 63 68 74 81 91 101 102 101 98 87 75 68 % SUNSHINE 77_5 75j 8.6 6 83.8 86.9 72-8 3,9 83.4 A.M. E. -- -- W. -- -- S.E. -- - DIRECTION P.M. W. -- -- S.E. -- -- W. -- -- HUMIDITY MEAN PRECIP. 34J3 .7 .8 28 18 14 15 24 29 28 29 .45 .2 .1 .1 1.1 .8 .h ,.6 WIND .7 S.E. -W. -- -- 35 42 NOTE: 1. Atmospheric pressure in Tempe, Arizona is 14.11074# at an elevation of 1083 feet above sea level. 2. The percent of cloudiness is determined by subtracting the percent of sunshine, as shown in the above chart, from 100 percent. ATi'J 4UJL$ 27 -- .75 Fig. S U N 10 A N GLE S Date Time Altitude Azimnth June 21 Sunrise 6:00 AM 7:00 AM 0 degrees " 12 " 24 28 degrees north of east " " " " 21 " " " 13 37 50 63 " 11:00 AM 74 " 28 " " " " " " due east 10 degrees south of east " " " " Noon 81 " due south 1:00 PM 74 " 28 degrees south of west H 63 " 1degees 3:00 PR 4:00 PU 5:00 PM 6:00 PM 50 37 " " " Sunset 24 12 0 dae Met 7 deees serth of West " " 13 Sunrise 8:00 AM 9:00 AM 0 degrees " 10 " 20 28 degrees south of east " " " " 36 " " " " 46 28 " 59 33 35 33 28 20 10 " "# "f "f "s 73 due south 73 degrees south of west " f " o 59 " " N " 46 " " N " 36 0 " 2:00 December 21 7 8:00 AM 9:00 AM 10:00 AM 10:00 AM 11:00 Noon 1:00 2:00 3:00 4:00 AM PM PM PH PM Sunset 28 4 " " " " " 21 28 " " " " " " " " " " " " " " " '9 " in the following layers starting at the top: sand and gravel, caliche and gravel, cobbles, boulders, and bedrock. Each of these layers runs from 611 to 15' depending on the Since the soil is very dry and dense and some location. caliche exists, some areas have extremely high bearing capacities. In all cases, however, soil tests of any particular site are necessary to determine actual soil bearing values. E. LANDSCAPE MATERIALS Since Tenpe is an area under irrigation, almost any kind of plant will grow provided it is protected from the sun according to its resistence to sunlight. Also, plants must be protected from frost if necessary, but not from any sustained freezing. The indigenous landscape material of the area is all desert plants such as the saguaro, prickly pear, ocotillo, cholla, and fish hook cactuses, palo verde tree, etc. In addition to these plants, many plants such as the date palm, fig, and citrus trees have been developed as part of the city landscape. In addition, the university campus has a wide range of plant development. Here is a list of some of those, categorized into tall, medium, and low plants: Tall: Olive Tree Carob Tree Victorian Box Tree Fan Palm Tree 29 Medium: Crape Myrtle Brazillian Pepper Latifolia Bird of Paradise Yew Pine Loquat Pyracantha Peruvian Pepper Low: Sago Palm Bamboo Palm Flax Pampous grass Blue Fescue Tamarix Juniper Heavenly Bamboo Natal Plum Evansii Mock Orange 30 III. SPACIAL ANALYSIS The projections of number of employees and space needs are based on a study made by the City of Tempe. is based on the projection of each department needs. The study is summarized on figure 11. This study of their own This data was then compared to similar requirements of other western cities (see figure 12). The study shows a rather significant increase in personnel which seems to be substantiated by a study made by the Employment Security Commission of Arizona (see figure 13). For functions other than the municipal government and police, the space requirement is an estimate made by the City. The parking requirement is based on what the City feels is a minimum site area to total ratio of 2.5:1. floor area Spacial requirements of functions such as cafeteria and exhibit and unassigned space which are not part of the City's program are estimates made by the designer. The listing of equipment is only an indication of some of the essential equipment of those departments. given in A. All floor area is square feet. MUNICIPAL DEPARTMENT 1. Mayor and City Council a. Description of Function The and for for Mayor is the presiding officer of the Council is recognized as head of the City government all ceremonial purposes and by the governor purposes of military law and civil defense. Neither the Mayor nor any Council member has any administrative duties. Policy making and all other powers of the City are vested in the Council. 31 SUMMARY SHEET EMPLOYEE AND SPACE DATA TEMPE MUNICIPAL COMPLEX Compiled by the City of Tempe Planning Department DEPARTMENT (DTVTSTON) GENERAL GOVERNMENT Council Chambers NO. OF GMPIDYEES PROJECTED* EXISTTNG SPACE ALLCCATIONS** SQ. FT. PROJECTED EXIST 792 2,510 552 1,875 3 0 326 630 2,200 3 22 6 45 580 1,887 3 7 440 3 ~3 7 ~0 525 1,300 6,583 1,575 1 ,50 BUILDING INSPECTION 7 13 475 1,650 MUNICIPAL COURT 3 7 980 4,050 PARKS AND RECREATION 6 13 835 4,275 POLICE 41 154 2,04o 15,000 PUBLIC WlRKS Administration Engineering Construction 3 10 1 8 22 6 450 1,500 3, 380 650 1 T~ h -- -- City Manager h Personnel Lobby and Receptionist 0 1 h City Clerk Finance and Purchasing Legal Department Planning Department TOTAL GENIL G0VERNMENT Property Service TOTAL PUBLIC WORKS 550 150 150 1,7, -- -- 0 HEALTH OFFICE -- -- 0 108 307 REMARKS 450 18,000 500 _a GRAND TOTAL October 1964 , LITTLE THEATRE I - This would be a multi-purpose facility, seating 500, for cultural presentations, public meetings, etc. This would be a City Health Service with visiting nurse. 10.732 67. 778 J *Figures based upon an estimated population of 96,000 persons by 1980. **Figures do not include rest rooms, corridors, closets, mechanical equipment rooms, etc. Tabulation of Data From SUMMARY SHEET MUNICIPAL COMPLEX SURVEY Conducted by the City of Tempe Planning Department - October 1964 SITE POPULATION CITY 1 Albuquerque, N. M. 2.Alhambra, California Ill. 3 Arlington Heights, 4 Barstow, California 5 Bellevue, Washington 6 7 8 9 10 11 12 13 Buena Park, California Clovis, New Mexico Concord, Calif ornia Filluore, California Fullerton, California Golden, Colorado Hemet, California Henderson, Nevada 14 La Mesa, 15 16 17 18 19 20 California Los Altos, California Los Altos Hills, Calif. Mesquite, Texas Mountlake Terrace, Wash. Palm Springs, Calif. Paso Robles, California 21 Prescott, Arizona 22 23 24 25 26 Redondo Beach, Calif. San Jose, California Santa Paula, Calif. Saratoga, California Tacoma, Washington 27 Torrance, California 28 Turlock, California 29 Westinister, Colorado TEMPE, ARIZONA (existing) TEM . ARIZONA (proposed) CURRENT 240,000 61,000 40,000 14,500 18,000 63,000 27,000 62,000 5,475 70,000 8,500 8,000 18,100 32,800 23,300 3,472 45,000 13,143 18,520 7,000 15,000 54,000 320,000 15,050 18,550 151,300 126,000 10,200 18,000 NO. I PROJECT* 500,000 120,000 55,000 25,000 30,000 88,000 70,000 90,000 7,500 130,000 15,000 20,000 35,000 50,000 NA 10,000 70,000 20,000 NA 15,000 30,000 NA 400,000 20,000 40,000 250,000 None 30,000 25,ooo 44,000 96,ooo OF EMPIDTEES 1,725 427 260 102 126 241 189 434 38 493 60 56 127 230 163 24 315 92 127 49 105 378 2,240 105 130 1,059 880 FLOOR AREA (SQ. FT.) 103,820 49,600 34,000 27,000 17,250 15,598 12,000 12, 200 (ACRES) 3.,o4 3.21 4.50 24.00 8.00 12*26 1.00 1.25 3,850 46,274 1.75 3.75 17,279 13,924 13,000 12,120 7,000 2,000 17,700 17,800 4.82 2.00 2.50 1.50 10.00 metered niarkimr VISITORS 126 SPACES I Sff NA 10 NA 123 31 10 38 34 NA *A 26 NA 25 95 139a 50 5i' 87 13, 81 39 32 32 58 33 58 25 57 NA 33 Im 62 19.52 8.00 k0 20 17,487 100 6,250 19,000 2.50 NA 50 NA 1.00 4la 33,415 4.13 60 154,000 12,050 7,500 30.00 1.60 7.00 50 358,368 232,410 8,600 .6,010 300 10,732 67,778 3.00 8.73 51.00 33 100 251 70 600 12 20 258 187 214 10.00 70 4.5 10 25 25 1.66 32 50 *Estimate of populati on which could be served by existing facility without expansion. 4indieates OFF-STIEET PARKII 12.55 71 126 670 AREA -- Fig. 13 FEDERAL, STATE AND LOCAL GOVERNMENT THOUSANDS EMPLOYMENT IN ARIZONA 160 1* 1950-1962 WITH PROJECTIONS TO 1973 *0 / 140 1* / 120 I* / / / / / / / / / / / / TOTAL STATE f AND LOCAL 100 0 80 l* 60 1e 40 0 S ow w FEDERAL ap 20 lo 0 0 0 0 0 0 a 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 '50 '60 '61 '55 34 '62 '66 '73 b. Personnel Mayor Council Members (6) Staff (5) Guests (150) c. Spaces (1) Council Chamber- - - Council seating Staff seating Guest seating - - - - 260 - 150 1,600 - - 2,010 Equipment: Posting Board Blackboard Storage Cabinet Custom built Council raised platform & table combination plate glassed tops for 7 people in semi-circular pattern with on & off switches Dynamic Cardioid Microphones Name Plates (7) Arizona State Flag, pole & stand Flag, pole & stand U.S. MX6 Power Supply Units (2) Bogen Amplifier - 2 speakers Wall Clock Thermo-Fax Overhead Projector Picture Screen with Stand (2) Mayor's Office - 3 Drawer Equipment: (3) Conference Room- - - - - - - 2. - - - - - - - 200 File Cabinet (legal) -50 - - - - - - - 300 (5) Public Toilets - - - - - - - - 115 Total Space Requirement - (4) Foyer- - - d. - - - - - - - - - - 3,125 Sq. Ft. City Manager a. Description of Function The City Manager's Office is responsible for the proper administration of the affairs of the City Government. This office must be continually needs, and programs aware of the activities, within the City Organization as well as related activities, needs and programs of the community and its environs. b. Personnel City Manager Assistant City Manager Secretaries (2) Adminitrative Assistant (2) Administrative Intern Clerk c. Spaces (1) Manager's Office - - Equipment: - - - - - Bookcase Posting Board (2) Assistant Manager's Office (3) Manager's Secretary- Equipment: - 400 - - - - - - 4 Drawer Files - - 200 - - 100 (7) 6 Drawer Cardex Assistant (5) Administrative Equipment: d. 3. 100 150 4 Drawer File (legal) Interns Administrative (7) Clerk- (8) Conference Room- - - ----- Assistant (6) - - - - - - - - - - - - - - - - - - - - - - Total Space Requirement- Municipal a. Secretary- Manager's (4) - - - 200 - - 100 - - - 625 - - 11,875 Sq. Ft. Court Description of Function Responsible for the administration, establishment and control of all Municipal Court functions. Included is adjudication and deposition of all misdemeanor charges originating within the City limits of Tempe. b. Personnel Magistrate Clerk-Steno Steno (2) Secretary Clerk Prosecuting Attorney 700c. Spaces (1) Courtroom- - - - - - - - - - 11,500 (2) Prosecutor - - - - - - - - - - - - 200 (3) Fines Clerk- - - - - - - - - - - - 350 - - - - 250 Legal Size Files Adding Machine Equipment: (4) Judge's Chambers - - - - - - - (5) Stenographer - (6) Clerk-- - - - (8) Foyer- - - - - - - - - (7) Stenographer - - - - - - - - - - - - - - - - - - - - - - - - - - - - 200 - - 200 - - - 200 - - 150 - - - - - - - - - - 400 (10) Conference Room - - - - - - (11) Interview Room- - - - - (9) Jury Room- - 4. - Blackboard (wall) American Flag Arizona State Flag Wall Clock Equipment: d. - - - - - - - - - 300 - 300 Sq. Ft. Total Space Requirement- City Clerk a. Description of Function The City Clerk's primary duty is to the City Council. secretary that of Also, the City Clerk is the official recordkeeper of City documents. b. Personnel City Clerk Assistant City Clerk Secretary Clerk/Steno Clerks c. (2) Spaces (1) Foyer/Reception- 37 - - - - - - - - 400 -4,05 (2) City Clerk - - - - - - (3) Assistant City Clerk - - - - - - - - - - - 200 - - 150 (4) Clerks - - - - - - - - - - - - - - 200 (5) File Room, etc.-- - Equipment: - - - - 300 walls above Cabinets to line file cabinets; these are to house volumes of minutes, ordinances, (6) - - - Walk-in Vault-- - - - - - etc. supplies, - - - - - 50 Equipment: File Cabinets to house election files, formal bids, etc. d. 5. Total Space Requirement- - - - - - - 1,300 SQ.FT. Finance Department a. Description of Function the responsible for The Finance Department is accounting, billing, collection of revenue, and expenditures of the City pertaining to utilities, improvement assessments, permits, licenses and taxes. b. Personnel Finance Director Administrative Intern Clerk-Steno (2) Clerks (10) Accounting Clerks (6) Clerk Typists (12) Custodial Service Representatives (2) Meter Readers (8) Purchasing Agent Assistant Purchasing Agent Auditor c. Spaces (1) Lobby, PBX - Control System Area - 196 - - - - - - - - - 550 (2) Billing Clerks - (3) Duplicating & Office Supplies- - - 340 38 (4) Machine Accounting - - - - - - - 2,100 (Humidified & Soundproofed) Equipment: Printing Calculator (2) Electric Adders (4) Bookkeeping Machines (2) Posting Machine Addressograph Machines (2) Feeder Frame for Addressograph cabinet for 70 Drawer file Addressograph plates 4 Drawer File Files on Wheels (3) Mail Opener Stamp Machine Metal Table on Rollers Wall Clock Sectional Files Protectograph Signer Counter, Knee Hole Type (30! x 80" x 42"?) Counter, Open type pdegeon hole (30? x 160? x 42") Master Safe on Wheels 4 Drawer Files (legal) (2) Cashier Counter, solid front, raised top in middle (11' x 361?) (5) Clerk, Assistant & Auditor - (6) Cashiers & Lobby - - - - - - - - - - 250 - - 592 Equipment: Counters - 50 lineal feet (7) Accounting (8) Steno- - - - Equipment: (9) - - - - - - - - - - - 480 - - - - - - - - - - - - - - - 200 - - Finance Director's Equipment: 200 Files Office Bookcase 4 Drawer Files (10) Safe, Walk-In (Humidified) (2) - 200 (11) Archieves & Storage (Humidified)- 675 (12) Microfilming (Humidified) - 39 - - - 300 (13) Conference & Meter Readers- d. 6. - 500 6,583 ------ Total Space Requirement- - Personnel a. b. Description of Function Responsible for interviewing prospective personnel and keeping personnel records. Personnel Personnel Officer Assistant Secretary Clerk c. Spaces (1) Personnel Officer- (2) Assistant- - - - - - - - - - - - - - - - 200 - - 150 (3) Secretary, Clerk, and Interview - - - - - - - - 280 Requirement- - - - - - - - 630 Sq. Ft. Cubiclesd. 7. Total Space - - - Law Department a. Description of Function The City Attorney is a full-time appointed official whose primary functions are to advise the City Council and the Administrative Staff on legal matters; to represent the City of Tempe in all court actions; to review proposed ordinances, contracts, etc. from the standpoint of legality; to draft all legal documents and to perform such other legal duties as may be required. b. Personnel City Attorney Assistant City Attorney (2) Secretaries Clerk-Receptionist c. (3) Spaces (1) City Attorney- - - - - - - - - Equipment: Calculator Built-in Credenze 40 - - 225 (2) Assistant City Attorney- Equipment: Equipment: d. 8. - - - 600 Credenzas Built-in (3) Secretaries- - - - - - - - - - - - - 200 Filing Cabinets (4) Reception and Foyer- - - - - - 300 (5) Law Library and Conference - - - - 255 - Total Space Requirement- - - - - - - - 11,575 Sq. Ft. Building Inspection a. Description of Function The Building Inspection Department functions principally for the purpose of regulating efficiently all building construction within the municipality in the interest of public safety, health, istration property and welfare through the admin- of the Municipal Building Code, Electrical Code, Plumbing Code, and Zoning Ordinance. b. c. Personnel Director Building Inspectors Plans Examiner (2) Clerk-Stenographer Clerk-Typist (3) (6) Spaces (1) Director - - - Equipment: (2) Inspectors (3) - - - - - - - - 200 4 Drawer File Plan Hold Files Book Shelves (3) - Plan Examiners - -- - - - - - - - - 600 - - - - - - - - 250 (4) Clerk-Stenographer - Equipment: - - Counter - - - - - - 100 (30" x 120?) Adding Machines (2) Tray on Wheels Bulletin Board for Zoning maps 41 (5) Public and Clerical- d. 9. - - Total Space Requirement- - - - - - - - 500 - - - 11,650 Sq. Ft. Planning Department a. Description of Function The Planning Department administers the Zoning Ordinance and Subdivision Ordinance, assists the Planning Commission and Board of Adjustment, and prepares reports and planning presentations for the City Manager and other Department Heads. b. Personnel Director Planner Planning Analyst Planning Aides (2) Secretary-Receptionist Clerk-Steno c. Spaces (1) Director - - - - - - - - - - - (2) Planner- - - - - - - - - - - (3) Drafting - - - - - d. 10. - - 150 - - - 300 - - - - - - - - - - - - - 100 (5) Clerical and Public- (6) Files- - - - - - 200 Drafting Table Equipment: (4) Analyst - - - - - - - - - - - - - - - - - 400 - - - - 200 - - Total Space Requirement- - - - - - - 1,650 Sq. Ft. Parks and Recreation a. Description of Function Operates Tempe Beach Swimming Pool, golf course, Offers arts and crafts cemetary and parks. programs, particularly for senior citizens and children, cultural program for children and adults, etc. 42 b. Personnel Director Assistant Director Clerk-Steno Clerk-Typist (3) Recreation Supervisor (3) Recreation Specialist Aquatic Supervisor Maintenance Supervisor Landscape Architect c. Spaces (1) Directorts Office- - - - - - - - - 250 (2) Assistant Director - - - - - (3) Clerk-Steno- - - - - - - - - - - - 125 - - - 150 (4) Recreation Supervisor and Specialist (5) Clerk-Typists- - - - - - - - - - - - - - - - 300 - - - - 500 (6) Recreation Supervisors and Aquatic Supervisors- - - - 225 (7) Maintenance Superviso r (8) Landscape Architect- - (9) Conference Room- - 11. - - - - - - - - 150 - - 600 - - - - - - (11) Storage Room- - - - - - - - - - - 350 Total Space Requirement- - - - - 4,275 Sq. Ft. Publ ic a. - - - - 125 - (10) d. ------ Crafts Area - - - - 1,500 - Works Administration Description of Function The Public Works Department is responsible for providing such services as construction and maintenance of water and sewer lines, maintenance of sewerage treatment plant, street maintenance, irrigation, refuse collection, maintenance of all City properties including parks, vehicles, and buildings and grounds. It also has the responsi- bility of checking and inspecting all installations and facilities on City property and within street 43 rights-of-way so that they meet with the numerous City requirements. b. Personnel Director Assistant Administrative Assistant Secretary (2) Clerks (3) c. Spaces (1) Director's Office- - (2) Assistant- - - - - - - - 200 - - - - 150 - - - (3) Administrative Assistant (4) Secretaries- - - - - - - - - - - - - - - (6) Conference Room- - - - - - - (5) Clerks - - 150 ----- - - 200 Files, legal & letter size Equipment: 12. - - - Bookshelf Equipment: d. - - - - - - - - - - - 300 - 300 Total Space Requirement- - - - - - - 1,500 Sq. Ft. Public Works - Engineering a. Description of Function The Engineering Office is responsible for the checking of final plans and the inspection of all new subdivisions, and in some instances initial planning and design for all types of construction performed within City of Tempe rights-of-way, such as streets, sewers, water lines and off-site improvements for commercial developments. b. Personnel City Engineer Assistant City Engineer Civil Engineer (3) Engineer Aides (9) File - Engineer Aide Blueprint - Engineer Aide Lab - Engineer Aide Field Crews - Engineer Aides (3) Small Office - Engineer Aides (2) AA c. Spaces (1) City Engineer- - - - - - - - 200 (2) Assistant City Engineer- - - - - - 150 - - - - - - - 450 - - - 1,000 (3) Civil Engineers- d. 13. - - (4) Office Engineer Aides- - - (5) File Engineer Aides- - - - - - - - 130 (6) Blueprint Engineer Aide- - - - - - 150 - - - - 200 (7) Lab Engineer Aide - - - - (8) Field Crews- - - - - - - - - - - - 100 - - - - - 3,380 Sq. Total Space Requirement- Public Works a. - - - - Ft. Oonstruction Personnel Superintendent Supervisors (4) Secretary b. Spaces (1) Superintendent - - (2) Supervisors-----(3) Secretary- d. 14. - - - - - - - - - - 150 - - - - - - - 400 - - - - - - - - - 100 Total Space Requirement- - - - - - - - 650 Sq. Ft. Public Works - Property Service a. Description of Function Responsible for maintenance and janitorial services of the buildings within the City, and for the care of more than 60 acres of parks and grounds throughout the City. All vehicular primary maintenance for every department within the City organization is handled by this section. b. Personnel Superintendent Supervisors (2) Secretary 45 c. Spaces (1) Superintendent - - - - - - (2) Supervisors- - - - - - - - - - - - - 150 - - - - - - 200 - - - - - - - - 100 Total Space Requirement- - - - - - - - 450 Sq. Ft. (3) Secretary- d. 15. Police a. Description of Function The prime functions of the Police Department are the preservation of the public peace and order, the prevention and detection of crime, the apprehension of offenders, the protection of persons and property, and the enforcement of the laws of the State and the ordinances of the City. b. Personnel Chief Captains (3) Lieutenants (4) Sergeants (14) Dispatchers (6) Clerks (10) Patrolmen (100) I.D. (4) Detectives (12) c. Spaces (1) Chief's Office - Equipment: (2) - - - - - - - - - - - - - - - - - 240 - - 400 File Cabinet Cabinet with Shelves (5) Interrogation and Viewing- - - 46 - 450 Files (3) (4) Detectives Office- - Equipment: - 200 Files (3) Lieutenants' Office- - Equipment: - - - Radio Monitor Receiver Tape Recorder Captains' Office - Equipment: - - - 200 (6) - - - Office Sergeants' (7) Squad Room - - - (8) Records------ - - 750 - - - - - - - 900 - - - - (10) Dispatcher- - - - - (12) - Evidence Room, N;aul t - - - - - - 240 - - - 120 and I.D. - - - - - Laboratory - - - - - - 500 Waiting Room- - - - - - 700 - - - - (13) Classroom - B. - - - (11) d. - - - - - - - 200 Stor age Cabinet Equipment: (9) Stenos - - - - - - - - - - - - - 750 (14) Additional Offi Ces- - (15) Storage - - - - - - (16) Show-Up - - - - - - - - - - - (17) Locker Room - - - - - - - - - - (18) Gymnasium - - - - - - - - - - - 4,000 (19) Cells - - - - - - - - - 3,000 (20) Kitchen - - - - - - - - - - - - - 200 (21) Miscellaneous - - - - - - - - - - 900 (22) Public Toilets- - - - - - (23) Staff Toilets - - - - - - - - - - - - - - - - 750 - - - - - 200 - - - - - - Total Space Requirement- - - - - 300 - - - 1,500 336 - 532 -17,368 OTHER FUNCTIONS 1. Central Library a. Description of Function The Library's primary responsibility is to provide reading material to the public. In addition, it will provide assistance in the use of the Library to adults as well as provide early library It is responsible training for small children. 47 for gathering and maintenance of library materials. b. Personnel Library Director Librarian (5) Librarian - Part time (2) Clerk Typist (2) Library Aid (2) Page (2) c. Equipment Dictionary Stand Magazine Rack Book Stacks Globe Clocks Auto-Page Book Depository Card Catalogs Book Truck Filing Cabinets Bulletin Board Water Cooler Adding Machine d. 2. Total Space Requirement - - - - - - 50,000 Sq. Ft. Little Theater a. Description of Function This theater would provide a multipurpose facility seating 500 people for cultural presentations, public meetings, etc. b. Spaces Lobby Seating Area Stage Area and scenery loft Scenery shop back stage Public Toilets c. 3. Total Space Allocation- - - - - - - 18,000 Sq. Ft. Post Office a. Description of Function This is a Federal facility to provide post office It requires good service business to the City. and parking and loading space of approximately 30,000 Sq. Ft. 48 b. 3. Total Space Allocation - - - - - - 16,400 Sq. Ft. Unassigned Space a. Description of Function This space is to be adjusted to the varying uses of different civic functions. b. Typical Functions Chamber of Commerce Junior Chamber of Commerce Veteran Groups Service Groups Professional Groups General Civic Club Function 411 Boy Scouts Girl Scouts Junior Achievement c. 4. C. Total Space Requirement- - - - - - - 2,000 Sq. Ft. Health Office a. Description of Function Supervision of the general health problems of the community. b. Total Space Requirement- - - - - - - - 500 Sq. COMMON USAGE 1. Lobby and Reception a. Description of Function This is the main lobby for the whole complex. It will provide information about the complex and city services to the public. b. Personnel Receptionist Switchboard Operator Communications Clerk C. Siaces (1) Lobby- - - - - - - - - (2) Reception- - - - - (3) Switchboard- - - 49 - - - - - - - - - - - - - 100 - - - - - 100 - - - 2,000 Ft. d. 2. Total Space Requirement- - - - - - - 2,200 Sq. Ft. General Lounge and Rest Rooms a. Description of Function This is a common facility for all staff members of the complex. It is a place for relaxation and social conversation. b. c. 3. Spaces (1) Lounge - - - - - - - - - - - - - 3,250 (2) Rest Rooms - - - - - - - - Total Space Requirement- - - - - - - - 750 - - - 4,000 Sq. Ft. Cafeteria a. Description of Function Dining area for staff in the complex. b. Spaces (1) Dining - (2) c. 4. 5. Kitchen - - - - - - - - - - - - - - 1,500 - - - - - - - 1,100 - - - - - - 2,600 Sq. Ft. - Total Space Requirement- Staff Rest Rooms a. There are two rest room/lounge areas integrated with the municipal administrative areas and unassigned space areas. b. Total Space Requirement- - - - - - - - 500 Sq. Ft. Exhibition Space a. Description of Function Public exhibits for the enjoyment and instructinn of the citizens. b. J Areas Library Police General c. Total Space Requirement- 50 - - - - - - -,000 Sq. Ft. - - - - - 6. Circulation- - - 7. Mechanical Equipment - - 8. Parking - - Municipal Parking (1) Post Office- - - - a. - - - (2) Police - - - - - - - - - D3. - - - Parking - - - - - - 19,742 Sq. -- Ft. Approx. 30,000 Sq. Ft. - - Approx. 60,000 Sq. Approx. (3) Public Works-----(4) Staff- - 14,956 Sq. Ft. Ft. 30,000 Sq. Ft. - - Approx. 201,000 Sq. Ft. - - Approx. 80,000 Sq. Ft. b. Public c. Total Space Requirement- - Approx. 401,000 Sq. Ft. TABULATION OF SPACIAL REQUIREMENTS 1 C4 +Coi I anA Ma Y or - - - - Sq. Ft. -3, y7 2. City Manager - - - - - - - - Sq. Ft. -1, 3. Municipal Court- - - - - - - - Sq. Ft. -4, 4. City Clerk - - - - - - - - Sq. Ft. -1, 5. Finance Department - - - - - - - - - - - 6,583 Sq. Ft. 6. Personnel- - - - - - - - - - - - - - - - 630 Sq. Ft. 7. Law Department - - - - - - - - Sq. Ft. -1, 8. Building Inspection- - - - - - Sq. Ft. -1, 9. Planning Department- - - - - - Sq. Ft. -1, Sq. Ft. -4, - - - - 10. Parks 11. Public Works - Administration- Sq. Ft. -1, 12. Public Works - Engineering - Sq. Ft. -3, 13. Public 14. Public Works - Property Service- and Recreation------ - works - Construction- - - - - - - 51 - - - 650 Sq. Ft. 450 Sq. Ft. - - - - - - - - - 15. Police - 16. Central Library-- 17. Little 18. Post Office------ 19. Unassigned 20. Health Office- --- 21. Lobby and Reception- - 22. General Lounge and Re st 23. Cafeteria- - 24. Staff Rest Rooms - - - 25. Exhibition Space - - 26. Circulation------ 27. Mechanical Equipment - Theater - Space - - - - - - - - - - - - - - - - - - - - - - - Parking- - - - - - Ft. - - - - - 16,400 Sq. Ft. - - - - 2,000 Sq. Ft. 500 Sq. Ft. - 2,200 Sq. Ft. - - 4,000 Sq. Ft. - - - - - - - - - - - - - - - - - - - - - - Rooms- - - - - 52 Ft. - 18,000 Sq. - - - - 50,000 Sq. - - - - - - - - Ft. - - - - - - - - - - - - 2,600 Sq. Ft. - - - - - - - - - 500 Sq. Ft. - - - - - - - - - - 3,000 Sq. Ft. - - - - - - - - - - 14,956 Sq. Ft. - - - - 19,742 Sq. Ft. - - 183,939 Sq. Ft. - - 401,000 Sq. Ft. - - - - - TOTAL INI ERIOR SPACE 28. - - - 17,368 Sq. - - - - - - - IV. STATEMENT OF INTENT The particular solution that I have proposed for this thesis project is primarily the result of a search for an image of civic government in general and specifically an image congenial to the needs of Tempe. This search was undertaken under the constraints of what I consider to be real and important design contingencies that have a direct bearing on the results that I have developed. A. SYMBOLIC NEEDS First, I felt that the bureaucratic or administrative function of this project should not dominate the project in importance by shear size or by submerging the court and policy making and leadership functions into undiferentiated structure. I felt they needed to be given the importance they merit in regards to the gravity of their work and symbolic significance as the representative body of the people. I felt that the services of the City should form the supporting structure as they are the supporting functions. B. CITIZEN PARTICIPATION Secondly, I felt very strongly that there is a great need for the people of the City to have a sense of participation in this complex as they should in their government. This lead to the development of a shaded pedestrian street that locates the people in close proximity to the services that are offered. On one side of the street are the services and on the other are 53 The spaces where the citizens can actually be a part of functions going on in the complex. These functions are the exhibition spaces, the little theater, crafts area, club space, etc. So the complex has a band of spaces on the south and west periphery that are services and parallel to that are a band of social function spaces. I expanded the gymnasium facility of the police in order that the possibility would be present for the police to offer classes to the young men of the community so that a better relationship might be developed between the law enforcement and the future adult citizen. In addition, I felt it should be possible for the whole staff of the city to use that space. C. STRENGTHENING THEl1 BUSINESS STREET Thirdly, as stated earlier, there is a need to strengthen the business street (i.e. Mill Avenue), major municipal function on that street. so I located the As one moves down Fifth Avenue east, the complex changes from municipal function to cultural function which are more congenial to the residential development in that area. This progression ends with the library which has a need for the quieter condition of that part of the site. D. REGIONAL CHARACTER Fourthly, there is the development of the regional character of the structure. Here the need for an image that was particularly characteristic of T mpe lead me to choose 54 the site that had the worst possible sun control problem. In site "A" streets. (see figure 7), the orientation is to the major The same direction that the most severe sun was coming from. This allowed for the development of the sun screen control to block out the sunlight and prevent severe heat penetration into the structure. In addition, it allows for a view through the louvers down to the street. An attempt was made to minimize flat roof area in order to give the maximum shelter with the sun control device. form, in addition, aids the flow of air toward the moving over the surface of the inclosed space. This top Since the inclosed space is generally free of direct sunlight, large glass area could be used. This eliminated the necessity for heavy masonry walls to slow down heat penetration that eventually carries the heat, in any case, into the structure. Since the glass area allows for immediate transfer of heat and in addition it offers the possibility of large opening surfaces, then heat could be removed from the structure by simple ventilation in the evening hours. Since it is desirable to minimize the volume of air conditioned space, I developed a large percent of exterior circulation, thus cutting down on the interior corridor needs. E. ACCESSIBILITY TO THE PUBLIC Fifthly, a large covered parking area is provided in a location that encourages pedestrian movement through the complex as well as makes the complex accessible to the public. One of my classmates like is a commented that shopping center than a city my solution complex, was more and indeed it a shopping center for services provided by the City for its citizens. 56 BIBLIOGRAPHY 1. Anderson, L.3., H.L. Beckwith, and Burnham Kelley. Survey for a Proposed Town Office Building, June 1948. 2. Aronin, Jeffrey Ellis. New York: Climate and Architecture. Reinhold Publishing Corp., 1953. 3. Carrier, Willis H. and Vntilating. 4. Charter 5. City of Tempe. 6. Civic Center Site Selection Committee Meetings, Minutes Modern Air Conditioning, Heating Syska and Hennessy, Inc., 1960. for City of Tempe. Tempe, Arizona, Aug. 1964 Annual Budget, Fiscal Year 1964-1965. dated 9/15/64, 10/21/64, 11/4/64, 12/9/64, 1/6/65, 1/13/65, 2/3/65, 2/24/65, 3/3/65, 3/23/65. 7. Critchfield, Howard J. Prentice-Hall, Inc., 8. Employment Security Commission of Arizona, Unemployment Compensation Division. The Economy of Arizona, Feb. 1964. 9. Higgins, Harry. Reports and Recommendations on Research of the Administrative Staff to Site Selection Committee, 12/7/64. General Climatology. 1961. N.J.. 10. Hook, Ralph and Jack Kekar. Arizona, June 1964. 11. International Conference of Building Officials. Building Code. Los Angeles: 1958. 12. Neuberger, Hans H. and F. Brisco Stephens. Weather and Man. Englewood Cliffs, N.J.: Prentice-Hall, Inc., Economic Data, Tempe, Uniform 1961. 13. Olgay and Olgay. Solar Control and Shading Devices. Princeton, New Jersey: Princeton University Press, 1957. 14. Phoenix Chamber of Commerce. Directory in the Phoenix Area, October 1964. 15. Salt River Project. Salt in Brief, May 1963. 57 River Project nufacturers - Ma acts 16. Tempe Fire Department, William Hanna, Fire Chief. Tempe Fire Department Status Report, August 1964. 17. Valley National Bank, Research Department. Review Statistical 58 Arizona Munlicpal Cenftr ii -- 'I- -~n. for Trnpe Arlnon £ac. ofArch.Thei, Wi.t, 1966 John Anon Berg L ~ -b ---1 Iv I r~I2 1 3-~wwm-r4see Fi V.L~ 17 'ii L.1 rn II ~ 1.... ... ... Q=D T771! TLt .- - - - .---.- L ..- ?b t.. . -t-o - I Sec .. d Floor Pia - Am IB0 7 VERTICAL I 4j--- j7 .16.01 - ------ 1-- IIIW,i1 Settles A-A f- 5.tV I. - I -I e $**ties U.U